Enviar búsqueda
Cargar
2013 acuity es case study reduced
•
0 recomendaciones
•
256 vistas
R
richcphd
Seguir
Denunciar
Compartir
Denunciar
Compartir
1 de 55
Descargar ahora
Descargar para leer sin conexión
Recomendados
Sand2016 7941 pe nea salt club presentation 082216 hansen llm
Sand2016 7941 pe nea salt club presentation 082216 hansen llm
leann_mays
Parallel session 2 2 evaluation of agronomic practices on growth, yield of ca...
Parallel session 2 2 evaluation of agronomic practices on growth, yield of ca...
David Ngome
Saskatchewan Geological Open House Presentation
Saskatchewan Geological Open House Presentation
Claude Resources Inc.
Full Cycle Tailings Management - Fosterville Gold Mine
Full Cycle Tailings Management - Fosterville Gold Mine
Advisian
Neil Intro Day1
Neil Intro Day1
Greg Gearheart
Sustainable Soil Surfactants for Turfgrass Management
Sustainable Soil Surfactants for Turfgrass Management
Lamberti Agrochemicals
Ges Corporate Marketing
Ges Corporate Marketing
Benji George
Arctic the final frontier
Arctic the final frontier
Statoil
Recomendados
Sand2016 7941 pe nea salt club presentation 082216 hansen llm
Sand2016 7941 pe nea salt club presentation 082216 hansen llm
leann_mays
Parallel session 2 2 evaluation of agronomic practices on growth, yield of ca...
Parallel session 2 2 evaluation of agronomic practices on growth, yield of ca...
David Ngome
Saskatchewan Geological Open House Presentation
Saskatchewan Geological Open House Presentation
Claude Resources Inc.
Full Cycle Tailings Management - Fosterville Gold Mine
Full Cycle Tailings Management - Fosterville Gold Mine
Advisian
Neil Intro Day1
Neil Intro Day1
Greg Gearheart
Sustainable Soil Surfactants for Turfgrass Management
Sustainable Soil Surfactants for Turfgrass Management
Lamberti Agrochemicals
Ges Corporate Marketing
Ges Corporate Marketing
Benji George
Arctic the final frontier
Arctic the final frontier
Statoil
Nano materials & technology
Nano materials & technology
Dhrupal Patel
09 Arithmetic
09 Arithmetic
Jeanie Delos Arcos
The use of Engineered Nanomaterials in Environmental Remediation: Environment...
The use of Engineered Nanomaterials in Environmental Remediation: Environment...
Gregory P Nichols, MPH, CPH
Nano materials
Nano materials
Sahil Anande
NANO MATERIALS ON CONSTRUCTION
NANO MATERIALS ON CONSTRUCTION
kuntansourav
Nanotechnology for the Environment
Nanotechnology for the Environment
AJAL A J
Nano concrete ppt
Nano concrete ppt
sravankumarreddy9
Nanomaterials
Nanomaterials
Maya Bhat
Pollution.Ppt
Pollution.Ppt
SVS
H&L Remediation 2011
H&L Remediation 2011
acuityes
Aoc sediment update_part 1
Aoc sediment update_part 1
Lake Superior Binational Forum
Well integrity lifecycle Santos
Well integrity lifecycle Santos
NSW Environment and Planning
#9/9 Regional compliance monitoring
#9/9 Regional compliance monitoring
NaturalEngland
Overliner or Landfill Mining?
Overliner or Landfill Mining?
Cornerstone Environmental
Alnes et al gravity and subsidence monitoring
Alnes et al gravity and subsidence monitoring
Statoil
Sean McFadyen
Sean McFadyen
Lucia Garcia
Corporate Presentation
Corporate Presentation
Adnet Communications
Swana md biosolid trials pettigrew
Swana md biosolid trials pettigrew
SWANA Northern Lights Chapter
Rosemont Project Hydrogeology & Water Supply
Rosemont Project Hydrogeology & Water Supply
Hudbay Minerals Inc.
