SlideShare una empresa de Scribd logo
1 de 129
Descargar para leer sin conexión
Infrastructures in City of Kolkata
&
West Bengal
Rajesh Prasad, IRSE
Executive Director
Rail Vikas Nigam Limited
Theme:
Clean and Green Mechanised Urban Transportation 
‐ Present Challenges and Future Horizons
 About RVNL
 Kolkata – Transport Infrastructure
 Metro in City of Kolkata
 Infrastructure Projects in West Bengal
 Innovation & Safety
 High Speed Rail
CONTENTS
 To bridge the infrastructure deficit on Indian Railways, the then Prime
Minister, Bharat Ratna Late Atal Bihari Vajpayee announced National Rail
Vikas Yojana (NRVY) on 15th August 2002 in his address from Red Fort.
 NRVY was formally launched by Hon’ble PM on 26th December 2002.
 To implement NRVY, RVNL was incorporated as a PSU on 24-1-2003; it is
100% owned by Ministry of Railways (MoR).
 RVNL works for & on behalf of MoR as an extended arm; not as a contracting
Company.
 Empowered to act as an Umbrella SPV to undertake project development,
resource mobilization etc. directly or by creating project specific SPVs or by
any other financing structure found suitable.
TURNOVER
843 985 1423 1654 1749 1445 1598
2117
2492
3142
4541
5917
7556.55
10063
0
2000
4000
6000
8000
10000
12000
Crore
Crore
FY
ACHIEVEMENT
New Railway Track 373
Gauge Conversion 1783
Doubling of Track 2920
Railway Electrification 3762
MTP (KM) 42
Workshops 7
Cable Stayed Bridge 1
373
1783
2920 3762
42
7
1
1
200
New Railway Track
Gauge Conversion
Doubling of Track
Railway Electrification
MTP (KM)
Workshops
Cable Stayed Bridge
76 projects have been fully commissioned.
 Tram Service
 Water Transport
 Bus Service
 Circular Railway
 Metro Railway
Kolkata – Transport Infrastructure
KOLKATA : City of Joy
Also known as –
 Cultural Capital of India
 Literary Capital of India
 City of Creative Energy
 City of Architecture
City of Brides of India
City of Football in India
KOLKATA : (Calcutta - Gateway to Eastern Region)
 Kolkata was the capital of India till 1912.
 The second train in India from Howrah to Hooghly in 1854
 The first Tramways Services in India (horse drawn) in
Kolkata in 1873
 The first u/g Metro Railway in India started in Kolkata in
1984
 The circular Railway started in 1990.
 A city with all different modes of transportation.
Tram Service at a glance
 Kolkata is the only city in
India to have a tram
network.
 As per RITES ‐ 2004 trams
carry 1.90 lakh passengers
on an average week day.
 In the year 2010, 147 trams
carried about 75,000
passengers only. Presently
there are 125 Tram vehicles
running in the city.
Water Transport System at  and around Kolkata
 In Kolkata and Howrah, water
ferries are used through the
various ghats like Fairlie Ghat,
Howrah Ghat, Shibpur Ghat,
Princep Ghat, Cossipore Ghat.
 There are plans to start utilizing
the canals running through the
city as water‐transport network.
 Ferry services cater to about 3
Lakh passengers daily from 42
ferry stations.
BUS SYSTEM
 Kolkata State Transport Corporation (KSTC)
 Kolkata Tramway Company (KTC)
 West Bengal Surface Transport Corporation
(WBSTC)
 North Bengal State Transport Corporation
(NBSTC)
 South Bengal State Transport Corporation
(SBSTC)
 Private Bus operators.
 Other Hired/Chartered Bus Operators.
The construction of Circular Railway
from Dumdum Jn to Princep Ghat
(13.42 km) was sanctioned in the
year 1983 - 84 at a total cost of
Rs35.49 Crore. The construction
work was taken in hand in Jul’1983
and full stretch of 13.42 km was
opened for passenger traffic in
Jun’1990.
Section between Princep Ghat and
Majerhat was opened in 2006.
Circular Railway
Existing Metro network
Kolkata Metropolitan Area (KMA)
– Population
• KMA, the largest urban agglomeration in eastern India, extends
over 1851.41 sq. km. and envelopes 3 Municipal Corporations
including Kolkata Municipal Corporation, 38 Municipalities and
24 Panchayat Samitis.
0
5
10
15
20
25
2001 2011 2021 2025
14.72
17
20 21.1
Population
(in million)
Kolkata (KMA)– Vehicles
• Total number of registered vehicles in
Kolkata was 7.6 Lakh in 2001 which
increased to 10.27 lakh in 2008
registering an annual growth rate of
4.3%. Considering the given growth rate,
the no of registered motor vehicles is
expected to exceed 17 lakh by 2021.
About Existing Roads of Kolkata
• Road space of Kolkata is about‐6%. But effective Road space 
available for traffic movement is 5% only. 
• Road space of 
Delhi ‐ 23%,
Mumbai ‐ 18% 
Chennai ‐ 14%
KOLKATA
“Turning into Traffic chaos”
Traffic Congestion is a normal phenomenon
Frequent traffic congestion at most traffic junctions along the Metro Corridors of Kolkata
TOI-29.01.20
Air Pollution
Telegraph –01.01.20Telegraph –21.01.20
Air Pollution
TOI-28.01.20
 Present Average Noise level
 Peak Noise level recorded
 Permitted Noise level
