SlideShare una empresa de Scribd logo
1 de 25
Descargar para leer sin conexión
Sourcing Gurus – Advisory Briefing




                      March 2010

           www.SourcingGurus.com
           © 2010 Systems Plus Proprietary and Confidential
Agenda

  About Systems Plus
      Profiles
      Background
  Our Approach
      Sourcing Advisory
      Methodology
      Vendor Classification & Timelines
  Service Offerings




                                © 2010 Systems Plus Proprietary and Confidential   2
 About Systems Plus
            Background
   Our Approach
            Sourcing Advisory
            Methodology
            Vendor Classification & Timelines
   Service Offerings




    www.SourcingGurus.com
    © 2010 Systems Plus Proprietary and Confidential
Systems Plus Solutions – Background

  20 years of transforming global enterprises using Technology
  Experience in 20+ countries, multi-lingual, multi time zone environment
  Team of 300+ resources and growing
  ISO Certified Processes (ISO 9001:2008)
  Key practice areas:
     Sourcing Advisory (services rendered under “Sourcing Gurus” brand)
     Technology Solutions
     Oracle E-Business                                                              Oracle E-
                                                                                     Business
                                                                                                  Sourcing
                                                                                                  Advisory

     Support & Helpdesk

                                                                                                    24/7
                                                                                    Technology
                                                                                                 Helpdesk &
                                                                                     Solutions
                                                                                                  Support




                                 © 2010 Systems Plus Proprietary and Confidential                             4
Services Portfolio

 Oracle E-Business                    Business Consulting                                     Technology Solutions
    Oracle E-Biz Implementation      Sourcing Advisory                                        Application Development and
    Process Manufacturing             Vendor Selection                                        Maintenance
    Financials, HRMS                  VMO / PMO setup and sustain                            Intranet Portals and Share
                                                                                                point Implementation
    Order Management                  Managed Services Scorecard
                                                                                               Legacy system migration
    Advance Pricing, Workflow,
     EDI/E-Com Gateway                Governance, Risk & Compliance                            Offshore Project Support
                                       IT Audit & Health Check                                 Services
    Oracle On Demand Support
                                       IT Compliance: Implementations                         Staff Augmentation Services
    CEMLI development &
     customization                       of COSO/COBIT 4.0 compliant IT                        Product Development
                                         Operating Model                                       EAI
    DBA Services: DB Audit,
     Remote Server Management          SOX & ITIL Framework                                   MS.Net, VB 6, J2EE
    Oracle DBI & BIEE                Financial Services / Alternative                         SQL Server, MS Access, MS
    Forms / Reports / Discoverer /      Investments                                            Office
     PL/SQL                            Operational processing                                 Pocket PC, Win CE,
                                           expertise                                           Hospital Management System
                                       Master data management
                                       Operating model definition /
                                           process standardization




                                           © 2010 Systems Plus Proprietary and Confidential                                   5
Geographies




                            Canada
                                                                              Poland
                               Fort                                             Belg/
                               Atk                           UK                 Holland               Russia
                          Los Angeles Chicago         UK              Germany
                                                                             Romania
                  San          US                                                        Turkey
                                                           Portugal Spain
                                       US                                       Greece
                  Diego
                              Dallas                                                                                                             Japan
                                                                                                                       China            Korea
                                                                                              Gulf    India                      Hong
                                    Mexico                                                                     India             Kong
                                                                                                     India                 Thailand
                                                                                                                                        Taiwan
                                                                                                                           Malaysia

                                                                                                                                  Singapore


                                                                                                                                          Australia


                                                                                                                                                         New
                                                                                                                                                         Zealand

  Offices   Partners         Customers




                                                © 2010 Systems Plus Proprietary and Confidential                                                                   6
Some of our Clients




   Lilavati Hospital




                       © 2010 Systems Plus Proprietary and Confidential   7
   About Systems Plus
            Background

 Our Approach
            Sourcing Advisory
            Methodology
            Vendor Classification & Timelines
   Service Offerings




    www.SourcingGurus.com
    © 2010 Systems Plus Proprietary and Confidential
Systems Plus Advisory

   SourcingGurus is a boutique advisory firm offering end to end consulting for
    IT, BPO and Infrastructure outsourcing initiatives. Our advisory service
    provides a comprehensive understanding of the client’s IT sourcing options

   SourcingGurus consults with mid-sized (US $ 1 – 5 bn) companies on their
    outsourcing needs. We have domain expertise in the Retail and
    Manufacturing verticals

   SourcingGurus succeeds when clients save 20 – 40 % of outsourcing costs
    with an appropriately matched sourcing partner



                                                Vision
                    The leading India based sourcing advisor,
      preferred by clients for delivering outstanding value at minimum cost




                                   © 2010 Systems Plus Proprietary and Confidential   9
Why a Sourcing Advisor?

