Intelligent Project Acceleration:


                  goal-based acceleration


     Dr. Dan Patterson | CEO & Founder Acumen
2




Agenda
�    Introductions
�    Schedule acceleration
�    Case Study using Fuse 360
�    Q&A




    November 17, 2011
Acumen: Proven Project Analytics
�      Project Management Software Company
�      Improving CPM scheduling & analysis
�      Thought leader in Analytics
�      Schedule maturity framework

       S1 > S5™ Framework                                    Acumen Core Offerings
                                                  S5:             Acumen Fuse®
                                                  Validate
                                       S4:
                                       Optimize
                           S3: Risk-
                S2:
                           Adjust                            Risk Assessment Workshops
                Critique
    S1: Build


                                                                 Software Training
4




Fuse 360 Goal-Based Acceleration
�     Module for Fuse platform
�     Automated:
       �    Scenario generation    Logic
                                  Analysis
       �    Acceleration
       �    Decision support      Forensic Metric
                                  Analysis Analysis




    November 17, 2011
Goal-Based Acceleration
    Accelerate schedule…

      by applying criteria

  …to achieve a given goal
6




Acceleration
�     Planning: Schedule alignment
�     Execution: Delay recovery
�     Goal:
       �    Target date
       �    % of remaining duration
       �    Best date possible
       �    Project or activity

    November 17, 2011
Criteria Sets
�   Drive acceleration
                                     Criteria Set
    �   Reduce duration
                                        Script
    �   Change calendars         “Cleanse & accelerate
                                     construction”
    �   Reduce logic lags       Step 1         Step 2        Step 3
                             Remove all    Filter for     Reduce
    �   Remove constraints   constraints   Construction
                                           activities
                                                          remaining
                                                          duration by
                                                          20%
8




How Does it Work?
�     CPM simulation
�     Critical path focus
�     Incremental push
�     Prioritize
       �    Earliest/latest
       �    Longest durations
       �    Least resistance

    November 17, 2011
Accept or Reject Scenario
�   Number of days accelerated?
�   Goal achieved?
10




Decision Support
�     Scenario Insight:
       �    Fuse forensics: what changed?
       �    Fuse analysis: which option?
�     New plan:
       �    Publish back to Primavera or MS Project




    November 17, 2011
11




Baseline Compliance™
�     Traditional measures include:
       �    Earned value
       �    % complete
       �    Ahead/behind baseline
�     Baseline Compliance™
       �    True measure of how plan is being executed
       �    More than just date comparison


    November 17, 2011
Compliance Scenarios
Case Study
  Baseline Compliance™ Analysis

100%
 80%
 60%
 40%
  20%
   0%
14




 Demo
 Based on case study
            Project slipped by 6 months
            Acceleration used to recover delay
            Result was faster, more achievable plan




November 17, 2011
Example 1                                       Example 2
�   2 day project acceleration                  �   2 day project acceleration
�   Requires 2 days of reduction                �   Requires 2 days of reduction
�                               100%            �                              67%




                             2 day activity
                               reduction                                     2 day activity
                                                                               reduction

                                                                             1 day activity
    3                                                                          reduction




                                2 day project                                   2 day project
                                acceleration                                    acceleration
Fuse 360 Summary
Goal-based Schedule Acceleration
Based on true CPM analysis
Uses your
Generate alternate scenarios
Publish to native scheduling tool
  Faster schedules through intelligent acceleration
   Decision support through advanced analytics
More information:
White papers: www.projectacumen.com
Software Trial: www.projectacumen.com/trial
Twitter: @projectacumen
Email: info@projectacumen.com

Más contenido relacionado

Similar a Intelligent Project Acceleration: An Introduction to Acumen 360

Why Scrum Why Now
Why Scrum Why NowWhy Scrum Why Now
Why Scrum Why Nowmtoppa
 
Agile Project Management
Agile Project ManagementAgile Project Management
Agile Project ManagementMary Macin
 
Sage Project Management
Sage Project Management Sage Project Management
Sage Project Management RKLeSolutions
 
Introduction to Agile
Introduction to AgileIntroduction to Agile
Introduction to AgileRichard Cheng
 
Organizational growth towards Lean by adopting Agile Practices
Organizational growth towards Lean by adopting Agile PracticesOrganizational growth towards Lean by adopting Agile Practices
Organizational growth towards Lean by adopting Agile PracticesLean India Summit
 
The Business Analysts Role in Agile Software Development
The Business Analysts Role in Agile Software DevelopmentThe Business Analysts Role in Agile Software Development
The Business Analysts Role in Agile Software Developmentallan kelly
 
