In-Situ Remediation of Hexavalent Chromium, Antimony and
 Nickel with Sub-Micron (Nano)-Scale Ferrous Sulfide Slurry

           Jim V. Rouse, Richard H. Christensen, PhD LPG,
              & Steven R. Irvin µg/L
                                (AcuityES, Fishers, IN)




                                                            © AcuityES 2013
Acuity Environmental Solutions

 Company’s Primary Focus:
 •   Environmental Liability Consulting (how to manage liabilities)
 •   Site Investigation – Soil, Groundwater, Air
 •   Remediation of contaminated Sites
 •   Expert Witness Testimony

 Company’s Secondary Focus:
 •   Environmental Permitting – Air, Water, Waste
 •   Environmental Compliance




                                                                © AcuityES 2013
In-Situ Remediation of Hexavalent Chromium,
Antimony and Nickel with Nano-Scale Ferrous
               Sulfide Slurry

 Presented At:
 •   International Seminar on Remediation and Redevelopment of
        Contaminated Sites, Sao Paulo, Brazil
 •   AEHS West Coast Conference, San Diego, CA
 •   USEPA’s Sustainable Remediation International Conference,
          Amherst, MA
 •   AWPA National Conference, Ft. Lauderdale, FL & Nashville, TN
 •   Midwest States Environmental Consulting Assoc., Indianapolis, IN
 •   Battelle Conference, Monterey, California




                                                             © AcuityES 2013
Case Study In…
In Situ Geochemical Reduction
 Stabilization (i.e., immobilizing) of metal constituents by
 chemically reducing the metals of concern to less soluble forms
 through the manipulation of geochemical factors such as:
    • pH
    • Oxidation potential (Eh or ORP)
    • Complexation
    • Sorption
    • Ion exchange

 Resulting in the elimination of metallic contaminants by:
   • Precipitation
   • Dissolution
   • Oxidation
   • Complexation


                                                             © AcuityES 2013
Key Project Considerations
 Competitor’s Proposals for Project included:
 • Off-site disposal of hazardous soils
 • 15 - 20 year pump and treat remedy for groundwater
 • >$8 Million
     Note: original estimates based on >50% smaller source area


 Our Solution:
 • In Situ remediation of impacted soils and groundwater
 • Goal: 2 year total remedy - 1/8th the time -
 • Cost: $4.5 Million - Nearly 50% below competitor’s bids -




                                                         © AcuityES 2013
Chrome Plating
       Gone Wild!




                    © AcuityES 2013
First things
  first…

                                    Segregation of Waste for Disposal




Interior Building Decontamination


                 Building Demolition

                                                           © AcuityES 2013
First things
 first…


                                      Groundwater Sampling




Soil Boring & Well Installation


                      Soil Sampling

                                                       © AcuityES 2013
Site Location -- Muncie, IN

                         GW
                       Impacts




                           Source
                           Areas



                                 © AcuityES 2013
Site Plan for X-Section Line
Site Conditions
                             A’
First investigation – 2005

AcuityES - 2009




                                  A


                                      © AcuityES 2013
Geologic X-Section

     FORMER
    BASEMENT
   SOURCE AREA




                     © AcuityES 2013
Hydrogeology
Unconfined Aquifer

Clay to 15 feet (w/stringers)
Sands & fine gravels

Static Water at 15’ bgl

Saturated thickness
   5’ in SE to
      > 25’ in NW




                                © AcuityES 2013
Soil Impacts
                                  7,900 mg/Kg maximum Cr+6

                                  3,600 mg/Kg Cr+6 at 12’ bgl

                                 State Cleanup Goal - 38 mg/Kg




• Two Adjacent Source Areas
• 5,400 cubic yards of impact
• Perched water sand stringers




                                                          © AcuityES 2013
Groundwater
Impacts
      On-Site
       Cr+6
      800,000 µg/L


    9,700,000 µg/L




   Groundwater COCs          66,000 sq ft (320 ft long) Plume
   Cr+6, Sb, As, and Ni      Offsite Cr+6 at 58,800 µg/L

            State Cleanup Goal- 100 µg/L Cr+6
                                                    © AcuityES 2013
In Situ Chemical Reduction
          BENCH TESTED CHEMICALS REDUCTANTS

