JULY - SEPTEMBER 2010                                  VOLUME - 12, ISSUE 3




             We@
               Shapoorji Pallonji Corporate Magazine
Editorial

     Hello,                                                             also got a feature on the making of The Imperial and the
                                                                        challenges faced during its construction. As usual there are a
     It has been a good quarter for India. The economy seems to be      number of events covered in the Happenings section,
     getting back on track. The growth percentages, stock prices        including a report on the handover of the first lot of flats at SP
     and the real estate market have all been showing positive signs.   Shukhobrishti in Kolkata. Your Space features a short travel log
     Hopefully, the trend will strengthen into a full fledged upward    about Israel and Egypt. We hope you like it.
     turn in the coming year.
                                                                        We would once again request you to send in suggestions,
     On the sports front, the much talked about Commonwealth            articles and feedback to us to help us in our effort to constantly
     Games have arrived, though there has been much left to be          improve the magazine. The festival season is in its full swing;
     desired in the run up to the event. Shapoorji Pallonji has also    Ganeshotsav and Eid have just got over. Dussera, Diwali and
     been a part of the CWG process, in a positive way, as we were      Christmas are not too far away. On behalf of Shapoorji Pallonji,
     involved in the upgrade and enhancement of the Jawaharlal          the editorial team would like to wish each one of you peace,
     Nehru Stadium. Shapoorji Pallonji has also been associated         prosperity and happiness. Keep reading and contributing to
     with a couple of other stadium projects – the famous Eden          We@SP     .
     Gardens at Kolkata and the MCA Stadium near Pune. All these
     stadiums have been featured in this issue of We@SP We have
                                                         .                                                         - The Editorial Team




                                   Another Moment of Pride & Joy for SPCL
     The General Motors site from Pune Region has bagged the coveted GOLDEN SAFETY AWARD from National Safety Council of
      India (NSCI) for the year 2009 in construction sector. The competitors included names such as L & T, Gammon, HCC, Toyo,
                                                       IVRCL, TCE, ITD, CCC etc.

                      Heartiest congratulations to the General Motors Team and Pune Region!!




     New Projects

     • Design and Build Barwa City Phase 1 at Doha, Qatar for           • Piling work for Raw Material Handling at Jamshedpur for
       Barwa City Real Estate Co WLL.                                     Tata Steel.

     • Construction of a group Housing Project- Shillas for             • Site Grading works for Asian Paints Plant Project at
       Raheja Developers Pvt Ltd at Gurgaon, Haryana.                     Khandala, Satara, Maharashatra for Asian Paints Ltd.

     • Piling and General Civil works for Lignite Based Thermal         • Structural works and Flooring of Palnt Building at Ennore
       Power Project at Bhavnagar, Gujarat for Bhavnagar Energy           Terminal Project, Chennai for HPCL.
       Company Ltd.
                                                                        • Construction of World's largest Sterile manufacturing
     • Construction of Five Star Hotel, Budget Hotel and                  Facility in the Ramky Pharma City at Visakhapatnam,
       Convention Centre at Dum Dum, Kolkata for Kolkata                  Andhra Pradesh for Hospira Healthcare Ind. Pvt. Ltd.
       Hotels Ltd.
                                                                        • Civil and Structural works for Tara Aerospace Systems Ltd
     • Structural Steel work for Raw Material Handling at Zone 2          facility at Hyderabad for Tata Advanced Systems Ltd.
       at Jamshedpur for Tata Steel.

01
Main Feature

Jawaharlal Nehru Stadium, Delhi                                    ring around the stadium to support 600 MT of cables and
                                                                   castings. The entire roof structure is alive with constant
                                                                   movement of various components considering that the steel
                                                                   structure expands and contracts with change in temperature
                                                                   and wind pressures. The steel structure is anchored on solid
                                                                   foundations which consist of 272 numbers of 1500 mm dia
                                                                   and 25 m depth piles. The Base Plates for each column are
                                                                   fixed with a special cementatious Grout having compressive
                                                                   strength of 100N/sq.mm and high tension pre-stressed
                                                                   single tendon bars. The steel structure has been made with
                                                                   an accuracy of ±1 mm per element.

                                                                   The whole focal point in the design of the new structure
                                                                   was the cables and it was important that they had the
                                                                   uniqueness to fulfill the requirement and bear the stress of
Jawaharlal Nehru stadium                                           the whole structure. All the cables are fully locked with
Inside view of the stadium                                         round and Z shaped wires. All fully locked cables are made
                                                                   from hot-dip-galvanized and gal fan (or equivalent; 5%Al
Jawaharlal Nehru stadium was constructed for Asian Games-          95%Zn) coated wires. The cable net structure working on
1982 in order to accommodate the athletic events in the            bicycle wheel principle providing central tension ring and the
complex. The Sports Authority of India has engaged Central         spokes consisting of prefabricated cables which are
Public Works Department (CPWD), as their principal                 supported on the X and V shaped structure of steel
consultant for planning and execution for the stadium, so as       sections. The length of wires used in the cable is around
to upgrade it to international standards, to host the              2200 km, the distance between Delhi and Bangalore. The
forthcoming Commonwealth Games, 2010. The Jawaharlal               entire Cable Net has been assembled on the ground and
Nehru Stadium has been given a face lift with a new roof           lifted to its final position 36 meters above, using 68 numbers
and improved seating and other facilities to meet                  heavy duty hydraulic jacks having maximum capacity of 120
international standards to host the opening and closing            MT at 44 points simultaneously. This cable net lifting was a
ceremonies as well as the athletics events during the              well orchestrated process using fully computerized systems
Commonwealth Games.                                                to control and monitor the entire lift which involved inducing
                                                                   forces of about 10,000 tonnes in the structure.
   A state-of-the-art roof of PTFE coated membrane,
extending up to 70 m into the stand, supported on the cable        The PTFE membrane covers a total area of 54,000 sqm.
net and structural steel rings has been provided without           The PTFE (Poly Tetra Fluoro Ethylene) coating on the
disturbing the existing stadium. This is the largest membrane      membrane makes it chemically inert and pure, extremely
roof in the world. In terms of seating capacity, it is the third   abrasive resistant and flame resistant. A unique self cleaning
largest stadium in India.                                          property is possessed by the membrane which does not
                                                                   allow dust and foreign bodies to stick on it. Off white in
The stadium consists of 44 numbers of X columns (45                color when installed, the membrane has the virtue of being
meters high from ground level) and 44 numbers of V                 bleached by UV rays and becoming lighter in shade, each
columns (25 meters high from ground level) which form a            passing day. As the membrane forms a huge catchment




Outside view of the stadium                                                                                                         02
area, special arrangement consisting of scupper and flexible     The major quantities executed in the project are:
     stainless steel pipe is provided for drainage of rain water
     falling on membrane.                                             Project Cost               :   308 Crores
                                                                      Concrete                   :   30000 Cum
     The stadium has newly designed system of 14 structural           Bored Cast in situ piles   :   272 Nos
     steel ramps around the periphery to ensure that the stadium      Reinforcement Steel        :   3000 MT
     can be evacuated in 6 minutes in case of emergency.              Structural Steel           :   10000 MT
                                                                      Cables and Castings        :   600 MT
     The stadium has been equipped to conform to the                  Membrane                   :   54000 Sqm
     requirements of HDTV Broadcast. The 748 numbers of
     lights are fixed in two different ways, 264 numbers of lights    Major Sub-agencies involved in our Project:
     on 22 small light towers on cable net and balance on 44
     numbers of catwalks below the cable net. Speakers and            Piling Works           : M/s Afcons, Mumbai, India and
     other sound systems have been provided on catwalks to                                     M/s B C Contractors, Delhi, India
     produce an even decibel level across the stadium. Basically      Structural Steel Works : M/s P & R Infrastructure, Ropar,
     the design for both lights system and Public Address system                               India
     has been done according to Olympic Games and FIFA                Cable and Casting      : M/s Pfeifer, Germany
     standards.                                                       Cable Lifting Works    : M/s VSL, Switzerland
                                                                      Membrane Works         : M/s Taiyo Membrane
     Jawaharlal Nehru stadium stands as the au-courant                                         Corporation, Australia
     testimony of India's architectural legacy. Contemporary          Lighting Works         : M/s GE India, India
     cabled designs enhanced the crown structure of the               PA System Works        : M/s Bosch Ltd, India
     stadium. European coronet of the 14th century has been           Flooring Works         : M/s Pidilite and M/s Fosroc
     transformed into a glorified steel structure. With the
     successful overhaul of JNS, it can augment the                                                                    -JNS Team, Delhi
     transformation of similar kind of structures in India.


     MCA Cricket Stadium, Pune                                        Salient Features of the Project

                                                                      Site area                                   :   13037 sq.mt
                                                                      Stadium Gross Area                          :   50,830 sq.mt
                                                                      Seating in Lower Bowl                       :   38200 nos
                                                                      Seating in South Stand Upper Terrace        :   7500 nos.
                                                                      Numbers of hospitality boxes                :   26
                                                                      Total Phase 1 Seating Capacity              :   45300 nos.

                                                                      Central to the design philosophy of the stadium is the
                                                                      complete synthesis of architecture and engineering. The
                                                                      architecture, structure and services are fully co-ordinated
                                                                      and play an equal role in achieving the design ambitions. The
                                                                      quality of the structural component is therefore of vital
                                                                      importance. Steel and concrete form primary materials.
                                                                      Above concourse level the structure comprises of fabricated
                                                                      steel circular column (some of them are upto 18 mts & 45
     An International Cricket stadium near Pune                       mts height) and steel I section beams supporting a
                                                                      composite slab made up from pre-cast coffered concrete
     by MCA
     Artist's Impression of the stadium from above                    units, supported within the flanges of steel beams. The
                                                                      structure is topped with an in-situ concrete slab stitched to
     Maharashtra Cricket Association (MCA) is developing an
                                                                      the pre-cast units with reinforcement to form the composite
     international cricket stadium at Village Gahunje, on the north
                                                                      whole floor. The concourse slab, sub- concourse structure
     side of Pune Mumbai Express Highway, approx 20 km north
                                                                      and envelope will be of exposed in-situ concrete. At this
     west of the central Pune, Maharashtra.
                                                                      level the concrete is to be of an architectural quality mix with
                                                                      a high specification fair faced finish and formed with a regular
     After successful completion of cricket stadium for “Vidharbha
                                                                      grid of feature recess detailing. Further key element is in the
     Cricket Association” at Nagpur, this would be second cricket
                                                                      form of roof over south stand. This is created with 6 pairs of
     stadium being constructed by Shapoorji Pallonji, on
                                                                      steel masts supporting inclined steel braced trusses which in
     Lumpsum Design and Build model and with project value of
                                                                      turn support the series of tensile fabric canopies in PVDF
     Rs.193 crores. Even though we have constructed a stadium
                                                                      material.
     earlier, this one at Pune is a unique experience from both
     architectural and execution point of view. The project
                                                                      Other Special features
     commenced on 26th Nov 2009 and the duration of this

03   project now been reduced to 12 months from the earlier
     15 months.
                                                                      • Pre-Cast construction: There is a huge quantum of pre-
                                                                      cast work to be executed for the stadium. There are 6883
excellent aesthetic appearance to the stadium. The
                                                                   cruciform columns are a special feature in the structural steel
                                                                   work.

                                                                   • Innovative roof: Innovative roofs have been designed for
                                                                   the stands both to maximize shading and provide a
                                                                   memorable and identifiable signature for the complex. The
                                                                   roofs are designed to be made of tensile fabric.

                                                                   • Pitch Drainage: The drainage for the ground has been
                                                                   designed such that the entire ground gets dried within 15
                                                                   minutes even after very heavy rainfall. A dense network of
                                                                   lateral pipes of 110mm dia collects the water penetrating the
Artist's Impression of the stadium from the side                   turf and drains to main pipes of 160mm dia which finally
                                                                   drains off to the inner peripheral drain.
elements to be casted and erected on site. The precast
construction is a challenging job since there are a number of      Cost-wise Break-up of the Project:
elements which are to be joined to one another and the
tolerance allowed is negligible. A partnership with 'E             Stadium Works                  :   139.19 Cr.
Construct' from Dubai is established for construction of           Civil works                    :   81.25 Cr.
precast elements mainly for the design and methodology.            Structural Steel               :   48.98 Cr.
They have requisite expertise in this area. E-Construct had        Precast Work                   :   8.96 Cr.
procured the precast moulds from Dubai to achieve the              Ancillary Buildings            :   5.11 Cr.
desired standard of quality                                        Infrastructure Works           :   18.90 Cr.
                                                                   MEP Works                      :   ·29.79 Cr.
• Structural Steel Works: The structural steel works at this       Public Health                  :   417 lacs
project is again a challenging one. The elements used are          Electrical Work                :   1758 lacs
very different and heavy from regular structures, making           Fire fighting work             :   179 lacs
them difficult for fabrication and erection. The total scope for   HVAC Work                      :   327 lacs
Structural Steel work is around 5000 MT and it contributes         Fire fighting work             :   179 lacs
to more than one-fifth of the total project cost. The stadium
is designed in such a manner that structural steel gives                                                        -MCA Team, Pune



Eden Gardens, Kolkata                                              The major change is introduction of corporate suites for high
                                                                   paying corporate customers. This would result in a decrease
                                                                   the seating capacity, but increase the earnings of Cricket
A major tourist attraction, Eden Gardens Stadium in Kolkata
                                                                   Association of Bengal. The structural steel truss and purlins
is one of the largest in the world with a seating capacity of
                                                                   have also been replaced. Other works in our scope:
almost 1,00,000. built in 1840 and named after the sister of
then Governor General, Lord Auckland, it is India's oldest
                                                                   • Proposed blocks “B”, “C”, “K” and “L” Foundations, all
cricket ground and home to the Bengal Cricket Team and
                                                                     tiers, structural steel work, doors, windows, cladding,
IPL's Kolkata Knight Riders. The first test was played here in
                                                                     railing, flooring and wall finishes, sanitary and plumbing
1934 and the first ODI match in 1987.
                                                                     works.
Over the years, Eden Gardens has witnessed changes from
                                                                   • Modification of public facilities in “D”, “E”, “F”, “C” and “H”
erection of new stands to installation of four gigantic
                                                                     blocks :
floodlights. To keep up with new media and corporate
                                                                     a) Dismantling of existing toilets and food court including
requirements in today's age of global broadcasting and
                                                                        reconstruction as per new design and drawing.
sponsorship, the venerable stadium needs to be
                                                                     b) Flooring, painting, doors and windows
modernised.
                                                                     c) Sanitary fitting and fixtures.
The renovation and refurbishment contract was awarded to
                                                                   • External Infrastructure:
SPCL in Jan 2010 with a caluse that the work would be
                                                                     Peripheral roads, Surface drains, Sanitary works, Fire tank,
completed in December 2010, before the 2011 World
                                                                     Water tank, Pump house and Storm water sump.
Cup. The project is challenging as work has to be carried
out amidst stoppages to accommodate cricket match
                                                                   In the Pre-IPL phase, work was concentrated on
schedule.
                                                                   foundations and structural works in proposed blocks “B”,
                                                                   “C”, “K” and “L”. In the post IPL phase, sanitary and road
The stoppages amounted to 28 days split in:
                                                                   works were also taken up to augment revenues.
• Test Match vs South Africa: 9 days • IPL3 (3 slots):19days
The contract value is Rs. 53 crores but is expected to come
down to Rs 40 crores.
                                                                                                      -Eden Gardens Team, Kolkata
                                                                                                                                       04
The Imperial, Mumbai                                              A glance at major quantities for the making, Excavation
                                                                       30,100 Cum, Cement 11,85,000 bags, Concrete 1,34,795
     A Journey, It's Making & Challenges in Construction….             Cum (M50- Grade), Rebar 20,230 MT (Fe-500, CRS-
                                                                       TMT), Structural Steel 2,800Mt(Rolled & Tubular sections),
     When we think of challenge, we think of climbing a                Shuttering 4,54,800 Sqm (Titan & Doka), Block work
     mountain, but has anybody thought of building a mountain.         9,81,676 Nos (AAC Siporex), Car park screed 32,700 Sqm,
     Yes this is a story a snapshot of building a mountain, a          Doors (Wodden & Laminated), Windows (Heavy Sections
     challenging task, a decade long struggle, rising India to new     with Dupont Glass), ACP 38,700 Sqm (Imported from
     height, its building the Imperial Towers (61 floors) at Tardeo,   Japan), Copper wire 300 Km, Plumbing Pipes 120 Km,
     Mumbai. A bench marks for Mumbai, not only Mumbai but             Marble 99,500 Sqm (Imported from Italy), C P & Sanitary
     a benchmark for India too. At present The Imperial is the         ware (Imported from Germany & Italy), etc.
     tallest occupied residential building in south Asia.
                                                                       Construction of Tower started around last quarter of 2002
     The Imperial project, S D Corporation is a joint venture          with main entry ramp & foundation works. The 2004 mid to
     between Shapoorji Pallonji Co Ltd & Dilip Thacker. It's not
                                                                       end of 2005 really went dry as no much work progress was
     just construction of twin towers but 14 other building for
                                                                       observed, as part work was hold for clearance at hill side
     slum dwellers, enhancing the development & image
     management for city's view. Renowned Hafeez Contractor            excavation. Majorly from 2006 the work started in full swing
     is the principal architect & SPCL is the General Contractor.      towards completion of structure. In Dec-2007 Tower 1
                                                                       RCC structure was completed. Now at this time the interior
     A quick view of what hidden inside The Imperial towers, a         & services works at lower levels was also in initiated. Also
     fully residential 61 storied tower, 254M (827') in height with    the works for podium structure begin in early 2008. The
     218 high-end flats, starting area of 1,680Sft of 2BHK to          construction of podium was a huge work, as the quantity
     10,800Sft 5BHK with plunge pool, podium 9 levels reserved         was more than 50% of tower. The works divided in 4
     for parking of 937 cars; triple height main entrance lobby &      phases & phase wise work was executed. At end of 2008
     landscape at 9th level, a huge clubhouse of 70,000 Sft with       podium RCC was completed (The Podium RCC works was
     five star amenities, top 3 floors (58, 59 & 60) are occupied      executed within a period of year) & by early 2009 the tower
     by pent house which is measuring almost 27,000 Sft with           2 structures was also completed. Now works for crown,
     swimming pool. The top portion of tower consists of glazed        external façade, interiors & services was in progress. During
     crown with observation area & above is galvanized structural      mid 2009 the client SDC supported by SPRE HO team
     steel spire.                                                      started directly releasing drawings & decisions required for
                                                                       construction & this facilitated for faster execution. All major
     The Imperial has awarded as Best High-rise development &          works were completed in March 2010, with occupancy
     Best renovation/redevelopment project at the CNBC Asia
                                                                       certificate in hand. At present customers are doing their fit-
     Pacific Property Awards 2009
                                                                       outs, some also have fully occupied.

