What Makes a Project Complex?
Size and Duration: The Big Dig, Crossrail and The
English Chunnel (FHWA: More than $1Billion)

Technology: Hoover Dam and Panama Canal
Extension

Untried: BP Gulf of Mexico Oil Disaster

Integration of Processes: Many Diverse and
Autonomous, but interrelated and interdependent
components or parts linked through many dense
interconnections and interfaces.
                   Virginia A. Greiman © 2013
                                                    2
Unique Characteristics of Complex
            Projects
Long Duration – 10 to 60 years

Extensive Public Scrutiny

Ambiguity and Uncertainty

Large Scale Policy Making

Complex Organizational and Governance Structures

Consistent Cost Underestimation

Systems Complexity


                        Virginia A. Greiman © 2013
                                                     3
Linkage Between Complexity and
             Ambiguity
If requirements are Ambiguous, then resolving that
Ambiguity will be more complex than if projects are
well specified

If the deliverables are complex, then it follows that
the outcomes will be less certain, especially if the
plan is ambiguous about how success will be
measured




                 Virginia A. Greiman © Copyright 2012
                                                        4
Challenges of Mega Projects
Keeping the Focus on Quality and Safety instead of Schedule
and Cost

Integration of all Project Disciplines throughout the Life of the
Project

Educating and Involving the Public Citizens from the Inception
of the Project

Establishing a strong public owner with independent oversight

Integration does not mean sacrificing Independence!

Dynamic governance structures

                        Virginia A. Greiman © 2010
                                                                    5
Boston’s Big Dig

An Example of a Complex Project




            Virginia A. Greiman © 2013
                                         6
Another Example
 London’s Crossrail Project - 16 Billion Pounds
  –   42 kilometres of rail tunnels underneath London
  –   Nine new Stations
  –   200 million passengers
  –   10% increase in rail capacity


 UK’s High Speed Rail Service between London and Birmingham
 (HS2) - 17 Billion Pounds




                            Virginia A. Greiman © 2013
                                                              7
CA/T Program
                                          • 54 Design Packages
                                          • 132 Construction Packages
                                          • 9000 Processes & Procedures
                                          • 161 Lane Miles
                                          •   5 Major Interchanges

                                          •   Landmark Cable-stay Bridge

                                          •   Jacked Tunnels

                                          •   Immersed Tubes

                                          •   Soil Freezing

                                          •   Deep Soil Mixing

                                          •   8 miles of Slurry Wall

                                          • Jet Grouting
VV. A. Greiman © 2012
                                      2012•
                        Virginia A. Greiman © Copyright
                                                 Excavation   and Parks
Major Complexity Challenges on the
            Big Dig:
 Project Integration – (150 Major Employers – One Team)
 5,000 workers, thousands of complex processes

 Risk Management – World’s Largest Wrap-up Program

 Ambiguity and Uncertainty – Subsurface conditions

 Technology Integration – Monitoring the Critical Path

 Claims and Changes - Partnering
Project Integration Management


                            Close         Project
                            Project       Charter
                               7             1

                 Integrated                         Scope
                 Change                             Statement
                 Control                                 2
                      6

                                                    Project
                        Monitor                     Mgmt
                        And           Direct and
                                                    Plan
                        Control       Manage
                                                       3
                          5           Execution
                                           4

Project Management
Institute, PMBOK, 4th ed.
What is Integration?
Requires each project and product process
to be appropriately aligned and connected
with the other processes to facilitate their
coordination. These process interactions
often require tradeoffs among project
requirements and objectives.
Integration on Large and Complex
               Projects
Organizational Structure

– The People
– The Processes

Community and Public Concerns

Internal and External Stakeholders
First of 12 tube
                                       sections each
                                       longer than a
                                       football field arrive
                                       in Boston for the
                                       Ted Williams
                                       Tunnel




Virginia A. Greiman © Copyright 2012
                                                               13
V.A. Greiman © Copyright 2012
Fig. 7.1




EIS = Environmental
Impact
Statement
ICE – Interstate Cost
Estimate
CSU – Cost and
Schedule Update
Why are Mega Projects Consistently
           Underestimated?

A review of large public works projects
over the last century concluded that
costs are consistently underestimated,
a phenomenon attributed to the desire
of the project advocates to have their
projects approved.
(Flyvbjerg, Megaprojects and Risk: An Anatomy of Ambition, 2002)
National Transportation Research
             Board
In 2006, the Transportation Research Board’s Final Report
for Cost Estimation and Management for Highway Projects,
identified eight strategies to address cost escalation, and
linked these strategies to 18 different causes of cost
escalation on highway projects in the United States.
Notably, the research concluded that most efforts in cost
estimation have focused on creating tools to improve cost
estimates with less emphasis on tools for cost estimation
management.

