SlideShare una empresa de Scribd logo
1 de 37
NRMCA Green-Star Program Strategies for Effective Implementation Presented by: Ryan Sewell Redi-Mix Concrete,  a U.S. Concrete company
 
 
Look Ahead Green-Star Background Potential Benefits Challenges Success Stories Look Ahead Green-Star Background Potential Benefits Challenges Success Stories
Background
? What is   Green-Star   ?
 
+ = NRMCA
Why   should producers be interested in   Green-Star   ?
In-House Benefits
External Benefits
U.S. Concrete Production 41% since ’05 NRMCA
U.S. Housing Starts 56% since ’05 U.S. Census Bureau
± 600% since ’05 LEED Certified Construction Projects U.S. Green Building Council
$96 - $140 billion  green  building market by 2013 -McGraw Hill Construction
Challenges   to Anticipate
 
 
EMS Legal Req’s Procedures Training Policy Aspects
 
 
 
 
Dear Green-Star Team, Please call me.  -Ryan Communication Communication
Specific Measurable Attainable Realistic Timely or Teamly S M A R T Setting   SMART   goals is a  good  idea
 
OPERATIONS EMS TEAM EMS COORDINATOR MANAGER MEMBER
 
 
Persevere
“ Success is the ability to go from one failure to another with no loss of enthusiasm.” -Winston Churchill
Success   Stories ?
 
 
 
[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]

Más contenido relacionado

Destacado (9)

Advanced material of construction..ppt24545452
Advanced material of construction..ppt24545452Advanced material of construction..ppt24545452
Advanced material of construction..ppt24545452
 
13 construction material from the future
13 construction material from the future13 construction material from the future
13 construction material from the future
 
Innovative Building Materials
Innovative Building MaterialsInnovative Building Materials
Innovative Building Materials
 
Building construction materials
Building construction materialsBuilding construction materials
Building construction materials
 
Construction Materials
Construction MaterialsConstruction Materials
Construction Materials
 
Concrete Mix Design
Concrete Mix DesignConcrete Mix Design
Concrete Mix Design
 
Self healing bacterial concrete
Self healing bacterial concreteSelf healing bacterial concrete
Self healing bacterial concrete
 
Self Healing Bacterial Concrete Presentation
Self Healing Bacterial Concrete PresentationSelf Healing Bacterial Concrete Presentation
Self Healing Bacterial Concrete Presentation
 
Ceramics and clay products
Ceramics and clay productsCeramics and clay products
Ceramics and clay products
 

Similar a Nrmca Presentation 9 22 09 Nrmca

Cosmini resume_7July2016
Cosmini resume_7July2016Cosmini resume_7July2016
Cosmini resume_7July2016
Doug Cosmini
 
Greystone DeSalle Consulting - VFMiddleton Profile
Greystone DeSalle Consulting - VFMiddleton ProfileGreystone DeSalle Consulting - VFMiddleton Profile
Greystone DeSalle Consulting - VFMiddleton Profile
Vincent Middleton
 
Coleman Resume9-19-16
Coleman Resume9-19-16Coleman Resume9-19-16
Coleman Resume9-19-16
John Coleman
 
Q1 business update jm v7
Q1 business update jm v7Q1 business update jm v7
Q1 business update jm v7
Justin Mai
 

Similar a Nrmca Presentation 9 22 09 Nrmca (20)

Quality
QualityQuality
Quality
 
Quality
QualityQuality
Quality
 
Matecumbe machinery Brand Strategy
Matecumbe machinery Brand StrategyMatecumbe machinery Brand Strategy
Matecumbe machinery Brand Strategy
 
Cosmini resume_7July2016
Cosmini resume_7July2016Cosmini resume_7July2016
Cosmini resume_7July2016
 
Greystone DeSalle Consulting - VFMiddleton Profile
Greystone DeSalle Consulting - VFMiddleton ProfileGreystone DeSalle Consulting - VFMiddleton Profile
Greystone DeSalle Consulting - VFMiddleton Profile
 
Stanford-SDG Webinar Six critical principles of strategic portfolio management
Stanford-SDG Webinar Six critical principles of strategic portfolio managementStanford-SDG Webinar Six critical principles of strategic portfolio management
Stanford-SDG Webinar Six critical principles of strategic portfolio management
 
Elevate the Industry
Elevate the Industry Elevate the Industry
Elevate the Industry
 
Improvement Facilitation and Coaching: An Open Forum
Improvement Facilitation and Coaching: An Open ForumImprovement Facilitation and Coaching: An Open Forum
Improvement Facilitation and Coaching: An Open Forum
 
BMSD_CASE.ppt
BMSD_CASE.pptBMSD_CASE.ppt
BMSD_CASE.ppt
 
Building and Maintaining High Performance Software Teams - traits, tactics an...
Building and Maintaining High Performance Software Teams - traits, tactics an...Building and Maintaining High Performance Software Teams - traits, tactics an...
Building and Maintaining High Performance Software Teams - traits, tactics an...
 
