TPM – Total Productive Maintenance
 TPM is for improving productivity by making
processes more reliable and less wasteful.
 The objective of TPM is to maintain the plant or
equipment in good condition.
 To achieve this objective, preventive and predictive
maintenance is required.
Pillars of TPM
TPM – Total Productive Maintenance
 Autonomous Maintenance, one of the features of
TPM.
 The operator has a better understanding of the how
the equipment works and can tell :
 if an issue is appearing,
 if quality is decreasing,
TPM – Total Productive Maintenance .
Operators are Trained and Motivated to :
Develop ownership attitude toward their equipment
They are encouraged to :
 Perform initial cleaning
 Remove the causes and effects of dirt and dust
 Conduct general inspection
 Lubricating periodically
 Workplace management.
TPM – Total Productive Maintenance
 Maintenance group makes changes that lead to
maintenance prevention.
 Thus preventive maintenance along with maintenance
prevention grouped as Productive Maintenance
TPM – Total Productive Maintenance .
TPM has 3 goals :
 Zero Product Defects
 Zero Equipment Failures
 Zero Accidents.
 Note : On the surface this may seem impossible, but if
it can be run without accident for an hour, it can
be done for two hours, a shift, a day, and so on.
TPM – Total Productive Maintenance .
 TPM performance Metrics is :
OEE = Overall Equipment Effectiveness
The metric is calculated :
Availability x Performance x Quality
 EXAMPLE: if Availability is 95%, Performance is 97%,
and Quality is 98%, then OEE is .95 x .97 x .98 =
90.3%
TPM – Total Productive Maintenance .
 TPM identifies the 6 losses (types of waste)
 Set-up and initial adjustment time,
 Equipment breakdown time,
 Idling and minor losses,
 Speed (cycle time) losses,
 Start-up quality losses, and
 Process quality losses,
TPM – Total Productive Maintenance .
The Base for the TPM Activity is 5S
 Seiri (Sort)
 Seition (Set-in-Order/Arrange)
 Seiso (Shine/Clean)
 Seiketsu (Standard)
 Shitsuke (Sustain)
S -Shift
 Shift unnecessary items to stores or dump ( if
obsolete)
 Separate those which are necessary for the job from
those which are not.
 Single out priority items, keep them as close as
possible and at convenient location.
 Label up (tag) all equipment to returned to stores or
dumped.
S -Shine
 Sweep and shine the work place
 Spring clean the work place
 Secure safety and health
 Stop leaks
S - Sort
 Secure a place for everything and store everything in
its place like
 Tools
 Consumables
 Shop floor material
 Clearly identify work areas, equipment and routes
S - Standardize
 Operating procedures in pictures and photos and not
words
 Simplify the usage instructions
 Store contents of cupboards visibly
 Keep the place tidy, clean and organized
S - Stick to Rules
 Support the process throughout
 Seek to eliminate root cause of the problem
 Conduct audit
 Make the improvements visible so that everyone gets
motivated.
TPM – Total Productive Maintenance .
Results in:
 Equipment condition is known at all times
 Unexpected breakdowns are minimized.
 Corrosion is prevented; wear is delayed; machine life is
extended.
 Spare parts need is reduced.
 Knowledge of the machine is increased
 Machine operation ration is improved
TPM – Total Productive Maintenance .
 Benefits of effective TPM include the following:
 Safer Working Environment
 Improved Equipment Reliability - Uptime
 Increased Capacity
 Increased Productivity
 Improved Quality
 Company Financial Performance and Job Security
‘s Experience
“5S is the starting point for any improvement
Our experience shows about 40% productivity improves
by just getting organized”.

