- Gensol Consultants Pvt Ltd
Project Allocations & Status
                                                              950 MW



                                    750 MW




           110 MW




  Rooftop and other small
                                Phase I of JNNSM
     solar power plants                                    Phase I & phase II of
                             covering plants of capacity
  connected of capacity up                                 Gujarat Solar Policy
                                 more than 5 MW
          to 2 MW
Project Allocations & Status
                                                             950 MW



                                   750 MW




          110 MW




  Rooftop and other small
                  of the total projects JNNSM Financial Closures II of
                                 Phase I of have
                                                          Phase I & phase in
  1/3rd
     solar power plants

          to 2 MW
                  place
                              covering plants of capacity
  connected of capacity up and EPC Contractors finalized. Solar Policy
                                  more than 5 MW
                                                          Gujarat
The Process Flow



                         Detailed           Vetting of           Plant
                      Project Report        Drawings          Commissioning




 Allocation                                                              Execution




                 Land             Contractor              Onsite
              Finalization        Finalization           Monitoring
Land Finalization

                       Parameter                                 Purpose
  IMPORTANT




              Metrological Resource Assessment                Energy Generation
                                                             Capacity of substation
                     Nearest Substation                       Availability of feeder
                                                             Transmission Losses
                     Accessibility to site                Ease of Delivery of materials
                      Water Availability             Water requirement during construction
                       Nearby Terrain                           Shadow Effects
                      Site Topography             To analyze the water blockage problems and
                                                       placement of mounting structures
                   Availability of Manpower         For Construction and subsequent O&M
                         GPS Survey                               Site Layout
                        Storm History                            Dust Losses
                                                         Mounting Structure Strength
                         Type of Soil              To analyze the resistivity and load bearing
                                                                capacity of soil
                Construction power availability     Power Requirement during construction
Detailed Project Report

      Why is it
      Contents required?



       •    Site Analysis and Solar radiation resource assessment
       •    Prefeasibility Analysis
       •    Technology Selection : Solar PV modules and BoS
       •    Acts as a Reference / Guidance Document
       •    Plant and Machinery (Solar PV array and Electrical System)
       •    As an instrument for Financial Closure
       •    Civil and Architectural requirement for the project
       •    Necessary for claiming Carbon Credits
       •    Annual energy generation from power plant
       •    System Schematics
       •    Power plant operation and maintenance
       •    Project implementation and schedule
       •    Project Financials
       •    Risk Analysis
Detailed Project Report

      Contents



       •    Site Analysis and Solar radiation resource assessment
       •    Technology Selection : Solar PV modules and BoS
       •    Plant and Machinery (Solar PV array and Electrical System)
       •    Civil and Architectural requirement for the project
       •    Annual energy generation from power plant
       •    System Schematics
       •    Power plant operation and maintenance
       •    Project implementation and schedule
       •    Project Financials
       •    Risk Analysis
EPC Contractor Finalization

            Release                   Shortlisting &                   Contract
             of RfP                    Finalization                    Design


   •  Defining Exhaustive Scope of Work with well defined Quality Criteria
       •     Designing – Engineering Calculations, Site Layout and System Sizing
       •     Civil – Leveling, Foundations, Mounting Structures, Control Room etc.
       •     Electrical – Solar Panels, Inverters, Switchyard, Monitoring etc.
       •     Testing – Performance Acceptance/Guarantee Test
       •     Operation & Maintenance – Comprehensive Maintenance & Guarantees



   •  Arranging and coordinating pre/post bid meetings for clarification to the
      queries of bidders.
EPC Contractor Finalization

          Release                Shortlisting &               Contract
           of RfP                 Finalization                Design



   •    Defining Criteria for Comparison
   •    Determination of Minimum Qualification Criteria
   •    Assigning Weightage to Parameters
   •    Preparing Comprehensive Scoring Sheet
   •    Arriving at Final Scores for Responses from EPC Contractors
   •    Drawing Project Implementation & Drawdown Schedule
   •    Conducting Background Checks on Tie-ups for Equipment Supply
   •    Conducting Rounds of Negotiation
EPC Contractor Finalization

