Project Auditing
Project Audit Tasks
1. Evaluate if the project delivered the expected
benefits to all stakeholders.
Was the project managed well?
Was the customer satisfied?
2. Assess what was done wrong and what contributed
to successes.
3. Identify changes to improve the delivery of future
projects.
Project Audit
 Step 1: Initiation and Staffing
 Step 2: Data Collection and Analysis
 Step 3: Reporting
Project Audit Report
 Actual vs.
planned
 Schedule
changes
 Nature of
changes
 Progress of
specific tasks
 Potential of
failure
 Lessons learned
 Data assumptions
Audit Life Cycle
Audit Initiation
Baseline Definition
Audit Database
Preliminary Analysis
Report Preparation
Termination
Project Closure
Objectives
 Determine when to terminate a project
 Identify various reasons why a project is terminated
 Describe a project audit
 Identify a general project close-out checklist
Major Tasks of Project Closure
1. Evaluate if the project delivered the expected
benefits to all stakeholders.
• Was the project managed well?
• Was the customer satisfied?
1. Assess what was done wrong and what
contributed to successes.
2. Identify changes to improve
the delivery of future projects.
Project Closure
 Types of Project
Closure
 Normal
 Premature
 Perpetual
 Failed Project
 Changed Priority
 Close-out Plan:
Questions to be
Asked
 What tasks are
required to close the
project?
 Who will be
responsible for these
tasks?
 When will closure
begin and end?
 How will the project
be delivered?
Closure
1. Getting delivery acceptance from the customer.
2. Shutting down resources and releasing to new uses.
3. Reassigning project team members.
4. Closing accounts and seeing all bills are paid.
5. Evaluating the project team, project team members,
and the project manager.
Wrap-up Closure Checklist
Creating the Final Report
 Executive Summary
 Project goals met/unmet
 Stakeholder satisfaction
with project
 User reactions to quality
of deliverables
 Analysis
 Project mission and
objective
 Procedures and
systems used
 Organization resources
used
 Recommendations
 Technical improvements
 Corrective actions
 Lessons Learned
 Reminders
 Retrospectives
 Appendix
 Backup data
 Critical information
Project Performance
Evaluations
 Reasons for Poor-Quality Project Performance
Evaluations:
 Evaluations of individuals are left to supervisors
of the team member’s
home department.
 Typically measure team performance only on
time, cost, and specifications.
Conducting Performance
Reviews
 Begin by asking the individual to evaluate his or
her own performance.
 Avoid drawing comparisons with other team
members; rather, assess the individual in terms of
established standards and expectations.
 Focus criticism on specific behaviors rather than
on the individual personally.
 Be consistent and fair in treatment of all team
members.
 Treat the review as one point in an ongoing
process.
Retrospectives
 Lessons Learned
 An analysis carried out during and shortly
after the project life cycle to capture positive
and negative project learning—“what
worked and what didn’t?”
 Goals of Retrospectives
 To reuse learned solutions
 To stop repetitive mistakes
Retrospectives (cont’d)
 Barriers to Organizational Learning
 Lack of post-project time for developing
lessons
 No post-project direction or support for teams
 Lessons become blame sessions
 Lessons are not applied in other locations
 Organizational culture does not recognize
value of learning
The Value of Retrospective
Analyses
 Making Retrospectives Effective:
 Use an independent facilitator to guide the project team
through the analysis project activities.
 Include a minimum of three in-process learning gates
during the life project cycle.
 Designate a team member as owner for each point in the
retrospective.
 Develop an easy-to-use learning repository to ensure future
utilization of retrospective lessons.
 Mandate use of retrospectives as part of the normal
process for all projects.
Any Questions?
Thank You

Más contenido relacionado

La actualidad más candente

Final Class Presentation on Project Audit and Closure.ppt
Final Class Presentation on Project Audit and Closure.pptFinal Class Presentation on Project Audit and Closure.ppt
Final Class Presentation on Project Audit and Closure.pptGeorgeKabongah2
 
Project Schedule Management - PMBOK6
Project Schedule Management - PMBOK6Project Schedule Management - PMBOK6
Project Schedule Management - PMBOK6Agus Suhanto
 
Elements of Project Management
Elements of Project ManagementElements of Project Management
Elements of Project ManagementKevin Thomas
 
Project scope management
Project scope managementProject scope management
Project scope managementAnit Roy
 
Project Management PowerPoint Presentation Slides
Project Management PowerPoint Presentation SlidesProject Management PowerPoint Presentation Slides
Project Management PowerPoint Presentation SlidesSlideTeam
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project ManagementSlav Karaslavov
 
5. project activity and risk planning
5. project activity and risk planning5. project activity and risk planning
5. project activity and risk planningJeanette C. Patindol
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project ManagementWaleed Elnaggar
 