•Ferrous Sulfate : FeSO4·7H2O       •Sodium Thiosulfate : Na2S2O3
•Ferrous Sulfide : FeS              •Sodium Metabisulfite : Na2S2O5
•Calcium Polysulfide (CPS) : CaSx   •Sodium Sulfite : Na2SO3
                                    •Zero Valent Iron




                                                          © AcuityES 2013
Selected Ferrous Sulfide (FeS)
    FeS, Hybrid Form (aka precipitated pyrite)
    Liquid suspension of 7% FeS
    FeS, hybrid - With additional 2% free Sulfide
                  to simulate CaSx

    Nanoscale: 98% crystals <5 microns

    Cationic (Iron)
     4 H2O + Cr042- + 3 Fe2- + 4 OH- 
            3 Fe(OH)3+ Cr(OH)3 (Solid)

    Anionic (sulfide)
     17 H2O + 8 Cr042- + 3 HS- 
            3 S + 8 Cr(OH)3 (Solid) + 12 OH-

                                                    © AcuityES 2013
In Situ Soil
      Blending

                                   GPS Grid Network – 10’ x 10’
                                 (100’ x 70’ to 15’) & Shallow to 5’




Dual Axis Blender – 15’ Plunge
Total Area – 130’ x 110’

             Computerized Dosing

                                                          © AcuityES 2013
In Situ Soil Blending




     Dual Axis Blender
     FeS injection/mixing

                            © AcuityES 2013
In Situ Soil Blending




                  Thorough Mixing to 15’ BGL

                                     © AcuityES 2013
In Situ Soil Blending
    Completed in 2 weeks
    Total FeS = 78,300 gallons
    Subsequent stabilization with aglime required




                                                © AcuityES 2013
Confirmation Sampling




                        © AcuityES 2013
Groundwater Injections – FeS
THE NUMBERS
155 Inject Pts
15 ft ROI
6 wks complete




                                 © AcuityES 2013
Groundwater Injections

  Difficult
 Injections

Boulder Fields

  6’ caliche
(calcified silt)

Lodgement till




                             © AcuityES 2013
Groundwater
  Injections




  FeS Injection Totes
 35,385 gallons injected
                                 Rotosonic Drilling
                           Top Down Injection – 5ft intervals

                                                  © AcuityES 2013
Groundwater Injections

 Sensitivity to
the Community
   Required


 Residential
   Hours




                              © AcuityES 2013
Preferential Flow Paths
15 – 20’ bgl
Sand Unit




                             © AcuityES 2013
Preferential Flow Paths
20 - 25’ bgl
Sand Unit




                            © AcuityES 2013
Pre-Treatment   Cr +6



State Cleanup
   Goal of
  100 µg/L




                            © AcuityES 2013
FeS Reductant Injection




                          © AcuityES 2013
1 st   Q Post-Treatment   Cr +6




                                  © AcuityES 2013
2 nd   Q Post-Treatment   Cr +6




                                  © AcuityES 2013
3 rd   Q Post-Treatment   Cr +6




                                  © AcuityES 2013
1 st   Supplemental Injection




                                © AcuityES 2013
4 th   Q Post-Treatment   Cr +6




                                  © AcuityES 2013
5 th   Q Post-Treatment   Cr +6




                                  © AcuityES 2013
6 th   Q Post-Treatment   Cr +6




                                  © AcuityES 2013
7 th   Q Post-Treatment   Cr +6




                                  © AcuityES 2013
2 nd   Supplemental Injection




                                © AcuityES 2013
8 th   –   10 th   Q Post-Treatment   Cr +6




                                       © AcuityES 2013
Antimony Treatment
   Antimony Concentrations:
         Detected in 25 monitoring wells
         on-Site up to 30,000 µg/L
         off-Site up to 4,700 µg/L

         State Industrial Cleanup level - 41 µg/L
         State Residential Cleanup Level - 6 µg/L

   Goal for Antimony:
          Fixate onto Goethite (FeO(OH)) or
          Precipitate as stibnite (Sb2S3)




