SlideShare una empresa de Scribd logo
1 de 13
Yellow Team Care Area
Improvement Action Plan
Super Control Room
(Owner Bob Sutcliffe)
Issues Raised Issues
Affecting
Suggested Fix Time Scale
to fix
Quoted
Cost
Quoted
By
Small room by managers desk to put new roof
tiles up,
floor area to be updated,
Walls to clean and 3 shelves to be placed for
storage purposes.
Cleaning MD to quote and refurb the room, also
PHS required for loose cables.
2 months
Walls and windows ledge by printer to add
plastic fascia
Cleaning MD to quote and complete the job 1 month
PHS to put loose cables that are hanging down
under both desks on cable tray – Andy Elley to
contact to organise -
Safety Andy Elley to contact to organise
New Sink worktops, taps and fridge 7 Year old taps leaking, no plug
Cable ties for the work stations, sink area and storage space
all raised as requiring improvements within the audit.
FR 2 Bottom Floor (Owner Craig Lock)
Issues Raised Issues
Affecting
Suggested Fix Time Scale
to fix
Quoted
Cost
Quoted
By
All Hand values in FR2 to be removed and re
powder coated
Cleaning Remove and replace, Contact Steve
Watkins
Hours
Order 3 spares to be purchased so able to swap
the powder coat
Cleaning Buy Hours
Issues Raised by the Audit - - - - -
Glass Beakers used for checking gravities to be
kept out of production area
House
Keeping/
Safety
Remove and acquire some plastic beakers
from the lab
Damaged Soap Dispenser Cleaning Replace Hours
Drains dirty require cleaning Cleaning/
Housekeeping
Create a SOP and clean the drains as it is
a manual handling risk to remove the
drains.
Hoses stored on the floor, ensure they are
capped off when not In use
Housekeeping Acquire caps, are employ a new soak
bath.
FR2 Middle Floor (Owner Andrew
Bingham)
Issues Raised Issues
Affecting
Suggested Fix Time Scale
to fix
Quoted
Cost
Quoted
By
Long Term CAPEX - - - - -
Issues Raised through Audit
Out of Dates steps to service, powder to clean
off the floor and cladding to tidy by D3/E4
Safety/
Housekeeping
Service the steps and continue to work
on long term CAPEX
FR2 Top Deck (Owner Chris Jaques)
Issues Raised Issues
Affecting
Suggested Fix Time Scale
to fix
Quoted
Cost
Quoted
By
Floor Areas that are damaged to be repaired Safety Contact Paul Tiffany for Quotes 2 months
Issues Raised through Audit
Pure malt bund leaking Housekeeping Replace Bund
Fire exit sign required on the door Safety Fitters to replace the sign
Yeast Storage Room (Owner Paul Maxted)
Issues Raised Issues
Affecting
Suggested Fix Time Scale
to fix
Quoted
Cost
Quoted
By
Floor area by steps to deep clean to remove
black stains
Cleaning Floor to clean with hypochlorite and to
recheck if stains are still present
In place foam unit to be costed to help
housekeeping and hygiene
Cleaning Quote from diversey
Breeze block to get mould cleaned off and
repainted
House
Keeping
Quote from MD
Drains required in the doorway to remove
standing water
Safety Quote from MD
Floor area repainted House
keeping
Quote from MD
Improve air conditioning to reduce
