Opportunity Background
The Big Picture
 Capitalize on Government-backed Green Certificate (GC) incentive scheme with top prices
achievable for early entrants (estimated top GC trading price at least 3 years from Renewable
Energy Law publishing)
 Tap in to high demand for renewable energy created by Romanian Government undertaking
targets vs. EU green energy policy.
 For the next 2-3 years at least, the revenues from green energy projects (MWh price plus GC price)
will slightly increase vs. the current price situation (no external market factors are considered).
Application of GC subsidies system is covered by a MWh price increasing (until 2020 it is estimated
a MWh price increasing up to 30%)
 Romania rated as the 3rd
fastest growing country in the EU for gaining planning permission for wind
turbine developments (according to European Wind Energy Association); After the coming into
force of Renewable Energy Law it is expected a similar growth for PV developments.
 Since launch of trading platform, GCs have been traded at the maximum price, i.e. 241.04 Ron. GC
are fully traded.
 Renewable Energy Law is applicable starting October 2011 (Government Order 88/12.10.2011)
CONTESTI DB PV PLANTCONTESTI DB PV PLANT
Photovoltaic Engineering
BORRABORRA
Energy Danube SrlEnergy Danube Srl
Tariff Review
 Romanian Government undertaking for renewable energy, including hydro, concerns an increasing
of renewable energy production vs. gross internal energy production at 48% by 2020
 Renewable energy, that benefits of GC system subsidies is set at 20% from total energy production
by 2020 (from 10% in 2011 and 12% in 2012)
 GC tariff schedule will operate for 15 years from commissioning date, providing project starts no
later then 2016
 Solar generated power will receive 6 GCs per MWh;
 GC prices: min. €27 to max. €55; starting with 2011, the GC price will be EU inflation-indexed at set
up in Ron based on average Eur/Ron at the BNR exchange rate established in December,
“previous” year.
 Current average electricity price €50 per MWh (average price for interval 1-24 h for 2011); tariff
used in the financial modelling, also.
 Penalties of €110 per non-purchased GC, payable by non-compliant electricity suppliers -> twice
the price of purchasing Green Certificates. The penalty is also EU inflation-indexed
CONTESTI DB PV PLANTCONTESTI DB PV PLANT
Photovoltaic Engineering
BORRABORRA
Energy Danube SrlEnergy Danube Srl
Project’s Specifics
 The Project has an installed power of 48 MW, being developed over a land with a surface of over 98
ha, divided in 5 plots interconnected with 20 kV underground power lines (see layout in page 6).
 The current use of land is agricultural; it is plane and free of any type of constraints (environmental
etc).
 The land is privately owned; the rights are secured for a period of 30 years, starting January / March
2012.
 The location is conveniently placed from the access roads point of view and also in a very close
proximity to one 110/20 kV distribution sub-station, owned by the local power distribution company
(Electrica Muntenia), where The Project will be connected to the national power grid.
 There is a double 110 kV overhead power line and a 20kV one crossing one of the 3 plots of land
covered by the project, owned by the local power distribution company (Electrica Muntenia); the
20kV line will be used to connect the PV plant to the national power grid, for the internal services.
 The fixed ground-mounted PV panels will be of premium quality, supplied by REC Group – Norway
(type REC 235 PE), with an efficiency of up to 14.2%, a 10 year product warranty and a 25 year
linear power output warranty (max. degression in performance of 0.7% p.a.).
 The invertors will also be of premium quality, from SMA – Germany.
CONTESTI DB PV PLANTCONTESTI DB PV PLANT
Photovoltaic Engineering
BORRABORRA
Energy Danube SrlEnergy Danube Srl
Solar Resource
 Over 210 sunny days per annum
 1450-1500 kWh / sqm is the yearly sum of global irradiation
 The figures are submitted in kWh (per mp/year), on optimally – inclined PV modules, the most used
calculation method for energetic application.
 Photovoltaic Geographical Information Systems (PVGIS) is a software approved by the Centre for
Renewable Energy Sources
 The solar map related for Dambovita area is developed and offered by Energy Research Institute –
Italy, entity under coordination of the EU
CONTESTI DB PV PLANTCONTESTI DB PV PLANT
Photovoltaic Engineering
BORRABORRA
Energy Danube SrlEnergy Danube Srl
Solar Resource
CONTESTI DB PV PLANTCONTESTI DB PV PLANT
Photovoltaic Engineering
BORRABORRA
Energy Danube SrlEnergy Danube Srl
Project’s
layout
CONTESTI DB PV PLANTCONTESTI DB PV PLANT
Photovoltaic Engineering
BORRABORRA
Energy Danube SrlEnergy Danube Srl
Permitting process – general overview:
 According to the Romania laws, there are two key-permits to be obtained:
1. The Construction Permit, as a result of a land use change procedure and an application file
including different additional permits (including Environmental Permit) and basic designs (civil
works and technical design) of the project;
2. The Connection-to-the-grid Permit (Connection Permit), following a procedure that includes,
among getting few other additional permits, a Connection Solution Study performed by an
authorized consultant.
Permitting process – project’s status:
 The procedure for the change of the land destination was initiated; civil works design and technical
designs are in progress already; the Construction Permit is expected to be issued in May 2012.
 The Connection Solution Study was conducted and the First Phase approval of the connection
solution was obtained; Connection Permit is expected to be issued no later than April 2012.
CONTESTI DB PV PLANTCONTESTI DB PV PLANT
Photovoltaic Engineering
BORRABORRA
Energy Danube SrlEnergy Danube Srl
Financial figures for a ..... years investment :
 Estimated revenues: EUR ..... per year,
 Total investment costs: EUR .....,
 Estimated operation and maintenance costs per annum - 5% from total income
 Estimated debt / equity ratio: ....
 Recovering investment period: ..... years
 Other financial indicators:
 IRR project – .....%,
 EBITDA margin – .....%,
 Net margin profit – ......%,
 ROE – ......% (yearly average ROE – ......%),
 NPV – EUR ....., (@ assumed cost of capital ...% p.a.)
 ......
 ......
CONTESTI DB PV PLANTCONTESTI DB PV PLANT
Photovoltaic Engineering
BORRABORRA
Energy Danube SrlEnergy Danube Srl
Assumptions for revenues’ estimation:
Green Certificate price
 Considered the current price of EUR 56.16 (equiv. of RON 241 at an exchange rate of 4.25)
 Yearly adjusted with inflation rate (EUROSTAT data), estimated at 2.50% p.a. (average for 2005-2010 was
2.70%; for 2011 estimated at 2.70%)
 No changing negative adverse pricing up to 2015 (included)
 Starting with 2015 until 2020, we’ve considered a GC price decreasing of 30%, constantly distributed during
the analysed period.
Electricity Price
 2011 MWh price considered is EUR 50 (based on 2011 quantity electricity statistics, for 0-24h intervals; for
2011 the average price was EUR 51.75)
 From 2012 (included) to 2020 we estimate a price increasing of 27,5% (according to ANRE’s publication, the
price increasing of 30% is considered until 2017/2018), constantly distributed during the analysed period ;
 No external factors market considered which might affect the internal price energy
 No Romanian’s commitment considered to EU for market liberalisation of energy price
CONTESTI DB PV PLANTCONTESTI DB PV PLANT
Photovoltaic Engineering
BORRABORRA
Energy Danube SrlEnergy Danube Srl
Proposed Selling Structure
 ....
 ....
CONTESTI DB PV PLANTCONTESTI DB PV PLANT
Photovoltaic Engineering
BORRABORRA
Energy Danube SrlEnergy Danube Srl