  Advisors bring in value through unbiased advice
  92.6% of clients surveyed say - “An advisor would have improved their outsourcing
    initiative”
  Over 2/3rd of clients say they will use an advisor for their next outsourcing initiative
   91.8% of clients surveyed are satisfied with their outsourcing advisor
                                                                                       Source: 2008 Black Book of Outsourcing




  Advisors have demonstrated their value and contribution to clients in both
  first time and repeat outsourcing engagements.

  They bring insight, objectivity and local knowledge to enhance results for
  successful outsourcing initiatives


                                    © 2010 Systems Plus Proprietary and Confidential                                            10
Typical Sourcing Lifecycle

     1   Sourcing Strategy                                     2             Vendor Selection


           Sourcing
            Value               Strategy                              Requirement                  Vendor
         Assessment           Formulation                              Definition               Evaluation &
         & Sourcing                                                     RFI/RFP                   Selection
          Readiness




                                                                                                     Due
          Contract           Steady State                                  Transition to         Diligence &
          Review /           Optimization                                     Vendor             Negotiation
          Resource



     4   Relationship Management                                      3        Transition


                                     Outsourcing Lifecycle


                                    © 2010 Systems Plus Proprietary and Confidential                           11
Methodology: Vendor Selection
            Sourcing Readiness                Data Collection & RFP Build                                            Scope Workshop                         RFP Finalization
           Kick off and Readiness          Data Collection       RFP Creation                    Validate Scope and Shortlist Vendor                         RFP Finalization
           Assessment                      and Analysis
Process




                                                                                                               Validate Scope and review RFP                  Finalize RFP

                                                                                                        TIER                       TIER
                                                                                                          1         Giant            1
                                                                                                                                          Contenders



           Outsourcing preparation and      Data collection,      Build RFP &
                                                                                                                                   TIER
           gap identification               validation and        Annexure                               TIER
                                                                                                           2                         2
                                                                                                                                          Global -
                                                                                                                   Pure Play              India arm
                                            Analysis
                                                                                                                                                               Vendor NDA
                                                                                                               Vendor shortlist: Finance and IT


          Readiness assessment          Onsite support       RFP creation                     Scope workshop to                                    Finalize and approve RFP
              People, Process,           for data              to start with                       Validate final information to be                   with OSI team and Legal
                Strategy checkpoints      collection phase      data analysis                        released in RFP                                    Modify RFP, if required
                                         Capture key          Create draft
Details




          Outsourcing Steering                                                                     Final vendor short list for Financial             Establish contact with
           Committee formation            data                  RFP for                              and IT scope                                       vendors
          Briefing on vendor            Offshore data         Financial and
                                                                                                                                                          Sign NDA with
           selection process              validation            IT scope
                                                                                                                                                            vendors for RFP
          Data collection templates     Analyze and                                                                                                       release
           introduction                   model data
          Plan for Internal Setup
           and Sustain (Client side
           activities)


                                                                 © 2010 Systems Plus Proprietary and Confidential                                                                  12
Methodology: Vendor Selection
                              RFP Management                                                                            RFP Analysis
           RFP Release, RFP Clarifications and final Proposals                                  Quick Elimination                      Detailed Evaluation
Process




                   Vendor          Clarification/       Vendor                                   Elimination workshop                  Detailed Ratings of vendor response
                   contacts        Additional data      Proposal




          Release of RFP to shortlisted vendors                            Determine elimination criteria to quickly        The short listed vendors will go through
          RFP clarifications                                                evaluate knockouts and strikeouts from            detailed response rating & analysis
          Release RFP response / additional data to vendors                 vendor proposals                                  process prior to vendor visit
                                                                            Elimination Workshop is conducted to             Analysis is carried out for vendors based
Details




           Manage all communication with vendors
                                                                             shortlist vendors to visit                        on
                                                                            Checkpoint for vendors selected that                Over all response
                                                                             are common in both RFPs                             Best fit (Technology and culture)
                                                                                                                                 Financials