CarbonNet storage site characterisation and selection process
CarbonNet storage site characterisation and selection process
Global CCS Institute
Microsoft Word - Georgie Scott
Microsoft Word - Georgie Scott
Georgia Scott
Presentation
Presentation
Adnet Communications
Más contenido relacionado
Destacado
Nano materials & technology
Nano materials & technology
Dhrupal Patel
09 Arithmetic
09 Arithmetic
Jeanie Delos Arcos
The use of Engineered Nanomaterials in Environmental Remediation: Environment...
The use of Engineered Nanomaterials in Environmental Remediation: Environment...
Gregory P Nichols, MPH, CPH
Nano materials
Nano materials
Sahil Anande
NANO MATERIALS ON CONSTRUCTION
NANO MATERIALS ON CONSTRUCTION
kuntansourav
Nanotechnology for the Environment
Nanotechnology for the Environment
AJAL A J
Nano concrete ppt
Nano concrete ppt
sravankumarreddy9
Nanomaterials
Nanomaterials
Maya Bhat
Pollution.Ppt
Pollution.Ppt
SVS
Destacado
(9)
Nano materials & technology
Nano materials & technology
09 Arithmetic
09 Arithmetic
The use of Engineered Nanomaterials in Environmental Remediation: Environment...
The use of Engineered Nanomaterials in Environmental Remediation: Environment...
Nano materials
Nano materials
NANO MATERIALS ON CONSTRUCTION
NANO MATERIALS ON CONSTRUCTION
Nanotechnology for the Environment
Nanotechnology for the Environment
Nano concrete ppt
Nano concrete ppt
Nanomaterials
Nanomaterials
Pollution.Ppt
Pollution.Ppt
Similar a 2013 acuity es case study reduced
H&L Remediation 2011
H&L Remediation 2011
acuityes
Aoc sediment update_part 1
Aoc sediment update_part 1
Lake Superior Binational Forum
Well integrity lifecycle Santos
Well integrity lifecycle Santos
NSW Environment and Planning
#9/9 Regional compliance monitoring
#9/9 Regional compliance monitoring
NaturalEngland
Overliner or Landfill Mining?
Overliner or Landfill Mining?
Cornerstone Environmental
Alnes et al gravity and subsidence monitoring
Alnes et al gravity and subsidence monitoring
Statoil
Sean McFadyen
Sean McFadyen
Lucia Garcia
Corporate Presentation
Corporate Presentation
Adnet Communications
Swana md biosolid trials pettigrew
Swana md biosolid trials pettigrew
SWANA Northern Lights Chapter
Rosemont Project Hydrogeology & Water Supply
Rosemont Project Hydrogeology & Water Supply
Hudbay Minerals Inc.
CarbonNet storage site characterisation and selection process
CarbonNet storage site characterisation and selection process
Global CCS Institute
Microsoft Word - Georgie Scott
Microsoft Word - Georgie Scott
Georgia Scott
Presentation
Presentation
Adnet Communications
2010 2012-groundwater-plume
2010 2012-groundwater-plume
Eric Xanderson
Active landfill
Active landfill
MOHIT JAIN
What is a Solar Energy Landfill Cover System
What is a Solar Energy Landfill Cover System
Circular Economy Asia
Anisotropic hydraulic conductivity of jointed rocks analytical and numerical ...
Anisotropic hydraulic conductivity of jointed rocks analytical and numerical ...
Mahdi_zoorabadi
Monitoring measuring and verification, Gonzalo Zambrano, University of Alberta
Monitoring measuring and verification, Gonzalo Zambrano, University of Alberta
Global CCS Institute
Aoc sediment update_part2
Aoc sediment update_part2
Lake Superior Binational Forum
Investor Presentation | Mutiny Gold (ASX:MYG) | Gold Investment Symposium 2014
Investor Presentation | Mutiny Gold (ASX:MYG) | Gold Investment Symposium 2014
Symposium
Similar a 2013 acuity es case study reduced
(20)
H&L Remediation 2011
H&L Remediation 2011
Aoc sediment update_part 1
Aoc sediment update_part 1
Well integrity lifecycle Santos
Well integrity lifecycle Santos
#9/9 Regional compliance monitoring
#9/9 Regional compliance monitoring
Overliner or Landfill Mining?