condensation issues
House
Keeping
Contact Steve Watkins
Issues Raised in the audit
Floor by entrance and under YST to clean Cleaning As above
Pipework between YST4 and YST 5has dirt and
biofilm dripping off them to clean
Cleaning Require foam unit
Laboratory (Owner Bob Sutcliffe)
Issues Raised Issues
Affecting
Suggested Fix Time Scale
to fix
Quoted
Cost
Quoted
By
Issues Raised through Audit
CarboQC trialling cables require tie-
wraps and making safe
Safety/
House
Keeping
Tie up
Filtrate Tanks (Owner Brain Vollans)
Issues Raised Issues
Affecting
Suggested Fix Time Scale
to fix
Quoted
Cost
Quoted
By
Deeper Drains required Cleaning Contact Paul Tiffany for Quotes
FT’s to show read out from SCADA Environmental Myself to discuss with Jason Swaby
Pasteuriser/ Meta – Filter
(Owner Brain Vollans
Issues Raised Issues
Affecting
Suggested Fix Time Scale
to fix
Quoted
Cost
Quoted
By
Hypochlorite on the floor to remove stains Cleaning Clean area on next CILT
Flooding occurring when till-racker is required,
water floods the area
Safety Find out why the flooding occurs, if its
drains unable to cope with amount of
water then improve drainage
Blunger Room (Owner Brain Vollans)
Issues Raised Issues
Affecting
Suggested Fix Time Scale
to fix
Quoted
Cost
Quote
d By
Deeper drains with a longer exit from the
blungers
Cleaning Increase the drain Size Planning Time
(Weeks)
- -
Paint a walkway through Cleaning /
Safety
Paint the walkways Hours Paint from
Stalls
Roof leak requires cleaning Cleaning /
Safety
Fill holes with Sealant Hours
Overhead cleaning of pipes require cleaning Cleaning Foamer Hours
Light required by caustic hook up plate Safety Put a light in PHS Planning Time
(Weeks)
Regrout walls Cleaning Regrout Planning Time
(Weeks)
Fill Holes in walls Cleaning /
Safety
Fill Holes Hours
Removed unused lights Safety /
Electrical
Remove lights- PHS Hours
Longer Drain fitted to stop water pooling along
the floor
Cleaning /
Safety
Increase the drain size Planning time
(weeks)
Deep cleaning required behind Blungers Safety Fit lights and bring in a foamer Planning time
Weeks
Mill Tower Floor 3 and 4 (Owners Oliver
Bird and Lee Powell)
Issues Raised Issues
Affecting
Suggested Fix Time Scale
to fix
Quoted
Cost
Quoted
By
Both have on going work going, will re assess
when work is finished.
Issues Raised through Audit
Floor to be cleaned of malt dust and hoist to
be fixed (Hazard raised)
Cleaning Use hover to remove dust when work
completed
Fury Room (Owner Craig Lock)
Issues Raised Issues
Affecting
Suggested Fix Time Scale
to fix
Quoted
Cost
Quoted
By
Holes around pipework to seal Hygiene MD to complete the work
Large hole above pipework top corner to fill in Hygiene MD to complete the work
Area above pipework between Fury Room and
Blunger area to block off
Hygiene MD to complete the work
Lights to remove Safety PHS to complete the work
Small Light on celling to repair/Remove Safety PHS to Complete the work
Press Deck (Owned by Ryan Truswell)
All issues raised through Audit are noted above.

