Reliability Task Assignments


GPAllied Training Series

              Task                        Reliability Engineer          Maintenance Engineer                     Planner
  Preventive Maintenance              Ensures failure modes           Responsible for              Ensures correct parts and
  Procedures                           addressed are                    technical accuracy of         consumables are called out
                                       appropriate                      the job plan                  in the procedure
                                      Performs cost/benefit           Resource for the             Responsible for consistency
                                       analysis to set correct          Planner to establish          of format and management
                                       frequency of task(s)             specific equipment            of the PM program on daily
                                                                        tolerances and                basis
                                                                        specifications
  Job Plans and Job Plan Library      Ensures that all assets in      Responsible for              Ensures correct parts and
                                       the EMP have a job plan          technical accuracy of         consumables are called out
                                       on file (both proactive          the job plan                  in the procedure
                                       and reactive)                   Resource for the             Responsible for consistency
                                                                        Planner to establish          of format and management
                                                                        specific equipment            of the Job Plan Library on
                                                                        tolerances and                daily basis
                                                                        specifications               Responsible for verification
                                                                                                      of parts kits
  Bill of Materials                   Supports the                    Responsible for              Alerts Maintenance
                                       Maintenance Engineer             accuracy of                   Engineer when
                                       and Store with                   information                   discrepancies are identified.
                                       availability simulation to      Responsible for              Works with Maintenance
                                       verify stores adjustments        verifying that the BOM        Engineer to determine
                                      Alerts stores function           has been updated after        appropriate stores levels for
                                       when stocking                    equipment                     parts by tracking parts
                                       modifications are                modifications                 usage.
                                       warranted based on
                                       usage and failure
                                       analysis
  Engineered Maintenance              Responsible for changes         Resource for the             Manages the CMMS output
  Strategy                             to the Equipment                 Reliability Engineer          of inspection schedules for
                                       Maintenance Plan based           with assistance in            the PM and PdM routes.
                                       on analysis of asset             collection and analysis      Prepares and analyzes
                                       failure data                     of machinery failure          reports on inspection route
                                      Alerts Stores to changes         data                          compliance and satisfaction
                                       in stocking levels to                                          of noted action items
                                       match changes in task
                                       frequency




                                                                    Page 1 of 9                                            GPAllied LLC
                                                                                                                      4200 Faber Place
                                                                                                                 Charleston, SC 29405
                                                                 www.GPAllied.com                                Office (843) 414-5760
                                                                                                                   Fax (843) 414-5779
Reliability Task Assignments


GPAllied Training Series

              Task                     Reliability Engineer            Maintenance Engineer                      Planner
  Outage/Turn Around Planning      Ensures use of                   Optimizes the Mean-            Completes job plans with
                                    Condition Monitoring              Time-To-Repair (MTTR)           manpower scheduling and
                                    information is included          Responsible for technical       parts verifications per
                                    in turn-around the                accuracy of the job steps       standard
                                    master plan decision                                             Responsible to develop the
                                    making process                                                    master plan for outages and
                                                                                                      turn-arounds
                                                                                                     Prepares outage schedules
                                                                                                      and manpower
                                                                                                      requirement estimates
  Equipment Modifications          Assists Maintenance              Develops equipment             Completes job plans with
                                    Engineer with reliability         modification plans based        manpower scheduling and
                                    analysis of proposed              on failure data, crafts         parts verifications per
                                    equipment                         feedback and OEM                standard
                                    modifications                     design modifications
                                   Makes specific                   Makes specific
                                    recommendations to                equipment
                                    improve machinery                 recommendations to
                                    performance and                   improve machinery
                                    reliability based on              performance,
                                    analysis of process and           maintainability and
                                    failure data                      reliability
  Parts Standardizations           Assists Maintenance              Creates plans to               Updates Job Plans to reflect
                                    Engineer with reliability         standardize parts across        changes in parts
                                    analysis of proposed              like machines taking into
                                    changes                           account specific
                                                                      component performance
                                                                      and maintainability
                                                                     Verifies that the BOM
                                                                      reflects the changes
                                                                     Works with stores to
                                                                      delete unnecessary
                                                                      spares
  MRO Adjustments                  Responsible for analysis
                                    of spares usage and
                                    failure data to
                                    determine proper
                                    stocking levels based on
                                    failure data, usage and
                                    simulation modeling of
                                    the Engineered
                                    Maintenance Strategy


                                                                   Page 2 of 9                                            GPAllied LLC
                                                                                                                     4200 Faber Place
                                                                                                                Charleston, SC 29405
                                                                www.GPAllied.com                                Office (843) 414-5760
                                                                                                                  Fax (843) 414-5779
Reliability Task Assignments


GPAllied Training Series

             Task                    Reliability Engineer            Maintenance Engineer                     Planner
  Equipment Documentation                                          Responsible to maintain        Keeps current copy of all
  Management                                                        current and correct OEM         OEM specifications,
                                                                    specifications, manuals         manuals and procedures as
                                                                    and procedures for plant        job planning reference
                                                                    assets in support of
                                                                    planning functions and in
                                                                    support of daily
                                                                    maintenance function
  PdM/NDT                         Develops and manages            Resource for the               Plans the work and places it
                                   the PdM/NDT process              Reliability Engineer with       on the schedule in a timely
                                   for the purpose of the           specific machine                manner such that
                                   early identification and         performance                     machinery breakdown are
                                   elimination of asset             information and detailed        mitigated or eliminated
                                   defects                          component and parts
                               
                                    nd
                                   2 tier resource for              data
                                   technical assistance
                                  Responsible for alarm
                                   management
  Work Order System                                                                                Manages the life of the of
  Management                                                                                        Work Requests/Work Order
                                                                                                   Completes Job Plans
                                                                                                   Follows-up on job plans
                                                                                                    completion
  CMMS Failure Data (FRACAS)      Responsible to performs         Resource for the               Responsible for ensuring
                                   statistical analysis on          Reliability Engineer with       that all work orders are
                                   machinery failure data           specific machine                closed with correct closing
                                   and work order closing           performance                     codes
                                   codes to determine               information and detailed       Ensures the “As Found”, “As
                                   whether adjustments to           component and parts             Left” fields on the Job Plan
                                   the Engineered                   data                            Procedures are completed
                                   Maintenance Strategy                                             by the craft and entered
                                   are warranted                                                    into the CMMS
                                  Responsible for the
                                   development of (failure)
                                   codes for the WO
                                   system