Overliner or Landfill Mining?
Alnes et al gravity and subsidence monitoring
Alnes et al gravity and subsidence monitoring
Sean McFadyen
Sean McFadyen
Corporate Presentation
Corporate Presentation
Swana md biosolid trials pettigrew
Swana md biosolid trials pettigrew
Rosemont Project Hydrogeology & Water Supply
Rosemont Project Hydrogeology & Water Supply
CarbonNet storage site characterisation and selection process
CarbonNet storage site characterisation and selection process
Microsoft Word - Georgie Scott
Microsoft Word - Georgie Scott
Presentation
Presentation
2010 2012-groundwater-plume
2010 2012-groundwater-plume
Active landfill
Active landfill
What is a Solar Energy Landfill Cover System
What is a Solar Energy Landfill Cover System
Anisotropic hydraulic conductivity of jointed rocks analytical and numerical ...
Anisotropic hydraulic conductivity of jointed rocks analytical and numerical ...
Monitoring measuring and verification, Gonzalo Zambrano, University of Alberta
Monitoring measuring and verification, Gonzalo Zambrano, University of Alberta
Aoc sediment update_part2
Aoc sediment update_part2
Investor Presentation | Mutiny Gold (ASX:MYG) | Gold Investment Symposium 2014
Investor Presentation | Mutiny Gold (ASX:MYG) | Gold Investment Symposium 2014
2013 acuity es case study reduced
1.
In-Situ Remediation of
Hexavalent Chromium, Antimony and Nickel with Sub-Micron (Nano)-Scale Ferrous Sulfide Slurry Jim V. Rouse, Richard H. Christensen, PhD LPG, & Steven R. Irvin µg/L (AcuityES, Fishers, IN) © AcuityES 2013
2.
Acuity Environmental Solutions
Company’s Primary Focus: • Environmental Liability Consulting (how to manage liabilities) • Site Investigation – Soil, Groundwater, Air • Remediation of contaminated Sites • Expert Witness Testimony Company’s Secondary Focus: • Environmental Permitting – Air, Water, Waste • Environmental Compliance © AcuityES 2013
3.
In-Situ Remediation of
Hexavalent Chromium, Antimony and Nickel with Nano-Scale Ferrous Sulfide Slurry Presented At: • International Seminar on Remediation and Redevelopment of Contaminated Sites, Sao Paulo, Brazil • AEHS West Coast Conference, San Diego, CA • USEPA’s Sustainable Remediation International Conference, Amherst, MA • AWPA National Conference, Ft. Lauderdale, FL & Nashville, TN • Midwest States Environmental Consulting Assoc., Indianapolis, IN • Battelle Conference, Monterey, California © AcuityES 2013
4.
Case Study In… In
Situ Geochemical Reduction Stabilization (i.e., immobilizing) of metal constituents by chemically reducing the metals of concern to less soluble forms through the manipulation of geochemical factors such as: • pH • Oxidation potential (Eh or ORP) • Complexation • Sorption • Ion exchange Resulting in the elimination of metallic contaminants by: • Precipitation • Dissolution • Oxidation • Complexation © AcuityES 2013
5.
Key Project Considerations
Competitor’s Proposals for Project included: • Off-site disposal of hazardous soils • 15 - 20 year pump and treat remedy for groundwater • >$8 Million Note: original estimates based on >50% smaller source area Our Solution: • In Situ remediation of impacted soils and groundwater • Goal: 2 year total remedy - 1/8th the time - • Cost: $4.5 Million - Nearly 50% below competitor’s bids - © AcuityES 2013
6.