Noise Pollution
Contd..
 70-80 dB
 80 – 83 dB
 50 dB
Telegraph –29.01.20
 Widening of Roads
Limited Scope
due to lack of
space
Remedies to the Traffic Problems
 Construction of Flyover-
Limited scope due to financial constraints
and limited space
Remedies to the Traffic Problems in Kolkata
Remedies to the Traffic Problems
 Surface Metro System
• Not Possible due to non availability
of large open, continuous
strech of land
• Frequent Crossing
will pose problem
Metro Rail - Advantages
 Requires 1/5th energy per passenger km compared to
road-based transport system.
 Causes less noise, no air pollution and eco friendly
transport system.
 Occupies no road space if Underground and only about
3.0 mtrs width of the road if elevated
 More reliable, comfortable
and safer than road based
systems
 Reduces journey time.
East west Corridor 
executed by KMRCL
New Garia – Dum 
Dum Airport 
(RVNL)
Noapara ‐ Barasat
(Metro Rly.)
Baranagar‐
Barrackpore (RVNL)
Joka‐ BBD Bag 
(RVNL)
Noapara –
Dakshineswar
(RVNL)
SANCTIONED METRO PROJECTS OF RVNL
Project Length (Km) Project Length (Km)
New Garia – Dum Dum Airport 32.00 Noapara‐Baranagar –Dakshineswar 4.012
Joka – BBD Bag – Diamond Park 16.75 Baranagar‐Barrackpore 12.5
• Projects transferred to RVNL without any planning and not even DPR was made.
METRO PROJECTS-COMMISSIONING PLANNING
SN Name of Project Lengt
h (km)
Tentative Commissioning Planning Remarks
2019-20 2020-21 2021-22 2022-23
1 Noapara-
Baranagar –
Dakshineswar
4.01 4.01 - - - - TDC – April 2020
- Removal of encroachments took 7 years.
2 New Garia – Dum
Dum Airport
32 - 7.0 8.0 12.0 - 5 Km – Work yet to start
- TDC - Dec. 2020, Dec. 2021, Sept. 2022
respectively, subject to removal of
impediments by Dec. 2018.
- Land acquisition, relocation of utilities,
encroachments, traffic diversion, non-
availability of site are still pending.
3 Joka – BBD Bag
– Diamond Park
16.75 - - 9.0 - - 7.75 Km - Work yet to start
- TDC - Sep. 2021 subject to removal of
impediments by June 2019.
- Encroachments, utility diversion, Land
acquisition for depot & at other location
and decision on Majerhat bridge.
4 Baranagar-
Barrackpore
12.5 - - - - - Work yet to start
- State Govt. is yet to hand over the site.
They are also not responding to the
proposal submitted by RVNL.
Total 65.26 4.01 7.0 17.0 12.0 -
Work is affected in remaining stretches due to land acquisition issues, encroachment issues, non-finalization of
alignment, material modification proposal etc. Major bottlenecks addressed.
Route Alignment by RVNL:
 Noapara(Ex.) to Baranagar (2.627Km) &
Baranagar to Dakshineswar (2Km).
 Baranagar to Barrackpore (12.5 Km) Metro
Corridor.
 Joka to BBD Bag Via Majerhat (16.72Km)
Metro Corridor.
 DumDum Airport to New Garia (32Km) Metro
Corridor.
Year of sanction 2010-11
Pink Book Item
No.
63 & 66 of 2019-
20
Anticipated cost Rs.464.86 Cr.
Expn upto 3/19 Rs.353.94 Cr.
Budget Outlay
2019-20
Rs.81.00 Cr.
Exp. Upto
20.01.2019
Rs 124.21 Cr
Financial
progress (%)
2019-20
153.34 %
Present Status Work in progress
NOAPARA – BARANAGAR – DAKSHINESWAR METRO
ACHIEVEMENTS : 
NOAPARA – BARANAGAR – DAKSHINESWAR METRO
 100% embankment has been completed.
 100% viaduct has been completed.
 1.9 Kms of Belghoria expressway diversion work
completed commissioned.
 Dakshineswar station work completed- 98%
 Baranagar station work completed – 92%
PSC VIADUCT WITH DECK SLAB
34
VIADUCT WITH DECK SLAB IN PORTAL LOCATION
VIADUCT WITH DECK SLAB COMPLETED
EMBANKMENT COMPLETED
DAKSHINESWAR METRO STATION BUILDING WORK
DAKSHINESWAR METRO STATION BUILDING
DAKSHINESWAR METRO STATION BUILDING WORK
BARANAGAR METRO STATION BUILDING WORK IN PROGRESS
BARANAGAR METRO STATION BUILDING
BELGHORIA EXPRESSWAY DIVERSION WORK COMPLETED AND 
COMMISIONED ON 08.08.2017
BLT OVER VIADUCT IN PROGRESS
BLT IFS OVER EMBANKMENT IN PROGRESS
3rd rail installed at Noapara
Made by a local blogger
Year of sanction  2010‐11
Pink Book Item No. 68 of 2019‐20
sanctioned cost Rs. 2913.50 Cr.
Expn upto 3/19 Rs. 834.06 Cr.
Budget Outlay 19‐20 Rs. 100 Cr.
Expenditure upto
24.01.2020
Rs. 42.20 Cr.
Total Expenditure Rs. 876.26 Cr
Financial Progress (%) in 
FY 19‐20
42.20 %
Present Progress Work in progress
JOKA – BBD BAG PROJECT 16.75 Km
M-35
M-35
M-40
M-40 M-50
3D SUPERSTRUCTURE OF VIADUCT
M-60
Joka MID 
Section
Thakkurrpuk
ur
MID 
Section
ShakherBaz
ar       
MID 
Section
Behala 
Chowrasta
MID 
Section
Behala 
Bazar
MID 
Section
TaratalaMID 
Section
Majerhat MID 
Section
Mominp
ur
Chainage 0.00 0.65 1.46 1.81 2.68 2.99 4.13 4.45 5.46 6.1 6.45 6.72 7.607 8.13 8.625
PF Length 180m 180m 180m 180m 180m 180m 180m 180m
High 
point
Low 
Point High point
Low 
Point High point
Low 
Point High point
Low 
Point High point
Low 
Point
High 
point
Low 
Point High point
Low 
Point
High 
point
Rail 