The BA role in Agile software development
The BA role in Agile software developmentThe BA role in Agile software development
The BA role in Agile software developmentallan kelly
 
Pmi agile planning, inspection and adaption
Pmi   agile planning, inspection and adaptionPmi   agile planning, inspection and adaption
Pmi agile planning, inspection and adaptionscrumtodd
 
Agile at enterprice level
Agile at enterprice levelAgile at enterprice level
Agile at enterprice levelJan De Baere
 
From Waterfall to Agile - from predictive to adaptive methods
From Waterfall to Agile - from predictive to adaptive methodsFrom Waterfall to Agile - from predictive to adaptive methods
From Waterfall to Agile - from predictive to adaptive methodsBjörn Jónsson
 
PMICOS Webinar: Building a Sound Schedule in an Enterprise Environment
PMICOS Webinar: Building a Sound Schedule in an Enterprise EnvironmentPMICOS Webinar: Building a Sound Schedule in an Enterprise Environment
PMICOS Webinar: Building a Sound Schedule in an Enterprise EnvironmentAcumen
 
Copenhagen 121127 - Lars Irenius
Copenhagen 121127 - Lars IreniusCopenhagen 121127 - Lars Irenius
Copenhagen 121127 - Lars IreniusKnowit_TM
 
Agile Product Management
Agile Product ManagementAgile Product Management
Agile Product ManagementSVPMA
 
Skyward Erp Presentation
Skyward Erp PresentationSkyward Erp Presentation
Skyward Erp Presentationvishalnvora1
 
OpenERP - Project Methodology
OpenERP - Project MethodologyOpenERP - Project Methodology
OpenERP - Project MethodologyOdoo
 
Solution to 5 practical cases caused by the scaling process. SAFe implementat...
Solution to 5 practical cases caused by the scaling process. SAFe implementat...Solution to 5 practical cases caused by the scaling process. SAFe implementat...
Solution to 5 practical cases caused by the scaling process. SAFe implementat...Anna Barzakovskaya
 
SCRUM and Agile in CPAnalytics
SCRUM and Agile in CPAnalyticsSCRUM and Agile in CPAnalytics
SCRUM and Agile in CPAnalyticsAvi Kedar
 

Similar a Intelligent Project Acceleration: An Introduction to Acumen 360 (20)

Why Scrum Why Now
Why Scrum Why NowWhy Scrum Why Now
Why Scrum Why Now
 
Agile Project Management
Agile Project ManagementAgile Project Management
Agile Project Management
 
Sage Project Management
Sage Project Management Sage Project Management
Sage Project Management
 
Introduction to Agile
Introduction to AgileIntroduction to Agile
Introduction to Agile
 
Organizational growth towards Lean by adopting Agile Practices
Organizational growth towards Lean by adopting Agile PracticesOrganizational growth towards Lean by adopting Agile Practices
Organizational growth towards Lean by adopting Agile Practices
 
The Business Analysts Role in Agile Software Development
The Business Analysts Role in Agile Software DevelopmentThe Business Analysts Role in Agile Software Development
The Business Analysts Role in Agile Software Development
 
The BA role in Agile software development
The BA role in Agile software developmentThe BA role in Agile software development
The BA role in Agile software development
 
Pmi agile planning, inspection and adaption
Pmi   agile planning, inspection and adaptionPmi   agile planning, inspection and adaption
Pmi agile planning, inspection and adaption
 
Agile at enterprice level
Agile at enterprice levelAgile at enterprice level
Agile at enterprice level
 
From Waterfall to Agile - from predictive to adaptive methods
From Waterfall to Agile - from predictive to adaptive methodsFrom Waterfall to Agile - from predictive to adaptive methods
From Waterfall to Agile - from predictive to adaptive methods
 
PMICOS Webinar: Building a Sound Schedule in an Enterprise Environment
PMICOS Webinar: Building a Sound Schedule in an Enterprise EnvironmentPMICOS Webinar: Building a Sound Schedule in an Enterprise Environment
PMICOS Webinar: Building a Sound Schedule in an Enterprise Environment
 
Copenhagen 121127 - Lars Irenius
Copenhagen 121127 - Lars IreniusCopenhagen 121127 - Lars Irenius
Copenhagen 121127 - Lars Irenius
 
Being Lean Agile
Being Lean AgileBeing Lean Agile
Being Lean Agile
 
Agile Product Management
Agile Product ManagementAgile Product Management
Agile Product Management
 
Skyward Erp Presentation
Skyward Erp PresentationSkyward Erp Presentation
Skyward Erp Presentation
 
OpenERP - Project Methodology
OpenERP - Project MethodologyOpenERP - Project Methodology
OpenERP - Project Methodology
 
Solution to 5 practical cases caused by the scaling process. SAFe implementat...
Solution to 5 practical cases caused by the scaling process. SAFe implementat...Solution to 5 practical cases caused by the scaling process. SAFe implementat...
Solution to 5 practical cases caused by the scaling process. SAFe implementat...
 