Más contenido relacionado

La actualidad más candente

What Is A HVAC Load Calculation And Why Is It Important?
What Is A HVAC Load Calculation And Why Is It Important?What Is A HVAC Load Calculation And Why Is It Important?
What Is A HVAC Load Calculation And Why Is It Important?Hays Cooling,Heating & Plumbing
 
Assignment (1)
Assignment (1)Assignment (1)
Assignment (1)Lwj Welson
 
Considerations in Re-roofing
Considerations in Re-roofingConsiderations in Re-roofing
Considerations in Re-roofingRobert Dye, LLC
 
Why piper plumbing
Why piper plumbingWhy piper plumbing
Why piper plumbingreachfirst01
 
Maintenance Improvement 15-16
Maintenance Improvement 15-16Maintenance Improvement 15-16
Maintenance Improvement 15-16Amrit Raj Jaiswal
 
Building Enclosures of the Future - Building Tomorrow's Buildings Today
Building Enclosures of the Future - Building Tomorrow's Buildings TodayBuilding Enclosures of the Future - Building Tomorrow's Buildings Today
Building Enclosures of the Future - Building Tomorrow's Buildings TodayRDH Building Science
 
Deep Retrofit: The Contractor's Perspective
Deep Retrofit: The Contractor's PerspectiveDeep Retrofit: The Contractor's Perspective
Deep Retrofit: The Contractor's PerspectiveSustainableEnergyAut
 
NBEC 2014 - High Performance Retrofits
NBEC 2014 - High Performance RetrofitsNBEC 2014 - High Performance Retrofits
NBEC 2014 - High Performance RetrofitsRDH Building Science
 
State of the Art Review of Unvented Sloped Wood-Framed Roofs in Cold Climates
State of the Art Review of Unvented Sloped Wood-Framed Roofs in Cold ClimatesState of the Art Review of Unvented Sloped Wood-Framed Roofs in Cold Climates
State of the Art Review of Unvented Sloped Wood-Framed Roofs in Cold ClimatesRDH Building Science
 
Building services-i (2)
Building services-i (2)Building services-i (2)
Building services-i (2)Lwj Welson
 
Duplex Conversion - City of Toronto
Duplex Conversion - City of TorontoDuplex Conversion - City of Toronto
Duplex Conversion - City of Torontotboyko
 
Aesthetics in a High-Performing Building How Beauty Blends with Energy Savings
Aesthetics in a High-Performing Building How Beauty Blends with Energy SavingsAesthetics in a High-Performing Building How Beauty Blends with Energy Savings
Aesthetics in a High-Performing Building How Beauty Blends with Energy Savingsenergytrustor
 
Energy efficient for part 9 buildings and city bylaws
Energy efficient for part 9 buildings and city bylawsEnergy efficient for part 9 buildings and city bylaws
Energy efficient for part 9 buildings and city bylawsXiangyang Tan
 
Net Zero Building Enclosure Retrofits for Houses
Net Zero Building Enclosure Retrofits for HousesNet Zero Building Enclosure Retrofits for Houses
Net Zero Building Enclosure Retrofits for HousesRDH Building Science
 
Linked In Presentation1
Linked In Presentation1Linked In Presentation1
Linked In Presentation1Dave Tallon
 

La actualidad más candente (20)

What Is A HVAC Load Calculation And Why Is It Important?
What Is A HVAC Load Calculation And Why Is It Important?What Is A HVAC Load Calculation And Why Is It Important?
What Is A HVAC Load Calculation And Why Is It Important?
 
Closed Conditioned Crawlspace Construction
Closed Conditioned Crawlspace ConstructionClosed Conditioned Crawlspace Construction
Closed Conditioned Crawlspace Construction
 
Assignment (1)
Assignment (1)Assignment (1)
Assignment (1)
 
Considerations in Re-roofing
Considerations in Re-roofingConsiderations in Re-roofing
Considerations in Re-roofing
 
Why piper plumbing
Why piper plumbingWhy piper plumbing
Why piper plumbing
 
Maintenance Improvement 15-16
Maintenance Improvement 15-16Maintenance Improvement 15-16
Maintenance Improvement 15-16
 
Building Enclosures of the Future - Building Tomorrow's Buildings Today
Building Enclosures of the Future - Building Tomorrow's Buildings TodayBuilding Enclosures of the Future - Building Tomorrow's Buildings Today
Building Enclosures of the Future - Building Tomorrow's Buildings Today
 
Deep Retrofit: The Contractor's Perspective
Deep Retrofit: The Contractor's PerspectiveDeep Retrofit: The Contractor's Perspective
Deep Retrofit: The Contractor's Perspective
 
NBEC 2014 - High Performance Retrofits
NBEC 2014 - High Performance RetrofitsNBEC 2014 - High Performance Retrofits
NBEC 2014 - High Performance Retrofits
 
State of the Art Review of Unvented Sloped Wood-Framed Roofs in Cold Climates
State of the Art Review of Unvented Sloped Wood-Framed Roofs in Cold ClimatesState of the Art Review of Unvented Sloped Wood-Framed Roofs in Cold Climates
State of the Art Review of Unvented Sloped Wood-Framed Roofs in Cold Climates
 
