 Typical products of process plants:
◦ Chemistry: paints, plastics, fibres, fertilizers etc
◦ Pharmaceuticals: drugs
◦ Cosmetics: creams, lotions, cosmetic products etc
◦ Refineries: fuels, basic products for chemistry,
lubricants etc
◦ Building materials: cement, sand, gravel etcfood
industry: fats, oils, cereals, sugar etccoal: mining
and processing of coal
 In a contect of plant design and construction, two parties have
to be distinguished:
◦ Plant operator – wants to procure and operate a
process plant
◦ Plant constructor – who according to the agreed
scope of delivery and service, takes on the
planning, devlievry, assembly and start-up.
 Small plants
◦ Production volume of up to RM 3-5 million
◦ Project duration up to one yaer
◦ Many suppliers for small plants
 Medium-sized plants
◦ Order volumes of single or double digit amounts
◦ Project duration: 1-3 years
◦ Carried out by a project team under the leadership
of a project manager –normally handle all steps of
plant design and delivery
◦ Often include several smaller plants integrated as
components
◦ Example: food production plants, sewage plants
 Large-scale plant
◦ Order volume – 500 – 1 billion
◦ Duration: exceeds two years
◦ Large project teams headed by several project managers
◦ General PM – overall responsibility which involves organisational
labour only
◦ Composed of several medium-sized and multitude of small plant units
◦ Example: refineries, complete chemical complexes, steelworks
Technical Requirements Personal qualifications
Expert knowledge in the
disciplines:
Chemical process engineering
Thermal process engineering
Mechanical process engineering
Biological process engineering
Apparatus and pipeline engineering
Pumps and compressors
Material science
E/MC-Technology
EDP capabilities
Word Processing
Spreadsheet analysis
CAD and CAE in plant engineering
Pipe stress analysis
Communication skills
Team spirit
Cross communication within the
project team
Appearance
Stress tolerance and adaptability
Independence
Loyalty
Readiness to take on responsibility
Assertiveness
Negotiating skills
Cost consciousness
Spoken and written English
Additional foreign language
competence
Experience acquired abroad
PRODUCT IDEA/PRODUCT DEVELOPMENT
MARKETANALYSIS
(Product price, quantity and quality)
DETERMINATION OF INVESTMENT COSTS
(Cost Estimation Methods)
DETERMINATION OF OPERATION COSTS
(Mass, material and energy balances)
FEASIBILITY STUDY
INQUIRY
PRIVATE PUBLIC
ENVIRONMENTAL
IMPACT/ RISK ANALYSIS
PREQUALIFICATION
BID/TENDER
BASIC ENGINEERING
Activities during the project planning phase
DEPOSITION OF TENDER
TENDERANALYSISAND COMPARISON
SIGNATURE OF THE CONTRACT
CONTRACT NEGOTIATION
BASIC ENGINEERING
Main components Determination of the offer priceSchedulingElectric components
Process Design Civil EngineeringBalancesLayout Materials Concept
Activities during the project planning phase (continued from previous)
PRODUCT ORGANIZATION AND SCHEDULING
AUTHORITYAPPROVAL
DETAIL ENGINEERING
Final Process Design Building/Steel structure P&I diagrammes
Design of plant components LayoutTechnical specifications
Documentation Piping engineering Electrical engineering
PROCUREMENT
Inquiries Bids of subsuppliers Bid comparison
Contract negotiations Orders and confirmations
EXPEDITING
11
Activities during the project execution phase
EXPEDITING
ERECTION
Site Organization
Building/steel works Electrical partsPipes, valves and fittingsComponents
COLD COMISSIONING
WARM COMMISSIONING
DEMONSTRATION OF THE GUARANTEED PERFORMANCE
ACCEPTANCE
WARRANTY
Activities during the project execution phase (continued from previous)
12
DEFINITION
Bringing new product to market
Endeavor dealing with design,
creation and marketing of product
TARGET
Product marketable in large
quantities
Product realize at high selling
price
IDEA
Technical
‐ Suitable product has to be found
Commercial
‐ Focusing consumer goods
marketing
Research and Development
‐ Scientist and engineer conduct experiment to find a new and better
products
13
i. Research the current price of the
product.
ii. The status of product sellable in market
by doing interview or statistic analysis.
The product should be marketable in as
large quantities as possible.
iii.
iv. The distribution of product should
continue as long as possible.
14
Product Capacity
Type Of Project
Cost Estimation
ResourcesProfitability
Project Organization
& Scheduling
Authorities Channel
Plant Site
Financial
FACTORS
MUST!!
CONSIDER IN
STARTING A
PROJECT
15
Location/Kind of Premises
 Plot of Land
 Operating Resources
 Labour Market
 Political Conditions
 Geographic Conditions
 Infrastructure
 Type of Building
Capacity/Availability/Lifespan
 Capacity
‐ Scheduled annual production output
‐ Depends on Sales and Market
 Availability or Operating Reliability
‐ Actual operating time of a plant in relation to
overall time
‐ Stated as a % and relates to 8760 hrs/yr
 LIFESPAN
‐ Predetermined by the management
‐ Periods range 5 to 30 years
‐ Longer lifespan, higher procurement costs
Degree of Automation
“Fully automatic” plant
 Only the control room has to be staffed
High labour cost – high degree of
automation
Low‐wage countries – cheap personnel
are sufficiently available
Legal Requirements
 Depending on the country
 Regarding permission, implementation,
operation and control of a process plant
Environmental regulations :
environmentally friendly plant
 Safety regulations
16
Thanks for Watching
Please follow me / SAJJAD KHUDHUR ABBAS

