SlideShare una empresa de Scribd logo
1 de 14
Descargar para leer sin conexión
Building Traditional Casing For New Windows




                                 Garage Remodel:

                                 Building Traditional Casing For New Windows




In This Article:                                                                Related Articles:

      q   Case 1: Vinyl Window, New Sill                                              q   Index of Siding and Exterior Trim
      q   Case 2: Aluminum Window, Old Sill                                               Articles
      q   Caulking                                                                    q   Index of Window Articles
      q   Notes On Using Treated Yellow Pine                                          q

      q   Tools and Materials


Skill Level: 3                                                                  Time Taken: 2 Hours Per Window

By Bruce W. Maki, Editor




Introduction:

In our garage makeover project we had to replace 3 windows. We wanted to re-create the window trim so it
would look like the original, or at least look like the other old garages and houses in the neighborhood.




The Vinyl Window:




One of the windows I installed was a 24" x 36" vinyl new
construction window (about $70 at Home Depot).

While this double-pane single-hung window is sort of overkill
for a garage, there really are not many options available for
plain old-fashioned garage windows.




  http://www.hammerzone.com/archives/exterior/trim/window/casing1/traditional.htm (1 of 14)10/03/2005 06:53:51
Building Traditional Casing For New Windows




The window installation was basic:

     q   Prepare the rough opening, allowing for a 1/4" gap all around. Lay two shims on the sill.
     q   Apply some caulk to the back side of the window flange.
     q   Set the window in the opening.
     q   Drive one 2" roofing nail at the top right corner.
     q   Adjust the window position so it was level across the top.
     q   Drive another nail at the top left corner
     q   Measure the diagonals to make sure the window was square.
     q   Drive nails in the bottom, side and top flanges to secure the window.
     q   Smooth out any excess caulk that oozed out from behind the flange.




                                                                                    Carpentry On The Cheatin' Side Of Town:

                                                                                    I drove some deck screws into the siding, but I
                                                                                    left the heads sticking out about 1/8" (red
                                                                                    arrows). This is the same thickness as the
                                                                                    flange on the vinyl window.

                                                                                    These screw heads will act as a standoff, to hold
                                                                                    the casing away from the wall and prevent the
                                                                                    casing from resting on an angle.




More screw heads at the top.




 http://www.hammerzone.com/archives/exterior/trim/window/casing1/traditional.htm (2 of 14)10/03/2005 06:53:51
Building Traditional Casing For New Windows


                                                                                     I made a window sill from treated pine. This
                                                                                     was simply a piece of knot-free 2x4 that I ripped
                                                                                     at a 10 degree angle on my table saw.

                                                                                     I installed the sill with the angled surface against
                                                                                     the wall, so the entire piece sloped downward
                                                                                     slightly. This will help shed water.

                                                                                     Note that the sill extends over 4 inches beyond
                                                                                     the sides of the window, to accommodate the
                                                                                     side casing.




Of course, this sill is a fake. In the old days the sill would extend back under the sash (the movable part of
the window).




The window with the faker-sill attached at the bottom.




                                                                                     I installed 1x4 treated pine on the sides. The
                                                                                     lower edge of this piece was cut at the same 10
                                                                                     degree angle, so it mated with the sloped sill.

                                                                                     I just nailed these boards with a 2-inch
                                                                                     pneumatic finish nailer. Later I added some 2½"
                                                                                     stainless steel ring-shank siding nails, which
                                                                                     hold extremely well.




  http://www.hammerzone.com/archives/exterior/trim/window/casing1/traditional.htm (3 of 14)10/03/2005 06:53:51
Building Traditional Casing For New Windows


The side casing extends to the top of the vinyl
frame.

Sometimes the best way to cut a board like this
is to make the angled cut for the bottom end,
set the board in place, and mark the top cut
where the board meets the top of the vinyl.

After both side pieces of casing were installed,
I installed the top casing, also 1x4 treated pine.




Note how there is primer behind the casing. Prior to installing these boards I scraped off the old paint in the
scalloped grooves, sanded the wood clean, and applied primer. This is just a precaution in case water gets
behind the trim someday. Primed wood is less able to absorb water.