                                                    © AcuityES 2013
Pre-Treatment Antimony

State Cleanup
   Goal of
    6 µg/L




                         © AcuityES 2013
FeS Reductant Injection




                          © AcuityES 2013
1 st   Q Post-Treatment Antimony




                               © AcuityES 2013
2 nd   Q Post-Treatment Antimony




                              © AcuityES 2013
3 rd   Q Post-Treatment Antimony




                               © AcuityES 2013
1 st   Supplemental Injection




                                © AcuityES 2013
4 th   -   10th    Q Post-Treatment Antimony

All results less
 than method
detection level
       of
     6 µg/L




                                        © AcuityES 2013
Nickel Treatment
   Nickel Concentrations
         Detected in 10 wells exceeding cleanup levels
           off-Site up to 4,100 µg/L
           on-Site up to 50,000 µg/L

          State Industrial Cleanup level – 2,000 µg/L
          State Residential Cleanup Level - 730 µg/L

   Goal for Nickel:
          Fixate as: westerveldite ([FeNiCo]As) or
                     pentlandite (FeNiS)




                                                     © AcuityES 2013
Pre-Treatment Nickel

State Cleanup
   Goal of
  730 µg/L




                        © AcuityES 2013
FeS Reductant Injection




                          © AcuityES 2013
1st Q Post-Treatment Nickel

All results less
 than method
detection level
       of
    50 µg/L

     No
subsequent
 detections




                              © AcuityES 2013
Arsenic
Arsenic –   Pre-treatment As detected in 13 wells
            @ concentrations of 11 µg/L to 360 µg/L

            10th Quarter Sampling results:
                   only 2 wells @ 11 & 12 µg/L


            Goal for Arsenic
            Fixate as: orpiment (As2S3) or
                       arsenopyrite (FeAsS)



                                                 © AcuityES 2013
The Site Today




                 © AcuityES 2013
ISCR Benefits
1. In situ soil blending eliminated need for off-Site
   hazardous waste disposal. (> 10,000 Tons)

2. In situ groundwater geochemical reduction
   eliminated need for prolonged pump and treat.

3. In situ geochemical reduction reduced time
   period of remediation from > 15 years to about 2
   years.




                                                  © AcuityES 2013
CONTACT
Richard H. Christensen, PhD, LPG – rchristensen@acuityes.com
             Steven R. Irvin – Irvin@acuityes.com
             Jim V. Rouse – jrouse@acuityes.com

                      317-570-4919

               Past Teaming Partners
     CDM                     Mundell & Associates
     Burns & McDonnell       CALIBRE
     Professional Engineers  MWH Global
     Malcom Pirnie           V3 Consultants

                   www.acuityes.com

                                                       © AcuityES 2013

Más contenido relacionado

Destacado

Nano materials & technology
Nano materials & technologyNano materials & technology
Nano materials & technologyDhrupal Patel
 
The use of Engineered Nanomaterials in Environmental Remediation: Environment...
The use of Engineered Nanomaterials in Environmental Remediation: Environment...The use of Engineered Nanomaterials in Environmental Remediation: Environment...
The use of Engineered Nanomaterials in Environmental Remediation: Environment...Gregory P Nichols, MPH, CPH
 
NANO MATERIALS ON CONSTRUCTION
NANO MATERIALS ON CONSTRUCTIONNANO MATERIALS ON CONSTRUCTION
NANO MATERIALS ON CONSTRUCTIONkuntansourav
 
Nanotechnology for the Environment
Nanotechnology for the EnvironmentNanotechnology for the Environment
Nanotechnology for the EnvironmentAJAL A J
 
Nanomaterials
NanomaterialsNanomaterials
NanomaterialsMaya Bhat
 
Pollution.Ppt
Pollution.PptPollution.Ppt
Pollution.PptSVS
 

Destacado (9)

Nano materials & technology
Nano materials & technologyNano materials & technology
Nano materials & technology
 
09 Arithmetic
09  Arithmetic09  Arithmetic
09 Arithmetic
 
The use of Engineered Nanomaterials in Environmental Remediation: Environment...
The use of Engineered Nanomaterials in Environmental Remediation: Environment...The use of Engineered Nanomaterials in Environmental Remediation: Environment...
The use of Engineered Nanomaterials in Environmental Remediation: Environment...
 