Más contenido relacionado

La actualidad más candente

capacity planning om
capacity planning omcapacity planning om
capacity planning omArushi Verma
 
Technical analysis of Projects
Technical analysis of ProjectsTechnical analysis of Projects
Technical analysis of ProjectsPrateek Pawar
 
Process selection and capacity planning
Process selection and capacity planningProcess selection and capacity planning
Process selection and capacity planningShankarjyoti Hazarika
 
Strategic capacity planning for products and services
Strategic capacity planning for products and servicesStrategic capacity planning for products and services
Strategic capacity planning for products and servicesgerlyn bonus
 
Industrial Capacity Planning & Queue Management
Industrial Capacity Planning & Queue ManagementIndustrial Capacity Planning & Queue Management
Industrial Capacity Planning & Queue ManagementSwapnil Shahade
 
Facility planning
Facility planningFacility planning
Facility planningMANJUNATH N
 
Capacity planning
Capacity planningCapacity planning
Capacity planningRatan479
 
Capacity planning ppt @ bec doms
Capacity planning ppt @ bec domsCapacity planning ppt @ bec doms
Capacity planning ppt @ bec domsBabasab Patil
 
Capacity & Inventory Management
Capacity & Inventory ManagementCapacity & Inventory Management
Capacity & Inventory ManagementNilam Kabra
 
Facility location & steps on location selection
Facility location & steps on location selectionFacility location & steps on location selection
Facility location & steps on location selectionemmanuelpjoy1992
 
plant location
plant locationplant location
plant locationSanjay War
 
Facilities planning and production management
Facilities planning and production managementFacilities planning and production management
Facilities planning and production managementSerkan Alan
 
Project Management- Unit III
Project Management- Unit IIIProject Management- Unit III
Project Management- Unit IIILamay Sabir
 
Tools for capacity planning, measurement of capacity, capacity planning process
Tools for capacity planning, measurement of capacity, capacity planning processTools for capacity planning, measurement of capacity, capacity planning process
Tools for capacity planning, measurement of capacity, capacity planning processRohan Monis
 

La actualidad más candente (20)

Facility location
Facility locationFacility location
Facility location
 
Capacity planning
Capacity planningCapacity planning
Capacity planning
 
capacity planning om
capacity planning omcapacity planning om
capacity planning om
 
Technical analysis of Projects
Technical analysis of ProjectsTechnical analysis of Projects
Technical analysis of Projects
 
Process selection and capacity planning
Process selection and capacity planningProcess selection and capacity planning
Process selection and capacity planning
 
Strategic capacity planning for products and services
Strategic capacity planning for products and servicesStrategic capacity planning for products and services
Strategic capacity planning for products and services
 