2020 Risk Mitigation Strategies For Inventory Shortages | Supply Chain Manage...
2020 Risk Mitigation Strategies For Inventory Shortages | Supply Chain Manage...2020 Risk Mitigation Strategies For Inventory Shortages | Supply Chain Manage...
2020 Risk Mitigation Strategies For Inventory Shortages | Supply Chain Manage...
 
Matecumbe Machinery Brand Strategy Plan
Matecumbe Machinery Brand Strategy PlanMatecumbe Machinery Brand Strategy Plan
Matecumbe Machinery Brand Strategy Plan
 
Customer Experience Strategy: Bad News is Good News & Doing the Whole Job
Customer Experience Strategy: Bad News is Good News & Doing the Whole JobCustomer Experience Strategy: Bad News is Good News & Doing the Whole Job
Customer Experience Strategy: Bad News is Good News & Doing the Whole Job
 
Coleman Resume9-19-16
Coleman Resume9-19-16Coleman Resume9-19-16
Coleman Resume9-19-16
 
Plan-Do-Study-Adjust: A Deep Dive
Plan-Do-Study-Adjust: A Deep DivePlan-Do-Study-Adjust: A Deep Dive
Plan-Do-Study-Adjust: A Deep Dive
 
Unpacking the Business and Stakeholder Relationship Management Toolbox
Unpacking the Business and Stakeholder Relationship Management ToolboxUnpacking the Business and Stakeholder Relationship Management Toolbox
Unpacking the Business and Stakeholder Relationship Management Toolbox
 
Advancement Strategies for the New Economy
Advancement Strategies for the New EconomyAdvancement Strategies for the New Economy
Advancement Strategies for the New Economy
 
Total Quality Management for Improved Project Success - Construction Claims M...
Total Quality Management for Improved Project Success - Construction Claims M...Total Quality Management for Improved Project Success - Construction Claims M...
Total Quality Management for Improved Project Success - Construction Claims M...
 
Q1 business update jm v7
Q1 business update jm v7Q1 business update jm v7
Q1 business update jm v7
 
Execution Certainty
Execution CertaintyExecution Certainty
Execution Certainty
 

Último

Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
ZurliaSoop
 
obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...
obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...
obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...
yulianti213969
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
allensay1
 

Último (20)

Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
 
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAIGetting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur DubaiUAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
 
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptx
 
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book nowPARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
WheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond InsightsWheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond Insights
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
Nanded Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Nanded Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableNanded Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Nanded Call Girl Just Call 8084732287 Top Class Call Girl Service Available
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdf
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business Potential
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
KOTA 💋 Call Girl 9827461493 Call Girls in Escort service book now
KOTA 💋 Call Girl 9827461493 Call Girls in  Escort service book nowKOTA 💋 Call Girl 9827461493 Call Girls in  Escort service book now
KOTA 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...
obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...
obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
 
Only Cash On Delivery Call Girls In Sikandarpur Gurgaon ❤️8448577510 ⊹Escorts...
Only Cash On Delivery Call Girls In Sikandarpur Gurgaon ❤️8448577510 ⊹Escorts...Only Cash On Delivery Call Girls In Sikandarpur Gurgaon ❤️8448577510 ⊹Escorts...
Only Cash On Delivery Call Girls In Sikandarpur Gurgaon ❤️8448577510 ⊹Escorts...
 
Cannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 UpdatedCannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 Updated
 

