SIPOREX UNREINFORCED BLOCKS 
Available in the following dimensions 
Oven dry density 
-450 Kg/Cum 
Thk X Height X Length 
075 x 240 x 650 mm 
100 x 240 x 650 mm 
Oven dry density 
-600 Kg/Cum 
Thk X Height X Length 
125 x 240 x 650 mm 
150 x 240 x 650 mm 
200 x 240 x 650 mm
GENERAL 
1. Details of sizes of blocks for walling, partitions & cladding are given in the price list. 
2. Blocks should be stacked in dry, well ventilated areas on a level ground. 
Block should be placed on edges (in the direction of 240 mm height) 
not on flat (in the direction of the thickness). Different stacks should be 
maintained for different sizes of blocks. 
3. Siporex blocks should not be used below ground level or in plinth. 
4. Damp-proof course should be provided before starting superstructure masonry. 
5. Generally, load bearing structures using 20 cm (8”) Siporex blocks can be 
constructed up to two storeys, i.e. G + 1 Buildings. Over G+2, will be a “Framed” 
structure. 
However, it is necessary to design load bearing / partition wall as per relevant IS 
specifications. 
6. Siporex blocks and slabs are highly suitable for extension or addition of floors to 
existing old or new buildings because of their lightweight characteristics
MASONRY WITH SIPOREX BLOCKS 
1. Cement mortar 1 : 6 using Portland cement should be used. 
2. Blocks shall be placed in the direction of 240 mm height in the masonry. 
3. It is not necessary to soak the Siporex blocks before their use in masonry. Their 
surface should be wetted sparingly and afterwards water should be sprinkled for 
curing of masonry joints. 
4. For breaking of joints in the masonry, specifications for brick masonry work shall 
be adopted for guidance. 
5. At door and window openings, 2 nos. 6 mm dia bars should be provided at the top 
of the openings to avoid cracks on plaster. The bars should be provided in the 
course immediately above the lintel and bar should be extended 0.6 m on both 
sides. 
6. Inter-locking should not be done at junctions of load bearing and non-load bearing 
partition walls. Connections between these walls can be achieved by: 
a) Nailing galvanized strips across every third joint with 12 mm galvanized or 
aluminum nails, or 
b) By providing 6 mm dia bars 200 mm long at the Junction.
Siporex blocks are wetted before being 
laid in construction of walls. 
Top: A wall built using siporex blocks 
Bottom: Stacking blocks, on site
MASONRY WITH SIPOREX BLOCKS 
7. Inter-locking at junction of 2 load bearing walls should be done as in brick masonry. 
At the junction between conventional and Siporex block masonry, chicken mesh 
should be provided in the plaster to avoid cracking at the corners and junctions. 
8. Bond beams, 200 x 100 mm (8" x 4") should be provided throughout the load bearing 
walls below the Siporex slabs for floors and roofs, e.g. if there are three rooms with 
continuous wall, bond beam should be continuous with 12 mm dia bars. 2 Nos. and 6 
mm dia bar stirrups of 175 mm (7") centre to centre shall be provided as 
reinforcement. 
9. For Unsupported Siporex: Walling height ≤ height 18 times the thk of wall and 
……………………… horizontally ≤ 24 times thk of wall for load bearing walls. 
For partition or non load bearing walls unsupported length and height should be: 
≤ 30 times the thickness of walls. 
In cases where the length of wall exceeds these limits, Siporex pillars can be 
constructed. If height exceeds the prescribed limit, bond beams at a suitable height 
in the wall should be provided (IS-6041 and IS 1905) . 
10. The work of concealed plumbing & concealed electrical wiring fittings, etc., should 
be decided in advance. Work of chasing should be done in Siporex blocks with 
proper tools to avoid damage to blocks & to prevent cracks in plaster.
INTERNAL AND EXTERNAL PLASTER 
a) Siporex walls should generally be plastered on both sides in two coats. 
Internal walls in industrial buildings may be left unplastered if so desired 
and joints should be properly finished. 
b) Block walls should be wetted sparingly before plaster. 
c) Method of plaster is similar to that of plaster on brick1 concrete walls. 