                                                                 Page 3 of 9                                            GPAllied LLC
                                                                                                                   4200 Faber Place
                                                                                                              Charleston, SC 29405
                                                              www.GPAllied.com                                Office (843) 414-5760
                                                                                                                Fax (843) 414-5779
Reliability Task Assignments


GPAllied Training Series

                Task                    Reliability Engineer            Maintenance Engineer                      Planner
  Asset Repair Techniques                                              Develops new and              Completes job plan to
                                                                        innovative methods for         specified standard
                                                                        timely repair of assets
                                                                       Prepares specific job
                                                                        plans steps with
                                                                        detailed procedures
                                                                        for completion of
                                                                        repair in the most
                                                                        effective and efficient
                                                                        manner
  Asset Test Procedures (Return      Develops specific                                               Converts and maintains
  to Service)                         procedures for                                                   procedures in standardized
                                      verification of an assets                                        format
                                      fitness for return to
                                      service
                                     Verifies return-to-service
                                      procedures were
                                      performed
  Failure Investigation              Leads the Root Cause             Leads the Root Cause          Responsible for verifies that
  RCA & RCFA                          Analysis effort as a part         Failure Analysis effort        all work orders are closed
                                      of a proactive strategy           for chronic failures           with correct closing codes
                                     Leads the Root Cause              (typically uses Cause         Verifies the “As Found”, “As
                                      Failure Analysis effort for       Mapping incident               Left” fields on the Job Plan
                                      sporadic failures                 analysis)                      Procedures are completed
                                      (typically uses Logic Tree       Catalogues and                 and entered into the CMMS
                                      incident analysis)                databases the                 Facilitates a 5-Why
                                     Develops specific                 RCA/RCFA results and           discussion with crafts and
                                      operational procedure             subsequent action              supervision for all failure
                                      changes to help mitigate          items                          maintenance activities
                                      future system failures           Develops specific
                                     Catalogues and                    maintenance
                                      databases the RCA/RCFA            procedure
                                      results and subsequent            modifications to help
                                      action items                      mitigate future
                                     Analyzes plant wide               machinery failures
                                      failure data and                 Develops specific
                                      downtime scenarios to             machinery
                                      calculate relevant                modifications to help
                                      trigger points for RCFA           mitigate future failures




                                                                    Page 4 of 9                                             GPAllied LLC
                                                                                                                       4200 Faber Place
                                                                                                                  Charleston, SC 29405
                                                               www.GPAllied.com                                   Office (843) 414-5760
                                                                                                                    Fax (843) 414-5779
Reliability Task Assignments


GPAllied Training Series

               Task                      Reliability Engineer         Maintenance Engineer                    Planner
  Technical Support of Daily         Provides technical             Provides technical
  Maintenance Effort                  assistance to                   assistance to
                                      maintenance                     maintenance
                                      supervisors, planners           supervisors, planners
                                      and crafts personnel in         and crafts personnel in
                                      the form of specific,           the form of specific,
                                      technical data on system        technical data on
                                      configuration and               machinery
                                      performance                     configuration and
                                                                      performance
  Asset Hierarchy and Technical      Responsible for the            Responsible to               Responsible to maintain a
  Specifications                      design of the plant asset       maintain a current and        current and correct copy of
                                      hierarchy                       correct technical             the technical specifications
                                                                      specifications library        library
                                                                                                   Responsible for the upkeep
                                                                                                    of the hierarchy in the
                                                                                                    CMMS
  Criticality Analysis               Responsible for the                                          Supports the Reliability
                                      design and management                                         Engineer with specific,
                                      of the asset criticality                                      detailed failure data and
                                      database and the failure                                      component configuration
                                      modes criticality                                             information
                                      database                                                     Responsible for the upkeep
                                                                                                    of the criticality database in
                                                                                                    the CMMS
  Metrics                            Develops and utilizes          Utilizes metrics for         Prepares and analyzes
                                      specific metrics for the        system, asset and             reports on system, asset and
                                      process, system, asset          component                     components metrics
                                      and component                   maintainability
                                      reliability
  Materials Management               Develops the preventive        Develops specific            Ensures correct parts and
                                      maintenance strategy for        maintenance activities        consumables are called out
                                      the stored spares               to ensure spare fitness       in the procedure
                                     Develops a testing              for duty
                                      strategy incoming new          Develops specific
                                      and rebuilt spares              equipment
                                     Develops a testing              preservation
                                      strategy for OEM testing        techniques for pre-
                                      compliance                      commissioning storage
                                                                      of equipment




                                                                  Page 5 of 9                                            GPAllied LLC
                                                                                                                    4200 Faber Place
                                                                                                               Charleston, SC 29405
                                                             www.GPAllied.com                                  Office (843) 414-5760
                                                                                                                 Fax (843) 414-5779
Reliability Task Assignments


GPAllied Training Series

                 Task                 Reliability Engineer           Maintenance Engineer    Planner
  Reliability Centered Design      Applies reliability             Creates new
                                    analysis methods to new          equipment purchase
                                    designs to determine the         specifications around
                                    process, system, asset           improved
                                    and component                    maintainability
                                    reliability
                                   Determines single-point
                                    failures
                                   Reviews and/or develops
                                    commissioning
                                    procedures for new
                                    system, asset and
                                    component design
                                   Reviews and/or develops
                                    strategies for OEM
                                    warranty issues and
                                    claims
                                   Reviews and/or develops
                                    machinery modification
                                    plans to deal with single-
                                    point failure scenarios
                                   Develops specific
                                    maintenance and
                                    operational start-up
                                    procedures for new
                                    installations
                                   Responsible to
                                    develop/review new
                                    equipment purchase
                                    specifications for
                                    reliability and
                                    maintainability