Transforming your sw development to agile
Transforming your sw development to agileTransforming your sw development to agile
Transforming your sw development to agile
 
SCRUM and Agile in CPAnalytics
SCRUM and Agile in CPAnalyticsSCRUM and Agile in CPAnalytics
SCRUM and Agile in CPAnalytics
 
Agile and Web Development
Agile and Web DevelopmentAgile and Web Development
Agile and Web Development
 

Más de Acumen

How Traditional Risk Reporting Has Let Us Down
How Traditional Risk Reporting Has Let Us DownHow Traditional Risk Reporting Has Let Us Down
How Traditional Risk Reporting Has Let Us DownAcumen
 
Developing Standards for Enterprise Schedule Quality
Developing Standards for Enterprise Schedule QualityDeveloping Standards for Enterprise Schedule Quality
Developing Standards for Enterprise Schedule QualityAcumen
 
Simplifiying cost and schedule risk analysis with acumen risk
Simplifiying cost and schedule risk analysis with acumen riskSimplifiying cost and schedule risk analysis with acumen risk
Simplifiying cost and schedule risk analysis with acumen riskAcumen
 
Benchmarking Execution Performance and Earned Value
Benchmarking Execution Performance and Earned ValueBenchmarking Execution Performance and Earned Value
Benchmarking Execution Performance and Earned ValueAcumen
 
Fuse Customer Perspectives: Oil & Gas / Energy
Fuse Customer Perspectives: Oil & Gas / EnergyFuse Customer Perspectives: Oil & Gas / Energy
Fuse Customer Perspectives: Oil & Gas / EnergyAcumen
 
Acumen Fuse World Tour 2012
Acumen Fuse World Tour 2012Acumen Fuse World Tour 2012
Acumen Fuse World Tour 2012Acumen
 
Does Better Scheduling Drive Execution Success?
Does Better Scheduling Drive Execution Success?Does Better Scheduling Drive Execution Success?
Does Better Scheduling Drive Execution Success?Acumen
 
Meet or Exceed Schedule Expectations through Intelligent Acceleration
Meet or Exceed Schedule Expectations through Intelligent AccelerationMeet or Exceed Schedule Expectations through Intelligent Acceleration
Meet or Exceed Schedule Expectations through Intelligent AccelerationAcumen
 
Smarter Project Analysis and Improved Project Performance
Smarter Project Analysis and Improved Project PerformanceSmarter Project Analysis and Improved Project Performance
Smarter Project Analysis and Improved Project PerformanceAcumen
 
Meeting Project Schedule Compliance Standards
Meeting Project Schedule Compliance StandardsMeeting Project Schedule Compliance Standards
Meeting Project Schedule Compliance StandardsAcumen
 
Acumen Fuse & Customer Case Study
Acumen Fuse & Customer Case StudyAcumen Fuse & Customer Case Study
Acumen Fuse & Customer Case StudyAcumen
 
Acumen & ARES: Simplified Cost & Schedule Integration
Acumen & ARES: Simplified Cost & Schedule IntegrationAcumen & ARES: Simplified Cost & Schedule Integration
Acumen & ARES: Simplified Cost & Schedule IntegrationAcumen
 
Calgary Breakfast Seminar: Predict and Influence Project Success
Calgary Breakfast Seminar: Predict and Influence Project SuccessCalgary Breakfast Seminar: Predict and Influence Project Success
Calgary Breakfast Seminar: Predict and Influence Project SuccessAcumen
 
Advanced Project Analysis: An Introduction to Fuse 3.0
Advanced Project Analysis: An Introduction to Fuse 3.0Advanced Project Analysis: An Introduction to Fuse 3.0
Advanced Project Analysis: An Introduction to Fuse 3.0Acumen
 
Successful Dispute Resolution
Successful Dispute ResolutionSuccessful Dispute Resolution
Successful Dispute ResolutionAcumen
 