d) Internal plaster should be carried out in 2 coats with cement mortar 1 : 3 
(One part of Portland cement and 3 parts of screened and washed sand). 
First coat may be of 4 to 6 mm thick and the second coat (finishing coat) 
e) External plaster should be carried out in 2 coats with cement mortar 1 : 3 
(One part of Portland . cement and 3 parts of screened and washed sand.) 
First coat may be of 8 to 10 mm thickness and the second coat (finishing 
coat) may be about 10 mm thick. 
f)Plastered surfaces should be watered for at least one week.
PAINTING 
a) INTERNAL PAINTING 
• For plastered walls the method employed is the same as for other plastered walls. 
• For unplastered walls in industrial buildings, berating paints such as acrylic 
emulsion can be applied. They provide a more impermeable surface and are often 
washable. 
b) EXTERNAL PAINTING 
• For exterior painting of plastered walls, where whitewash is the most common 
method. Longer life and better weather protection is obtained with a cement 
paint. Better moisture protection is obtained with all cement paints by application 
with a stiff brush raher than by spraying
FIXTURES IN SIPOREX 
a) DOOR AND WINDOW FRAMES: 
Door and window frames are attached in the surrounding masonry with 7" aluminum or 
galvanized iron cut nails hammered directly into the Siporex blocks. The nails should be spaced 
at a maximum 40 cm and the first nail should not be farther than 20 cm from a corner. 14 
gauge screws may be used. They should penetrate at least 50 mm into the Siporex blocks and 
should preferable be driven into raw plugs. ALL NAILS AND SCREWS SHALL BE INSERTED INTO 
THE BLOCKS AND NOT ALONG JOINTS. 
b) WASH BASINS: 
Pedestal type wash basins are fixed to the wall using 3" x 14 gauge screws in raw1 plugs. Where 
wash basins are mounted on brackets, use of 4" x 14 gauge screws in raw1 plugs will give 
sufficient strength and rigidity. 
c) CUPBOARDS: 
For most purposes, 3" x 14 gauge screws in raw1 plugs should prove satisfactory. For heavily 
loaded cupboards, timber connector should be used between cupboards and Siporex walls, in 
addition to screws in raw1 plugs.
FIXTURES IN SIPOREX 
d) ELECTRICAL FITTINGS: 
-Light fuse boxes and switch boxes should be fixed using 3" x 10 gauge 
screws in raw1 plugs. 
-Heavier fittings should preferably be mounted on the floor or fixed with 
through bolts. 
-Wall brackets, light switches, should be fixed using 8 to 10 gauge screws, 
not less than 3" long in raw1 plugs. 
-Where conduit runs are made on surface the supporting saddles may be 
fixed with 2" x 10 gauge screws directly into Siporex or where the conduit is 
likely to be subjected to loads during erection, by 811 0 gauge screws in 
raw1 plugs. 
e) HANDRAILS: 
Wherever possible these should be through-bolts. Failing this, use 4" x 14 
gauge screws in raw plugs. 
f) HOT AND COLD WATER PIPES: 
The supporting brackets or holderbats should be fixed to walls using 2"x 10 
gauge screws in raw1 plugs.
PRECAUTIONS 
AGAINST CRACKING IN BLOCKWORK 
1. Limit the cracking to the joints, so that it can be repaired easily. Hence, mortars 
weaker than the blocks are always recommended. 
2. Where uneven settlement of foundations is feared, proper bonding and the use of 
reinforcement in horizontal joints will tend to reduce risks of cracking by 
distributing stresses throughout the wall. 
3. In block walls abutting against columns and beams of load bearing frame, 
differential movements can be caused by settlement, variable loading conditions 
and changes in temperature and humidity. 
4. For blockwork partitions, care should be taken to limit deflection of floors or 
partitions should be strengthened by use of bond beams or reinforcement in the 
lower courses. 
5. Use resilient material stoppers between door shutter and wall at one or two points 
or use door closer to avoid cracking in walls by impact of slamming of doors, etc., 
particularly in these rigid partitions. 
6. Alleviate temperature & shrinkage stresses in the wall by incorporating control 
joints at appropriate intervals and locations.
Guidelines for construction of masonry with siporex