Building services-i (2)
Building services-i (2)Building services-i (2)
Building services-i (2)
 
Re-glazing of an All Glass Tower
Re-glazing of an All Glass TowerRe-glazing of an All Glass Tower
Re-glazing of an All Glass Tower
 
Duplex Conversion - City of Toronto
Duplex Conversion - City of TorontoDuplex Conversion - City of Toronto
Duplex Conversion - City of Toronto
 
Aesthetics in a High-Performing Building How Beauty Blends with Energy Savings
Aesthetics in a High-Performing Building How Beauty Blends with Energy SavingsAesthetics in a High-Performing Building How Beauty Blends with Energy Savings
Aesthetics in a High-Performing Building How Beauty Blends with Energy Savings
 
Energy step code
Energy step codeEnergy step code
Energy step code
 
Energy efficient for part 9 buildings and city bylaws
Energy efficient for part 9 buildings and city bylawsEnergy efficient for part 9 buildings and city bylaws
Energy efficient for part 9 buildings and city bylaws
 
Sheboygan County Home Builder's Association
Sheboygan County Home Builder's AssociationSheboygan County Home Builder's Association
Sheboygan County Home Builder's Association
 
Greg Shinaut on What is Green?
Greg Shinaut on What is Green?Greg Shinaut on What is Green?
Greg Shinaut on What is Green?
 
Net Zero Building Enclosure Retrofits for Houses
Net Zero Building Enclosure Retrofits for HousesNet Zero Building Enclosure Retrofits for Houses
Net Zero Building Enclosure Retrofits for Houses
 
Linked In Presentation1
Linked In Presentation1Linked In Presentation1
Linked In Presentation1
 

Destacado

Forssen Haho 2001 Participative development and training for business process...
Forssen Haho 2001 Participative development and training for business process...Forssen Haho 2001 Participative development and training for business process...
Forssen Haho 2001 Participative development and training for business process...Minna-Kaarina Forssén
 
Is canceled debt taxable
Is canceled debt taxableIs canceled debt taxable
Is canceled debt taxableSchaumburg CPA
 
Fastest growing state in india
Fastest growing state in indiaFastest growing state in india
Fastest growing state in indiaRishi Joshi
 
Satya's Resume -updated 12-25-16
Satya's Resume -updated 12-25-16Satya's Resume -updated 12-25-16
Satya's Resume -updated 12-25-16Satya Montgomery
 
Loadแนวข้อสอบ นักวิชาการศึกษา มหาวิทยาลัยราชภัฏจันทรเกษม
 Loadแนวข้อสอบ นักวิชาการศึกษา มหาวิทยาลัยราชภัฏจันทรเกษม Loadแนวข้อสอบ นักวิชาการศึกษา มหาวิทยาลัยราชภัฏจันทรเกษม
Loadแนวข้อสอบ นักวิชาการศึกษา มหาวิทยาลัยราชภัฏจันทรเกษมnawaporn khamseanwong
 
Virtualização e consolidação de servidores
Virtualização e consolidação de servidoresVirtualização e consolidação de servidores
Virtualização e consolidação de servidoresRuy Mendonça
 
REARCH _WOMEN AND MENTAL HEALTH in NRB 1998_ 2014
REARCH _WOMEN AND MENTAL HEALTH in NRB 1998_ 2014REARCH _WOMEN AND MENTAL HEALTH in NRB 1998_ 2014
REARCH _WOMEN AND MENTAL HEALTH in NRB 1998_ 2014waymarks
 
Presentacion
Presentacion Presentacion
Presentacion fuly123
 

Destacado (8)

Forssen Haho 2001 Participative development and training for business process...
Forssen Haho 2001 Participative development and training for business process...Forssen Haho 2001 Participative development and training for business process...
Forssen Haho 2001 Participative development and training for business process...
 