         Release                     Shortlisting &                     Contract
          of RfP                      Finalization                      Design

                               Parameters for Judgment

   Equipment
   Type | Market Presence | Efficiency | Adherence to Standards | Rate of Degradation


   EPC Contractor
   Experience in India and abroad | EPC & O&M Cost | Manpower Experience &
   Availability | Type & Extent of Guarantees Offered


   Other Parameters
   Office in India | Collaboration with International EPC Company
EPC Contractor Finalization

           Release                     Shortlisting &                   Contract
            of RfP                      Finalization                     Design

  Format

  3 separate contracts are typically drawn to reduce tax burden:

  1.  Supplies Contract
  2.  Services Contract
  3.  Operation & Maintenance Contract

  Further, Supplies Contract can be broken down into Import Supplies for Inverters and
  modules and Domestic Supplies for the rest of the BoS.
EPC Contractor Finalization

          Release                 Shortlisting &                 Contract
           of RfP                  Finalization                   Design
  Contents Snapshot

  •  General Terms of Agreement         •  Variations & Adjustments

  •  Special Terms of Agreement         •  Termination

  •  Payment Milestones                 •  Warranties

  •  Liquidated Damages                 •  Force Majeure

  •  Insurance                          •  Guarantees
                                            •  Performance Bank Guarantee
  •  Defects Liability                      •  Advance Bank Guarantee
                                            •  Minimum Energy Generation –
                                               Bank Guarantee
Vetting of Drawings & Design

                        Drawing                                      Purpose
                        Site Layout                             Avoid Shading Losses
                 Module Mounting Structure         Strength to withstand mechanical and wind loads
                                                      Zinc Coating for 25 year corrosion free life
                                                    Control Panel, Living Accommodation, Pantry,
  CIVIL




                Main Control Room Building                          Bathrooms etc.
                                                     To ensure proper strength of foundations for
                        Switchyard                        transformers and other equipment
               Water Pipes & Drainage Layout                    To avoid water logging
               Approach Roads & Pathways           To ensure proper access to all parts of the plant
                     Equipment Layout                         To minimize system losses
  ELECTRICAL




                       System Sizing
               (Cables, Inverters, Switchyard)     For efficient working while ensuring redundancy
                          Earthing                     To ensure safety of man and equipment
                    Single Line Diagram          To comprehend the fundamental structure of the plant
Onsite Monitoring

                              Quality
                              Control




              Claims &                      Reporting
                Bills                      Methodology




                            Monitoring



              Document
              control and                     Factory
                                            Inspection
             management



                            Compliance
                            to standards
Commissioning of Plant

              Commissioning                                    Evacuation



  •  Validating actual generation against guaranteed generation
  •  Validating the technical parameters of equipment
  •  Preparation of final acceptance tests
  •  Conducting performance tests after successful commissioning
  •  Schedule for periodic checks
  •  Preparation of annual maintenance contract along with final list of spares and tools
Commissioning of Plant

               Commissioning                                  Evacuation

  •  Liasoning and approvals from authorized government bodies


  •  The following need to be communicated and finalized with the state utlities:
       •  Laying of transmission lines
       •  ABT meters
       •  Evacuation infrastructure
       •  Grid availability
       •  Dedicated feeder
       •  Evacuation point
Ideal Timeline
           Project Activities                 1   2   3   4   5   6   7   8

 Completion of site visit and due diligence

 Bid Management

 EPC contractor finalization

 Vettings of designs and drawings

 Contract drafting

 Commissioning of 25% of Project

 Commissioning of 50% of Project

 Commissioning of 75% of Project

 Commissioning of 100% of Project

 Testing and Handing Over

 Evacuation arrangement
Take Away


   It takes only 2% change in PLF to take a project from state of art to
  disastrous and vice versa, please make sure you are on the right side
                             of this change.