Más contenido relacionado

La actualidad más candente

La actualidad más candente (20)

Tyoes of Flooring
Tyoes of FlooringTyoes of Flooring
Tyoes of Flooring
 
cladding
claddingcladding
cladding
 
PLYWOOD
PLYWOODPLYWOOD
PLYWOOD
 
Wall finishes
Wall finishesWall finishes
Wall finishes
 
Plastering
PlasteringPlastering
Plastering
 
Laminates Veneers & Plywood
Laminates Veneers & PlywoodLaminates Veneers & Plywood
Laminates Veneers & Plywood
 
types of Flooring in construction
types of Flooring in constructiontypes of Flooring in construction
types of Flooring in construction
 
Timber structure
Timber structureTimber structure
Timber structure
 
Glass partition 002
Glass partition 002Glass partition 002
Glass partition 002
 
Plywood
PlywoodPlywood
Plywood
 
Plastering and pointing
Plastering and pointingPlastering and pointing
Plastering and pointing
 
Report on wall treatment
Report on wall treatmentReport on wall treatment
Report on wall treatment
 
Roof and roof coverings
Roof and roof coveringsRoof and roof coverings
Roof and roof coverings
 
Partitions and panelling
Partitions and panellingPartitions and panelling
Partitions and panelling
 
Floor finishes - flooring and finish types
Floor finishes - flooring and finish typesFloor finishes - flooring and finish types
Floor finishes - flooring and finish types
 
BT 1: Concrete Hollow Blocks
BT 1: Concrete Hollow BlocksBT 1: Concrete Hollow Blocks
BT 1: Concrete Hollow Blocks
 
Acp panel
Acp panelAcp panel
Acp panel
 
Partition wall
Partition wallPartition wall
Partition wall
 
R.C.C. STAIRS
R.C.C. STAIRSR.C.C. STAIRS
R.C.C. STAIRS
 
Report on doors
Report on doorsReport on doors
Report on doors
 

Destacado

Autoclaved aerated concrete
Autoclaved aerated concreteAutoclaved aerated concrete
Autoclaved aerated concreteAyushi Mehrotra
 
Aerated autoclaved concrete
Aerated autoclaved concreteAerated autoclaved concrete
Aerated autoclaved concreteFrahim Akhtar
 
AAC- The wonder Building Material
AAC- The wonder Building MaterialAAC- The wonder Building Material
AAC- The wonder Building Materialindiablockmachine
 
Autoclaved Aerated Concrete Blocks
Autoclaved Aerated Concrete BlocksAutoclaved Aerated Concrete Blocks
Autoclaved Aerated Concrete BlocksThaju Zaman
 
Plastering Process (Cement/Masonry/Finishing Layer)
Plastering Process (Cement/Masonry/Finishing Layer)Plastering Process (Cement/Masonry/Finishing Layer)
Plastering Process (Cement/Masonry/Finishing Layer)Zelkhan
 
autoclaved aerated concrete
autoclaved aerated concreteautoclaved aerated concrete
autoclaved aerated concreteSIVA Aruna
 
pointing, plastering, bonding
pointing, plastering, bondingpointing, plastering, bonding
pointing, plastering, bondingRAHUL SINHA
 
Presentation on Brick Masonry, Paint and Plastering
Presentation on Brick Masonry, Paint and PlasteringPresentation on Brick Masonry, Paint and Plastering
Presentation on Brick Masonry, Paint and PlasteringAbontee
 
Siporex Portaiden Rakentaminen
Siporex Portaiden RakentaminenSiporex Portaiden Rakentaminen
Siporex Portaiden RakentaminenHouseofPR
 
Presentation [AP14015]
Presentation [AP14015]Presentation [AP14015]
Presentation [AP14015]Rahul Dasgupta
 

Destacado (20)

AAC - do's and don't
AAC - do's and don'tAAC - do's and don't
AAC - do's and don't
 
Autoclaved aerated concrete
Autoclaved aerated concreteAutoclaved aerated concrete
Autoclaved aerated concrete
 
Aerated autoclaved concrete
Aerated autoclaved concreteAerated autoclaved concrete
Aerated autoclaved concrete
 
AAC Blocks Vs. Red Bricks
AAC Blocks Vs. Red BricksAAC Blocks Vs. Red Bricks
AAC Blocks Vs. Red Bricks
 
AAC- The wonder Building Material
AAC- The wonder Building MaterialAAC- The wonder Building Material
AAC- The wonder Building Material
 
Autoclaved Aerated Concrete Blocks
Autoclaved Aerated Concrete BlocksAutoclaved Aerated Concrete Blocks
Autoclaved Aerated Concrete Blocks
 