Is canceled debt taxable
Is canceled debt taxableIs canceled debt taxable
Is canceled debt taxable
 
Fastest growing state in india
Fastest growing state in indiaFastest growing state in india
Fastest growing state in india
 
Satya's Resume -updated 12-25-16
Satya's Resume -updated 12-25-16Satya's Resume -updated 12-25-16
Satya's Resume -updated 12-25-16
 
Loadแนวข้อสอบ นักวิชาการศึกษา มหาวิทยาลัยราชภัฏจันทรเกษม
 Loadแนวข้อสอบ นักวิชาการศึกษา มหาวิทยาลัยราชภัฏจันทรเกษม Loadแนวข้อสอบ นักวิชาการศึกษา มหาวิทยาลัยราชภัฏจันทรเกษม
Loadแนวข้อสอบ นักวิชาการศึกษา มหาวิทยาลัยราชภัฏจันทรเกษม
 
Virtualização e consolidação de servidores
Virtualização e consolidação de servidoresVirtualização e consolidação de servidores
Virtualização e consolidação de servidores
 
REARCH _WOMEN AND MENTAL HEALTH in NRB 1998_ 2014
REARCH _WOMEN AND MENTAL HEALTH in NRB 1998_ 2014REARCH _WOMEN AND MENTAL HEALTH in NRB 1998_ 2014
REARCH _WOMEN AND MENTAL HEALTH in NRB 1998_ 2014
 
Presentacion
Presentacion Presentacion
Presentacion
 

Similar a Yellow Team Care Area Improvement Action Plan

New Technology for Efficient Multifamily Building Envelope Sealing
New Technology for Efficient Multifamily Building Envelope SealingNew Technology for Efficient Multifamily Building Envelope Sealing
New Technology for Efficient Multifamily Building Envelope SealingCenter for Energy and Environment
 
MinnePHit House Case Study
MinnePHit House Case StudyMinnePHit House Case Study
MinnePHit House Case StudyTE Studio
 
Automated House Sealing - Aerosol Envelope Sealing of New Homes
Automated House Sealing - Aerosol Envelope Sealing of New HomesAutomated House Sealing - Aerosol Envelope Sealing of New Homes
Automated House Sealing - Aerosol Envelope Sealing of New HomesCenter for Energy and Environment
 
Kitec Plumbing Replacement : A Comprehensive Guide
Kitec Plumbing Replacement : A Comprehensive GuideKitec Plumbing Replacement : A Comprehensive Guide
Kitec Plumbing Replacement : A Comprehensive GuideSamantha Angel
 
Using Aerosol Sealant to Reduce Multifamily Envelope Leakage
Using Aerosol Sealant to Reduce Multifamily Envelope LeakageUsing Aerosol Sealant to Reduce Multifamily Envelope Leakage
Using Aerosol Sealant to Reduce Multifamily Envelope LeakageCenter for Energy and Environment
 
Assignment (1)
Assignment (1)Assignment (1)
Assignment (1)Lwj Welson
 
2015 x472 class 02 - generation systems
2015 x472 class 02 - generation systems2015 x472 class 02 - generation systems
2015 x472 class 02 - generation systemsmichaeljmack
 
2015 x472 class 02 - generation systems
2015 x472 class 02 - generation systems2015 x472 class 02 - generation systems
2015 x472 class 02 - generation systemsmichaeljmack
 
Pile Chapter 11 Technical Ym
Pile Chapter 11   Technical   YmPile Chapter 11   Technical   Ym
Pile Chapter 11 Technical YmGalala University
 
Air Sealing and Ventilation Improvements for Multifamily Buildings - Fitzgera...
Air Sealing and Ventilation Improvements for Multifamily Buildings - Fitzgera...Air Sealing and Ventilation Improvements for Multifamily Buildings - Fitzgera...
Air Sealing and Ventilation Improvements for Multifamily Buildings - Fitzgera...Center for Energy and Environment
 