Más contenido relacionado

La actualidad más candente

02training material for msa
02training material for msa02training material for msa
02training material for msa營松 林
 
Production planning & control & Forecasting
Production planning & control & ForecastingProduction planning & control & Forecasting
Production planning & control & ForecastingJenıstön Delımä
 
Statistical Quality Control Lecture Notes.pdf
Statistical Quality Control Lecture Notes.pdfStatistical Quality Control Lecture Notes.pdf
Statistical Quality Control Lecture Notes.pdfDr. Tushar J Bhatt
 
Introduction to Failure Mode and Effects Analysis (FMEA) in TQM
Introduction to Failure Mode and Effects Analysis (FMEA) in TQMIntroduction to Failure Mode and Effects Analysis (FMEA) in TQM
Introduction to Failure Mode and Effects Analysis (FMEA) in TQMDr.Raja R
 
Introduction To Taguchi Method
Introduction To Taguchi MethodIntroduction To Taguchi Method
Introduction To Taguchi MethodRamon Balisnomo
 
Presentation on Total Productive Maintenance
Presentation on Total Productive MaintenancePresentation on Total Productive Maintenance
Presentation on Total Productive MaintenanceMahendra K SHUKLA
 
Statistical Process control
Statistical Process controlStatistical Process control
Statistical Process controlPrashant Tomar
 
Total Productive Maintenance
Total Productive MaintenanceTotal Productive Maintenance
Total Productive MaintenanceAnand Subramaniam
 
PPT ON TOTAL PRODUCTIVE MAINTENANCE (TPM)
PPT ON TOTAL PRODUCTIVE MAINTENANCE (TPM)PPT ON TOTAL PRODUCTIVE MAINTENANCE (TPM)
PPT ON TOTAL PRODUCTIVE MAINTENANCE (TPM)Inter Alliance Werardt
 
Overall Equipment Effectiveness
Overall Equipment EffectivenessOverall Equipment Effectiveness
Overall Equipment EffectivenessAnand Subramaniam
 
Cellular manufacturing
Cellular manufacturingCellular manufacturing
Cellular manufacturingananya0122
 
FP module 4 qualitative approaches to facilities planning
FP module 4 qualitative approaches to facilities planningFP module 4 qualitative approaches to facilities planning
FP module 4 qualitative approaches to facilities planningRashmi Srinivas
 
Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and Controlshrinivas kulkarni
 

La actualidad más candente (20)

02training material for msa
02training material for msa02training material for msa
02training material for msa
 
Production planning & control & Forecasting
Production planning & control & ForecastingProduction planning & control & Forecasting
Production planning & control & Forecasting
 
Statistical Quality Control Lecture Notes.pdf
Statistical Quality Control Lecture Notes.pdfStatistical Quality Control Lecture Notes.pdf
Statistical Quality Control Lecture Notes.pdf
 
TPM 8 Pillars
TPM 8 PillarsTPM 8 Pillars
TPM 8 Pillars
 
Introduction to Failure Mode and Effects Analysis (FMEA) in TQM
Introduction to Failure Mode and Effects Analysis (FMEA) in TQMIntroduction to Failure Mode and Effects Analysis (FMEA) in TQM
Introduction to Failure Mode and Effects Analysis (FMEA) in TQM
 
Introduction To Taguchi Method
Introduction To Taguchi MethodIntroduction To Taguchi Method
Introduction To Taguchi Method
 
Presentation on Total Productive Maintenance
Presentation on Total Productive MaintenancePresentation on Total Productive Maintenance
Presentation on Total Productive Maintenance
 
Statistical Process control
Statistical Process controlStatistical Process control
Statistical Process control
 
Taguchi method
Taguchi methodTaguchi method
Taguchi method
 
Total Productive Maintenance
Total Productive MaintenanceTotal Productive Maintenance
Total Productive Maintenance
 
Maintenance strategies
Maintenance strategiesMaintenance strategies
Maintenance strategies
 
PPT ON TOTAL PRODUCTIVE MAINTENANCE (TPM)
PPT ON TOTAL PRODUCTIVE MAINTENANCE (TPM)PPT ON TOTAL PRODUCTIVE MAINTENANCE (TPM)
PPT ON TOTAL PRODUCTIVE MAINTENANCE (TPM)
 