                                                                   © 2010 Systems Plus Proprietary and Confidential                                                          13
Methodology: Vendor Selection
               Vendor Visits                    Negotiation                                  Transition Support             Relationship Management
           Vendor Visits &              Final walk through &                              Transition planning               Sustain outsourcing relationship
           Re-evaluation                negotiation
Process




            Detailed proposal and          Due diligence and negotiation                      Transition oversight,           Relationship Management Oversight
            vendor team evaluation                                                            checklist based approach




          Vendor facility visits for   Vendor performs onsite due                Review of transition plan            Participation in quarterly
           proposal defense              diligence before final proposal           Transition governance setup           governance meeting with vendor
          Evaluate                     Best and final offers                     Transition assessment and             Review SLAs
Details




             Delivery team             Negotiation with selected                  analysis                              Issues
             Solution assumptions       vendors                                   Transition checkpoints for various    Escalations
             Account executives        Finalize draft MSA/SOW                     transition phases                    Relationship counselor and liaison
             Process & Facility                                                       Shadow                            between client and vendor
             Management                                                               Reverse shadow
               attention
          Finalize qualified vendors
          Revised bid , if required



                                                                © 2010 Systems Plus Proprietary and Confidential                                                  14
   About Systems Plus
            Profiles
            Background

 Our Approach
            Sourcing Advisory
            Methodology
            Vendor Classification & Timelines
   Service Offerings




    www.SourcingGurus.com
    © 2010 Systems Plus Proprietary and Confidential
Vendor Classification – IT

   TIER                        TIER                                          TIER                        TIER     Global -
     1       Giant               1    Contenders                               2            Pure Play      2
                                                                                                                  India arm

   Leading Indian offshore     Vendors with significant                      Mid sized companies          Mature Model –
   providers                   Indian delivery teams &                       with good delivery          building synergies with
   Equally strong in IT, BPO   global presence                               capability                  local operations
   and Infrastructure          Building competencies                         Traditionally stronger in    Global vendors with
   offerings                   in Integrated BPO and                         Application                 good Indian presence
   Competing with Global       Infrastructure offerings                      Development and             Have acquired sizeable
   players on equal footing                                                  Support                     firms to leverage
                                Revenue                                                                 offshore model
    Revenue                      $500 mn- $3 bn                            Revenue
     $4 bn +                   Employees                                      $200 mn -               Sales - India in infancy
    Employees                     ~30,000 +                                    $500mn                  India Employees
       50,000 +                                                             Employees                     15,000 +
                                                                                ~ 5,000 +




                                                                                        Hexaware                Accenture
                                    Cognizant
           Infosys                                                                        iGate                 Capgemini
                                       HCL
             TCS                                                                         Mastek                    CSC
                                 Mahindra-Satyam
            Wipro                                                                       Mindtree                 HP (EDS)
                                      Patni
                                                                                         Syntel                    IBM



                                             © 2010 Systems Plus Proprietary and Confidential                                        16
Vendor Classification – BPO

     TIER                         TIER                                            TIER
       1     Pure Play              1         ITO & BPO                             2      Pure Play
                                               Vendors
     Proven global delivery        Has a mature service                           Gained global exposure
     track record, rapidly         delivery footprint in ITO                      and capabilities by
     expanding, focused on         domain, with BPO as an                         servicing their large client
     providing BPO offerings       extension to their service                     accounts. They are strong
     for different domains         offerings. Have setup                          in niche area and compete
                                   delivery centers in India as                   with all other players
     Revenue
                                   well as global for more
                                                                                   Revenue
          $500 mn +               competitiveness in the
                                   BPO service offerings                               $50 mn – $500 mn
     Employees
                                      Revenue                                     Employees
          15K +
                                            $ 500 mn                                  ~<10K
                                      Employees
                                            ~12K +



                                           Cognizant
                                                                                            24/7
               Aegis                       HCL Tech
                                                                                         Cambridge
            FirstSource                   IBM Daksh
                                                                                            EXL
              Genpact                       Infosys
                                                                                           HTMT
             Intelenet                 Mahindra Satyam
                                                                                          Minacs
                WNS                           TCS
                                                                                            Sitel
                                            Wipro




                               © 2010 Systems Plus Proprietary and Confidential                                  17
Vendor Selection Process – IT
                                                                                                                                                      3 Months             3 Years




          Readiness                          Scope             RFP                RFP     Vendor                        Due Diligence    Letter of
          Checklist                         Workshop         Release           Submission visits                           begins         intent

 Sourcing Readiness        Data Collection,RFP Build      RFP Management                    Vendor Selection                    Negotiation          Transition   Relationship Management

