Surface Water Facilities construction progress 11-2012
•
Descargar como PPTX, PDF
•
0 recomendaciones
•
377 vistas
San Jacinto River Authority
Seguir
Denunciar
Compartir
Denunciar
Compartir
1 de 12
Descargar ahora
Recomendados
19-07-06 Scheme Description details
19-07-06 Scheme Description details
Aonghus Murray
cpwss to piler and 8other habitations
cpwss to piler and 8other habitations
Prasadreddy Nemmali
BCPC LOADING JETTY AND STOCK PILE Presentation
BCPC LOADING JETTY AND STOCK PILE Presentation
Adi Sumanto
Marks Sess13 102309
Marks Sess13 102309
SAME 2009 California Water Conference
Presentation fot Coal Loading Operation
Presentation fot Coal Loading Operation
Adi Sumanto
RV Thuwal - Refit project overview by Maritime Survey Australia
RV Thuwal - Refit project overview by Maritime Survey Australia
MichaelUberti
Montrose BLP
Montrose BLP
James Tumilty
Moheshkhali - Anowara 30'' Dia Gas Pipeline Project, Section-A.
Moheshkhali - Anowara 30'' Dia Gas Pipeline Project, Section-A.
Md Abdur Rashid Rony
Recomendados
19-07-06 Scheme Description details
19-07-06 Scheme Description details
Aonghus Murray
cpwss to piler and 8other habitations
cpwss to piler and 8other habitations
Prasadreddy Nemmali
BCPC LOADING JETTY AND STOCK PILE Presentation
BCPC LOADING JETTY AND STOCK PILE Presentation
Adi Sumanto
Marks Sess13 102309
Marks Sess13 102309
SAME 2009 California Water Conference
Presentation fot Coal Loading Operation
Presentation fot Coal Loading Operation
Adi Sumanto
RV Thuwal - Refit project overview by Maritime Survey Australia
RV Thuwal - Refit project overview by Maritime Survey Australia
MichaelUberti
Montrose BLP
Montrose BLP
James Tumilty
Moheshkhali - Anowara 30'' Dia Gas Pipeline Project, Section-A.
Moheshkhali - Anowara 30'' Dia Gas Pipeline Project, Section-A.
Md Abdur Rashid Rony
Storm Pipe Rehabilitation at Cider Barrel Circle and Orr Drive
Storm Pipe Rehabilitation at Cider Barrel Circle and Orr Drive
Fairfax County
New Microsoft Word Document (6)
New Microsoft Word Document (6)
Dilip Kumar Mahato
BAZYAN CCPP – Phase 1
BAZYAN CCPP – Phase 1
Cüneyt Yurtseven
Building a mega-power plant on liquefiable sands
Building a mega-power plant on liquefiable sands
Infocengrs63
11 19-04 drb presentation
11 19-04 drb presentation
lookinforagr8time
Client Presentation
Client Presentation
Sumanth Ramakrishna
Project 2
Project 2
Jigar Ubhadia
Best practices at (aditya cement works site) n ew
Best practices at (aditya cement works site) n ew
Praveen Rathore
SOME OF THE PROJECTS HANDLED
SOME OF THE PROJECTS HANDLED
Casmir Ugo chiekezie
Tsps
Tsps
Ravikiran Chendake
48. ss-esmmp-for-foundationerection-and-stringing-work-may-2015
48. ss-esmmp-for-foundationerection-and-stringing-work-may-2015
Sandeep Bhowmick
Bahamas Project
Bahamas Project
Tony Bell
Jan. 27: Waste Management Daily Report
Jan. 27: Waste Management Daily Report
Honolulu Civil Beat
Yashar Pourang Portfolio
Yashar Pourang Portfolio
Yashar Pourang MIEAust
400kv gis substation erection sequence
400kv gis substation erection sequence
Anbarasu Balakrishnan
Two-Lift Paving
Two-Lift Paving
Jill Reeves
Project presentation
Project presentation
Robin Neupane
Giles Run Pump Station Rehabilitation