Chrome Plating
Gone Wild! © AcuityES 2013
7.
First things
first… Segregation of Waste for Disposal Interior Building Decontamination Building Demolition © AcuityES 2013
8.
First things first…
Groundwater Sampling Soil Boring & Well Installation Soil Sampling © AcuityES 2013
9.
Site Location --
Muncie, IN GW Impacts Source Areas © AcuityES 2013
10.
Site Plan for
X-Section Line Site Conditions A’ First investigation – 2005 AcuityES - 2009 A © AcuityES 2013
11.
Geologic X-Section
FORMER BASEMENT SOURCE AREA © AcuityES 2013
12.
Hydrogeology Unconfined Aquifer Clay to
15 feet (w/stringers) Sands & fine gravels Static Water at 15’ bgl Saturated thickness 5’ in SE to > 25’ in NW © AcuityES 2013
13.
Soil Impacts
7,900 mg/Kg maximum Cr+6 3,600 mg/Kg Cr+6 at 12’ bgl State Cleanup Goal - 38 mg/Kg • Two Adjacent Source Areas • 5,400 cubic yards of impact • Perched water sand stringers © AcuityES 2013
14.
Groundwater Impacts
On-Site Cr+6 800,000 µg/L 9,700,000 µg/L Groundwater COCs 66,000 sq ft (320 ft long) Plume Cr+6, Sb, As, and Ni Offsite Cr+6 at 58,800 µg/L State Cleanup Goal- 100 µg/L Cr+6 © AcuityES 2013
15.
In Situ Chemical
Reduction BENCH TESTED CHEMICALS REDUCTANTS •Ferrous Sulfate : FeSO4·7H2O •Sodium Thiosulfate : Na2S2O3 •Ferrous Sulfide : FeS •Sodium Metabisulfite : Na2S2O5 •Calcium Polysulfide (CPS) : CaSx •Sodium Sulfite : Na2SO3 •Zero Valent Iron © AcuityES 2013
16.
Selected Ferrous Sulfide
(FeS) FeS, Hybrid Form (aka precipitated pyrite) Liquid suspension of 7% FeS FeS, hybrid - With additional 2% free Sulfide to simulate CaSx Nanoscale: 98% crystals <5 microns Cationic (Iron) 4 H2O + Cr042- + 3 Fe2- + 4 OH- 3 Fe(OH)3+ Cr(OH)3 (Solid) Anionic (sulfide) 17 H2O + 8 Cr042- + 3 HS- 3 S + 8 Cr(OH)3 (Solid) + 12 OH- © AcuityES 2013
17.
In Situ Soil
Blending GPS Grid Network – 10’ x 10’ (100’ x 70’ to 15’) & Shallow to 5’ Dual Axis Blender – 15’ Plunge Total Area – 130’ x 110’ Computerized Dosing © AcuityES 2013
18.
In Situ Soil
Blending Dual Axis Blender FeS injection/mixing © AcuityES 2013
19.
In Situ Soil
Blending Thorough Mixing to 15’ BGL © AcuityES 2013
20.
In Situ Soil
Blending Completed in 2 weeks Total FeS = 78,300 gallons Subsequent stabilization with aglime required © AcuityES 2013
21.
Confirmation Sampling
© AcuityES 2013
22.
Groundwater Injections –
FeS THE NUMBERS 155 Inject Pts 15 ft ROI 6 wks complete © AcuityES 2013
23.
Groundwater Injections
Difficult Injections Boulder Fields 6’ caliche (calcified silt) Lodgement till © AcuityES 2013
24.
Groundwater Injections
FeS Injection Totes 35,385 gallons injected Rotosonic Drilling Top Down Injection – 5ft intervals © AcuityES 2013
25.
Groundwater Injections Sensitivity
to the Community Required Residential Hours © AcuityES 2013
26.
Preferential Flow Paths 15
– 20’ bgl Sand Unit © AcuityES 2013
27.