              Sourcing        Data         RFP            RFP         RFP                   RFP             Vendor              Due                               Steady State       Contract
Kickoff                                                                                                                                 Finalization Transition
              Readiness     Gathering    Creation        Release   Management             Analysis           Visits         Diligence                             Optimization        Review

Internal                    Delivery model, &          RFP release and                 Elimination          Proposal         Pricing & negotiation / Transition       Performance
Preparation                 finalize RFP vendors       clarification                   workshop             Defense          Vendor                                   monitoring & Vendor
                                                                                                                             recommendation                           management



                Giants




              Contenders

                                                                8 - 10                                     ~4-5                                2                  1

               Pure Play




               Global -
               India arm                                                     Filter                                 Filter                    Filter
                                                                               1                                      2                         3
      - Milestone                                                          Elimination                            Vendor visits          Contract negotiation

                                                                         © 2010 Systems Plus Proprietary and Confidential                                                                       18
Timelines – IT
Timeline


                                                                                           Vendor Selection                                                  Transition                    RM

                                                                Dec         Jan            Feb               Mar                 Apr             May   Jun          Jul         Aug   Y1   Y2   Y3

                                Sourcing Readiness                        Readiness Assessment

                                Data Collection & RFP Build
                                                                                       Build Scope and Scope Workshop

                                RFP Management                         RFP Release                           RFP Submission
Core Phase




                                RFP Analysis                                                                                 Elimination Workshop

                                Vendor Visits                                                                                          Vendor Visit

                                Negotiation                                                                                                                              LOI

                                Transition Support

                                Relationship Management


                                Outsourcing Remediation
Internal Setup and Sustain




                                Client side project management

                                PMO Setup

                                VMO Setup

                                Process Harmonization

                                Transition Preparation and Set up

                                Finalize SLA

                                Finalize Engagement Governance

                                VMO ,Governance and Process Support (Ongoing)


                                                                                            © 2010 Systems Plus Proprietary and Confidential                                                    19
Client List – Sourcing Advisory
                                                                                             Vendor Selection                   Relationship Management
  Client      Scope Description           Sourcing Strategy                Vendor Evaluation and           Due diligence    Contract Review /    Steady State
                                                                                Selection                 and Negotiation       Resource         Optimization
            Application             Sourcing value                      Vendor evaluation and          SOW              Alternate vendor   Incumbent
            Development and           assessment                           selection                      MSA review        strategy            vendor
            Maintenance (ADM)        Strategy formulation                                                                  Captive unit        performance
           Application Portfolio    Requirement definition                                                                 Business Case       improvement
            Analysis                         RFI/ RFP                                                                                          Process Audit


            ADM Outsourcing         Strategy formulation                RFP response analysis          SOW                                   VMO Back
           Infra Outsourcing        Requirement definition              Vendor visits                  MSA review                              office
           Competency Centers       RFP Management                      Recommendations
                   QA
                   DW/BI
            ADM Outsourcing         Strategy formulation                RFP response analysis          SOW               Negotiation &
           BPO - Finance &          Requirement definition              Vendor visits                  MSA review          Contracts
            Accounting (F&A)                 RFP                         Recommendations


            ADM Outsourcing         Strategy formulation                RFP response analysis          SOW               Negotiation &     Vendor
            Helpdesk Outsourcing    Requirement definition              Vendor visits                  MSA review          Contracts         management
           VMO                              RFI / RFP                   Recommendations                                                       office Setup
           PMO                      Data collection and                                                                                       Project
                                      analysis                                                                                                   management
                                                                                                                                                 office Setup
            ADM Outsourcing         Requirement definition              Vendor evaluation and
                                     RFP Management                       selection
                                                                                   RFP analysis
                                                                                   Vendor visits
            F&A outsourcing RFI –   Scope build                         Vendor research &
            APAC                     RFI process finalization             shortlist
            SAP resource            RFI creation                        RFI response analysis
            augmentation RFI –       RFI Management                      Recommendations
            Europe


                                                    © 2010 Systems Plus Proprietary and Confidential                                                            20
Our Differentiators

  We leverage knowledge of being both an IT vendor and a client in our advisory services
       Over 20 years of experience as an India based IT solutions provider
       Vendor selection process formulated by the CEO based on his prior CIO experience.( as an
        outsourced CIO of OIS, a Santander group company, and ex-outsourced CIO of Frito-Lay
        Asia Pacific )
       A highly knowledgeable team of consultants and domain specialists to support the
        processes
  Advisory services based out of India
       Insights into the Indian market scenario and evolving vendor capabilities
       Provide valuable perspective in the selection process through our understanding of
        cultural nuances and regional diversity
       Efficient scheduling and coordination of logistics of vendors visits
       We are close to the clients through our offices in the USA and UK