                                                                 Page 6 of 9                           GPAllied LLC
                                                                                                  4200 Faber Place
                                                                                             Charleston, SC 29405
                                                             www.GPAllied.com                Office (843) 414-5760
                                                                                               Fax (843) 414-5779
Reliability Task Assignments


GPAllied Training Series

                                                                          Maintenance
               Task                 Reliability Engineer                                                    Planner
                                                                           Engineer
  Operational Reliability      Uses reliability analysis tools
                                to determine operational
                                reliability of systems, assets
                                and components
                               Helps determine the QA/QC
                                test points and procedures
                                to maximize operational
                                reliability
                               Aides in the development of
                                alarms designed to
                                determine and verify
                                acceptable operations
                               Develop assessment
                                activities centered around
                                operability and performance
                                optimization
                               Develops operator care
                                tasks as a part of the
                                Equipment Maintenance
                                Plan
                               Develops the Risk
                                Management Strategy
  Reliability Economics        Responsible for performing           Supports the
                                quantitative analysis on new          Reliability Engineer
                                projects/strategies and               with supporting data
                                determining                           specific to equipment
                                project/strategies viability          maintainability
                                based on corporate values
                                and standards
  Technical Training           Analyzes process and/or              Analyzes process            Verifies that Supervisors
                                failure data to determine             and/or failure data to       and Craft personnel have
                                the need for improved craft           determine the need           adequate knowledge of
                                skills                                for improved craft           maintenance procedure
                               Identifies/conducts/arranges          skills                       formats
                                technical training for               Conducts/arranges           Verifies maintenance
                                PdM/NDT personnel                     craft skills training        workflow continuity
                               Conducts/arranges general
                                reliability training for all
                                plant personnel



                                                              Page 7 of 9                                              GPAllied LLC
                                                                                                                  4200 Faber Place
                                                                                                             Charleston, SC 29405
                                                          www.GPAllied.com                                   Office (843) 414-5760
                                                                                                               Fax (843) 414-5779
Reliability Task Assignments


GPAllied Training Series

               Reliability Engineering               Reliability    Maintenance
                                                                                     Planner
              Tools and/or Techniques                 Engineer       Engineer
Statistical Analysis (Basic)                         Evaluation      Synthesis    Comprehension
Statistical Analysis (Advanced)                      Synthesis        Analysis      Awareness
Root Cause Analysis                                  Evaluation      Synthesis       Analysis
Reliability Centered Maintenance                     Synthesis        Analysis    Comprehension
Condition Monitoring                                 Synthesis        Analysis    Comprehension
Reliability Centered Design                          Synthesis        Analysis    Comprehension
Availability Simulation                              Synthesis        Analysis    Comprehension
Life Cycle Cost Analysis                             Synthesis     Comprehension Comprehension
Criticality Analysis                                 Evaluation       Analysis   Comprehension

Reference: Bloom’s Taxonomy of Learning Objectives




                                                              Page 8 of 9                                   GPAllied LLC
                                                                                                       4200 Faber Place
                                                                                                  Charleston, SC 29405
                                                          www.GPAllied.com                        Office (843) 414-5760
                                                                                                    Fax (843) 414-5779
Reliability Task Assignments


GPAllied Training Series
Knowledge
      Attendee can recall basic information about the subject. Has knowledge of major ideas and can match names of
      concepts with major ideas.

      Example:       Who, What, When, Where, How…?

Comprehension
      Understands information and can grasp meaning of concepts. Attendee can explain the meaning of concepts in
      their own words.

      Example:       Explain in one’s own words the steps for completing a given task.

Application
      Can use the information in new situations to solve problems or produce results.

      Example:       Why is…an example of…?

Analysis
      Recognize hidden meanings. Attendee can see patterns, organize parts and identify components of ideas.

      Example:       How does…compare/contrast with…?

Synthesis
      Attendee can draw conclusions on related knowledge from other areas. Can generalize from given facts and use
      old ideas to create new ones.

      Example:       What solutions would you select for…?

Evaluation
      Attendee can compare and discriminate between ideas. Can assess the value of theories and presentations, and
      can make choices based on reasoned arguments. Can verify the value of evidence and recognize subjectivity.

      Example:       Select the most effective solution.



                                                              Page 9 of 9                                      GPAllied LLC
                                                                                                          4200 Faber Place
                                                                                                     Charleston, SC 29405
                                                           www.GPAllied.com                          Office (843) 414-5760
                                                                                                       Fax (843) 414-5779

Más contenido relacionado

La actualidad más candente

Mukesh:IT Asset Management Pulse 2010
Mukesh:IT Asset Management Pulse 2010Mukesh:IT Asset Management Pulse 2010
Mukesh:IT Asset Management Pulse 2010
Shanker Sareen
 
Aras How To Think About Aras Integrations
Aras How To Think About Aras IntegrationsAras How To Think About Aras Integrations
Aras How To Think About Aras Integrations
Prodeos
 
IFS Marget Segment Overview
IFS Marget Segment OverviewIFS Marget Segment Overview
IFS Marget Segment Overview
daeager
 
02 mda middle east - part 1
02 mda middle east - part 102 mda middle east - part 1
02 mda middle east - part 1
PiLog
 
Engineering
EngineeringEngineering
Engineering
HaDeGo
 
Kpi 101223064832 Phpapp02
Kpi 101223064832 Phpapp02Kpi 101223064832 Phpapp02
Kpi 101223064832 Phpapp02
ubaidamazai
 

La actualidad más candente (19)

Value Reference Model - Information and Knowledge Mgt
Value Reference Model - Information and Knowledge MgtValue Reference Model - Information and Knowledge Mgt
Value Reference Model - Information and Knowledge Mgt
 