                         THANK YOU
Contact Us:
      Gensol Consultants Pvt Ltd
      14 - 15, 2nd Floor, Camps Corner – 2,
      Opp. Auda Garden, Prahladnagar,
      Ahmedabad – 380015, GUJARAT

       W: www.gensolsolar.com
       E: solar@gensolconsultants.com
       Ph: +91-79-39122200

Más contenido relacionado

La actualidad más candente

Developing Solar Projects
Developing Solar ProjectsDeveloping Solar Projects
Developing Solar Projects
alejolop
 
PV solar Design and Installtion
PV solar Design and InstalltionPV solar Design and Installtion
PV solar Design and Installtion
Eli Israeli
 
Solar Project Management
Solar Project ManagementSolar Project Management
Solar Project Management
firstgreen
 

La actualidad más candente (20)

MS Projects - 10 MW Implementation Schedule
MS Projects - 10 MW Implementation ScheduleMS Projects - 10 MW Implementation Schedule
MS Projects - 10 MW Implementation Schedule
 
Economics of Solar Park
Economics of Solar ParkEconomics of Solar Park
Economics of Solar Park
 
Developing Solar Projects
Developing Solar ProjectsDeveloping Solar Projects
Developing Solar Projects
 
Performance paramter and suggestion to optizing the performnce of grid connec...
Performance paramter and suggestion to optizing the performnce of grid connec...Performance paramter and suggestion to optizing the performnce of grid connec...
Performance paramter and suggestion to optizing the performnce of grid connec...
 
Utility-Scale Solar Photovoltaic Power Plants - A Project Developer’s Guide
Utility-Scale Solar Photovoltaic Power Plants - A Project Developer’s GuideUtility-Scale Solar Photovoltaic Power Plants - A Project Developer’s Guide
Utility-Scale Solar Photovoltaic Power Plants - A Project Developer’s Guide
 
Study of Large Scale Grid interactive Solar PV power plant
Study of Large Scale Grid interactive Solar PV power plantStudy of Large Scale Grid interactive Solar PV power plant
Study of Large Scale Grid interactive Solar PV power plant
 
Engineering Drawings required for Solar Projects
Engineering Drawings required for Solar Projects Engineering Drawings required for Solar Projects
Engineering Drawings required for Solar Projects
 
PV solar Design and Installtion
PV solar Design and InstalltionPV solar Design and Installtion
PV solar Design and Installtion
 
List of Clearances for Solar Project
List of Clearances for Solar ProjectList of Clearances for Solar Project
List of Clearances for Solar Project
 
Basics of Solar PV O&M - Solarig Gensol
Basics of Solar PV O&M - Solarig GensolBasics of Solar PV O&M - Solarig Gensol
Basics of Solar PV O&M - Solarig Gensol
 
Solar Project Management
Solar Project ManagementSolar Project Management
Solar Project Management
 
Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020
Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020
Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020
 
Gensol - EPC Services
Gensol - EPC ServicesGensol - EPC Services
Gensol - EPC Services
 
Optimisation of Balance of System (BOS) for Solar Projects
Optimisation of Balance of System (BOS) for Solar ProjectsOptimisation of Balance of System (BOS) for Solar Projects
Optimisation of Balance of System (BOS) for Solar Projects
 
10 MW Solar PV power Plant - CPM & PERT, Design
10 MW Solar PV power Plant - CPM & PERT, Design10 MW Solar PV power Plant - CPM & PERT, Design
10 MW Solar PV power Plant - CPM & PERT, Design
 
1 MW solar Power plant project Scheduling and Tracking
1 MW solar Power plant project Scheduling and Tracking1 MW solar Power plant project Scheduling and Tracking
1 MW solar Power plant project Scheduling and Tracking
 
Solar Power Project Development
Solar Power Project DevelopmentSolar Power Project Development
Solar Power Project Development
 
Project Proposal on 10 MW Solar PV Power Plant
Project Proposal on 10 MW Solar PV Power PlantProject Proposal on 10 MW Solar PV Power Plant
Project Proposal on 10 MW Solar PV Power Plant
 
Photovoltaic Training - Session 4 - Plant Maintenance
Photovoltaic Training - Session 4 - Plant MaintenancePhotovoltaic Training - Session 4 - Plant Maintenance
Photovoltaic Training - Session 4 - Plant Maintenance
 