                                        © 2010 Systems Plus Proprietary and Confidential           21
Advisory value adds

  Vendor Selection process with advantages
      Advice and direction from the starting of process
      Relationship management oversight (3 years ongoing during contract period included)
      Vendor SWOT of India delivery operations
      Cost benchmarking
      Fast tracking of selection if required

     Experience as Tier 3 IT software vendor provides
      Direct knowledge of market conditions
      Easy access to all vendors (global and Indian)
      Immediate information of skill availability – zero lag


     Acclimatizing client team
      Coordination of all India travel, scheduling and vendors visits
      Sensitizing to local culture and norms
      Establish and sustain outsourcing governance process


                                       © 2010 Systems Plus Proprietary and Confidential      22
   About Systems Plus
            Profiles
            Background
   Our Approach
            Sourcing Advisory
            Methodology
            Vendor Classification & Timelines

 Service Offerings




    www.SourcingGurus.com
    © 2010 Systems Plus Proprietary and Confidential
Service Offerings


      Sourcing Readiness Assessment and Strategy Formulation

      • Internal preparedness and reorganization

      Vendor Evaluation and Selection through a RFI / RFP process


      Steady State Optimization and Relationship Management

      • Establish PMO / VMO
      • Provide Back Office support for VMO

      Contract Review and Resourcing Alternatives


      Relationship Management Scorecard

      • Web based tool using the Balance Scorecard framework



                                  © 2010 Systems Plus Proprietary and Confidential   24
Thank You




www.SourcingGurus.com
© 2010 Systems Plus Proprietary and Confidential

Más contenido relacionado

Destacado

Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTEverything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTExpeed Software
 
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsPixeldarts
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthThinkNow
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfmarketingartwork
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024Neil Kimberley
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)contently
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024Albert Qian
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsKurio // The Social Media Age(ncy)
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Search Engine Journal
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summarySpeakerHub
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next Tessa Mero
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentLily Ray
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best PracticesVit Horky
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project managementMindGenius
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...RachelPearson36
 
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Applitools
 

Destacado (20)

Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTEverything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPT
 
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage Engineerings
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental Health
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
 
Skeleton Culture Code
Skeleton Culture CodeSkeleton Culture Code
Skeleton Culture Code
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
 