Also, you can see some streaks of primer near the edges of these trim boards. I primed the backs and sides of
these boards prior to cutting. This is another technique I employ to reduce the chances of water getting into
the wood if the caulking fails someday. I know from experience (and from reading) that moisture going into
and out of the wood is a major cause of paint failure. Sealing all sides of the wood (even pressure treated
wood) helps reduce moisture absorption. I now this sounds wacko, but the extra time involved is trivial.




I nailed on the top cap. This is a piece of clear,
straight-grained 1x4 treated pine that I ripped
on my table saw, with a 10 degree angle on both
edges.

I sanded all surfaces with a random orbital
sander, and slightly rounded-off the corners so
they wouldn't be so sharp.




  http://www.hammerzone.com/archives/exterior/trim/window/casing1/traditional.htm (4 of 14)10/03/2005 06:53:51
Building Traditional Casing For New Windows




The completed casing, ready for priming and painting.




Case 2: Aluminum Window, Full Sill




                                           The east side of the garage, before the makeover. Those windows have been
                                           boarded up for years.




One of these windows wasn't even installed straight. All we could figure
was... the original carpenters must have drank a lot of liquor at lunchtime...
nothing else could explain this pathetic sloppiness.




 http://www.hammerzone.com/archives/exterior/trim/window/casing1/traditional.htm (5 of 14)10/03/2005 06:53:51
Building Traditional Casing For New Windows




                                On the inside I pried off anything that looked related to the original window
                                installation.




On the outside I carefully pried off the trim, thinking that I might want to
reuse it.




                                                                I pried away the casing a bit and cut the nails with my
                                                                reciprocating saw.




 http://www.hammerzone.com/archives/exterior/trim/window/casing1/traditional.htm (6 of 14)10/03/2005 06:53:51
Building Traditional Casing For New Windows




The casing was removed easily.

Only the original window sill remained. I decided to reuse the
sills on these two windows




                                                                I pried on the sill to see how it was nailed in place.

                                                                They had nailed through the vertical face of the sill, into the
                                                                studs on either side of the window.




I removed the paint from around the window opening. I used
the Metabo power paint remover for the flat surfaces, and a
scraper for the grooves.




 http://www.hammerzone.com/archives/exterior/trim/window/casing1/traditional.htm (7 of 14)10/03/2005 06:53:51
Building Traditional Casing For New Windows




                                                                After the sill was stripped and sanded, I installed two angled
                                                                blocks for the sill to rest on. I was careful to make sure that the
                                                                sill would end up level, because the window will rest on this
                                                                sill.

                                                                These were just 2x6 scraps cut at a 10 degree angle and
                                                                screwed onto the studs.

                                                                The sill had not been fastened down yet.




I coated the back sides of the sill with primer,
installed it, and then painted the remaining
surfaces with primer.

I also dabbed some primer on the bare surfaces
around the window opening. Just in case.




 http://www.hammerzone.com/archives/exterior/trim/window/casing1/traditional.htm (8 of 14)10/03/2005 06:53:51
Building Traditional Casing For New Windows




                                                                 I installed the window.

                                                                 After applying a bead of caulking all around the back of the
                                                                 flange, I just set the aluminum-framed window into the
                                                                 opening, resting it on the sill.

                                                                 I installed one screw in a top corner, then I measured the
                                                                 diagonals to make sure the frame was square.

                                                                 Then I drove in screws all around the perimeter.




Where possible I used screws with a low-profile head, so they wouldn't
interfere with the casing.

Note how this metal window frame has a channel shape. This may be
intended to act like vinyl siding J-channel, to cover the ends of vinyl siding..




I also caulked all the gaps where the scalloped part of the siding met the window flange. This will deter leaks
and discourage bugs from nesting in there.




                                                        Using a brad nailer, I attached some 1/4" thick strips of wood around
                                                        the perimeter of the window.

                                                        These are spacers, but they will also be visible, so I laid them out
                                                        carefully so they would line up with the edges of the 1x4 trim boards.




  http://www.hammerzone.com/archives/exterior/trim/window/casing1/traditional.htm (9 of 14)10/03/2005 06:53:51
Building Traditional Casing For New Windows




I installed the side casings and then the top casing.




                                                        The bottom end of the side casings were cut at a 10 degree angle to
                                                        match the window sill.