CAPACITY PLANNING
CAPACITY PLANNINGCAPACITY PLANNING
CAPACITY PLANNING
 
Industrial Capacity Planning & Queue Management
Industrial Capacity Planning & Queue ManagementIndustrial Capacity Planning & Queue Management
Industrial Capacity Planning & Queue Management
 
Facility planning
Facility planningFacility planning
Facility planning
 
Capacity Planning and Control
Capacity Planning and ControlCapacity Planning and Control
Capacity Planning and Control
 
Capacity planning
Capacity planningCapacity planning
Capacity planning
 
Capacity planning
Capacity planningCapacity planning
Capacity planning
 
Capacity planning ppt @ bec doms
Capacity planning ppt @ bec domsCapacity planning ppt @ bec doms
Capacity planning ppt @ bec doms
 
Capacity & Inventory Management
Capacity & Inventory ManagementCapacity & Inventory Management
Capacity & Inventory Management
 
Facility location & steps on location selection
Facility location & steps on location selectionFacility location & steps on location selection
Facility location & steps on location selection
 
plant location
plant locationplant location
plant location
 
Capacity planning
Capacity planningCapacity planning
Capacity planning
 
Facilities planning and production management
Facilities planning and production managementFacilities planning and production management
Facilities planning and production management
 
Project Management- Unit III
Project Management- Unit IIIProject Management- Unit III
Project Management- Unit III
 
Tools for capacity planning, measurement of capacity, capacity planning process
Tools for capacity planning, measurement of capacity, capacity planning processTools for capacity planning, measurement of capacity, capacity planning process
Tools for capacity planning, measurement of capacity, capacity planning process
 

Similar a Episode 26 : Project Management

Similar a Episode 26 : Project Management (20)

Mohamed Hegazy CV -
Mohamed Hegazy CV -Mohamed Hegazy CV -
Mohamed Hegazy CV -
 
Mec.Engineer
Mec.EngineerMec.Engineer
Mec.Engineer
 
SRCV
SRCVSRCV
SRCV
 
Enterprise- Project selection analysis
Enterprise- Project selection  analysisEnterprise- Project selection  analysis
Enterprise- Project selection analysis
 
PROJECT ENGINEER
PROJECT ENGINEERPROJECT ENGINEER
PROJECT ENGINEER
 
MY CV RESUME reviewed
MY CV RESUME reviewedMY CV RESUME reviewed
MY CV RESUME reviewed
 
CV Sigve Hamilton Aspelund 062013
CV Sigve Hamilton Aspelund 062013CV Sigve Hamilton Aspelund 062013
CV Sigve Hamilton Aspelund 062013
 
20161206CJRogers
20161206CJRogers20161206CJRogers
20161206CJRogers
 
SURESHKUMAR. S RESUME LATEST new
SURESHKUMAR. S RESUME LATEST newSURESHKUMAR. S RESUME LATEST new
SURESHKUMAR. S RESUME LATEST new
 
Sureshkumar. s resume latest new
Sureshkumar. s resume latest newSureshkumar. s resume latest new
Sureshkumar. s resume latest new
 
Ahmed Mostafa kamel Mohamed abdulla
Ahmed Mostafa kamel Mohamed abdullaAhmed Mostafa kamel Mohamed abdulla
Ahmed Mostafa kamel Mohamed abdulla
 
Circulem viate
Circulem viateCirculem viate
Circulem viate
 
cv Tajuddin 15 August 2015
cv Tajuddin 15 August 2015cv Tajuddin 15 August 2015
cv Tajuddin 15 August 2015
 
Rakesh CV (4)
Rakesh CV (4)Rakesh CV (4)
Rakesh CV (4)
 
Sabih Laham CV Mar 2015
Sabih Laham CV Mar 2015Sabih Laham CV Mar 2015
Sabih Laham CV Mar 2015
 
Eugene Eybers - CURRICULUM VITAE Rev 4 oman
Eugene Eybers - CURRICULUM VITAE Rev 4 oman Eugene Eybers - CURRICULUM VITAE Rev 4 oman
Eugene Eybers - CURRICULUM VITAE Rev 4 oman
 