(Anderson et. al. 2006).
Complexity and
 Project Management Trade-offs




Design, Risk, Safety, and Quality
Decisions!!
Big Dig’s Worst Disaster




2006 Ted Williams Tunnel
Roof Collapse
Source: NTSB Report
                           Virginia A. Greiman © Copyright 2012
                                                                  19
National Transportation Safety Board
                    Findings
(1) Failure to identify potential creep by designers and contractors in the anchor adhesive as a
critical long-term failure mode

(2) A general lack of understanding and knowledge in the construction community about creep in
adhesive anchoring systems.

(3) Failure of the Contractor to provide the Central Artery/Tunnel project with sufficiently
complete, accurate, and detailed information about the suitability of the company’s Fast Set epoxy
for sustaining long-term tensile loads.

(4) Failure of Powers Fasteners, Inc., to determine that the anchor displacement that was found in
the high-occupancy vehicle tunnel in 1999 was a result of anchor creep.

(5) Failure of Contractor, subsequent to the 1999 anchor displacement, to continue to monitor
anchor performance in light of the uncertainty as to the cause of the failures.

(6) Failure of the owner to implement a timely tunnel inspection program that would likely have
revealed the ongoing anchor creep.


                                  Virginia A. Greiman © Copyright 2012
                                                                                                   20
Mississippi River I-35 Bridge Collapse
   in Minneapolis, August 1, 2007
     The National Transportation Safety Board (NTSB)
 determined that the probable cause of the collapse, was the
 inadequate load capacity, due to a design error, of the gusset
 plates at the U10 nodes.
     Contributing to the accident was the generally accepted
 practice among Federal and State transportation officials of
 giving inadequate attention to gusset plates during
 inspections for conditions of distortion, such as bowing, and
 of excluding gusset plates in load rating analyses.




                   Virginia A. Greiman © Copyright 2012
                                                                  21
What Tradeoffs Have You Made on
         Your Project?
Resources?
Quality?
Design?
Risk?
Time?
Cost?

          Virginia A. Greiman © Copyright 2012
                                                 22
Questions???



Virginia A. Greiman
     Professor
 Boston University
   617-353-6860
ggreiman@bu.edu




  Virginia A. Greiman © Copyright 2013
                                         23

Más contenido relacionado

Similar a Greiman City of Boston Presentation 2013

State senate transpo hearings 11 13-13 backgroundpaper
State senate transpo hearings 11 13-13 backgroundpaperState senate transpo hearings 11 13-13 backgroundpaper
State senate transpo hearings 11 13-13 backgroundpaperpeggydrouet
 
MSP601 Group 4 Presentation Final Version.pptx
MSP601 Group 4 Presentation Final Version.pptxMSP601 Group 4 Presentation Final Version.pptx
MSP601 Group 4 Presentation Final Version.pptxAftabAhmed301
 
The Construction Manager-General Contractor method for consctruction of trans...
The Construction Manager-General Contractor method for consctruction of trans...The Construction Manager-General Contractor method for consctruction of trans...
The Construction Manager-General Contractor method for consctruction of trans...Angel Damian Rivera-Saez
 
LEADERSHIP ROLES With a project of this magnitude, it .docx
LEADERSHIP ROLES With a project of this magnitude, it .docxLEADERSHIP ROLES With a project of this magnitude, it .docx
LEADERSHIP ROLES With a project of this magnitude, it .docxcroysierkathey
 
Project management case study.pptx
Project management case study.pptxProject management case study.pptx
Project management case study.pptxDrRRajalakshmi
 
Improving Megaproject Performance (2011)
Improving Megaproject Performance (2011)Improving Megaproject Performance (2011)
Improving Megaproject Performance (2011)Michael Filippich
 
megaprojects, SPUR 2022.pdf
megaprojects, SPUR 2022.pdfmegaprojects, SPUR 2022.pdf
megaprojects, SPUR 2022.pdfAdina Levin
 
PPM BIM summer school presentation vasudeva
PPM BIM summer school presentation vasudevaPPM BIM summer school presentation vasudeva
PPM BIM summer school presentation vasudevaNarendra Vasudeva
 
A Case Study In Complex Project Management T-Rex
A Case Study In Complex Project Management  T-RexA Case Study In Complex Project Management  T-Rex
A Case Study In Complex Project Management T-RexJose Katab
 