                                                        There were some small pits in the old sill, which I later filled with
                                                        polyester resin (essentially Bondo) followed by the final coat of
                                                        paint.




I installed the top cap.

(Okay, I cheated... this picture is from the other window, but
it's the same idea)




Where Siding Meets Casing:




 http://www.hammerzone.com/archives/exterior/trim/window/casing1/traditional.htm (10 of 14)10/03/2005 06:53:51
Building Traditional Casing For New Windows




                                           I applied caulking all over the place, especially between the window frame
                                           and the wood casing.




                                                               The red arrows point to seams that I later caulked with
                                                               siliconized acrylic latex caulk.

                                                               The top seam is critical. Ideally I would install an aluminum Z-
                                                               flashing over this gap, with one leg of the Z-flashing going
                                                               under the next higher siding board.

                                                               But... that wasn't possible.




Where the scalloped siding met wood trim, I applied a liberal
dab of caulk and smoothed it with my finger. But often one
application isn't enough.




 http://www.hammerzone.com/archives/exterior/trim/window/casing1/traditional.htm (11 of 14)10/03/2005 06:53:51
Building Traditional Casing For New Windows




I just let the caulk harden for an hour and then applied more to
fill in any holes.




Finally...




                                                                                    The completed project. These are the two
                                                                                    aluminum windows that I installed over the
                                                                                    original sills.




That's the vinyl window with the fake sill, to the right of the red door.
It's a bit bigger than the aluminum windows.




 http://www.hammerzone.com/archives/exterior/trim/window/casing1/traditional.htm (12 of 14)10/03/2005 06:53:51
Building Traditional Casing For New Windows



Some notes about using treated wood:

Pressure treated yellow pine is an inexpensive and very durable wood. If the paint ever fails, I'm certain the
wood will last many years before it begins to rot. But treated yellow pine is a tricky material to work with,
especially for finish carpentry, because it can warp very badly. They don't call it "Banana Wood" for
nothing.

Since pressure treated wood is soaked in a water-based chemical solution, the boards are often very wet
when purchased. Boards that appear straight at the store often look like hockey sticks or airplane propellers
in a few days.

Thin lumber can usually be forced to lay flat, and it will stay there if fastened well. I don't consider
common nails to be good fasteners. Ring-shank nails or deck screws are good fasteners for holding warp-
prone wood in place.

But my usual approach is to just be lazy. I often buy the materials far ahead of time and store them in a
warm, dry place. It always seems to take a couple of weeks longer than planned before I get around to
using the wood, so the wet pine ends up drying out. If the wood is going to warp, it will warp while it's
drying in my shop. Then I can choose the best boards for the most critical trim pieces. Of course, this
means that I usually need to buy extra materials, because some boards won't be usable for visible trim, but
even the worst boards get used somewhere.

Yes guys, there is a good side to procrastination. Letting the lumber dry makes good sense.




Tools Used:                                                                    Materials Used:

     q   Cordless Drill/Driver                                                        q   Lumber, Pressure Treated, 1x4x8'
     q   Basic Carpentry Tools                                                        q   Lumber, Pressure Treated, 2x4x8'
     q   Miter Saw                                                                    q   Ring-Shank Siding Nails
     q   Table Saw                                                                    q   Deck Screws
     q   Finish Nail Gun                                                              q   Siliconized Acrylic Latex Caulking




                                                           Back To Top Of Page




                                                             Read our Disclaimer.

                                                                   Search Page

                                    Home What's New Project Archives H.I. World

 http://www.hammerzone.com/archives/exterior/trim/window/casing1/traditional.htm (13 of 14)10/03/2005 06:53:51
Building Traditional Casing For New Windows




                                                               Rants Contact Us



Copyright © 2003 HammerZone.com

Written February 6, 2003




  http://www.hammerzone.com/archives/exterior/trim/window/casing1/traditional.htm (14 of 14)10/03/2005 06:53:51

Más contenido relacionado

Destacado (9)

Wiziq
WiziqWiziq
Wiziq
 
ICFJune
ICFJuneICFJune
ICFJune
 
Cartella Clinica Atto Notarile
Cartella Clinica Atto NotarileCartella Clinica Atto Notarile
Cartella Clinica Atto Notarile
 