Level 16.5 14.824 18.4 15.352 17.8 16.172 19.1 16.419 19.8 15.183 17.8 14.98 18.199 14.9 17.73
Ground 
Level 3.317 3.35 4.791 4.445 4.189 4.968 5.682 6.129 6.074 6.184 4.588 4.69 6.692 4.63 5.515
Gradient 388 227 115 355 190 389 119 299 139 134 96 276 159 175
16.5
14.824
18.4
15.352
17.8
16.172
19.1
16.419
19.8
15.183
17.8
14.98
18.199
14.9
17.73
3.317 3.35
4.791 4.445 4.189
4.968
5.682 6.129 6.074 6.184
4.588 4.69
6.692
4.63
5.515
0
5
10
15
20
25
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Rail Level
Ground Level
Joka
Thakurpukur
Shakher Bazar
Behala
Chowrast
a
Behala Bazar
Taratala Majerhat Mominpur
Energy saving due to gradient
EXECUTION OVER CHARIAL KHAL
BEFORE EXECUTION AFTER EXECUTION 
JOKA DEPOT APPROACH CONNECTED 
NEWLY CONSTRUCTED OLD AGE HOME
Old Age Home
Newly Constructed Rehabilitation India Building
Rehabilitation India
(C‐Commens & Sons Ltd)
BEFORE AFTER EXECUTION
JOKA – BBD BAG PROJECT 16.75 Km (RVNL)
Progress of WorkJOKA – BBD BAG PROJECT 16.75 Km
JOKA – BBD BAG PROJECT 16.75 Km (RVNL)
ACHIEVEMENTS : 
• 9 km of viaduct including Depot approach has been completed. (Only 15 out of 276 Piers
in front of MINT is pending)
• Joka Depot Land :‐ Possession by RVNL – 84.55% & Awarded – 89.16%
JOKA – BBD BAG PROJECT 16.19 Km
Total area to be acquired  24.48 Ha
Total area awarded 22.1298 Ha (89.16%)
(89.16% on 24.01.2020)
Total are Taken Over 20.9863 Ha (84.55%)
(84.55% on 24.01.2020)
JOKA DEPOT
JOKA DEPOT
Mominpur(Ex)‐Esplanade underground 
Section of JOKA‐BBD Bag Metro Corridor 
(5.12 Km)
Underground Stations :
1. KHIDIRPUR (9.87 Km),
2. VICTORIA MEMORIAL(12.025),
3.PARK STREET (13.29 Km)
4.ESPLANADE (14.145 km)
ESPLANADE
MOMINPUR
MAJERHAT
PARK STREET
VICTORIA 
MEMORIAL
KHIDIRPUR
ALIGNMENT
ELEVATED SECTION
UNDERGROUND 
SECTION
Year of sanction  2010‐11
Pink Book No. 67 of 2019‐20
Anticipated cost Rs. 4259.50 Cr.
Expn upto 3/19 Rs. 2104.52 Cr.
Budget Outlay 19‐
20
Rs. 345 Cr.
Expn. upto . 
24.01.2020
Rs. 223.41 Cr.
Total Expenditure Rs. 2327.93 Cr.
Financial Progress 
(19‐20)
64.75 %
NEW GARIA (KAVI SUBHAS) – BIMAN BANDAR 32 KM
NEW GARIA – AIRPORT METRO
STATIONS
• 18.17 km viaduct completed including station
portion.
• 87% substructure & 87% piers completed for 26
km length.
• 50% track slab completed for 20 stations.
NEW GARIA (KAVI SUBHAS) – BIMAN BANDAR ‐ 32 KM
ACHIEVEMENTS : 
Erection over railway track at Baghajatin near Garia
Future Metro Works
Total 52 nos. of Metro Projects in 
India in different phases of 
Planning & Execution.
Investment of 2.5 lakh Crores in 
next 10 to 20 years as per the 
present cost.
Infrastructure Projects
in
West Bengal
4 LANE CABLE STAYED ROB, BARDDHAMAN 
 Completion of work : March’ 2016
APPROACH WORK  OF 4 LANE CABLE STAYED ROB, BARDDHAMAN 
 Commissioned in Sep’ 2019.
Diesel Loco Component Factory , Dankuni.
 Commencement of work : 07.08.2010
 Completion of work : July 2012
DMU Factory at Haldia
 Commencement of work : July 2011
 Completion of work : December 2012
Electric locomotive Factory , Dankuni
 Commencement of work : December 2012
 Completion of work : Jan 2015
Panskura – Kharagpur 3rd Line – 45 Km
 Commencement of work : Jan 2010
 Section Completed and Handed over.
Doubling between Rajgoda – Tamluk (13.50 KM)
 Commencement of Work : July 2010
 Commissioned on 13.03.2013.
Doubling between Tamluk Jn. – Basulya (24.4 KM)
 Commissioned on Phase‐I 30.04.2015 & Phase‐II 20.12.2016.
 Entire 24.4 Kms commissioned and now in operation.
3rd LINE PROJECT BETWEEN MANOHARPUR ‐ GOELKERA (27 KM)
Commissioned in Nov. 2018
(HOWRAH – MUMBAI ROUTE)
(Administrative challenge)
NEW LINE FROM NABADWIP GHAT TO NABADWIP DHAM (12.169 KM) 
Special kind of Cantilever Launching Scheme was followed.
Innovation
&
Safety
• For monitoring of the structural health of the bridge
during its service life, 6 nos. sensors have been installed
on the stay cables subjected to maximum loads. The
ROBO Control System of M/s Mageba is being used for
the purpose.
• The structural monitoring system issues alarm
notification based on measurements by the on‐
structure instrumentation when pre‐defined threshold
values of structural loads are passed. Alarm criteria can
be configured based on the structural design of the
bridge
INSTRUMENTATION (LIVE MONITORING SYSTEM)
First of it’s kind in any bridge of I.Rly.
INDIVIDUAL GRAPHS
MONITORING SYSTEM 
(TO ENSURE SAFETY OF THE ADJOINING TUNNEL)
• Monitoring system for measuring
vibration in the existing tunnel
during blasting of 3rd line.
• Seismograph equipment was
installed in near by existing tunnel
wall during every blasting to
record the blasting amplitude and
frequency of shock wave.
• This monitoring system has been
used to ensure safety of the
existing tunnel while executing a
new tunnel for double line or
third line project.
The summary of blast vibration 