Solar O&M Presentation Intersolar 2013
Solar O&M Presentation Intersolar 2013Solar O&M Presentation Intersolar 2013
Solar O&M Presentation Intersolar 2013
 

Similar a Solar Photovoltaic Power Plant: Best Practices

Kenergy Infrapresentation(Aravind Format) (1)
Kenergy Infrapresentation(Aravind Format) (1)Kenergy Infrapresentation(Aravind Format) (1)
Kenergy Infrapresentation(Aravind Format) (1)
anjumehrotra
 
A-Shiva YC@EPCC- 219KB
A-Shiva YC@EPCC- 219KBA-Shiva YC@EPCC- 219KB
A-Shiva YC@EPCC- 219KB
Shiva Y Cmath
 
Gensolownersengineerservices 140323094758-phpapp02
Gensolownersengineerservices 140323094758-phpapp02Gensolownersengineerservices 140323094758-phpapp02
Gensolownersengineerservices 140323094758-phpapp02
jitendra kumar biswas
 
Vant hof 2010
Vant hof 2010Vant hof 2010
Vant hof 2010
Ngy Ea
 
Standard Solar - Corporate Overview
Standard Solar - Corporate OverviewStandard Solar - Corporate Overview
Standard Solar - Corporate Overview
Andrew Maus
 
Suryakiran Engineers - Solar Projects Specialist
Suryakiran Engineers - Solar Projects SpecialistSuryakiran Engineers - Solar Projects Specialist
Suryakiran Engineers - Solar Projects Specialist
Ratnakar Sortur
 
Ozone - Solar Business
Ozone - Solar BusinessOzone - Solar Business
Ozone - Solar Business
Setu Goyal
 
Sr.Electrical Engineer
Sr.Electrical EngineerSr.Electrical Engineer
Sr.Electrical Engineer
nomanqudrat
 

Similar a Solar Photovoltaic Power Plant: Best Practices (20)

Presentation 1
Presentation 1Presentation 1
Presentation 1
 
Kenergy Infrapresentation(Aravind Format) (1)
Kenergy Infrapresentation(Aravind Format) (1)Kenergy Infrapresentation(Aravind Format) (1)
Kenergy Infrapresentation(Aravind Format) (1)
 
Cymi Ecourja
Cymi EcourjaCymi Ecourja
Cymi Ecourja
 
EPC Services Capability Tra International limited
EPC Services Capability  Tra International limitedEPC Services Capability  Tra International limited
EPC Services Capability Tra International limited
 
A-Shiva YC@EPCC- 219KB
A-Shiva YC@EPCC- 219KBA-Shiva YC@EPCC- 219KB
A-Shiva YC@EPCC- 219KB
 
Owner's engineer services - statement of capabilities
Owner's engineer services - statement of capabilitiesOwner's engineer services - statement of capabilities
Owner's engineer services - statement of capabilities
 
Guidetosolarprojectimplementation 140323073210-phpapp01
Guidetosolarprojectimplementation 140323073210-phpapp01Guidetosolarprojectimplementation 140323073210-phpapp01
Guidetosolarprojectimplementation 140323073210-phpapp01
 
Gensolownersengineerservices 140323094758-phpapp02
Gensolownersengineerservices 140323094758-phpapp02Gensolownersengineerservices 140323094758-phpapp02
Gensolownersengineerservices 140323094758-phpapp02
 
Chas spradbery wgk bilbao
Chas spradbery  wgk bilbaoChas spradbery  wgk bilbao
Chas spradbery wgk bilbao
 
Rajasthan-Solar-Policy 2011
Rajasthan-Solar-Policy 2011Rajasthan-Solar-Policy 2011
Rajasthan-Solar-Policy 2011
 
Hyperion Power Ans 18 Nov09
Hyperion Power Ans 18 Nov09Hyperion Power Ans 18 Nov09
Hyperion Power Ans 18 Nov09
 
Rajasthan Solar Policy PV Services
Rajasthan Solar Policy PV ServicesRajasthan Solar Policy PV Services
Rajasthan Solar Policy PV Services
 
Amol bakane update rockstar
Amol bakane    update rockstarAmol bakane    update rockstar
Amol bakane update rockstar
 