                                                                       The Site engineering & supporting staff from construction
                                                                       team was around 180 No's at peak time. This staff at project
                                                                       was just as big as running a factory. All departments were
                                                                       well defined with responsibility & authority; regular meeting
                                                                       with project in-charge was conducted for work completion
                                                                       & resolving critical issues.




                                                                       SPCL Site team with Project In-Charge Mr. S. Srinivas (Standing in Centre)

                                                                       In 2005 Mr. S. Srinivas was deputed as project In-charge for
                                                                       construction of overall project under the guidance of Mr. S
                                                                       C Dixit, at his stage a major work was balance to be
                                                                       completed. This was the time when project started moving
                                                                       towards completion in all respects, from structure to finishes
                                                                       to services to handing over. The leadership of Mr. S. Srinivas
                                                                       & site team efforts has really benefitted in completing the
                                                                       project.

05   Actual Project Photograph as in June 2010
The construction of tower (61 floors) was a major part,               plant of 60Cum/Hr was installed. The form works for
where achieving an optimum floor cycle was really required            structure was stored on structural steel cantilever platform
to complete the work in timeframe. These only could be                erected just 3 levels below actual work. This helped to
achieved with advanced form works system in place, to                 reduce cycle time as repetition is major criteria for
tackle this imported TITAN form works was used for first              shuttering. The vertical movement for men & material was
time in SPCL. The work went well initially, but as when time          taken care by construction elevators. There where 9
restriction (Work only from 9am to 6pm) came in picture               construction elevators to fulfill this need. The major
where work could be done barely 8 to 10 hrs per day, a                disadvantage was in terms of slow speed, as it would take an
minimum floor cycle 7 days was achieved at some stages of             average time of 30min for one cycle & additional time also
work. Concrete of M50 grade was manufactured in site                  required for loading / unloading of materials. A separate lift
batching plant & pumped with concrete pump capacity of                allocation schedule for usage was implemented for efficient
300m vertical. Reinforcement for column cage was tied at              use of lifts. Now when permanent service elevators
ground level & directed placed at existing columns of tower           installation was complete it was used as construction
with tower crane. This technique saved time in terms of               elevators with proper protection to the car. It would be
tying the rebar's, which really consumed time.                        equated like this as 4 construction elevators equals to one
                                                                      permanent elevator. The storage of material was managed
The PMV deployed were amongst the advanced & most                     with main store room at level 1 & other small storage at
efficient. Just to summarize the PMV's major equipments               upper levels. This would help in easy unloading & shifting of
used for construction are batching plant 2 nos (60cum/hr &            materials. All site offices were accommodated in podium
30cum/Hr), Concrete pumps (2 nos), boom placer, tower                 levels of tower with all required operational facilities.
canes (Total 4 nos), construction elevators (9 nos) etc
                                                                      Labor workforce; with very advanced & heavy equipment
The Dismantle of                                                      deployed for construction of towers, it was also supported
Jaso tower crane                                                      by sufficient labor strength. The labor strength at peak of
was a very critical                                                   construction was almost 2500nos, out of which 1500nos
task to execute;                                                      labors were accommodated at site in labor camps. The
this was first time                                                   labor camp was located in lower tower podium area to
that a crane of such                                                  reduce the transportation time & facilitate early started of
type has to be                                                        work. Welfare facilities such as well-ventilated rooms, ceiling
dismantled from                                                       fan in each room, exhaust fan in passages, water filter, neat
such height. Jaso                                                     & clean kitchen area, toilet-latrine facilities and to maintain all
crane is one of the                                                   this a dedicated team of housekeeping were present all the
biggest telescopic                                                    time on site.
tower cranes with
boom of 70M &                                                         The major concern for Safety at the Imperial was fall from /
capacity of 12Mt.                                                     off, other than this fire, electrical hazards & housekeeping
The approximate                                                       was also crucial, these were taken care by conducting
weight of crane                                                       inducting training for all new comers, PPE, site access cards,
was 150Mt. A                                                          work permit system, no supervision no work & on site
special crane                                                         training.
                           Tower structure with Cranes (Level 58)
dismantle contractor
from Singapore was enquired. The Singapore contractor                 Almost 12,000sqm safety net was being erected at site for
had quoted a price of Rs 2.25Cr for dismantle, which was              fall protection hazards. At project a new system of
more than the cost of crane. Now Mr. S Srinivas & Mr. P E.        .   peripheral net was implemented. Now this system is being
Babu (DGM-PMV) with guidance from Plant Dept HO, had                  used on other projects. As the building was ready & services
round of technical discussions to reduce this huge cost.              commissioning works started, LOTO (Lock Out Tag Out)
Finally it was decided to dismantle the crane with the in-            system was implemented.
house PMV dept at site. Finally the crane was safely
dismantled by SPCL's in-house PMV department from a
height of 245 without a single incident. Total 3 cranes were
dismantled & a huge saving of Rs 6.75Cr. After safely
dismantle of all canes a special incentive & appreciation letter
was issued to all concern staff from top management.

Site logistics has been a challenging activity to manage
thought the project with initially mass works for excavation,
concreting, formwork, rebar & at latter stage for finishing &
services works. The storage of material, their movements
both vertical & horizontal need to be managed. Only the
existing single access road was properly managed for
vehicular movement. The foundation works was done with                             Flat Interior Works (4BHK Linear – Level 30)
RMC brought from out of site, but this was not sufficient to
cater the need of towers, hence an in-site concrete batching          At The Imperial more that 45 types of imported marble
                                                                      slabs accounting to almost 11 lakh Sft is used for flooring &         06
dado. Also special gold plated tile are used in some flats. The   The Imperial's envelope/facade consists of ACP (Aluminum
     variety of marble was chosen to suit the flat type & interior     Composite Panel imported from Japan) & combination
     layout. The hard-scape & eternal dry cladding works was           window / curtain wall units. Sandwich double laminated
     majorly done with Cobble & granite stone of around 11             Dupont glass (Special heat strengthened glass) is used for
     types with almost 30 variations in color & surface finish. This   windows which can withstand winds of speed 240Km/Hr.
     major concern for finishing work was to deploy skilled            Quantity wise ACP is 38,700 Sqm & glass glazing is around
     labors, as high class finishing quality need to be delivered.     27,400 Sqm for both towers.
     This was achieved by outsourcing from highly skilled
     subcontracts on item basis & specialized agencies.                The external façade cleaning & maintenance is done with
                                                                       Building Maintenance Unit, termed as BMU. Each tower has
     There is not much to say about the interior work as it has        a Scorpio type BMU imported from France with 12m
     spoken worldwide after receiving best interior layout/design      boom. A full cleaning cycle will take 3 months for each
     awards. The imperial has won 7 awards at CNBC Asia                tower & the towers will be cleaned thrice in a year.
     Pacific Property Awards 2009, Best apartment layout: 3
     awards (4 BHK, 4BHK Duplex & 5 BHK Duplex), Best                        Lightning arrestor & Aviation light installation      In progress
     interior layout: 2 awards (2 BHK & 4 BHK Duplex), Best
     High-rise development & Best renovation/redevelopment.
     Recently 3 more awards at Asia Pacific Property Awards
     2010 Best Interior design (5BHK Duplex), Best apartment
     Layout (5BHK & 4 BHK Duplex) are just keeping us in time.
                                                                                                                                Work Height: 254M
     Any building will be dead as historical monument if not                                                                      Completed
     provided with required services. Hi-tech services are
     running in the twin towers. The services are as basic as
     electrical (Total load of 17 MW - Its just equal as running a
     large scale industry), fire fighting (Hydrant & sprinkler),
     plumbing (Hydro-pneumatic systems with PRV's), STP          ,
     elevators (High speed. Medium speed & service), CCTV,
     access control, FAS & PAS, further much automated services
     like Home automation, IBMS (Integrated Building                   Elevators are back-bone for vertical transportation in towers.
     Management System)etc. Major flats have split type HVAC           We have 39 permanent elevators to ferry customers. The
     system, also VRV system is used for larger area of duplex         fastest elevator is 6m/s and a trip would take less than a 1
     flats & lobbies to reduce electric consumption. Common            min. The interior of elevators is a combination of glass,
     areas are ventilated with high speed exhaust / pressuring         mirror, wood, stainless steel & imported marble. The
     fans. The water requirement for towers is 3,85,000 per day.       execution of elevators was on critical path of project, as it
     Rain water harvesting & water recycling is also implemented       would take minimum 9 months for completion; 3 months
     in towers, this will reduce the overall water consumption.        for shaft civil works & 6 months for
     The towers are divided into 6 zones & there are in total 7        installation/commissioning. Overall the lifts installation was
     service floors in each tower for better serviceability.           more critical as there were construction elevators installed in
                                                                       shafts of permanent lifts, so now first we need to dismantle
     The execution of these                                            the construction lifts, do all shaft civil works & than only
     services was varying from                                         permanent lifts installation would commence. This was
     phase to phase of                                                 crucial as dismantle of construction lifts would affect overall
     construction. At construction                                     logistics, to overcome this twin cabin construction lifts were
     stage when the project was                                        installed on external face of building & than only inside
     running on construction                                           construction lifts in shafts were dismantled to make way for
     power & water, it was a                                           installation of permanent. Now when inside permanent
     temporary system, but still it                                    elevators were ready, they were protected from inside &
     need to serve all construction                                    used as construction elevators.
     activities. A more crucial stage
     was witness when the                                              Now at this stage when we have handed over a major part
     electrical supply was switched                                    of project to clients/customer for fit outs /occupancy, it's like
     from temporary to                                                 our dream come true. Someone has really said
     permanent power. The                                              well…“Dream for a building should be twice the height of
     transition was managed                                            building”. It was our true dream that kept us really going till
     properly & progress was not                                       completion of project.
     much hampered. Vertical                  LT Panel Charging
     services runs through shafts were execution was difficult due     After completion of such type of complex project, it is a
     to limited space. The flats & common area works was well          great achievement for the team at site, as well as for SPCL &
     co-ordinated with civil & finishes works, some hiccups were       entire construction industry of India. More dominantly this
     observed initially due to non-availability of work fronts, but    presents SPCL's capability of executing such challenging &
     improved soon. Major works were carried by specialized            huge high-rise projects to compete with international

07   subcontractors, where keen supervision was done.                  market.
                                                                                                      –The Imperial Team, Mumbai
Happenings
Amity HR Excellence Award for Shapoorji Pallonji
                                                               Management System for the year 2010. The award presented
                                                               to SPCL carries a Shield and a Memento.

                                                               Amity is a renowned business school, based out of New Delhi
                                                               and the occasion was their 7th Global HR Summit. Other
                                                               award recipients in various categories included prominent
                                                               organisations such as Maruti Suzuki, L&T, Bharti Airtel, EPIL,
                                                               Star TV, McDonalds, Axis Bank, etc

                                                               Mr. Varghese Mathew, the Corporate HR Head of SPCL,
                                                               received the award on behalf of the company. He has
                                                               attributed the award to the joint efforts of the HR Team, and
                                                               the unstinted support of the top management. Mr. P K
(L to R) Ms. Rukhsana Haque, Mr. Satnam Singh,
                                                               Rakheja, Head of the Northern Region of SPCL and the Delhi
Mr. Gurinder Singh, Mr. Varghese Mathew & Ms. Preeti Sehgal    HR team – Rukshana Haque and Preeti Sehgal also attended
                                                               the award function which was held in Amity Campus, Noida.
On the 17th of September 2010 Amity International Business     The jury also declared, Ms. Rukshana Haque as the Most
School honored a few Indian Corporate Houses for their HR      Promising & Budding Young HR Manager. A proud day for
domain Best Practices. Shapoorji Pallonji & Co. Ltd. was the   SPCL indeed.
proud recipient of Amity Excellence Award for Performance                                -Vasant Sanzgiri, SP Group Centre


GET Induction Program, 2010
                                                               Mr. Varghese Mathew, Executive VP - HR inaugurated the
                                                               program by the ceremonial lighting of lamp. Topics covered on
                                                               the first day were based on the theme of organization
                                                               orientation and training, wherein trainees were given an
                                                               understanding of the company history, business philosophy,
                                                               lines of business, organisation culture, values, philosophy,
                                                               practices and structure. On the first day itself, the trainees were
                                                               informed about the different training modules which they
                                                               would undergo during the training period. Further, they were
                                                               also informed about the recently launched leadership program
                                                               'ALDEP'.