Más contenido relacionado

La actualidad más candente

International energy partnership program manuscript instructions: case Bulgaria
International energy partnership program manuscript instructions: case BulgariaInternational energy partnership program manuscript instructions: case Bulgaria
International energy partnership program manuscript instructions: case BulgariaSimeon Arnaudov
 
Giz2013 en-exploring-biogas-market-opportunities-vietnam
Giz2013 en-exploring-biogas-market-opportunities-vietnamGiz2013 en-exploring-biogas-market-opportunities-vietnam
Giz2013 en-exploring-biogas-market-opportunities-vietnamTuong Do
 
Eu green certificates for promoting electricity from renewable sources
Eu green certificates for promoting electricity from renewable sourcesEu green certificates for promoting electricity from renewable sources
Eu green certificates for promoting electricity from renewable sourcesantonis000
 
Med enec building ee indicators f visser121129
Med enec building ee indicators f visser121129Med enec building ee indicators f visser121129
Med enec building ee indicators f visser121129RCREEE
 
R cleantech finland bd to hungary - hungarian energy market by finpro debrecz...
R cleantech finland bd to hungary - hungarian energy market by finpro debrecz...R cleantech finland bd to hungary - hungarian energy market by finpro debrecz...
R cleantech finland bd to hungary - hungarian energy market by finpro debrecz...Finpro
 
Evaluation of Energy Efficiency policies in Italy - Daniel Giannetti, GSE
Evaluation of Energy Efficiency policies in Italy - Daniel Giannetti, GSEEvaluation of Energy Efficiency policies in Italy - Daniel Giannetti, GSE
Evaluation of Energy Efficiency policies in Italy - Daniel Giannetti, GSEGestore dei Servizi Energetici
 
Lessons learned presentation Lithuania
Lessons learned presentation LithuaniaLessons learned presentation Lithuania
Lessons learned presentation Lithuaniaconsumerenergy
 
The impact of photovoltaic on power market in Italy - D.Migali, R.Covicchio, ...
The impact of photovoltaic on power market in Italy - D.Migali, R.Covicchio, ...The impact of photovoltaic on power market in Italy - D.Migali, R.Covicchio, ...
The impact of photovoltaic on power market in Italy - D.Migali, R.Covicchio, ...Gestore dei Servizi Energetici
 
Giz2013 en-identification-of-biomass-market-opportunities-in-vietnam 2
Giz2013 en-identification-of-biomass-market-opportunities-in-vietnam 2Giz2013 en-identification-of-biomass-market-opportunities-in-vietnam 2
Giz2013 en-identification-of-biomass-market-opportunities-in-vietnam 2Tuong Do
 
The Grüner Strom Label Criteria List 2015
The Grüner Strom Label Criteria List 2015The Grüner Strom Label Criteria List 2015
The Grüner Strom Label Criteria List 2015Grüner Strom Label e.V.
 
