Tool-Box Talk
Preventive Maintenance 101
Preventive Maintenance - Actions performed on a time- or machine-run-based schedule
that detect, preclude, or mitigate degradation of a component or system with the aim of
sustaining or extending its useful life through controlling degradation to an acceptable
level. (Definition Source: SMRP Best Practices)
Join me for my upcoming workshop October 19-21 at Southern Wesleyan University
in Central, SC (5 miles from Clemson) Interested in a brochure send an email to
rsmith@worldclassmaintenance.org
Fundamentals of PM
1. All Equipment PMs are focused on
specific “Failure Modes”
2. All PM Procedures should have the
following:
• Step by Step Instructions (initial each
step)
• Specifications
• Space available for extra information
­ Condition as found
­ Condition as left
­ Recommendation to changes
to Procedure
3. When a PM Work Order is given to
Maintenance Techs the following should
be attached:
­ Equipment Failure history
since last PM Executed
4. If a piece of critical equipment fails
between PM cycles an RCA should be
initiated
5. Post the following metric in Maintenance
Shop on a line graph
­ PM Labor Hours vs EM/Urgent
Labor Hours
Steps to take if PMs are not Effective
or meeting expectations
Step 1: Acknowledge you have a problem
with your PM Program not meeting
expectations
“you cannot solve a problem without
admitting you have a problem”
Step 2: Create a PM Optimization Team -
Assemble a team of Maintenance Techs,
Maintenance Supervisor and operators for
the team.
Step 3: The PM Optimization Team
establishes their Vision, Mission, and
Guiding Principles approved by
Maintenance, Production and Plant
Leadership and meet weekly for 30 minutes
max (FOCUS)
Step 4: Identify the equipment experiencing
the most losses, ie. OEE, Production loss,
EM/Urgent Labor hrs., etc.
Step 5: Implement PM Optimization Process
on the first asset or area. (review Tool Box
Talk – 103 PM Optimization)
Step 5: Post a Dashboard to measure
progress and effectiveness of the Program
Step 6: Create a PM Problem/Solutions
Board using the A3 Approach to problem
solving

Más contenido relacionado

La actualidad más candente

24 the complete pc tech
24 the complete pc tech24 the complete pc tech
24 the complete pc techhafizhanif86
 
Mgmt 306 progress tracking presentation
Mgmt 306 progress tracking presentationMgmt 306 progress tracking presentation
Mgmt 306 progress tracking presentationJman1287
 
AssetCentral CMMS - Computerized Maintenance Management System
AssetCentral CMMS - Computerized Maintenance Management SystemAssetCentral CMMS - Computerized Maintenance Management System
AssetCentral CMMS - Computerized Maintenance Management SystemAuthentic Venture Sdn Bhd
 
Building a Control Plan
Building a Control PlanBuilding a Control Plan
Building a Control PlanMatt Hansen
 
Om0015 maintenance management
Om0015 maintenance managementOm0015 maintenance management
Om0015 maintenance managementsmumbahelp
 
Julie Rampello Maximo workshop IMC 2013 presentation
Julie Rampello Maximo workshop IMC 2013 presentationJulie Rampello Maximo workshop IMC 2013 presentation
Julie Rampello Maximo workshop IMC 2013 presentationProjetech
 
TM1 Healthcheck - QueBIT Consulting
TM1 Healthcheck  - QueBIT ConsultingTM1 Healthcheck  - QueBIT Consulting
TM1 Healthcheck - QueBIT ConsultingQueBIT Consulting
 
Defect MgmtBugDay Bangkok 2009: Defect Management
Defect MgmtBugDay Bangkok 2009: Defect ManagementDefect MgmtBugDay Bangkok 2009: Defect Management
Defect MgmtBugDay Bangkok 2009: Defect Managementguest476528
 
Systems and processes - second Pillar from Three Pillars of sustainable busin...
Systems and processes - second Pillar from Three Pillars of sustainable busin...Systems and processes - second Pillar from Three Pillars of sustainable busin...
Systems and processes - second Pillar from Three Pillars of sustainable busin...The Pathway Group
 
Moc overview
Moc overviewMoc overview
Moc overviewpmallik
 
Control Phase Roadmap (Level 3)
Control Phase Roadmap (Level 3)Control Phase Roadmap (Level 3)
Control Phase Roadmap (Level 3)Matt Hansen
 

