1) Prerequisites, Requirements and Intents
• Memorize the information regarding prerequisites to
become a LEED AP
• Know the definitions and goals of each USGBC standard
• Know the purpose/intent of each credit category
2) Minimum Program Requirements (MPRs)
• “All projects applying for LEED certification must meet a set of minimum program
requirements” according to the USGBC
• The Minimum Program Requirements (MPRs) are the minimum characteristics or
conditions that make a project appropriate to pursue LEED certification.
• MPRs serve the purpose of giving clear guidance to customers, protecting the integrity
of the LEED program, and reducing challenges that occur during the LEED process
• All LEED projects (except LEED for Homes and Neighborhood Development) must meet
all MPRs to become certified. MPRs include:
• 1. Must be in a permanent location on existing land
• 2. Must use reasonable LEED boundaries
• 3. Must comply with project size requirements
Reference: LEED v4 BD+C Reference Guide
3) Potential Technologies and Strategies
• Potential Technologies and Strategies found in the
Reference Guides for each Credit Category are
commonly found on the exam.
4) Summary of Reference Standards,
Implementation and Exemplary Performance
• Study and memorize the Reference Standards,
the implementation of the standards, and what,
if any, Exemplary Performance credits are
available.
• Know standards such as ASHRAE, Green Seal, and
Green Label
Project Experience
The following concepts are related to project
experience and have appeared on LEED AP
Exams.
5) LEED Pilot Credits
• Pilot Credits are ideas and strategies that are
entirely new to LEED that may be implemented
for the first time on a LEED project.
• Standard Pilot Credits are each worth 1 point
and are earned within the Innovation category.
Reference: USGBC.org
6) Owners Project Requirements
• Owner’s Project Requirements (OPR) is a “written
document that details the ideas, concepts, and criteria
determined by the owner to be important to the success
of the project.”
• This document also establishes the owner’s goals for the
building and its function.
Reference: BD+C Reference Guide
7) Basis of Design (BoD)
• Basis of Design (BoD) is the information that helps the
team accomplish the owner’s project requirements.
• It includes:
• System descriptions
• Indoor environmental quality criteria
• Design assumptions
• References to applicable codes
• Standards
• Regulations
• Guidelines
Reference: BD+C Reference Guide
8) LEED Certification Steps
• To make sure a project meets all credit requirements
and creates synergies between each credit, project
teams should make sure they follow the steps in the
LEED Reference Guides.
9) Credit Interpretation Process (CIRs)
• The Credit Interpretation Process (CIR) “supports high-
performance, cost-effective project outcomes through
an analysis of the interrelationships among systems.”
Reference: BD+C Reference Guide
10) LEED Online
• Teams manage their projects on the LEED Online website. LEED Online is
a web application designed specifically for managing LEED certification
projects.
• LEED Online contains credit templates and allows teams to upload
documentation (e.g. photos, site plans, floor plans, site rendering,
project descriptions, etc) and submit their Credit Interpretation
Requests (CIRs).
• LEED Online contains the LEED Scorecard, which lists all the credits that
the project is attempting. It helps teams keep track of their LEED
Certification plan.
Reference: Poplar Network LEED v4 GA Study Guide
11) LEED Project Registration Costs
• Registration fee: There is a flat fee calculated on a per-project basis
that you’ll pay at the time of registration
• Certification fee: The certification fee is charged on a per-project basis
and based on the size of the project and the rating system under which
the project is registered. Certification fees are due when you submit
your application for review. GBCI will not begin your review until
payment in full has been received
• Other fees: Other fees related to expedited reviews and other optional
parts of the certification process may apply.
• Member discounts: USGBC Silver, Gold and Platinum level member
organizations will have a discounted LEED registration and certification
rate.
Reference: USGBC.org
12) LEED Certification Review Process
• LEED certification involves four main steps:
• Registration: Register your project by completing required
forms and submitting payment.
• Apply: apply by submitting your completed certification
application through LEED Online and paying a certification
review fee.
• Review: Your LEED application will be reviewed by GBCI.
• Certify: You will receive a certification decision informing you
of your certification.
Reference: USGBC.org
13) LEED Charrette and Kickoff Process
• During the initial four-hour meeting or design charrette, teams “explore
opportunities to incorporate innovative strategies, achieve exemplary
performance for existing LEED credits, and develop pilot credits, based on the
project scope.”
• The goal is to combine team expertise to optimize green strategies across all
aspects of building design and construction.
• Then, a team of stakeholders is assembled and a kickoff meeting is held to
introduce the team members, review roles and responsibilities, and review all
remaining activities.
• To participate in a Charrette visit the following link:
https://www.poplarnetwork.com/edu/leed-specific-charrette-exercise
Reference: BD+C Reference Guide
14) Integrative Process and IPD
• The Integrative Process Credit “requires implementing a
detailed energy and water analysis to maximize synergies of
the building systems through design improvements.”
• Throughout the design process, teams will identify
opportunities to achieve synergies across building systems.
• Assessing the site will help project teams meet the site
condition and building and site program requirements.
Reference: BD+C Reference Guide
15) LEED Site Boundary
• In order for a project to become LEED certified, teams must
follow and report specific site boundaries meaning land in and
around the project space that are affected as a result.
• This includes the site area affected by the construction, including
parking and open space.
• The LEED project boundary may not be “gerrymandered” or
be designed to exclude portions of a space simply for the
purposes of seeking LEED certification.
Reference: LEED GA Study Guide
16) LEED Impact Categories
• LEED v4 Impact Categories “emphasize the potential for projects to
contribute positively to their communities and to the planet.”
• They determine requirements of the rating system and are used to assign
points to each credit. There are also incentives to pursue higher-point-
valued credits and higher certification levels.
• The following are Impact Categories:
• Enhance human health and well-being
• Reverse contribution to climate change
• Enhance community, social equity, environmental justice and quality of life
• Build a greener economy
• Promote sustainable and regenerative resource cycles
• Protect biodiversity and ecosystem services
• Protect and restore water resources
Reference: USGBC.org
17) LEED Interpretations and Addenda
• Addenda is made up of LEED Interpretations and
Corrections.
• LEED Interpretations are rulings decided by USGBC on
inquiries submitted by LEED project teams.
• Corrections “are permanent changes and
improvements to LEED 2009 and v4 resources,
including rating systems and reference guides.”
Reference: USGBC.org
Calculations
Difficult calculation questions are common on the LEED
AP v4 exams. Calculations may include basic addition and
subtraction, but also may include more complex
calculations which we will review next.
18) Calculating densities per acre
• Density is a ratio of building coverage on a given
parcel of land to the size of that parcel.
• Density can be calculated as Combined density: square
footage/acre or as separate residential (DU/acre) and
non-residential densities (FAR).
References: Poplar Network LEED GA Study Guide, BD+C Reference Guide
19) Floor Area Ratios (FAR)
• To calculate residential density, you “divide the number of
dwelling units by the amount of residential land.”
• To calculate nonresidential density, use floor area ratio (FAR):
• Floor-area Ratio (FAR) is “the density of nonresidential land use,
exclusive of structured parking, measured as the total nonresidential
building floor area divided by the total buildable land area available
for nonresidential buildings.”
Reference: BD+C Reference Guide
20) Indoor Water Use Reduction Calculations
• The Indoor Water Use Reduction prerequisite and credit require
projections based on occupants’ usage of flush and/or flow rates for
toilets, sinks, showers, etc.
• These calculations are important to Water Efficiency Indoor Water Use
Reduction (prerequisite or credits). Below is an example calculation from
the BD+C Reference Guide.
21) Solar Reflectance Index (SRI)
• Solar Reflectance Index (SRI) is related to calculations of roofs or
calculations of slope for a heat island roof.
• “The most effective measure of a roofing material’s ability to
reject solar heat is the measure of the constructed surface’s ability
to stay cool in the sun by reflecting solar radiation and emitting
thermal radiation.”
• To calculate the SRI for a given material, “obtain its solar
reflectance and thermal emittance via the Cool Roof Rating Council
Standard (CRRC-1).”
Reference: BD+C Reference Guide
22) Renewable Energy Production
• Calculate the total amount of energy generated by the system
and convert this value into the equivalent cost using either utility
rates or virtual energy rates.
• To receive credit for renewable energy systems savings,
calculate the equivalent cost of the energy generated using the
methodology outlined in the related credit.
Reference: BD+C Reference Guide
23) Green Power and Carbon Offset
• The goal of Green Power and Carbon Offsets credit is “to encourage the
reduction of greenhouse gas emissions through the use of grid-source,
renewable energy technologies and carbon mitigation projects.”
• To calculate the use of the project’s electricity and nonelectricity energy
use totals to determine the required amount of green power and/or
carbon offsets to be purchased.
• Projects that use green power or RECs must convert their annual grid-
generated electricity use to MWh. See example calculation below:
Reference: BD+C Reference Guide
24) Flush-out Requirement Calculations
• Flush-out is a part of the Indoor Air Quality Credit
• Flush-out can be done in two ways:
• Option 1: Before occupancy, teams can “install new filtration media and perform a
building flush-out by supplying a total air volume of 14,000 cubic feet of outdoor air
per square foot.”
• Option 2: Once the space is occupied, “it must be ventilated at a minimum rate of
0.30 cubic foot per minute (cfm) per square foot of outdoor air (1.5 liters of outside
air per second per square meter).”
• OR After construction ends and before occupancy, teams can conduct baseline IAQ
testing using LEED protocols for all occupied spaces. ASTM standard methods, EPA
compendium methods or ISO methods can be used.
Reference: BD+C Reference Guide