Day 2 Try NEGAWATT Power Plants
Day 2 Try NEGAWATT Power Plants Day 2 Try NEGAWATT Power Plants
Day 2 Try NEGAWATT Power Plants RCREEE
 
Commissie aanvaardt Vlaamse groenestroomcertificaten
Commissie aanvaardt Vlaamse groenestroomcertificatenCommissie aanvaardt Vlaamse groenestroomcertificaten
Commissie aanvaardt Vlaamse groenestroomcertificatenThierry Debels
 
Feed in tariff malaysia brochure 2012
Feed in tariff malaysia brochure 2012Feed in tariff malaysia brochure 2012
Feed in tariff malaysia brochure 2012Sarod Paichayonrittha
 
Cyprus Energy Market
Cyprus Energy MarketCyprus Energy Market
Cyprus Energy MarketSeanergies
 
Laure Duliere - T&D Europe
Laure Duliere - T&D EuropeLaure Duliere - T&D Europe
Laure Duliere - T&D EuropeDutch Power
 
Presentation Paritet law firm_Cissolar
Presentation Paritet law firm_CissolarPresentation Paritet law firm_Cissolar
Presentation Paritet law firm_CissolarIrinaParitet
 

La actualidad más candente (20)

International energy partnership program manuscript instructions: case Bulgaria
International energy partnership program manuscript instructions: case BulgariaInternational energy partnership program manuscript instructions: case Bulgaria
International energy partnership program manuscript instructions: case Bulgaria
 
Giz2013 en-exploring-biogas-market-opportunities-vietnam
Giz2013 en-exploring-biogas-market-opportunities-vietnamGiz2013 en-exploring-biogas-market-opportunities-vietnam
Giz2013 en-exploring-biogas-market-opportunities-vietnam
 
Eu green certificates for promoting electricity from renewable sources
Eu green certificates for promoting electricity from renewable sourcesEu green certificates for promoting electricity from renewable sources
Eu green certificates for promoting electricity from renewable sources
 
Med enec building ee indicators f visser121129
Med enec building ee indicators f visser121129Med enec building ee indicators f visser121129
Med enec building ee indicators f visser121129
 
R cleantech finland bd to hungary - hungarian energy market by finpro debrecz...
R cleantech finland bd to hungary - hungarian energy market by finpro debrecz...R cleantech finland bd to hungary - hungarian energy market by finpro debrecz...
R cleantech finland bd to hungary - hungarian energy market by finpro debrecz...
 
Evaluation of Energy Efficiency policies in Italy - Daniel Giannetti, GSE
Evaluation of Energy Efficiency policies in Italy - Daniel Giannetti, GSEEvaluation of Energy Efficiency policies in Italy - Daniel Giannetti, GSE
Evaluation of Energy Efficiency policies in Italy - Daniel Giannetti, GSE
 
Lessons learned presentation Lithuania
Lessons learned presentation LithuaniaLessons learned presentation Lithuania
Lessons learned presentation Lithuania
 
The impact of photovoltaic on power market in Italy - D.Migali, R.Covicchio, ...
The impact of photovoltaic on power market in Italy - D.Migali, R.Covicchio, ...The impact of photovoltaic on power market in Italy - D.Migali, R.Covicchio, ...
The impact of photovoltaic on power market in Italy - D.Migali, R.Covicchio, ...
 
Czech republic
Czech republicCzech republic
Czech republic
 
Bulgaria
BulgariaBulgaria
Bulgaria
 
Giz2013 en-identification-of-biomass-market-opportunities-in-vietnam 2
Giz2013 en-identification-of-biomass-market-opportunities-in-vietnam 2Giz2013 en-identification-of-biomass-market-opportunities-in-vietnam 2
Giz2013 en-identification-of-biomass-market-opportunities-in-vietnam 2
 
The Grüner Strom Label Criteria List 2015
The Grüner Strom Label Criteria List 2015The Grüner Strom Label Criteria List 2015
The Grüner Strom Label Criteria List 2015
 
Vsevolod Kovalchuk_Press conference_6 Fedruary 2018
Vsevolod Kovalchuk_Press conference_6 Fedruary 2018Vsevolod Kovalchuk_Press conference_6 Fedruary 2018
Vsevolod Kovalchuk_Press conference_6 Fedruary 2018
 
Day 2 Try NEGAWATT Power Plants
Day 2 Try NEGAWATT Power Plants Day 2 Try NEGAWATT Power Plants
Day 2 Try NEGAWATT Power Plants
 
Commissie aanvaardt Vlaamse groenestroomcertificaten
Commissie aanvaardt Vlaamse groenestroomcertificatenCommissie aanvaardt Vlaamse groenestroomcertificaten
Commissie aanvaardt Vlaamse groenestroomcertificaten
 
EU Energy policies for buildings
EU Energy policies for buildingsEU Energy policies for buildings
EU Energy policies for buildings
 
Feed in tariff malaysia brochure 2012
Feed in tariff malaysia brochure 2012Feed in tariff malaysia brochure 2012
Feed in tariff malaysia brochure 2012
 
Cyprus Energy Market
Cyprus Energy MarketCyprus Energy Market
Cyprus Energy Market
 
Laure Duliere - T&D Europe
Laure Duliere - T&D EuropeLaure Duliere - T&D Europe
Laure Duliere - T&D Europe
 
Presentation Paritet law firm_Cissolar
Presentation Paritet law firm_CissolarPresentation Paritet law firm_Cissolar
Presentation Paritet law firm_Cissolar
 