2016 SENTRO-Tech Online Chemical Cleaning_5-2016
2016 SENTRO-Tech Online Chemical Cleaning_5-20162016 SENTRO-Tech Online Chemical Cleaning_5-2016
2016 SENTRO-Tech Online Chemical Cleaning_5-2016SENTRO TECHNOLOGIES
 
Reframed Tech Series: Prefabricated panels & deep retrofits
Reframed Tech Series: Prefabricated panels & deep retrofitsReframed Tech Series: Prefabricated panels & deep retrofits
Reframed Tech Series: Prefabricated panels & deep retrofitsPembina Institute
 
2012 09 - eeba nahbrcip-prod_bldr struct design
2012 09 - eeba nahbrcip-prod_bldr struct design2012 09 - eeba nahbrcip-prod_bldr struct design
2012 09 - eeba nahbrcip-prod_bldr struct designAmber Joan Wood
 
Swimming Pool and SpaRisk Assessment Project Objective1Ver.docx
Swimming Pool and SpaRisk Assessment Project Objective1Ver.docxSwimming Pool and SpaRisk Assessment Project Objective1Ver.docx
Swimming Pool and SpaRisk Assessment Project Objective1Ver.docxmattinsonjanel
 

Similar a Yellow Team Care Area Improvement Action Plan (20)

New Technology for Efficient Multifamily Building Envelope Sealing
New Technology for Efficient Multifamily Building Envelope SealingNew Technology for Efficient Multifamily Building Envelope Sealing
New Technology for Efficient Multifamily Building Envelope Sealing
 
MinnePHit House Case Study
MinnePHit House Case StudyMinnePHit House Case Study
MinnePHit House Case Study
 
Automated House Sealing - Aerosol Envelope Sealing of New Homes
Automated House Sealing - Aerosol Envelope Sealing of New HomesAutomated House Sealing - Aerosol Envelope Sealing of New Homes
Automated House Sealing - Aerosol Envelope Sealing of New Homes
 
Rowland
RowlandRowland
Rowland
 
February Home Maintenance
February Home MaintenanceFebruary Home Maintenance
February Home Maintenance
 
Kitec Plumbing Replacement : A Comprehensive Guide
Kitec Plumbing Replacement : A Comprehensive GuideKitec Plumbing Replacement : A Comprehensive Guide
Kitec Plumbing Replacement : A Comprehensive Guide
 
Using Aerosol Sealant to Reduce Multifamily Envelope Leakage
Using Aerosol Sealant to Reduce Multifamily Envelope LeakageUsing Aerosol Sealant to Reduce Multifamily Envelope Leakage
Using Aerosol Sealant to Reduce Multifamily Envelope Leakage
 
PPT-on-false-air.ppt
PPT-on-false-air.pptPPT-on-false-air.ppt
PPT-on-false-air.ppt
 
Assignment (1)
Assignment (1)Assignment (1)
Assignment (1)
 
2015 x472 class 02 - generation systems
2015 x472 class 02 - generation systems2015 x472 class 02 - generation systems
2015 x472 class 02 - generation systems
 
Warmer Homes Workshop - WHS Team
Warmer Homes Workshop - WHS TeamWarmer Homes Workshop - WHS Team
Warmer Homes Workshop - WHS Team
 
2015 x472 class 02 - generation systems
2015 x472 class 02 - generation systems2015 x472 class 02 - generation systems
2015 x472 class 02 - generation systems
 
Pile Chapter 11 Technical Ym
Pile Chapter 11   Technical   YmPile Chapter 11   Technical   Ym
Pile Chapter 11 Technical Ym
 
Assume the Worst: Dealing with Contingency Items Before and After Renovation...
Assume the Worst: Dealing with Contingency Items Before and After Renovation...Assume the Worst: Dealing with Contingency Items Before and After Renovation...
Assume the Worst: Dealing with Contingency Items Before and After Renovation...
 