Overall Equipment Effectiveness
Overall Equipment EffectivenessOverall Equipment Effectiveness
Overall Equipment Effectiveness
 
Cellular manufacturing
Cellular manufacturingCellular manufacturing
Cellular manufacturing
 
CONTROL CHARTS
CONTROL CHARTSCONTROL CHARTS
CONTROL CHARTS
 
FP module 4 qualitative approaches to facilities planning
FP module 4 qualitative approaches to facilities planningFP module 4 qualitative approaches to facilities planning
FP module 4 qualitative approaches to facilities planning
 
Line balancing
Line balancingLine balancing
Line balancing
 
Cellular manufacturing
Cellular manufacturingCellular manufacturing
Cellular manufacturing
 
Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and Control
 
Taguchi.ppt
Taguchi.pptTaguchi.ppt
Taguchi.ppt
 

Similar a Tpm performance measure

Total Productive Maintenance - TPM
Total Productive Maintenance - TPM Total Productive Maintenance - TPM
Total Productive Maintenance - TPM Achuthan Rajagopal
 
Total Productive Maintenance
Total Productive MaintenanceTotal Productive Maintenance
Total Productive MaintenanceVikas Awasthi
 
Total productive maintenance
Total productive maintenanceTotal productive maintenance
Total productive maintenanceAbdullah Saif
 
TPM - Total Productive Maintenance
TPM - Total Productive MaintenanceTPM - Total Productive Maintenance
TPM - Total Productive MaintenanceRAHMAT EIE
 
Total productive maintainence
Total productive maintainenceTotal productive maintainence
Total productive maintainenceSandeep Chowdary
 
Total Productive Maintenance (TPM) for EVERTS 20Aug2018
Total Productive Maintenance (TPM) for EVERTS  20Aug2018Total Productive Maintenance (TPM) for EVERTS  20Aug2018
Total Productive Maintenance (TPM) for EVERTS 20Aug2018Timothy Wooi
 
Autonomous Maintenance (AM)
Autonomous Maintenance (AM)Autonomous Maintenance (AM)
Autonomous Maintenance (AM)Pramod A
 
TPM the effective maintenance with Autonomous Maintenance
TPM the effective maintenance with Autonomous MaintenanceTPM the effective maintenance with Autonomous Maintenance
TPM the effective maintenance with Autonomous MaintenanceTimothy Wooi
 
An introduction to total productive maintenance (tpm
An introduction to total productive maintenance (tpmAn introduction to total productive maintenance (tpm
An introduction to total productive maintenance (tpmarpitmishra
 
tpm main.pptx
tpm main.pptxtpm main.pptx
tpm main.pptxEzraDhigo
 
TPM Total Productive Maintenance Workshop for Quarry Plant (1) 09Oct16
TPM Total Productive Maintenance Workshop for Quarry Plant (1) 09Oct16TPM Total Productive Maintenance Workshop for Quarry Plant (1) 09Oct16
TPM Total Productive Maintenance Workshop for Quarry Plant (1) 09Oct16Timothy Wooi
 

Similar a Tpm performance measure (20)

Total Productive Maintenance - TPM
Total Productive Maintenance - TPM Total Productive Maintenance - TPM
Total Productive Maintenance - TPM
 
Total Productive Maintenance
Total Productive MaintenanceTotal Productive Maintenance
Total Productive Maintenance
 
TPM Activity
TPM ActivityTPM Activity
TPM Activity
 
Tpm by drh.
Tpm by drh.Tpm by drh.
Tpm by drh.
 