Air bricks
Air bricksAir bricks
Air bricks
 
2nd Annual Mobile Marketing Summit
2nd Annual Mobile Marketing Summit2nd Annual Mobile Marketing Summit
2nd Annual Mobile Marketing Summit
 
Cladding
CladdingCladding
Cladding
 
Fit a toilet and bidet
Fit a toilet and bidetFit a toilet and bidet
Fit a toilet and bidet
 
Changing taps
Changing tapsChanging taps
Changing taps
 
dance4life в Бурятии_2012
dance4life в Бурятии_2012dance4life в Бурятии_2012
dance4life в Бурятии_2012
 

Similar a Building traditional casing for new windows

The Ultimate Window Guide | Paramount Builders
The Ultimate Window Guide | Paramount BuildersThe Ultimate Window Guide | Paramount Builders
The Ultimate Window Guide | Paramount BuildersParamount Builders
 
How to install window blinds
How to install window blindsHow to install window blinds
How to install window blindsApollo Blinds
 
Woodworking - DIY- Veneering
Woodworking - DIY- VeneeringWoodworking - DIY- Veneering
Woodworking - DIY- VeneeringRamón Vidal
 
Typical Problems with Vertical Sliding Sash Windows
Typical Problems with Vertical Sliding Sash WindowsTypical Problems with Vertical Sliding Sash Windows
Typical Problems with Vertical Sliding Sash WindowsStephen Davies
 
Visual Dictionary
Visual  DictionaryVisual  Dictionary
Visual DictionaryCabinet
 
Double Glazing Repairs
Double Glazing RepairsDouble Glazing Repairs
Double Glazing Repairsinputdomain4
 
Paper castle to build
Paper castle   to buildPaper castle   to build
Paper castle to buildkty09
 
Stained Glass Presentation
Stained Glass PresentationStained Glass Presentation
Stained Glass PresentationDoris Cultraro
 
Lösbare verbindung
Lösbare verbindungLösbare verbindung
Lösbare verbindungneuwerk
 
Four common window problems and how to fix them
Four common window problems and how to fix themFour common window problems and how to fix them
Four common window problems and how to fix themWindow Liquidators
 

Similar a Building traditional casing for new windows (15)

Build Shed Windows
Build Shed WindowsBuild Shed Windows
Build Shed Windows
 
The Ultimate Window Guide | Paramount Builders
The Ultimate Window Guide | Paramount BuildersThe Ultimate Window Guide | Paramount Builders
The Ultimate Window Guide | Paramount Builders
 
How to install window blinds
How to install window blindsHow to install window blinds
How to install window blinds
 
Woodworking - DIY- Veneering
Woodworking - DIY- VeneeringWoodworking - DIY- Veneering
Woodworking - DIY- Veneering
 
Veneering blogg
Veneering bloggVeneering blogg
Veneering blogg
 
Veneering - Movil
Veneering - MovilVeneering - Movil
Veneering - Movil
 
Typical Problems with Vertical Sliding Sash Windows
Typical Problems with Vertical Sliding Sash WindowsTypical Problems with Vertical Sliding Sash Windows
Typical Problems with Vertical Sliding Sash Windows
 
Visual Dictionary
Visual  DictionaryVisual  Dictionary
Visual Dictionary
 
Double Glazing Repairs
Double Glazing RepairsDouble Glazing Repairs
Double Glazing Repairs
 
Paper castle to build
Paper castle   to buildPaper castle   to build
Paper castle to build
 
Stained Glass Presentation
Stained Glass PresentationStained Glass Presentation
Stained Glass Presentation
 
Lösbare verbindung
Lösbare verbindungLösbare verbindung
Lösbare verbindung
 
Four common window problems and how to fix them
Four common window problems and how to fix themFour common window problems and how to fix them
Four common window problems and how to fix them
 
Change a door handle
Change a door handleChange a door handle
Change a door handle
 
Fireplace
FireplaceFireplace
Fireplace
 

Más de Praveen Sudarsan

Más de Praveen Sudarsan (20)

How to install pvc downpipes
How to install pvc downpipesHow to install pvc downpipes
How to install pvc downpipes
 
How to hang wallpaper
How to hang wallpaperHow to hang wallpaper
How to hang wallpaper
 
How to construct a suimple garden pond
How to construct a suimple garden pondHow to construct a suimple garden pond
How to construct a suimple garden pond
 