                                                               The theme for the second and third day was methods,
                                                               systems, technology and resources. On the second day, Mr.
Mr. Varghese Mathew lighting the inaugural lamp                S.Y.Karkhanis, VP (Pune Region) presented an overview of the
                                                               regional business to the GETs.
This year the Graduate Engineer Trainees joined the
Organisation on 1st August, 2010 and were inducted into the    The third and the final theme was about career transitioning
organisation through an induction program held at Velvett      from student to professional. It included speakers who had
Country Resort, Khandala. The new batch consists of 74         joined the organisation as GETs in the past. In this session, the
Graduate Engineer Trainees selected from different colleges.   current GETs got many of their queries answered by the




GET 2010-11 Batch                                                                                                                    08
speakers who themselves had been GETs sometime back.               After the group Induction, the trainees have joined their
     The experience sharing should prove beneficial to them in the      respective regions. They would now undergo an intensive on-
     long run. Further, a half-day workshop on 'Campus to               the-job training over the next one year before getting
     Corporate' was organized on the last day of the program. The       absorbed into the regular rolls. We wish them a bright future in
     trainees took part in various group exercises which helped         SPCL!
     them to understand the Do's and Don'ts of corporate life.                                               -Sohan Mohanty, SP HO



     GET's Project Presentation




     Mr. Mukesh Rao introducing the Best Mentor-                        The winners from construction sector - Ahmedabad Team
     Mr. Sandip Mahato (standing at extreme right)
                                                                        along with the Best Presenter honour, two more special
     The Project Presentation by the Graduate Engineer Trainees         awards were recommended by jury members and the results
     (GETs) of batch 2009-10 was held at SP Infocity, Pune on 8th &     are as under:
     9th Sept 2010. This year 09 teams from Construction Division       • Best Presenter: Anurag Pal (Ahmedabad- Construction)
     (8 representing regions + 1 representing EPC) were                 • Special Jury award:
     competing for two prizes of best presentation. Also 03 teams       1) Azim Gunderwala (Hyderabad- Construction)
     representing Real Estate Division competed for the best            2) Rajshree Sarkar ( Kolkata- Real Estate)
     presentation.
                                                                        In recognition of his efforts and dedication, Mr. Sandip Mahata
     This year too regional eliminations were conducted (except         (Sr. Manager, Process, EPC) was chosen as the Best Mentor of
     for Chennai & Hyderabad region which had only one team) to         the year. All prizes were given away by Mr. Cyrus Mistry on the
     select the best team to represent the Regions. So out of total     evening of 9th Sept. Mr. Cyrus stressed the importance of
     227 GETs only 68 could make it to the finals at Pune. The          learning by informing the GETs that learning has not come to
     teams were allotted 45 minutes to present their understanding      an end with the Graduation Ceremony but it will depend on
     on the performance of and lessons learnt on assigned project       the willingness of the GETs to learn from all possible sources.
     before the jury of 4 senior officials- Mr. Debasis Mitra (Sr.VP.   Mr. M.D.Saini, Mr. Varghese Mathew and Mr. Jayant Oswal
     Operations), Mr. Kaustuv Ghosh (GM, Construction Methods           also spoke on the occasion. Mr. Kaustau Ghosh shared a few
     & Planning) , Mr. Prabal Kansal (Add. GM, Strategy) and Mr.        words on the excellent presentation done by all the GETs on
     Sohan Mohanty (Add. GM, Training & OD). Mr Jayant Oswal            behalf of the jury members. The award distribution ceremony
     (COO, SPRE) was on panel for the Real Estate presentations.        was followed by a lively Question/ Answer session where
                                                                        GET's got clarification on many of their queries right from Mr.
     This time the efforts made by all the teams were highly            Cyrus Mistry. The event concluded with a cocktail dinner.
     commended not only by all the jury members but also by the
     members of competing team. Almost every team performed                                                   -Prashanti Kutty, SP HO
     over the expectations and made the platform difficult for jury
     members to select the best ones. But finally, to conclude the
     competition, jury members had to select the best and winners
     were decided as under:
     • Best Presentation (Construction)-
     1) 1st Prize: Ahmedabad (TATA Nano, Sanand)
     2) 2nd Prize: Hyderabad (EMAAR)
     • Best Presentation (Real Estate)- 1st Prize: SP Infocity Pune
     ( Pune+ Chennai)
     In addition to above two winning teams for construction
     division, jury members did share that EPC team had also
     prepared very well but lost the 2nd prize to Hyderabad team
     with marginal difference.


09   Even in case of selecting the Best Presenter, many team
     members presented extremely well and the judges again
     found it difficult to choose just one GET as Best Presenter. So    Mr. MD Saini addressing the gathering
Group Practice Sharing Forum II
                                                                    Department. She explained the benefits of standardization and
                                                                    unification of processes derived from this initiative.

                                                                    Mr. Sandeep Desai, AFCONS, shared practices followed in IT
                                                                    on “Document Management System” and “Sub-contractor
                                                                    Tracking”, which enabled their organization to manage the
                                                                    processes better and resulted in better efficiencies.

                                                                    Mr. Aniruddha Choudhari, Sterling and Wilson, presented the
                                                                    case study of “SAP Implementation” and the key challenges
                                                                    faced by them during the implementation process. He also
                                                                    shared how implementation of SAP had helped improve upon
                                                                    the business processes and provide better view on the key
                                                                    performance indicators.
Mr. Mahesh Tahilyani welcoming the gathering
                                                                    Following this, Mr. Darak, from AFCONS shared the soft
As a part of the initiative launched by Group Centre, the           practices on “Relationship Management with Lenders”, in the
Second Shapoorji Pallonji Practice Sharing Forum was held on        areas of Banking, Internal Treasury Management and Insurance
22nd July, 2010 at Sunville Banquets, Mumbai. The theme was         and the benefits derived from such relationships. He outlined
to share practices in the area of “Finance and Information          the process of Relationship Management and explained how a
Technology”. Executives from Finance and IT functions of our        simple process of being transparent, proactive, timely, honest
Group Companies like SPCL, SP Real Estate, SP Fabricators,          in dealing etc. is being utilized to create a competitive
Sterling and Wilson, AFCONS, Forbes, Eureka Forbes,                 advantage and substantial goodwill with our key lenders. He
NextGen etc; were present for the forum along with Group            also mentioned that the awareness of developments across
Centre Members and Mr. Cyrus Mistry.                                Group companies also help the respective companies to build
                                                                    up the case for a better relationship between the lenders and
After the introduction and welcome speech by Mr. Vasant             the Group.
Sanzgiri, Mr. Mahesh Tahilyani welcomed the gathering and
initiated the discussion on the opportunities in areas of Finance   Mr. Adi Shroff, EFL, spoke about “Business Transformation and
& IT and how Finance & IT organizations use the IT                  Information Technology” in Eureka Forbes. He further briefed
Framework to install processes and controls across the              the gathering on the four pillars of Information Technology i.e.
business for effective results. He also mentioned of SP Group's     Business Transformation, Software Development,
endeavor to synergize effectively to create value for the group.    Infrastructure Management and Application Maintenance
The importance of keeping abreast with latest trends in the         support and explained how these could be used to leverage
professional domain of finance was also emphasized.                 and create an efficient business process environment. He
                                                                    effectively explained by given examples used within EFL about
SP had the pleasure of having amongst us Dr. Samiran                how close linkage between process and technology is
Chakraborty, Head of Indian and Global Research, Financial          important to ensure coordinated solutions to business
Market and Mr. Abhay Ketkar, Director Project and Export            challenges.
Finance from Standard Chartered Bank who shared their
candid views on Current Macro Economic scenario on the              The session concluded with a presentation on “Sustainable
financial indicators of India, China, Middle East. Current trends   Business Process Improvement” in SPCL by Mr. H. J. Tavaria.
of financial / structuring deals in INFRASTRUTURE SECTOR            He spoke on his experiences of implementing an ERP system
to optimize value for shareholders were also shared. These          across SPCL and how the rigor of the processes could result in
sessions were highly appreciated by the audience.                   an effective implementation and also result in effectiveness of
                                                                    control over the processes irrespective of the ERP in place.
Ms. Sunetra Ganeshan, Forbes, presented “Shared Services”
process in Accounting followed at Forbes and explained how          The next practice sharing forum on “Functional Expertise and
certain key accounting processes were centralized and               Technology” theme is scheduled for October 2010.
standardized under their newly formed Shared Service
                                                                                                -Vikas Agarwal, SP Group Centre




The attendees of the forum                                                                                                             10
The Handing Over of Keys at SP Shukhobrishti, Kolkata




     A view of SP Shukhobrishti                                        Mr. Rana Gupta, regional head of SPRE with the dignitaries

     On the 6th of September 2010, the ceremonial handing over         The proceedings began with some melodious songs by the
     of keys of the first lot of apartments of SP Shukhobrishti, the   famous singer of the region – Mr. Shibaji Chattopadhyay. Mr.
     mass housing project of SP Real Estate, took place in New         Kekoo Colah, CEO, SP Real Estate welcomed the apartment
     Town, Kolkata. This lot comprised of 1,500 LIG units. This        owners to their new abode and also gave assurance of the
     event was covered by most electronic and print media of the       finest quality and form that is associated with any Shapoorji
     region.                                                           product. He also requested WBHIDCO and the Govt. of
                                                                       W.Bengal to review and improve the existing communication
     The Chief Minister of West Bengal, Mr. Buddhadeb                  and infrastructure facilities of the project by including some
     Bhattacharjee was the guest of honour on the occasion. He         mass transit bus lines and other required services. Mr.Gautam
     personally handed over the keys to seven flat owners, much to     Deb said this project, besides providing affordable housing
     their joy. Speaking on the occasion, Mr.Buddhadeb                 solution, will also create job opportunities for the local
     Bhattacharjee applauded the effort of creating such low cost      population. He also declared that for improving connectivity to
     housing with all modern facilities and congratulated Shapoorji    the project, WBHIDCO had plans to procure around 10
     Pallonji on this commendable achievement. The ceremony            buses.
     was presided over by Mr. Gautam Deb, the Minister of
     Housing & Public Health Engineering Dept., Govt. of               SP Shukhobrishti is the country's largest mass housing project,
     W.Bengal. In his welcome address, Mr. Saurabh Das, MD,            which will have a total of 20,000 units in the LIG and MIG
     WBHIDCO said that every new satellite township is                 segments, spread over an expanse of 150 acres of land. In
     symbolized by an iconic project that defines the character of     addition it will also feature various amenities such as retail
     the place and expressed his belief that SP Shukhobrishti was      stores, club facilities, medical centre, school etc. With more
     going to be that iconic project of New Town.                      than 70% of the land area open to the sky, green corridors,
                                                                       extensive landscaping and abundant greenery, SP
     The event had a large presence of dignitaries which included      Shukhobrishti is not just a beautifully executed project but an
     Mr. Abdur Razzak Mollah, the Minister of Land & Land              eco friendly one too. When completed, it will be home to a
     Reforms, Govt. of W.Bengal, Mr. Abdus Sattar, the Minister of     population of around a lakh people.
     State for Minorities Development and Welfare & Madrasah
     Education, Govt. of W.Bengal, and Mr.Rabindra Nath Mondal,                                     -Ranjan Sengupta, SPRE Kolkata
     Member of Legislative Assembly, W.Bengal.




11   (LtoR) Mr. Kekoo Colah, Mr. Buddhadeb Bhattacharjee,
     Mr. Gautam Deb, Mr. Abdus Sattar & Mr. Abdur Razzak Mollah
                                                                       The Chief Minister handing over the keys of the flat to the
                                                                       owner
Supervisor Upgradation Course - Batch 5
                                                                      Cheques of Rs. 3,000 each to the toppers and Rs.1,500 each
                                                                      to the second rank holders were given by the Principal, Col. A
                                                                      K Mukherjee. Mr. Bijan Bala (Delhi) in the Finishing Stream and
                                                                      Mr. Akbar Ali (Kolkata) in Formwork & Steel Fixing Stream
                                                                      were the toppers. Mr. Bablu Kumar Pandey (Pune) and Mr.
                                                                      Asish (Kolkata) bagged the 2nd places respectively. With this
                                                                      batch, the school has touched the 100 mark in terms of the
                                                                      number of upgraded supervisors and has in total trained more
                                                                      than 175 supervisors for all the regions of SPCL.

                                                                      Earlier, in August, the Group HR Head MrVasant Sanzgiri paid a
Col A K Mukherjee presenting cheque to the topper of Form             visit to the school. He addressed the trainees and stressed on
work & Steel Fixing Stream, Mr.Akbar Ali from Kolkata region
                                                                      the importance of training & shouldering of additional
                                                                      responsibility by the supervisors on site. Mr Joerg Meyer,
                                                                      Quality Expert from the Head Office also visited the school.
The 5th batch of Supervisor Upgradation Course passed out
                                                                      He observed the trainees during group exercises on
on the 18th of September 2010, from Supervisor Training
                                                                      Engineering Problems and interacted with them individually.
Center, Kolkata. A total of 18 Supervisors from all the regions
were trained during the 10 week course in two streams -
                                                                                                 -Col A K Mukherjee, STC, Kolkata
Formwork/ Steel Fixing and Finishing.




Mr. Joerg Meyer and Ms. Usha Venkatesan with the students of Batch 5 & school staff



PRW Subcontractors Meet, Delhi
IIT Piece Rate Work (PRW) subcontractors (Labour                                                     credited more quickly to their
Subcontractors) attended the meet hosted by Delhi. Regional                                          bank accounts. He also
office on 31st July 2010 at Grand Vatika, Gurgoan, Haryana.                                          declared that the accounts
                                                                                                     departments would aid the sub
The meet opened with the address by Mr. P Rakheja, senior
                                           .K.                                                       contractors in registering in
Vice President. Mr. Rakheja highlighted the importance of                                            service tax, provident fund and
PRWs in construction and updated the gathering on their                                              income tax departments.
current status and future plans. Terming the pRWs as “good
partners in our success and future growth,” Mr Rakheja                                               Mr. Rakheja alongwith Mr.
announced cash awards for the PRW sub contractors. The                                               K.K.Knaji, Mr. Shammmi
awards, would be based on the average labour strength                                                Khurana, Mr. Manoj Dubey,
maintained at the site throughout the year commencing the                                            Mr. Amit Dasgupta, Mr
financial year.                                                                                      Rahaman and Mr. Vimal saroha
                                                                                                     distributed members and wool
The awards are:                                                                                      shawls to the participating sub
1) Rs 50,000 for an all year average strength of 50 lobours at a                                     contractors. Certificates of
site                                                                                                 appreciation were sent to all
2) Rs 1,00,000 for an all year average strength of 100 labour at                                     sites for distribution to the
a site                                                                                               PRW subcontractors.
3) Rs 2,00,000 for an all year average strength of 200 labour at
a site                                                                                              The meet concluded with
                                                                      cocktails and dinner which was enjoyed by the PRW
Mr. Jatindaer Grover, (Addl. GM) advised the sub contractors
to go for ECs facilities in their basic to get their payments
                                                                      subcontractors and senior company officials.
                                                                                                             -Gautam Sarkar, Delhi      12
Inauguration of new offices
     SP Infrastructure Capital Co. Ltd.                               business offices were inaugurated. It was a clear testimony of
     The Infrastructure Business Group of SP (SP Infra) has been      the support of the entire SP Group when the inaugural lamp
     expanding its activities and has secured key project             was lit by our revered Chairman and Managing Directors of
     developments in the road, power, port and mining sectors.        SPCL.
     Recently 'SP Infra' moved into its new spacious premises         Group Centre Members were all there to wish the very best
     where the interiors were done by SP CMG to high standards        to this fledgling but significant arm of the SP Group. The SP Infra
     in record time and on 30th August, Phase I of SP Infra's         team wishes to thank all those MADE IT HAPPEN on time.
                                                                                                          -Mukundan Srinivasan, SP Infra




     Mr. Pallonji Mistry lighting the inaugural lamp

     SP Investment Advisors Pvt. Ltd.