Nrmca Presentation 9 22 09 Nrmca

Notas del editor

  1. Intro: Tell anecdotal story Spend no more than 5 minutes on story
  2. Implementing an EMS is a team effort. You can’t do it by yourself. Everyone has a role to play. Multiple parties will have responsibilities. If upper management (analogous to my wife) and the EMS coordinator don’t have a clear vision of the program’s goals it will probably not succeed (or you’ll end up with another dusty folder on a shelf). There is no Weuless Blvd! “ If you don't know where you are going , any road will get you there.” –Cheshire Cat, Alice in Wonderland I hope to encourage you by sharing some of my experiences in the past 24 months.
  3. Spend no more that 5 minutes on this topic
  4. Approximately 5-7 minutes
  5. Internal Benefits: Culture Change Improved Efficiency Reduced Risk
  6. External Benefits: Community Relations Compliance Recognition
  7. “ By 2013, McGraw-Hill Construction estimates today’s overall green building market to more than double, reaching between $96 -$140 billion
  8. Approximately 15 minutes Misinformation Conflict with Existing Workload Lack of Employee Interest Lack of Communication Unrealistic Expectations Changes in Management Document Management
  9. If someone tells you that your’re sitting on a chic and it turns out to be a puppy, you’ve been misinformed. Common examples: This is going to cost too much! We don’t have the people for this. We don’t have any compliance issues. We have too many compliance issues. My previous experience with EMS consisted of reviewing the ISO standard and quickly determining that I wanted no part of EMS. Misinformation is caused by a lack of leadership Get approval from management Select an EMS champion Build a team… you can’t do this by yourself. The team should consist of reps from various depts… (finance, customer service, operations, etc.)
  10. When you ask your managers to do take on another project, some of them may act as if you’re asking them to do this… 1. Plan EMS meetings and implementation wisely. Hold Green-Star meetings immediately after pre-scheduled operations meetings. 3. Help EMS Team members delegate responsibility 4. Divide workload wisely among EMS members. Don’t rely on the most capable individual to do everything. 5. Take existing workload into consideration when planning. Set realistic goals for each term! 6. Keep it simple!
  11. The shoe phone does not work! 1. Provide a written agenda for all regularly held EMS meetings 2. After a meeting, provide a written summary of all topics discussed including expectations for the next meeting 3. Provide a written description of responsibilities to all EMS Team members 4. Provide a list of goals for each term in writing Use email to document and provide a reference GS has to be a project that is aggresively managed Focus, Organize, and compartmentalize. Not everyone on the EMS Team needs to understand the minutia of the entire program Taylor your message for each team member? If you walk in with a 4” EMS binder at the first GS meeting… you will lose people Use NRMCA’s SMART guideline! Give your team members clear / concise goals and deadlines; give examples Don’t let your team members get bogged down / overwhelmed in the details. Follow-up
  12. Signs that your team lacks interest in the program Yawning in meetings Texting during meetings Not paying attention Not completing assigned tasks Rolling eyes Strategies to address lack of interest: 1. Choose EMS team members wisely; if you can’t convert them, get them off the team. 2. During GS meetings make sure everyone is involved. 3. Everyone is expected to contribute 4. Discuss current progress at each participating facility and take notes 5. Do not simply give orders; ask for input and suggestions 6. Make an effort to use those suggestions to improve the program 7. Continually promote the positive aspects of the program at every opportunity 8. Acknowledge positive individual and team participation Always say “Thank You.” You’re not simply asking team members to show up… they must know that they are part of the team. Ask ops managers for problems that they have and look for ways of using GS to address it.
  13. 1. Make sure that management understands the goals and commitments associated with the program… Green-Star is not an award! 2. Green-Star is a marathon, it is not a sprint 3. Define long-term goals and expectations in writing before committing to participate 4. Develop an implementation plan and review it with upper management 5. Start slowly! Carefully select a few facilities in the beginning As you gain experience, expand the program You don’t have to stop everything and go in a different direction! Implementation should be as smooth as possible
  14. Develop a solid program. The benefits will be self-evident. Be prepared with measurable results to demonstrate the effectiveness of your program; efficiency, compliance, or cost savings be prepared to show it. 2. Support for the program must come from the highest levels of management 3. Make Green-Star part of the corporate environmental policy. Indifference is not an option 4. When a new manager comes on board, make an effort to reach out to him/her regarding Green-Star
  15. "Success is the ability to go from one failure to another with no loss of enthusiasm."  - Winston Churchill “ If you’re going through hell, keep going.” -Winston Churchill “ Never never never give up.”  -Winston Churchill
  16. Approximately 5 minutes
  17. In pilot program AI installed bypass system on trucks in Illinois, Indiana, South Carolina and Colorado Reduced oil consumption by 3366 gallons in one year at participating facilities. The system: Reduce costs associated with oil changes Reduce amount of oil purchased Eliminate wear and tear on engines. Joel Nickel: “ The HEPO system is another step toward those goals, helping to reduce our carbon footprint and saving money by reducing our oil changes by two thirds."
  18. “Aggregate Industries has improved compliance by 20% over the last 3 years”
  19. 6 to date