and Fast Fourier Transform 
Analysis (FFT) 
PPV = 4.572 mm/s< 10mm/sec.
Noise = 106.0 dB < 146 dB
For the first time in Indian
Railways, such treatment
with the involvement of
RDSO was executed.
Extremely weak soil base
is encountered because of
proximity to port area.
Therefore, special ground
treatment undertaken by
providing more than 4500
nos. of stone columns by
Dry Vibro Method.
SUB  GRADE   IMPROVEMENT  USING  STONE  COLUMN
(4450 nos. @ 2m spacing)
Acquisition of 49 kota land avoided with a saving 
of Rs. 52 Crs. By Joka Model
Joka Model for Relocation of 5 no 132 KV
O/H Transmission Line
QR coding of Metro structures
All Metro structures are being planned with QR coding to access
horoscope of the structure.
RETRIEVAL OF RAILWAY LAND FOR CONSTRUCTION OF METRO & 
BARDDHAMAN VIADUCT WORK AFTER RELOCATION OF 
ENCROACHMENTS IN LAND OF STATE AT THE COST OF THE STATE GOVT.
(Unique model for removal of encroachments from Project sites)
CONSTRUCTION OF MODEL HOSPITAL (TRAFFIC HEALTH UNIT)
AS PART OF UTILITY SHIFTING
CONSTRUCTION OF MODEL GANG HUT 
As part of relocation of 
Metro works
Safety Management….
Bigger changes required for 
engineers….
First Principle in Safety……..
• Do not PLAY with Safety….
- A matter of concern….
Good Physique
Regular Check ups
Preventive  Measures & 
Medicines
Proper & Timely Cure & 
Restoration
A KEY TO LONG HEALTH LIFE OF MAN/STRUCTURE
Good Construction
Regular Inspections
Preventive Measures & 
Materials
Proper & Timely Repairs & 
Restoration
Construction Safety ProtocolAdequate care till baby is born
SAFETY MEASURES TAKEN AT WORK SITE
Proper barricading at site to protect Motorists, Pedestrians, Workmen, 
Plant & Equipment from accident
• Display of temporary traffic signs as per the requirement of the Traffic
Police.
SAFETY MEASURES TAKEN AT WORK SITE
SAFETY MEASURES TAKEN AT WORK SITE
Protection of worksite… 
(Pile Cap work)
SAFETY MEASURES TAKEN AT WORK SITE 
Height gauge and safety fish net provided for safety of
pedestrian and vehicular traffic
Height Gauge 
Safety Fish Net
I‐GIRDER STEEL FRAME LOCKING 
ARRANGEMENT
STEEL FRAME LOCKING ARRANAGEMENT
SAFETY PLEDGE
Make it a habit
Vivekananda Flyover suddenly collapsed on 31.03.2016
IIT KGP REPORT‐ DEC 2017
‐ Poor Contract               ‐ Poor Workmanship
‐ Poor Design                  ‐ Poor Supervision
‐ Poor Material
Handle 
Media 
With 
Care
May not get the chance of hospital trip
Sequencing in construction is very important 
Placements of wrong bearings
Zamrudpur Metro worksite accident
L pier gave enough warning to have change in 
approach….
The Times of India 
02.09.2019
Disaster at Bowbazar….
Disaster at Bowbazar….
High Speed Rail
Diamond Quadrilateral
Diagonals
Legend
Diamond 
Quadrilateral of High 
Speed Rail Network
Future High 
Speed Scenario 
in India
 Delhi‐Mumbai (1357 Km)
 Mumbai‐Chennai (1260 Km) 
 Chennai‐Kolkata (1649 Km) 
 Kolkata‐Delhi (1474 Km)
 Mumbai‐Kolkata (1968 Km)
 Delhi‐Chennai (2182 Km)
In next 10‐20 years 10,000 Km
HSR in India.
Costing Rs. 20 Lakh Crores
 Does India need a change…..
 Comparison of HSR System in the world
First Inauguration year
Country  Year
Japan 1964
France 1981
Italy 1988
Germany 1991
Spain 1992
South Korea 2004
Taiwan 2007
China 2008
India ‐
ENERGY EFFICIENCY
High Speed saves Energy Costs and reduces Greenhouse Gases
0 10 20 30 40 50 60
“Fuel equivalent grams” per passenger‐kilometer
High Speed
Railway
Bus
Plane 51.1
29.9
18.3
17.6
12.1
Classic Train
Private Car
DECONGESTION of Metropolitan cities
Tier I 
City
Tier IITier II
Tier I 
City
Small towns and Tier II & III Cities
Tier I 
City
Tier II 
city
Tier II city
TRAVEL TIME ( Trigger for modal shift)
Delhi 
(city centre)
(city centre)Delhi Airport
Chandigarh
Airport
.75 hr 30 min1.25 hrs at Terminal + 1 hr Flying time
Total time: 3.5 hrs
Plane
Delhi 
(city centre)
Chandigarh
(city centre)
Total time: 1 hr
High Speed 
Railway
Journey time for air travel involves travel to airport, away from city centers and waiting time at Airports. 
Distance between DELHI to CHANDIGARH is 245 Km.
Feasibility studies for Diamond 
Quadrilateral Network
• Railway Board has entrusted the feasibility studies of
Diamond Quadrilateral of HSR network to RVNL/HSRC,
(i) Delhi‐Mumbai (1357 Km),
(ii) Mumbai‐Chennai (1260 Km), 
(iii) Chennai‐Kolkata (1649 Km), 
(iv) Kolkata‐Delhi (1474 Km) and both the diagonals i.e.
(v) Mumbai‐Kolkata (1968 Km)
(vi) Delhi‐Chennai (2182 Km)
Economic Times 30.01.20
KOLKATA –NEW DELHI
PART OF FEASIBILITY
STUDY FOR DIAMOND
QUADRILATERAL
NETWORK OF HIGH SPEED
RAIL CORRIDOR
Alignment 
Alignment 
Length: 1474 .47 Km 13 Stations 17 Sidings
28 crossovers 04 depots                 7 workbases
Station Classification
Kolkata:
Option 1:-
Shalimar Station
Option 2 –
Kolkata Terminal
Terminal Station
THANK YOU