Destacado

Lesson Plan 5
Lesson Plan 5Lesson Plan 5
Lesson Plan 5elvictorc
 
Fitness Club Sport Gymnasiums Martial Art Training Centres Meditation Centre...
Fitness  Club Sport Gymnasiums Martial Art Training Centres Meditation Centre...Fitness  Club Sport Gymnasiums Martial Art Training Centres Meditation Centre...
Fitness Club Sport Gymnasiums Martial Art Training Centres Meditation Centre...Varthak India
 
Lesson Plan 6
Lesson Plan 6Lesson Plan 6
Lesson Plan 6elvictorc
 
StoryTelling
StoryTellingStoryTelling
StoryTellingknotaisss
 
Sight to Information Act (India) Section 4
Sight to Information Act (India) Section 4 Sight to Information Act (India) Section 4
Sight to Information Act (India) Section 4 Sanjay Barve
 
วารสาร ปอ3
วารสาร ปอ3วารสาร ปอ3
วารสาร ปอ3Suwannee Pun
 
Infografic Grupul Edenred in 2014
Infografic Grupul Edenred in 2014Infografic Grupul Edenred in 2014
Infografic Grupul Edenred in 2014Edenred Romania
 

Destacado (12)

Lesson Plan 5
Lesson Plan 5Lesson Plan 5
Lesson Plan 5
 
Fitness Club Sport Gymnasiums Martial Art Training Centres Meditation Centre...
Fitness  Club Sport Gymnasiums Martial Art Training Centres Meditation Centre...Fitness  Club Sport Gymnasiums Martial Art Training Centres Meditation Centre...
Fitness Club Sport Gymnasiums Martial Art Training Centres Meditation Centre...
 
Social mediathetrap
Social mediathetrapSocial mediathetrap
Social mediathetrap
 
Restaurents
Restaurents Restaurents
Restaurents
 
Lesson Plan 6
Lesson Plan 6Lesson Plan 6
Lesson Plan 6
 
Consultants ppt
Consultants pptConsultants ppt
Consultants ppt
 
Garden Services
Garden ServicesGarden Services
Garden Services
 
StoryTelling
StoryTellingStoryTelling
StoryTelling
 
Sight to Information Act (India) Section 4
Sight to Information Act (India) Section 4 Sight to Information Act (India) Section 4
Sight to Information Act (India) Section 4
 
วารสาร ปอ3
วารสาร ปอ3วารสาร ปอ3
วารสาร ปอ3
 
Life style ppt
Life style pptLife style ppt
Life style ppt
 
Infografic Grupul Edenred in 2014
Infografic Grupul Edenred in 2014Infografic Grupul Edenred in 2014
Infografic Grupul Edenred in 2014
 

Similar a CONTESTI DB 48 MW PV PLANT

IZVOARELE 38 MW PV PLANT
IZVOARELE 38 MW PV PLANTIZVOARELE 38 MW PV PLANT
IZVOARELE 38 MW PV PLANTRenato Borra
 
presentations_res_forum_speakers.pdf
presentations_res_forum_speakers.pdfpresentations_res_forum_speakers.pdf
presentations_res_forum_speakers.pdfGlennBerry13
 
Remida fedarene - gorizia 13.5.2015
Remida   fedarene - gorizia 13.5.2015Remida   fedarene - gorizia 13.5.2015
Remida fedarene - gorizia 13.5.2015Informest
 
Vito Gamberale: Photovoltaics like PCs and mobile phones
Vito Gamberale: Photovoltaics like PCs and  mobile phonesVito Gamberale: Photovoltaics like PCs and  mobile phones
Vito Gamberale: Photovoltaics like PCs and mobile phonesVito Gamberale
 
Energy Transition in Belgium – Choices and Costs
Energy Transition in Belgium – Choices and CostsEnergy Transition in Belgium – Choices and Costs
Energy Transition in Belgium – Choices and CostsIEA-ETSAP
 
Janez Kopac, Director of the Energy Community Secretariat
Janez Kopac, Director of the Energy Community SecretariatJanez Kopac, Director of the Energy Community Secretariat
Janez Kopac, Director of the Energy Community SecretariatWEC Italia
 
News 20110830 grants
News 20110830 grantsNews 20110830 grants
News 20110830 grantsPaul Keisch
 
Solar District Heating best-practice examples from Italy
Solar District Heating best-practice examples from Italy Solar District Heating best-practice examples from Italy
Solar District Heating best-practice examples from Italy Riccardo Battisti
 
VIETNAM – LATEST UPDATE FROM MOIT REGARDING POWER MASTER PLAN 8
VIETNAM –  LATEST UPDATE FROM MOIT REGARDING POWER MASTER PLAN 8VIETNAM –  LATEST UPDATE FROM MOIT REGARDING POWER MASTER PLAN 8
VIETNAM – LATEST UPDATE FROM MOIT REGARDING POWER MASTER PLAN 8Dr. Oliver Massmann
 
Solar Power Project (45 MW): Bulgarian Electricity Market Study
Solar Power Project (45 MW): Bulgarian Electricity Market  Study  Solar Power Project (45 MW): Bulgarian Electricity Market  Study
Solar Power Project (45 MW): Bulgarian Electricity Market Study Simeon Arnaudov
 