TQM TPM
TQM TPMTQM TPM
TQM TPM
 
Total productive maintenance
Total productive maintenanceTotal productive maintenance
Total productive maintenance
 
Tpm (group 8)
Tpm (group 8)Tpm (group 8)
Tpm (group 8)
 
Srj tpm
Srj tpmSrj tpm
Srj tpm
 
TPM - Total Productive Maintenance
TPM - Total Productive MaintenanceTPM - Total Productive Maintenance
TPM - Total Productive Maintenance
 
Total productive maintainence
Total productive maintainenceTotal productive maintainence
Total productive maintainence
 
Total Productive Maintenance (TPM) for EVERTS 20Aug2018
Total Productive Maintenance (TPM) for EVERTS  20Aug2018Total Productive Maintenance (TPM) for EVERTS  20Aug2018
Total Productive Maintenance (TPM) for EVERTS 20Aug2018
 
tpm presentation
tpm presentationtpm presentation
tpm presentation
 
Autonomous Maintenance (AM)
Autonomous Maintenance (AM)Autonomous Maintenance (AM)
Autonomous Maintenance (AM)
 
TPM the effective maintenance with Autonomous Maintenance
TPM the effective maintenance with Autonomous MaintenanceTPM the effective maintenance with Autonomous Maintenance
TPM the effective maintenance with Autonomous Maintenance
 
An introduction to total productive maintenance (tpm
An introduction to total productive maintenance (tpmAn introduction to total productive maintenance (tpm
An introduction to total productive maintenance (tpm
 
tpm main.pptx
tpm main.pptxtpm main.pptx
tpm main.pptx
 
TPM & OEE
TPM & OEETPM & OEE
TPM & OEE
 
TPM (en)
TPM (en)TPM (en)
TPM (en)
 
Chapter 2. tpm
Chapter 2. tpmChapter 2. tpm
Chapter 2. tpm
 
TPM Total Productive Maintenance Workshop for Quarry Plant (1) 09Oct16
TPM Total Productive Maintenance Workshop for Quarry Plant (1) 09Oct16TPM Total Productive Maintenance Workshop for Quarry Plant (1) 09Oct16
TPM Total Productive Maintenance Workshop for Quarry Plant (1) 09Oct16
 

Más de Sree sowdambika College of Engineering (17)

Qfd example
Qfd   exampleQfd   example
Qfd example
 
Iso 9000 2000
Iso 9000 2000Iso 9000 2000
Iso 9000 2000
 
Iso 14000
Iso 14000Iso 14000
Iso 14000
 
Process capability
Process capabilityProcess capability
Process capability
 
Taguchi quality loss function
Taguchi quality loss functionTaguchi quality loss function
Taguchi quality loss function
 
Qfd
QfdQfd
Qfd
 
Quality function deployment
Quality function deploymentQuality function deployment
Quality function deployment
 
Tqm unit 4
Tqm unit 4Tqm unit 4
Tqm unit 4
 
Cs6303 unit2
Cs6303 unit2 Cs6303 unit2
Cs6303 unit2
 
GE6757 - TQM - Unit 4 - TOOLS & TECHNIQUES II
GE6757 - TQM - Unit 4 - TOOLS & TECHNIQUES IIGE6757 - TQM - Unit 4 - TOOLS & TECHNIQUES II
GE6757 - TQM - Unit 4 - TOOLS & TECHNIQUES II
 
Ge6757 t17
Ge6757   t17Ge6757   t17
Ge6757 t17
 
Benchmarking tqm
Benchmarking tqmBenchmarking tqm
Benchmarking tqm
 
Ge6757 unit2
Ge6757   unit2Ge6757   unit2
Ge6757 unit2
 
Ge6757 tqm tools and techniques i
Ge6757   tqm tools and techniques iGe6757   tqm tools and techniques i
Ge6757 tqm tools and techniques i
 
CS6303 - Computer Architecture
CS6303 - Computer ArchitectureCS6303 - Computer Architecture
CS6303 - Computer Architecture
 
Ge6757 - Total Quality Management
Ge6757 - Total Quality ManagementGe6757 - Total Quality Management
Ge6757 - Total Quality Management
 
GE6757 - TOTAL QUALITY MANAGEMENT
GE6757 - TOTAL QUALITY MANAGEMENTGE6757 - TOTAL QUALITY MANAGEMENT
GE6757 - TOTAL QUALITY MANAGEMENT
 