     SPIAPL Team with Mr.Shapoor Mistry, Mr.Cyrus Mistry and Mr.Jimmy Parakh at the inauguration

     The new office of Shapoorji Pallonji Investment Advisors Pvt.    SPIAPL was set up in April 2010 for advising third party overseas
     Ltd. became operational on the 30th August 2010. It is located   institutional equity funds on investments into the SP Real Estate
     at Mittal Court in Nariman Point at Mumbai. On the 27th          projects as well as third party developer projects with the
     August, 2010, a “Jashan” (Parsi religious ceremony) was          objective of generating attractive returns for these investors.
     conducted at the premises marking its auspicious opening.        We look forward to SPIAPL establishing SP Group's strong and

13                                                                    long term presence in the Fund Management vertical.
                                                                                                               -Hutoxi Saher, SPIAPL
Second phase of SP Real Estate office premise becomes operational




SPRE Office Cafeteria                                              SPRE Office Phase 2

The second phase of the SP Real Estate office premise became       the same basic interior décor pattern as the first phase. It also
operational on 23rd of September, 2010. This phase is also         includes a small cafeteria space. The new premise will
located in the B-Wing of SP Centre at Colaba and is connected      presently accommodate personnel from the departments of
to the first phase. A small “Puja” was performed to mark the       Legal, HR, Liasioning and Accounts. The total seating capacity
opening of the new office. This ceremony was attended by the       of the SP Real Estate office has gone up to approx.90 with the
entire real estate team including the CEO - Mr.Kekoo Colah,        addition of this new space.
all heads of departments and the staff. The new office follows                                    -Saurabh Chaturvedi, SPRE HO



Release of Site Policy Manual




(Lto R) Mr. SC Dixit, Mr. MD Saini & Mr. Varghese Mathew releasing the site policy manual

A comprehensive Site Policy Manual covering all aspects of         Project Management team and for the Regional Admin staff. It
statutory compliances has been prepared and formally               is hoped that this document will act as a handy reference book
released by Mr. M. D. Saini & Mr. S. C. Dixit recently. The        for all involved in statutory compliances.
Manual is an answer to many critical compliance issues which
are relevant for the Project Managers as well as the Admin         The whole project was completed with active involvement of
Personnel. The Manual is written in a simple and non-legalistic    Mr. Lalit Jaywant and Mr. Anil Deshpande.
language along with a section for FAQs. Subsequent to the
release of the Manual, Mr. Lalit Jaywant, General Manager – IR
& Admin has conducted a series of workshops for the Sr.
                                                                                                       -Varghese Mathew, SP HO
                                                                                                                                       14
Donation of Raincoats, Hyderabad
                                                                      SPCL, H1 Emaar site,Gachi Bowli, Hyderabad donated 15
                                                                      sets of rain coats to police personnel of Raidurg police station in
                                                                      special recognition of the services rendered by this police
                                                                      station.

                                                                      This police station retrieved stolen material & hand tools and
                                                                      resolved theft cases which had occurred at this site apart from
                                                                      offering assistance in labour welfare cases. This police station
                                                                      has always rendered their best services and help when ever
                                                                      required, with a smiling face. On SPCL's request, they also
                                                                      commenced night patrolling near the labour colony.

                                                                      The tokens of appreciation were handed over by Mr. Gautam
                                                                      Das, Addl. General Manager, H1 Emaar project .

     Mr Gautam Das handing over the raincoats                                                             -Sriram Bidayat, Hyderabad




     Independence Day Celebrations, Hyderabad




     Flag hoisting ceremony in progress at Aga Khan Site              Flag hoisting ceremony in progress at ITC Bhadrachalam Site

     India's 66th Independence Day was celebrated with a lot of       speeches on the freedom movement and spoke about the
     vigour at various labour colonies across the Hyderabad region.   great leaders of the freedom movement. They also recited
     Almost 2,500 workers, their families and staff members           patriotic verses and dedicated songs to these great names. It
     actively took part in celebrating the day. Flag hoisting         was great to see such enthusiasm and patriotic feelings
     ceremonies along with distribution of sweets were carried out    amongst the workers.
     at most sites. Some of the workers delivered informative                                            -Aziz Tayyaba, Hyderabad



     The I-space Table Tennis Tourney 2010
                                                                      The inaugural I-Space Table Tennis Tourney was held at SP
                                                                      Infocity Pune (at the iSPace club) on the 27th, 28th & 29th of
                                                                      July. The tourney was open to all employees of organisations
                                                                      on the campus and was held primarily to enhance awareness
                                                                      about the club facilities.

                                                                      Approximately 60 entries were received for the various events
                                                                      scheduled. These included Men's & Ladies' Singles, Men's &
                                                                      Ladies' Doubles & Mixed Doubles and a Team Event. All
                                                                      matches were best of five 11 point games. Mr Arun Bavde, a
                                                                      veteran from the fraternity was the chief referee. He has more
                                                                      than 25 years of experience and is actively involved in playing at

15   Mr. Shailesh Korgaokar presenting the trophy to the winner
     of Ladie's Singles
                                                                      tournaments of district & state levels as well as refereeing at
                                                                      various tournaments around the state.
The entire event was conducted in the iSport zone at the club.    The tourney concluded with the prize distribution ceremony
All three days witnessed a very supportive crowd who              and the vote of thanks by Mr Shailesh Korgaokar, GM
cheered & encouraged each point that was scored. The Men's        Hospitality (I-Space). All winners & runners up were given
Singles final between Abhishek Kumar & Nitin Kulkarni (both       trophies & honorary memberships of the Health Club at
from IBM) was a best of seven cliffhanger which went up to the    iSpace Club.
sixth match. The title was eventually won by Nitin. The Ladies'
Singles final was also a keenly contested match between                                     -Shailesh Korgaokar, SP Infocity, Pune
Shweta & Vaishali (both from IBM) & Shweta emerged the
winner of the title.



Blood Donation Camp at SP Infocity, Pune
                                                                  It was conducted under the supervision of Deenanath
                                                                  Mangeshkar Hospital, Pune, one of the city's premier medical
                                                                  institutes. The blood bank team, led by their PRO Mr Arvind
                                                                  Dhurve & the technicians, were ably guided by their chief
                                                                  pathologist - Mrs Durwankar.

                                                                  The drive received an encouraging response. A total of 160
                                                                  units of blood were collected in the two days, which, was far
                                                                  beyond expectations, as stated by Mr Dhurve. Encouraged by
                                                                  the response he expressed his desire to conduct regular blood
                                                                  donation drives at SP Infocity in the years to come.

                                                                  SPCL will have access to 10% of the donated units for
Blood Donation Drive in progress                                  allotment to anybody in need of blood (within a radius of 5 hrs
                                                                  road travel time). This requirement will be met with by the
The first blood donation drive at SP Infocity Pune was            blood bank of the hospital on request sent by the SPCL HR
conducted on the 10th and 11th August, 2010.                      department and prescription of the treating doctor.

                                                                                            -Shailesh Korgaokar, SP Infocity, Pune



“No Liquor” campaign, Pune




Workers attending the program                                     A banner at the event highlighting the ill effects of alcoholism

Alcoholism is one of the major concern areas in many              The event featured a talk accompanied by a slide show
construction site labour camps. An awareness program was          followed by a question answer session. Over 2000 workers
held at the TCS Pune site on the eve of Independence Day to       were present and most of them actively participated. The
educate the workers about the negative effects of this habit.     NGO has also offered to train SPCL staff members who are
The event was held in association with the NGO – Muktangan.       interested in counseling.

                                                                                                              -Smita Wadkar, Pune
                                                                                                                                     16
Towards Excellence
     Introduction to OHSAS 18001
     OHSAS 18001 is an international specification which defines                            The basic approach taken within OHSAS 18001 is the
     a set of requirements for an Occupational Health & Safety                              familiar mechanism of PLAN - DO - CHECK - ACT and it
     Management System which would be suitable for any kind                                 systematically requires the organisation to:
     and size of organisation. OHSAS 18001 was developed by a                               • Detail an Occupational Health & Safety Policy applicable
     committee of interested parties including national standards'                             to its operations
     bodies, certification bodies, learned bodies and industry                              • Identify the OHS hazards and risks which the
     representatives. Occupational health and safety                                           organisation needs to manage
     management system enables companies to address issues in                               • Identify the legal and similar constraints on the
     an effective manner.                                                                      organisation
                                                                                            • Define and implement the means of managing these
     There are number of Occupational, Health & Safety                                         issues and requirements
     Legislations, which cover the health and safety related                                • Set up the means of effecting continual improvement in
     components, which play a vital role in the legal framework                                the organisation's occupational health & safety
     of the business world. An effective Integrated OHS                                        performance
     Management System, shall facilitate an enterprise to identify                          • Check and review the effectiveness of controls and
     and address all such gaps.                                                                improvements

     In view of the above, the top management has decided to                                This approach means that OHSAS 18001 can be applied to
     implement an Occupational Health & Safety Management                                   any type and scale of organisation. An OHSAS 18001
     System (OHSMS) in our organization.                                                    management system will mean that:
                                                                                            • You understand all of the hazards and consequent risks
     Not only does an effective Safety Management System                                       your organisation poses to employees and neighbours
     (SMS) improve existing and establish new controls, it also                             • You know what you are doing to manage and reduce or
     installs and drives a system of continual improvement in                                  eliminate these risks
     Occupational Health & Safety performance.                                              • You put good Occupational Health & Safety management
                                                                                               into all your future plans and the heart of your business
     Without a formal management system in place, issues tend
     to be tackled on an ad-hoc basis or in a fire-fighting manner,                         MAIN REQUIREMENTS
     simply attacking each issue as it arises. Similarly, simple                            1) Identification of Legal Requirements
     auditing of an organisation's activities, identifying its health                       2) Establishing & maintaining Safety Objectives
     and safety problems, and then resolving them, could well                               3) Establishing & maintaing OH&S Management Programme
     mean that you could come back a year later to find that all of                            for achieving its objectives
     the problems have reappeared.                                                          4) Emergency preparedness & response to incidents and
                                                                                               emergency situations
                                                                                            5) Establishing & maintaining procedure for defining
      Management                          Policy                            Planning           responsibility & authority for handling & investigation of
      Reviews                                                                                  accidents, incidents, non-conformances & audit.
                                                                   --OSHA Risk
                                                                     --Legal Requirement
                                                                       --Objectives         Structure of OSHAS accd. to 18001
                                Act               Plan                  --OH & S Programe
                                •How to Improve   •What to do?
                                 next time?       •How to do it?



                                                                          --Structure &
                                                                         responsibility
      --Monitoring &          Check                Do                   --Training                                   Continual
        Measurement         •Did things happen    •Do what was         --Communication
      --Non confeormance     according to plan?    planned            --Documentation                                Improvement
        CAPA                                                        --Document & record
      --Incident & accidents                                          control
      investigations                                          --Operational Control
      Records                                              --Emergency preparedness &
      Audits                                                 Response plan                                                       OSHAS
                                                                                                                                 policy
     Checking & Corrective                                           Implementation
     Actions                                                         Operations                    Management
                                                                                                     review

     An OHSAS 18001 Safety Management System provides for                                                                              Planning
     the development of a system of inter-linking processes. It is                                Measurement
     a simple and effective toolkit of mechanisms for managing                                        and
     Occupational Health & Safety issues in any kind of                                            Evaluation           Implementation
     organisation. It is only prescriptive in terms of what must                                                             and

17   happen, leaving the how to the organisation to decide or
     devise for itself.
                                                                                                                          Operation
THE BENEFITS                                                         compliance to regulatory requirements hence we will be
Some of the key benefits of an OHS Management System                 sure that we have identified and understood all the legal
are outlined below:                                                  requirements affecting our business and we will be sure
                                                                     that we comply with them all.
Operational point of view -                                        • Demonstrates organisation's commitment towards
• Identifies the overall health and safety hazards and risks         betterment of society
• Assures safe & healthy working conditions for working
  people                                                           Commercial point of view –
• Enhances awareness on emergency preparedness &                   • Eliminates or minimized Risk
  response                                                         • Facilitates in the reduction of insurance premium
• Reduces number of accidents & thus lost working hours            • Increases productivity by boosting morale of the labour by
• Identifies the OHS legal gaps and addresses the                    way of Safe Working Environment
                                                                                                          -Omkar Bendre, SP HO



Persuasive Proposals and Presentations
It is no use saying, we are doing our best; we have got to         Thus, the matter was successfully perused without BOQ
succeed in doing what is necessary                                 and even resulted into client developing improved
                                                                   confidence in Shapoorji Pallonji's way of dealing with it. Of
Sir Winston Churchill's Theory is indeed powerful which            course, for internal monitoring purpose, we did work out
fetches the results, when practiced religiously.                   the BOQ. The danger in furnishing the BOQ lies ahead,
                                                                   when it is circulated to other competitors for inviting the
Proposals and presentations always play an imperative role         commercial proposals which, at times could prove
in successfully achieving the desired goals of sales strategy as   detrimental to the organization.
it involves all the elements necessary for winning. It's
relevant to mention what Aristotle had quoted-                     Thus, the proposal was put forth with great collaboration &
                                                                   confidence incorporating exact requirements indicated by
“Of the modes of persuasion furnished by the spoken word,          client's representative and strengthened the “Design & Build
there are three kinds. The first kind depends on the               Project Delivery System”.
speaker's 'personal character'; the second on the art of
putting the audience in to a 'certain frame of mind'; and the      The favorable results virtually made the entire proposal
third on 'the proof, provided by the words of speech itself'”      team to think about the sanctity of Aristotle's statement as it
                                                                   helped successfully in practice. Another imperative, the
At Design & Build (D&B), the proposals are pivoted on the          'Intuition' also contributes to a great extent. In Albert
insights shared by client themselves on; what their                Einstein's words, “The only real valuable thing is intuition” It
requirements are. D&B endeavors in ensuring that                   does occur while constituting the varied elements of the any
necessary support is provided to the client to make them           business proposal. The comments of the audience are
share their requirements; especially when the client finds it      needed to be taken positively with a belief that each and
difficult to define the exact requirements. D&B believes that      every person in audience posses some special inherent
it is very important that how the case study is presented by       capability and points made by them can certainly clarify their
the speaker. The case is presented in such systematic              expectation in detail and also can add significant value to our
manner that persuades the client to share his requirements         proposal.
very clearly. Here the interpretation in literal manner makes
the matter crystal clear and leaves no room for the                Few things to be remembered for making effective proposal:
ambiguity. The words, during presentation always, created          • FOCUS on the Theme,
the ripples around, for reaping the benefits in terms of 'Time     • REAP the benefit from interactions,
and Cost'.                                                         • SHARE BOLDLY the case studies and problems
                                                                     encountered,
For example the CAN PACK, one of our potential client              • MENTION the strengths and success,
who was initially insisting for the BOQ but by using our           • HIGHLIGHT THE BENEFITS with customized language
persuasive techniques we could successfully change his mind          to focus on needs from the client's point of view.
set and made their representative provide us with necessary
inputs on their exact expectations and the proposal we             Last but not least; let's always bear in mind the motivational
submitted was explicitly based not on BOQ rather on-               quote by Thomas Jefferson, who asserted, “It takes time to
• Clients inputs                                                   persuade men to do even what is for their own good”.
• Concept drawings
• Area statement                                                   With this in mind, let's follow that the proposal is to be
• Specifications                                                   made clear, concise and organized because, eventually in
• Scope                                                            business you get what you want by giving other people what
• Exclusions                                                       they want…
• Commercial conditions &                                                                         -J P Rao, Design & Build Div
• Time schedule

                                                                                                                                      18
We@sp 3 (2010)
We@sp 3 (2010)
We@sp 3 (2010)
We@sp 3 (2010)
We@sp 3 (2010)

Más contenido relacionado

La actualidad más candente

IRJET- Experimental Investigation on Mechanical Splices in Fiber Reinforc...
IRJET-  	  Experimental Investigation on Mechanical Splices in Fiber Reinforc...IRJET-  	  Experimental Investigation on Mechanical Splices in Fiber Reinforc...
IRJET- Experimental Investigation on Mechanical Splices in Fiber Reinforc...IRJET Journal
 
Satec Envir Engineering (India) Private Limited, Mumbai, Industrial Products
Satec Envir Engineering (India) Private Limited, Mumbai, Industrial ProductsSatec Envir Engineering (India) Private Limited, Mumbai, Industrial Products
Satec Envir Engineering (India) Private Limited, Mumbai, Industrial ProductsIndiaMART InterMESH Limited
 
CFRP Strengthening of Concrete Beam Shear Cracks
CFRP Strengthening of Concrete Beam Shear CracksCFRP Strengthening of Concrete Beam Shear Cracks
CFRP Strengthening of Concrete Beam Shear CracksAlex Elpianto Kajuputra
 
Fibre Reinforced Polymer
Fibre Reinforced PolymerFibre Reinforced Polymer
Fibre Reinforced PolymerBudi Suryanto
 
IRJET- Experimental Investigation on Engineered Cementious Composite
IRJET- Experimental Investigation on Engineered Cementious CompositeIRJET- Experimental Investigation on Engineered Cementious Composite
IRJET- Experimental Investigation on Engineered Cementious CompositeIRJET Journal
 
IRJET- An Experimental Study on Compressive Stength of Composite Fiber Re...
IRJET-  	  An Experimental Study on Compressive Stength of Composite Fiber Re...IRJET-  	  An Experimental Study on Compressive Stength of Composite Fiber Re...
IRJET- An Experimental Study on Compressive Stength of Composite Fiber Re...IRJET Journal
 
B.tech Project 1 - Industrialised Building Systems
B.tech Project 1 - Industrialised Building SystemsB.tech Project 1 - Industrialised Building Systems
B.tech Project 1 - Industrialised Building SystemsCarmen Chan
 
Building Technology I Project 1
Building Technology I Project 1Building Technology I Project 1
Building Technology I Project 1DavidJPCChai
 
Building Technology 1 (Project 1)
Building Technology 1 (Project 1)Building Technology 1 (Project 1)
Building Technology 1 (Project 1)Soh Shing
 
Fabrication and Characterisation of Hybrid Aluminium Metal Matrix Composite...
	 Fabrication and Characterisation of Hybrid Aluminium Metal Matrix Composite...	 Fabrication and Characterisation of Hybrid Aluminium Metal Matrix Composite...
Fabrication and Characterisation of Hybrid Aluminium Metal Matrix Composite...IRJET Journal
 

La actualidad más candente (13)

Tabs ppt
Tabs pptTabs ppt
Tabs ppt
 
IRJET- Experimental Investigation on Mechanical Splices in Fiber Reinforc...
IRJET-  	  Experimental Investigation on Mechanical Splices in Fiber Reinforc...IRJET-  	  Experimental Investigation on Mechanical Splices in Fiber Reinforc...
IRJET- Experimental Investigation on Mechanical Splices in Fiber Reinforc...
 