CV_Vijay
CV_VijayCV_Vijay
CV_Vijay
 
Senior Mechanical Engineer CV
Senior Mechanical Engineer CVSenior Mechanical Engineer CV
Senior Mechanical Engineer CV
 
Ahmed Abd El Hafez - Senior technical Sales & Operations Engineer
Ahmed Abd El Hafez - Senior technical Sales & Operations EngineerAhmed Abd El Hafez - Senior technical Sales & Operations Engineer
Ahmed Abd El Hafez - Senior technical Sales & Operations Engineer
 
Shaktikumar_Potdar
Shaktikumar_PotdarShaktikumar_Potdar
Shaktikumar_Potdar
 

Más de SAJJAD KHUDHUR ABBAS

PROJECT MANAGEMENT PLAN OF WHITE PORTLAND CEMENT PLANT PROJECT
PROJECT MANAGEMENT PLAN OF  WHITE PORTLAND CEMENT  PLANT PROJECTPROJECT MANAGEMENT PLAN OF  WHITE PORTLAND CEMENT  PLANT PROJECT
PROJECT MANAGEMENT PLAN OF WHITE PORTLAND CEMENT PLANT PROJECTSAJJAD KHUDHUR ABBAS
 
DRYING PROCESS OF BERRY FRUIT BY VACUUM DRYING EQUIPMENT (SIMULATION PROCE...
  DRYING PROCESS OF BERRY FRUIT BY VACUUM DRYING EQUIPMENT  (SIMULATION PROCE...  DRYING PROCESS OF BERRY FRUIT BY VACUUM DRYING EQUIPMENT  (SIMULATION PROCE...
DRYING PROCESS OF BERRY FRUIT BY VACUUM DRYING EQUIPMENT (SIMULATION PROCE...SAJJAD KHUDHUR ABBAS
 
DRYING PROCESS OF BERRY FRUIT BY VACUUM DRYING EQUIPMENT (SIMULATION PROCE...
  DRYING PROCESS OF BERRY FRUIT BY VACUUM DRYING EQUIPMENT  (SIMULATION PROCE...  DRYING PROCESS OF BERRY FRUIT BY VACUUM DRYING EQUIPMENT  (SIMULATION PROCE...
DRYING PROCESS OF BERRY FRUIT BY VACUUM DRYING EQUIPMENT (SIMULATION PROCE...SAJJAD KHUDHUR ABBAS
 
‘Sustainable Approach Of Recycling Palm Oil Mill Effluent Using Integrated Bi...
‘Sustainable Approach Of Recycling Palm Oil Mill Effluent Using Integrated Bi...‘Sustainable Approach Of Recycling Palm Oil Mill Effluent Using Integrated Bi...
‘Sustainable Approach Of Recycling Palm Oil Mill Effluent Using Integrated Bi...SAJJAD KHUDHUR ABBAS
 
Sustainable Approach Of Recycling Palm Oil Mill Effluent Using Integrated Bio...
Sustainable Approach Of Recycling Palm Oil Mill Effluent Using Integrated Bio...Sustainable Approach Of Recycling Palm Oil Mill Effluent Using Integrated Bio...
Sustainable Approach Of Recycling Palm Oil Mill Effluent Using Integrated Bio...SAJJAD KHUDHUR ABBAS
 
Sustainable Approach Of Recycling Palm Oil Mill Effluent Using Integrated Bio...
Sustainable Approach Of Recycling Palm Oil Mill Effluent Using Integrated Bio...Sustainable Approach Of Recycling Palm Oil Mill Effluent Using Integrated Bio...
Sustainable Approach Of Recycling Palm Oil Mill Effluent Using Integrated Bio...SAJJAD KHUDHUR ABBAS
 
SUSTAINABLE APPROACH OF RECYCLING PALM OIL MILL EFFLUENT USING INTEGRATED BIO...
SUSTAINABLE APPROACH OF RECYCLING PALM OIL MILL EFFLUENTUSING INTEGRATED BIO...SUSTAINABLE APPROACH OF RECYCLING PALM OIL MILL EFFLUENTUSING INTEGRATED BIO...
SUSTAINABLE APPROACH OF RECYCLING PALM OIL MILL EFFLUENT USING INTEGRATED BIO...SAJJAD KHUDHUR ABBAS
 