Más contenido relacionado

La actualidad más candente

Leed green associate pool g - question
Leed green associate   pool g - questionLeed green associate   pool g - question
Leed green associate pool g - questionBilal Mohamed
 
Leed v4-view-from-mep-seats-140429
Leed v4-view-from-mep-seats-140429Leed v4-view-from-mep-seats-140429
Leed v4-view-from-mep-seats-140429Scott Bowman
 
Leed green associate vii. project surroundings and public outreach answer
Leed green associate vii. project surroundings and public outreach   answer Leed green associate vii. project surroundings and public outreach   answer
Leed green associate vii. project surroundings and public outreach answer Bilal Mohamed
 
Leed green associate vi. stakeholder involvement in innovation answer
Leed green associate vi. stakeholder involvement in innovation   answer Leed green associate vi. stakeholder involvement in innovation   answer
Leed green associate vi. stakeholder involvement in innovation answer Bilal Mohamed
 
Leed green associate pool c - answer
Leed green associate   pool c - answer Leed green associate   pool c - answer
Leed green associate pool c - answer Bilal Mohamed
 
LEED(leadership in energy & enviromental design)
LEED(leadership in energy & enviromental design)LEED(leadership in energy & enviromental design)
LEED(leadership in energy & enviromental design)mohammedshahjalal1
 
WELL Building Standard Introduction
WELL Building Standard IntroductionWELL Building Standard Introduction
WELL Building Standard IntroductionLida_Lewis
 
An Introduction to the LEED Rating Systems
An Introduction to the LEED Rating SystemsAn Introduction to the LEED Rating Systems
An Introduction to the LEED Rating SystemsAllison Beer
 
LEED BD&C EXAM PREP, Green Building LEED Certification, and Sustainability
LEED BD&C EXAM PREP, Green Building LEED Certification, and SustainabilityLEED BD&C EXAM PREP, Green Building LEED Certification, and Sustainability
LEED BD&C EXAM PREP, Green Building LEED Certification, and SustainabilityArchiteG, Inc. (http://www.ArchiteG.com)
 