Plastering
PlasteringPlastering
Plastering
 
Plastering Process (Cement/Masonry/Finishing Layer)
Plastering Process (Cement/Masonry/Finishing Layer)Plastering Process (Cement/Masonry/Finishing Layer)
Plastering Process (Cement/Masonry/Finishing Layer)
 
autoclaved aerated concrete
autoclaved aerated concreteautoclaved aerated concrete
autoclaved aerated concrete
 
Bricks
BricksBricks
Bricks
 
5.plastering
5.plastering5.plastering
5.plastering
 
pointing, plastering, bonding
pointing, plastering, bondingpointing, plastering, bonding
pointing, plastering, bonding
 
Plastering and pointing
Plastering and pointingPlastering and pointing
Plastering and pointing
 
Presentation on Brick Masonry, Paint and Plastering
Presentation on Brick Masonry, Paint and PlasteringPresentation on Brick Masonry, Paint and Plastering
Presentation on Brick Masonry, Paint and Plastering
 
Unit plan
Unit planUnit plan
Unit plan
 
Sharmishtha Salunke
Sharmishtha SalunkeSharmishtha Salunke
Sharmishtha Salunke
 
Siporex Portaiden Rakentaminen
Siporex Portaiden RakentaminenSiporex Portaiden Rakentaminen
Siporex Portaiden Rakentaminen
 
From Sieve to Silver
From Sieve to SilverFrom Sieve to Silver
From Sieve to Silver
 
Aac advantage
Aac advantageAac advantage
Aac advantage
 
Presentation [AP14015]
Presentation [AP14015]Presentation [AP14015]
Presentation [AP14015]
 

Similar a Guidelines for construction of masonry with siporex

Floor and wall ties
Floor and wall tiesFloor and wall ties
Floor and wall tiesSaratMishra4
 
How to build a retaining wall
How to build a retaining wallHow to build a retaining wall
How to build a retaining wallPraveen Sudarsan
 
Repair,Retrofitting and Rehabilitation
Repair,Retrofitting and RehabilitationRepair,Retrofitting and Rehabilitation
Repair,Retrofitting and RehabilitationIshwar Chauhan
 
Chapter 4 (e) cavity walls
Chapter 4 (e) cavity wallsChapter 4 (e) cavity walls
Chapter 4 (e) cavity wallsKHUSHBU SHAH
 
CASE STUDY of remedial measure of civil works
CASE STUDY of remedial measure of civil worksCASE STUDY of remedial measure of civil works
CASE STUDY of remedial measure of civil worksKumarS250747
 
CASE STUDY. on Restoration and rehabilitation
CASE STUDY. on Restoration and rehabilitationCASE STUDY. on Restoration and rehabilitation
CASE STUDY. on Restoration and rehabilitationKumarS250747
 
Tutor wall ties in cavity walls .ppt 2
Tutor wall ties in cavity walls .ppt 2Tutor wall ties in cavity walls .ppt 2
Tutor wall ties in cavity walls .ppt 2Luke D'Arcy
 
Construction and testing of sewer line
Construction and testing of sewer lineConstruction and testing of sewer line
Construction and testing of sewer lineRAMPRASAD KUMAWAT
 
SPECIFICATIONS FOR ADDL HOUSING PROJECT.pptx
SPECIFICATIONS FOR ADDL HOUSING PROJECT.pptxSPECIFICATIONS FOR ADDL HOUSING PROJECT.pptx
SPECIFICATIONS FOR ADDL HOUSING PROJECT.pptxswethasekhar5
 
How to build a retaining wall
How to build a retaining wallHow to build a retaining wall
How to build a retaining wallZulaiha Amaria
 
Masonry special features
Masonry special featuresMasonry special features
Masonry special featuresJitesh Dhule
 
UNIT 2 PREFABRICATION COMPONENTS | CE8022 PREFABRICATED STRUCTURES
UNIT 2 PREFABRICATION COMPONENTS | CE8022 PREFABRICATED STRUCTURESUNIT 2 PREFABRICATION COMPONENTS | CE8022 PREFABRICATED STRUCTURES
UNIT 2 PREFABRICATION COMPONENTS | CE8022 PREFABRICATED STRUCTURESVenkateswaran S
 
Masonry-Special-Features (1).pdf
Masonry-Special-Features (1).pdfMasonry-Special-Features (1).pdf
Masonry-Special-Features (1).pdfAnmolSharma668762
 
Masonry-Special-Features.pdf
Masonry-Special-Features.pdfMasonry-Special-Features.pdf
Masonry-Special-Features.pdfwoanumberdar
 