The Renewables EU Directive
The Renewables EU DirectiveThe Renewables EU Directive
The Renewables EU Directivefernando nuño
 
The EU Renewables Directive
The EU Renewables DirectiveThe EU Renewables Directive
The EU Renewables DirectiveLeonardo ENERGY
 
Wind energy projects integration in electricity grids portugal and med tso e...
Wind energy projects integration in electricity grids  portugal and med tso e...Wind energy projects integration in electricity grids  portugal and med tso e...
Wind energy projects integration in electricity grids portugal and med tso e...RCREEE
 
Pet Mogili Solar Project
Pet Mogili Solar ProjectPet Mogili Solar Project
Pet Mogili Solar ProjectIvSatinLtd
 
The Proposed new EU Renewables Directive
The Proposed new EU Renewables DirectiveThe Proposed new EU Renewables Directive
The Proposed new EU Renewables DirectiveLeonardo ENERGY
 
PV development in France Market, Policy & Forecasts
PV development in France Market, Policy & ForecastsPV development in France Market, Policy & Forecasts
PV development in France Market, Policy & ForecastsPARIS
 

Similar a CONTESTI DB 48 MW PV PLANT (20)

IZVOARELE 38 MW PV PLANT
IZVOARELE 38 MW PV PLANTIZVOARELE 38 MW PV PLANT
IZVOARELE 38 MW PV PLANT
 
Montenegro
MontenegroMontenegro
Montenegro
 
presentations_res_forum_speakers.pdf
presentations_res_forum_speakers.pdfpresentations_res_forum_speakers.pdf
presentations_res_forum_speakers.pdf
 
Remida fedarene - gorizia 13.5.2015
Remida   fedarene - gorizia 13.5.2015Remida   fedarene - gorizia 13.5.2015
Remida fedarene - gorizia 13.5.2015
 
Vito Gamberale: Photovoltaics like PCs and mobile phones
Vito Gamberale: Photovoltaics like PCs and  mobile phonesVito Gamberale: Photovoltaics like PCs and  mobile phones
Vito Gamberale: Photovoltaics like PCs and mobile phones
 
Energy Transition in Belgium – Choices and Costs
Energy Transition in Belgium – Choices and CostsEnergy Transition in Belgium – Choices and Costs
Energy Transition in Belgium – Choices and Costs
 
Janez Kopac, Director of the Energy Community Secretariat
Janez Kopac, Director of the Energy Community SecretariatJanez Kopac, Director of the Energy Community Secretariat
Janez Kopac, Director of the Energy Community Secretariat
 
News 20110830 grants
News 20110830 grantsNews 20110830 grants
News 20110830 grants
 
RPVF PR10
RPVF PR10RPVF PR10
RPVF PR10
 
Solar District Heating best-practice examples from Italy
Solar District Heating best-practice examples from Italy Solar District Heating best-practice examples from Italy
Solar District Heating best-practice examples from Italy
 
VIETNAM – LATEST UPDATE FROM MOIT REGARDING POWER MASTER PLAN 8
VIETNAM –  LATEST UPDATE FROM MOIT REGARDING POWER MASTER PLAN 8VIETNAM –  LATEST UPDATE FROM MOIT REGARDING POWER MASTER PLAN 8
VIETNAM – LATEST UPDATE FROM MOIT REGARDING POWER MASTER PLAN 8
 
B2_Kukuczka
B2_KukuczkaB2_Kukuczka
B2_Kukuczka
 
Solar Power Project (45 MW): Bulgarian Electricity Market Study
Solar Power Project (45 MW): Bulgarian Electricity Market  Study  Solar Power Project (45 MW): Bulgarian Electricity Market  Study
Solar Power Project (45 MW): Bulgarian Electricity Market Study
 
The Renewables EU Directive
The Renewables EU DirectiveThe Renewables EU Directive
The Renewables EU Directive
 
The EU Renewables Directive
The EU Renewables DirectiveThe EU Renewables Directive
The EU Renewables Directive
 
Ana Quelhas, Directora de Planificación Energética del Grupo EDP
Ana Quelhas, Directora de Planificación Energética del Grupo EDPAna Quelhas, Directora de Planificación Energética del Grupo EDP
Ana Quelhas, Directora de Planificación Energética del Grupo EDP
 
Wind energy projects integration in electricity grids portugal and med tso e...
Wind energy projects integration in electricity grids  portugal and med tso e...Wind energy projects integration in electricity grids  portugal and med tso e...
Wind energy projects integration in electricity grids portugal and med tso e...
 
Pet Mogili Solar Project
Pet Mogili Solar ProjectPet Mogili Solar Project
Pet Mogili Solar Project
 
The Proposed new EU Renewables Directive
The Proposed new EU Renewables DirectiveThe Proposed new EU Renewables Directive
The Proposed new EU Renewables Directive
 
PV development in France Market, Policy & Forecasts
PV development in France Market, Policy & ForecastsPV development in France Market, Policy & Forecasts
PV development in France Market, Policy & Forecasts
 

Último

Best investment platform in india-Falcon Invoice Discounting
Best investment platform in india-Falcon Invoice DiscountingBest investment platform in india-Falcon Invoice Discounting
Best investment platform in india-Falcon Invoice DiscountingFalcon Invoice Discounting
 