La actualidad más candente (20)

1970
19701970
1970
 
24 the complete pc tech
24 the complete pc tech24 the complete pc tech
24 the complete pc tech
 
QMSS PFMEA - Sample Slides
QMSS PFMEA - Sample SlidesQMSS PFMEA - Sample Slides
QMSS PFMEA - Sample Slides
 
Ch+14
Ch+14Ch+14
Ch+14
 
Tqm fmea
Tqm fmeaTqm fmea
Tqm fmea
 
Mgmt 306 progress tracking presentation
Mgmt 306 progress tracking presentationMgmt 306 progress tracking presentation
Mgmt 306 progress tracking presentation
 
AssetCentral CMMS - Computerized Maintenance Management System
AssetCentral CMMS - Computerized Maintenance Management SystemAssetCentral CMMS - Computerized Maintenance Management System
AssetCentral CMMS - Computerized Maintenance Management System
 
Building a Control Plan
Building a Control PlanBuilding a Control Plan
Building a Control Plan
 
Om0015 maintenance management
Om0015 maintenance managementOm0015 maintenance management
Om0015 maintenance management
 
Failure Modes and Effect Analysis (FMEA)
Failure Modes and Effect Analysis (FMEA)Failure Modes and Effect Analysis (FMEA)
Failure Modes and Effect Analysis (FMEA)
 
Julie Rampello Maximo workshop IMC 2013 presentation
Julie Rampello Maximo workshop IMC 2013 presentationJulie Rampello Maximo workshop IMC 2013 presentation
Julie Rampello Maximo workshop IMC 2013 presentation
 
FMEA program brochure
FMEA program brochureFMEA program brochure
FMEA program brochure
 
TM1 Healthcheck - QueBIT Consulting
TM1 Healthcheck  - QueBIT ConsultingTM1 Healthcheck  - QueBIT Consulting
TM1 Healthcheck - QueBIT Consulting
 
Defect MgmtBugDay Bangkok 2009: Defect Management
Defect MgmtBugDay Bangkok 2009: Defect ManagementDefect MgmtBugDay Bangkok 2009: Defect Management
Defect MgmtBugDay Bangkok 2009: Defect Management
 
Systems and processes - second Pillar from Three Pillars of sustainable busin...
Systems and processes - second Pillar from Three Pillars of sustainable busin...Systems and processes - second Pillar from Three Pillars of sustainable busin...
Systems and processes - second Pillar from Three Pillars of sustainable busin...
 
Moc overview
Moc overviewMoc overview
Moc overview
 
FMEA Analysis Cycle
FMEA Analysis CycleFMEA Analysis Cycle
FMEA Analysis Cycle
 
Process Troubleshooting
Process TroubleshootingProcess Troubleshooting
Process Troubleshooting
 
23 timestudy
23 timestudy23 timestudy
23 timestudy
 
Control Phase Roadmap (Level 3)
Control Phase Roadmap (Level 3)Control Phase Roadmap (Level 3)
Control Phase Roadmap (Level 3)
 

Similar a PM Tool Box Talk 101 - Fundamentals of Preventive Maintenance

PM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
PM Tool Box Talk 101 - Fundamentals of Preventive MaintenancePM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
PM Tool Box Talk 101 - Fundamentals of Preventive MaintenanceRicky Smith CMRP, CMRT
 
Smart Maintenance engineering
Smart Maintenance engineering Smart Maintenance engineering
Smart Maintenance engineering Michel Mafumba
 
TPM the effective maintenance (2)
TPM the effective maintenance (2)TPM the effective maintenance (2)
TPM the effective maintenance (2)Timothy Wooi
 
TPM Pillar Routes_2005_v6.ppt
TPM Pillar Routes_2005_v6.pptTPM Pillar Routes_2005_v6.ppt
TPM Pillar Routes_2005_v6.pptlsurkov2709
 
Pfmea training 1111.pptx
Pfmea training 1111.pptxPfmea training 1111.pptx
Pfmea training 1111.pptxManish Pathak
 