Mukesh:IT Asset Management Pulse 2010
Mukesh:IT Asset Management Pulse 2010Mukesh:IT Asset Management Pulse 2010
Mukesh:IT Asset Management Pulse 2010
 
Mainnovation Seminar 2 Juni,Versie 3b
Mainnovation Seminar 2 Juni,Versie 3bMainnovation Seminar 2 Juni,Versie 3b
Mainnovation Seminar 2 Juni,Versie 3b
 
Mir Rt Presentation
Mir Rt  PresentationMir Rt  Presentation
Mir Rt Presentation
 
Ohl project risk register
Ohl project risk registerOhl project risk register
Ohl project risk register
 
Aras How To Think About Aras Integrations
Aras How To Think About Aras IntegrationsAras How To Think About Aras Integrations
Aras How To Think About Aras Integrations
 
BIS 08a - Application Development - II Version 2
BIS 08a - Application Development - II Version 2BIS 08a - Application Development - II Version 2
BIS 08a - Application Development - II Version 2
 
Supply chain process in the UN
Supply chain process in the UNSupply chain process in the UN
Supply chain process in the UN
 
IFS Marget Segment Overview
IFS Marget Segment OverviewIFS Marget Segment Overview
IFS Marget Segment Overview
 
Agile Metrics Driven Management
Agile Metrics Driven ManagementAgile Metrics Driven Management
Agile Metrics Driven Management
 
Predacorr Presentation
Predacorr PresentationPredacorr Presentation
Predacorr Presentation
 
Tools Processes And Training
Tools Processes And TrainingTools Processes And Training
Tools Processes And Training
 
Business Process Improvement
Business Process ImprovementBusiness Process Improvement
Business Process Improvement
 
Bridging the gap between manufacturing and engineering
Bridging the gap between manufacturing and engineeringBridging the gap between manufacturing and engineering
Bridging the gap between manufacturing and engineering
 
02 mda middle east - part 1
02 mda middle east - part 102 mda middle east - part 1
02 mda middle east - part 1
 
WQD2011 - KAIZEN - SILVER WINNER - DUBAL - Improve Materials Management in To...
WQD2011 - KAIZEN - SILVER WINNER - DUBAL - Improve Materials Management in To...WQD2011 - KAIZEN - SILVER WINNER - DUBAL - Improve Materials Management in To...
WQD2011 - KAIZEN - SILVER WINNER - DUBAL - Improve Materials Management in To...
 
Engineering
EngineeringEngineering
Engineering
 
Kpi 101223064832 Phpapp02
Kpi 101223064832 Phpapp02Kpi 101223064832 Phpapp02
Kpi 101223064832 Phpapp02
 
Luchette HR/Training 2012
Luchette HR/Training 2012Luchette HR/Training 2012
Luchette HR/Training 2012
 

Destacado

Preventive Maintenance Process and Program
Preventive Maintenance Process and ProgramPreventive Maintenance Process and Program
Preventive Maintenance Process and Program
Ricky Smith CMRP
 
SCM2013_Vermeylen_CasestudySupplyChainSixSigma
SCM2013_Vermeylen_CasestudySupplyChainSixSigmaSCM2013_Vermeylen_CasestudySupplyChainSixSigma
SCM2013_Vermeylen_CasestudySupplyChainSixSigma
Terry Vermeylen
 
Industrial Training Report: Ozone pharmaceuticals
Industrial Training Report: Ozone pharmaceuticalsIndustrial Training Report: Ozone pharmaceuticals
Industrial Training Report: Ozone pharmaceuticals
Dibrugarh University
 

Destacado (20)

Advanced Maintenance And Reliability (Best Practices in Maintenance and Relia...
Advanced Maintenance And Reliability (Best Practices in Maintenance and Relia...Advanced Maintenance And Reliability (Best Practices in Maintenance and Relia...
Advanced Maintenance And Reliability (Best Practices in Maintenance and Relia...
 
Preventive Maintenance Process and Program
Preventive Maintenance Process and ProgramPreventive Maintenance Process and Program
Preventive Maintenance Process and Program
 
SCM2013_Vermeylen_CasestudySupplyChainSixSigma
SCM2013_Vermeylen_CasestudySupplyChainSixSigmaSCM2013_Vermeylen_CasestudySupplyChainSixSigma
SCM2013_Vermeylen_CasestudySupplyChainSixSigma
 
Results from Optimized Asset Reliability
Results from Optimized Asset ReliabilityResults from Optimized Asset Reliability
Results from Optimized Asset Reliability
 
FRACAS, Failure Reporting Analysis, Corrective Action System
FRACAS, Failure Reporting Analysis, Corrective Action SystemFRACAS, Failure Reporting Analysis, Corrective Action System
FRACAS, Failure Reporting Analysis, Corrective Action System
 
Equipment Criticality Analysis
Equipment Criticality AnalysisEquipment Criticality Analysis
Equipment Criticality Analysis
 
Condition Monitoring (PdM) Maturity Matrix - Know Best Practices
Condition Monitoring (PdM) Maturity Matrix - Know Best PracticesCondition Monitoring (PdM) Maturity Matrix - Know Best Practices
Condition Monitoring (PdM) Maturity Matrix - Know Best Practices
 
Lubrication Maturity Matrix
Lubrication Maturity MatrixLubrication Maturity Matrix
Lubrication Maturity Matrix
 
Maintenance Craft Skill Maturity Matrix
Maintenance Craft Skill Maturity MatrixMaintenance Craft Skill Maturity Matrix
Maintenance Craft Skill Maturity Matrix
 
Preventive Maintenance Maturity Matrix 2013 version
Preventive Maintenance Maturity Matrix   2013 versionPreventive Maintenance Maturity Matrix   2013 version
Preventive Maintenance Maturity Matrix 2013 version
 
How to set up a Preventive Maintenance Program
How to set up a Preventive Maintenance ProgramHow to set up a Preventive Maintenance Program
How to set up a Preventive Maintenance Program
 