SME IPO and sme ipo listing consultants .pptx
SME IPO and sme ipo listing consultants .pptxSME IPO and sme ipo listing consultants .pptx
SME IPO and sme ipo listing consultants .pptxindia IPO
 
Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024CollectiveMining1
 
VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...
VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...
VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...SUHANI PANDEY
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Shamshabad high-profile Call ...
VIP 7001035870 Find & Meet Hyderabad Call Girls Shamshabad high-profile Call ...VIP 7001035870 Find & Meet Hyderabad Call Girls Shamshabad high-profile Call ...
VIP 7001035870 Find & Meet Hyderabad Call Girls Shamshabad high-profile Call ...aditipandeya
 
B2 Interpret the brief.docxccccccccccccccc
B2 Interpret the brief.docxcccccccccccccccB2 Interpret the brief.docxccccccccccccccc
B2 Interpret the brief.docxcccccccccccccccMollyBrown86
 
Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024CollectiveMining1
 
Q3 FY24 Earnings Conference Call Presentation
Q3 FY24 Earnings Conference Call PresentationQ3 FY24 Earnings Conference Call Presentation
Q3 FY24 Earnings Conference Call PresentationSysco_Investors
 
Corporate Presentation Probe May 2024.pdf
Corporate Presentation Probe May 2024.pdfCorporate Presentation Probe May 2024.pdf
Corporate Presentation Probe May 2024.pdfProbe Gold
 
Call Girls in Friends Colony 9711199171 Delhi Enjoy Call Girls With Our Escorts
Call Girls in Friends Colony 9711199171 Delhi Enjoy Call Girls With Our EscortsCall Girls in Friends Colony 9711199171 Delhi Enjoy Call Girls With Our Escorts
Call Girls in Friends Colony 9711199171 Delhi Enjoy Call Girls With Our Escortsindian call girls near you
 
VIP Call Girl Amritsar 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl Amritsar 7001035870 Enjoy Call Girls With Our EscortsVIP Call Girl Amritsar 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl Amritsar 7001035870 Enjoy Call Girls With Our Escortssonatiwari757
 
Enjoy Night⚡Call Girls Udyog Vihar Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Udyog Vihar Gurgaon >༒8448380779 Escort ServiceEnjoy Night⚡Call Girls Udyog Vihar Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Udyog Vihar Gurgaon >༒8448380779 Escort ServiceDelhi Call girls
 

Último (20)

(👉゚9999965857 ゚)👉 Russian Call Girls Aerocity 👉 Delhi 👈 : 9999 Cash Payment F...
(👉゚9999965857 ゚)👉 Russian Call Girls Aerocity 👉 Delhi 👈 : 9999 Cash Payment F...(👉゚9999965857 ゚)👉 Russian Call Girls Aerocity 👉 Delhi 👈 : 9999 Cash Payment F...
(👉゚9999965857 ゚)👉 Russian Call Girls Aerocity 👉 Delhi 👈 : 9999 Cash Payment F...
 
Best investment platform in india-Falcon Invoice Discounting
Best investment platform in india-Falcon Invoice DiscountingBest investment platform in india-Falcon Invoice Discounting
Best investment platform in india-Falcon Invoice Discounting
 
SME IPO and sme ipo listing consultants .pptx
SME IPO and sme ipo listing consultants .pptxSME IPO and sme ipo listing consultants .pptx
SME IPO and sme ipo listing consultants .pptx
 
Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024
 
VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...
VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...
VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...
 
(👉゚9999965857 ゚)👉 VIP Call Girls Greater Noida 👉 Delhi 👈 : 9999 Cash Payment...
(👉゚9999965857 ゚)👉 VIP Call Girls Greater Noida  👉 Delhi 👈 : 9999 Cash Payment...(👉゚9999965857 ゚)👉 VIP Call Girls Greater Noida  👉 Delhi 👈 : 9999 Cash Payment...
(👉゚9999965857 ゚)👉 VIP Call Girls Greater Noida 👉 Delhi 👈 : 9999 Cash Payment...
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Shamshabad high-profile Call ...
VIP 7001035870 Find & Meet Hyderabad Call Girls Shamshabad high-profile Call ...VIP 7001035870 Find & Meet Hyderabad Call Girls Shamshabad high-profile Call ...
VIP 7001035870 Find & Meet Hyderabad Call Girls Shamshabad high-profile Call ...
 
B2 Interpret the brief.docxccccccccccccccc
B2 Interpret the brief.docxcccccccccccccccB2 Interpret the brief.docxccccccccccccccc
B2 Interpret the brief.docxccccccccccccccc
 
@9999965857 🫦 Sexy Desi Call Girls Karol Bagh 💓 High Profile Escorts Delhi 🫶
@9999965857 🫦 Sexy Desi Call Girls Karol Bagh 💓 High Profile Escorts Delhi 🫶@9999965857 🫦 Sexy Desi Call Girls Karol Bagh 💓 High Profile Escorts Delhi 🫶
@9999965857 🫦 Sexy Desi Call Girls Karol Bagh 💓 High Profile Escorts Delhi 🫶
 
@9999965857 🫦 Sexy Desi Call Girls Vaishali 💓 High Profile Escorts Delhi 🫶
@9999965857 🫦 Sexy Desi Call Girls Vaishali 💓 High Profile Escorts Delhi 🫶@9999965857 🫦 Sexy Desi Call Girls Vaishali 💓 High Profile Escorts Delhi 🫶
@9999965857 🫦 Sexy Desi Call Girls Vaishali 💓 High Profile Escorts Delhi 🫶
 
Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024
 
Vip Call Girls Vasant Kunj ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
Vip Call Girls Vasant Kunj ➡️ Delhi ➡️ 9999965857 No Advance 24HRS LiveVip Call Girls Vasant Kunj ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
Vip Call Girls Vasant Kunj ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
 
Vip Call Girls South Ex ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
Vip Call Girls South Ex ➡️ Delhi ➡️ 9999965857 No Advance 24HRS LiveVip Call Girls South Ex ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
Vip Call Girls South Ex ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
 
Q3 FY24 Earnings Conference Call Presentation
Q3 FY24 Earnings Conference Call PresentationQ3 FY24 Earnings Conference Call Presentation
Q3 FY24 Earnings Conference Call Presentation
 
Corporate Presentation Probe May 2024.pdf
Corporate Presentation Probe May 2024.pdfCorporate Presentation Probe May 2024.pdf
Corporate Presentation Probe May 2024.pdf
 
Call Girls in Friends Colony 9711199171 Delhi Enjoy Call Girls With Our Escorts
Call Girls in Friends Colony 9711199171 Delhi Enjoy Call Girls With Our EscortsCall Girls in Friends Colony 9711199171 Delhi Enjoy Call Girls With Our Escorts
Call Girls in Friends Colony 9711199171 Delhi Enjoy Call Girls With Our Escorts
 
VIP Call Girl Amritsar 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl Amritsar 7001035870 Enjoy Call Girls With Our EscortsVIP Call Girl Amritsar 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl Amritsar 7001035870 Enjoy Call Girls With Our Escorts
 
Sensual Moments: +91 9999965857 Independent Call Girls Noida Delhi {{ Monika}...
Sensual Moments: +91 9999965857 Independent Call Girls Noida Delhi {{ Monika}...Sensual Moments: +91 9999965857 Independent Call Girls Noida Delhi {{ Monika}...
Sensual Moments: +91 9999965857 Independent Call Girls Noida Delhi {{ Monika}...
 
(👉゚9999965857 ゚)👉 VIP Call Girls Friends Colony 👉 Delhi 👈 : 9999 Cash Payment...
(👉゚9999965857 ゚)👉 VIP Call Girls Friends Colony 👉 Delhi 👈 : 9999 Cash Payment...(👉゚9999965857 ゚)👉 VIP Call Girls Friends Colony 👉 Delhi 👈 : 9999 Cash Payment...
(👉゚9999965857 ゚)👉 VIP Call Girls Friends Colony 👉 Delhi 👈 : 9999 Cash Payment...
 
Enjoy Night⚡Call Girls Udyog Vihar Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Udyog Vihar Gurgaon >༒8448380779 Escort ServiceEnjoy Night⚡Call Girls Udyog Vihar Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Udyog Vihar Gurgaon >༒8448380779 Escort Service
 