MAINTENANCE POLICIES – PREVENTIVE MAINTENANCE
MAINTENANCE POLICIES – PREVENTIVE MAINTENANCEMAINTENANCE POLICIES – PREVENTIVE MAINTENANCE
MAINTENANCE POLICIES – PREVENTIVE MAINTENANCElaxtwinsme
 
Reliability-centered maintenance (RCM) & Total Productive Maintenance (TPM).pptx
Reliability-centered maintenance (RCM) & Total Productive Maintenance (TPM).pptxReliability-centered maintenance (RCM) & Total Productive Maintenance (TPM).pptx
Reliability-centered maintenance (RCM) & Total Productive Maintenance (TPM).pptxSamuel Gher
 
Anatomy of breakdown
Anatomy of breakdownAnatomy of breakdown
Anatomy of breakdownAnthony Pesce
 
Simple Steps to Improve Your Maintenance Program
Simple Steps to Improve Your Maintenance ProgramSimple Steps to Improve Your Maintenance Program
Simple Steps to Improve Your Maintenance ProgramTranscat
 
Planned preventive maintenance report
Planned preventive maintenance reportPlanned preventive maintenance report
Planned preventive maintenance reportbabarsaleeem11
 
FMEA failure-mode-and-effect-analysis_Occupational safety and health
FMEA failure-mode-and-effect-analysis_Occupational safety and healthFMEA failure-mode-and-effect-analysis_Occupational safety and health
FMEA failure-mode-and-effect-analysis_Occupational safety and healthJing Jing Cheng
 
RCM extension for Maximo - Cohesive Solutions (IMUG 2017)
RCM extension for Maximo - Cohesive Solutions (IMUG 2017)RCM extension for Maximo - Cohesive Solutions (IMUG 2017)
RCM extension for Maximo - Cohesive Solutions (IMUG 2017)Cyrus Sorab
 
Cohesive imug 2017 RCM extension for Maximo
Cohesive imug 2017 RCM extension for MaximoCohesive imug 2017 RCM extension for Maximo
Cohesive imug 2017 RCM extension for MaximoBrandonWilhelm4
 
TPM the effective maintenance with Autonomous Maintenance
TPM the effective maintenance with Autonomous MaintenanceTPM the effective maintenance with Autonomous Maintenance
TPM the effective maintenance with Autonomous MaintenanceTimothy Wooi
 

Similar a PM Tool Box Talk 101 - Fundamentals of Preventive Maintenance (20)

PM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
PM Tool Box Talk 101 - Fundamentals of Preventive MaintenancePM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
PM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
 
Smart Maintenance engineering
Smart Maintenance engineering Smart Maintenance engineering
Smart Maintenance engineering
 
TPM the effective maintenance (2)
TPM the effective maintenance (2)TPM the effective maintenance (2)
TPM the effective maintenance (2)
 
TPM Pillar Routes_2005_v6.ppt
TPM Pillar Routes_2005_v6.pptTPM Pillar Routes_2005_v6.ppt
TPM Pillar Routes_2005_v6.ppt
 
Pfmea training 1111.pptx
Pfmea training 1111.pptxPfmea training 1111.pptx
Pfmea training 1111.pptx
 
MAINTENANCE POLICIES – PREVENTIVE MAINTENANCE
MAINTENANCE POLICIES – PREVENTIVE MAINTENANCEMAINTENANCE POLICIES – PREVENTIVE MAINTENANCE
MAINTENANCE POLICIES – PREVENTIVE MAINTENANCE
 
Reliability-centered maintenance (RCM) & Total Productive Maintenance (TPM).pptx
Reliability-centered maintenance (RCM) & Total Productive Maintenance (TPM).pptxReliability-centered maintenance (RCM) & Total Productive Maintenance (TPM).pptx
Reliability-centered maintenance (RCM) & Total Productive Maintenance (TPM).pptx
 
Anatomy of breakdown
Anatomy of breakdownAnatomy of breakdown
Anatomy of breakdown
 
Simple Steps to Improve Your Maintenance Program
Simple Steps to Improve Your Maintenance ProgramSimple Steps to Improve Your Maintenance Program
Simple Steps to Improve Your Maintenance Program
 
Maintenance management
Maintenance managementMaintenance management
Maintenance management
 