The 5 Levels of Maintenance Scheduling - SMRP 2016 Annual Conference
The 5 Levels of Maintenance Scheduling - SMRP 2016 Annual ConferenceThe 5 Levels of Maintenance Scheduling - SMRP 2016 Annual Conference
The 5 Levels of Maintenance Scheduling - SMRP 2016 Annual Conference
 
Maintenance of Hydraulic Systems
Maintenance of Hydraulic SystemsMaintenance of Hydraulic Systems
Maintenance of Hydraulic Systems
 
Maintenance Planning and Scheduling Maturity Matrix - #1 of 2
Maintenance Planning and Scheduling Maturity Matrix - #1 of 2Maintenance Planning and Scheduling Maturity Matrix - #1 of 2
Maintenance Planning and Scheduling Maturity Matrix - #1 of 2
 
Internship report for pharmaceutical industry
Internship report for pharmaceutical industryInternship report for pharmaceutical industry
Internship report for pharmaceutical industry
 
Maintenance Planning and Scheduling Maturity Matrix #2 of 2
Maintenance Planning and Scheduling Maturity Matrix #2 of 2Maintenance Planning and Scheduling Maturity Matrix #2 of 2
Maintenance Planning and Scheduling Maturity Matrix #2 of 2
 
ALM (Application Lifecycle Management)
ALM (Application Lifecycle Management)ALM (Application Lifecycle Management)
ALM (Application Lifecycle Management)
 
Best Practices in Maintenance Planning And Scheduling
Best Practices in Maintenance Planning And Scheduling Best Practices in Maintenance Planning And Scheduling
Best Practices in Maintenance Planning And Scheduling
 
Industrial Training Report: Ozone pharmaceuticals
Industrial Training Report: Ozone pharmaceuticalsIndustrial Training Report: Ozone pharmaceuticals
Industrial Training Report: Ozone pharmaceuticals
 
3..maintenance management
3..maintenance management3..maintenance management
3..maintenance management
 

Similar a Reliability Tasks - Maintenance Engr, Reliability Engr, Maintenance Planner

Pm key user presentation- Harith senarath/Janaka Pathmendra
Pm   key user presentation- Harith senarath/Janaka PathmendraPm   key user presentation- Harith senarath/Janaka Pathmendra
Pm key user presentation- Harith senarath/Janaka Pathmendra
Janaka Pathmendra
 
Chen.tim
Chen.timChen.tim
Chen.tim
NASAPMC
 
Ease Corporate Overview (PSL)
Ease Corporate Overview (PSL)Ease Corporate Overview (PSL)
Ease Corporate Overview (PSL)
470media
 
Pharmprocess0405 predmaint
Pharmprocess0405 predmaintPharmprocess0405 predmaint
Pharmprocess0405 predmaint
khaneducation
 
Oil and Gas 75 Workshop Ana Paula Brambila Sep 2012
Oil and Gas 75 Workshop Ana Paula Brambila Sep 2012Oil and Gas 75 Workshop Ana Paula Brambila Sep 2012
Oil and Gas 75 Workshop Ana Paula Brambila Sep 2012
alipaiva
 
Checking the health of your active directory enviornment
Checking the health of your active directory enviornmentChecking the health of your active directory enviornment
Checking the health of your active directory enviornment
Spiffy
 
Proces Simulatie
Proces SimulatieProces Simulatie
Proces Simulatie
HaDeGo
 

Similar a Reliability Tasks - Maintenance Engr, Reliability Engr, Maintenance Planner (20)

Field Service
Field ServiceField Service
Field Service
 
InfosysPublicServices - Provider Network & Performance Management | Solutions
InfosysPublicServices - Provider Network & Performance Management | SolutionsInfosysPublicServices - Provider Network & Performance Management | Solutions
InfosysPublicServices - Provider Network & Performance Management | Solutions
 
Advertisement jakarta walk_in_interview_published_nov_20_2011
Advertisement jakarta walk_in_interview_published_nov_20_2011Advertisement jakarta walk_in_interview_published_nov_20_2011
Advertisement jakarta walk_in_interview_published_nov_20_2011
 
Life After PPM
Life After PPMLife After PPM
Life After PPM
 
Pm key user presentation- Harith senarath/Janaka Pathmendra
Pm   key user presentation- Harith senarath/Janaka PathmendraPm   key user presentation- Harith senarath/Janaka Pathmendra
Pm key user presentation- Harith senarath/Janaka Pathmendra
 
Chen.tim
Chen.timChen.tim
Chen.tim
 
Sqa material
Sqa materialSqa material
Sqa material
 
All That Jazz
All That JazzAll That Jazz
All That Jazz
 
Indian railways workshop accounts
Indian railways workshop accountsIndian railways workshop accounts
Indian railways workshop accounts
 
Requirements Manager Center of Excellence: “Achieving Goals Without Formaliz...
Requirements Manager Center of Excellence:  “Achieving Goals Without Formaliz...Requirements Manager Center of Excellence:  “Achieving Goals Without Formaliz...
Requirements Manager Center of Excellence: “Achieving Goals Without Formaliz...
 
Ease Corporate Overview (PSL)
Ease Corporate Overview (PSL)Ease Corporate Overview (PSL)
Ease Corporate Overview (PSL)
 
Pharmprocess0405 predmaint
Pharmprocess0405 predmaintPharmprocess0405 predmaint
Pharmprocess0405 predmaint
 
Energy and engineering services leverages growth
Energy and engineering services leverages growthEnergy and engineering services leverages growth
Energy and engineering services leverages growth
 
Become A Best Run Inecom Client - Remote Services Platform
Become A Best Run Inecom Client - Remote Services PlatformBecome A Best Run Inecom Client - Remote Services Platform
Become A Best Run Inecom Client - Remote Services Platform
 
Xperdyte Manufacturing for Sage Evolution
Xperdyte Manufacturing for Sage EvolutionXperdyte Manufacturing for Sage Evolution
Xperdyte Manufacturing for Sage Evolution
 