Nano materials
Nano materialsNano materials
Nano materials
 
NANO MATERIALS ON CONSTRUCTION
NANO MATERIALS ON CONSTRUCTIONNANO MATERIALS ON CONSTRUCTION
NANO MATERIALS ON CONSTRUCTION
 
Nanotechnology for the Environment
Nanotechnology for the EnvironmentNanotechnology for the Environment
Nanotechnology for the Environment
 
Nano concrete ppt
Nano concrete  pptNano concrete  ppt
Nano concrete ppt
 
Nanomaterials
NanomaterialsNanomaterials
Nanomaterials
 
Pollution.Ppt
Pollution.PptPollution.Ppt
Pollution.Ppt
 

Similar a 2013 acuity es case study reduced

H&L Remediation 2011
H&L Remediation 2011H&L Remediation 2011
H&L Remediation 2011acuityes
 
#9/9 Regional compliance monitoring
#9/9 Regional compliance monitoring#9/9 Regional compliance monitoring
#9/9 Regional compliance monitoringNaturalEngland
 
Alnes et al gravity and subsidence monitoring
Alnes et al gravity and subsidence monitoringAlnes et al gravity and subsidence monitoring
Alnes et al gravity and subsidence monitoringStatoil
 
Rosemont Project Hydrogeology & Water Supply
Rosemont Project Hydrogeology & Water SupplyRosemont Project Hydrogeology & Water Supply
Rosemont Project Hydrogeology & Water SupplyHudbay Minerals Inc.
 
CarbonNet storage site characterisation and selection process
CarbonNet storage site characterisation and selection processCarbonNet storage site characterisation and selection process
CarbonNet storage site characterisation and selection processGlobal CCS Institute
 
Microsoft Word - Georgie Scott
Microsoft Word - Georgie ScottMicrosoft Word - Georgie Scott
Microsoft Word - Georgie ScottGeorgia Scott
 
2010 2012-groundwater-plume
2010 2012-groundwater-plume2010 2012-groundwater-plume
2010 2012-groundwater-plumeEric Xanderson
 
Active landfill
Active landfillActive landfill
Active landfillMOHIT JAIN
 
What is a Solar Energy Landfill Cover System
What is a Solar Energy Landfill Cover SystemWhat is a Solar Energy Landfill Cover System
What is a Solar Energy Landfill Cover SystemCircular Economy Asia
 
Anisotropic hydraulic conductivity of jointed rocks analytical and numerical ...
Anisotropic hydraulic conductivity of jointed rocks analytical and numerical ...Anisotropic hydraulic conductivity of jointed rocks analytical and numerical ...
Anisotropic hydraulic conductivity of jointed rocks analytical and numerical ...Mahdi_zoorabadi
 
Monitoring measuring and verification, Gonzalo Zambrano, University of Alberta
Monitoring measuring and verification, Gonzalo Zambrano, University of AlbertaMonitoring measuring and verification, Gonzalo Zambrano, University of Alberta
Monitoring measuring and verification, Gonzalo Zambrano, University of AlbertaGlobal CCS Institute
 
Investor Presentation | Mutiny Gold (ASX:MYG) | Gold Investment Symposium 2014
Investor Presentation | Mutiny Gold (ASX:MYG) | Gold Investment Symposium 2014Investor Presentation | Mutiny Gold (ASX:MYG) | Gold Investment Symposium 2014
Investor Presentation | Mutiny Gold (ASX:MYG) | Gold Investment Symposium 2014Symposium
 

Similar a 2013 acuity es case study reduced (20)

H&L Remediation 2011
H&L Remediation 2011H&L Remediation 2011
H&L Remediation 2011
 
Aoc sediment update_part 1
Aoc sediment update_part 1Aoc sediment update_part 1
Aoc sediment update_part 1
 
Well integrity lifecycle Santos
Well integrity lifecycle SantosWell integrity lifecycle Santos
Well integrity lifecycle Santos
 
#9/9 Regional compliance monitoring
#9/9 Regional compliance monitoring#9/9 Regional compliance monitoring
#9/9 Regional compliance monitoring
 
Overliner or Landfill Mining?
Overliner or Landfill Mining?Overliner or Landfill Mining?
Overliner or Landfill Mining?
 