Project Schedule Management - Sequence Activities - PMP Workgroup
Project Schedule Management - Sequence Activities - PMP WorkgroupProject Schedule Management - Sequence Activities - PMP Workgroup
Project Schedule Management - Sequence Activities - PMP WorkgroupTùng Trần Thanh
 
Project Management Fundamentals
Project Management FundamentalsProject Management Fundamentals
Project Management FundamentalsOxfordCambridge
 
Project Management: Project Schedule Management Knowledge Area
Project Management: Project Schedule Management Knowledge AreaProject Management: Project Schedule Management Knowledge Area
Project Management: Project Schedule Management Knowledge AreaJoshua Render
 
Project Manangement Introduction
Project Manangement IntroductionProject Manangement Introduction
Project Manangement Introductionasim78
 
project management fundamentals Chapter 1
project management fundamentals Chapter 1project management fundamentals Chapter 1
project management fundamentals Chapter 1Mazhar Poohlah
 
Project Types and their importance
Project Types and their importanceProject Types and their importance
Project Types and their importanceUjjwal Joshi
 
Introduction to Project Management (workshop) - v.1
Introduction to Project Management (workshop) - v.1Introduction to Project Management (workshop) - v.1
Introduction to Project Management (workshop) - v.1Mena M. Eissa
 

La actualidad más candente (20)

Final Class Presentation on Project Audit and Closure.ppt
Final Class Presentation on Project Audit and Closure.pptFinal Class Presentation on Project Audit and Closure.ppt
Final Class Presentation on Project Audit and Closure.ppt
 
Project Schedule Management - PMBOK6
Project Schedule Management - PMBOK6Project Schedule Management - PMBOK6
Project Schedule Management - PMBOK6
 
Elements of Project Management
Elements of Project ManagementElements of Project Management
Elements of Project Management
 
Project scope management
Project scope managementProject scope management
Project scope management
 
Project Management PowerPoint Presentation Slides
Project Management PowerPoint Presentation SlidesProject Management PowerPoint Presentation Slides
Project Management PowerPoint Presentation Slides
 
Project Management
Project ManagementProject Management
Project Management
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project Management
 
5. project activity and risk planning
5. project activity and risk planning5. project activity and risk planning
5. project activity and risk planning
 
Stakeholder management
Stakeholder managementStakeholder management
Stakeholder management
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project Management
 
1. project integration management
1. project integration management1. project integration management
1. project integration management
 
Stakeholder Management
Stakeholder ManagementStakeholder Management
Stakeholder Management
 
Project Schedule Management - Sequence Activities - PMP Workgroup
Project Schedule Management - Sequence Activities - PMP WorkgroupProject Schedule Management - Sequence Activities - PMP Workgroup
Project Schedule Management - Sequence Activities - PMP Workgroup
 
Project Planning
Project PlanningProject Planning
Project Planning
 
Project Management Fundamentals
Project Management FundamentalsProject Management Fundamentals
Project Management Fundamentals
 
Project Management: Project Schedule Management Knowledge Area
Project Management: Project Schedule Management Knowledge AreaProject Management: Project Schedule Management Knowledge Area
Project Management: Project Schedule Management Knowledge Area
 
Project Manangement Introduction
Project Manangement IntroductionProject Manangement Introduction
Project Manangement Introduction
 
project management fundamentals Chapter 1
project management fundamentals Chapter 1project management fundamentals Chapter 1
project management fundamentals Chapter 1
 
Project Types and their importance
Project Types and their importanceProject Types and their importance
Project Types and their importance
 
Introduction to Project Management (workshop) - v.1
Introduction to Project Management (workshop) - v.1Introduction to Project Management (workshop) - v.1
Introduction to Project Management (workshop) - v.1
 

Similar a Project audit and closure

Final Class Presentation on Project Audit and Closure.ppt
Final Class Presentation on Project Audit and Closure.pptFinal Class Presentation on Project Audit and Closure.ppt
Final Class Presentation on Project Audit and Closure.pptGeorgeKabongah2
 
Lecture PLAN MONITORING and EVALUATING.
Lecture PLAN  MONITORING and EVALUATING.Lecture PLAN  MONITORING and EVALUATING.
Lecture PLAN MONITORING and EVALUATING.Jo Balucanag - Bitonio
 
Is your project not going well this will help you get it back on track
Is your project not going well this will help you get it back on trackIs your project not going well this will help you get it back on track
Is your project not going well this will help you get it back on trackProject Management Solutions
 
Construction Management in Developing Countries, Lecture 10
Construction Management in Developing Countries, Lecture 10Construction Management in Developing Countries, Lecture 10
Construction Management in Developing Countries, Lecture 10Hari Krishna Shrestha
 