Leed green associate ii. project site factors answer
Leed green associate  ii. project site factors   answer Leed green associate  ii. project site factors   answer
Leed green associate ii. project site factors answer Bilal Mohamed
 
Leed green associate pool g - answer
Leed green associate   pool g - answer Leed green associate   pool g - answer
Leed green associate pool g - answer Bilal Mohamed
 

La actualidad más candente (20)

LEED Presentation
LEED PresentationLEED Presentation
LEED Presentation
 
Leed green associate pool g - question
Leed green associate   pool g - questionLeed green associate   pool g - question
Leed green associate pool g - question
 
Leed v4-view-from-mep-seats-140429
Leed v4-view-from-mep-seats-140429Leed v4-view-from-mep-seats-140429
Leed v4-view-from-mep-seats-140429
 
Leed green associate vii. project surroundings and public outreach answer
Leed green associate vii. project surroundings and public outreach   answer Leed green associate vii. project surroundings and public outreach   answer
Leed green associate vii. project surroundings and public outreach answer
 
Leed green associate vi. stakeholder involvement in innovation answer
Leed green associate vi. stakeholder involvement in innovation   answer Leed green associate vi. stakeholder involvement in innovation   answer
Leed green associate vi. stakeholder involvement in innovation answer
 
Leed green associate pool c - answer
Leed green associate   pool c - answer Leed green associate   pool c - answer
Leed green associate pool c - answer
 
LEED(leadership in energy & enviromental design)
LEED(leadership in energy & enviromental design)LEED(leadership in energy & enviromental design)
LEED(leadership in energy & enviromental design)
 
WELL Building Standard Introduction
WELL Building Standard IntroductionWELL Building Standard Introduction
WELL Building Standard Introduction
 
LEED Introduction
LEED IntroductionLEED Introduction
LEED Introduction
 
An Introduction to the LEED Rating Systems
An Introduction to the LEED Rating SystemsAn Introduction to the LEED Rating Systems
An Introduction to the LEED Rating Systems
 
LEED green buildings
LEED green buildingsLEED green buildings
LEED green buildings
 
LEED BD&C EXAM PREP, Green Building LEED Certification, and Sustainability
LEED BD&C EXAM PREP, Green Building LEED Certification, and SustainabilityLEED BD&C EXAM PREP, Green Building LEED Certification, and Sustainability
LEED BD&C EXAM PREP, Green Building LEED Certification, and Sustainability
 
Understanding LEED
Understanding LEEDUnderstanding LEED
Understanding LEED
 
LEED GA Exam Prep
LEED GA Exam PrepLEED GA Exam Prep
LEED GA Exam Prep
 
Leed green associate ii. project site factors answer
Leed green associate  ii. project site factors   answer Leed green associate  ii. project site factors   answer
Leed green associate ii. project site factors answer
 
LEED Certification
LEED CertificationLEED Certification
LEED Certification
 
Breeam presentation
Breeam presentationBreeam presentation
Breeam presentation
 
LEED
LEEDLEED
LEED
 
Leed green associate pool g - answer
Leed green associate   pool g - answer Leed green associate   pool g - answer
Leed green associate pool g - answer
 
Electrical design
Electrical designElectrical design
Electrical design
 

Destacado

Low Carbon Buildings in Malaysia @ Low Carbon Asia Conference by UTM
Low Carbon Buildings in Malaysia @ Low Carbon Asia Conference by UTMLow Carbon Buildings in Malaysia @ Low Carbon Asia Conference by UTM
Low Carbon Buildings in Malaysia @ Low Carbon Asia Conference by UTMSteve Lojuntin
 
Abdelmalik - input2012
Abdelmalik - input2012Abdelmalik - input2012
Abdelmalik - input2012INPUT 2012
 
General info on Low Carbon Cities Framework (LCCF) Malaysia
General info on Low Carbon Cities Framework (LCCF) MalaysiaGeneral info on Low Carbon Cities Framework (LCCF) Malaysia
General info on Low Carbon Cities Framework (LCCF) MalaysiaSteve Lojuntin
 
LEED GA Study Tips from the Pros
LEED GA Study Tips from the ProsLEED GA Study Tips from the Pros
LEED GA Study Tips from the ProsRob Freeman
 
LEED-ND 251: Principles of LEED for Neighborhood Development
LEED-ND 251: Principles of LEED for Neighborhood DevelopmentLEED-ND 251: Principles of LEED for Neighborhood Development
LEED-ND 251: Principles of LEED for Neighborhood DevelopmentConor Merrigan
 
Green Building And Low Carbon Building in Malaysia
Green Building And Low Carbon Building in MalaysiaGreen Building And Low Carbon Building in Malaysia
Green Building And Low Carbon Building in MalaysiaSteve Lojuntin
 

Destacado (10)

Low Carbon Buildings in Malaysia @ Low Carbon Asia Conference by UTM
Low Carbon Buildings in Malaysia @ Low Carbon Asia Conference by UTMLow Carbon Buildings in Malaysia @ Low Carbon Asia Conference by UTM
Low Carbon Buildings in Malaysia @ Low Carbon Asia Conference by UTM
 
Webinar: Become a LEED AP and Maintain Your Credential
Webinar: Become a LEED AP and Maintain Your CredentialWebinar: Become a LEED AP and Maintain Your Credential
Webinar: Become a LEED AP and Maintain Your Credential
 
LEED ND Pilot Program
LEED ND Pilot ProgramLEED ND Pilot Program
LEED ND Pilot Program
 
Green Building Basics
Green Building BasicsGreen Building Basics
Green Building Basics
 