Alnes et al gravity and subsidence monitoring
Alnes et al gravity and subsidence monitoringAlnes et al gravity and subsidence monitoring
Alnes et al gravity and subsidence monitoring
 
Sean McFadyen
Sean McFadyenSean McFadyen
Sean McFadyen
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
Swana md biosolid trials pettigrew
Swana md biosolid trials pettigrewSwana md biosolid trials pettigrew
Swana md biosolid trials pettigrew
 
Rosemont Project Hydrogeology & Water Supply
Rosemont Project Hydrogeology & Water SupplyRosemont Project Hydrogeology & Water Supply
Rosemont Project Hydrogeology & Water Supply
 
CarbonNet storage site characterisation and selection process
CarbonNet storage site characterisation and selection processCarbonNet storage site characterisation and selection process
CarbonNet storage site characterisation and selection process
 
Microsoft Word - Georgie Scott
Microsoft Word - Georgie ScottMicrosoft Word - Georgie Scott
Microsoft Word - Georgie Scott
 
Presentation
PresentationPresentation
Presentation
 
2010 2012-groundwater-plume
2010 2012-groundwater-plume2010 2012-groundwater-plume
2010 2012-groundwater-plume
 
Active landfill
Active landfillActive landfill
Active landfill
 
What is a Solar Energy Landfill Cover System
What is a Solar Energy Landfill Cover SystemWhat is a Solar Energy Landfill Cover System
What is a Solar Energy Landfill Cover System
 
Anisotropic hydraulic conductivity of jointed rocks analytical and numerical ...
Anisotropic hydraulic conductivity of jointed rocks analytical and numerical ...Anisotropic hydraulic conductivity of jointed rocks analytical and numerical ...
Anisotropic hydraulic conductivity of jointed rocks analytical and numerical ...
 
Monitoring measuring and verification, Gonzalo Zambrano, University of Alberta
Monitoring measuring and verification, Gonzalo Zambrano, University of AlbertaMonitoring measuring and verification, Gonzalo Zambrano, University of Alberta
Monitoring measuring and verification, Gonzalo Zambrano, University of Alberta
 
Aoc sediment update_part2
Aoc sediment update_part2Aoc sediment update_part2
Aoc sediment update_part2
 
Investor Presentation | Mutiny Gold (ASX:MYG) | Gold Investment Symposium 2014
Investor Presentation | Mutiny Gold (ASX:MYG) | Gold Investment Symposium 2014Investor Presentation | Mutiny Gold (ASX:MYG) | Gold Investment Symposium 2014
Investor Presentation | Mutiny Gold (ASX:MYG) | Gold Investment Symposium 2014
 