Achieving the Unachievable: Aligning a Project with Stakeholder Expectations
Achieving the Unachievable: Aligning a Project with Stakeholder ExpectationsAchieving the Unachievable: Aligning a Project with Stakeholder Expectations
Achieving the Unachievable: Aligning a Project with Stakeholder ExpectationsAcumen
 
Advanced Project Analysis and Project Benchmarking with Acumen Cloud™
Advanced Project Analysis and Project Benchmarking with Acumen Cloud™Advanced Project Analysis and Project Benchmarking with Acumen Cloud™
Advanced Project Analysis and Project Benchmarking with Acumen Cloud™Acumen
 
Fuse Customer Perspectives Webinar: EPC
Fuse Customer Perspectives Webinar: EPCFuse Customer Perspectives Webinar: EPC
Fuse Customer Perspectives Webinar: EPCAcumen
 
Fuse Customer Perspectives Webinar: Project Compliance
Fuse Customer Perspectives Webinar: Project ComplianceFuse Customer Perspectives Webinar: Project Compliance
Fuse Customer Perspectives Webinar: Project ComplianceAcumen
 
Acumen Risk Workshops Overview
Acumen Risk Workshops OverviewAcumen Risk Workshops Overview
Acumen Risk Workshops OverviewAcumen
 

Más de Acumen (20)

How Traditional Risk Reporting Has Let Us Down
How Traditional Risk Reporting Has Let Us DownHow Traditional Risk Reporting Has Let Us Down
How Traditional Risk Reporting Has Let Us Down
 
Developing Standards for Enterprise Schedule Quality
Developing Standards for Enterprise Schedule QualityDeveloping Standards for Enterprise Schedule Quality
Developing Standards for Enterprise Schedule Quality
 
Simplifiying cost and schedule risk analysis with acumen risk
Simplifiying cost and schedule risk analysis with acumen riskSimplifiying cost and schedule risk analysis with acumen risk
Simplifiying cost and schedule risk analysis with acumen risk
 
Benchmarking Execution Performance and Earned Value
Benchmarking Execution Performance and Earned ValueBenchmarking Execution Performance and Earned Value
Benchmarking Execution Performance and Earned Value
 
Fuse Customer Perspectives: Oil & Gas / Energy
Fuse Customer Perspectives: Oil & Gas / EnergyFuse Customer Perspectives: Oil & Gas / Energy
Fuse Customer Perspectives: Oil & Gas / Energy
 
Acumen Fuse World Tour 2012
Acumen Fuse World Tour 2012Acumen Fuse World Tour 2012
Acumen Fuse World Tour 2012
 
Does Better Scheduling Drive Execution Success?
Does Better Scheduling Drive Execution Success?Does Better Scheduling Drive Execution Success?
Does Better Scheduling Drive Execution Success?
 
Meet or Exceed Schedule Expectations through Intelligent Acceleration
Meet or Exceed Schedule Expectations through Intelligent AccelerationMeet or Exceed Schedule Expectations through Intelligent Acceleration
Meet or Exceed Schedule Expectations through Intelligent Acceleration
 
Smarter Project Analysis and Improved Project Performance
Smarter Project Analysis and Improved Project PerformanceSmarter Project Analysis and Improved Project Performance
Smarter Project Analysis and Improved Project Performance
 
Meeting Project Schedule Compliance Standards
Meeting Project Schedule Compliance StandardsMeeting Project Schedule Compliance Standards
Meeting Project Schedule Compliance Standards
 
Acumen Fuse & Customer Case Study
Acumen Fuse & Customer Case StudyAcumen Fuse & Customer Case Study
Acumen Fuse & Customer Case Study
 
Acumen & ARES: Simplified Cost & Schedule Integration
Acumen & ARES: Simplified Cost & Schedule IntegrationAcumen & ARES: Simplified Cost & Schedule Integration
Acumen & ARES: Simplified Cost & Schedule Integration
 
Calgary Breakfast Seminar: Predict and Influence Project Success
Calgary Breakfast Seminar: Predict and Influence Project SuccessCalgary Breakfast Seminar: Predict and Influence Project Success
Calgary Breakfast Seminar: Predict and Influence Project Success
 
Advanced Project Analysis: An Introduction to Fuse 3.0
Advanced Project Analysis: An Introduction to Fuse 3.0Advanced Project Analysis: An Introduction to Fuse 3.0
Advanced Project Analysis: An Introduction to Fuse 3.0
 
Successful Dispute Resolution
Successful Dispute ResolutionSuccessful Dispute Resolution
Successful Dispute Resolution
 