Giles Run Pump Station Rehabilitation
Fairfax County
Presentation - July 4, 2011
Presentation - July 4, 2011
newpacificmetals
New Pacific Metals Corporate Presentation
New Pacific Metals Corporate Presentation
newpacific
Sitka's Blue Lake Project - by Dean Orbison
Sitka's Blue Lake Project - by Dean Orbison
Justin Otternewzman
20220817 Presentation wapda.pptx
20220817 Presentation wapda.pptx
AmirShafiq25
Más contenido relacionado
La actualidad más candente
Storm Pipe Rehabilitation at Cider Barrel Circle and Orr Drive
Storm Pipe Rehabilitation at Cider Barrel Circle and Orr Drive
Fairfax County
New Microsoft Word Document (6)
New Microsoft Word Document (6)
Dilip Kumar Mahato
BAZYAN CCPP – Phase 1
BAZYAN CCPP – Phase 1
Cüneyt Yurtseven
Building a mega-power plant on liquefiable sands
Building a mega-power plant on liquefiable sands
Infocengrs63
11 19-04 drb presentation
11 19-04 drb presentation
lookinforagr8time
Client Presentation
Client Presentation
Sumanth Ramakrishna
Project 2
Project 2
Jigar Ubhadia
Best practices at (aditya cement works site) n ew
Best practices at (aditya cement works site) n ew
Praveen Rathore
SOME OF THE PROJECTS HANDLED
SOME OF THE PROJECTS HANDLED
Casmir Ugo chiekezie
Tsps
Tsps
Ravikiran Chendake
48. ss-esmmp-for-foundationerection-and-stringing-work-may-2015
48. ss-esmmp-for-foundationerection-and-stringing-work-may-2015
Sandeep Bhowmick
Bahamas Project
Bahamas Project
Tony Bell
Jan. 27: Waste Management Daily Report
Jan. 27: Waste Management Daily Report
Honolulu Civil Beat
Yashar Pourang Portfolio
Yashar Pourang Portfolio
Yashar Pourang MIEAust
400kv gis substation erection sequence
400kv gis substation erection sequence
Anbarasu Balakrishnan
Two-Lift Paving
Two-Lift Paving
Jill Reeves
Project presentation
Project presentation
Robin Neupane
Giles Run Pump Station Rehabilitation
Giles Run Pump Station Rehabilitation
Fairfax County
Presentation - July 4, 2011
Presentation - July 4, 2011
newpacificmetals
New Pacific Metals Corporate Presentation
New Pacific Metals Corporate Presentation
newpacific
La actualidad más candente
(20)
Storm Pipe Rehabilitation at Cider Barrel Circle and Orr Drive
Storm Pipe Rehabilitation at Cider Barrel Circle and Orr Drive
New Microsoft Word Document (6)
New Microsoft Word Document (6)
BAZYAN CCPP – Phase 1
BAZYAN CCPP – Phase 1
Building a mega-power plant on liquefiable sands
Building a mega-power plant on liquefiable sands
11 19-04 drb presentation
11 19-04 drb presentation
Client Presentation
Client Presentation
Project 2
Project 2
Best practices at (aditya cement works site) n ew
Best practices at (aditya cement works site) n ew
SOME OF THE PROJECTS HANDLED
SOME OF THE PROJECTS HANDLED
Tsps
Tsps
48. ss-esmmp-for-foundationerection-and-stringing-work-may-2015
48. ss-esmmp-for-foundationerection-and-stringing-work-may-2015
Bahamas Project
Bahamas Project
Jan. 27: Waste Management Daily Report
Jan. 27: Waste Management Daily Report
Yashar Pourang Portfolio
Yashar Pourang Portfolio
400kv gis substation erection sequence
400kv gis substation erection sequence
Two-Lift Paving
Two-Lift Paving
Project presentation
Project presentation
Giles Run Pump Station Rehabilitation