Satec Envir Engineering (India) Private Limited, Mumbai, Industrial Products
Satec Envir Engineering (India) Private Limited, Mumbai, Industrial ProductsSatec Envir Engineering (India) Private Limited, Mumbai, Industrial Products
Satec Envir Engineering (India) Private Limited, Mumbai, Industrial Products
 
Retrrofitting
RetrrofittingRetrrofitting
Retrrofitting
 
CFRP Strengthening of Concrete Beam Shear Cracks
CFRP Strengthening of Concrete Beam Shear CracksCFRP Strengthening of Concrete Beam Shear Cracks
CFRP Strengthening of Concrete Beam Shear Cracks
 
Fibre Reinforced Polymer
Fibre Reinforced PolymerFibre Reinforced Polymer
Fibre Reinforced Polymer
 
IRJET- Experimental Investigation on Engineered Cementious Composite
IRJET- Experimental Investigation on Engineered Cementious CompositeIRJET- Experimental Investigation on Engineered Cementious Composite
IRJET- Experimental Investigation on Engineered Cementious Composite
 
IRJET- An Experimental Study on Compressive Stength of Composite Fiber Re...
IRJET-  	  An Experimental Study on Compressive Stength of Composite Fiber Re...IRJET-  	  An Experimental Study on Compressive Stength of Composite Fiber Re...
IRJET- An Experimental Study on Compressive Stength of Composite Fiber Re...
 
B.tech Project 1 - Industrialised Building Systems
B.tech Project 1 - Industrialised Building SystemsB.tech Project 1 - Industrialised Building Systems
B.tech Project 1 - Industrialised Building Systems
 
Structures brochure feb 2013
Structures brochure feb 2013Structures brochure feb 2013
Structures brochure feb 2013
 
Building Technology I Project 1
Building Technology I Project 1Building Technology I Project 1
Building Technology I Project 1
 
Building Technology 1 (Project 1)
Building Technology 1 (Project 1)Building Technology 1 (Project 1)
Building Technology 1 (Project 1)
 
Fabrication and Characterisation of Hybrid Aluminium Metal Matrix Composite...
	 Fabrication and Characterisation of Hybrid Aluminium Metal Matrix Composite...	 Fabrication and Characterisation of Hybrid Aluminium Metal Matrix Composite...
Fabrication and Characterisation of Hybrid Aluminium Metal Matrix Composite...
 

Similar a We@sp 3 (2010)

Crrugated sheets vks
Crrugated sheets vksCrrugated sheets vks
Crrugated sheets vksvenkatkurra
 
Applying Ferrocement Concept for Non- Gravity Weir Construction in Rural Area.
Applying Ferrocement Concept for Non- Gravity Weir Construction in Rural Area.Applying Ferrocement Concept for Non- Gravity Weir Construction in Rural Area.
Applying Ferrocement Concept for Non- Gravity Weir Construction in Rural Area.IRJET Journal
 
IRJET- Sleeper Design using Fibre Reinforcement
IRJET- Sleeper Design using Fibre ReinforcementIRJET- Sleeper Design using Fibre Reinforcement
IRJET- Sleeper Design using Fibre ReinforcementIRJET Journal
 
IRJET- Case Study on Beijing National Stadium : Bird Nest Olympic Stadium
IRJET- Case Study on Beijing National Stadium : Bird Nest Olympic StadiumIRJET- Case Study on Beijing National Stadium : Bird Nest Olympic Stadium
IRJET- Case Study on Beijing National Stadium : Bird Nest Olympic StadiumIRJET Journal
 
Tbea vocatinal training
Tbea vocatinal trainingTbea vocatinal training
Tbea vocatinal trainingDeep Shah
 
IRJET- Use of Solar Energy for Pumping Out Groundwater for Irrigation in ...
IRJET-  	  Use of Solar Energy for Pumping Out Groundwater for Irrigation in ...IRJET-  	  Use of Solar Energy for Pumping Out Groundwater for Irrigation in ...
IRJET- Use of Solar Energy for Pumping Out Groundwater for Irrigation in ...IRJET Journal
 
IRJET- Analytical Study on Strengthening of RC Tee Beams with Composite Mater...
IRJET- Analytical Study on Strengthening of RC Tee Beams with Composite Mater...IRJET- Analytical Study on Strengthening of RC Tee Beams with Composite Mater...
IRJET- Analytical Study on Strengthening of RC Tee Beams with Composite Mater...IRJET Journal
 
Jindal-Steel-Structure-Brochure
Jindal-Steel-Structure-BrochureJindal-Steel-Structure-Brochure
Jindal-Steel-Structure-BrochureJindalStructural
 
Cnc project by prashant kumar
Cnc project by prashant kumarCnc project by prashant kumar
Cnc project by prashant kumarprashant kumar
 
Final power point teckno profile
Final power point teckno profileFinal power point teckno profile
Final power point teckno profileJanakbhatt
 
IRJET- Review on Manufacturing Process Study of Coils used in Industrial and ...
IRJET- Review on Manufacturing Process Study of Coils used in Industrial and ...IRJET- Review on Manufacturing Process Study of Coils used in Industrial and ...
IRJET- Review on Manufacturing Process Study of Coils used in Industrial and ...IRJET Journal
 

Similar a We@sp 3 (2010) (20)

15020441033
1502044103315020441033
15020441033
 
Crrugated sheets vks
Crrugated sheets vksCrrugated sheets vks
Crrugated sheets vks
 
Applying Ferrocement Concept for Non- Gravity Weir Construction in Rural Area.
Applying Ferrocement Concept for Non- Gravity Weir Construction in Rural Area.Applying Ferrocement Concept for Non- Gravity Weir Construction in Rural Area.
Applying Ferrocement Concept for Non- Gravity Weir Construction in Rural Area.
 
BHEL Trainning Report
BHEL Trainning ReportBHEL Trainning Report
BHEL Trainning Report
 
IRJET- Sleeper Design using Fibre Reinforcement
IRJET- Sleeper Design using Fibre ReinforcementIRJET- Sleeper Design using Fibre Reinforcement
IRJET- Sleeper Design using Fibre Reinforcement
 
IRJET- Case Study on Beijing National Stadium : Bird Nest Olympic Stadium
IRJET- Case Study on Beijing National Stadium : Bird Nest Olympic StadiumIRJET- Case Study on Beijing National Stadium : Bird Nest Olympic Stadium
IRJET- Case Study on Beijing National Stadium : Bird Nest Olympic Stadium
 
Structura Brochure
Structura BrochureStructura Brochure
Structura Brochure
 
Tbea vocatinal training
Tbea vocatinal trainingTbea vocatinal training
Tbea vocatinal training
 
Bsp sail project
Bsp sail projectBsp sail project
Bsp sail project
 
Internship report
Internship reportInternship report
Internship report
 
Mpil pre engineered-building
Mpil pre engineered-buildingMpil pre engineered-building
Mpil pre engineered-building
 
Hot metal ladle
Hot metal ladleHot metal ladle
Hot metal ladle
 
IRJET- Use of Solar Energy for Pumping Out Groundwater for Irrigation in ...
IRJET-  	  Use of Solar Energy for Pumping Out Groundwater for Irrigation in ...IRJET-  	  Use of Solar Energy for Pumping Out Groundwater for Irrigation in ...
IRJET- Use of Solar Energy for Pumping Out Groundwater for Irrigation in ...
 
IRJET- Analytical Study on Strengthening of RC Tee Beams with Composite Mater...
IRJET- Analytical Study on Strengthening of RC Tee Beams with Composite Mater...IRJET- Analytical Study on Strengthening of RC Tee Beams with Composite Mater...
IRJET- Analytical Study on Strengthening of RC Tee Beams with Composite Mater...
 
ICES-Presentation
ICES-PresentationICES-Presentation
ICES-Presentation
 
Jindal-Steel-Structure-Brochure
Jindal-Steel-Structure-BrochureJindal-Steel-Structure-Brochure
Jindal-Steel-Structure-Brochure
 
Report
ReportReport
Report
 
Cnc project by prashant kumar
Cnc project by prashant kumarCnc project by prashant kumar
Cnc project by prashant kumar
 
Final power point teckno profile
Final power point teckno profileFinal power point teckno profile
Final power point teckno profile
 
IRJET- Review on Manufacturing Process Study of Coils used in Industrial and ...
IRJET- Review on Manufacturing Process Study of Coils used in Industrial and ...IRJET- Review on Manufacturing Process Study of Coils used in Industrial and ...
IRJET- Review on Manufacturing Process Study of Coils used in Industrial and ...
 

Último

Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfAmzadHosen3
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756dollysharma2066
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangaloreamitlee9823
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityEric T. Tung
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...lizamodels9
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...amitlee9823
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 

Último (20)

unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdf
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 

We@sp 3 (2010)