Más contenido relacionado

La actualidad más candente

Ministry of Urban Development’s initiatives on Transit-Oriented Development (...
Ministry of Urban Development’s initiatives on Transit-Oriented Development (...Ministry of Urban Development’s initiatives on Transit-Oriented Development (...
Ministry of Urban Development’s initiatives on Transit-Oriented Development (...WRI Ross Center for Sustainable Cities
 
Chandigarh City Planning
Chandigarh City Planning Chandigarh City Planning
Chandigarh City Planning SandeEp VeRma
 
Trasnportation system of mumbai
Trasnportation system of  mumbaiTrasnportation system of  mumbai
Trasnportation system of mumbaiYash Kotgirwar
 
indore city
indore cityindore city
indore cityhome
 
Ahmedabad BRTS Overview
Ahmedabad BRTS OverviewAhmedabad BRTS Overview
Ahmedabad BRTS OverviewNishit kadia
 
City development plan guwahati
City development plan guwahatiCity development plan guwahati
City development plan guwahatiAnupama Krishnan
 
Bhopal city planning
Bhopal city planningBhopal city planning
Bhopal city planningsonika patel
 
Chandigarh and Navi Mumbai town planning
Chandigarh and Navi Mumbai town planningChandigarh and Navi Mumbai town planning
Chandigarh and Navi Mumbai town planningMUHAMMEDJESWIN
 
Kakinada Smart City MP Presentation
Kakinada Smart City MP PresentationKakinada Smart City MP Presentation
Kakinada Smart City MP PresentationHarish Lunani
 
BRT System in Delhi
BRT System in DelhiBRT System in Delhi
BRT System in DelhiJaspal Singh
 
City Origin and Growth - Banaras/Varanasi
City Origin and Growth - Banaras/VaranasiCity Origin and Growth - Banaras/Varanasi
City Origin and Growth - Banaras/VaranasiGurkirpal Singh
 
Road networks in india
Road networks in indiaRoad networks in india
Road networks in indiaRenosh R
 
Varanasi development plan analysis
Varanasi development plan analysisVaranasi development plan analysis
Varanasi development plan analysisAvanitaSharma
 
Structure plan of patna
Structure plan of patnaStructure plan of patna
Structure plan of patnaAnkitVishwa
 
Varanasi Riverfront Development
Varanasi Riverfront DevelopmentVaranasi Riverfront Development
Varanasi Riverfront DevelopmentBeda Choudhury
 

La actualidad más candente (20)

Ministry of Urban Development’s initiatives on Transit-Oriented Development (...
Ministry of Urban Development’s initiatives on Transit-Oriented Development (...Ministry of Urban Development’s initiatives on Transit-Oriented Development (...
Ministry of Urban Development’s initiatives on Transit-Oriented Development (...
 
LAP - Rajkot Case Study
LAP - Rajkot Case StudyLAP - Rajkot Case Study
LAP - Rajkot Case Study
 
ZONES OF DELHI(AJ)
ZONES OF DELHI(AJ)ZONES OF DELHI(AJ)
ZONES OF DELHI(AJ)
 
Chandigarh City Planning
Chandigarh City Planning Chandigarh City Planning
Chandigarh City Planning
 
Trasnportation system of mumbai
Trasnportation system of  mumbaiTrasnportation system of  mumbai
Trasnportation system of mumbai
 
indore city
indore cityindore city
indore city
 
Gurugram casestudy
Gurugram casestudyGurugram casestudy
Gurugram casestudy
 
Ahmedabad BRTS Overview
Ahmedabad BRTS OverviewAhmedabad BRTS Overview
Ahmedabad BRTS Overview
 
City development plan guwahati
City development plan guwahatiCity development plan guwahati
City development plan guwahati
 
Bhopal city planning
Bhopal city planningBhopal city planning
Bhopal city planning
 
Kolkata history
Kolkata historyKolkata history
Kolkata history
 
Chandigarh and Navi Mumbai town planning
Chandigarh and Navi Mumbai town planningChandigarh and Navi Mumbai town planning
Chandigarh and Navi Mumbai town planning
 
Kakinada Smart City MP Presentation
Kakinada Smart City MP PresentationKakinada Smart City MP Presentation
Kakinada Smart City MP Presentation
 
BRT System in Delhi
BRT System in DelhiBRT System in Delhi
BRT System in Delhi
 
City Origin and Growth - Banaras/Varanasi
City Origin and Growth - Banaras/VaranasiCity Origin and Growth - Banaras/Varanasi
City Origin and Growth - Banaras/Varanasi
 
Road networks in india
Road networks in indiaRoad networks in india
Road networks in india
 
Varanasi development plan analysis
Varanasi development plan analysisVaranasi development plan analysis
Varanasi development plan analysis
 
INDORE SMART CITY.pptx
INDORE SMART CITY.pptxINDORE SMART CITY.pptx
INDORE SMART CITY.pptx
 
Structure plan of patna
Structure plan of patnaStructure plan of patna
Structure plan of patna
 