VaDOT
VaDOTVaDOT
VaDOTcgla
 
ENR MOUNTAIN STATES 2013 BEST PROJECTS AWARD
ENR MOUNTAIN STATES 2013 BEST PROJECTS AWARDENR MOUNTAIN STATES 2013 BEST PROJECTS AWARD
ENR MOUNTAIN STATES 2013 BEST PROJECTS AWARDPhilip Tunnah
 
PD - Contract and Risk Conference - Integrated Schedule Cost Risk Analysis fo...
PD - Contract and Risk Conference - Integrated Schedule Cost Risk Analysis fo...PD - Contract and Risk Conference - Integrated Schedule Cost Risk Analysis fo...
PD - Contract and Risk Conference - Integrated Schedule Cost Risk Analysis fo...Pedram Danesh-Mand
 
Investigation And Analysis of Traffic Flow Capacity And Level of Service Dete...
Investigation And Analysis of Traffic Flow Capacity And Level of Service Dete...Investigation And Analysis of Traffic Flow Capacity And Level of Service Dete...
Investigation And Analysis of Traffic Flow Capacity And Level of Service Dete...IRJET Journal
 
CCS Projects Integration Workshop - London 3Nov11 - ROAD - CCS project integr...
CCS Projects Integration Workshop - London 3Nov11 - ROAD - CCS project integr...CCS Projects Integration Workshop - London 3Nov11 - ROAD - CCS project integr...
CCS Projects Integration Workshop - London 3Nov11 - ROAD - CCS project integr...Global CCS Institute
 
Esri News for Transportation - Summer 2012
Esri News for Transportation - Summer 2012Esri News for Transportation - Summer 2012
Esri News for Transportation - Summer 2012Esri
 
Changing the Face at the Busiest Airport in the World th.docx
Changing the Face  at the Busiest Airport  in the World th.docxChanging the Face  at the Busiest Airport  in the World th.docx
Changing the Face at the Busiest Airport in the World th.docxcravennichole326
 
Adeoye Preye charles qsv/12/0227 term paper on Risk involved in highway const...
Adeoye Preye charles qsv/12/0227 term paper on Risk involved in highway const...Adeoye Preye charles qsv/12/0227 term paper on Risk involved in highway const...
Adeoye Preye charles qsv/12/0227 term paper on Risk involved in highway const...Adeoye Charles
 
Project Financing in Public Projects
Project Financing in Public ProjectsProject Financing in Public Projects
Project Financing in Public ProjectsXinyi (Sophia) Xue
 

Similar a Greiman City of Boston Presentation 2013 (20)

State senate transpo hearings 11 13-13 backgroundpaper
State senate transpo hearings 11 13-13 backgroundpaperState senate transpo hearings 11 13-13 backgroundpaper
State senate transpo hearings 11 13-13 backgroundpaper
 
MSP601 Group 4 Presentation Final Version.pptx
MSP601 Group 4 Presentation Final Version.pptxMSP601 Group 4 Presentation Final Version.pptx
MSP601 Group 4 Presentation Final Version.pptx
 
The Construction Manager-General Contractor method for consctruction of trans...
The Construction Manager-General Contractor method for consctruction of trans...The Construction Manager-General Contractor method for consctruction of trans...
The Construction Manager-General Contractor method for consctruction of trans...
 
LEADERSHIP ROLES With a project of this magnitude, it .docx
LEADERSHIP ROLES With a project of this magnitude, it .docxLEADERSHIP ROLES With a project of this magnitude, it .docx
LEADERSHIP ROLES With a project of this magnitude, it .docx
 
Project management case study.pptx
Project management case study.pptxProject management case study.pptx
Project management case study.pptx
 
Jamuna bridge denar_final_19_feb20
Jamuna bridge denar_final_19_feb20Jamuna bridge denar_final_19_feb20
Jamuna bridge denar_final_19_feb20
 
Improving Megaproject Performance (2011)
Improving Megaproject Performance (2011)Improving Megaproject Performance (2011)
Improving Megaproject Performance (2011)
 
megaprojects, SPUR 2022.pdf
megaprojects, SPUR 2022.pdfmegaprojects, SPUR 2022.pdf
megaprojects, SPUR 2022.pdf
 
PPM BIM summer school presentation vasudeva
PPM BIM summer school presentation vasudevaPPM BIM summer school presentation vasudeva
PPM BIM summer school presentation vasudeva
 
A Case Study In Complex Project Management T-Rex
A Case Study In Complex Project Management  T-RexA Case Study In Complex Project Management  T-Rex
A Case Study In Complex Project Management T-Rex
 
VaDOT
VaDOTVaDOT
VaDOT
 
ENR MOUNTAIN STATES 2013 BEST PROJECTS AWARD
ENR MOUNTAIN STATES 2013 BEST PROJECTS AWARDENR MOUNTAIN STATES 2013 BEST PROJECTS AWARD
ENR MOUNTAIN STATES 2013 BEST PROJECTS AWARD
 
Chunnel Project
Chunnel ProjectChunnel Project
Chunnel Project
 
PD - Contract and Risk Conference - Integrated Schedule Cost Risk Analysis fo...
PD - Contract and Risk Conference - Integrated Schedule Cost Risk Analysis fo...PD - Contract and Risk Conference - Integrated Schedule Cost Risk Analysis fo...
PD - Contract and Risk Conference - Integrated Schedule Cost Risk Analysis fo...
 