Giles Run Pump Station Rehabilitation
Presentation - July 4, 2011
Presentation - July 4, 2011
New Pacific Metals Corporate Presentation
New Pacific Metals Corporate Presentation
Similar a Surface Water Facilities construction progress 11-2012
Sitka's Blue Lake Project - by Dean Orbison
Sitka's Blue Lake Project - by Dean Orbison
Justin Otternewzman
20220817 Presentation wapda.pptx
20220817 Presentation wapda.pptx
AmirShafiq25
ASCE San Ramon Canyon Storm Drain 6 4-15
ASCE San Ramon Canyon Storm Drain 6 4-15
American Society of Civil Engineers, Orange County Branch
Merrywood Force Main Rehabilitation Project
Merrywood Force Main Rehabilitation Project
Fairfax County
MANAGING A GOLD MINE TAILINGS DAM
MANAGING A GOLD MINE TAILINGS DAM
No to mining in Palawan
waris.pptx
waris.pptx
Basit861379
Lower Granite Dam Breach Proposal2
Lower Granite Dam Breach Proposal2
JimWaddell4
ANP DAM PPT Dt 30-10-2022 EE.pptx
ANP DAM PPT Dt 30-10-2022 EE.pptx
Anil Venkata Nag Kothur
Construction of gravity dam by M.R.S
Construction of gravity dam by M.R.S
MD RAHEL SK
Hydro power.pptx
Hydro power.pptx
AbdikariinAhmedMoham
Bee Creek Sewer Line
Bee Creek Sewer Line
City of College Station
Tremie
Tremie
sappy2shail
Modelling of Run-Of-River Hydro generation by Identifying high.pdf
Modelling of Run-Of-River Hydro generation by Identifying high.pdf
Hariharan1065
11737046_08.pdf
11737046_08.pdf
ttaulo
Vivek ppt
Vivek ppt
pspankaj55
Facilities Engineering Presentation
Facilities Engineering Presentation
Hudbay Minerals Inc.
Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)
Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)
Nandan Shandilya
Similar a Surface Water Facilities construction progress 11-2012
(17)
Sitka's Blue Lake Project - by Dean Orbison
Sitka's Blue Lake Project - by Dean Orbison
20220817 Presentation wapda.pptx
20220817 Presentation wapda.pptx
ASCE San Ramon Canyon Storm Drain 6 4-15
ASCE San Ramon Canyon Storm Drain 6 4-15
Merrywood Force Main Rehabilitation Project
Merrywood Force Main Rehabilitation Project
MANAGING A GOLD MINE TAILINGS DAM
MANAGING A GOLD MINE TAILINGS DAM
waris.pptx
waris.pptx
Lower Granite Dam Breach Proposal2
Lower Granite Dam Breach Proposal2
ANP DAM PPT Dt 30-10-2022 EE.pptx
ANP DAM PPT Dt 30-10-2022 EE.pptx
Construction of gravity dam by M.R.S
Construction of gravity dam by M.R.S
Hydro power.pptx
Hydro power.pptx
Bee Creek Sewer Line
Bee Creek Sewer Line
Tremie
Tremie
Modelling of Run-Of-River Hydro generation by Identifying high.pdf
Modelling of Run-Of-River Hydro generation by Identifying high.pdf
11737046_08.pdf
11737046_08.pdf
Vivek ppt
Vivek ppt
Facilities Engineering Presentation
Facilities Engineering Presentation
Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)
Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)
Más de San Jacinto River Authority
Lake Conroe Surface Water Pilot Plant PowerPoint
Lake Conroe Surface Water Pilot Plant PowerPoint
San Jacinto River Authority
GRP Program Construction Progress April 2013
GRP Program Construction Progress April 2013
San Jacinto River Authority
Zebra Mussels in Texas
Zebra Mussels in Texas
San Jacinto River Authority