Leed for SWE WE 14
Leed for SWE WE 14Leed for SWE WE 14
Leed for SWE WE 14
 
Abdelmalik - input2012
Abdelmalik - input2012Abdelmalik - input2012
Abdelmalik - input2012
 
General info on Low Carbon Cities Framework (LCCF) Malaysia
General info on Low Carbon Cities Framework (LCCF) MalaysiaGeneral info on Low Carbon Cities Framework (LCCF) Malaysia
General info on Low Carbon Cities Framework (LCCF) Malaysia
 
LEED GA Study Tips from the Pros
LEED GA Study Tips from the ProsLEED GA Study Tips from the Pros
LEED GA Study Tips from the Pros
 
LEED-ND 251: Principles of LEED for Neighborhood Development
LEED-ND 251: Principles of LEED for Neighborhood DevelopmentLEED-ND 251: Principles of LEED for Neighborhood Development
LEED-ND 251: Principles of LEED for Neighborhood Development
 
Green Building And Low Carbon Building in Malaysia
Green Building And Low Carbon Building in MalaysiaGreen Building And Low Carbon Building in Malaysia
Green Building And Low Carbon Building in Malaysia
 

Similar a 24 Concepts LEED AP

LEED CERTIFIATTION.pdf
LEED CERTIFIATTION.pdfLEED CERTIFIATTION.pdf
LEED CERTIFIATTION.pdfSunshineBeats
 
Historic Buildings and LEED v4
Historic Buildings and LEED v4Historic Buildings and LEED v4
Historic Buildings and LEED v4aiahouston
 
Leed Plumbing Sanitary Engineering Design
Leed Plumbing Sanitary Engineering DesignLeed Plumbing Sanitary Engineering Design
Leed Plumbing Sanitary Engineering DesignJefreyAbalos
 
Dispelling Myths and Making Cents of Multifamily Green Building Certification
Dispelling Myths and Making Cents of Multifamily Green Building CertificationDispelling Myths and Making Cents of Multifamily Green Building Certification
Dispelling Myths and Making Cents of Multifamily Green Building CertificationKEPHART
 
Ga 08 07 02 Leed For Manufacturers
Ga 08 07 02 Leed For ManufacturersGa 08 07 02 Leed For Manufacturers
Ga 08 07 02 Leed For ManufacturersStephani Carter
 
ESC PRESENTATION PPT (2).ppt VDRHFTGHJMXGH
ESC PRESENTATION PPT (2).ppt VDRHFTGHJMXGHESC PRESENTATION PPT (2).ppt VDRHFTGHJMXGH
ESC PRESENTATION PPT (2).ppt VDRHFTGHJMXGHBhimappaLakshappa
 
CleanEdison LEED BD&C: How to Interpret the Reference Guide
CleanEdison LEED BD&C: How to Interpret the Reference GuideCleanEdison LEED BD&C: How to Interpret the Reference Guide
CleanEdison LEED BD&C: How to Interpret the Reference GuideCleanEdison
 
LEED U.S. Green Building Council.htm
LEED   U.S. Green Building Council.htmLEED   U.S. Green Building Council.htm
LEED U.S. Green Building Council.htmFathi Nada
 
LEED: Sustainable Building Design
LEED: Sustainable Building DesignLEED: Sustainable Building Design
LEED: Sustainable Building DesignJoe Harks
 
Chapter 2 introduction-to_leed_rating_systems
Chapter 2 introduction-to_leed_rating_systemsChapter 2 introduction-to_leed_rating_systems
Chapter 2 introduction-to_leed_rating_systemsVenkatesh S
 
[Nordic GBC Conference 2013] Sue Clark: LEED Pilot Credits
[Nordic GBC Conference 2013] Sue Clark: LEED Pilot Credits[Nordic GBC Conference 2013] Sue Clark: LEED Pilot Credits
[Nordic GBC Conference 2013] Sue Clark: LEED Pilot CreditsGBC Finland
 
LEED BDC Credit SummaryLEED BDCSheet.pdf
LEED BDC Credit SummaryLEED BDCSheet.pdfLEED BDC Credit SummaryLEED BDCSheet.pdf
LEED BDC Credit SummaryLEED BDCSheet.pdfihjjvv1
 

Similar a 24 Concepts LEED AP (20)

Leed
LeedLeed
Leed
 
LEED CERTIFIATTION.pdf
LEED CERTIFIATTION.pdfLEED CERTIFIATTION.pdf
LEED CERTIFIATTION.pdf
 
final
finalfinal
final
 
Opitz writing sample_technical
Opitz writing sample_technicalOpitz writing sample_technical
Opitz writing sample_technical
 
Historic Buildings and LEED v4
Historic Buildings and LEED v4Historic Buildings and LEED v4
Historic Buildings and LEED v4
 
BLUG LEED Version 3 Changes Presentation
BLUG LEED Version 3 Changes PresentationBLUG LEED Version 3 Changes Presentation
BLUG LEED Version 3 Changes Presentation
 
ASSET LIFE CYCLE COST ESTIMATING AND THE CCRG Rev4
ASSET LIFE CYCLE COST ESTIMATING AND THE CCRG Rev4ASSET LIFE CYCLE COST ESTIMATING AND THE CCRG Rev4
ASSET LIFE CYCLE COST ESTIMATING AND THE CCRG Rev4
 
CCRG 2005 Alberta Assessors Association Conference Seminar
CCRG 2005 Alberta Assessors Association Conference SeminarCCRG 2005 Alberta Assessors Association Conference Seminar
CCRG 2005 Alberta Assessors Association Conference Seminar
 
Leed Plumbing Sanitary Engineering Design
Leed Plumbing Sanitary Engineering DesignLeed Plumbing Sanitary Engineering Design
Leed Plumbing Sanitary Engineering Design
 