Sourcing Gurus Advisory Briefing Ver 1.0

  • 1. Sourcing Gurus – Advisory Briefing March 2010 www.SourcingGurus.com © 2010 Systems Plus Proprietary and Confidential
  • 2. Agenda  About Systems Plus  Profiles  Background  Our Approach  Sourcing Advisory  Methodology  Vendor Classification & Timelines  Service Offerings © 2010 Systems Plus Proprietary and Confidential 2
  • 3.  About Systems Plus  Background  Our Approach  Sourcing Advisory  Methodology  Vendor Classification & Timelines  Service Offerings www.SourcingGurus.com © 2010 Systems Plus Proprietary and Confidential
  • 4. Systems Plus Solutions – Background 20 years of transforming global enterprises using Technology Experience in 20+ countries, multi-lingual, multi time zone environment Team of 300+ resources and growing ISO Certified Processes (ISO 9001:2008) Key practice areas: Sourcing Advisory (services rendered under “Sourcing Gurus” brand) Technology Solutions Oracle E-Business Oracle E- Business Sourcing Advisory Support & Helpdesk 24/7 Technology Helpdesk & Solutions Support © 2010 Systems Plus Proprietary and Confidential 4
  • 5. Services Portfolio Oracle E-Business Business Consulting Technology Solutions  Oracle E-Biz Implementation Sourcing Advisory  Application Development and  Process Manufacturing  Vendor Selection Maintenance  Financials, HRMS  VMO / PMO setup and sustain  Intranet Portals and Share point Implementation  Order Management  Managed Services Scorecard  Legacy system migration  Advance Pricing, Workflow, EDI/E-Com Gateway Governance, Risk & Compliance  Offshore Project Support  IT Audit & Health Check Services  Oracle On Demand Support  IT Compliance: Implementations  Staff Augmentation Services  CEMLI development & customization of COSO/COBIT 4.0 compliant IT  Product Development Operating Model  EAI  DBA Services: DB Audit, Remote Server Management  SOX & ITIL Framework  MS.Net, VB 6, J2EE  Oracle DBI & BIEE Financial Services / Alternative  SQL Server, MS Access, MS  Forms / Reports / Discoverer / Investments Office PL/SQL  Operational processing  Pocket PC, Win CE, expertise  Hospital Management System  Master data management  Operating model definition / process standardization © 2010 Systems Plus Proprietary and Confidential 5
  • 6. Geographies Canada Poland Fort Belg/ Atk UK Holland Russia Los Angeles Chicago UK Germany Romania San US Turkey Portugal Spain US Greece Diego Dallas Japan China Korea Gulf India Hong Mexico India Kong India Thailand Taiwan Malaysia Singapore Australia New Zealand Offices Partners Customers © 2010 Systems Plus Proprietary and Confidential 6
  • 7. Some of our Clients Lilavati Hospital © 2010 Systems Plus Proprietary and Confidential 7
  • 8. About Systems Plus  Background  Our Approach  Sourcing Advisory  Methodology  Vendor Classification & Timelines  Service Offerings www.SourcingGurus.com © 2010 Systems Plus Proprietary and Confidential
  • 9. Systems Plus Advisory  SourcingGurus is a boutique advisory firm offering end to end consulting for IT, BPO and Infrastructure outsourcing initiatives. Our advisory service provides a comprehensive understanding of the client’s IT sourcing options  SourcingGurus consults with mid-sized (US $ 1 – 5 bn) companies on their outsourcing needs. We have domain expertise in the Retail and Manufacturing verticals  SourcingGurus succeeds when clients save 20 – 40 % of outsourcing costs with an appropriately matched sourcing partner Vision The leading India based sourcing advisor, preferred by clients for delivering outstanding value at minimum cost © 2010 Systems Plus Proprietary and Confidential 9
  • 10. Why a Sourcing Advisor? Advisors bring in value through unbiased advice 92.6% of clients surveyed say - “An advisor would have improved their outsourcing initiative” Over 2/3rd of clients say they will use an advisor for their next outsourcing initiative  91.8% of clients surveyed are satisfied with their outsourcing advisor Source: 2008 Black Book of Outsourcing Advisors have demonstrated their value and contribution to clients in both first time and repeat outsourcing engagements. They bring insight, objectivity and local knowledge to enhance results for successful outsourcing initiatives © 2010 Systems Plus Proprietary and Confidential 10
  • 11. Typical Sourcing Lifecycle 1 Sourcing Strategy 2 Vendor Selection Sourcing Value Strategy Requirement Vendor Assessment Formulation Definition Evaluation & & Sourcing RFI/RFP Selection Readiness Due Contract Steady State Transition to Diligence & Review / Optimization Vendor Negotiation Resource 4 Relationship Management 3 Transition Outsourcing Lifecycle © 2010 Systems Plus Proprietary and Confidential 11
