1. RESUME
RRRAAAKKKEEESSSHHH SSSIIINNNGGGHHH BBBHHHAAADDDOOORRRIIIYYYAAA
11.2 Years Experience in Power Plant Operation, Commissioning, Erection &
Maintenance. B.E. Mechanical, BOE, Best Bengal
rakeshsinghbhadoriya@gmail.com
Mobile – 9204750901
Address
Flat No.105 (Tata
Power), Garden
City, Luby Circular
Road, Besides City
Centre, Bartand,
Dhanbad
(Jharkhand)-826001
Personal Data
Father Name:
Shri S.P.S.Bhadoriya
Date of Birth:
05/07/1980
Sex: Male
Marital Status
Married
Nationality: Indian
Languages
Known:
English and Hindi
Synopsis
B.E. Mechanical having extensive experience in Operation,
Commissioning, and Erection & Maintenance of coal based Thermal Power
Plant. Self-starter, who applies individual initiative to get the job done,
Enjoy working in a demanding condition.
Skills
Technical: Operation, commissioning, erection activities of Pulverized
fuel and CFBC Boiler &Turbine and their auxiliaries. Plant Performance,
energy losses, efficiency calculations, water treatment analysis and Plant
troubleshooting.
Management: Handling site activities and preparing report day-to-day
progress Follow up the material availability as shipping list and mobilization
of agencies involving in project. Estimation of materials, planning &
arranging for resources like equipment’s, manpower etc. for the thermal
power plant. Coordinate and follow-up fuel management. Preparing shut-
down planning and implementation. Preparation of daily& monthly reports.
Coordination with the engineers and planning for implementation.
Power Plant O&M: With the Pulverized fuel and CFBC Cold, warm & hot
start-up of boiler& turbine through DCS, Synchronizing alternator, load
distribution & dispatch. Shut-down maintenance of boiler, turbine & BOPs.
Educational Qualification
B.E (Mechanical) from S.A.T.I, Vidisha (M.P.) Affiliated with R.G.P.V.
Bhopal (M.P.) in 2003 with 62.73%.
Certificate of Proficiency as BOILER OPERATION ENGINEER (Govt. Of
West Bengal, Kolkata)
2. Nov’10
To
Till date
Lead Engineer (Mechanical Maintenance), Maithon Power Limited- The
Tata Power Company Limited. Maithon Dhanbad (Jharkhand)
2X1700 TPH PF Boilers, M/S BHEL
2X525 MW TG, M/S BHEL
Maintenance Responsibilities:-
Handling the manpower, training to associates/operators, co–ordination and reducing losses to
achieve maximum production target.
Achieve the departmental goals / objectives in terms of production targets, quality, cost, safety &
environment.
Ensure men, machine, material, environment safety with benchmark operating practices fromthe
industry.
As a Lead Engineer take the responsibility of site for smooth running the plant and avoid the
breakdown.
Maintained the protocols and records of schedule maintenance and shifts.
Carrying out Preventive, periodic & shutdown maintenance of rotary equipment, cone crusher, rotary
crusher, jaw crusher, coal impactor, vibro screen, magnetic separator, lobe compressor, screw
compressor, wet scraper, gear box , pumps & fans.
Schedule, Material & Manpower availability, Tools & Plant Cash flow & Liability, Site Constraints
Preparing Monthly project report and conducting Deviation Analysis with concerned persons.
Budget Cost estimation, Control & Review for achievement of Target
Conducting meetings with Clients for monthly planning to achieve target.
Responsible for Spare Planning, Manpower Engagement, Reports and Future Planning activity
involved in AOH.
Implementation of Safety Standards at site.
Condition monitoring of equipment like Valve, Fan, Mill, Lube oil system, Soot Blower.
SAP – PM module – Material Stock inspection, Defects acknowledgement & closing, creating Material
Requisition & Purchase requisition
Commissioning and Operation:
Cold, warm and Hot light up of boiler, rolling of turbine and Synchronization loading unit maintaining
parameters with in limit. Normal shutdown of unit boiler, turbine and other auxiliary.
Avoiding tripping during house isolation of unit. Load shedding as per generation schedule in case of
emergency.
Handling emergencies like plant blackout, tripping of boiler turbine and generator and its auxiliary.
Issue and cancellation PTW (Permit to Work) system, safe isolation, personnel safety and equipment
safety.
Prepare the plant performance report for the shift/day during the shift operation logging of all the
critical parameters is being done at all location by respective operators and engineers.
Ensuring proper utilization of resources such as water (raw water & DM water), air (instrument air &
service air), auxiliary power, coal and oil (HFO, LDO & Plant Lubricants) etc & reducing their
wastage.
Air tightening test, drainable and non-drainable hydro test of boiler (1950 TPH) of unit #1 and
unit#2.Air tightening test, rain test and kerosene test of ESP of unit #1 and unit #2.
Successfully commissioning of boiler auxiliary like F.D. fan, I.D. fan, P.A. fan there oil skid, scanner
air fan and seal air fan.
STG lube oil flushing of lube oil, lifting oil and control oil line. Acid pickling and flushing of BFP lube oil
line .Hydro test of condensate and feed lines.
Boiler light up for chemical cleaning through EDTA process, detergent flushing of boiler tubes, feed
line and condensate line.
.