Último

APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhikauryashika82
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...PsychoTech Services
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfAdmir Softic
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxVishalSingh1417
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Disha Kariya
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...christianmathematics
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingTeacherCyreneCayanan
 
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...Sapna Thakur
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 

Último (20)

APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writing
 
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 

Tpm performance measure

  • 1. TPM – Total Productive Maintenance  TPM is for improving productivity by making processes more reliable and less wasteful.  The objective of TPM is to maintain the plant or equipment in good condition.  To achieve this objective, preventive and predictive maintenance is required.
  • 3. TPM – Total Productive Maintenance  Autonomous Maintenance, one of the features of TPM.  The operator has a better understanding of the how the equipment works and can tell :  if an issue is appearing,  if quality is decreasing,
  • 4. TPM – Total Productive Maintenance . Operators are Trained and Motivated to : Develop ownership attitude toward their equipment They are encouraged to :  Perform initial cleaning  Remove the causes and effects of dirt and dust  Conduct general inspection  Lubricating periodically  Workplace management.
  • 5. TPM – Total Productive Maintenance  Maintenance group makes changes that lead to maintenance prevention.  Thus preventive maintenance along with maintenance prevention grouped as Productive Maintenance
  • 6. TPM – Total Productive Maintenance . TPM has 3 goals :  Zero Product Defects  Zero Equipment Failures  Zero Accidents.  Note : On the surface this may seem impossible, but if it can be run without accident for an hour, it can be done for two hours, a shift, a day, and so on.
  • 7. TPM – Total Productive Maintenance .  TPM performance Metrics is : OEE = Overall Equipment Effectiveness The metric is calculated : Availability x Performance x Quality  EXAMPLE: if Availability is 95%, Performance is 97%, and Quality is 98%, then OEE is .95 x .97 x .98 = 90.3%
  • 8. TPM – Total Productive Maintenance .  TPM identifies the 6 losses (types of waste)  Set-up and initial adjustment time,  Equipment breakdown time,  Idling and minor losses,  Speed (cycle time) losses,  Start-up quality losses, and  Process quality losses,
  • 9. TPM – Total Productive Maintenance . The Base for the TPM Activity is 5S  Seiri (Sort)  Seition (Set-in-Order/Arrange)  Seiso (Shine/Clean)  Seiketsu (Standard)  Shitsuke (Sustain)
  • 10.
  • 11. S -Shift  Shift unnecessary items to stores or dump ( if obsolete)  Separate those which are necessary for the job from those which are not.  Single out priority items, keep them as close as possible and at convenient location.  Label up (tag) all equipment to returned to stores or dumped.
  • 12. S -Shine  Sweep and shine the work place  Spring clean the work place  Secure safety and health  Stop leaks
  • 13. S - Sort  Secure a place for everything and store everything in its place like  Tools  Consumables  Shop floor material  Clearly identify work areas, equipment and routes
  • 14. S - Standardize  Operating procedures in pictures and photos and not words  Simplify the usage instructions  Store contents of cupboards visibly  Keep the place tidy, clean and organized
  • 15. S - Stick to Rules  Support the process throughout  Seek to eliminate root cause of the problem  Conduct audit  Make the improvements visible so that everyone gets motivated.
  • 16. TPM – Total Productive Maintenance . Results in:  Equipment condition is known at all times  Unexpected breakdowns are minimized.  Corrosion is prevented; wear is delayed; machine life is extended.  Spare parts need is reduced.  Knowledge of the machine is increased  Machine operation ration is improved
  • 17. TPM – Total Productive Maintenance .  Benefits of effective TPM include the following:  Safer Working Environment  Improved Equipment Reliability - Uptime  Increased Capacity  Increased Productivity  Improved Quality  Company Financial Performance and Job Security
  • 18. ‘s Experience “5S is the starting point for any improvement Our experience shows about 40% productivity improves by just getting organized”.