  • 12. Methodology: Vendor Selection Sourcing Readiness Data Collection & RFP Build Scope Workshop RFP Finalization Kick off and Readiness Data Collection RFP Creation Validate Scope and Shortlist Vendor RFP Finalization Assessment and Analysis Process Validate Scope and review RFP Finalize RFP TIER TIER 1 Giant 1 Contenders Outsourcing preparation and Data collection, Build RFP & TIER gap identification validation and Annexure TIER 2 2 Global - Pure Play India arm Analysis Vendor NDA Vendor shortlist: Finance and IT Readiness assessment Onsite support RFP creation Scope workshop to Finalize and approve RFP People, Process, for data to start with Validate final information to be with OSI team and Legal Strategy checkpoints collection phase data analysis released in RFP  Modify RFP, if required Capture key Create draft Details Outsourcing Steering Final vendor short list for Financial Establish contact with Committee formation data RFP for and IT scope vendors Briefing on vendor Offshore data Financial and Sign NDA with selection process validation IT scope vendors for RFP Data collection templates Analyze and release introduction model data Plan for Internal Setup and Sustain (Client side activities) © 2010 Systems Plus Proprietary and Confidential 12
  • 13. Methodology: Vendor Selection RFP Management RFP Analysis RFP Release, RFP Clarifications and final Proposals Quick Elimination Detailed Evaluation Process Vendor Clarification/ Vendor Elimination workshop Detailed Ratings of vendor response contacts Additional data Proposal Release of RFP to shortlisted vendors Determine elimination criteria to quickly The short listed vendors will go through RFP clarifications evaluate knockouts and strikeouts from detailed response rating & analysis Release RFP response / additional data to vendors vendor proposals process prior to vendor visit Elimination Workshop is conducted to Analysis is carried out for vendors based Details  Manage all communication with vendors shortlist vendors to visit on Checkpoint for vendors selected that  Over all response are common in both RFPs  Best fit (Technology and culture)  Financials © 2010 Systems Plus Proprietary and Confidential 13
  • 14. Methodology: Vendor Selection Vendor Visits Negotiation Transition Support Relationship Management Vendor Visits & Final walk through & Transition planning Sustain outsourcing relationship Re-evaluation negotiation Process Detailed proposal and Due diligence and negotiation Transition oversight, Relationship Management Oversight vendor team evaluation checklist based approach Vendor facility visits for Vendor performs onsite due Review of transition plan Participation in quarterly proposal defense diligence before final proposal Transition governance setup governance meeting with vendor Evaluate Best and final offers Transition assessment and Review SLAs Details Delivery team Negotiation with selected analysis Issues Solution assumptions vendors Transition checkpoints for various Escalations Account executives Finalize draft MSA/SOW transition phases Relationship counselor and liaison Process & Facility Shadow between client and vendor Management Reverse shadow attention Finalize qualified vendors Revised bid , if required © 2010 Systems Plus Proprietary and Confidential 14
  • 15. About Systems Plus  Profiles  Background  Our Approach  Sourcing Advisory  Methodology  Vendor Classification & Timelines  Service Offerings www.SourcingGurus.com © 2010 Systems Plus Proprietary and Confidential
  • 16. Vendor Classification – IT TIER TIER TIER TIER Global - 1 Giant 1 Contenders 2 Pure Play 2 India arm Leading Indian offshore Vendors with significant Mid sized companies Mature Model – providers Indian delivery teams & with good delivery building synergies with Equally strong in IT, BPO global presence capability local operations and Infrastructure Building competencies Traditionally stronger in Global vendors with offerings in Integrated BPO and Application good Indian presence Competing with Global Infrastructure offerings Development and Have acquired sizeable players on equal footing Support firms to leverage  Revenue offshore model  Revenue $500 mn- $3 bn Revenue $4 bn +  Employees $200 mn - Sales - India in infancy  Employees  ~30,000 + $500mn India Employees  50,000 + Employees 15,000 + ~ 5,000 + Hexaware Accenture Cognizant Infosys iGate Capgemini HCL TCS Mastek CSC Mahindra-Satyam Wipro Mindtree HP (EDS) Patni Syntel IBM © 2010 Systems Plus Proprietary and Confidential 16
  • 17. Vendor Classification – BPO TIER TIER TIER 1 Pure Play 1 ITO & BPO 2 Pure Play Vendors Proven global delivery Has a mature service Gained global exposure track record, rapidly delivery footprint in ITO and capabilities by expanding, focused on domain, with BPO as an servicing their large client providing BPO offerings extension to their service accounts. They are strong for different domains offerings. Have setup in niche area and compete delivery centers in India as with all other players Revenue well as global for more  Revenue  $500 mn + competitiveness in the BPO service offerings  $50 mn – $500 mn Employees  Revenue  Employees  15K +  $ 500 mn  ~<10K  Employees  ~12K + Cognizant 24/7 Aegis HCL Tech Cambridge FirstSource IBM Daksh EXL Genpact Infosys HTMT Intelenet Mahindra Satyam Minacs WNS TCS Sitel Wipro © 2010 Systems Plus Proprietary and Confidential 17