6. FORMWORK (ACE) 2160601 GTU
6. FORMWORK (ACE) 2160601 GTU6. FORMWORK (ACE) 2160601 GTU
6. FORMWORK (ACE) 2160601 GTUVATSAL PATEL
 

Similar a Guidelines for construction of masonry with siporex (20)

Floor and wall ties
Floor and wall tiesFloor and wall ties
Floor and wall ties
 
How to build a retaining wall
How to build a retaining wallHow to build a retaining wall
How to build a retaining wall
 
Repair,Retrofitting and Rehabilitation
Repair,Retrofitting and RehabilitationRepair,Retrofitting and Rehabilitation
Repair,Retrofitting and Rehabilitation
 
Form Work
Form Work Form Work
Form Work
 
Chapter 4 (e) cavity walls
Chapter 4 (e) cavity wallsChapter 4 (e) cavity walls
Chapter 4 (e) cavity walls
 
CASE STUDY of remedial measure of civil works
CASE STUDY of remedial measure of civil worksCASE STUDY of remedial measure of civil works
CASE STUDY of remedial measure of civil works
 
CASE STUDY. on Restoration and rehabilitation
CASE STUDY. on Restoration and rehabilitationCASE STUDY. on Restoration and rehabilitation
CASE STUDY. on Restoration and rehabilitation
 
All about decking
All about deckingAll about decking
All about decking
 
Tutor wall ties in cavity walls .ppt 2
Tutor wall ties in cavity walls .ppt 2Tutor wall ties in cavity walls .ppt 2
Tutor wall ties in cavity walls .ppt 2
 
Construction and testing of sewer line
Construction and testing of sewer lineConstruction and testing of sewer line
Construction and testing of sewer line
 
SPECIFICATIONS FOR ADDL HOUSING PROJECT.pptx
SPECIFICATIONS FOR ADDL HOUSING PROJECT.pptxSPECIFICATIONS FOR ADDL HOUSING PROJECT.pptx
SPECIFICATIONS FOR ADDL HOUSING PROJECT.pptx
 
How to build a retaining wall
How to build a retaining wallHow to build a retaining wall
How to build a retaining wall
 
Masonry special features
Masonry special featuresMasonry special features
Masonry special features
 
Top Down Construction Presentation.
Top Down Construction Presentation.Top Down Construction Presentation.
Top Down Construction Presentation.
 
All about decking
All about deckingAll about decking
All about decking
 
UNIT 2 PREFABRICATION COMPONENTS | CE8022 PREFABRICATED STRUCTURES
UNIT 2 PREFABRICATION COMPONENTS | CE8022 PREFABRICATED STRUCTURESUNIT 2 PREFABRICATION COMPONENTS | CE8022 PREFABRICATED STRUCTURES
UNIT 2 PREFABRICATION COMPONENTS | CE8022 PREFABRICATED STRUCTURES
 
Masonry-Special-Features (1).pdf
Masonry-Special-Features (1).pdfMasonry-Special-Features (1).pdf
Masonry-Special-Features (1).pdf
 
Masonry-Special-Features.pdf
Masonry-Special-Features.pdfMasonry-Special-Features.pdf
Masonry-Special-Features.pdf
 
IS 4326
IS 4326IS 4326
IS 4326
 
6. FORMWORK (ACE) 2160601 GTU
6. FORMWORK (ACE) 2160601 GTU6. FORMWORK (ACE) 2160601 GTU
6. FORMWORK (ACE) 2160601 GTU
 

Más de Priya Raj

The Channel Tunnel
The Channel TunnelThe Channel Tunnel
The Channel TunnelPriya Raj
 
Management Education: Flip sides of the coin
Management Education: Flip sides of the coinManagement Education: Flip sides of the coin
Management Education: Flip sides of the coinPriya Raj
 
Desalination for water supply
Desalination for water supplyDesalination for water supply
Desalination for water supplyPriya Raj
 
Pune transport solutions
Pune transport solutionsPune transport solutions
Pune transport solutionsPriya Raj
 
Pune transport problems
Pune transport problemsPune transport problems
Pune transport problemsPriya Raj
 

Más de Priya Raj (7)

Jeff bezos
Jeff bezosJeff bezos
Jeff bezos
 
The Channel Tunnel
The Channel TunnelThe Channel Tunnel
The Channel Tunnel
 
Management Education: Flip sides of the coin
Management Education: Flip sides of the coinManagement Education: Flip sides of the coin
Management Education: Flip sides of the coin
 