Lake conroe zebra mussels action plan
Lake conroe zebra mussels action plan
San Jacinto River Authority
GRP Program Water Line Construction Progress
GRP Program Water Line Construction Progress
San Jacinto River Authority
The Lake Report 03/05/13
The Lake Report 03/05/13
San Jacinto River Authority
The Lake Report 12/06/2012
The Lake Report 12/06/2012
San Jacinto River Authority
The Lake Report 11/07/2012
The Lake Report 11/07/2012
San Jacinto River Authority
The Lake Report 08-01-12
The Lake Report 08-01-12
San Jacinto River Authority
SJRA Highlands Division
SJRA Highlands Division
San Jacinto River Authority
U.S. Drought monitor Texas presentation 2010 to 2012
U.S. Drought monitor Texas presentation 2010 to 2012
San Jacinto River Authority
SJRA and the Catahoula
SJRA and the Catahoula
San Jacinto River Authority
GRP Monthly Report February 2012
GRP Monthly Report February 2012
San Jacinto River Authority
The lake report 2-13-12
The lake report 2-13-12
San Jacinto River Authority
Lake Conroe Clean-Up
Lake Conroe Clean-Up
San Jacinto River Authority
The Lake Report 01-24-12
The Lake Report 01-24-12
San Jacinto River Authority
Más de San Jacinto River Authority
(16)
Lake Conroe Surface Water Pilot Plant PowerPoint
Lake Conroe Surface Water Pilot Plant PowerPoint
GRP Program Construction Progress April 2013
GRP Program Construction Progress April 2013
Zebra Mussels in Texas
Zebra Mussels in Texas
Lake conroe zebra mussels action plan
Lake conroe zebra mussels action plan
GRP Program Water Line Construction Progress
GRP Program Water Line Construction Progress
The Lake Report 03/05/13
The Lake Report 03/05/13
The Lake Report 12/06/2012
The Lake Report 12/06/2012
The Lake Report 11/07/2012
The Lake Report 11/07/2012
The Lake Report 08-01-12
The Lake Report 08-01-12
SJRA Highlands Division
SJRA Highlands Division
U.S. Drought monitor Texas presentation 2010 to 2012
U.S. Drought monitor Texas presentation 2010 to 2012
SJRA and the Catahoula
SJRA and the Catahoula
GRP Monthly Report February 2012
GRP Monthly Report February 2012
The lake report 2-13-12
The lake report 2-13-12
Lake Conroe Clean-Up
Lake Conroe Clean-Up
The Lake Report 01-24-12
The Lake Report 01-24-12
Surface Water Facilities construction progress 11-2012
1.
SJRA GRP Surface Water
Facilities Construction Projects November 2012
2.
Surface Water Facilities •
Cost = $42,874,840.00 (thru EWP2) • Change Orders = $0.00 • Total = $42,874,840.00 • Total Estimated Cost To Date: $190,078,395.00 • Total Project Budget: $191,000,000.00 • Scheduled Completion Date: June 1, 2015
3.
Drilling Rig
Hoisting Crane Dredging Crane
4.
Steel Casing being
set in-place at Bent 2 of the Bridge Foundation
5.
Steel casing being driven
to the proper depth
6.
Drilling of 1st Shaft
- Bent 2
7.
Rebar installation at first
shaft – Bent 2
8.
Concrete Placement for Drilled Shaft
– Bent 2
9.
Concrete Placement for Drilled Shaft
– Bent 2
10.
Aerial Photos Flyover October
22, 2012
11.
WATER TREATMENT PLANT
AND HIGH SERVICE PUMP STATION AERIAL Water Treatment Plant Work Zone High Service Pump Station Work Zone
12.
RAW WATER INTAKE
– BRIDGE CONNECTION TO THE DAM Drilling Rig Dredging Crane Hoisting Crane
Descargar ahora