3. FABRICATION & ERECTIONS OF PRESSURE PARTS:
Erection and Commissioning of Boilers and auxiliaries Tri Sector Air Pre Heater, Radial ID Fan,
Axial PA & FD Fan, Coal Milling System, Coal Piping and Ducting system as per approved
drawing and FQAP.
Erection & Commissioning of Pulverized fuel Boilers and auxiliaries from client side &
coordinating with M/s BHEL , ThyssenKrupp, Chinese specialists and erection vendors for timely
and proper erection of boilers as per FQPs.
Erection of pressure parts attachments like backstay, skin casing, seal box, leveler guide etc
Erection & Fabrication of Pressure & Non pressure parts.
Erection & Fabrication of IBR & Non IBR parts.
Involved in Commissioning activities like Refractory dry Out, Alkali Boil Out, Hydro Test, and
steam blowing.
PERFORMANCE MONITIORING & MIS
Daily review of progress& status, reporting for the day generation
Involve in the Performance monitoring of 2*525 MW units. Its include daily monitoring of unit Heat
Rate, aux power consumption, Sp oil consumption & other performance parameter. Reduction of
variable cost through performance improvement.
Preparing the Daily / Monthly MIS report for Senior Management.
Preparing monthly performance report of the station.
Preparation of Annual Business operating plan for the station.
Preparation of Capex/Opex plan for the station as per CERC Guideline.
Preparation of details of ORT/PRT meeting. Reviewing the status of crit ical projects of the station.
Preparing the Board presentation on station performance.
To Plan, control & supervise operational & maintenance tasks for a safe, reliable and smooth plant
operation, start up, shutdown and emergency conditions.
Liaison with other departments for related activities in the Plant.
Carrying out preventive maintenance jobs, attending breakdowns, carrying out planned jobs during
Plant Shutdowns.
Co-Ordination between field and control room to optimize plant Performance.
To analyze repeated breakdowns, take corrective actions & preventive action to avoid repetition of
breakdowns.
FUEL MNAGEMENT:
Liasioning with BCCL/CCL for procurement of coal for Maithon Power Plant
Transportation Management – Managing the transportation work to lift the 3.5 Million MT coal from
Rail and Road from various Mines of BCCL, CCL & TATA Steel.
Co-ordination with BCCL & CCL officials to timely issue the Release orders as per FSA and to ensure
the good quality coal dispatch from mines.
Co-ordination with Transporter to ensure the vehicles availability for lifting of coal from different
mines of BCCL and CCL
Co-ordination with Railway officials for timely Rake Placement for dispatch as per indent
Timely Rake Unloading to avoid penalties & Evacuation and shifting from Railway Siding to plant.
Presenting various MIS to management for clear view and communication and follow up to avoid any
deviation in plan as per ACQ
Billing & documentation for Rake supply, penalty calculation of Overload / under load, late supply,
demurrages charges if any.
Transportation billing and Payment
Vendor Management as per requirement of Job, Timely placement of PR and follow up for release of
PO to execute the work and vendor billing.
Formulating coal procurement rolling plan on monthly basis in coordination with O&M. Review of
4. Career History
May’08
To
Oct’10
e Engineer-Mechanical (Thermal Power Plant) in Aditya Cement Works. (A Unit of
Ultratech Cement Ltd., Aditya Birla Group (Chittorgarh (Raj.)
2X25 MW TG, M/S HTC, China.
2X115 TPH CFBC Boilers, M/S ThyssenKrupp Ind. Pvt. Ltd.
1X23 MW TG, M/S BHEL.
1X105 TPH AFBC Boilers, M/s BHEL.
Jan’04
To
May’08
e Engineer-Mechanical (Thermal Power Plant) in Aditya Cement Works. (A Unit of
Ultratech Cement Ltd., Aditya Birla Group (Chittorgarh (Raj.)
2X25 MW TG, M/S HTC, China.
2X115 TPH CFBC Boilers, M/S ThyssenKrupp Ind. Pvt. Ltd.
1X23 MW TG, M/S BHEL.
1X105 TPH AFBC Boilers, M/s BHEL.
Computer skills
M.S Office (MS-Word. Power point, Excel)
Knowledge of SAP
Strengths:
Excellent Communication Skills.
Proficient in managing various Project operations as per the set standards and
experience of developing standard operating procedures for operational excellence
An effective communicator and team player with strong analytical, logical & problem
solving abilities.
Flexibility to work hard for long hours and patient enough until the goal I accomplish.
Knowledge of Working on SAP system.
Declaration
I hereby declare that all the information mentioned above is true to the best of my knowledge.
Place:
Yours faithfully
Date:10.03.2016
Rakesh Singh Bhadoriya
coal stock on daily basis and communicating same to concern department on weekly basis as to
maintain adequate coal inventory.
Proficiency in preparation of Costing of Coal as well as Logistics in Power Sector.
To ensure the Proper supply of coal to CHP as per their requirement without any failure (Average
consumption is 13500 MT/ Day).
Facilitate the signing of FSA for linkage coal allocation with CCL and BCCL.
Co-ordination with different inter department for smoothly execution of work.
Co-ordinate and plan the movement of coal through rail from various sidings to Maithon
Ensure availability of weighbridges for smooth operations.
Ensure that the contractual obligations with vendor are complied
Handle the manpower to streamline the support services
Initiate the process of GPS installation in all the vehicles
Execution GPS installation in all the vehicles for effective monitoring to avoid any pilferages