  • 1. JULY - SEPTEMBER 2010 VOLUME - 12, ISSUE 3 We@ Shapoorji Pallonji Corporate Magazine
  • 2. Editorial Hello, also got a feature on the making of The Imperial and the challenges faced during its construction. As usual there are a It has been a good quarter for India. The economy seems to be number of events covered in the Happenings section, getting back on track. The growth percentages, stock prices including a report on the handover of the first lot of flats at SP and the real estate market have all been showing positive signs. Shukhobrishti in Kolkata. Your Space features a short travel log Hopefully, the trend will strengthen into a full fledged upward about Israel and Egypt. We hope you like it. turn in the coming year. We would once again request you to send in suggestions, On the sports front, the much talked about Commonwealth articles and feedback to us to help us in our effort to constantly Games have arrived, though there has been much left to be improve the magazine. The festival season is in its full swing; desired in the run up to the event. Shapoorji Pallonji has also Ganeshotsav and Eid have just got over. Dussera, Diwali and been a part of the CWG process, in a positive way, as we were Christmas are not too far away. On behalf of Shapoorji Pallonji, involved in the upgrade and enhancement of the Jawaharlal the editorial team would like to wish each one of you peace, Nehru Stadium. Shapoorji Pallonji has also been associated prosperity and happiness. Keep reading and contributing to with a couple of other stadium projects – the famous Eden We@SP . Gardens at Kolkata and the MCA Stadium near Pune. All these stadiums have been featured in this issue of We@SP We have . - The Editorial Team Another Moment of Pride & Joy for SPCL The General Motors site from Pune Region has bagged the coveted GOLDEN SAFETY AWARD from National Safety Council of India (NSCI) for the year 2009 in construction sector. The competitors included names such as L & T, Gammon, HCC, Toyo, IVRCL, TCE, ITD, CCC etc. Heartiest congratulations to the General Motors Team and Pune Region!! New Projects • Design and Build Barwa City Phase 1 at Doha, Qatar for • Piling work for Raw Material Handling at Jamshedpur for Barwa City Real Estate Co WLL. Tata Steel. • Construction of a group Housing Project- Shillas for • Site Grading works for Asian Paints Plant Project at Raheja Developers Pvt Ltd at Gurgaon, Haryana. Khandala, Satara, Maharashatra for Asian Paints Ltd. • Piling and General Civil works for Lignite Based Thermal • Structural works and Flooring of Palnt Building at Ennore Power Project at Bhavnagar, Gujarat for Bhavnagar Energy Terminal Project, Chennai for HPCL. Company Ltd. • Construction of World's largest Sterile manufacturing • Construction of Five Star Hotel, Budget Hotel and Facility in the Ramky Pharma City at Visakhapatnam, Convention Centre at Dum Dum, Kolkata for Kolkata Andhra Pradesh for Hospira Healthcare Ind. Pvt. Ltd. Hotels Ltd. • Civil and Structural works for Tara Aerospace Systems Ltd • Structural Steel work for Raw Material Handling at Zone 2 facility at Hyderabad for Tata Advanced Systems Ltd. at Jamshedpur for Tata Steel. 01
  • 3. Main Feature Jawaharlal Nehru Stadium, Delhi ring around the stadium to support 600 MT of cables and castings. The entire roof structure is alive with constant movement of various components considering that the steel structure expands and contracts with change in temperature and wind pressures. The steel structure is anchored on solid foundations which consist of 272 numbers of 1500 mm dia and 25 m depth piles. The Base Plates for each column are fixed with a special cementatious Grout having compressive strength of 100N/sq.mm and high tension pre-stressed single tendon bars. The steel structure has been made with an accuracy of ±1 mm per element. The whole focal point in the design of the new structure was the cables and it was important that they had the uniqueness to fulfill the requirement and bear the stress of Jawaharlal Nehru stadium the whole structure. All the cables are fully locked with Inside view of the stadium round and Z shaped wires. All fully locked cables are made from hot-dip-galvanized and gal fan (or equivalent; 5%Al Jawaharlal Nehru stadium was constructed for Asian Games- 95%Zn) coated wires. The cable net structure working on 1982 in order to accommodate the athletic events in the bicycle wheel principle providing central tension ring and the complex. The Sports Authority of India has engaged Central spokes consisting of prefabricated cables which are Public Works Department (CPWD), as their principal supported on the X and V shaped structure of steel consultant for planning and execution for the stadium, so as sections. The length of wires used in the cable is around to upgrade it to international standards, to host the 2200 km, the distance between Delhi and Bangalore. The forthcoming Commonwealth Games, 2010. The Jawaharlal entire Cable Net has been assembled on the ground and Nehru Stadium has been given a face lift with a new roof lifted to its final position 36 meters above, using 68 numbers and improved seating and other facilities to meet heavy duty hydraulic jacks having maximum capacity of 120 international standards to host the opening and closing MT at 44 points simultaneously. This cable net lifting was a ceremonies as well as the athletics events during the well orchestrated process using fully computerized systems Commonwealth Games. to control and monitor the entire lift which involved inducing forces of about 10,000 tonnes in the structure. A state-of-the-art roof of PTFE coated membrane, extending up to 70 m into the stand, supported on the cable The PTFE membrane covers a total area of 54,000 sqm. net and structural steel rings has been provided without The PTFE (Poly Tetra Fluoro Ethylene) coating on the disturbing the existing stadium. This is the largest membrane membrane makes it chemically inert and pure, extremely roof in the world. In terms of seating capacity, it is the third abrasive resistant and flame resistant. A unique self cleaning largest stadium in India. property is possessed by the membrane which does not allow dust and foreign bodies to stick on it. Off white in The stadium consists of 44 numbers of X columns (45 color when installed, the membrane has the virtue of being meters high from ground level) and 44 numbers of V bleached by UV rays and becoming lighter in shade, each columns (25 meters high from ground level) which form a passing day. As the membrane forms a huge catchment Outside view of the stadium 02
  • 4. area, special arrangement consisting of scupper and flexible The major quantities executed in the project are: stainless steel pipe is provided for drainage of rain water falling on membrane. Project Cost : 308 Crores Concrete : 30000 Cum The stadium has newly designed system of 14 structural Bored Cast in situ piles : 272 Nos steel ramps around the periphery to ensure that the stadium Reinforcement Steel : 3000 MT can be evacuated in 6 minutes in case of emergency. Structural Steel : 10000 MT Cables and Castings : 600 MT The stadium has been equipped to conform to the Membrane : 54000 Sqm requirements of HDTV Broadcast. The 748 numbers of lights are fixed in two different ways, 264 numbers of lights Major Sub-agencies involved in our Project: on 22 small light towers on cable net and balance on 44 numbers of catwalks below the cable net. Speakers and Piling Works : M/s Afcons, Mumbai, India and other sound systems have been provided on catwalks to M/s B C Contractors, Delhi, India produce an even decibel level across the stadium. Basically Structural Steel Works : M/s P & R Infrastructure, Ropar, the design for both lights system and Public Address system India has been done according to Olympic Games and FIFA Cable and Casting : M/s Pfeifer, Germany standards. Cable Lifting Works : M/s VSL, Switzerland Membrane Works : M/s Taiyo Membrane Jawaharlal Nehru stadium stands as the au-courant Corporation, Australia testimony of India's architectural legacy. Contemporary Lighting Works : M/s GE India, India cabled designs enhanced the crown structure of the PA System Works : M/s Bosch Ltd, India stadium. European coronet of the 14th century has been Flooring Works : M/s Pidilite and M/s Fosroc transformed into a glorified steel structure. With the successful overhaul of JNS, it can augment the -JNS Team, Delhi transformation of similar kind of structures in India. MCA Cricket Stadium, Pune Salient Features of the Project Site area : 13037 sq.mt Stadium Gross Area : 50,830 sq.mt Seating in Lower Bowl : 38200 nos Seating in South Stand Upper Terrace : 7500 nos. Numbers of hospitality boxes : 26 Total Phase 1 Seating Capacity : 45300 nos. Central to the design philosophy of the stadium is the complete synthesis of architecture and engineering. The architecture, structure and services are fully co-ordinated and play an equal role in achieving the design ambitions. The quality of the structural component is therefore of vital importance. Steel and concrete form primary materials. Above concourse level the structure comprises of fabricated steel circular column (some of them are upto 18 mts & 45 An International Cricket stadium near Pune mts height) and steel I section beams supporting a composite slab made up from pre-cast coffered concrete by MCA Artist's Impression of the stadium from above units, supported within the flanges of steel beams. The structure is topped with an in-situ concrete slab stitched to Maharashtra Cricket Association (MCA) is developing an the pre-cast units with reinforcement to form the composite international cricket stadium at Village Gahunje, on the north whole floor. The concourse slab, sub- concourse structure side of Pune Mumbai Express Highway, approx 20 km north and envelope will be of exposed in-situ concrete. At this west of the central Pune, Maharashtra. level the concrete is to be of an architectural quality mix with a high specification fair faced finish and formed with a regular After successful completion of cricket stadium for “Vidharbha grid of feature recess detailing. Further key element is in the Cricket Association” at Nagpur, this would be second cricket form of roof over south stand. This is created with 6 pairs of stadium being constructed by Shapoorji Pallonji, on steel masts supporting inclined steel braced trusses which in Lumpsum Design and Build model and with project value of turn support the series of tensile fabric canopies in PVDF Rs.193 crores. Even though we have constructed a stadium material. earlier, this one at Pune is a unique experience from both architectural and execution point of view. The project Other Special features commenced on 26th Nov 2009 and the duration of this 03 project now been reduced to 12 months from the earlier 15 months. • Pre-Cast construction: There is a huge quantum of pre- cast work to be executed for the stadium. There are 6883
  • 5. excellent aesthetic appearance to the stadium. The cruciform columns are a special feature in the structural steel work. • Innovative roof: Innovative roofs have been designed for the stands both to maximize shading and provide a memorable and identifiable signature for the complex. The roofs are designed to be made of tensile fabric. • Pitch Drainage: The drainage for the ground has been designed such that the entire ground gets dried within 15 minutes even after very heavy rainfall. A dense network of lateral pipes of 110mm dia collects the water penetrating the Artist's Impression of the stadium from the side turf and drains to main pipes of 160mm dia which finally drains off to the inner peripheral drain. elements to be casted and erected on site. The precast construction is a challenging job since there are a number of Cost-wise Break-up of the Project: elements which are to be joined to one another and the tolerance allowed is negligible. A partnership with 'E Stadium Works : 139.19 Cr. Construct' from Dubai is established for construction of Civil works : 81.25 Cr. precast elements mainly for the design and methodology. Structural Steel : 48.98 Cr. They have requisite expertise in this area. E-Construct had Precast Work : 8.96 Cr. procured the precast moulds from Dubai to achieve the Ancillary Buildings : 5.11 Cr. desired standard of quality Infrastructure Works : 18.90 Cr. MEP Works : ·29.79 Cr. • Structural Steel Works: The structural steel works at this Public Health : 417 lacs project is again a challenging one. The elements used are Electrical Work : 1758 lacs very different and heavy from regular structures, making Fire fighting work : 179 lacs them difficult for fabrication and erection. The total scope for HVAC Work : 327 lacs Structural Steel work is around 5000 MT and it contributes Fire fighting work : 179 lacs to more than one-fifth of the total project cost. The stadium is designed in such a manner that structural steel gives -MCA Team, Pune Eden Gardens, Kolkata The major change is introduction of corporate suites for high paying corporate customers. This would result in a decrease the seating capacity, but increase the earnings of Cricket A major tourist attraction, Eden Gardens Stadium in Kolkata Association of Bengal. The structural steel truss and purlins is one of the largest in the world with a seating capacity of have also been replaced. Other works in our scope: almost 1,00,000. built in 1840 and named after the sister of then Governor General, Lord Auckland, it is India's oldest • Proposed blocks “B”, “C”, “K” and “L” Foundations, all cricket ground and home to the Bengal Cricket Team and tiers, structural steel work, doors, windows, cladding, IPL's Kolkata Knight Riders. The first test was played here in railing, flooring and wall finishes, sanitary and plumbing 1934 and the first ODI match in 1987. works. Over the years, Eden Gardens has witnessed changes from • Modification of public facilities in “D”, “E”, “F”, “C” and “H” erection of new stands to installation of four gigantic blocks : floodlights. To keep up with new media and corporate a) Dismantling of existing toilets and food court including requirements in today's age of global broadcasting and reconstruction as per new design and drawing. sponsorship, the venerable stadium needs to be b) Flooring, painting, doors and windows modernised. c) Sanitary fitting and fixtures. The renovation and refurbishment contract was awarded to • External Infrastructure: SPCL in Jan 2010 with a caluse that the work would be Peripheral roads, Surface drains, Sanitary works, Fire tank, completed in December 2010, before the 2011 World Water tank, Pump house and Storm water sump. Cup. The project is challenging as work has to be carried out amidst stoppages to accommodate cricket match In the Pre-IPL phase, work was concentrated on schedule. foundations and structural works in proposed blocks “B”, “C”, “K” and “L”. In the post IPL phase, sanitary and road The stoppages amounted to 28 days split in: works were also taken up to augment revenues. • Test Match vs South Africa: 9 days • IPL3 (3 slots):19days The contract value is Rs. 53 crores but is expected to come down to Rs 40 crores. -Eden Gardens Team, Kolkata 04
  • 6. The Imperial, Mumbai A glance at major quantities for the making, Excavation 30,100 Cum, Cement 11,85,000 bags, Concrete 1,34,795 A Journey, It's Making & Challenges in Construction…. Cum (M50- Grade), Rebar 20,230 MT (Fe-500, CRS- TMT), Structural Steel 2,800Mt(Rolled & Tubular sections), When we think of challenge, we think of climbing a Shuttering 4,54,800 Sqm (Titan & Doka), Block work mountain, but has anybody thought of building a mountain. 9,81,676 Nos (AAC Siporex), Car park screed 32,700 Sqm, Yes this is a story a snapshot of building a mountain, a Doors (Wodden & Laminated), Windows (Heavy Sections challenging task, a decade long struggle, rising India to new with Dupont Glass), ACP 38,700 Sqm (Imported from height, its building the Imperial Towers (61 floors) at Tardeo, Japan), Copper wire 300 Km, Plumbing Pipes 120 Km, Mumbai. A bench marks for Mumbai, not only Mumbai but Marble 99,500 Sqm (Imported from Italy), C P & Sanitary a benchmark for India too. At present The Imperial is the ware (Imported from Germany & Italy), etc. tallest occupied residential building in south Asia. Construction of Tower started around last quarter of 2002 The Imperial project, S D Corporation is a joint venture with main entry ramp & foundation works. The 2004 mid to between Shapoorji Pallonji Co Ltd & Dilip Thacker. It's not end of 2005 really went dry as no much work progress was just construction of twin towers but 14 other building for observed, as part work was hold for clearance at hill side slum dwellers, enhancing the development & image management for city's view. Renowned Hafeez Contractor excavation. Majorly from 2006 the work started in full swing is the principal architect & SPCL is the General Contractor. towards completion of structure. In Dec-2007 Tower 1 RCC structure was completed. Now at this time the interior A quick view of what hidden inside The Imperial towers, a & services works at lower levels was also in initiated. Also fully residential 61 storied tower, 254M (827') in height with the works for podium structure begin in early 2008. The 218 high-end flats, starting area of 1,680Sft of 2BHK to construction of podium was a huge work, as the quantity 10,800Sft 5BHK with plunge pool, podium 9 levels reserved was more than 50% of tower. The works divided in 4 for parking of 937 cars; triple height main entrance lobby & phases & phase wise work was executed. At end of 2008 landscape at 9th level, a huge clubhouse of 70,000 Sft with podium RCC was completed (The Podium RCC works was five star amenities, top 3 floors (58, 59 & 60) are occupied executed within a period of year) & by early 2009 the tower by pent house which is measuring almost 27,000 Sft with 2 structures was also completed. Now works for crown, swimming pool. The top portion of tower consists of glazed external façade, interiors & services was in progress. During crown with observation area & above is galvanized structural mid 2009 the client SDC supported by SPRE HO team steel spire. started directly releasing drawings & decisions required for construction & this facilitated for faster execution. All major The Imperial has awarded as Best High-rise development & works were completed in March 2010, with occupancy Best renovation/redevelopment project at the CNBC Asia certificate in hand. At present customers are doing their fit- Pacific Property Awards 2009 outs, some also have fully occupied. The Site engineering & supporting staff from construction team was around 180 No's at peak time. This staff at project was just as big as running a factory. All departments were well defined with responsibility & authority; regular meeting with project in-charge was conducted for work completion & resolving critical issues. SPCL Site team with Project In-Charge Mr. S. Srinivas (Standing in Centre) In 2005 Mr. S. Srinivas was deputed as project In-charge for construction of overall project under the guidance of Mr. S C Dixit, at his stage a major work was balance to be completed. This was the time when project started moving towards completion in all respects, from structure to finishes to services to handing over. The leadership of Mr. S. Srinivas & site team efforts has really benefitted in completing the project. 05 Actual Project Photograph as in June 2010