Dispelling Myths and Making Cents of Multifamily Green Building Certification
Dispelling Myths and Making Cents of Multifamily Green Building CertificationDispelling Myths and Making Cents of Multifamily Green Building Certification
Dispelling Myths and Making Cents of Multifamily Green Building Certification
 
Ga 08 07 02 Leed For Manufacturers
Ga 08 07 02 Leed For ManufacturersGa 08 07 02 Leed For Manufacturers
Ga 08 07 02 Leed For Manufacturers
 
ESC PRESENTATION PPT (2).ppt VDRHFTGHJMXGH
ESC PRESENTATION PPT (2).ppt VDRHFTGHJMXGHESC PRESENTATION PPT (2).ppt VDRHFTGHJMXGH
ESC PRESENTATION PPT (2).ppt VDRHFTGHJMXGH
 
LEED Introduction & Naked Stables
LEED Introduction & Naked StablesLEED Introduction & Naked Stables
LEED Introduction & Naked Stables
 
CleanEdison LEED BD&C: How to Interpret the Reference Guide
CleanEdison LEED BD&C: How to Interpret the Reference GuideCleanEdison LEED BD&C: How to Interpret the Reference Guide
CleanEdison LEED BD&C: How to Interpret the Reference Guide
 
Leed
LeedLeed
Leed
 
LEED U.S. Green Building Council.htm
LEED   U.S. Green Building Council.htmLEED   U.S. Green Building Council.htm
LEED U.S. Green Building Council.htm
 
LEED: Sustainable Building Design
LEED: Sustainable Building DesignLEED: Sustainable Building Design
LEED: Sustainable Building Design
 
Chapter 2 introduction-to_leed_rating_systems
Chapter 2 introduction-to_leed_rating_systemsChapter 2 introduction-to_leed_rating_systems
Chapter 2 introduction-to_leed_rating_systems
 
[Nordic GBC Conference 2013] Sue Clark: LEED Pilot Credits
[Nordic GBC Conference 2013] Sue Clark: LEED Pilot Credits[Nordic GBC Conference 2013] Sue Clark: LEED Pilot Credits
[Nordic GBC Conference 2013] Sue Clark: LEED Pilot Credits
 
LEED BDC Credit SummaryLEED BDCSheet.pdf
LEED BDC Credit SummaryLEED BDCSheet.pdfLEED BDC Credit SummaryLEED BDCSheet.pdf
LEED BDC Credit SummaryLEED BDCSheet.pdf
 

Más de Rob Freeman

Poplar LEED Continuing Education Guide 2017
Poplar LEED Continuing Education Guide 2017Poplar LEED Continuing Education Guide 2017
Poplar LEED Continuing Education Guide 2017Rob Freeman
 
LEED v4 GA exam flashcards
LEED v4 GA exam flashcardsLEED v4 GA exam flashcards
LEED v4 GA exam flashcardsRob Freeman
 
CRS Green-e Leed presentation 11 1-12 final
CRS Green-e Leed presentation 11 1-12 finalCRS Green-e Leed presentation 11 1-12 final
CRS Green-e Leed presentation 11 1-12 finalRob Freeman
 
Introduction to Green Roofs
Introduction to Green RoofsIntroduction to Green Roofs
Introduction to Green RoofsRob Freeman
 
LEED v4 Green Building Focuses on Lighting
LEED v4 Green Building Focuses on Lighting LEED v4 Green Building Focuses on Lighting
LEED v4 Green Building Focuses on Lighting Rob Freeman
 
Understanding Net Zero
Understanding Net ZeroUnderstanding Net Zero
Understanding Net ZeroRob Freeman
 
LEED v4: Life Cycle Assessments & Environmental Product Declarations
LEED v4: Life Cycle Assessments & Environmental Product DeclarationsLEED v4: Life Cycle Assessments & Environmental Product Declarations
LEED v4: Life Cycle Assessments & Environmental Product DeclarationsRob Freeman
 

Más de Rob Freeman (7)

Poplar LEED Continuing Education Guide 2017
Poplar LEED Continuing Education Guide 2017Poplar LEED Continuing Education Guide 2017
Poplar LEED Continuing Education Guide 2017
 
LEED v4 GA exam flashcards
LEED v4 GA exam flashcardsLEED v4 GA exam flashcards
LEED v4 GA exam flashcards
 
CRS Green-e Leed presentation 11 1-12 final
CRS Green-e Leed presentation 11 1-12 finalCRS Green-e Leed presentation 11 1-12 final
CRS Green-e Leed presentation 11 1-12 final
 
Introduction to Green Roofs
Introduction to Green RoofsIntroduction to Green Roofs
Introduction to Green Roofs
 
LEED v4 Green Building Focuses on Lighting
LEED v4 Green Building Focuses on Lighting LEED v4 Green Building Focuses on Lighting
LEED v4 Green Building Focuses on Lighting
 
Understanding Net Zero
Understanding Net ZeroUnderstanding Net Zero
Understanding Net Zero
 
LEED v4: Life Cycle Assessments & Environmental Product Declarations
LEED v4: Life Cycle Assessments & Environmental Product DeclarationsLEED v4: Life Cycle Assessments & Environmental Product Declarations
LEED v4: Life Cycle Assessments & Environmental Product Declarations
 

Último

Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.cojitesh
 
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...BrixsonLajara
 
Call Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budgetCall Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budgetkajal
 
Top Call Girls in Bishnupur 9332606886 High Profile Call Girls You Can Get...
Top Call Girls in Bishnupur   9332606886  High Profile Call Girls You Can Get...Top Call Girls in Bishnupur   9332606886  High Profile Call Girls You Can Get...
Top Call Girls in Bishnupur 9332606886 High Profile Call Girls You Can Get...Sareena Khatun
 
Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...ZAPPAC1
 
Russian Call girl Dubai 0503464457 Dubai Call girls
Russian Call girl Dubai 0503464457 Dubai Call girlsRussian Call girl Dubai 0503464457 Dubai Call girls
Russian Call girl Dubai 0503464457 Dubai Call girlsMonica Sydney
 
Role of Copper and Zinc Nanoparticles in Plant Disease Management
Role of Copper and Zinc Nanoparticles in Plant Disease ManagementRole of Copper and Zinc Nanoparticles in Plant Disease Management
Role of Copper and Zinc Nanoparticles in Plant Disease ManagementRavikumar Vaniya
 
Hook Up Call Girls Rajgir 9332606886 High Profile Call Girls You Can Get T...
Hook Up Call Girls Rajgir   9332606886  High Profile Call Girls You Can Get T...Hook Up Call Girls Rajgir   9332606886  High Profile Call Girls You Can Get T...
Hook Up Call Girls Rajgir 9332606886 High Profile Call Girls You Can Get T...Sareena Khatun
 
Trusted call girls in Fatehabad 9332606886 High Profile Call Girls You Can...
Trusted call girls in Fatehabad   9332606886  High Profile Call Girls You Can...Trusted call girls in Fatehabad   9332606886  High Profile Call Girls You Can...
Trusted call girls in Fatehabad 9332606886 High Profile Call Girls You Can...kumargunjan9515
 
Test bank for beckmann and ling s obstetrics and gynecology 8th edition by ro...
Test bank for beckmann and ling s obstetrics and gynecology 8th edition by ro...Test bank for beckmann and ling s obstetrics and gynecology 8th edition by ro...
Test bank for beckmann and ling s obstetrics and gynecology 8th edition by ro...robinsonayot
 
Yil Me Hu Summer 2023 Edition - Nisqually Salmon Recovery Newsletter
Yil Me Hu Summer 2023 Edition - Nisqually Salmon Recovery NewsletterYil Me Hu Summer 2023 Edition - Nisqually Salmon Recovery Newsletter
Yil Me Hu Summer 2023 Edition - Nisqually Salmon Recovery NewsletterNisqually River Council
 
Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...
Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...
Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...HyderabadDolls
 
Vip Salem Call Girls 8250092165 Low Price Escorts Service in Your Area
Vip Salem Call Girls 8250092165 Low Price Escorts Service in Your AreaVip Salem Call Girls 8250092165 Low Price Escorts Service in Your Area
Vip Salem Call Girls 8250092165 Low Price Escorts Service in Your Areameghakumariji156
 
Russian Escort Dubai 0503464457 Dubai Escorts
Russian Escort Dubai 0503464457 Dubai EscortsRussian Escort Dubai 0503464457 Dubai Escorts
Russian Escort Dubai 0503464457 Dubai EscortsMonica Sydney
 
High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi Escorts
High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi EscortsHigh Profile Escort in Abu Dhabi 0524076003 Abu Dhabi Escorts
High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi EscortsMonica Sydney
 
Russian Call girls in Dubai 0508644382 Dubai Call girls
Russian Call girls in Dubai 0508644382 Dubai Call girlsRussian Call girls in Dubai 0508644382 Dubai Call girls
Russian Call girls in Dubai 0508644382 Dubai Call girlsMonica Sydney
 
Call Girl in Faridabad ₹7.5k Pick Up & Drop With Cash Payment #8168257667
Call Girl in Faridabad ₹7.5k Pick Up & Drop With Cash Payment #8168257667Call Girl in Faridabad ₹7.5k Pick Up & Drop With Cash Payment #8168257667
Call Girl in Faridabad ₹7.5k Pick Up & Drop With Cash Payment #8168257667Hyderabad Escorts Agency
 
一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理
一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理
一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理zubnm
 

Último (20)

Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.
 
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...
 
Call Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budgetCall Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budget
 
Top Call Girls in Bishnupur 9332606886 High Profile Call Girls You Can Get...
Top Call Girls in Bishnupur   9332606886  High Profile Call Girls You Can Get...Top Call Girls in Bishnupur   9332606886  High Profile Call Girls You Can Get...
Top Call Girls in Bishnupur 9332606886 High Profile Call Girls You Can Get...
 
Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...
 
Russian Call girl Dubai 0503464457 Dubai Call girls
Russian Call girl Dubai 0503464457 Dubai Call girlsRussian Call girl Dubai 0503464457 Dubai Call girls
Russian Call girl Dubai 0503464457 Dubai Call girls
 
Role of Copper and Zinc Nanoparticles in Plant Disease Management
Role of Copper and Zinc Nanoparticles in Plant Disease ManagementRole of Copper and Zinc Nanoparticles in Plant Disease Management
Role of Copper and Zinc Nanoparticles in Plant Disease Management
 
Hook Up Call Girls Rajgir 9332606886 High Profile Call Girls You Can Get T...
Hook Up Call Girls Rajgir   9332606886  High Profile Call Girls You Can Get T...Hook Up Call Girls Rajgir   9332606886  High Profile Call Girls You Can Get T...
Hook Up Call Girls Rajgir 9332606886 High Profile Call Girls You Can Get T...
 
Trusted call girls in Fatehabad 9332606886 High Profile Call Girls You Can...
Trusted call girls in Fatehabad   9332606886  High Profile Call Girls You Can...Trusted call girls in Fatehabad   9332606886  High Profile Call Girls You Can...
Trusted call girls in Fatehabad 9332606886 High Profile Call Girls You Can...
 
Test bank for beckmann and ling s obstetrics and gynecology 8th edition by ro...
Test bank for beckmann and ling s obstetrics and gynecology 8th edition by ro...Test bank for beckmann and ling s obstetrics and gynecology 8th edition by ro...
Test bank for beckmann and ling s obstetrics and gynecology 8th edition by ro...
 