  • 18. Vendor Selection Process – IT 3 Months 3 Years Readiness Scope RFP RFP Vendor Due Diligence Letter of Checklist Workshop Release Submission visits begins intent Sourcing Readiness Data Collection,RFP Build RFP Management Vendor Selection Negotiation Transition Relationship Management Sourcing Data RFP RFP RFP RFP Vendor Due Steady State Contract Kickoff Finalization Transition Readiness Gathering Creation Release Management Analysis Visits Diligence Optimization Review Internal Delivery model, & RFP release and Elimination Proposal Pricing & negotiation / Transition Performance Preparation finalize RFP vendors clarification workshop Defense Vendor monitoring & Vendor recommendation management Giants Contenders 8 - 10 ~4-5 2 1 Pure Play Global - India arm Filter Filter Filter 1 2 3 - Milestone Elimination Vendor visits Contract negotiation © 2010 Systems Plus Proprietary and Confidential 18
  • 19. Timelines – IT Timeline Vendor Selection Transition RM Dec Jan Feb Mar Apr May Jun Jul Aug Y1 Y2 Y3  Sourcing Readiness Readiness Assessment  Data Collection & RFP Build Build Scope and Scope Workshop  RFP Management RFP Release RFP Submission Core Phase  RFP Analysis Elimination Workshop  Vendor Visits Vendor Visit  Negotiation LOI  Transition Support  Relationship Management  Outsourcing Remediation Internal Setup and Sustain  Client side project management  PMO Setup  VMO Setup  Process Harmonization  Transition Preparation and Set up  Finalize SLA  Finalize Engagement Governance  VMO ,Governance and Process Support (Ongoing) © 2010 Systems Plus Proprietary and Confidential 19
  • 20. Client List – Sourcing Advisory Vendor Selection Relationship Management Client Scope Description Sourcing Strategy Vendor Evaluation and Due diligence Contract Review / Steady State Selection and Negotiation Resource Optimization  Application Sourcing value Vendor evaluation and SOW Alternate vendor Incumbent Development and assessment selection MSA review strategy vendor Maintenance (ADM) Strategy formulation Captive unit performance Application Portfolio Requirement definition Business Case improvement Analysis RFI/ RFP Process Audit  ADM Outsourcing Strategy formulation RFP response analysis SOW VMO Back Infra Outsourcing Requirement definition Vendor visits MSA review office Competency Centers RFP Management Recommendations QA DW/BI  ADM Outsourcing Strategy formulation RFP response analysis SOW Negotiation & BPO - Finance & Requirement definition Vendor visits MSA review Contracts Accounting (F&A) RFP Recommendations  ADM Outsourcing Strategy formulation RFP response analysis SOW Negotiation & Vendor  Helpdesk Outsourcing Requirement definition Vendor visits MSA review Contracts management VMO RFI / RFP Recommendations office Setup PMO Data collection and Project analysis management office Setup  ADM Outsourcing Requirement definition Vendor evaluation and RFP Management selection RFP analysis Vendor visits  F&A outsourcing RFI – Scope build Vendor research & APAC RFI process finalization shortlist  SAP resource RFI creation RFI response analysis augmentation RFI – RFI Management Recommendations Europe © 2010 Systems Plus Proprietary and Confidential 20
  • 21. Our Differentiators We leverage knowledge of being both an IT vendor and a client in our advisory services Over 20 years of experience as an India based IT solutions provider Vendor selection process formulated by the CEO based on his prior CIO experience.( as an outsourced CIO of OIS, a Santander group company, and ex-outsourced CIO of Frito-Lay Asia Pacific ) A highly knowledgeable team of consultants and domain specialists to support the processes Advisory services based out of India Insights into the Indian market scenario and evolving vendor capabilities Provide valuable perspective in the selection process through our understanding of cultural nuances and regional diversity Efficient scheduling and coordination of logistics of vendors visits We are close to the clients through our offices in the USA and UK © 2010 Systems Plus Proprietary and Confidential 21
  • 22. Advisory value adds Vendor Selection process with advantages Advice and direction from the starting of process Relationship management oversight (3 years ongoing during contract period included) Vendor SWOT of India delivery operations Cost benchmarking Fast tracking of selection if required  Experience as Tier 3 IT software vendor provides Direct knowledge of market conditions Easy access to all vendors (global and Indian) Immediate information of skill availability – zero lag  Acclimatizing client team Coordination of all India travel, scheduling and vendors visits Sensitizing to local culture and norms Establish and sustain outsourcing governance process © 2010 Systems Plus Proprietary and Confidential 22
  • 23. About Systems Plus  Profiles  Background  Our Approach  Sourcing Advisory  Methodology  Vendor Classification & Timelines  Service Offerings www.SourcingGurus.com © 2010 Systems Plus Proprietary and Confidential
  • 24. Service Offerings Sourcing Readiness Assessment and Strategy Formulation • Internal preparedness and reorganization Vendor Evaluation and Selection through a RFI / RFP process Steady State Optimization and Relationship Management • Establish PMO / VMO • Provide Back Office support for VMO Contract Review and Resourcing Alternatives Relationship Management Scorecard • Web based tool using the Balance Scorecard framework © 2010 Systems Plus Proprietary and Confidential 24
  • 25. Thank You www.SourcingGurus.com © 2010 Systems Plus Proprietary and Confidential