How to build a retaining wall
How to build a retaining wallHow to build a retaining wall
How to build a retaining wall
 
How to build a raised formal pool
How to build a raised formal poolHow to build a raised formal pool
How to build a raised formal pool
 
How to build a deck
How to build a deckHow to build a deck
How to build a deck
 
How a lighting circuit works
How a lighting circuit worksHow a lighting circuit works
How a lighting circuit works
 
Home security
Home securityHome security
Home security
 
Heat guns
Heat gunsHeat guns
Heat guns
 
Hanging wallpaper
Hanging wallpaperHanging wallpaper
Hanging wallpaper
 
Hanging a door
Hanging a doorHanging a door
Hanging a door
 
Handrail anatomy
Handrail anatomyHandrail anatomy
Handrail anatomy
 
Upvc fascia
Upvc fasciaUpvc fascia
Upvc fascia
 
Timber care
Timber careTimber care
Timber care
 
How to avoid the cowboy builder
How to avoid the cowboy builderHow to avoid the cowboy builder
How to avoid the cowboy builder
 
General do it yourself safety comments
General do it yourself safety commentsGeneral do it yourself safety comments
General do it yourself safety comments
 
Garage floor insulation
Garage floor insulationGarage floor insulation
Garage floor insulation
 
Foundations for light garden walls
Foundations for light garden wallsFoundations for light garden walls
Foundations for light garden walls
 
Fixing to plasterboard and plasterboard fixings
Fixing to plasterboard and plasterboard fixingsFixing to plasterboard and plasterboard fixings
Fixing to plasterboard and plasterboard fixings
 
Fixing to lathe & plaster
Fixing to lathe & plasterFixing to lathe & plaster
Fixing to lathe & plaster
 

Último

Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityEric T. Tung
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756dollysharma2066
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...rajveerescorts2022
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...Any kyc Account
 

Último (20)

Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pillsMifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 