Yil Me Hu Summer 2023 Edition - Nisqually Salmon Recovery Newsletter
Yil Me Hu Summer 2023 Edition - Nisqually Salmon Recovery NewsletterYil Me Hu Summer 2023 Edition - Nisqually Salmon Recovery Newsletter
Yil Me Hu Summer 2023 Edition - Nisqually Salmon Recovery Newsletter
 
Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...
Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...
Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...
 
Water Pollution
Water Pollution Water Pollution
Water Pollution
 
Vip Salem Call Girls 8250092165 Low Price Escorts Service in Your Area
Vip Salem Call Girls 8250092165 Low Price Escorts Service in Your AreaVip Salem Call Girls 8250092165 Low Price Escorts Service in Your Area
Vip Salem Call Girls 8250092165 Low Price Escorts Service in Your Area
 
Russian Escort Dubai 0503464457 Dubai Escorts
Russian Escort Dubai 0503464457 Dubai EscortsRussian Escort Dubai 0503464457 Dubai Escorts
Russian Escort Dubai 0503464457 Dubai Escorts
 
Deforestation
DeforestationDeforestation
Deforestation
 
High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi Escorts
High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi EscortsHigh Profile Escort in Abu Dhabi 0524076003 Abu Dhabi Escorts
High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi Escorts
 
Russian Call girls in Dubai 0508644382 Dubai Call girls
Russian Call girls in Dubai 0508644382 Dubai Call girlsRussian Call girls in Dubai 0508644382 Dubai Call girls
Russian Call girls in Dubai 0508644382 Dubai Call girls
 
Call Girl in Faridabad ₹7.5k Pick Up & Drop With Cash Payment #8168257667
Call Girl in Faridabad ₹7.5k Pick Up & Drop With Cash Payment #8168257667Call Girl in Faridabad ₹7.5k Pick Up & Drop With Cash Payment #8168257667
Call Girl in Faridabad ₹7.5k Pick Up & Drop With Cash Payment #8168257667
 
一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理
一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理
一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理
 