Desalination for water supply
Desalination for water supplyDesalination for water supply
Desalination for water supply
 
Zion ppt
Zion pptZion ppt
Zion ppt
 
Pune transport solutions
Pune transport solutionsPune transport solutions
Pune transport solutions
 
Pune transport problems
Pune transport problemsPune transport problems
Pune transport problems
 

Último

(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesPrabhanshu Chaturvedi
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 

Último (20)

(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 

Guidelines for construction of masonry with siporex

  • 1. GUIDELINES FOR CONSTRUCTION OF MASONRY WITH SIPOREX BLOCKS 271246 Puppala Vamsee 271247 Helen Anitha R 271248 SRINAATH R 271249 Priya Rajeev 271250 Vikhyat Ramachandran 271251 Chinmai G Rao 271253 Nirman Rathi 271254 Riv Mahesh
  • 2. SIPOREX UNREINFORCED BLOCKS Available in the following dimensions Oven dry density -450 Kg/Cum Thk X Height X Length 075 x 240 x 650 mm 100 x 240 x 650 mm Oven dry density -600 Kg/Cum Thk X Height X Length 125 x 240 x 650 mm 150 x 240 x 650 mm 200 x 240 x 650 mm
  • 3. GENERAL 1. Details of sizes of blocks for walling, partitions & cladding are given in the price list. 2. Blocks should be stacked in dry, well ventilated areas on a level ground. Block should be placed on edges (in the direction of 240 mm height) not on flat (in the direction of the thickness). Different stacks should be maintained for different sizes of blocks. 3. Siporex blocks should not be used below ground level or in plinth. 4. Damp-proof course should be provided before starting superstructure masonry. 5. Generally, load bearing structures using 20 cm (8”) Siporex blocks can be constructed up to two storeys, i.e. G + 1 Buildings. Over G+2, will be a “Framed” structure. However, it is necessary to design load bearing / partition wall as per relevant IS specifications. 6. Siporex blocks and slabs are highly suitable for extension or addition of floors to existing old or new buildings because of their lightweight characteristics
  • 4. MASONRY WITH SIPOREX BLOCKS 1. Cement mortar 1 : 6 using Portland cement should be used. 2. Blocks shall be placed in the direction of 240 mm height in the masonry. 3. It is not necessary to soak the Siporex blocks before their use in masonry. Their surface should be wetted sparingly and afterwards water should be sprinkled for curing of masonry joints. 4. For breaking of joints in the masonry, specifications for brick masonry work shall be adopted for guidance. 5. At door and window openings, 2 nos. 6 mm dia bars should be provided at the top of the openings to avoid cracks on plaster. The bars should be provided in the course immediately above the lintel and bar should be extended 0.6 m on both sides. 6. Inter-locking should not be done at junctions of load bearing and non-load bearing partition walls. Connections between these walls can be achieved by: a) Nailing galvanized strips across every third joint with 12 mm galvanized or aluminum nails, or b) By providing 6 mm dia bars 200 mm long at the Junction.
  • 5. Siporex blocks are wetted before being laid in construction of walls. Top: A wall built using siporex blocks Bottom: Stacking blocks, on site
  • 6. MASONRY WITH SIPOREX BLOCKS 7. Inter-locking at junction of 2 load bearing walls should be done as in brick masonry. At the junction between conventional and Siporex block masonry, chicken mesh should be provided in the plaster to avoid cracking at the corners and junctions. 8. Bond beams, 200 x 100 mm (8" x 4") should be provided throughout the load bearing walls below the Siporex slabs for floors and roofs, e.g. if there are three rooms with continuous wall, bond beam should be continuous with 12 mm dia bars. 2 Nos. and 6 mm dia bar stirrups of 175 mm (7") centre to centre shall be provided as reinforcement. 9. For Unsupported Siporex: Walling height ≤ height 18 times the thk of wall and ……………………… horizontally ≤ 24 times thk of wall for load bearing walls. For partition or non load bearing walls unsupported length and height should be: ≤ 30 times the thickness of walls. In cases where the length of wall exceeds these limits, Siporex pillars can be constructed. If height exceeds the prescribed limit, bond beams at a suitable height in the wall should be provided (IS-6041 and IS 1905) . 10. The work of concealed plumbing & concealed electrical wiring fittings, etc., should be decided in advance. Work of chasing should be done in Siporex blocks with proper tools to avoid damage to blocks & to prevent cracks in plaster.