CONTESTI DB 48 MW PV PLANT

  • 1. 48 MW PV PLANT CONTESTI DB - Dambovita County - ROMANIA January , 2012 Presentation to Potential Investors Photovoltaic Engineering BORRABORRA Energy Danube SrlEnergy Danube Srl
  • 2. Opportunity Background The Big Picture  Capitalize on Government-backed Green Certificate (GC) incentive scheme with top prices achievable for early entrants (estimated top GC trading price at least 3 years from Renewable Energy Law publishing)  Tap in to high demand for renewable energy created by Romanian Government undertaking targets vs. EU green energy policy.  For the next 2-3 years at least, the revenues from green energy projects (MWh price plus GC price) will slightly increase vs. the current price situation (no external market factors are considered). Application of GC subsidies system is covered by a MWh price increasing (until 2020 it is estimated a MWh price increasing up to 30%)  Romania rated as the 3rd fastest growing country in the EU for gaining planning permission for wind turbine developments (according to European Wind Energy Association); After the coming into force of Renewable Energy Law it is expected a similar growth for PV developments.  Since launch of trading platform, GCs have been traded at the maximum price, i.e. 241.04 Ron. GC are fully traded.  Renewable Energy Law is applicable starting October 2011 (Government Order 88/12.10.2011) CONTESTI DB PV PLANTCONTESTI DB PV PLANT Photovoltaic Engineering BORRABORRA Energy Danube SrlEnergy Danube Srl
  • 3. Tariff Review  Romanian Government undertaking for renewable energy, including hydro, concerns an increasing of renewable energy production vs. gross internal energy production at 48% by 2020  Renewable energy, that benefits of GC system subsidies is set at 20% from total energy production by 2020 (from 10% in 2011 and 12% in 2012)  GC tariff schedule will operate for 15 years from commissioning date, providing project starts no later then 2016  Solar generated power will receive 6 GCs per MWh;  GC prices: min. €27 to max. €55; starting with 2011, the GC price will be EU inflation-indexed at set up in Ron based on average Eur/Ron at the BNR exchange rate established in December, “previous” year.  Current average electricity price €50 per MWh (average price for interval 1-24 h for 2011); tariff used in the financial modelling, also.  Penalties of €110 per non-purchased GC, payable by non-compliant electricity suppliers -> twice the price of purchasing Green Certificates. The penalty is also EU inflation-indexed CONTESTI DB PV PLANTCONTESTI DB PV PLANT Photovoltaic Engineering BORRABORRA Energy Danube SrlEnergy Danube Srl
  • 4. Project’s Specifics  The Project has an installed power of 48 MW, being developed over a land with a surface of over 98 ha, divided in 5 plots interconnected with 20 kV underground power lines (see layout in page 6).  The current use of land is agricultural; it is plane and free of any type of constraints (environmental etc).  The land is privately owned; the rights are secured for a period of 30 years, starting January / March 2012.  The location is conveniently placed from the access roads point of view and also in a very close proximity to one 110/20 kV distribution sub-station, owned by the local power distribution company (Electrica Muntenia), where The Project will be connected to the national power grid.  There is a double 110 kV overhead power line and a 20kV one crossing one of the 3 plots of land covered by the project, owned by the local power distribution company (Electrica Muntenia); the 20kV line will be used to connect the PV plant to the national power grid, for the internal services.  The fixed ground-mounted PV panels will be of premium quality, supplied by REC Group – Norway (type REC 235 PE), with an efficiency of up to 14.2%, a 10 year product warranty and a 25 year linear power output warranty (max. degression in performance of 0.7% p.a.).  The invertors will also be of premium quality, from SMA – Germany. CONTESTI DB PV PLANTCONTESTI DB PV PLANT Photovoltaic Engineering BORRABORRA Energy Danube SrlEnergy Danube Srl
  • 5. Solar Resource  Over 210 sunny days per annum  1450-1500 kWh / sqm is the yearly sum of global irradiation  The figures are submitted in kWh (per mp/year), on optimally – inclined PV modules, the most used calculation method for energetic application.  Photovoltaic Geographical Information Systems (PVGIS) is a software approved by the Centre for Renewable Energy Sources  The solar map related for Dambovita area is developed and offered by Energy Research Institute – Italy, entity under coordination of the EU CONTESTI DB PV PLANTCONTESTI DB PV PLANT Photovoltaic Engineering BORRABORRA Energy Danube SrlEnergy Danube Srl
  • 6. Solar Resource CONTESTI DB PV PLANTCONTESTI DB PV PLANT Photovoltaic Engineering BORRABORRA Energy Danube SrlEnergy Danube Srl
  • 7. Project’s layout CONTESTI DB PV PLANTCONTESTI DB PV PLANT Photovoltaic Engineering BORRABORRA Energy Danube SrlEnergy Danube Srl
  • 8. Permitting process – general overview:  According to the Romania laws, there are two key-permits to be obtained: 1. The Construction Permit, as a result of a land use change procedure and an application file including different additional permits (including Environmental Permit) and basic designs (civil works and technical design) of the project; 2. The Connection-to-the-grid Permit (Connection Permit), following a procedure that includes, among getting few other additional permits, a Connection Solution Study performed by an authorized consultant. Permitting process – project’s status:  The procedure for the change of the land destination was initiated; civil works design and technical designs are in progress already; the Construction Permit is expected to be issued in May 2012.  The Connection Solution Study was conducted and the First Phase approval of the connection solution was obtained; Connection Permit is expected to be issued no later than April 2012. CONTESTI DB PV PLANTCONTESTI DB PV PLANT Photovoltaic Engineering BORRABORRA Energy Danube SrlEnergy Danube Srl
  • 9. Financial figures for a ..... years investment :  Estimated revenues: EUR ..... per year,  Total investment costs: EUR .....,  Estimated operation and maintenance costs per annum - 5% from total income  Estimated debt / equity ratio: ....  Recovering investment period: ..... years  Other financial indicators:  IRR project – .....%,  EBITDA margin – .....%,  Net margin profit – ......%,  ROE – ......% (yearly average ROE – ......%),  NPV – EUR ....., (@ assumed cost of capital ...% p.a.)  ......  ...... CONTESTI DB PV PLANTCONTESTI DB PV PLANT Photovoltaic Engineering BORRABORRA Energy Danube SrlEnergy Danube Srl
  • 10. Assumptions for revenues’ estimation: Green Certificate price  Considered the current price of EUR 56.16 (equiv. of RON 241 at an exchange rate of 4.25)  Yearly adjusted with inflation rate (EUROSTAT data), estimated at 2.50% p.a. (average for 2005-2010 was 2.70%; for 2011 estimated at 2.70%)  No changing negative adverse pricing up to 2015 (included)  Starting with 2015 until 2020, we’ve considered a GC price decreasing of 30%, constantly distributed during the analysed period. Electricity Price  2011 MWh price considered is EUR 50 (based on 2011 quantity electricity statistics, for 0-24h intervals; for 2011 the average price was EUR 51.75)  From 2012 (included) to 2020 we estimate a price increasing of 27,5% (according to ANRE’s publication, the price increasing of 30% is considered until 2017/2018), constantly distributed during the analysed period ;  No external factors market considered which might affect the internal price energy  No Romanian’s commitment considered to EU for market liberalisation of energy price CONTESTI DB PV PLANTCONTESTI DB PV PLANT Photovoltaic Engineering BORRABORRA Energy Danube SrlEnergy Danube Srl
  • 11. Proposed Selling Structure  ....  .... CONTESTI DB PV PLANTCONTESTI DB PV PLANT Photovoltaic Engineering BORRABORRA Energy Danube SrlEnergy Danube Srl