  • 7. The construction of tower (61 floors) was a major part, plant of 60Cum/Hr was installed. The form works for where achieving an optimum floor cycle was really required structure was stored on structural steel cantilever platform to complete the work in timeframe. These only could be erected just 3 levels below actual work. This helped to achieved with advanced form works system in place, to reduce cycle time as repetition is major criteria for tackle this imported TITAN form works was used for first shuttering. The vertical movement for men & material was time in SPCL. The work went well initially, but as when time taken care by construction elevators. There where 9 restriction (Work only from 9am to 6pm) came in picture construction elevators to fulfill this need. The major where work could be done barely 8 to 10 hrs per day, a disadvantage was in terms of slow speed, as it would take an minimum floor cycle 7 days was achieved at some stages of average time of 30min for one cycle & additional time also work. Concrete of M50 grade was manufactured in site required for loading / unloading of materials. A separate lift batching plant & pumped with concrete pump capacity of allocation schedule for usage was implemented for efficient 300m vertical. Reinforcement for column cage was tied at use of lifts. Now when permanent service elevators ground level & directed placed at existing columns of tower installation was complete it was used as construction with tower crane. This technique saved time in terms of elevators with proper protection to the car. It would be tying the rebar's, which really consumed time. equated like this as 4 construction elevators equals to one permanent elevator. The storage of material was managed The PMV deployed were amongst the advanced & most with main store room at level 1 & other small storage at efficient. Just to summarize the PMV's major equipments upper levels. This would help in easy unloading & shifting of used for construction are batching plant 2 nos (60cum/hr & materials. All site offices were accommodated in podium 30cum/Hr), Concrete pumps (2 nos), boom placer, tower levels of tower with all required operational facilities. canes (Total 4 nos), construction elevators (9 nos) etc Labor workforce; with very advanced & heavy equipment The Dismantle of deployed for construction of towers, it was also supported Jaso tower crane by sufficient labor strength. The labor strength at peak of was a very critical construction was almost 2500nos, out of which 1500nos task to execute; labors were accommodated at site in labor camps. The this was first time labor camp was located in lower tower podium area to that a crane of such reduce the transportation time & facilitate early started of type has to be work. Welfare facilities such as well-ventilated rooms, ceiling dismantled from fan in each room, exhaust fan in passages, water filter, neat such height. Jaso & clean kitchen area, toilet-latrine facilities and to maintain all crane is one of the this a dedicated team of housekeeping were present all the biggest telescopic time on site. tower cranes with boom of 70M & The major concern for Safety at the Imperial was fall from / capacity of 12Mt. off, other than this fire, electrical hazards & housekeeping The approximate was also crucial, these were taken care by conducting weight of crane inducting training for all new comers, PPE, site access cards, was 150Mt. A work permit system, no supervision no work & on site special crane training. Tower structure with Cranes (Level 58) dismantle contractor from Singapore was enquired. The Singapore contractor Almost 12,000sqm safety net was being erected at site for had quoted a price of Rs 2.25Cr for dismantle, which was fall protection hazards. At project a new system of more than the cost of crane. Now Mr. S Srinivas & Mr. P E. . peripheral net was implemented. Now this system is being Babu (DGM-PMV) with guidance from Plant Dept HO, had used on other projects. As the building was ready & services round of technical discussions to reduce this huge cost. commissioning works started, LOTO (Lock Out Tag Out) Finally it was decided to dismantle the crane with the in- system was implemented. house PMV dept at site. Finally the crane was safely dismantled by SPCL's in-house PMV department from a height of 245 without a single incident. Total 3 cranes were dismantled & a huge saving of Rs 6.75Cr. After safely dismantle of all canes a special incentive & appreciation letter was issued to all concern staff from top management. Site logistics has been a challenging activity to manage thought the project with initially mass works for excavation, concreting, formwork, rebar & at latter stage for finishing & services works. The storage of material, their movements both vertical & horizontal need to be managed. Only the existing single access road was properly managed for vehicular movement. The foundation works was done with Flat Interior Works (4BHK Linear – Level 30) RMC brought from out of site, but this was not sufficient to cater the need of towers, hence an in-site concrete batching At The Imperial more that 45 types of imported marble slabs accounting to almost 11 lakh Sft is used for flooring & 06
  • 8. dado. Also special gold plated tile are used in some flats. The The Imperial's envelope/facade consists of ACP (Aluminum variety of marble was chosen to suit the flat type & interior Composite Panel imported from Japan) & combination layout. The hard-scape & eternal dry cladding works was window / curtain wall units. Sandwich double laminated majorly done with Cobble & granite stone of around 11 Dupont glass (Special heat strengthened glass) is used for types with almost 30 variations in color & surface finish. This windows which can withstand winds of speed 240Km/Hr. major concern for finishing work was to deploy skilled Quantity wise ACP is 38,700 Sqm & glass glazing is around labors, as high class finishing quality need to be delivered. 27,400 Sqm for both towers. This was achieved by outsourcing from highly skilled subcontracts on item basis & specialized agencies. The external façade cleaning & maintenance is done with Building Maintenance Unit, termed as BMU. Each tower has There is not much to say about the interior work as it has a Scorpio type BMU imported from France with 12m spoken worldwide after receiving best interior layout/design boom. A full cleaning cycle will take 3 months for each awards. The imperial has won 7 awards at CNBC Asia tower & the towers will be cleaned thrice in a year. Pacific Property Awards 2009, Best apartment layout: 3 awards (4 BHK, 4BHK Duplex & 5 BHK Duplex), Best Lightning arrestor & Aviation light installation In progress interior layout: 2 awards (2 BHK & 4 BHK Duplex), Best High-rise development & Best renovation/redevelopment. Recently 3 more awards at Asia Pacific Property Awards 2010 Best Interior design (5BHK Duplex), Best apartment Layout (5BHK & 4 BHK Duplex) are just keeping us in time. Work Height: 254M Any building will be dead as historical monument if not Completed provided with required services. Hi-tech services are running in the twin towers. The services are as basic as electrical (Total load of 17 MW - Its just equal as running a large scale industry), fire fighting (Hydrant & sprinkler), plumbing (Hydro-pneumatic systems with PRV's), STP , elevators (High speed. Medium speed & service), CCTV, access control, FAS & PAS, further much automated services like Home automation, IBMS (Integrated Building Elevators are back-bone for vertical transportation in towers. Management System)etc. Major flats have split type HVAC We have 39 permanent elevators to ferry customers. The system, also VRV system is used for larger area of duplex fastest elevator is 6m/s and a trip would take less than a 1 flats & lobbies to reduce electric consumption. Common min. The interior of elevators is a combination of glass, areas are ventilated with high speed exhaust / pressuring mirror, wood, stainless steel & imported marble. The fans. The water requirement for towers is 3,85,000 per day. execution of elevators was on critical path of project, as it Rain water harvesting & water recycling is also implemented would take minimum 9 months for completion; 3 months in towers, this will reduce the overall water consumption. for shaft civil works & 6 months for The towers are divided into 6 zones & there are in total 7 installation/commissioning. Overall the lifts installation was service floors in each tower for better serviceability. more critical as there were construction elevators installed in shafts of permanent lifts, so now first we need to dismantle The execution of these the construction lifts, do all shaft civil works & than only services was varying from permanent lifts installation would commence. This was phase to phase of crucial as dismantle of construction lifts would affect overall construction. At construction logistics, to overcome this twin cabin construction lifts were stage when the project was installed on external face of building & than only inside running on construction construction lifts in shafts were dismantled to make way for power & water, it was a installation of permanent. Now when inside permanent temporary system, but still it elevators were ready, they were protected from inside & need to serve all construction used as construction elevators. activities. A more crucial stage was witness when the Now at this stage when we have handed over a major part electrical supply was switched of project to clients/customer for fit outs /occupancy, it's like from temporary to our dream come true. Someone has really said permanent power. The well…“Dream for a building should be twice the height of transition was managed building”. It was our true dream that kept us really going till properly & progress was not completion of project. much hampered. Vertical LT Panel Charging services runs through shafts were execution was difficult due After completion of such type of complex project, it is a to limited space. The flats & common area works was well great achievement for the team at site, as well as for SPCL & co-ordinated with civil & finishes works, some hiccups were entire construction industry of India. More dominantly this observed initially due to non-availability of work fronts, but presents SPCL's capability of executing such challenging & improved soon. Major works were carried by specialized huge high-rise projects to compete with international 07 subcontractors, where keen supervision was done. market. –The Imperial Team, Mumbai
  • 9. Happenings Amity HR Excellence Award for Shapoorji Pallonji Management System for the year 2010. The award presented to SPCL carries a Shield and a Memento. Amity is a renowned business school, based out of New Delhi and the occasion was their 7th Global HR Summit. Other award recipients in various categories included prominent organisations such as Maruti Suzuki, L&T, Bharti Airtel, EPIL, Star TV, McDonalds, Axis Bank, etc Mr. Varghese Mathew, the Corporate HR Head of SPCL, received the award on behalf of the company. He has attributed the award to the joint efforts of the HR Team, and the unstinted support of the top management. Mr. P K (L to R) Ms. Rukhsana Haque, Mr. Satnam Singh, Rakheja, Head of the Northern Region of SPCL and the Delhi Mr. Gurinder Singh, Mr. Varghese Mathew & Ms. Preeti Sehgal HR team – Rukshana Haque and Preeti Sehgal also attended the award function which was held in Amity Campus, Noida. On the 17th of September 2010 Amity International Business The jury also declared, Ms. Rukshana Haque as the Most School honored a few Indian Corporate Houses for their HR Promising & Budding Young HR Manager. A proud day for domain Best Practices. Shapoorji Pallonji & Co. Ltd. was the SPCL indeed. proud recipient of Amity Excellence Award for Performance -Vasant Sanzgiri, SP Group Centre GET Induction Program, 2010 Mr. Varghese Mathew, Executive VP - HR inaugurated the program by the ceremonial lighting of lamp. Topics covered on the first day were based on the theme of organization orientation and training, wherein trainees were given an understanding of the company history, business philosophy, lines of business, organisation culture, values, philosophy, practices and structure. On the first day itself, the trainees were informed about the different training modules which they would undergo during the training period. Further, they were also informed about the recently launched leadership program 'ALDEP'. The theme for the second and third day was methods, systems, technology and resources. On the second day, Mr. Mr. Varghese Mathew lighting the inaugural lamp S.Y.Karkhanis, VP (Pune Region) presented an overview of the regional business to the GETs. This year the Graduate Engineer Trainees joined the Organisation on 1st August, 2010 and were inducted into the The third and the final theme was about career transitioning organisation through an induction program held at Velvett from student to professional. It included speakers who had Country Resort, Khandala. The new batch consists of 74 joined the organisation as GETs in the past. In this session, the Graduate Engineer Trainees selected from different colleges. current GETs got many of their queries answered by the GET 2010-11 Batch 08
  • 10. speakers who themselves had been GETs sometime back. After the group Induction, the trainees have joined their The experience sharing should prove beneficial to them in the respective regions. They would now undergo an intensive on- long run. Further, a half-day workshop on 'Campus to the-job training over the next one year before getting Corporate' was organized on the last day of the program. The absorbed into the regular rolls. We wish them a bright future in trainees took part in various group exercises which helped SPCL! them to understand the Do's and Don'ts of corporate life. -Sohan Mohanty, SP HO GET's Project Presentation Mr. Mukesh Rao introducing the Best Mentor- The winners from construction sector - Ahmedabad Team Mr. Sandip Mahato (standing at extreme right) along with the Best Presenter honour, two more special The Project Presentation by the Graduate Engineer Trainees awards were recommended by jury members and the results (GETs) of batch 2009-10 was held at SP Infocity, Pune on 8th & are as under: 9th Sept 2010. This year 09 teams from Construction Division • Best Presenter: Anurag Pal (Ahmedabad- Construction) (8 representing regions + 1 representing EPC) were • Special Jury award: competing for two prizes of best presentation. Also 03 teams 1) Azim Gunderwala (Hyderabad- Construction) representing Real Estate Division competed for the best 2) Rajshree Sarkar ( Kolkata- Real Estate) presentation. In recognition of his efforts and dedication, Mr. Sandip Mahata This year too regional eliminations were conducted (except (Sr. Manager, Process, EPC) was chosen as the Best Mentor of for Chennai & Hyderabad region which had only one team) to the year. All prizes were given away by Mr. Cyrus Mistry on the select the best team to represent the Regions. So out of total evening of 9th Sept. Mr. Cyrus stressed the importance of 227 GETs only 68 could make it to the finals at Pune. The learning by informing the GETs that learning has not come to teams were allotted 45 minutes to present their understanding an end with the Graduation Ceremony but it will depend on on the performance of and lessons learnt on assigned project the willingness of the GETs to learn from all possible sources. before the jury of 4 senior officials- Mr. Debasis Mitra (Sr.VP. Mr. M.D.Saini, Mr. Varghese Mathew and Mr. Jayant Oswal Operations), Mr. Kaustuv Ghosh (GM, Construction Methods also spoke on the occasion. Mr. Kaustau Ghosh shared a few & Planning) , Mr. Prabal Kansal (Add. GM, Strategy) and Mr. words on the excellent presentation done by all the GETs on Sohan Mohanty (Add. GM, Training & OD). Mr Jayant Oswal behalf of the jury members. The award distribution ceremony (COO, SPRE) was on panel for the Real Estate presentations. was followed by a lively Question/ Answer session where GET's got clarification on many of their queries right from Mr. This time the efforts made by all the teams were highly Cyrus Mistry. The event concluded with a cocktail dinner. commended not only by all the jury members but also by the members of competing team. Almost every team performed -Prashanti Kutty, SP HO over the expectations and made the platform difficult for jury members to select the best ones. But finally, to conclude the competition, jury members had to select the best and winners were decided as under: • Best Presentation (Construction)- 1) 1st Prize: Ahmedabad (TATA Nano, Sanand) 2) 2nd Prize: Hyderabad (EMAAR) • Best Presentation (Real Estate)- 1st Prize: SP Infocity Pune ( Pune+ Chennai) In addition to above two winning teams for construction division, jury members did share that EPC team had also prepared very well but lost the 2nd prize to Hyderabad team with marginal difference. 09 Even in case of selecting the Best Presenter, many team members presented extremely well and the judges again found it difficult to choose just one GET as Best Presenter. So Mr. MD Saini addressing the gathering
  • 11. Group Practice Sharing Forum II Department. She explained the benefits of standardization and unification of processes derived from this initiative. Mr. Sandeep Desai, AFCONS, shared practices followed in IT on “Document Management System” and “Sub-contractor Tracking”, which enabled their organization to manage the processes better and resulted in better efficiencies. Mr. Aniruddha Choudhari, Sterling and Wilson, presented the case study of “SAP Implementation” and the key challenges faced by them during the implementation process. He also shared how implementation of SAP had helped improve upon the business processes and provide better view on the key performance indicators. Mr. Mahesh Tahilyani welcoming the gathering Following this, Mr. Darak, from AFCONS shared the soft As a part of the initiative launched by Group Centre, the practices on “Relationship Management with Lenders”, in the Second Shapoorji Pallonji Practice Sharing Forum was held on areas of Banking, Internal Treasury Management and Insurance 22nd July, 2010 at Sunville Banquets, Mumbai. The theme was and the benefits derived from such relationships. He outlined to share practices in the area of “Finance and Information the process of Relationship Management and explained how a Technology”. Executives from Finance and IT functions of our simple process of being transparent, proactive, timely, honest Group Companies like SPCL, SP Real Estate, SP Fabricators, in dealing etc. is being utilized to create a competitive Sterling and Wilson, AFCONS, Forbes, Eureka Forbes, advantage and substantial goodwill with our key lenders. He NextGen etc; were present for the forum along with Group also mentioned that the awareness of developments across Centre Members and Mr. Cyrus Mistry. Group companies also help the respective companies to build up the case for a better relationship between the lenders and After the introduction and welcome speech by Mr. Vasant the Group. Sanzgiri, Mr. Mahesh Tahilyani welcomed the gathering and initiated the discussion on the opportunities in areas of Finance Mr. Adi Shroff, EFL, spoke about “Business Transformation and & IT and how Finance & IT organizations use the IT Information Technology” in Eureka Forbes. He further briefed Framework to install processes and controls across the the gathering on the four pillars of Information Technology i.e. business for effective results. He also mentioned of SP Group's Business Transformation, Software Development, endeavor to synergize effectively to create value for the group. Infrastructure Management and Application Maintenance The importance of keeping abreast with latest trends in the support and explained how these could be used to leverage professional domain of finance was also emphasized. and create an efficient business process environment. He effectively explained by given examples used within EFL about SP had the pleasure of having amongst us Dr. Samiran how close linkage between process and technology is Chakraborty, Head of Indian and Global Research, Financial important to ensure coordinated solutions to business Market and Mr. Abhay Ketkar, Director Project and Export challenges. Finance from Standard Chartered Bank who shared their candid views on Current Macro Economic scenario on the The session concluded with a presentation on “Sustainable financial indicators of India, China, Middle East. Current trends Business Process Improvement” in SPCL by Mr. H. J. Tavaria. of financial / structuring deals in INFRASTRUTURE SECTOR He spoke on his experiences of implementing an ERP system to optimize value for shareholders were also shared. These across SPCL and how the rigor of the processes could result in sessions were highly appreciated by the audience. an effective implementation and also result in effectiveness of control over the processes irrespective of the ERP in place. Ms. Sunetra Ganeshan, Forbes, presented “Shared Services” process in Accounting followed at Forbes and explained how The next practice sharing forum on “Functional Expertise and certain key accounting processes were centralized and Technology” theme is scheduled for October 2010. standardized under their newly formed Shared Service -Vikas Agarwal, SP Group Centre The attendees of the forum 10
  • 12. The Handing Over of Keys at SP Shukhobrishti, Kolkata A view of SP Shukhobrishti Mr. Rana Gupta, regional head of SPRE with the dignitaries On the 6th of September 2010, the ceremonial handing over The proceedings began with some melodious songs by the of keys of the first lot of apartments of SP Shukhobrishti, the famous singer of the region – Mr. Shibaji Chattopadhyay. Mr. mass housing project of SP Real Estate, took place in New Kekoo Colah, CEO, SP Real Estate welcomed the apartment Town, Kolkata. This lot comprised of 1,500 LIG units. This owners to their new abode and also gave assurance of the event was covered by most electronic and print media of the finest quality and form that is associated with any Shapoorji region. product. He also requested WBHIDCO and the Govt. of W.Bengal to review and improve the existing communication The Chief Minister of West Bengal, Mr. Buddhadeb and infrastructure facilities of the project by including some Bhattacharjee was the guest of honour on the occasion. He mass transit bus lines and other required services. Mr.Gautam personally handed over the keys to seven flat owners, much to Deb said this project, besides providing affordable housing their joy. Speaking on the occasion, Mr.Buddhadeb solution, will also create job opportunities for the local Bhattacharjee applauded the effort of creating such low cost population. He also declared that for improving connectivity to housing with all modern facilities and congratulated Shapoorji the project, WBHIDCO had plans to procure around 10 Pallonji on this commendable achievement. The ceremony buses. was presided over by Mr. Gautam Deb, the Minister of Housing & Public Health Engineering Dept., Govt. of SP Shukhobrishti is the country's largest mass housing project, W.Bengal. In his welcome address, Mr. Saurabh Das, MD, which will have a total of 20,000 units in the LIG and MIG WBHIDCO said that every new satellite township is segments, spread over an expanse of 150 acres of land. In symbolized by an iconic project that defines the character of addition it will also feature various amenities such as retail the place and expressed his belief that SP Shukhobrishti was stores, club facilities, medical centre, school etc. With more going to be that iconic project of New Town. than 70% of the land area open to the sky, green corridors, extensive landscaping and abundant greenery, SP The event had a large presence of dignitaries which included Shukhobrishti is not just a beautifully executed project but an Mr. Abdur Razzak Mollah, the Minister of Land & Land eco friendly one too. When completed, it will be home to a Reforms, Govt. of W.Bengal, Mr. Abdus Sattar, the Minister of population of around a lakh people. State for Minorities Development and Welfare & Madrasah Education, Govt. of W.Bengal, and Mr.Rabindra Nath Mondal, -Ranjan Sengupta, SPRE Kolkata Member of Legislative Assembly, W.Bengal. 11 (LtoR) Mr. Kekoo Colah, Mr. Buddhadeb Bhattacharjee, Mr. Gautam Deb, Mr. Abdus Sattar & Mr. Abdur Razzak Mollah The Chief Minister handing over the keys of the flat to the owner