Production of 100 mt distilled monoglyceride (dmg)
Production of 100 mt distilled monoglyceride (dmg)Production of 100 mt distilled monoglyceride (dmg)
Production of 100 mt distilled monoglyceride (dmg)SAJJAD KHUDHUR ABBAS
 
Episode 66 : Renewable Energy Technologies
Episode 66 :  Renewable Energy TechnologiesEpisode 66 :  Renewable Energy Technologies
Episode 66 : Renewable Energy TechnologiesSAJJAD KHUDHUR ABBAS
 
Episode 65 : Membrane separation processes
Episode 65 :  Membrane separation processesEpisode 65 :  Membrane separation processes
Episode 65 : Membrane separation processesSAJJAD KHUDHUR ABBAS
 
SUSTAINABLE APPROACH OF RECYCLING PALM OIL MILL EFFLUENT USING INTEGRATED BIO...
SUSTAINABLE APPROACH OF RECYCLING PALM OIL MILL EFFLUENTUSING INTEGRATED BIO...SUSTAINABLE APPROACH OF RECYCLING PALM OIL MILL EFFLUENTUSING INTEGRATED BIO...
SUSTAINABLE APPROACH OF RECYCLING PALM OIL MILL EFFLUENT USING INTEGRATED BIO...SAJJAD KHUDHUR ABBAS
 
Episode 62 : MATERIAL BALANCE FOR REACTING SYSTEM
Episode 62 :  MATERIAL BALANCE FOR REACTING SYSTEM Episode 62 :  MATERIAL BALANCE FOR REACTING SYSTEM
Episode 62 : MATERIAL BALANCE FOR REACTING SYSTEM SAJJAD KHUDHUR ABBAS
 
Episode 61 : MATERIAL BALANCE FOR REACTING SYSTEM
Episode 61 : MATERIAL BALANCE FOR REACTING SYSTEM Episode 61 : MATERIAL BALANCE FOR REACTING SYSTEM
Episode 61 : MATERIAL BALANCE FOR REACTING SYSTEM SAJJAD KHUDHUR ABBAS
 
Episode 60 : Pinch Diagram and Heat Integration
Episode 60 :  Pinch Diagram and Heat IntegrationEpisode 60 :  Pinch Diagram and Heat Integration
Episode 60 : Pinch Diagram and Heat IntegrationSAJJAD KHUDHUR ABBAS
 
Episode 59 : Introduction of Process Integration
Episode 59 :  Introduction of Process IntegrationEpisode 59 :  Introduction of Process Integration
Episode 59 : Introduction of Process IntegrationSAJJAD KHUDHUR ABBAS
 
Episode 58 : Tools Integration Examples
Episode 58 :  Tools Integration ExamplesEpisode 58 :  Tools Integration Examples
Episode 58 : Tools Integration ExamplesSAJJAD KHUDHUR ABBAS
 
Episode 57 : Simulation for Design and Analysis
Episode 57 : Simulation for Design and AnalysisEpisode 57 : Simulation for Design and Analysis
Episode 57 : Simulation for Design and AnalysisSAJJAD KHUDHUR ABBAS
 
Episode 56 : Simulation for design and analysis
Episode 56 :  Simulation for design and analysis Episode 56 :  Simulation for design and analysis
Episode 56 : Simulation for design and analysis SAJJAD KHUDHUR ABBAS
 
Episode 55 : Conceptual Process Synthesis-Design
Episode 55 :  Conceptual Process Synthesis-DesignEpisode 55 :  Conceptual Process Synthesis-Design
Episode 55 : Conceptual Process Synthesis-DesignSAJJAD KHUDHUR ABBAS
 

Más de SAJJAD KHUDHUR ABBAS (20)

PROJECT MANAGEMENT PLAN OF WHITE PORTLAND CEMENT PLANT PROJECT
PROJECT MANAGEMENT PLAN OF  WHITE PORTLAND CEMENT  PLANT PROJECTPROJECT MANAGEMENT PLAN OF  WHITE PORTLAND CEMENT  PLANT PROJECT
PROJECT MANAGEMENT PLAN OF WHITE PORTLAND CEMENT PLANT PROJECT
 