Tpm
TpmTpm
Tpm
 
Unit iii tqm
Unit iii tqmUnit iii tqm
Unit iii tqm
 
Planned preventive maintenance report
Planned preventive maintenance reportPlanned preventive maintenance report
Planned preventive maintenance report
 
FMEA failure-mode-and-effect-analysis_Occupational safety and health
FMEA failure-mode-and-effect-analysis_Occupational safety and healthFMEA failure-mode-and-effect-analysis_Occupational safety and health
FMEA failure-mode-and-effect-analysis_Occupational safety and health
 
TPM Implementation Strategy
TPM Implementation StrategyTPM Implementation Strategy
TPM Implementation Strategy
 
FMEA
FMEAFMEA
FMEA
 
tpm olisa vincent
tpm olisa vincenttpm olisa vincent
tpm olisa vincent
 
RCM extension for Maximo - Cohesive Solutions (IMUG 2017)
RCM extension for Maximo - Cohesive Solutions (IMUG 2017)RCM extension for Maximo - Cohesive Solutions (IMUG 2017)
RCM extension for Maximo - Cohesive Solutions (IMUG 2017)
 
Cohesive imug 2017 RCM extension for Maximo
Cohesive imug 2017 RCM extension for MaximoCohesive imug 2017 RCM extension for Maximo
Cohesive imug 2017 RCM extension for Maximo
 
TPM the effective maintenance with Autonomous Maintenance
TPM the effective maintenance with Autonomous MaintenanceTPM the effective maintenance with Autonomous Maintenance
TPM the effective maintenance with Autonomous Maintenance
 

Más de Ricky Smith CMRP, CMRT

Skills of a Proactive Maintenance Technician
Skills of a Proactive Maintenance TechnicianSkills of a Proactive Maintenance Technician
Skills of a Proactive Maintenance TechnicianRicky Smith CMRP, CMRT
 
Day in the Life (DILO) of a Proactive Maintenance Manager
Day in the Life (DILO) of a Proactive Maintenance ManagerDay in the Life (DILO) of a Proactive Maintenance Manager
Day in the Life (DILO) of a Proactive Maintenance ManagerRicky Smith CMRP, CMRT
 
Day in the Life of a Proactive Maintenance Planner
Day in the Life of a Proactive Maintenance PlannerDay in the Life of a Proactive Maintenance Planner
Day in the Life of a Proactive Maintenance PlannerRicky Smith CMRP, CMRT
 
Day in the life of a Proactive Maintenance Supervisor
Day in the life of a Proactive Maintenance SupervisorDay in the life of a Proactive Maintenance Supervisor
Day in the life of a Proactive Maintenance SupervisorRicky Smith CMRP, CMRT
 
How to know if your maintenance planning and scheduling is not effective
How to know if your maintenance planning and scheduling is not effectiveHow to know if your maintenance planning and scheduling is not effective
How to know if your maintenance planning and scheduling is not effectiveRicky Smith CMRP, CMRT
 
Day in the life of a Proactive Maintenance Supervisor
Day in the life of a Proactive Maintenance SupervisorDay in the life of a Proactive Maintenance Supervisor
Day in the life of a Proactive Maintenance SupervisorRicky Smith CMRP, CMRT
 
Day in the Life of a Proactive Maintenance Technician Article
Day in the Life of a Proactive Maintenance Technician  ArticleDay in the Life of a Proactive Maintenance Technician  Article
Day in the Life of a Proactive Maintenance Technician ArticleRicky Smith CMRP, CMRT
 
Best Maintenance Repair Practices Article
Best Maintenance Repair Practices ArticleBest Maintenance Repair Practices Article
Best Maintenance Repair Practices ArticleRicky Smith CMRP, CMRT
 
Tool Box Talk - Maintenance Parts Checkout
Tool Box Talk - Maintenance Parts CheckoutTool Box Talk - Maintenance Parts Checkout
Tool Box Talk - Maintenance Parts CheckoutRicky Smith CMRP, CMRT
 
Tool Box Talk - Lubrication of Bearings
Tool Box Talk - Lubrication of BearingsTool Box Talk - Lubrication of Bearings
Tool Box Talk - Lubrication of BearingsRicky Smith CMRP, CMRT
 