Performance Improvement Final Presentation - ODH project
Performance Improvement Final Presentation - ODH projectPerformance Improvement Final Presentation - ODH project
Performance Improvement Final Presentation - ODH projectThomas Muldrow
 
Project audit and closure
Project audit and closureProject audit and closure
Project audit and closureVelita Furtado
 
Ensuring You Have a Strong Foundation for Project Success
Ensuring You Have a Strong Foundation for Project SuccessEnsuring You Have a Strong Foundation for Project Success
Ensuring You Have a Strong Foundation for Project SuccessTony Nicholson
 
NCV 4 Project Management Hands-On Support Slide Show - Module 1
NCV 4 Project Management Hands-On Support Slide Show - Module 1NCV 4 Project Management Hands-On Support Slide Show - Module 1
NCV 4 Project Management Hands-On Support Slide Show - Module 1Future Managers
 
Project Management Framework.pptx
Project Management Framework.pptxProject Management Framework.pptx
Project Management Framework.pptxvamsnrsfdevuqsrtmy
 
2 a. project auditing
2 a. project auditing2 a. project auditing
2 a. project auditingDr.R. SELVAM
 
Post Project Evaluation
Post Project EvaluationPost Project Evaluation
Post Project EvaluationDemand Metric
 

Similar a Project audit and closure (20)

Final Class Presentation on Project Audit and Closure.ppt
Final Class Presentation on Project Audit and Closure.pptFinal Class Presentation on Project Audit and Closure.ppt
Final Class Presentation on Project Audit and Closure.ppt
 
Lecture PLAN MONITORING and EVALUATING.
Lecture PLAN  MONITORING and EVALUATING.Lecture PLAN  MONITORING and EVALUATING.
Lecture PLAN MONITORING and EVALUATING.
 
Pm audit and assessment approach final
Pm audit and assessment approach   finalPm audit and assessment approach   final
Pm audit and assessment approach final
 
3 project life cycle
3   project life cycle3   project life cycle
3 project life cycle
 
Is your project not going well this will help you get it back on track
Is your project not going well this will help you get it back on trackIs your project not going well this will help you get it back on track
Is your project not going well this will help you get it back on track
 
Construction Management in Developing Countries, Lecture 10
Construction Management in Developing Countries, Lecture 10Construction Management in Developing Countries, Lecture 10
Construction Management in Developing Countries, Lecture 10
 
Performance Improvement Final Presentation - ODH project
Performance Improvement Final Presentation - ODH projectPerformance Improvement Final Presentation - ODH project
Performance Improvement Final Presentation - ODH project
 
Project audit and closure
Project audit and closureProject audit and closure
Project audit and closure
 
Project auditing
Project auditingProject auditing
Project auditing
 
STATIC TECHNIQUES
STATIC TECHNIQUESSTATIC TECHNIQUES
STATIC TECHNIQUES
 
Ensuring You Have a Strong Foundation for Project Success
Ensuring You Have a Strong Foundation for Project SuccessEnsuring You Have a Strong Foundation for Project Success
Ensuring You Have a Strong Foundation for Project Success
 
Unit 1 spm
Unit 1  spmUnit 1  spm
Unit 1 spm
 
Unit 1 spm
Unit 1  spmUnit 1  spm
Unit 1 spm
 
NCV 4 Project Management Hands-On Support Slide Show - Module 1
NCV 4 Project Management Hands-On Support Slide Show - Module 1NCV 4 Project Management Hands-On Support Slide Show - Module 1
NCV 4 Project Management Hands-On Support Slide Show - Module 1
 
Software Project Management by Dr. B. J. Mohite
Software Project Management by Dr. B. J. MohiteSoftware Project Management by Dr. B. J. Mohite
Software Project Management by Dr. B. J. Mohite
 
Project Management Framework.pptx
Project Management Framework.pptxProject Management Framework.pptx
Project Management Framework.pptx
 
2 a. project auditing
2 a. project auditing2 a. project auditing
2 a. project auditing
 
Ngo’s project management
Ngo’s project managementNgo’s project management
Ngo’s project management
 
Post Project Evaluation
Post Project EvaluationPost Project Evaluation
Post Project Evaluation
 
A2011214171642 1
A2011214171642 1A2011214171642 1
A2011214171642 1
 

Último

Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projectssmsksolar
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...HenryBriggs2
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdfKamal Acharya
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Call Girls Mumbai
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Servicemeghakumariji156
 
Bridge Jacking Design Sample Calculation.pptx
Bridge Jacking Design Sample Calculation.pptxBridge Jacking Design Sample Calculation.pptx
Bridge Jacking Design Sample Calculation.pptxnuruddin69
 
Learn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksLearn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksMagic Marks
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 

Último (20)

Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Bridge Jacking Design Sample Calculation.pptx
Bridge Jacking Design Sample Calculation.pptxBridge Jacking Design Sample Calculation.pptx
Bridge Jacking Design Sample Calculation.pptx
 