Electric cars
Electric carsElectric cars
Electric cars
 
DRYING PROCESS OF BERRY FRUIT BY VACUUM DRYING EQUIPMENT (SIMULATION PROCE...
  DRYING PROCESS OF BERRY FRUIT BY VACUUM DRYING EQUIPMENT  (SIMULATION PROCE...  DRYING PROCESS OF BERRY FRUIT BY VACUUM DRYING EQUIPMENT  (SIMULATION PROCE...
DRYING PROCESS OF BERRY FRUIT BY VACUUM DRYING EQUIPMENT (SIMULATION PROCE...
 
DRYING PROCESS OF BERRY FRUIT BY VACUUM DRYING EQUIPMENT (SIMULATION PROCE...
  DRYING PROCESS OF BERRY FRUIT BY VACUUM DRYING EQUIPMENT  (SIMULATION PROCE...  DRYING PROCESS OF BERRY FRUIT BY VACUUM DRYING EQUIPMENT  (SIMULATION PROCE...
DRYING PROCESS OF BERRY FRUIT BY VACUUM DRYING EQUIPMENT (SIMULATION PROCE...
 
‘Sustainable Approach Of Recycling Palm Oil Mill Effluent Using Integrated Bi...
‘Sustainable Approach Of Recycling Palm Oil Mill Effluent Using Integrated Bi...‘Sustainable Approach Of Recycling Palm Oil Mill Effluent Using Integrated Bi...
‘Sustainable Approach Of Recycling Palm Oil Mill Effluent Using Integrated Bi...
 
Sustainable Approach Of Recycling Palm Oil Mill Effluent Using Integrated Bio...
Sustainable Approach Of Recycling Palm Oil Mill Effluent Using Integrated Bio...Sustainable Approach Of Recycling Palm Oil Mill Effluent Using Integrated Bio...
Sustainable Approach Of Recycling Palm Oil Mill Effluent Using Integrated Bio...
 
Sustainable Approach Of Recycling Palm Oil Mill Effluent Using Integrated Bio...
Sustainable Approach Of Recycling Palm Oil Mill Effluent Using Integrated Bio...Sustainable Approach Of Recycling Palm Oil Mill Effluent Using Integrated Bio...
Sustainable Approach Of Recycling Palm Oil Mill Effluent Using Integrated Bio...
 
SUSTAINABLE APPROACH OF RECYCLING PALM OIL MILL EFFLUENT USING INTEGRATED BIO...
SUSTAINABLE APPROACH OF RECYCLING PALM OIL MILL EFFLUENTUSING INTEGRATED BIO...SUSTAINABLE APPROACH OF RECYCLING PALM OIL MILL EFFLUENTUSING INTEGRATED BIO...
SUSTAINABLE APPROACH OF RECYCLING PALM OIL MILL EFFLUENT USING INTEGRATED BIO...
 
Production of 100 mt distilled monoglyceride (dmg)
Production of 100 mt distilled monoglyceride (dmg)Production of 100 mt distilled monoglyceride (dmg)
Production of 100 mt distilled monoglyceride (dmg)
 
Episode 66 : Renewable Energy Technologies
Episode 66 :  Renewable Energy TechnologiesEpisode 66 :  Renewable Energy Technologies
Episode 66 : Renewable Energy Technologies
 
Episode 65 : Membrane separation processes
Episode 65 :  Membrane separation processesEpisode 65 :  Membrane separation processes
Episode 65 : Membrane separation processes
 
SUSTAINABLE APPROACH OF RECYCLING PALM OIL MILL EFFLUENT USING INTEGRATED BIO...
SUSTAINABLE APPROACH OF RECYCLING PALM OIL MILL EFFLUENTUSING INTEGRATED BIO...SUSTAINABLE APPROACH OF RECYCLING PALM OIL MILL EFFLUENTUSING INTEGRATED BIO...
SUSTAINABLE APPROACH OF RECYCLING PALM OIL MILL EFFLUENT USING INTEGRATED BIO...
 
