SJRA GRP
Surface Water Facilities
 Construction Projects
     November 2012
Surface Water Facilities

•   Cost = $42,874,840.00 (thru EWP2)
•   Change Orders = $0.00
•   Total = $42,874,840.00
•   Total Estimated Cost To Date: $190,078,395.00
•   Total Project Budget: $191,000,000.00
•   Scheduled Completion Date: June 1, 2015
Drilling Rig

                         Hoisting Crane
Dredging Crane
Steel Casing being set in-place
at Bent 2 of the Bridge
Foundation
Steel casing being
driven to the
proper depth
Drilling of 1st
Shaft - Bent 2
Rebar installation
at first shaft –
Bent 2
Concrete
Placement for
Drilled Shaft –
Bent 2
Concrete
Placement for
Drilled Shaft –
Bent 2
Aerial Photos
Flyover October 22, 2012
WATER TREATMENT PLANT AND HIGH SERVICE PUMP
              STATION AERIAL
                                 Water Treatment Plant
                                 Work Zone




             High Service Pump
             Station Work Zone
RAW WATER INTAKE – BRIDGE CONNECTION TO
THE DAM




                          Drilling Rig




                          Dredging Crane
  Hoisting Crane

Más contenido relacionado

La actualidad más candente

Storm Pipe Rehabilitation at Cider Barrel Circle and Orr Drive
Storm Pipe Rehabilitation at Cider Barrel Circle and Orr DriveStorm Pipe Rehabilitation at Cider Barrel Circle and Orr Drive
Storm Pipe Rehabilitation at Cider Barrel Circle and Orr DriveFairfax County
 
New Microsoft Word Document (6)
New Microsoft Word Document (6)New Microsoft Word Document (6)
New Microsoft Word Document (6)Dilip Kumar Mahato
 
Building a mega-power plant on liquefiable sands
Building a mega-power plant on liquefiable sandsBuilding a mega-power plant on liquefiable sands
Building a mega-power plant on liquefiable sandsInfocengrs63
 
Best practices at (aditya cement works site) n ew
Best practices at (aditya cement works site) n ewBest practices at (aditya cement works site) n ew
Best practices at (aditya cement works site) n ewPraveen Rathore
 
48. ss-esmmp-for-foundationerection-and-stringing-work-may-2015
48. ss-esmmp-for-foundationerection-and-stringing-work-may-201548. ss-esmmp-for-foundationerection-and-stringing-work-may-2015
48. ss-esmmp-for-foundationerection-and-stringing-work-may-2015Sandeep Bhowmick
 
Bahamas Project
Bahamas ProjectBahamas Project
Bahamas ProjectTony Bell
 
Jan. 27: Waste Management Daily Report
Jan. 27: Waste Management Daily ReportJan. 27: Waste Management Daily Report
Jan. 27: Waste Management Daily ReportHonolulu Civil Beat
 
400kv gis substation erection sequence
400kv gis substation erection sequence400kv gis substation erection sequence
400kv gis substation erection sequenceAnbarasu Balakrishnan
 
Project presentation
Project presentationProject presentation
Project presentationRobin Neupane
 
Giles Run Pump Station Rehabilitation
Giles Run Pump Station RehabilitationGiles Run Pump Station Rehabilitation
Giles Run Pump Station RehabilitationFairfax County
 
Presentation - July 4, 2011
Presentation - July 4, 2011Presentation - July 4, 2011
Presentation - July 4, 2011newpacificmetals
 
New Pacific Metals Corporate Presentation
New Pacific Metals Corporate PresentationNew Pacific Metals Corporate Presentation
New Pacific Metals Corporate Presentationnewpacific
 

La actualidad más candente (20)

Storm Pipe Rehabilitation at Cider Barrel Circle and Orr Drive
Storm Pipe Rehabilitation at Cider Barrel Circle and Orr DriveStorm Pipe Rehabilitation at Cider Barrel Circle and Orr Drive
Storm Pipe Rehabilitation at Cider Barrel Circle and Orr Drive
 
New Microsoft Word Document (6)
New Microsoft Word Document (6)New Microsoft Word Document (6)
New Microsoft Word Document (6)
 
BAZYAN CCPP – Phase 1
BAZYAN CCPP – Phase 1BAZYAN CCPP – Phase 1
BAZYAN CCPP – Phase 1
 
Building a mega-power plant on liquefiable sands
Building a mega-power plant on liquefiable sandsBuilding a mega-power plant on liquefiable sands
Building a mega-power plant on liquefiable sands
 
11 19-04 drb presentation
11 19-04 drb presentation11 19-04 drb presentation
11 19-04 drb presentation
 