Varanasi Riverfront Development
Varanasi Riverfront DevelopmentVaranasi Riverfront Development
Varanasi Riverfront Development
 

Similar a Infrastructures in City of Kolkata & West Bengal

Opportunities in Railway construction- development operations of infrastructu...
Opportunities in Railway construction- development operations of infrastructu...Opportunities in Railway construction- development operations of infrastructu...
Opportunities in Railway construction- development operations of infrastructu...Rajesh Prasad
 
Transport infrastructure in india
Transport infrastructure in indiaTransport infrastructure in india
Transport infrastructure in indiaHarsh Chudasama
 
Infrastructure and aviation - Business environment
Infrastructure and aviation - Business environmentInfrastructure and aviation - Business environment
Infrastructure and aviation - Business environmentPrabhat Taneja
 
DFC Decongesting Indian Railways
DFC Decongesting Indian RailwaysDFC Decongesting Indian Railways
DFC Decongesting Indian RailwaysAbeer Ray
 
Presentation on Bangladesh Metro Rail - Md Rajib Hossain.pptx
Presentation on Bangladesh Metro Rail - Md Rajib Hossain.pptxPresentation on Bangladesh Metro Rail - Md Rajib Hossain.pptx
Presentation on Bangladesh Metro Rail - Md Rajib Hossain.pptxraju2rahman
 
Presentation for Dhaka Metro Rail.pptx
Presentation for Dhaka Metro Rail.pptxPresentation for Dhaka Metro Rail.pptx
Presentation for Dhaka Metro Rail.pptxSabujMahmud2
 
Hyderabad metro rail – for a better livable city
Hyderabad metro rail – for a better livable cityHyderabad metro rail – for a better livable city
Hyderabad metro rail – for a better livable cityPramod Kumar
 
Metro rail in india
Metro rail in indiaMetro rail in india
Metro rail in indiaSourav Paul
 
IMPACT OF DEDICATED FREIGHT CORRIDOR ON LOGISTIC CONNECTIVITY IN INDIA
IMPACT  OF DEDICATED FREIGHT CORRIDOR ON LOGISTIC CONNECTIVITY IN INDIA IMPACT  OF DEDICATED FREIGHT CORRIDOR ON LOGISTIC CONNECTIVITY IN INDIA
IMPACT OF DEDICATED FREIGHT CORRIDOR ON LOGISTIC CONNECTIVITY IN INDIA Chiranjib Mahapatra
 
Metro rail seminor
Metro rail seminor Metro rail seminor
Metro rail seminor Joseph Jincy
 
Draft Feasibility report of the railway system in Karachi
Draft Feasibility report of the railway system in KarachiDraft Feasibility report of the railway system in Karachi
Draft Feasibility report of the railway system in KarachiUmer Mover
 
Project brief updated_aug081
Project brief updated_aug081Project brief updated_aug081
Project brief updated_aug081Anush verma
 

Similar a Infrastructures in City of Kolkata & West Bengal (20)

Opportunities in Railway construction- development operations of infrastructu...
Opportunities in Railway construction- development operations of infrastructu...Opportunities in Railway construction- development operations of infrastructu...
Opportunities in Railway construction- development operations of infrastructu...
 
Transport infrastructure in india
Transport infrastructure in indiaTransport infrastructure in india
Transport infrastructure in india
 
Infrastructure and aviation - Business environment
Infrastructure and aviation - Business environmentInfrastructure and aviation - Business environment
Infrastructure and aviation - Business environment
 
DFC Decongesting Indian Railways
DFC Decongesting Indian RailwaysDFC Decongesting Indian Railways
DFC Decongesting Indian Railways
 
Presentation on Bangladesh Metro Rail - Md Rajib Hossain.pptx
Presentation on Bangladesh Metro Rail - Md Rajib Hossain.pptxPresentation on Bangladesh Metro Rail - Md Rajib Hossain.pptx
Presentation on Bangladesh Metro Rail - Md Rajib Hossain.pptx
 
Presentation for Dhaka Metro Rail.pptx
Presentation for Dhaka Metro Rail.pptxPresentation for Dhaka Metro Rail.pptx
Presentation for Dhaka Metro Rail.pptx
 
OVERVIEW OF BANGLORE CMP
OVERVIEW OF BANGLORE CMPOVERVIEW OF BANGLORE CMP
OVERVIEW OF BANGLORE CMP
 
Hyderabad metro rail – for a better livable city
Hyderabad metro rail – for a better livable cityHyderabad metro rail – for a better livable city
Hyderabad metro rail – for a better livable city
 
Dhaka metro rail
Dhaka metro railDhaka metro rail
Dhaka metro rail
 
Metro rail in india
Metro rail in indiaMetro rail in india
Metro rail in india
 
Dfc
DfcDfc
Dfc
 
Transpot system in India
Transpot system in IndiaTranspot system in India
Transpot system in India
 
IMPACT OF DEDICATED FREIGHT CORRIDOR ON LOGISTIC CONNECTIVITY IN INDIA
IMPACT  OF DEDICATED FREIGHT CORRIDOR ON LOGISTIC CONNECTIVITY IN INDIA IMPACT  OF DEDICATED FREIGHT CORRIDOR ON LOGISTIC CONNECTIVITY IN INDIA
IMPACT OF DEDICATED FREIGHT CORRIDOR ON LOGISTIC CONNECTIVITY IN INDIA
 
Metro project
Metro project Metro project
Metro project
 
Metro rail status in india
Metro rail status in indiaMetro rail status in india
Metro rail status in india
 
Metro rail seminor
Metro rail seminor Metro rail seminor
Metro rail seminor
 
Draft Feasibility report of the railway system in Karachi
Draft Feasibility report of the railway system in KarachiDraft Feasibility report of the railway system in Karachi
Draft Feasibility report of the railway system in Karachi
 