2013 acuity es case study reduced

  • 1. In-Situ Remediation of Hexavalent Chromium, Antimony and Nickel with Sub-Micron (Nano)-Scale Ferrous Sulfide Slurry Jim V. Rouse, Richard H. Christensen, PhD LPG, & Steven R. Irvin µg/L (AcuityES, Fishers, IN) © AcuityES 2013
  • 2. Acuity Environmental Solutions  Company’s Primary Focus: • Environmental Liability Consulting (how to manage liabilities) • Site Investigation – Soil, Groundwater, Air • Remediation of contaminated Sites • Expert Witness Testimony  Company’s Secondary Focus: • Environmental Permitting – Air, Water, Waste • Environmental Compliance © AcuityES 2013
  • 3. In-Situ Remediation of Hexavalent Chromium, Antimony and Nickel with Nano-Scale Ferrous Sulfide Slurry  Presented At: • International Seminar on Remediation and Redevelopment of Contaminated Sites, Sao Paulo, Brazil • AEHS West Coast Conference, San Diego, CA • USEPA’s Sustainable Remediation International Conference, Amherst, MA • AWPA National Conference, Ft. Lauderdale, FL & Nashville, TN • Midwest States Environmental Consulting Assoc., Indianapolis, IN • Battelle Conference, Monterey, California © AcuityES 2013
  • 4. Case Study In… In Situ Geochemical Reduction Stabilization (i.e., immobilizing) of metal constituents by chemically reducing the metals of concern to less soluble forms through the manipulation of geochemical factors such as: • pH • Oxidation potential (Eh or ORP) • Complexation • Sorption • Ion exchange Resulting in the elimination of metallic contaminants by: • Precipitation • Dissolution • Oxidation • Complexation © AcuityES 2013
  • 5. Key Project Considerations Competitor’s Proposals for Project included: • Off-site disposal of hazardous soils • 15 - 20 year pump and treat remedy for groundwater • >$8 Million Note: original estimates based on >50% smaller source area Our Solution: • In Situ remediation of impacted soils and groundwater • Goal: 2 year total remedy - 1/8th the time - • Cost: $4.5 Million - Nearly 50% below competitor’s bids - © AcuityES 2013
  • 6. Chrome Plating Gone Wild! © AcuityES 2013
  • 7. First things first… Segregation of Waste for Disposal Interior Building Decontamination Building Demolition © AcuityES 2013
  • 8. First things first… Groundwater Sampling Soil Boring & Well Installation Soil Sampling © AcuityES 2013
  • 9. Site Location -- Muncie, IN GW Impacts Source Areas © AcuityES 2013
  • 10. Site Plan for X-Section Line Site Conditions A’ First investigation – 2005 AcuityES - 2009 A © AcuityES 2013
  • 11. Geologic X-Section FORMER BASEMENT SOURCE AREA © AcuityES 2013
  • 12. Hydrogeology Unconfined Aquifer Clay to 15 feet (w/stringers) Sands & fine gravels Static Water at 15’ bgl Saturated thickness 5’ in SE to > 25’ in NW © AcuityES 2013
  • 13. Soil Impacts 7,900 mg/Kg maximum Cr+6 3,600 mg/Kg Cr+6 at 12’ bgl State Cleanup Goal - 38 mg/Kg • Two Adjacent Source Areas • 5,400 cubic yards of impact • Perched water sand stringers © AcuityES 2013
  • 14. Groundwater Impacts On-Site Cr+6 800,000 µg/L 9,700,000 µg/L Groundwater COCs 66,000 sq ft (320 ft long) Plume Cr+6, Sb, As, and Ni Offsite Cr+6 at 58,800 µg/L State Cleanup Goal- 100 µg/L Cr+6 © AcuityES 2013
  • 15. In Situ Chemical Reduction BENCH TESTED CHEMICALS REDUCTANTS •Ferrous Sulfate : FeSO4·7H2O •Sodium Thiosulfate : Na2S2O3 •Ferrous Sulfide : FeS •Sodium Metabisulfite : Na2S2O5 •Calcium Polysulfide (CPS) : CaSx •Sodium Sulfite : Na2SO3 •Zero Valent Iron © AcuityES 2013
  • 16. Selected Ferrous Sulfide (FeS) FeS, Hybrid Form (aka precipitated pyrite) Liquid suspension of 7% FeS FeS, hybrid - With additional 2% free Sulfide to simulate CaSx Nanoscale: 98% crystals <5 microns Cationic (Iron) 4 H2O + Cr042- + 3 Fe2- + 4 OH-  3 Fe(OH)3+ Cr(OH)3 (Solid) Anionic (sulfide) 17 H2O + 8 Cr042- + 3 HS-  3 S + 8 Cr(OH)3 (Solid) + 12 OH- © AcuityES 2013
  • 17. In Situ Soil Blending GPS Grid Network – 10’ x 10’ (100’ x 70’ to 15’) & Shallow to 5’ Dual Axis Blender – 15’ Plunge Total Area – 130’ x 110’ Computerized Dosing © AcuityES 2013