Client Presentation
Client PresentationClient Presentation
Client Presentation
 
Project 2
Project 2Project 2
Project 2
 
Best practices at (aditya cement works site) n ew
Best practices at (aditya cement works site) n ewBest practices at (aditya cement works site) n ew
Best practices at (aditya cement works site) n ew
 
SOME OF THE PROJECTS HANDLED
SOME OF THE PROJECTS HANDLEDSOME OF THE PROJECTS HANDLED
SOME OF THE PROJECTS HANDLED
 
Tsps
TspsTsps
Tsps
 
48. ss-esmmp-for-foundationerection-and-stringing-work-may-2015
48. ss-esmmp-for-foundationerection-and-stringing-work-may-201548. ss-esmmp-for-foundationerection-and-stringing-work-may-2015
48. ss-esmmp-for-foundationerection-and-stringing-work-may-2015
 
Bahamas Project
Bahamas ProjectBahamas Project
Bahamas Project
 
Jan. 27: Waste Management Daily Report
Jan. 27: Waste Management Daily ReportJan. 27: Waste Management Daily Report
Jan. 27: Waste Management Daily Report
 
Yashar Pourang Portfolio
Yashar Pourang Portfolio Yashar Pourang Portfolio
Yashar Pourang Portfolio
 
400kv gis substation erection sequence
400kv gis substation erection sequence400kv gis substation erection sequence
400kv gis substation erection sequence
 
Two-Lift Paving
Two-Lift PavingTwo-Lift Paving
Two-Lift Paving
 
Project presentation
Project presentationProject presentation
Project presentation
 
Giles Run Pump Station Rehabilitation
Giles Run Pump Station RehabilitationGiles Run Pump Station Rehabilitation
Giles Run Pump Station Rehabilitation
 
Presentation - July 4, 2011
Presentation - July 4, 2011Presentation - July 4, 2011
Presentation - July 4, 2011
 
New Pacific Metals Corporate Presentation
New Pacific Metals Corporate PresentationNew Pacific Metals Corporate Presentation
New Pacific Metals Corporate Presentation
 

Similar a Surface Water Facilities construction progress 11-2012

Sitka's Blue Lake Project - by Dean Orbison
Sitka's Blue Lake Project - by Dean OrbisonSitka's Blue Lake Project - by Dean Orbison
Sitka's Blue Lake Project - by Dean OrbisonJustin Otternewzman
 
20220817 Presentation wapda.pptx
20220817 Presentation wapda.pptx20220817 Presentation wapda.pptx
20220817 Presentation wapda.pptxAmirShafiq25
 
Merrywood Force Main Rehabilitation Project
Merrywood Force Main Rehabilitation ProjectMerrywood Force Main Rehabilitation Project
Merrywood Force Main Rehabilitation ProjectFairfax County
 
Lower Granite Dam Breach Proposal2
Lower Granite Dam Breach Proposal2Lower Granite Dam Breach Proposal2
Lower Granite Dam Breach Proposal2JimWaddell4
 
Construction of gravity dam by M.R.S
Construction of gravity dam by M.R.SConstruction of gravity dam by M.R.S
Construction of gravity dam by M.R.SMD RAHEL SK
 
Modelling of Run-Of-River Hydro generation by Identifying high.pdf
Modelling of Run-Of-River Hydro generation by Identifying high.pdfModelling of Run-Of-River Hydro generation by Identifying high.pdf
Modelling of Run-Of-River Hydro generation by Identifying high.pdfHariharan1065
 
11737046_08.pdf
11737046_08.pdf11737046_08.pdf
11737046_08.pdfttaulo
 
Facilities Engineering Presentation
Facilities Engineering PresentationFacilities Engineering Presentation
Facilities Engineering PresentationHudbay Minerals Inc.
 
Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)
Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)
Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)Nandan Shandilya
 

Similar a Surface Water Facilities construction progress 11-2012 (17)

Sitka's Blue Lake Project - by Dean Orbison
Sitka's Blue Lake Project - by Dean OrbisonSitka's Blue Lake Project - by Dean Orbison
Sitka's Blue Lake Project - by Dean Orbison
 
20220817 Presentation wapda.pptx
20220817 Presentation wapda.pptx20220817 Presentation wapda.pptx
20220817 Presentation wapda.pptx
 
ASCE San Ramon Canyon Storm Drain 6 4-15
ASCE San Ramon Canyon Storm Drain 6 4-15 ASCE San Ramon Canyon Storm Drain 6 4-15
ASCE San Ramon Canyon Storm Drain 6 4-15
 