  • 13. Supervisor Upgradation Course - Batch 5 Cheques of Rs. 3,000 each to the toppers and Rs.1,500 each to the second rank holders were given by the Principal, Col. A K Mukherjee. Mr. Bijan Bala (Delhi) in the Finishing Stream and Mr. Akbar Ali (Kolkata) in Formwork & Steel Fixing Stream were the toppers. Mr. Bablu Kumar Pandey (Pune) and Mr. Asish (Kolkata) bagged the 2nd places respectively. With this batch, the school has touched the 100 mark in terms of the number of upgraded supervisors and has in total trained more than 175 supervisors for all the regions of SPCL. Earlier, in August, the Group HR Head MrVasant Sanzgiri paid a Col A K Mukherjee presenting cheque to the topper of Form visit to the school. He addressed the trainees and stressed on work & Steel Fixing Stream, Mr.Akbar Ali from Kolkata region the importance of training & shouldering of additional responsibility by the supervisors on site. Mr Joerg Meyer, Quality Expert from the Head Office also visited the school. The 5th batch of Supervisor Upgradation Course passed out He observed the trainees during group exercises on on the 18th of September 2010, from Supervisor Training Engineering Problems and interacted with them individually. Center, Kolkata. A total of 18 Supervisors from all the regions were trained during the 10 week course in two streams - -Col A K Mukherjee, STC, Kolkata Formwork/ Steel Fixing and Finishing. Mr. Joerg Meyer and Ms. Usha Venkatesan with the students of Batch 5 & school staff PRW Subcontractors Meet, Delhi IIT Piece Rate Work (PRW) subcontractors (Labour credited more quickly to their Subcontractors) attended the meet hosted by Delhi. Regional bank accounts. He also office on 31st July 2010 at Grand Vatika, Gurgoan, Haryana. declared that the accounts departments would aid the sub The meet opened with the address by Mr. P Rakheja, senior .K. contractors in registering in Vice President. Mr. Rakheja highlighted the importance of service tax, provident fund and PRWs in construction and updated the gathering on their income tax departments. current status and future plans. Terming the pRWs as “good partners in our success and future growth,” Mr Rakheja Mr. Rakheja alongwith Mr. announced cash awards for the PRW sub contractors. The K.K.Knaji, Mr. Shammmi awards, would be based on the average labour strength Khurana, Mr. Manoj Dubey, maintained at the site throughout the year commencing the Mr. Amit Dasgupta, Mr financial year. Rahaman and Mr. Vimal saroha distributed members and wool The awards are: shawls to the participating sub 1) Rs 50,000 for an all year average strength of 50 lobours at a contractors. Certificates of site appreciation were sent to all 2) Rs 1,00,000 for an all year average strength of 100 labour at sites for distribution to the a site PRW subcontractors. 3) Rs 2,00,000 for an all year average strength of 200 labour at a site The meet concluded with cocktails and dinner which was enjoyed by the PRW Mr. Jatindaer Grover, (Addl. GM) advised the sub contractors to go for ECs facilities in their basic to get their payments subcontractors and senior company officials. -Gautam Sarkar, Delhi 12
  • 14. Inauguration of new offices SP Infrastructure Capital Co. Ltd. business offices were inaugurated. It was a clear testimony of The Infrastructure Business Group of SP (SP Infra) has been the support of the entire SP Group when the inaugural lamp expanding its activities and has secured key project was lit by our revered Chairman and Managing Directors of developments in the road, power, port and mining sectors. SPCL. Recently 'SP Infra' moved into its new spacious premises Group Centre Members were all there to wish the very best where the interiors were done by SP CMG to high standards to this fledgling but significant arm of the SP Group. The SP Infra in record time and on 30th August, Phase I of SP Infra's team wishes to thank all those MADE IT HAPPEN on time. -Mukundan Srinivasan, SP Infra Mr. Pallonji Mistry lighting the inaugural lamp SP Investment Advisors Pvt. Ltd. SPIAPL Team with Mr.Shapoor Mistry, Mr.Cyrus Mistry and Mr.Jimmy Parakh at the inauguration The new office of Shapoorji Pallonji Investment Advisors Pvt. SPIAPL was set up in April 2010 for advising third party overseas Ltd. became operational on the 30th August 2010. It is located institutional equity funds on investments into the SP Real Estate at Mittal Court in Nariman Point at Mumbai. On the 27th projects as well as third party developer projects with the August, 2010, a “Jashan” (Parsi religious ceremony) was objective of generating attractive returns for these investors. conducted at the premises marking its auspicious opening. We look forward to SPIAPL establishing SP Group's strong and 13 long term presence in the Fund Management vertical. -Hutoxi Saher, SPIAPL
  • 15. Second phase of SP Real Estate office premise becomes operational SPRE Office Cafeteria SPRE Office Phase 2 The second phase of the SP Real Estate office premise became the same basic interior décor pattern as the first phase. It also operational on 23rd of September, 2010. This phase is also includes a small cafeteria space. The new premise will located in the B-Wing of SP Centre at Colaba and is connected presently accommodate personnel from the departments of to the first phase. A small “Puja” was performed to mark the Legal, HR, Liasioning and Accounts. The total seating capacity opening of the new office. This ceremony was attended by the of the SP Real Estate office has gone up to approx.90 with the entire real estate team including the CEO - Mr.Kekoo Colah, addition of this new space. all heads of departments and the staff. The new office follows -Saurabh Chaturvedi, SPRE HO Release of Site Policy Manual (Lto R) Mr. SC Dixit, Mr. MD Saini & Mr. Varghese Mathew releasing the site policy manual A comprehensive Site Policy Manual covering all aspects of Project Management team and for the Regional Admin staff. It statutory compliances has been prepared and formally is hoped that this document will act as a handy reference book released by Mr. M. D. Saini & Mr. S. C. Dixit recently. The for all involved in statutory compliances. Manual is an answer to many critical compliance issues which are relevant for the Project Managers as well as the Admin The whole project was completed with active involvement of Personnel. The Manual is written in a simple and non-legalistic Mr. Lalit Jaywant and Mr. Anil Deshpande. language along with a section for FAQs. Subsequent to the release of the Manual, Mr. Lalit Jaywant, General Manager – IR & Admin has conducted a series of workshops for the Sr. -Varghese Mathew, SP HO 14
  • 16. Donation of Raincoats, Hyderabad SPCL, H1 Emaar site,Gachi Bowli, Hyderabad donated 15 sets of rain coats to police personnel of Raidurg police station in special recognition of the services rendered by this police station. This police station retrieved stolen material & hand tools and resolved theft cases which had occurred at this site apart from offering assistance in labour welfare cases. This police station has always rendered their best services and help when ever required, with a smiling face. On SPCL's request, they also commenced night patrolling near the labour colony. The tokens of appreciation were handed over by Mr. Gautam Das, Addl. General Manager, H1 Emaar project . Mr Gautam Das handing over the raincoats -Sriram Bidayat, Hyderabad Independence Day Celebrations, Hyderabad Flag hoisting ceremony in progress at Aga Khan Site Flag hoisting ceremony in progress at ITC Bhadrachalam Site India's 66th Independence Day was celebrated with a lot of speeches on the freedom movement and spoke about the vigour at various labour colonies across the Hyderabad region. great leaders of the freedom movement. They also recited Almost 2,500 workers, their families and staff members patriotic verses and dedicated songs to these great names. It actively took part in celebrating the day. Flag hoisting was great to see such enthusiasm and patriotic feelings ceremonies along with distribution of sweets were carried out amongst the workers. at most sites. Some of the workers delivered informative -Aziz Tayyaba, Hyderabad The I-space Table Tennis Tourney 2010 The inaugural I-Space Table Tennis Tourney was held at SP Infocity Pune (at the iSPace club) on the 27th, 28th & 29th of July. The tourney was open to all employees of organisations on the campus and was held primarily to enhance awareness about the club facilities. Approximately 60 entries were received for the various events scheduled. These included Men's & Ladies' Singles, Men's & Ladies' Doubles & Mixed Doubles and a Team Event. All matches were best of five 11 point games. Mr Arun Bavde, a veteran from the fraternity was the chief referee. He has more than 25 years of experience and is actively involved in playing at 15 Mr. Shailesh Korgaokar presenting the trophy to the winner of Ladie's Singles tournaments of district & state levels as well as refereeing at various tournaments around the state.
  • 17. The entire event was conducted in the iSport zone at the club. The tourney concluded with the prize distribution ceremony All three days witnessed a very supportive crowd who and the vote of thanks by Mr Shailesh Korgaokar, GM cheered & encouraged each point that was scored. The Men's Hospitality (I-Space). All winners & runners up were given Singles final between Abhishek Kumar & Nitin Kulkarni (both trophies & honorary memberships of the Health Club at from IBM) was a best of seven cliffhanger which went up to the iSpace Club. sixth match. The title was eventually won by Nitin. The Ladies' Singles final was also a keenly contested match between -Shailesh Korgaokar, SP Infocity, Pune Shweta & Vaishali (both from IBM) & Shweta emerged the winner of the title. Blood Donation Camp at SP Infocity, Pune It was conducted under the supervision of Deenanath Mangeshkar Hospital, Pune, one of the city's premier medical institutes. The blood bank team, led by their PRO Mr Arvind Dhurve & the technicians, were ably guided by their chief pathologist - Mrs Durwankar. The drive received an encouraging response. A total of 160 units of blood were collected in the two days, which, was far beyond expectations, as stated by Mr Dhurve. Encouraged by the response he expressed his desire to conduct regular blood donation drives at SP Infocity in the years to come. SPCL will have access to 10% of the donated units for Blood Donation Drive in progress allotment to anybody in need of blood (within a radius of 5 hrs road travel time). This requirement will be met with by the The first blood donation drive at SP Infocity Pune was blood bank of the hospital on request sent by the SPCL HR conducted on the 10th and 11th August, 2010. department and prescription of the treating doctor. -Shailesh Korgaokar, SP Infocity, Pune “No Liquor” campaign, Pune Workers attending the program A banner at the event highlighting the ill effects of alcoholism Alcoholism is one of the major concern areas in many The event featured a talk accompanied by a slide show construction site labour camps. An awareness program was followed by a question answer session. Over 2000 workers held at the TCS Pune site on the eve of Independence Day to were present and most of them actively participated. The educate the workers about the negative effects of this habit. NGO has also offered to train SPCL staff members who are The event was held in association with the NGO – Muktangan. interested in counseling. -Smita Wadkar, Pune 16
  • 18. Towards Excellence Introduction to OHSAS 18001 OHSAS 18001 is an international specification which defines The basic approach taken within OHSAS 18001 is the a set of requirements for an Occupational Health & Safety familiar mechanism of PLAN - DO - CHECK - ACT and it Management System which would be suitable for any kind systematically requires the organisation to: and size of organisation. OHSAS 18001 was developed by a • Detail an Occupational Health & Safety Policy applicable committee of interested parties including national standards' to its operations bodies, certification bodies, learned bodies and industry • Identify the OHS hazards and risks which the representatives. Occupational health and safety organisation needs to manage management system enables companies to address issues in • Identify the legal and similar constraints on the an effective manner. organisation • Define and implement the means of managing these There are number of Occupational, Health & Safety issues and requirements Legislations, which cover the health and safety related • Set up the means of effecting continual improvement in components, which play a vital role in the legal framework the organisation's occupational health & safety of the business world. An effective Integrated OHS performance Management System, shall facilitate an enterprise to identify • Check and review the effectiveness of controls and and address all such gaps. improvements In view of the above, the top management has decided to This approach means that OHSAS 18001 can be applied to implement an Occupational Health & Safety Management any type and scale of organisation. An OHSAS 18001 System (OHSMS) in our organization. management system will mean that: • You understand all of the hazards and consequent risks Not only does an effective Safety Management System your organisation poses to employees and neighbours (SMS) improve existing and establish new controls, it also • You know what you are doing to manage and reduce or installs and drives a system of continual improvement in eliminate these risks Occupational Health & Safety performance. • You put good Occupational Health & Safety management into all your future plans and the heart of your business Without a formal management system in place, issues tend to be tackled on an ad-hoc basis or in a fire-fighting manner, MAIN REQUIREMENTS simply attacking each issue as it arises. Similarly, simple 1) Identification of Legal Requirements auditing of an organisation's activities, identifying its health 2) Establishing & maintaining Safety Objectives and safety problems, and then resolving them, could well 3) Establishing & maintaing OH&S Management Programme mean that you could come back a year later to find that all of for achieving its objectives the problems have reappeared. 4) Emergency preparedness & response to incidents and emergency situations 5) Establishing & maintaining procedure for defining Management Policy Planning responsibility & authority for handling & investigation of Reviews accidents, incidents, non-conformances & audit. --OSHA Risk --Legal Requirement --Objectives Structure of OSHAS accd. to 18001 Act Plan --OH & S Programe •How to Improve •What to do? next time? •How to do it? --Structure & responsibility --Monitoring & Check Do --Training Continual Measurement •Did things happen •Do what was --Communication --Non confeormance according to plan? planned --Documentation Improvement CAPA --Document & record --Incident & accidents control investigations --Operational Control Records --Emergency preparedness & Audits Response plan OSHAS policy Checking & Corrective Implementation Actions Operations Management review An OHSAS 18001 Safety Management System provides for Planning the development of a system of inter-linking processes. It is Measurement a simple and effective toolkit of mechanisms for managing and Occupational Health & Safety issues in any kind of Evaluation Implementation organisation. It is only prescriptive in terms of what must and 17 happen, leaving the how to the organisation to decide or devise for itself. Operation
  • 19. THE BENEFITS compliance to regulatory requirements hence we will be Some of the key benefits of an OHS Management System sure that we have identified and understood all the legal are outlined below: requirements affecting our business and we will be sure that we comply with them all. Operational point of view - • Demonstrates organisation's commitment towards • Identifies the overall health and safety hazards and risks betterment of society • Assures safe & healthy working conditions for working people Commercial point of view – • Enhances awareness on emergency preparedness & • Eliminates or minimized Risk response • Facilitates in the reduction of insurance premium • Reduces number of accidents & thus lost working hours • Increases productivity by boosting morale of the labour by • Identifies the OHS legal gaps and addresses the way of Safe Working Environment -Omkar Bendre, SP HO Persuasive Proposals and Presentations It is no use saying, we are doing our best; we have got to Thus, the matter was successfully perused without BOQ succeed in doing what is necessary and even resulted into client developing improved confidence in Shapoorji Pallonji's way of dealing with it. Of Sir Winston Churchill's Theory is indeed powerful which course, for internal monitoring purpose, we did work out fetches the results, when practiced religiously. the BOQ. The danger in furnishing the BOQ lies ahead, when it is circulated to other competitors for inviting the Proposals and presentations always play an imperative role commercial proposals which, at times could prove in successfully achieving the desired goals of sales strategy as detrimental to the organization. it involves all the elements necessary for winning. It's relevant to mention what Aristotle had quoted- Thus, the proposal was put forth with great collaboration & confidence incorporating exact requirements indicated by “Of the modes of persuasion furnished by the spoken word, client's representative and strengthened the “Design & Build there are three kinds. The first kind depends on the Project Delivery System”. speaker's 'personal character'; the second on the art of putting the audience in to a 'certain frame of mind'; and the The favorable results virtually made the entire proposal third on 'the proof, provided by the words of speech itself'” team to think about the sanctity of Aristotle's statement as it helped successfully in practice. Another imperative, the At Design & Build (D&B), the proposals are pivoted on the 'Intuition' also contributes to a great extent. In Albert insights shared by client themselves on; what their Einstein's words, “The only real valuable thing is intuition” It requirements are. D&B endeavors in ensuring that does occur while constituting the varied elements of the any necessary support is provided to the client to make them business proposal. The comments of the audience are share their requirements; especially when the client finds it needed to be taken positively with a belief that each and difficult to define the exact requirements. D&B believes that every person in audience posses some special inherent it is very important that how the case study is presented by capability and points made by them can certainly clarify their the speaker. The case is presented in such systematic expectation in detail and also can add significant value to our manner that persuades the client to share his requirements proposal. very clearly. Here the interpretation in literal manner makes the matter crystal clear and leaves no room for the Few things to be remembered for making effective proposal: ambiguity. The words, during presentation always, created • FOCUS on the Theme, the ripples around, for reaping the benefits in terms of 'Time • REAP the benefit from interactions, and Cost'. • SHARE BOLDLY the case studies and problems encountered, For example the CAN PACK, one of our potential client • MENTION the strengths and success, who was initially insisting for the BOQ but by using our • HIGHLIGHT THE BENEFITS with customized language persuasive techniques we could successfully change his mind to focus on needs from the client's point of view. set and made their representative provide us with necessary inputs on their exact expectations and the proposal we Last but not least; let's always bear in mind the motivational submitted was explicitly based not on BOQ rather on- quote by Thomas Jefferson, who asserted, “It takes time to • Clients inputs persuade men to do even what is for their own good”. • Concept drawings • Area statement With this in mind, let's follow that the proposal is to be • Specifications made clear, concise and organized because, eventually in • Scope business you get what you want by giving other people what • Exclusions they want… • Commercial conditions & -J P Rao, Design & Build Div • Time schedule 18