Tool Box Talk - Maintenance Planning and Scheduling
Tool Box Talk - Maintenance Planning and SchedulingTool Box Talk - Maintenance Planning and Scheduling
Tool Box Talk - Maintenance Planning and SchedulingRicky Smith CMRP, CMRT
 
Top 7 Reasons why Maintenance Work Orders are Closed Out Accurately
Top 7 Reasons why Maintenance Work Orders are Closed Out AccuratelyTop 7 Reasons why Maintenance Work Orders are Closed Out Accurately
Top 7 Reasons why Maintenance Work Orders are Closed Out AccuratelyRicky Smith CMRP, CMRT
 
Tool Box Talk - How to Stop Hydraulic Leaks and Why
Tool Box Talk - How to Stop Hydraulic Leaks and WhyTool Box Talk - How to Stop Hydraulic Leaks and Why
Tool Box Talk - How to Stop Hydraulic Leaks and WhyRicky Smith CMRP, CMRT
 
How to Develop an Effective Maintenance Skills Training Program
How to Develop an Effective Maintenance Skills Training ProgramHow to Develop an Effective Maintenance Skills Training Program
How to Develop an Effective Maintenance Skills Training ProgramRicky Smith CMRP, CMRT
 
Day in the Life of (DILO) of a Proactive Maintenance Technician
Day in the Life of (DILO) of a Proactive Maintenance TechnicianDay in the Life of (DILO) of a Proactive Maintenance Technician
Day in the Life of (DILO) of a Proactive Maintenance TechnicianRicky Smith CMRP, CMRT
 
SMRP World Class Maintenance Slides John Day - Alcoa Mt Holly
SMRP World Class Maintenance Slides John Day - Alcoa Mt HollySMRP World Class Maintenance Slides John Day - Alcoa Mt Holly
SMRP World Class Maintenance Slides John Day - Alcoa Mt HollyRicky Smith CMRP, CMRT
 

Más de Ricky Smith CMRP, CMRT (20)

Skills of a Proactive Maintenance Technician
Skills of a Proactive Maintenance TechnicianSkills of a Proactive Maintenance Technician
Skills of a Proactive Maintenance Technician
 
Day in the Life (DILO) of a Proactive Maintenance Manager
Day in the Life (DILO) of a Proactive Maintenance ManagerDay in the Life (DILO) of a Proactive Maintenance Manager
Day in the Life (DILO) of a Proactive Maintenance Manager
 
Day in the Life of a Proactive Maintenance Planner
Day in the Life of a Proactive Maintenance PlannerDay in the Life of a Proactive Maintenance Planner
Day in the Life of a Proactive Maintenance Planner
 
Day in the life of a Proactive Maintenance Supervisor
Day in the life of a Proactive Maintenance SupervisorDay in the life of a Proactive Maintenance Supervisor
Day in the life of a Proactive Maintenance Supervisor
 
How to know if your maintenance planning and scheduling is not effective
How to know if your maintenance planning and scheduling is not effectiveHow to know if your maintenance planning and scheduling is not effective
How to know if your maintenance planning and scheduling is not effective
 
Day in the life of a Proactive Maintenance Supervisor
Day in the life of a Proactive Maintenance SupervisorDay in the life of a Proactive Maintenance Supervisor
Day in the life of a Proactive Maintenance Supervisor
 
Day in the Life of a Proactive Maintenance Technician Article
Day in the Life of a Proactive Maintenance Technician  ArticleDay in the Life of a Proactive Maintenance Technician  Article
Day in the Life of a Proactive Maintenance Technician Article
 
Best Maintenance Repair Practices Article
Best Maintenance Repair Practices ArticleBest Maintenance Repair Practices Article
Best Maintenance Repair Practices Article
 
Tool Box Talk - Maintenance Parts Checkout
Tool Box Talk - Maintenance Parts CheckoutTool Box Talk - Maintenance Parts Checkout
Tool Box Talk - Maintenance Parts Checkout
 
Tool Box Talk - Lubrication of Bearings
Tool Box Talk - Lubrication of BearingsTool Box Talk - Lubrication of Bearings
Tool Box Talk - Lubrication of Bearings
 
Tool Box Talk - Maintenance Planning and Scheduling
Tool Box Talk - Maintenance Planning and SchedulingTool Box Talk - Maintenance Planning and Scheduling
Tool Box Talk - Maintenance Planning and Scheduling
 