  • 18. In Situ Soil Blending Dual Axis Blender FeS injection/mixing © AcuityES 2013
  • 19. In Situ Soil Blending Thorough Mixing to 15’ BGL © AcuityES 2013
  • 20. In Situ Soil Blending Completed in 2 weeks Total FeS = 78,300 gallons Subsequent stabilization with aglime required © AcuityES 2013
  • 21. Confirmation Sampling © AcuityES 2013
  • 22. Groundwater Injections – FeS THE NUMBERS 155 Inject Pts 15 ft ROI 6 wks complete © AcuityES 2013
  • 23. Groundwater Injections Difficult Injections Boulder Fields 6’ caliche (calcified silt) Lodgement till © AcuityES 2013
  • 24. Groundwater Injections FeS Injection Totes 35,385 gallons injected Rotosonic Drilling Top Down Injection – 5ft intervals © AcuityES 2013
  • 25. Groundwater Injections Sensitivity to the Community Required Residential Hours © AcuityES 2013
  • 26. Preferential Flow Paths 15 – 20’ bgl Sand Unit © AcuityES 2013
  • 27. Preferential Flow Paths 20 - 25’ bgl Sand Unit © AcuityES 2013
  • 28. Pre-Treatment Cr +6 State Cleanup Goal of 100 µg/L © AcuityES 2013
  • 29. FeS Reductant Injection © AcuityES 2013
  • 30. 1 st Q Post-Treatment Cr +6 © AcuityES 2013
  • 31. 2 nd Q Post-Treatment Cr +6 © AcuityES 2013
  • 32. 3 rd Q Post-Treatment Cr +6 © AcuityES 2013
  • 33. 1 st Supplemental Injection © AcuityES 2013
  • 34. 4 th Q Post-Treatment Cr +6 © AcuityES 2013
  • 35. 5 th Q Post-Treatment Cr +6 © AcuityES 2013
  • 36. 6 th Q Post-Treatment Cr +6 © AcuityES 2013
  • 37. 7 th Q Post-Treatment Cr +6 © AcuityES 2013
  • 38. 2 nd Supplemental Injection © AcuityES 2013
  • 39. 8 th – 10 th Q Post-Treatment Cr +6 © AcuityES 2013
  • 40. Antimony Treatment Antimony Concentrations: Detected in 25 monitoring wells on-Site up to 30,000 µg/L off-Site up to 4,700 µg/L State Industrial Cleanup level - 41 µg/L State Residential Cleanup Level - 6 µg/L Goal for Antimony: Fixate onto Goethite (FeO(OH)) or Precipitate as stibnite (Sb2S3) © AcuityES 2013
  • 41. Pre-Treatment Antimony State Cleanup Goal of 6 µg/L © AcuityES 2013
  • 42. FeS Reductant Injection © AcuityES 2013
  • 43. 1 st Q Post-Treatment Antimony © AcuityES 2013
  • 44. 2 nd Q Post-Treatment Antimony © AcuityES 2013
  • 45. 3 rd Q Post-Treatment Antimony © AcuityES 2013
  • 46. 1 st Supplemental Injection © AcuityES 2013
  • 47. 4 th - 10th Q Post-Treatment Antimony All results less than method detection level of 6 µg/L © AcuityES 2013
  • 48. Nickel Treatment Nickel Concentrations Detected in 10 wells exceeding cleanup levels off-Site up to 4,100 µg/L on-Site up to 50,000 µg/L State Industrial Cleanup level – 2,000 µg/L State Residential Cleanup Level - 730 µg/L Goal for Nickel: Fixate as: westerveldite ([FeNiCo]As) or pentlandite (FeNiS) © AcuityES 2013
  • 49. Pre-Treatment Nickel State Cleanup Goal of 730 µg/L © AcuityES 2013
  • 50. FeS Reductant Injection © AcuityES 2013
  • 51. 1st Q Post-Treatment Nickel All results less than method detection level of 50 µg/L No subsequent detections © AcuityES 2013
  • 52. Arsenic Arsenic – Pre-treatment As detected in 13 wells @ concentrations of 11 µg/L to 360 µg/L 10th Quarter Sampling results: only 2 wells @ 11 & 12 µg/L Goal for Arsenic Fixate as: orpiment (As2S3) or arsenopyrite (FeAsS) © AcuityES 2013
  • 53. The Site Today © AcuityES 2013
  • 54. ISCR Benefits 1. In situ soil blending eliminated need for off-Site hazardous waste disposal. (> 10,000 Tons) 2. In situ groundwater geochemical reduction eliminated need for prolonged pump and treat. 3. In situ geochemical reduction reduced time period of remediation from > 15 years to about 2 years. © AcuityES 2013
  • 55. CONTACT Richard H. Christensen, PhD, LPG – rchristensen@acuityes.com Steven R. Irvin – Irvin@acuityes.com Jim V. Rouse – jrouse@acuityes.com 317-570-4919 Past Teaming Partners CDM Mundell & Associates Burns & McDonnell CALIBRE Professional Engineers MWH Global Malcom Pirnie V3 Consultants www.acuityes.com © AcuityES 2013