Vant hof 2010
Vant hof 2010Vant hof 2010
Vant hof 2010
 
Standard Solar - Corporate Overview
Standard Solar - Corporate OverviewStandard Solar - Corporate Overview
Standard Solar - Corporate Overview
 
Suryakiran Engineers - Solar Projects Specialist
Suryakiran Engineers - Solar Projects SpecialistSuryakiran Engineers - Solar Projects Specialist
Suryakiran Engineers - Solar Projects Specialist
 
Overview of Clean Energy Community resources
Overview of Clean Energy Community resourcesOverview of Clean Energy Community resources
Overview of Clean Energy Community resources
 
Ozone - Solar Business
Ozone - Solar BusinessOzone - Solar Business
Ozone - Solar Business
 
Irfan-Mohammad
Irfan-MohammadIrfan-Mohammad
Irfan-Mohammad
 
Sr.Electrical Engineer
Sr.Electrical EngineerSr.Electrical Engineer
Sr.Electrical Engineer
 

Último

Último (20)

presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
Advantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessAdvantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your Business
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
Developing An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilDeveloping An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of Brazil
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
HTML Injection Attacks: Impact and Mitigation Strategies
HTML Injection Attacks: Impact and Mitigation StrategiesHTML Injection Attacks: Impact and Mitigation Strategies
HTML Injection Attacks: Impact and Mitigation Strategies
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 