Learn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksLearn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic Marks
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 

Project audit and closure

  • 1. Project Auditing and Closure Presented by:- 1 Sanjay Vaij 2 Shashikant Rode 3 Chandrakant Mawale 4 Sachin kulkarni 5 Rakesh das
  • 3.
  • 4.
  • 5.
  • 6.
  • 7. Project Audit Tasks 1. Evaluate if the project delivered the expected benefits to all stakeholders. Was the project managed well? Was the customer satisfied? 2. Assess what was done wrong and what contributed to successes. 3. Identify changes to improve the delivery of future projects.
  • 8. Project Audit  Step 1: Initiation and Staffing  Step 2: Data Collection and Analysis  Step 3: Reporting
  • 9. Project Audit Report  Actual vs. planned  Schedule changes  Nature of changes  Progress of specific tasks  Potential of failure  Lessons learned  Data assumptions
  • 10. Audit Life Cycle Audit Initiation Baseline Definition Audit Database Preliminary Analysis Report Preparation Termination
  • 12. Objectives  Determine when to terminate a project  Identify various reasons why a project is terminated  Describe a project audit  Identify a general project close-out checklist
  • 13. Major Tasks of Project Closure 1. Evaluate if the project delivered the expected benefits to all stakeholders. • Was the project managed well? • Was the customer satisfied? 1. Assess what was done wrong and what contributed to successes. 2. Identify changes to improve the delivery of future projects.
  • 14. Project Closure  Types of Project Closure  Normal  Premature  Perpetual  Failed Project  Changed Priority  Close-out Plan: Questions to be Asked  What tasks are required to close the project?  Who will be responsible for these tasks?  When will closure begin and end?  How will the project be delivered?
  • 15. Closure 1. Getting delivery acceptance from the customer. 2. Shutting down resources and releasing to new uses. 3. Reassigning project team members. 4. Closing accounts and seeing all bills are paid. 5. Evaluating the project team, project team members, and the project manager.
  • 17. Creating the Final Report  Executive Summary  Project goals met/unmet  Stakeholder satisfaction with project  User reactions to quality of deliverables  Analysis  Project mission and objective  Procedures and systems used  Organization resources used  Recommendations  Technical improvements  Corrective actions  Lessons Learned  Reminders  Retrospectives  Appendix  Backup data  Critical information
  • 18. Project Performance Evaluations  Reasons for Poor-Quality Project Performance Evaluations:  Evaluations of individuals are left to supervisors of the team member’s home department.  Typically measure team performance only on time, cost, and specifications.
  • 19. Conducting Performance Reviews  Begin by asking the individual to evaluate his or her own performance.  Avoid drawing comparisons with other team members; rather, assess the individual in terms of established standards and expectations.  Focus criticism on specific behaviors rather than on the individual personally.  Be consistent and fair in treatment of all team members.  Treat the review as one point in an ongoing process.
  • 20. Retrospectives  Lessons Learned  An analysis carried out during and shortly after the project life cycle to capture positive and negative project learning—“what worked and what didn’t?”  Goals of Retrospectives  To reuse learned solutions  To stop repetitive mistakes
  • 21. Retrospectives (cont’d)  Barriers to Organizational Learning  Lack of post-project time for developing lessons  No post-project direction or support for teams  Lessons become blame sessions  Lessons are not applied in other locations  Organizational culture does not recognize value of learning
  • 22. The Value of Retrospective Analyses  Making Retrospectives Effective:  Use an independent facilitator to guide the project team through the analysis project activities.  Include a minimum of three in-process learning gates during the life project cycle.  Designate a team member as owner for each point in the retrospective.  Develop an easy-to-use learning repository to ensure future utilization of retrospective lessons.  Mandate use of retrospectives as part of the normal process for all projects.

Notas del editor

  1. Does the work actually completed match the planned level of completion? Are significant schedule changes likely? If so, indicate the nature of changes. What progress has been made on tasks that could decide the success or failure of project? What is the potential for project failure or monetary loss? What lessons learned from the project being audited can be applied to other projects being undertaken by organization? What assumptions or limitations affect data in audit? First audit should be done early and focused on technical issues. From then on audits may be done after major milestones (important to team). An audit at the end would be value to parent organization.
  2. Audit Initiation = id. Purpose and scope of audit and determination of methodology. Team should have access to all records and reports. Baseline = performance standards Database = accumulation of information Preliminary Analysis = compares gathered information to standards and judges project performance Report preparation = preparing audit report and recommendations for improvement Termination = review of audit process and recommendations for improvement Project audit is not like a financial audit. A financial audit is limited in scope and focuses of organization’s assets while a project audit is broader in scope and either deals with whole, partial, or individual component of project.