Railway
RailwayRailway
Railway
 
Project brief updated_aug081
Project brief updated_aug081Project brief updated_aug081
Project brief updated_aug081
 
Nl infrastructure oct 3 - oct 9, 2015
Nl infrastructure oct 3 - oct 9, 2015Nl infrastructure oct 3 - oct 9, 2015
Nl infrastructure oct 3 - oct 9, 2015
 

Más de Rajesh Prasad

20th_Safety_Convention dt 11.09.2023.pdf
20th_Safety_Convention dt 11.09.2023.pdf20th_Safety_Convention dt 11.09.2023.pdf
20th_Safety_Convention dt 11.09.2023.pdfRajesh Prasad
 
Cyber Security Action Plan of RVNL
Cyber Security Action Plan of RVNLCyber Security Action Plan of RVNL
Cyber Security Action Plan of RVNLRajesh Prasad
 
RVNL Corporate Governance 26.11.2021
RVNL Corporate Governance 26.11.2021 RVNL Corporate Governance 26.11.2021
RVNL Corporate Governance 26.11.2021 Rajesh Prasad
 
Management Development programme - 01.07.2022 .pdf
Management Development programme - 01.07.2022 .pdfManagement Development programme - 01.07.2022 .pdf
Management Development programme - 01.07.2022 .pdfRajesh Prasad
 
New normal and beyond –RVNL Perspective dt 27.10.21
New normal and beyond –RVNL Perspective dt 27.10.21New normal and beyond –RVNL Perspective dt 27.10.21
New normal and beyond –RVNL Perspective dt 27.10.21Rajesh Prasad
 
"Protocol for safe execution of Infra Projects" by Rajesh Prasad, Director Op...
"Protocol for safe execution of Infra Projects" by Rajesh Prasad, Director Op..."Protocol for safe execution of Infra Projects" by Rajesh Prasad, Director Op...
"Protocol for safe execution of Infra Projects" by Rajesh Prasad, Director Op...Rajesh Prasad
 
Rebuilding of Railway Infrastructures during the present crisis by Rajesh Prasad
Rebuilding of Railway Infrastructures during the present crisis by Rajesh PrasadRebuilding of Railway Infrastructures during the present crisis by Rajesh Prasad
Rebuilding of Railway Infrastructures during the present crisis by Rajesh PrasadRajesh Prasad
 
Motivation and Bounce Back after the crisis....
Motivation and Bounce Back after the crisis....Motivation and Bounce Back after the crisis....
Motivation and Bounce Back after the crisis....Rajesh Prasad
 
Revolution 2020, Crisis.. Change....
Revolution 2020, Crisis.. Change....Revolution 2020, Crisis.. Change....
Revolution 2020, Crisis.. Change....Rajesh Prasad
 
A Coffee Table Book cum handbook on Cable Stayed Bridge with the 4 approaches...
A Coffee Table Book cum handbook on Cable Stayed Bridge with the 4 approaches...A Coffee Table Book cum handbook on Cable Stayed Bridge with the 4 approaches...
A Coffee Table Book cum handbook on Cable Stayed Bridge with the 4 approaches...Rajesh Prasad
 
Engineering for Change... A keynote address on Engineers day- 15th Sep 2019
Engineering for Change... A keynote address on Engineers day- 15th Sep 2019Engineering for Change... A keynote address on Engineers day- 15th Sep 2019
Engineering for Change... A keynote address on Engineers day- 15th Sep 2019Rajesh Prasad
 
PROTOCOL FOR SAFE EXECUTION OF INFRA PROJECTS BY RAJESH PRASAD ED RVNL DT 04...
PROTOCOL FOR SAFE EXECUTION OF INFRA PROJECTS  BY RAJESH PRASAD ED RVNL DT 04...PROTOCOL FOR SAFE EXECUTION OF INFRA PROJECTS  BY RAJESH PRASAD ED RVNL DT 04...
PROTOCOL FOR SAFE EXECUTION OF INFRA PROJECTS BY RAJESH PRASAD ED RVNL DT 04...Rajesh Prasad
 
Uses of special kind of technologies for implementation of special kind of st...
Uses of special kind of technologies for implementation of special kind of st...Uses of special kind of technologies for implementation of special kind of st...
Uses of special kind of technologies for implementation of special kind of st...Rajesh Prasad
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18Rajesh Prasad
 
Construction Safety Protocol PPT by Rajesh Prasad, ED RVNL at Lucknow on 26.0...
Construction Safety Protocol PPT by Rajesh Prasad, ED RVNL at Lucknow on 26.0...Construction Safety Protocol PPT by Rajesh Prasad, ED RVNL at Lucknow on 26.0...
Construction Safety Protocol PPT by Rajesh Prasad, ED RVNL at Lucknow on 26.0...Rajesh Prasad
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18Rajesh Prasad
 
Bridging over river Bhagirathi- a Handbook cum Coffee Table Book by Rajesh Pr...
Bridging over river Bhagirathi- a Handbook cum Coffee Table Book by Rajesh Pr...Bridging over river Bhagirathi- a Handbook cum Coffee Table Book by Rajesh Pr...
Bridging over river Bhagirathi- a Handbook cum Coffee Table Book by Rajesh Pr...Rajesh Prasad
 
PPT on execution of 680 m long tunnel ensuring safety of the adjoining rail t...
PPT on execution of 680 m long tunnel ensuring safety of the adjoining rail t...PPT on execution of 680 m long tunnel ensuring safety of the adjoining rail t...
PPT on execution of 680 m long tunnel ensuring safety of the adjoining rail t...Rajesh Prasad
 
Execution of 680 m long tunnel ensuring safety of the adjoining rail tunnel w...
Execution of 680 m long tunnel ensuring safety of the adjoining rail tunnel w...Execution of 680 m long tunnel ensuring safety of the adjoining rail tunnel w...
Execution of 680 m long tunnel ensuring safety of the adjoining rail tunnel w...Rajesh Prasad
 