Solar Photovoltaic Power Plant: Best Practices

  • 1. From Allocation to Execution: Best Practices - Gensol Consultants Pvt Ltd
  • 2. Project Allocations & Status 950 MW 750 MW 110 MW Rooftop and other small Phase I of JNNSM solar power plants Phase I & phase II of covering plants of capacity connected of capacity up Gujarat Solar Policy more than 5 MW to 2 MW
  • 3. Project Allocations & Status 950 MW 750 MW 110 MW Rooftop and other small of the total projects JNNSM Financial Closures II of Phase I of have Phase I & phase in 1/3rd solar power plants to 2 MW place covering plants of capacity connected of capacity up and EPC Contractors finalized. Solar Policy more than 5 MW Gujarat
  • 4. The Process Flow Detailed Vetting of Plant Project Report Drawings Commissioning Allocation Execution Land Contractor Onsite Finalization Finalization Monitoring
  • 5. Land Finalization Parameter Purpose IMPORTANT Metrological Resource Assessment Energy Generation Capacity of substation Nearest Substation Availability of feeder Transmission Losses Accessibility to site Ease of Delivery of materials Water Availability Water requirement during construction Nearby Terrain Shadow Effects Site Topography To analyze the water blockage problems and placement of mounting structures Availability of Manpower For Construction and subsequent O&M GPS Survey Site Layout Storm History Dust Losses Mounting Structure Strength Type of Soil To analyze the resistivity and load bearing capacity of soil Construction power availability Power Requirement during construction
  • 6. Detailed Project Report Why is it Contents required? •  Site Analysis and Solar radiation resource assessment •  Prefeasibility Analysis •  Technology Selection : Solar PV modules and BoS •  Acts as a Reference / Guidance Document •  Plant and Machinery (Solar PV array and Electrical System) •  As an instrument for Financial Closure •  Civil and Architectural requirement for the project •  Necessary for claiming Carbon Credits •  Annual energy generation from power plant •  System Schematics •  Power plant operation and maintenance •  Project implementation and schedule •  Project Financials •  Risk Analysis
  • 7. Detailed Project Report Contents •  Site Analysis and Solar radiation resource assessment •  Technology Selection : Solar PV modules and BoS •  Plant and Machinery (Solar PV array and Electrical System) •  Civil and Architectural requirement for the project •  Annual energy generation from power plant •  System Schematics •  Power plant operation and maintenance •  Project implementation and schedule •  Project Financials •  Risk Analysis
  • 8. EPC Contractor Finalization Release Shortlisting & Contract of RfP Finalization Design •  Defining Exhaustive Scope of Work with well defined Quality Criteria •  Designing – Engineering Calculations, Site Layout and System Sizing •  Civil – Leveling, Foundations, Mounting Structures, Control Room etc. •  Electrical – Solar Panels, Inverters, Switchyard, Monitoring etc. •  Testing – Performance Acceptance/Guarantee Test •  Operation & Maintenance – Comprehensive Maintenance & Guarantees •  Arranging and coordinating pre/post bid meetings for clarification to the queries of bidders.
  • 9. EPC Contractor Finalization Release Shortlisting & Contract of RfP Finalization Design •  Defining Criteria for Comparison •  Determination of Minimum Qualification Criteria •  Assigning Weightage to Parameters •  Preparing Comprehensive Scoring Sheet •  Arriving at Final Scores for Responses from EPC Contractors •  Drawing Project Implementation & Drawdown Schedule •  Conducting Background Checks on Tie-ups for Equipment Supply •  Conducting Rounds of Negotiation
  • 10. EPC Contractor Finalization Release Shortlisting & Contract of RfP Finalization Design Parameters for Judgment Equipment Type | Market Presence | Efficiency | Adherence to Standards | Rate of Degradation EPC Contractor Experience in India and abroad | EPC & O&M Cost | Manpower Experience & Availability | Type & Extent of Guarantees Offered Other Parameters Office in India | Collaboration with International EPC Company
  • 11. EPC Contractor Finalization Release Shortlisting & Contract of RfP Finalization Design Format 3 separate contracts are typically drawn to reduce tax burden: 1.  Supplies Contract 2.  Services Contract 3.  Operation & Maintenance Contract Further, Supplies Contract can be broken down into Import Supplies for Inverters and modules and Domestic Supplies for the rest of the BoS.
  • 12. EPC Contractor Finalization Release Shortlisting & Contract of RfP Finalization Design Contents Snapshot •  General Terms of Agreement •  Variations & Adjustments •  Special Terms of Agreement •  Termination •  Payment Milestones •  Warranties •  Liquidated Damages •  Force Majeure •  Insurance •  Guarantees •  Performance Bank Guarantee •  Defects Liability •  Advance Bank Guarantee •  Minimum Energy Generation – Bank Guarantee
  • 13. Vetting of Drawings & Design Drawing Purpose Site Layout Avoid Shading Losses Module Mounting Structure Strength to withstand mechanical and wind loads Zinc Coating for 25 year corrosion free life Control Panel, Living Accommodation, Pantry, CIVIL Main Control Room Building Bathrooms etc. To ensure proper strength of foundations for Switchyard transformers and other equipment Water Pipes & Drainage Layout To avoid water logging Approach Roads & Pathways To ensure proper access to all parts of the plant Equipment Layout To minimize system losses ELECTRICAL System Sizing (Cables, Inverters, Switchyard) For efficient working while ensuring redundancy Earthing To ensure safety of man and equipment Single Line Diagram To comprehend the fundamental structure of the plant
  • 14. Onsite Monitoring Quality Control Claims & Reporting Bills Methodology Monitoring Document control and Factory Inspection management Compliance to standards
  • 15. Commissioning of Plant Commissioning Evacuation •  Validating actual generation against guaranteed generation •  Validating the technical parameters of equipment •  Preparation of final acceptance tests •  Conducting performance tests after successful commissioning •  Schedule for periodic checks •  Preparation of annual maintenance contract along with final list of spares and tools
  • 16. Commissioning of Plant Commissioning Evacuation •  Liasoning and approvals from authorized government bodies •  The following need to be communicated and finalized with the state utlities: •  Laying of transmission lines •  ABT meters •  Evacuation infrastructure •  Grid availability •  Dedicated feeder •  Evacuation point
  • 17. Ideal Timeline Project Activities 1 2 3 4 5 6 7 8 Completion of site visit and due diligence Bid Management EPC contractor finalization Vettings of designs and drawings Contract drafting Commissioning of 25% of Project Commissioning of 50% of Project Commissioning of 75% of Project Commissioning of 100% of Project Testing and Handing Over Evacuation arrangement
  • 18. Take Away It takes only 2% change in PLF to take a project from state of art to disastrous and vice versa, please make sure you are on the right side of this change. THANK YOU