Achieving the Unachievable: Aligning a Project with Stakeholder Expectations
Achieving the Unachievable: Aligning a Project with Stakeholder ExpectationsAchieving the Unachievable: Aligning a Project with Stakeholder Expectations
Achieving the Unachievable: Aligning a Project with Stakeholder Expectations
 
Advanced Project Analysis and Project Benchmarking with Acumen Cloud™
Advanced Project Analysis and Project Benchmarking with Acumen Cloud™Advanced Project Analysis and Project Benchmarking with Acumen Cloud™
Advanced Project Analysis and Project Benchmarking with Acumen Cloud™
 
Fuse Customer Perspectives Webinar: EPC
Fuse Customer Perspectives Webinar: EPCFuse Customer Perspectives Webinar: EPC
Fuse Customer Perspectives Webinar: EPC
 
Fuse Customer Perspectives Webinar: Project Compliance
Fuse Customer Perspectives Webinar: Project ComplianceFuse Customer Perspectives Webinar: Project Compliance
Fuse Customer Perspectives Webinar: Project Compliance
 
Acumen Risk Workshops Overview
Acumen Risk Workshops OverviewAcumen Risk Workshops Overview
Acumen Risk Workshops Overview
 

Último

VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 DelhiCall Girls in Delhi
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdftbatkhuu1
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsMichael W. Hawkins
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insightsseribangash
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 

Último (20)

VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdf
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insights
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 

Intelligent Project Acceleration: An Introduction to Acumen 360

  • 1. Intelligent Project Acceleration: goal-based acceleration Dr. Dan Patterson | CEO & Founder Acumen
  • 2. 2 Agenda � Introductions � Schedule acceleration � Case Study using Fuse 360 � Q&A November 17, 2011
  • 3. Acumen: Proven Project Analytics � Project Management Software Company � Improving CPM scheduling & analysis � Thought leader in Analytics � Schedule maturity framework S1 > S5™ Framework Acumen Core Offerings S5: Acumen Fuse® Validate S4: Optimize S3: Risk- S2: Adjust Risk Assessment Workshops Critique S1: Build Software Training
  • 4. 4 Fuse 360 Goal-Based Acceleration � Module for Fuse platform � Automated: � Scenario generation Logic Analysis � Acceleration � Decision support Forensic Metric Analysis Analysis November 17, 2011
  • 5. Goal-Based Acceleration Accelerate schedule… by applying criteria …to achieve a given goal
  • 6. 6 Acceleration � Planning: Schedule alignment � Execution: Delay recovery � Goal: � Target date � % of remaining duration � Best date possible � Project or activity November 17, 2011
  • 7. Criteria Sets � Drive acceleration Criteria Set � Reduce duration Script � Change calendars “Cleanse & accelerate construction” � Reduce logic lags Step 1 Step 2 Step 3 Remove all Filter for Reduce � Remove constraints constraints Construction activities remaining duration by 20%
  • 8. 8 How Does it Work? � CPM simulation � Critical path focus � Incremental push � Prioritize � Earliest/latest � Longest durations � Least resistance November 17, 2011
  • 9. Accept or Reject Scenario � Number of days accelerated? � Goal achieved?
  • 10. 10 Decision Support � Scenario Insight: � Fuse forensics: what changed? � Fuse analysis: which option? � New plan: � Publish back to Primavera or MS Project November 17, 2011
  • 11. 11 Baseline Compliance™ � Traditional measures include: � Earned value � % complete � Ahead/behind baseline � Baseline Compliance™ � True measure of how plan is being executed � More than just date comparison November 17, 2011
  • 13. Case Study Baseline Compliance™ Analysis 100% 80% 60% 40% 20% 0%
  • 14. 14 Demo Based on case study   Project slipped by 6 months   Acceleration used to recover delay   Result was faster, more achievable plan November 17, 2011
  • 15. Example 1 Example 2 � 2 day project acceleration � 2 day project acceleration � Requires 2 days of reduction � Requires 2 days of reduction � 100% � 67% 2 day activity reduction 2 day activity reduction 1 day activity 3 reduction 2 day project 2 day project acceleration acceleration
  • 16. Fuse 360 Summary Goal-based Schedule Acceleration Based on true CPM analysis Uses your Generate alternate scenarios Publish to native scheduling tool Faster schedules through intelligent acceleration Decision support through advanced analytics
  • 17. More information: White papers: www.projectacumen.com Software Trial: www.projectacumen.com/trial Twitter: @projectacumen Email: info@projectacumen.com