Más de Rajesh Prasad (20)

20th_Safety_Convention dt 11.09.2023.pdf
20th_Safety_Convention dt 11.09.2023.pdf20th_Safety_Convention dt 11.09.2023.pdf
20th_Safety_Convention dt 11.09.2023.pdf
 
Cyber Security Action Plan of RVNL
Cyber Security Action Plan of RVNLCyber Security Action Plan of RVNL
Cyber Security Action Plan of RVNL
 
RVNL Corporate Governance 26.11.2021
RVNL Corporate Governance 26.11.2021 RVNL Corporate Governance 26.11.2021
RVNL Corporate Governance 26.11.2021
 
Management Development programme - 01.07.2022 .pdf
Management Development programme - 01.07.2022 .pdfManagement Development programme - 01.07.2022 .pdf
Management Development programme - 01.07.2022 .pdf
 
New normal and beyond –RVNL Perspective dt 27.10.21
New normal and beyond –RVNL Perspective dt 27.10.21New normal and beyond –RVNL Perspective dt 27.10.21
New normal and beyond –RVNL Perspective dt 27.10.21
 
"Protocol for safe execution of Infra Projects" by Rajesh Prasad, Director Op...
"Protocol for safe execution of Infra Projects" by Rajesh Prasad, Director Op..."Protocol for safe execution of Infra Projects" by Rajesh Prasad, Director Op...
"Protocol for safe execution of Infra Projects" by Rajesh Prasad, Director Op...
 
Rebuilding of Railway Infrastructures during the present crisis by Rajesh Prasad
Rebuilding of Railway Infrastructures during the present crisis by Rajesh PrasadRebuilding of Railway Infrastructures during the present crisis by Rajesh Prasad
Rebuilding of Railway Infrastructures during the present crisis by Rajesh Prasad
 
Motivation and Bounce Back after the crisis....
Motivation and Bounce Back after the crisis....Motivation and Bounce Back after the crisis....
Motivation and Bounce Back after the crisis....
 
Revolution 2020, Crisis.. Change....
Revolution 2020, Crisis.. Change....Revolution 2020, Crisis.. Change....
Revolution 2020, Crisis.. Change....
 
A Coffee Table Book cum handbook on Cable Stayed Bridge with the 4 approaches...
A Coffee Table Book cum handbook on Cable Stayed Bridge with the 4 approaches...A Coffee Table Book cum handbook on Cable Stayed Bridge with the 4 approaches...
A Coffee Table Book cum handbook on Cable Stayed Bridge with the 4 approaches...
 
Engineering for Change... A keynote address on Engineers day- 15th Sep 2019
Engineering for Change... A keynote address on Engineers day- 15th Sep 2019Engineering for Change... A keynote address on Engineers day- 15th Sep 2019
Engineering for Change... A keynote address on Engineers day- 15th Sep 2019
 
The RVNL Story 2019
The RVNL Story 2019The RVNL Story 2019
The RVNL Story 2019
 
PROTOCOL FOR SAFE EXECUTION OF INFRA PROJECTS BY RAJESH PRASAD ED RVNL DT 04...
PROTOCOL FOR SAFE EXECUTION OF INFRA PROJECTS  BY RAJESH PRASAD ED RVNL DT 04...PROTOCOL FOR SAFE EXECUTION OF INFRA PROJECTS  BY RAJESH PRASAD ED RVNL DT 04...
PROTOCOL FOR SAFE EXECUTION OF INFRA PROJECTS BY RAJESH PRASAD ED RVNL DT 04...
 
Uses of special kind of technologies for implementation of special kind of st...
Uses of special kind of technologies for implementation of special kind of st...Uses of special kind of technologies for implementation of special kind of st...
Uses of special kind of technologies for implementation of special kind of st...
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18
 
Construction Safety Protocol PPT by Rajesh Prasad, ED RVNL at Lucknow on 26.0...
Construction Safety Protocol PPT by Rajesh Prasad, ED RVNL at Lucknow on 26.0...Construction Safety Protocol PPT by Rajesh Prasad, ED RVNL at Lucknow on 26.0...
Construction Safety Protocol PPT by Rajesh Prasad, ED RVNL at Lucknow on 26.0...
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18
 
Bridging over river Bhagirathi- a Handbook cum Coffee Table Book by Rajesh Pr...
Bridging over river Bhagirathi- a Handbook cum Coffee Table Book by Rajesh Pr...Bridging over river Bhagirathi- a Handbook cum Coffee Table Book by Rajesh Pr...
Bridging over river Bhagirathi- a Handbook cum Coffee Table Book by Rajesh Pr...
 
PPT on execution of 680 m long tunnel ensuring safety of the adjoining rail t...
PPT on execution of 680 m long tunnel ensuring safety of the adjoining rail t...PPT on execution of 680 m long tunnel ensuring safety of the adjoining rail t...
PPT on execution of 680 m long tunnel ensuring safety of the adjoining rail t...
 
Execution of 680 m long tunnel ensuring safety of the adjoining rail tunnel w...
Execution of 680 m long tunnel ensuring safety of the adjoining rail tunnel w...Execution of 680 m long tunnel ensuring safety of the adjoining rail tunnel w...
Execution of 680 m long tunnel ensuring safety of the adjoining rail tunnel w...
 

Último

CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
An introduction to Semiconductor and its types.pptx
An introduction to Semiconductor and its types.pptxAn introduction to Semiconductor and its types.pptx
An introduction to Semiconductor and its types.pptxPurva Nikam
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...121011101441
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .Satyam Kumar
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncssuser2ae721
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEroselinkalist12
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 

Último (20)

CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
An introduction to Semiconductor and its types.pptx
An introduction to Semiconductor and its types.pptxAn introduction to Semiconductor and its types.pptx
An introduction to Semiconductor and its types.pptx
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 

Infrastructures in City of Kolkata & West Bengal