Top 7 Reasons why Maintenance Work Orders are Closed Out Accurately
Top 7 Reasons why Maintenance Work Orders are Closed Out AccuratelyTop 7 Reasons why Maintenance Work Orders are Closed Out Accurately
Top 7 Reasons why Maintenance Work Orders are Closed Out Accurately
 
Tool Box Talk - How to Stop Hydraulic Leaks and Why
Tool Box Talk - How to Stop Hydraulic Leaks and WhyTool Box Talk - How to Stop Hydraulic Leaks and Why
Tool Box Talk - How to Stop Hydraulic Leaks and Why
 
Maintenance of Hydraulic Systems
Maintenance of Hydraulic SystemsMaintenance of Hydraulic Systems
Maintenance of Hydraulic Systems
 
How to Develop an Effective Maintenance Skills Training Program
How to Develop an Effective Maintenance Skills Training ProgramHow to Develop an Effective Maintenance Skills Training Program
How to Develop an Effective Maintenance Skills Training Program
 
What is Lean Maintenance
What is Lean MaintenanceWhat is Lean Maintenance
What is Lean Maintenance
 
Best Maintenance Repair Practices
Best Maintenance Repair PracticesBest Maintenance Repair Practices
Best Maintenance Repair Practices
 
Day in the Life of (DILO) of a Proactive Maintenance Technician
Day in the Life of (DILO) of a Proactive Maintenance TechnicianDay in the Life of (DILO) of a Proactive Maintenance Technician
Day in the Life of (DILO) of a Proactive Maintenance Technician
 
Procedure Based Maintenance
Procedure Based MaintenanceProcedure Based Maintenance
Procedure Based Maintenance
 
SMRP World Class Maintenance Slides John Day - Alcoa Mt Holly
SMRP World Class Maintenance Slides John Day - Alcoa Mt HollySMRP World Class Maintenance Slides John Day - Alcoa Mt Holly
SMRP World Class Maintenance Slides John Day - Alcoa Mt Holly
 

Último

Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesPrabhanshu Chaturvedi
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 

Último (20)

Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 

PM Tool Box Talk 101 - Fundamentals of Preventive Maintenance

  • 1. Tool-Box Talk Preventive Maintenance 101 Preventive Maintenance - Actions performed on a time- or machine-run-based schedule that detect, preclude, or mitigate degradation of a component or system with the aim of sustaining or extending its useful life through controlling degradation to an acceptable level. (Definition Source: SMRP Best Practices) Join me for my upcoming workshop October 19-21 at Southern Wesleyan University in Central, SC (5 miles from Clemson) Interested in a brochure send an email to rsmith@worldclassmaintenance.org Fundamentals of PM 1. All Equipment PMs are focused on specific “Failure Modes” 2. All PM Procedures should have the following: • Step by Step Instructions (initial each step) • Specifications • Space available for extra information ­ Condition as found ­ Condition as left ­ Recommendation to changes to Procedure 3. When a PM Work Order is given to Maintenance Techs the following should be attached: ­ Equipment Failure history since last PM Executed 4. If a piece of critical equipment fails between PM cycles an RCA should be initiated 5. Post the following metric in Maintenance Shop on a line graph ­ PM Labor Hours vs EM/Urgent Labor Hours Steps to take if PMs are not Effective or meeting expectations Step 1: Acknowledge you have a problem with your PM Program not meeting expectations “you cannot solve a problem without admitting you have a problem” Step 2: Create a PM Optimization Team - Assemble a team of Maintenance Techs, Maintenance Supervisor and operators for the team. Step 3: The PM Optimization Team establishes their Vision, Mission, and Guiding Principles approved by Maintenance, Production and Plant Leadership and meet weekly for 30 minutes max (FOCUS) Step 4: Identify the equipment experiencing the most losses, ie. OEE, Production loss, EM/Urgent Labor hrs., etc. Step 5: Implement PM Optimization Process on the first asset or area. (review Tool Box Talk – 103 PM Optimization) Step 5: Post a Dashboard to measure progress and effectiveness of the Program Step 6: Create a PM Problem/Solutions Board using the A3 Approach to problem solving