Air Sealing and Ventilation Improvements for Multifamily Buildings - Fitzgera...
Air Sealing and Ventilation Improvements for Multifamily Buildings - Fitzgera...Air Sealing and Ventilation Improvements for Multifamily Buildings - Fitzgera...
Air Sealing and Ventilation Improvements for Multifamily Buildings - Fitzgera...
 
2016 SENTRO-Tech Online Chemical Cleaning_5-2016
2016 SENTRO-Tech Online Chemical Cleaning_5-20162016 SENTRO-Tech Online Chemical Cleaning_5-2016
2016 SENTRO-Tech Online Chemical Cleaning_5-2016
 
Reframed Tech Series: Prefabricated panels & deep retrofits
Reframed Tech Series: Prefabricated panels & deep retrofitsReframed Tech Series: Prefabricated panels & deep retrofits
Reframed Tech Series: Prefabricated panels & deep retrofits
 
2012 09 - eeba nahbrcip-prod_bldr struct design
2012 09 - eeba nahbrcip-prod_bldr struct design2012 09 - eeba nahbrcip-prod_bldr struct design
2012 09 - eeba nahbrcip-prod_bldr struct design
 
Refurbishment
RefurbishmentRefurbishment
Refurbishment
 
Swimming Pool and SpaRisk Assessment Project Objective1Ver.docx
Swimming Pool and SpaRisk Assessment Project Objective1Ver.docxSwimming Pool and SpaRisk Assessment Project Objective1Ver.docx
Swimming Pool and SpaRisk Assessment Project Objective1Ver.docx
 