Merrywood Force Main Rehabilitation Project
Merrywood Force Main Rehabilitation ProjectMerrywood Force Main Rehabilitation Project
Merrywood Force Main Rehabilitation Project
 
MANAGING A GOLD MINE TAILINGS DAM
MANAGING A GOLD MINE TAILINGS DAMMANAGING A GOLD MINE TAILINGS DAM
MANAGING A GOLD MINE TAILINGS DAM
 
waris.pptx
waris.pptxwaris.pptx
waris.pptx
 
Lower Granite Dam Breach Proposal2
Lower Granite Dam Breach Proposal2Lower Granite Dam Breach Proposal2
Lower Granite Dam Breach Proposal2
 
ANP DAM PPT Dt 30-10-2022 EE.pptx
ANP DAM PPT Dt 30-10-2022 EE.pptxANP DAM PPT Dt 30-10-2022 EE.pptx
ANP DAM PPT Dt 30-10-2022 EE.pptx
 
Construction of gravity dam by M.R.S
Construction of gravity dam by M.R.SConstruction of gravity dam by M.R.S
Construction of gravity dam by M.R.S
 
Hydro power.pptx
Hydro power.pptxHydro power.pptx
Hydro power.pptx
 
Bee Creek Sewer Line
Bee Creek Sewer LineBee Creek Sewer Line
Bee Creek Sewer Line
 
Tremie
TremieTremie
Tremie
 
Modelling of Run-Of-River Hydro generation by Identifying high.pdf
Modelling of Run-Of-River Hydro generation by Identifying high.pdfModelling of Run-Of-River Hydro generation by Identifying high.pdf
Modelling of Run-Of-River Hydro generation by Identifying high.pdf
 
11737046_08.pdf
11737046_08.pdf11737046_08.pdf
11737046_08.pdf
 
Vivek ppt
Vivek pptVivek ppt
Vivek ppt
 
Facilities Engineering Presentation
Facilities Engineering PresentationFacilities Engineering Presentation
Facilities Engineering Presentation
 
Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)
Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)
Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)
 

Más de San Jacinto River Authority (16)

Lake Conroe Surface Water Pilot Plant PowerPoint
Lake Conroe Surface Water Pilot Plant PowerPointLake Conroe Surface Water Pilot Plant PowerPoint
Lake Conroe Surface Water Pilot Plant PowerPoint
 
GRP Program Construction Progress April 2013
GRP Program Construction Progress April 2013GRP Program Construction Progress April 2013
GRP Program Construction Progress April 2013
 
Zebra Mussels in Texas
Zebra Mussels in TexasZebra Mussels in Texas
Zebra Mussels in Texas
 
Lake conroe zebra mussels action plan
Lake conroe zebra mussels action planLake conroe zebra mussels action plan
Lake conroe zebra mussels action plan
 
GRP Program Water Line Construction Progress
GRP Program Water Line Construction ProgressGRP Program Water Line Construction Progress
GRP Program Water Line Construction Progress
 
The Lake Report 03/05/13
The Lake Report 03/05/13The Lake Report 03/05/13
The Lake Report 03/05/13
 
The Lake Report 12/06/2012
The Lake Report 12/06/2012The Lake Report 12/06/2012
The Lake Report 12/06/2012
 
The Lake Report 11/07/2012
The Lake Report 11/07/2012The Lake Report 11/07/2012
The Lake Report 11/07/2012
 
The Lake Report 08-01-12
The Lake Report 08-01-12The Lake Report 08-01-12
The Lake Report 08-01-12
 
SJRA Highlands Division
SJRA Highlands DivisionSJRA Highlands Division
SJRA Highlands Division
 
U.S. Drought monitor Texas presentation 2010 to 2012
U.S. Drought monitor Texas presentation 2010 to 2012U.S. Drought monitor Texas presentation 2010 to 2012
U.S. Drought monitor Texas presentation 2010 to 2012
 
SJRA and the Catahoula
SJRA and the CatahoulaSJRA and the Catahoula
SJRA and the Catahoula
 
GRP Monthly Report February 2012
GRP Monthly Report February 2012GRP Monthly Report February 2012
GRP Monthly Report February 2012
 
The lake report 2-13-12
The lake report 2-13-12The lake report 2-13-12
The lake report 2-13-12
 
Lake Conroe Clean-Up
Lake Conroe Clean-UpLake Conroe Clean-Up
Lake Conroe Clean-Up
 
The Lake Report 01-24-12
The Lake Report 01-24-12The Lake Report 01-24-12
The Lake Report 01-24-12
 

Surface Water Facilities construction progress 11-2012