Building traditional casing for new windows

  • 1. Building Traditional Casing For New Windows Garage Remodel: Building Traditional Casing For New Windows In This Article: Related Articles: q Case 1: Vinyl Window, New Sill q Index of Siding and Exterior Trim q Case 2: Aluminum Window, Old Sill Articles q Caulking q Index of Window Articles q Notes On Using Treated Yellow Pine q q Tools and Materials Skill Level: 3 Time Taken: 2 Hours Per Window By Bruce W. Maki, Editor Introduction: In our garage makeover project we had to replace 3 windows. We wanted to re-create the window trim so it would look like the original, or at least look like the other old garages and houses in the neighborhood. The Vinyl Window: One of the windows I installed was a 24" x 36" vinyl new construction window (about $70 at Home Depot). While this double-pane single-hung window is sort of overkill for a garage, there really are not many options available for plain old-fashioned garage windows. http://www.hammerzone.com/archives/exterior/trim/window/casing1/traditional.htm (1 of 14)10/03/2005 06:53:51
  • 2. Building Traditional Casing For New Windows The window installation was basic: q Prepare the rough opening, allowing for a 1/4" gap all around. Lay two shims on the sill. q Apply some caulk to the back side of the window flange. q Set the window in the opening. q Drive one 2" roofing nail at the top right corner. q Adjust the window position so it was level across the top. q Drive another nail at the top left corner q Measure the diagonals to make sure the window was square. q Drive nails in the bottom, side and top flanges to secure the window. q Smooth out any excess caulk that oozed out from behind the flange. Carpentry On The Cheatin' Side Of Town: I drove some deck screws into the siding, but I left the heads sticking out about 1/8" (red arrows). This is the same thickness as the flange on the vinyl window. These screw heads will act as a standoff, to hold the casing away from the wall and prevent the casing from resting on an angle. More screw heads at the top. http://www.hammerzone.com/archives/exterior/trim/window/casing1/traditional.htm (2 of 14)10/03/2005 06:53:51
  • 3. Building Traditional Casing For New Windows I made a window sill from treated pine. This was simply a piece of knot-free 2x4 that I ripped at a 10 degree angle on my table saw. I installed the sill with the angled surface against the wall, so the entire piece sloped downward slightly. This will help shed water. Note that the sill extends over 4 inches beyond the sides of the window, to accommodate the side casing. Of course, this sill is a fake. In the old days the sill would extend back under the sash (the movable part of the window). The window with the faker-sill attached at the bottom. I installed 1x4 treated pine on the sides. The lower edge of this piece was cut at the same 10 degree angle, so it mated with the sloped sill. I just nailed these boards with a 2-inch pneumatic finish nailer. Later I added some 2½" stainless steel ring-shank siding nails, which hold extremely well. http://www.hammerzone.com/archives/exterior/trim/window/casing1/traditional.htm (3 of 14)10/03/2005 06:53:51
  • 4. Building Traditional Casing For New Windows The side casing extends to the top of the vinyl frame. Sometimes the best way to cut a board like this is to make the angled cut for the bottom end, set the board in place, and mark the top cut where the board meets the top of the vinyl. After both side pieces of casing were installed, I installed the top casing, also 1x4 treated pine. Note how there is primer behind the casing. Prior to installing these boards I scraped off the old paint in the scalloped grooves, sanded the wood clean, and applied primer. This is just a precaution in case water gets behind the trim someday. Primed wood is less able to absorb water. Also, you can see some streaks of primer near the edges of these trim boards. I primed the backs and sides of these boards prior to cutting. This is another technique I employ to reduce the chances of water getting into the wood if the caulking fails someday. I know from experience (and from reading) that moisture going into and out of the wood is a major cause of paint failure. Sealing all sides of the wood (even pressure treated wood) helps reduce moisture absorption. I now this sounds wacko, but the extra time involved is trivial. I nailed on the top cap. This is a piece of clear, straight-grained 1x4 treated pine that I ripped on my table saw, with a 10 degree angle on both edges. I sanded all surfaces with a random orbital sander, and slightly rounded-off the corners so they wouldn't be so sharp. http://www.hammerzone.com/archives/exterior/trim/window/casing1/traditional.htm (4 of 14)10/03/2005 06:53:51
  • 5. Building Traditional Casing For New Windows The completed casing, ready for priming and painting. Case 2: Aluminum Window, Full Sill The east side of the garage, before the makeover. Those windows have been boarded up for years. One of these windows wasn't even installed straight. All we could figure was... the original carpenters must have drank a lot of liquor at lunchtime... nothing else could explain this pathetic sloppiness. http://www.hammerzone.com/archives/exterior/trim/window/casing1/traditional.htm (5 of 14)10/03/2005 06:53:51
  • 6. Building Traditional Casing For New Windows On the inside I pried off anything that looked related to the original window installation. On the outside I carefully pried off the trim, thinking that I might want to reuse it. I pried away the casing a bit and cut the nails with my reciprocating saw. http://www.hammerzone.com/archives/exterior/trim/window/casing1/traditional.htm (6 of 14)10/03/2005 06:53:51
  • 7. Building Traditional Casing For New Windows The casing was removed easily. Only the original window sill remained. I decided to reuse the sills on these two windows I pried on the sill to see how it was nailed in place. They had nailed through the vertical face of the sill, into the studs on either side of the window. I removed the paint from around the window opening. I used the Metabo power paint remover for the flat surfaces, and a scraper for the grooves. http://www.hammerzone.com/archives/exterior/trim/window/casing1/traditional.htm (7 of 14)10/03/2005 06:53:51