Yellow Team Care Area Improvement Action Plan

  • 1. Yellow Team Care Area Improvement Action Plan
  • 2. Super Control Room (Owner Bob Sutcliffe) Issues Raised Issues Affecting Suggested Fix Time Scale to fix Quoted Cost Quoted By Small room by managers desk to put new roof tiles up, floor area to be updated, Walls to clean and 3 shelves to be placed for storage purposes. Cleaning MD to quote and refurb the room, also PHS required for loose cables. 2 months Walls and windows ledge by printer to add plastic fascia Cleaning MD to quote and complete the job 1 month PHS to put loose cables that are hanging down under both desks on cable tray – Andy Elley to contact to organise - Safety Andy Elley to contact to organise New Sink worktops, taps and fridge 7 Year old taps leaking, no plug Cable ties for the work stations, sink area and storage space all raised as requiring improvements within the audit.
  • 3. FR 2 Bottom Floor (Owner Craig Lock) Issues Raised Issues Affecting Suggested Fix Time Scale to fix Quoted Cost Quoted By All Hand values in FR2 to be removed and re powder coated Cleaning Remove and replace, Contact Steve Watkins Hours Order 3 spares to be purchased so able to swap the powder coat Cleaning Buy Hours Issues Raised by the Audit - - - - - Glass Beakers used for checking gravities to be kept out of production area House Keeping/ Safety Remove and acquire some plastic beakers from the lab Damaged Soap Dispenser Cleaning Replace Hours Drains dirty require cleaning Cleaning/ Housekeeping Create a SOP and clean the drains as it is a manual handling risk to remove the drains. Hoses stored on the floor, ensure they are capped off when not In use Housekeeping Acquire caps, are employ a new soak bath.
  • 4. FR2 Middle Floor (Owner Andrew Bingham) Issues Raised Issues Affecting Suggested Fix Time Scale to fix Quoted Cost Quoted By Long Term CAPEX - - - - - Issues Raised through Audit Out of Dates steps to service, powder to clean off the floor and cladding to tidy by D3/E4 Safety/ Housekeeping Service the steps and continue to work on long term CAPEX
  • 5. FR2 Top Deck (Owner Chris Jaques) Issues Raised Issues Affecting Suggested Fix Time Scale to fix Quoted Cost Quoted By Floor Areas that are damaged to be repaired Safety Contact Paul Tiffany for Quotes 2 months Issues Raised through Audit Pure malt bund leaking Housekeeping Replace Bund Fire exit sign required on the door Safety Fitters to replace the sign
  • 6. Yeast Storage Room (Owner Paul Maxted) Issues Raised Issues Affecting Suggested Fix Time Scale to fix Quoted Cost Quoted By Floor area by steps to deep clean to remove black stains Cleaning Floor to clean with hypochlorite and to recheck if stains are still present In place foam unit to be costed to help housekeeping and hygiene Cleaning Quote from diversey Breeze block to get mould cleaned off and repainted House Keeping Quote from MD Drains required in the doorway to remove standing water Safety Quote from MD Floor area repainted House keeping Quote from MD Improve air conditioning to reduce condensation issues House Keeping Contact Steve Watkins Issues Raised in the audit Floor by entrance and under YST to clean Cleaning As above Pipework between YST4 and YST 5has dirt and biofilm dripping off them to clean Cleaning Require foam unit
  • 7. Laboratory (Owner Bob Sutcliffe) Issues Raised Issues Affecting Suggested Fix Time Scale to fix Quoted Cost Quoted By Issues Raised through Audit CarboQC trialling cables require tie- wraps and making safe Safety/ House Keeping Tie up
  • 8. Filtrate Tanks (Owner Brain Vollans) Issues Raised Issues Affecting Suggested Fix Time Scale to fix Quoted Cost Quoted By Deeper Drains required Cleaning Contact Paul Tiffany for Quotes FT’s to show read out from SCADA Environmental Myself to discuss with Jason Swaby
  • 9. Pasteuriser/ Meta – Filter (Owner Brain Vollans Issues Raised Issues Affecting Suggested Fix Time Scale to fix Quoted Cost Quoted By Hypochlorite on the floor to remove stains Cleaning Clean area on next CILT Flooding occurring when till-racker is required, water floods the area Safety Find out why the flooding occurs, if its drains unable to cope with amount of water then improve drainage
  • 10. Blunger Room (Owner Brain Vollans) Issues Raised Issues Affecting Suggested Fix Time Scale to fix Quoted Cost Quote d By Deeper drains with a longer exit from the blungers Cleaning Increase the drain Size Planning Time (Weeks) - - Paint a walkway through Cleaning / Safety Paint the walkways Hours Paint from Stalls Roof leak requires cleaning Cleaning / Safety Fill holes with Sealant Hours Overhead cleaning of pipes require cleaning Cleaning Foamer Hours Light required by caustic hook up plate Safety Put a light in PHS Planning Time (Weeks) Regrout walls Cleaning Regrout Planning Time (Weeks) Fill Holes in walls Cleaning / Safety Fill Holes Hours Removed unused lights Safety / Electrical Remove lights- PHS Hours Longer Drain fitted to stop water pooling along the floor Cleaning / Safety Increase the drain size Planning time (weeks) Deep cleaning required behind Blungers Safety Fit lights and bring in a foamer Planning time Weeks
  • 11. Mill Tower Floor 3 and 4 (Owners Oliver Bird and Lee Powell) Issues Raised Issues Affecting Suggested Fix Time Scale to fix Quoted Cost Quoted By Both have on going work going, will re assess when work is finished. Issues Raised through Audit Floor to be cleaned of malt dust and hoist to be fixed (Hazard raised) Cleaning Use hover to remove dust when work completed
  • 12. Fury Room (Owner Craig Lock) Issues Raised Issues Affecting Suggested Fix Time Scale to fix Quoted Cost Quoted By Holes around pipework to seal Hygiene MD to complete the work Large hole above pipework top corner to fill in Hygiene MD to complete the work Area above pipework between Fury Room and Blunger area to block off Hygiene MD to complete the work Lights to remove Safety PHS to complete the work Small Light on celling to repair/Remove Safety PHS to Complete the work
  • 13. Press Deck (Owned by Ryan Truswell) All issues raised through Audit are noted above.