Episode 62 : MATERIAL BALANCE FOR REACTING SYSTEM
Episode 62 :  MATERIAL BALANCE FOR REACTING SYSTEM Episode 62 :  MATERIAL BALANCE FOR REACTING SYSTEM
Episode 62 : MATERIAL BALANCE FOR REACTING SYSTEM
 
Episode 61 : MATERIAL BALANCE FOR REACTING SYSTEM
Episode 61 : MATERIAL BALANCE FOR REACTING SYSTEM Episode 61 : MATERIAL BALANCE FOR REACTING SYSTEM
Episode 61 : MATERIAL BALANCE FOR REACTING SYSTEM
 
Episode 60 : Pinch Diagram and Heat Integration
Episode 60 :  Pinch Diagram and Heat IntegrationEpisode 60 :  Pinch Diagram and Heat Integration
Episode 60 : Pinch Diagram and Heat Integration
 
Episode 59 : Introduction of Process Integration
Episode 59 :  Introduction of Process IntegrationEpisode 59 :  Introduction of Process Integration
Episode 59 : Introduction of Process Integration
 
Episode 58 : Tools Integration Examples
Episode 58 :  Tools Integration ExamplesEpisode 58 :  Tools Integration Examples
Episode 58 : Tools Integration Examples
 
Episode 57 : Simulation for Design and Analysis
Episode 57 : Simulation for Design and AnalysisEpisode 57 : Simulation for Design and Analysis
Episode 57 : Simulation for Design and Analysis
 
Episode 56 : Simulation for design and analysis
Episode 56 :  Simulation for design and analysis Episode 56 :  Simulation for design and analysis
Episode 56 : Simulation for design and analysis
 
Episode 55 : Conceptual Process Synthesis-Design
Episode 55 :  Conceptual Process Synthesis-DesignEpisode 55 :  Conceptual Process Synthesis-Design
Episode 55 : Conceptual Process Synthesis-Design
 

Último

Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesRAJNEESHKUMAR341697
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"mphochane1998
 
Learn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksLearn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksMagic Marks
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdfKamal Acharya
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARKOUSTAV SARKAR
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxmaisarahman1
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Servicemeghakumariji156
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
Air Compressor reciprocating single stage
Air Compressor reciprocating single stageAir Compressor reciprocating single stage
Air Compressor reciprocating single stageAbc194748
 
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...Health
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesMayuraD1
 

Último (20)

Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Learn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksLearn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic Marks
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Air Compressor reciprocating single stage
Air Compressor reciprocating single stageAir Compressor reciprocating single stage
Air Compressor reciprocating single stage
 