Investigation And Analysis of Traffic Flow Capacity And Level of Service Dete...
Investigation And Analysis of Traffic Flow Capacity And Level of Service Dete...Investigation And Analysis of Traffic Flow Capacity And Level of Service Dete...
Investigation And Analysis of Traffic Flow Capacity And Level of Service Dete...
 
CCS Projects Integration Workshop - London 3Nov11 - ROAD - CCS project integr...
CCS Projects Integration Workshop - London 3Nov11 - ROAD - CCS project integr...CCS Projects Integration Workshop - London 3Nov11 - ROAD - CCS project integr...
CCS Projects Integration Workshop - London 3Nov11 - ROAD - CCS project integr...
 
Esri News for Transportation - Summer 2012
Esri News for Transportation - Summer 2012Esri News for Transportation - Summer 2012
Esri News for Transportation - Summer 2012
 
Changing the Face at the Busiest Airport in the World th.docx
Changing the Face  at the Busiest Airport  in the World th.docxChanging the Face  at the Busiest Airport  in the World th.docx
Changing the Face at the Busiest Airport in the World th.docx
 
Adeoye Preye charles qsv/12/0227 term paper on Risk involved in highway const...
Adeoye Preye charles qsv/12/0227 term paper on Risk involved in highway const...Adeoye Preye charles qsv/12/0227 term paper on Risk involved in highway const...
Adeoye Preye charles qsv/12/0227 term paper on Risk involved in highway const...
 
Project Financing in Public Projects
Project Financing in Public ProjectsProject Financing in Public Projects
Project Financing in Public Projects
 

Último

Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesSinan KOZAK
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Drew Madelung
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityPrincipled Technologies
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024Scott Keck-Warren
 
Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxOnBoard
 
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...HostedbyConfluent
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersThousandEyes
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Allon Mureinik
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Servicegiselly40
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure servicePooja Nehwal
 

Último (20)

Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen Frames
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024
 
Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptx
 
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
 

Greiman City of Boston Presentation 2013

  • 1. Managing Project Complexity Northeast Public Sector Project Management Conference City of Boston Department of Innovation and Technology and Boston Public Schools March 20, 2013 Presented By: Professor Virginia A. Greiman V. A. Greiman Copyright © 2013
  • 2. What Makes a Project Complex? Size and Duration: The Big Dig, Crossrail and The English Chunnel (FHWA: More than $1Billion) Technology: Hoover Dam and Panama Canal Extension Untried: BP Gulf of Mexico Oil Disaster Integration of Processes: Many Diverse and Autonomous, but interrelated and interdependent components or parts linked through many dense interconnections and interfaces. Virginia A. Greiman © 2013 2
  • 3. Unique Characteristics of Complex Projects Long Duration – 10 to 60 years Extensive Public Scrutiny Ambiguity and Uncertainty Large Scale Policy Making Complex Organizational and Governance Structures Consistent Cost Underestimation Systems Complexity Virginia A. Greiman © 2013 3
  • 4. Linkage Between Complexity and Ambiguity If requirements are Ambiguous, then resolving that Ambiguity will be more complex than if projects are well specified If the deliverables are complex, then it follows that the outcomes will be less certain, especially if the plan is ambiguous about how success will be measured Virginia A. Greiman © Copyright 2012 4
  • 5. Challenges of Mega Projects Keeping the Focus on Quality and Safety instead of Schedule and Cost Integration of all Project Disciplines throughout the Life of the Project Educating and Involving the Public Citizens from the Inception of the Project Establishing a strong public owner with independent oversight Integration does not mean sacrificing Independence! Dynamic governance structures Virginia A. Greiman © 2010 5
  • 6. Boston’s Big Dig An Example of a Complex Project Virginia A. Greiman © 2013 6
  • 7. Another Example London’s Crossrail Project - 16 Billion Pounds – 42 kilometres of rail tunnels underneath London – Nine new Stations – 200 million passengers – 10% increase in rail capacity UK’s High Speed Rail Service between London and Birmingham (HS2) - 17 Billion Pounds Virginia A. Greiman © 2013 7
  • 8. CA/T Program • 54 Design Packages • 132 Construction Packages • 9000 Processes & Procedures • 161 Lane Miles • 5 Major Interchanges • Landmark Cable-stay Bridge • Jacked Tunnels • Immersed Tubes • Soil Freezing • Deep Soil Mixing • 8 miles of Slurry Wall • Jet Grouting VV. A. Greiman © 2012 2012• Virginia A. Greiman © Copyright Excavation and Parks
  • 9. Major Complexity Challenges on the Big Dig: Project Integration – (150 Major Employers – One Team) 5,000 workers, thousands of complex processes Risk Management – World’s Largest Wrap-up Program Ambiguity and Uncertainty – Subsurface conditions Technology Integration – Monitoring the Critical Path Claims and Changes - Partnering
  • 10. Project Integration Management Close Project Project Charter 7 1 Integrated Scope Change Statement Control 2 6 Project Monitor Mgmt And Direct and Plan Control Manage 3 5 Execution 4 Project Management Institute, PMBOK, 4th ed.
  • 11. What is Integration? Requires each project and product process to be appropriately aligned and connected with the other processes to facilitate their coordination. These process interactions often require tradeoffs among project requirements and objectives.
  • 12. Integration on Large and Complex Projects Organizational Structure – The People – The Processes Community and Public Concerns Internal and External Stakeholders
  • 13. First of 12 tube sections each longer than a football field arrive in Boston for the Ted Williams Tunnel Virginia A. Greiman © Copyright 2012 13
  • 14. V.A. Greiman © Copyright 2012
  • 15. Fig. 7.1 EIS = Environmental Impact Statement ICE – Interstate Cost Estimate CSU – Cost and Schedule Update
  • 16. Why are Mega Projects Consistently Underestimated? A review of large public works projects over the last century concluded that costs are consistently underestimated, a phenomenon attributed to the desire of the project advocates to have their projects approved. (Flyvbjerg, Megaprojects and Risk: An Anatomy of Ambition, 2002)
  • 17. National Transportation Research Board In 2006, the Transportation Research Board’s Final Report for Cost Estimation and Management for Highway Projects, identified eight strategies to address cost escalation, and linked these strategies to 18 different causes of cost escalation on highway projects in the United States. Notably, the research concluded that most efforts in cost estimation have focused on creating tools to improve cost estimates with less emphasis on tools for cost estimation management. (Anderson et. al. 2006).
  • 18. Complexity and Project Management Trade-offs Design, Risk, Safety, and Quality Decisions!!
  • 19. Big Dig’s Worst Disaster 2006 Ted Williams Tunnel Roof Collapse Source: NTSB Report Virginia A. Greiman © Copyright 2012 19
  • 20. National Transportation Safety Board Findings (1) Failure to identify potential creep by designers and contractors in the anchor adhesive as a critical long-term failure mode (2) A general lack of understanding and knowledge in the construction community about creep in adhesive anchoring systems. (3) Failure of the Contractor to provide the Central Artery/Tunnel project with sufficiently complete, accurate, and detailed information about the suitability of the company’s Fast Set epoxy for sustaining long-term tensile loads. (4) Failure of Powers Fasteners, Inc., to determine that the anchor displacement that was found in the high-occupancy vehicle tunnel in 1999 was a result of anchor creep. (5) Failure of Contractor, subsequent to the 1999 anchor displacement, to continue to monitor anchor performance in light of the uncertainty as to the cause of the failures. (6) Failure of the owner to implement a timely tunnel inspection program that would likely have revealed the ongoing anchor creep. Virginia A. Greiman © Copyright 2012 20
  • 21. Mississippi River I-35 Bridge Collapse in Minneapolis, August 1, 2007 The National Transportation Safety Board (NTSB) determined that the probable cause of the collapse, was the inadequate load capacity, due to a design error, of the gusset plates at the U10 nodes. Contributing to the accident was the generally accepted practice among Federal and State transportation officials of giving inadequate attention to gusset plates during inspections for conditions of distortion, such as bowing, and of excluding gusset plates in load rating analyses. Virginia A. Greiman © Copyright 2012 21
  • 22. What Tradeoffs Have You Made on Your Project? Resources? Quality? Design? Risk? Time? Cost? Virginia A. Greiman © Copyright 2012 22
  • 23. Questions??? Virginia A. Greiman Professor Boston University 617-353-6860 ggreiman@bu.edu Virginia A. Greiman © Copyright 2013 23