Preferential Flow Paths 20
- 25’ bgl Sand Unit © AcuityES 2013
28.
Pre-Treatment
Cr +6 State Cleanup Goal of 100 µg/L © AcuityES 2013
29.
FeS Reductant Injection
© AcuityES 2013
30.
1 st
Q Post-Treatment Cr +6 © AcuityES 2013
31.
2 nd
Q Post-Treatment Cr +6 © AcuityES 2013
32.
3 rd
Q Post-Treatment Cr +6 © AcuityES 2013
33.
1 st
Supplemental Injection © AcuityES 2013
34.
4 th
Q Post-Treatment Cr +6 © AcuityES 2013
35.
5 th
Q Post-Treatment Cr +6 © AcuityES 2013
36.
6 th
Q Post-Treatment Cr +6 © AcuityES 2013
37.
7 th
Q Post-Treatment Cr +6 © AcuityES 2013
38.
2 nd
Supplemental Injection © AcuityES 2013
39.
8 th
– 10 th Q Post-Treatment Cr +6 © AcuityES 2013
40.
Antimony Treatment
Antimony Concentrations: Detected in 25 monitoring wells on-Site up to 30,000 µg/L off-Site up to 4,700 µg/L State Industrial Cleanup level - 41 µg/L State Residential Cleanup Level - 6 µg/L Goal for Antimony: Fixate onto Goethite (FeO(OH)) or Precipitate as stibnite (Sb2S3) © AcuityES 2013
41.
Pre-Treatment Antimony State Cleanup
Goal of 6 µg/L © AcuityES 2013
42.
FeS Reductant Injection
© AcuityES 2013
43.
1 st
Q Post-Treatment Antimony © AcuityES 2013
44.
2 nd
Q Post-Treatment Antimony © AcuityES 2013
45.
3 rd
Q Post-Treatment Antimony © AcuityES 2013
46.
1 st
Supplemental Injection © AcuityES 2013
47.
4 th
- 10th Q Post-Treatment Antimony All results less than method detection level of 6 µg/L © AcuityES 2013
48.
Nickel Treatment
Nickel Concentrations Detected in 10 wells exceeding cleanup levels off-Site up to 4,100 µg/L on-Site up to 50,000 µg/L State Industrial Cleanup level – 2,000 µg/L State Residential Cleanup Level - 730 µg/L Goal for Nickel: Fixate as: westerveldite ([FeNiCo]As) or pentlandite (FeNiS) © AcuityES 2013
49.
Pre-Treatment Nickel State Cleanup
Goal of 730 µg/L © AcuityES 2013
50.
FeS Reductant Injection
© AcuityES 2013
51.
1st Q Post-Treatment
Nickel All results less than method detection level of 50 µg/L No subsequent detections © AcuityES 2013
52.
Arsenic Arsenic –
Pre-treatment As detected in 13 wells @ concentrations of 11 µg/L to 360 µg/L 10th Quarter Sampling results: only 2 wells @ 11 & 12 µg/L Goal for Arsenic Fixate as: orpiment (As2S3) or arsenopyrite (FeAsS) © AcuityES 2013
53.
The Site Today
© AcuityES 2013
54.
ISCR Benefits 1. In
situ soil blending eliminated need for off-Site hazardous waste disposal. (> 10,000 Tons) 2. In situ groundwater geochemical reduction eliminated need for prolonged pump and treat. 3. In situ geochemical reduction reduced time period of remediation from > 15 years to about 2 years. © AcuityES 2013
55.
CONTACT Richard H. Christensen,
PhD, LPG – rchristensen@acuityes.com Steven R. Irvin – Irvin@acuityes.com Jim V. Rouse – jrouse@acuityes.com 317-570-4919 Past Teaming Partners CDM Mundell & Associates Burns & McDonnell CALIBRE Professional Engineers MWH Global Malcom Pirnie V3 Consultants www.acuityes.com © AcuityES 2013
Descargar ahora