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 

Episode 26 : Project Management

  • 1. SAJJAD KHUDHUR ABBAS Chemical Engineering , Al-Muthanna University, Iraq Oil & Gas Safety and Health Professional – OSHACADEMY Trainer of Trainers (TOT) - Canadian Center of Human Development Episode 25 : Project Management
  • 2.  Typical products of process plants: ◦ Chemistry: paints, plastics, fibres, fertilizers etc ◦ Pharmaceuticals: drugs ◦ Cosmetics: creams, lotions, cosmetic products etc ◦ Refineries: fuels, basic products for chemistry, lubricants etc ◦ Building materials: cement, sand, gravel etcfood industry: fats, oils, cereals, sugar etccoal: mining and processing of coal
  • 3.  In a contect of plant design and construction, two parties have to be distinguished: ◦ Plant operator – wants to procure and operate a process plant ◦ Plant constructor – who according to the agreed scope of delivery and service, takes on the planning, devlievry, assembly and start-up.
  • 4.  Small plants ◦ Production volume of up to RM 3-5 million ◦ Project duration up to one yaer ◦ Many suppliers for small plants
  • 5.  Medium-sized plants ◦ Order volumes of single or double digit amounts ◦ Project duration: 1-3 years ◦ Carried out by a project team under the leadership of a project manager –normally handle all steps of plant design and delivery ◦ Often include several smaller plants integrated as components ◦ Example: food production plants, sewage plants
  • 6.  Large-scale plant ◦ Order volume – 500 – 1 billion ◦ Duration: exceeds two years ◦ Large project teams headed by several project managers ◦ General PM – overall responsibility which involves organisational labour only ◦ Composed of several medium-sized and multitude of small plant units ◦ Example: refineries, complete chemical complexes, steelworks
  • 7.
  • 8. Technical Requirements Personal qualifications Expert knowledge in the disciplines: Chemical process engineering Thermal process engineering Mechanical process engineering Biological process engineering Apparatus and pipeline engineering Pumps and compressors Material science E/MC-Technology EDP capabilities Word Processing Spreadsheet analysis CAD and CAE in plant engineering Pipe stress analysis Communication skills Team spirit Cross communication within the project team Appearance Stress tolerance and adaptability Independence Loyalty Readiness to take on responsibility Assertiveness Negotiating skills Cost consciousness Spoken and written English Additional foreign language competence Experience acquired abroad
  • 9. PRODUCT IDEA/PRODUCT DEVELOPMENT MARKETANALYSIS (Product price, quantity and quality) DETERMINATION OF INVESTMENT COSTS (Cost Estimation Methods) DETERMINATION OF OPERATION COSTS (Mass, material and energy balances) FEASIBILITY STUDY INQUIRY PRIVATE PUBLIC ENVIRONMENTAL IMPACT/ RISK ANALYSIS PREQUALIFICATION BID/TENDER BASIC ENGINEERING Activities during the project planning phase
  • 10. DEPOSITION OF TENDER TENDERANALYSISAND COMPARISON SIGNATURE OF THE CONTRACT CONTRACT NEGOTIATION BASIC ENGINEERING Main components Determination of the offer priceSchedulingElectric components Process Design Civil EngineeringBalancesLayout Materials Concept Activities during the project planning phase (continued from previous)
  • 11. PRODUCT ORGANIZATION AND SCHEDULING AUTHORITYAPPROVAL DETAIL ENGINEERING Final Process Design Building/Steel structure P&I diagrammes Design of plant components LayoutTechnical specifications Documentation Piping engineering Electrical engineering PROCUREMENT Inquiries Bids of subsuppliers Bid comparison Contract negotiations Orders and confirmations EXPEDITING 11 Activities during the project execution phase
  • 12. EXPEDITING ERECTION Site Organization Building/steel works Electrical partsPipes, valves and fittingsComponents COLD COMISSIONING WARM COMMISSIONING DEMONSTRATION OF THE GUARANTEED PERFORMANCE ACCEPTANCE WARRANTY Activities during the project execution phase (continued from previous) 12
  • 13. DEFINITION Bringing new product to market Endeavor dealing with design, creation and marketing of product TARGET Product marketable in large quantities Product realize at high selling price IDEA Technical ‐ Suitable product has to be found Commercial ‐ Focusing consumer goods marketing Research and Development ‐ Scientist and engineer conduct experiment to find a new and better products 13
  • 14. i. Research the current price of the product. ii. The status of product sellable in market by doing interview or statistic analysis. The product should be marketable in as large quantities as possible. iii. iv. The distribution of product should continue as long as possible. 14
  • 15. Product Capacity Type Of Project Cost Estimation ResourcesProfitability Project Organization & Scheduling Authorities Channel Plant Site Financial FACTORS MUST!! CONSIDER IN STARTING A PROJECT 15
  • 16. Location/Kind of Premises  Plot of Land  Operating Resources  Labour Market  Political Conditions  Geographic Conditions  Infrastructure  Type of Building Capacity/Availability/Lifespan  Capacity ‐ Scheduled annual production output ‐ Depends on Sales and Market  Availability or Operating Reliability ‐ Actual operating time of a plant in relation to overall time ‐ Stated as a % and relates to 8760 hrs/yr  LIFESPAN ‐ Predetermined by the management ‐ Periods range 5 to 30 years ‐ Longer lifespan, higher procurement costs Degree of Automation “Fully automatic” plant  Only the control room has to be staffed High labour cost – high degree of automation Low‐wage countries – cheap personnel are sufficiently available Legal Requirements  Depending on the country  Regarding permission, implementation, operation and control of a process plant Environmental regulations : environmentally friendly plant  Safety regulations 16