Oil and Gas 75 Workshop Ana Paula Brambila Sep 2012
Oil and Gas 75 Workshop Ana Paula Brambila Sep 2012Oil and Gas 75 Workshop Ana Paula Brambila Sep 2012
Oil and Gas 75 Workshop Ana Paula Brambila Sep 2012
 
Dec 2012 Evening Talk - Managing Complex Project
Dec 2012 Evening Talk - Managing Complex ProjectDec 2012 Evening Talk - Managing Complex Project
Dec 2012 Evening Talk - Managing Complex Project
 
Checking the health of your active directory enviornment
Checking the health of your active directory enviornmentChecking the health of your active directory enviornment
Checking the health of your active directory enviornment
 
Proces Simulatie
Proces SimulatieProces Simulatie
Proces Simulatie
 
Cpm500 d _alleman__tpm lesson 3 (v1)
Cpm500 d _alleman__tpm lesson 3 (v1)Cpm500 d _alleman__tpm lesson 3 (v1)
Cpm500 d _alleman__tpm lesson 3 (v1)
 

Más de Ricky Smith CMRP, CMRT

Más de Ricky Smith CMRP, CMRT (20)

Skills of a Proactive Maintenance Technician
Skills of a Proactive Maintenance TechnicianSkills of a Proactive Maintenance Technician
Skills of a Proactive Maintenance Technician
 
Day in the Life (DILO) of a Proactive Maintenance Manager
Day in the Life (DILO) of a Proactive Maintenance ManagerDay in the Life (DILO) of a Proactive Maintenance Manager
Day in the Life (DILO) of a Proactive Maintenance Manager
 
Day in the Life of a Proactive Maintenance Planner
Day in the Life of a Proactive Maintenance PlannerDay in the Life of a Proactive Maintenance Planner
Day in the Life of a Proactive Maintenance Planner
 
Day in the life of a Proactive Maintenance Supervisor
Day in the life of a Proactive Maintenance SupervisorDay in the life of a Proactive Maintenance Supervisor
Day in the life of a Proactive Maintenance Supervisor
 
How to know if your maintenance planning and scheduling is not effective
How to know if your maintenance planning and scheduling is not effectiveHow to know if your maintenance planning and scheduling is not effective
How to know if your maintenance planning and scheduling is not effective
 
Day in the life of a Proactive Maintenance Supervisor
Day in the life of a Proactive Maintenance SupervisorDay in the life of a Proactive Maintenance Supervisor
Day in the life of a Proactive Maintenance Supervisor
 
Day in the Life of a Proactive Maintenance Technician Article
Day in the Life of a Proactive Maintenance Technician  ArticleDay in the Life of a Proactive Maintenance Technician  Article
Day in the Life of a Proactive Maintenance Technician Article
 
Best Maintenance Repair Practices Article
Best Maintenance Repair Practices ArticleBest Maintenance Repair Practices Article
Best Maintenance Repair Practices Article
 
Tool Box Talk - Maintenance Parts Checkout
Tool Box Talk - Maintenance Parts CheckoutTool Box Talk - Maintenance Parts Checkout
Tool Box Talk - Maintenance Parts Checkout
 
Tool Box Talk - Lubrication of Bearings
Tool Box Talk - Lubrication of BearingsTool Box Talk - Lubrication of Bearings
Tool Box Talk - Lubrication of Bearings
 
Tool Box Talk - Maintenance Planning and Scheduling
Tool Box Talk - Maintenance Planning and SchedulingTool Box Talk - Maintenance Planning and Scheduling
Tool Box Talk - Maintenance Planning and Scheduling
 
Top 7 Reasons why Maintenance Work Orders are Closed Out Accurately
Top 7 Reasons why Maintenance Work Orders are Closed Out AccuratelyTop 7 Reasons why Maintenance Work Orders are Closed Out Accurately
Top 7 Reasons why Maintenance Work Orders are Closed Out Accurately
 
Tool Box Talk - How to Stop Hydraulic Leaks and Why
Tool Box Talk - How to Stop Hydraulic Leaks and WhyTool Box Talk - How to Stop Hydraulic Leaks and Why
Tool Box Talk - How to Stop Hydraulic Leaks and Why
 
Maintenance of Hydraulic Systems
Maintenance of Hydraulic SystemsMaintenance of Hydraulic Systems
Maintenance of Hydraulic Systems
 
PM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
PM Tool Box Talk 101 - Fundamentals of Preventive MaintenancePM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
PM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
 
How to Develop an Effective Maintenance Skills Training Program
How to Develop an Effective Maintenance Skills Training ProgramHow to Develop an Effective Maintenance Skills Training Program
How to Develop an Effective Maintenance Skills Training Program
 
What is Lean Maintenance
What is Lean MaintenanceWhat is Lean Maintenance
What is Lean Maintenance
 
Best Maintenance Repair Practices
Best Maintenance Repair PracticesBest Maintenance Repair Practices
Best Maintenance Repair Practices
 
PM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
PM Tool Box Talk 101 -  Fundamentals of Preventive MaintenancePM Tool Box Talk 101 -  Fundamentals of Preventive Maintenance
PM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
 
Day in the Life of (DILO) of a Proactive Maintenance Technician
Day in the Life of (DILO) of a Proactive Maintenance TechnicianDay in the Life of (DILO) of a Proactive Maintenance Technician
Day in the Life of (DILO) of a Proactive Maintenance Technician
 

Último

1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
QucHHunhnh
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
heathfieldcps1
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
QucHHunhnh
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
negromaestrong
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
kauryashika82
 
An Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfAn Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdf
SanaAli374401
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
PECB
 

Último (20)

1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docx
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
An Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfAn Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdf
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 