24 Concepts LEED AP

  • 1. 24 concepts you should know to pass the LEEP AP Exams
  • 2. 1) Prerequisites, Requirements and Intents • Memorize the information regarding prerequisites to become a LEED AP • Know the definitions and goals of each USGBC standard • Know the purpose/intent of each credit category
  • 3. 2) Minimum Program Requirements (MPRs) • “All projects applying for LEED certification must meet a set of minimum program requirements” according to the USGBC • The Minimum Program Requirements (MPRs) are the minimum characteristics or conditions that make a project appropriate to pursue LEED certification. • MPRs serve the purpose of giving clear guidance to customers, protecting the integrity of the LEED program, and reducing challenges that occur during the LEED process • All LEED projects (except LEED for Homes and Neighborhood Development) must meet all MPRs to become certified. MPRs include: • 1. Must be in a permanent location on existing land • 2. Must use reasonable LEED boundaries • 3. Must comply with project size requirements Reference: LEED v4 BD+C Reference Guide
  • 4. 3) Potential Technologies and Strategies • Potential Technologies and Strategies found in the Reference Guides for each Credit Category are commonly found on the exam.
  • 5. 4) Summary of Reference Standards, Implementation and Exemplary Performance • Study and memorize the Reference Standards, the implementation of the standards, and what, if any, Exemplary Performance credits are available. • Know standards such as ASHRAE, Green Seal, and Green Label
  • 6. Project Experience The following concepts are related to project experience and have appeared on LEED AP Exams.
  • 7. 5) LEED Pilot Credits • Pilot Credits are ideas and strategies that are entirely new to LEED that may be implemented for the first time on a LEED project. • Standard Pilot Credits are each worth 1 point and are earned within the Innovation category. Reference: USGBC.org
  • 8. 6) Owners Project Requirements • Owner’s Project Requirements (OPR) is a “written document that details the ideas, concepts, and criteria determined by the owner to be important to the success of the project.” • This document also establishes the owner’s goals for the building and its function. Reference: BD+C Reference Guide
  • 9. 7) Basis of Design (BoD) • Basis of Design (BoD) is the information that helps the team accomplish the owner’s project requirements. • It includes: • System descriptions • Indoor environmental quality criteria • Design assumptions • References to applicable codes • Standards • Regulations • Guidelines Reference: BD+C Reference Guide
  • 10. 8) LEED Certification Steps • To make sure a project meets all credit requirements and creates synergies between each credit, project teams should make sure they follow the steps in the LEED Reference Guides.
  • 11. 9) Credit Interpretation Process (CIRs) • The Credit Interpretation Process (CIR) “supports high- performance, cost-effective project outcomes through an analysis of the interrelationships among systems.” Reference: BD+C Reference Guide
  • 12. 10) LEED Online • Teams manage their projects on the LEED Online website. LEED Online is a web application designed specifically for managing LEED certification projects. • LEED Online contains credit templates and allows teams to upload documentation (e.g. photos, site plans, floor plans, site rendering, project descriptions, etc) and submit their Credit Interpretation Requests (CIRs). • LEED Online contains the LEED Scorecard, which lists all the credits that the project is attempting. It helps teams keep track of their LEED Certification plan. Reference: Poplar Network LEED v4 GA Study Guide
  • 13. 11) LEED Project Registration Costs • Registration fee: There is a flat fee calculated on a per-project basis that you’ll pay at the time of registration • Certification fee: The certification fee is charged on a per-project basis and based on the size of the project and the rating system under which the project is registered. Certification fees are due when you submit your application for review. GBCI will not begin your review until payment in full has been received • Other fees: Other fees related to expedited reviews and other optional parts of the certification process may apply. • Member discounts: USGBC Silver, Gold and Platinum level member organizations will have a discounted LEED registration and certification rate. Reference: USGBC.org
  • 14. 12) LEED Certification Review Process • LEED certification involves four main steps: • Registration: Register your project by completing required forms and submitting payment. • Apply: apply by submitting your completed certification application through LEED Online and paying a certification review fee. • Review: Your LEED application will be reviewed by GBCI. • Certify: You will receive a certification decision informing you of your certification. Reference: USGBC.org
  • 15. 13) LEED Charrette and Kickoff Process • During the initial four-hour meeting or design charrette, teams “explore opportunities to incorporate innovative strategies, achieve exemplary performance for existing LEED credits, and develop pilot credits, based on the project scope.” • The goal is to combine team expertise to optimize green strategies across all aspects of building design and construction. • Then, a team of stakeholders is assembled and a kickoff meeting is held to introduce the team members, review roles and responsibilities, and review all remaining activities. • To participate in a Charrette visit the following link: https://www.poplarnetwork.com/edu/leed-specific-charrette-exercise Reference: BD+C Reference Guide
  • 16. 14) Integrative Process and IPD • The Integrative Process Credit “requires implementing a detailed energy and water analysis to maximize synergies of the building systems through design improvements.” • Throughout the design process, teams will identify opportunities to achieve synergies across building systems. • Assessing the site will help project teams meet the site condition and building and site program requirements. Reference: BD+C Reference Guide
  • 17. 15) LEED Site Boundary • In order for a project to become LEED certified, teams must follow and report specific site boundaries meaning land in and around the project space that are affected as a result. • This includes the site area affected by the construction, including parking and open space. • The LEED project boundary may not be “gerrymandered” or be designed to exclude portions of a space simply for the purposes of seeking LEED certification. Reference: LEED GA Study Guide
  • 18. 16) LEED Impact Categories • LEED v4 Impact Categories “emphasize the potential for projects to contribute positively to their communities and to the planet.” • They determine requirements of the rating system and are used to assign points to each credit. There are also incentives to pursue higher-point- valued credits and higher certification levels. • The following are Impact Categories: • Enhance human health and well-being • Reverse contribution to climate change • Enhance community, social equity, environmental justice and quality of life • Build a greener economy • Promote sustainable and regenerative resource cycles • Protect biodiversity and ecosystem services • Protect and restore water resources Reference: USGBC.org
  • 19. 17) LEED Interpretations and Addenda • Addenda is made up of LEED Interpretations and Corrections. • LEED Interpretations are rulings decided by USGBC on inquiries submitted by LEED project teams. • Corrections “are permanent changes and improvements to LEED 2009 and v4 resources, including rating systems and reference guides.” Reference: USGBC.org
  • 20. Calculations Difficult calculation questions are common on the LEED AP v4 exams. Calculations may include basic addition and subtraction, but also may include more complex calculations which we will review next.
  • 21. 18) Calculating densities per acre • Density is a ratio of building coverage on a given parcel of land to the size of that parcel. • Density can be calculated as Combined density: square footage/acre or as separate residential (DU/acre) and non-residential densities (FAR). References: Poplar Network LEED GA Study Guide, BD+C Reference Guide
  • 22. 19) Floor Area Ratios (FAR) • To calculate residential density, you “divide the number of dwelling units by the amount of residential land.” • To calculate nonresidential density, use floor area ratio (FAR): • Floor-area Ratio (FAR) is “the density of nonresidential land use, exclusive of structured parking, measured as the total nonresidential building floor area divided by the total buildable land area available for nonresidential buildings.” Reference: BD+C Reference Guide
  • 23. 20) Indoor Water Use Reduction Calculations • The Indoor Water Use Reduction prerequisite and credit require projections based on occupants’ usage of flush and/or flow rates for toilets, sinks, showers, etc. • These calculations are important to Water Efficiency Indoor Water Use Reduction (prerequisite or credits). Below is an example calculation from the BD+C Reference Guide.
  • 24. 21) Solar Reflectance Index (SRI) • Solar Reflectance Index (SRI) is related to calculations of roofs or calculations of slope for a heat island roof. • “The most effective measure of a roofing material’s ability to reject solar heat is the measure of the constructed surface’s ability to stay cool in the sun by reflecting solar radiation and emitting thermal radiation.” • To calculate the SRI for a given material, “obtain its solar reflectance and thermal emittance via the Cool Roof Rating Council Standard (CRRC-1).” Reference: BD+C Reference Guide
  • 25. 22) Renewable Energy Production • Calculate the total amount of energy generated by the system and convert this value into the equivalent cost using either utility rates or virtual energy rates. • To receive credit for renewable energy systems savings, calculate the equivalent cost of the energy generated using the methodology outlined in the related credit. Reference: BD+C Reference Guide
  • 26. 23) Green Power and Carbon Offset • The goal of Green Power and Carbon Offsets credit is “to encourage the reduction of greenhouse gas emissions through the use of grid-source, renewable energy technologies and carbon mitigation projects.” • To calculate the use of the project’s electricity and nonelectricity energy use totals to determine the required amount of green power and/or carbon offsets to be purchased. • Projects that use green power or RECs must convert their annual grid- generated electricity use to MWh. See example calculation below: Reference: BD+C Reference Guide
  • 27. 24) Flush-out Requirement Calculations • Flush-out is a part of the Indoor Air Quality Credit • Flush-out can be done in two ways: • Option 1: Before occupancy, teams can “install new filtration media and perform a building flush-out by supplying a total air volume of 14,000 cubic feet of outdoor air per square foot.” • Option 2: Once the space is occupied, “it must be ventilated at a minimum rate of 0.30 cubic foot per minute (cfm) per square foot of outdoor air (1.5 liters of outside air per second per square meter).” • OR After construction ends and before occupancy, teams can conduct baseline IAQ testing using LEED protocols for all occupied spaces. ASTM standard methods, EPA compendium methods or ISO methods can be used. Reference: BD+C Reference Guide