  • 7. INTERNAL AND EXTERNAL PLASTER a) Siporex walls should generally be plastered on both sides in two coats. Internal walls in industrial buildings may be left unplastered if so desired and joints should be properly finished. b) Block walls should be wetted sparingly before plaster. c) Method of plaster is similar to that of plaster on brick1 concrete walls. d) Internal plaster should be carried out in 2 coats with cement mortar 1 : 3 (One part of Portland cement and 3 parts of screened and washed sand). First coat may be of 4 to 6 mm thick and the second coat (finishing coat) e) External plaster should be carried out in 2 coats with cement mortar 1 : 3 (One part of Portland . cement and 3 parts of screened and washed sand.) First coat may be of 8 to 10 mm thickness and the second coat (finishing coat) may be about 10 mm thick. f)Plastered surfaces should be watered for at least one week.
  • 8. PAINTING a) INTERNAL PAINTING • For plastered walls the method employed is the same as for other plastered walls. • For unplastered walls in industrial buildings, berating paints such as acrylic emulsion can be applied. They provide a more impermeable surface and are often washable. b) EXTERNAL PAINTING • For exterior painting of plastered walls, where whitewash is the most common method. Longer life and better weather protection is obtained with a cement paint. Better moisture protection is obtained with all cement paints by application with a stiff brush raher than by spraying
  • 9. FIXTURES IN SIPOREX a) DOOR AND WINDOW FRAMES: Door and window frames are attached in the surrounding masonry with 7" aluminum or galvanized iron cut nails hammered directly into the Siporex blocks. The nails should be spaced at a maximum 40 cm and the first nail should not be farther than 20 cm from a corner. 14 gauge screws may be used. They should penetrate at least 50 mm into the Siporex blocks and should preferable be driven into raw plugs. ALL NAILS AND SCREWS SHALL BE INSERTED INTO THE BLOCKS AND NOT ALONG JOINTS. b) WASH BASINS: Pedestal type wash basins are fixed to the wall using 3" x 14 gauge screws in raw1 plugs. Where wash basins are mounted on brackets, use of 4" x 14 gauge screws in raw1 plugs will give sufficient strength and rigidity. c) CUPBOARDS: For most purposes, 3" x 14 gauge screws in raw1 plugs should prove satisfactory. For heavily loaded cupboards, timber connector should be used between cupboards and Siporex walls, in addition to screws in raw1 plugs.
  • 10. FIXTURES IN SIPOREX d) ELECTRICAL FITTINGS: -Light fuse boxes and switch boxes should be fixed using 3" x 10 gauge screws in raw1 plugs. -Heavier fittings should preferably be mounted on the floor or fixed with through bolts. -Wall brackets, light switches, should be fixed using 8 to 10 gauge screws, not less than 3" long in raw1 plugs. -Where conduit runs are made on surface the supporting saddles may be fixed with 2" x 10 gauge screws directly into Siporex or where the conduit is likely to be subjected to loads during erection, by 811 0 gauge screws in raw1 plugs. e) HANDRAILS: Wherever possible these should be through-bolts. Failing this, use 4" x 14 gauge screws in raw plugs. f) HOT AND COLD WATER PIPES: The supporting brackets or holderbats should be fixed to walls using 2"x 10 gauge screws in raw1 plugs.
  • 11. PRECAUTIONS AGAINST CRACKING IN BLOCKWORK 1. Limit the cracking to the joints, so that it can be repaired easily. Hence, mortars weaker than the blocks are always recommended. 2. Where uneven settlement of foundations is feared, proper bonding and the use of reinforcement in horizontal joints will tend to reduce risks of cracking by distributing stresses throughout the wall. 3. In block walls abutting against columns and beams of load bearing frame, differential movements can be caused by settlement, variable loading conditions and changes in temperature and humidity. 4. For blockwork partitions, care should be taken to limit deflection of floors or partitions should be strengthened by use of bond beams or reinforcement in the lower courses. 5. Use resilient material stoppers between door shutter and wall at one or two points or use door closer to avoid cracking in walls by impact of slamming of doors, etc., particularly in these rigid partitions. 6. Alleviate temperature & shrinkage stresses in the wall by incorporating control joints at appropriate intervals and locations.