Reliability Tasks - Maintenance Engr, Reliability Engr, Maintenance Planner

  • 1. Reliability Task Assignments GPAllied Training Series Task Reliability Engineer Maintenance Engineer Planner Preventive Maintenance  Ensures failure modes  Responsible for  Ensures correct parts and Procedures addressed are technical accuracy of consumables are called out appropriate the job plan in the procedure  Performs cost/benefit  Resource for the  Responsible for consistency analysis to set correct Planner to establish of format and management frequency of task(s) specific equipment of the PM program on daily tolerances and basis specifications Job Plans and Job Plan Library  Ensures that all assets in  Responsible for  Ensures correct parts and the EMP have a job plan technical accuracy of consumables are called out on file (both proactive the job plan in the procedure and reactive)  Resource for the  Responsible for consistency Planner to establish of format and management specific equipment of the Job Plan Library on tolerances and daily basis specifications  Responsible for verification of parts kits Bill of Materials  Supports the  Responsible for  Alerts Maintenance Maintenance Engineer accuracy of Engineer when and Store with information discrepancies are identified. availability simulation to  Responsible for  Works with Maintenance verify stores adjustments verifying that the BOM Engineer to determine  Alerts stores function has been updated after appropriate stores levels for when stocking equipment parts by tracking parts modifications are modifications usage. warranted based on usage and failure analysis Engineered Maintenance  Responsible for changes  Resource for the  Manages the CMMS output Strategy to the Equipment Reliability Engineer of inspection schedules for Maintenance Plan based with assistance in the PM and PdM routes. on analysis of asset collection and analysis  Prepares and analyzes failure data of machinery failure reports on inspection route  Alerts Stores to changes data compliance and satisfaction in stocking levels to of noted action items match changes in task frequency Page 1 of 9 GPAllied LLC 4200 Faber Place Charleston, SC 29405 www.GPAllied.com Office (843) 414-5760 Fax (843) 414-5779
  • 2. Reliability Task Assignments GPAllied Training Series Task Reliability Engineer Maintenance Engineer Planner Outage/Turn Around Planning  Ensures use of  Optimizes the Mean-  Completes job plans with Condition Monitoring Time-To-Repair (MTTR) manpower scheduling and information is included  Responsible for technical parts verifications per in turn-around the accuracy of the job steps standard master plan decision  Responsible to develop the making process master plan for outages and turn-arounds  Prepares outage schedules and manpower requirement estimates Equipment Modifications  Assists Maintenance  Develops equipment  Completes job plans with Engineer with reliability modification plans based manpower scheduling and analysis of proposed on failure data, crafts parts verifications per equipment feedback and OEM standard modifications design modifications  Makes specific  Makes specific recommendations to equipment improve machinery recommendations to performance and improve machinery reliability based on performance, analysis of process and maintainability and failure data reliability Parts Standardizations  Assists Maintenance  Creates plans to  Updates Job Plans to reflect Engineer with reliability standardize parts across changes in parts analysis of proposed like machines taking into changes account specific component performance and maintainability  Verifies that the BOM reflects the changes  Works with stores to delete unnecessary spares MRO Adjustments  Responsible for analysis of spares usage and failure data to determine proper stocking levels based on failure data, usage and simulation modeling of the Engineered Maintenance Strategy Page 2 of 9 GPAllied LLC 4200 Faber Place Charleston, SC 29405 www.GPAllied.com Office (843) 414-5760 Fax (843) 414-5779
  • 3. Reliability Task Assignments GPAllied Training Series Task Reliability Engineer Maintenance Engineer Planner Equipment Documentation  Responsible to maintain  Keeps current copy of all Management current and correct OEM OEM specifications, specifications, manuals manuals and procedures as and procedures for plant job planning reference assets in support of planning functions and in support of daily maintenance function PdM/NDT  Develops and manages  Resource for the  Plans the work and places it the PdM/NDT process Reliability Engineer with on the schedule in a timely for the purpose of the specific machine manner such that early identification and performance machinery breakdown are elimination of asset information and detailed mitigated or eliminated defects component and parts  nd 2 tier resource for data technical assistance  Responsible for alarm management Work Order System  Manages the life of the of Management Work Requests/Work Order  Completes Job Plans  Follows-up on job plans completion CMMS Failure Data (FRACAS)  Responsible to performs  Resource for the  Responsible for ensuring statistical analysis on Reliability Engineer with that all work orders are machinery failure data specific machine closed with correct closing and work order closing performance codes codes to determine information and detailed  Ensures the “As Found”, “As whether adjustments to component and parts Left” fields on the Job Plan the Engineered data Procedures are completed Maintenance Strategy by the craft and entered are warranted into the CMMS  Responsible for the development of (failure) codes for the WO system Page 3 of 9 GPAllied LLC 4200 Faber Place Charleston, SC 29405 www.GPAllied.com Office (843) 414-5760 Fax (843) 414-5779
  • 4. Reliability Task Assignments GPAllied Training Series Task Reliability Engineer Maintenance Engineer Planner Asset Repair Techniques  Develops new and  Completes job plan to innovative methods for specified standard timely repair of assets  Prepares specific job plans steps with detailed procedures for completion of repair in the most effective and efficient manner Asset Test Procedures (Return  Develops specific  Converts and maintains to Service) procedures for procedures in standardized verification of an assets format fitness for return to service  Verifies return-to-service procedures were performed Failure Investigation  Leads the Root Cause  Leads the Root Cause  Responsible for verifies that RCA & RCFA Analysis effort as a part Failure Analysis effort all work orders are closed of a proactive strategy for chronic failures with correct closing codes  Leads the Root Cause (typically uses Cause  Verifies the “As Found”, “As Failure Analysis effort for Mapping incident Left” fields on the Job Plan sporadic failures analysis) Procedures are completed (typically uses Logic Tree  Catalogues and and entered into the CMMS incident analysis) databases the  Facilitates a 5-Why  Develops specific RCA/RCFA results and discussion with crafts and operational procedure subsequent action supervision for all failure changes to help mitigate items maintenance activities future system failures  Develops specific  Catalogues and maintenance databases the RCA/RCFA procedure results and subsequent modifications to help action items mitigate future  Analyzes plant wide machinery failures failure data and  Develops specific downtime scenarios to machinery calculate relevant modifications to help trigger points for RCFA mitigate future failures Page 4 of 9 GPAllied LLC 4200 Faber Place Charleston, SC 29405 www.GPAllied.com Office (843) 414-5760 Fax (843) 414-5779