  • 8. Building Traditional Casing For New Windows After the sill was stripped and sanded, I installed two angled blocks for the sill to rest on. I was careful to make sure that the sill would end up level, because the window will rest on this sill. These were just 2x6 scraps cut at a 10 degree angle and screwed onto the studs. The sill had not been fastened down yet. I coated the back sides of the sill with primer, installed it, and then painted the remaining surfaces with primer. I also dabbed some primer on the bare surfaces around the window opening. Just in case. http://www.hammerzone.com/archives/exterior/trim/window/casing1/traditional.htm (8 of 14)10/03/2005 06:53:51
  • 9. Building Traditional Casing For New Windows I installed the window. After applying a bead of caulking all around the back of the flange, I just set the aluminum-framed window into the opening, resting it on the sill. I installed one screw in a top corner, then I measured the diagonals to make sure the frame was square. Then I drove in screws all around the perimeter. Where possible I used screws with a low-profile head, so they wouldn't interfere with the casing. Note how this metal window frame has a channel shape. This may be intended to act like vinyl siding J-channel, to cover the ends of vinyl siding.. I also caulked all the gaps where the scalloped part of the siding met the window flange. This will deter leaks and discourage bugs from nesting in there. Using a brad nailer, I attached some 1/4" thick strips of wood around the perimeter of the window. These are spacers, but they will also be visible, so I laid them out carefully so they would line up with the edges of the 1x4 trim boards. http://www.hammerzone.com/archives/exterior/trim/window/casing1/traditional.htm (9 of 14)10/03/2005 06:53:51
  • 10. Building Traditional Casing For New Windows I installed the side casings and then the top casing. The bottom end of the side casings were cut at a 10 degree angle to match the window sill. There were some small pits in the old sill, which I later filled with polyester resin (essentially Bondo) followed by the final coat of paint. I installed the top cap. (Okay, I cheated... this picture is from the other window, but it's the same idea) Where Siding Meets Casing: http://www.hammerzone.com/archives/exterior/trim/window/casing1/traditional.htm (10 of 14)10/03/2005 06:53:51
  • 11. Building Traditional Casing For New Windows I applied caulking all over the place, especially between the window frame and the wood casing. The red arrows point to seams that I later caulked with siliconized acrylic latex caulk. The top seam is critical. Ideally I would install an aluminum Z- flashing over this gap, with one leg of the Z-flashing going under the next higher siding board. But... that wasn't possible. Where the scalloped siding met wood trim, I applied a liberal dab of caulk and smoothed it with my finger. But often one application isn't enough. http://www.hammerzone.com/archives/exterior/trim/window/casing1/traditional.htm (11 of 14)10/03/2005 06:53:51
  • 12. Building Traditional Casing For New Windows I just let the caulk harden for an hour and then applied more to fill in any holes. Finally... The completed project. These are the two aluminum windows that I installed over the original sills. That's the vinyl window with the fake sill, to the right of the red door. It's a bit bigger than the aluminum windows. http://www.hammerzone.com/archives/exterior/trim/window/casing1/traditional.htm (12 of 14)10/03/2005 06:53:51
  • 13. Building Traditional Casing For New Windows Some notes about using treated wood: Pressure treated yellow pine is an inexpensive and very durable wood. If the paint ever fails, I'm certain the wood will last many years before it begins to rot. But treated yellow pine is a tricky material to work with, especially for finish carpentry, because it can warp very badly. They don't call it "Banana Wood" for nothing. Since pressure treated wood is soaked in a water-based chemical solution, the boards are often very wet when purchased. Boards that appear straight at the store often look like hockey sticks or airplane propellers in a few days. Thin lumber can usually be forced to lay flat, and it will stay there if fastened well. I don't consider common nails to be good fasteners. Ring-shank nails or deck screws are good fasteners for holding warp- prone wood in place. But my usual approach is to just be lazy. I often buy the materials far ahead of time and store them in a warm, dry place. It always seems to take a couple of weeks longer than planned before I get around to using the wood, so the wet pine ends up drying out. If the wood is going to warp, it will warp while it's drying in my shop. Then I can choose the best boards for the most critical trim pieces. Of course, this means that I usually need to buy extra materials, because some boards won't be usable for visible trim, but even the worst boards get used somewhere. Yes guys, there is a good side to procrastination. Letting the lumber dry makes good sense. Tools Used: Materials Used: q Cordless Drill/Driver q Lumber, Pressure Treated, 1x4x8' q Basic Carpentry Tools q Lumber, Pressure Treated, 2x4x8' q Miter Saw q Ring-Shank Siding Nails q Table Saw q Deck Screws q Finish Nail Gun q Siliconized Acrylic Latex Caulking Back To Top Of Page Read our Disclaimer. Search Page Home What's New Project Archives H.I. World http://www.hammerzone.com/archives/exterior/trim/window/casing1/traditional.htm (13 of 14)10/03/2005 06:53:51
  • 14. Building Traditional Casing For New Windows Rants Contact Us Copyright © 2003 HammerZone.com Written February 6, 2003 http://www.hammerzone.com/archives/exterior/trim/window/casing1/traditional.htm (14 of 14)10/03/2005 06:53:51