  • 5. Reliability Task Assignments GPAllied Training Series Task Reliability Engineer Maintenance Engineer Planner Technical Support of Daily  Provides technical  Provides technical Maintenance Effort assistance to assistance to maintenance maintenance supervisors, planners supervisors, planners and crafts personnel in and crafts personnel in the form of specific, the form of specific, technical data on system technical data on configuration and machinery performance configuration and performance Asset Hierarchy and Technical  Responsible for the  Responsible to  Responsible to maintain a Specifications design of the plant asset maintain a current and current and correct copy of hierarchy correct technical the technical specifications specifications library library  Responsible for the upkeep of the hierarchy in the CMMS Criticality Analysis  Responsible for the  Supports the Reliability design and management Engineer with specific, of the asset criticality detailed failure data and database and the failure component configuration modes criticality information database  Responsible for the upkeep of the criticality database in the CMMS Metrics  Develops and utilizes  Utilizes metrics for  Prepares and analyzes specific metrics for the system, asset and reports on system, asset and process, system, asset component components metrics and component maintainability reliability Materials Management  Develops the preventive  Develops specific  Ensures correct parts and maintenance strategy for maintenance activities consumables are called out the stored spares to ensure spare fitness in the procedure  Develops a testing for duty strategy incoming new  Develops specific and rebuilt spares equipment  Develops a testing preservation strategy for OEM testing techniques for pre- compliance commissioning storage of equipment Page 5 of 9 GPAllied LLC 4200 Faber Place Charleston, SC 29405 www.GPAllied.com Office (843) 414-5760 Fax (843) 414-5779
  • 6. Reliability Task Assignments GPAllied Training Series Task Reliability Engineer Maintenance Engineer Planner Reliability Centered Design  Applies reliability  Creates new analysis methods to new equipment purchase designs to determine the specifications around process, system, asset improved and component maintainability reliability  Determines single-point failures  Reviews and/or develops commissioning procedures for new system, asset and component design  Reviews and/or develops strategies for OEM warranty issues and claims  Reviews and/or develops machinery modification plans to deal with single- point failure scenarios  Develops specific maintenance and operational start-up procedures for new installations  Responsible to develop/review new equipment purchase specifications for reliability and maintainability Page 6 of 9 GPAllied LLC 4200 Faber Place Charleston, SC 29405 www.GPAllied.com Office (843) 414-5760 Fax (843) 414-5779
  • 7. Reliability Task Assignments GPAllied Training Series Maintenance Task Reliability Engineer Planner Engineer Operational Reliability  Uses reliability analysis tools to determine operational reliability of systems, assets and components  Helps determine the QA/QC test points and procedures to maximize operational reliability  Aides in the development of alarms designed to determine and verify acceptable operations  Develop assessment activities centered around operability and performance optimization  Develops operator care tasks as a part of the Equipment Maintenance Plan  Develops the Risk Management Strategy Reliability Economics  Responsible for performing  Supports the quantitative analysis on new Reliability Engineer projects/strategies and with supporting data determining specific to equipment project/strategies viability maintainability based on corporate values and standards Technical Training  Analyzes process and/or  Analyzes process  Verifies that Supervisors failure data to determine and/or failure data to and Craft personnel have the need for improved craft determine the need adequate knowledge of skills for improved craft maintenance procedure  Identifies/conducts/arranges skills formats technical training for  Conducts/arranges  Verifies maintenance PdM/NDT personnel craft skills training workflow continuity  Conducts/arranges general reliability training for all plant personnel Page 7 of 9 GPAllied LLC 4200 Faber Place Charleston, SC 29405 www.GPAllied.com Office (843) 414-5760 Fax (843) 414-5779
  • 8. Reliability Task Assignments GPAllied Training Series Reliability Engineering Reliability Maintenance Planner Tools and/or Techniques Engineer Engineer Statistical Analysis (Basic) Evaluation Synthesis Comprehension Statistical Analysis (Advanced) Synthesis Analysis Awareness Root Cause Analysis Evaluation Synthesis Analysis Reliability Centered Maintenance Synthesis Analysis Comprehension Condition Monitoring Synthesis Analysis Comprehension Reliability Centered Design Synthesis Analysis Comprehension Availability Simulation Synthesis Analysis Comprehension Life Cycle Cost Analysis Synthesis Comprehension Comprehension Criticality Analysis Evaluation Analysis Comprehension Reference: Bloom’s Taxonomy of Learning Objectives Page 8 of 9 GPAllied LLC 4200 Faber Place Charleston, SC 29405 www.GPAllied.com Office (843) 414-5760 Fax (843) 414-5779
  • 9. Reliability Task Assignments GPAllied Training Series Knowledge Attendee can recall basic information about the subject. Has knowledge of major ideas and can match names of concepts with major ideas. Example: Who, What, When, Where, How…? Comprehension Understands information and can grasp meaning of concepts. Attendee can explain the meaning of concepts in their own words. Example: Explain in one’s own words the steps for completing a given task. Application Can use the information in new situations to solve problems or produce results. Example: Why is…an example of…? Analysis Recognize hidden meanings. Attendee can see patterns, organize parts and identify components of ideas. Example: How does…compare/contrast with…? Synthesis Attendee can draw conclusions on related knowledge from other areas. Can generalize from given facts and use old ideas to create new ones. Example: What solutions would you select for…? Evaluation Attendee can compare and discriminate between ideas. Can assess the value of theories and presentations, and can make choices based on reasoned arguments. Can verify the value of evidence and recognize subjectivity. Example: Select the most effective solution. Page 9 of 9 GPAllied LLC 4200 Faber Place Charleston, SC 29405 www.GPAllied.com Office (843) 414-5760 Fax (843) 414-5779