PAVEMENT MANAGEMENT SYSTEM
TEST NO: 1
Date: 10 Nov 2012
Question:
The Road User Costs for various types of vehicles are affected by the road roughness, as shown in
Figure 1.

Unit Road User Costs (US$ per vehicle-km)

1.400

1.200

1.000

0.800
Medium Car
Medium Bus

0.600

Heavy Truck
Motorcycle

0.400

0.200

0.000

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

18.0

Roughness (IRI, m/km)

FIGURE 1: RUC VERSUS ROUGHNESS
A district engineer carried out an investigation on three different routes and the results are shown in
Table 1;
TABLE 1: RESULTS OF SITE SURVEY
Route 1
Average Daily Traffic volume:
Medium car: 5000
Medium Bus: 50
Heavy Truck: 1000
Existing International Roughness
Index (IRI) = 10 m/km
Required overlay = 100 mm
Design period =3 years
Length to be overlayed= 2 km
Overlay costs = RM300,000

Route 2
Average Daily Traffic volume:
Medium car: 20000
Medium bus: 1000
Heavy Truck: 2000
Existing International
Roughness Index(IRI) = 4.5
m/km
Required overlay = 60 mm
Design period= 3 years
Length to be overlayed = 4
km
Overlay costs= RM400,000

Route 3
Average Daily Traffic volume:
Medium car: 10000
Medium bus: 400
Heavy Truck: 800
Existing International
Roughness Index(IRI) = 7
m/km
Required overlay = 70 mm
Design period= 3 years
Length to be overlayed = 3
km
Overlay costs= RM 360,000

Suggest the most suitable route to be overlaid based on benefit over cost criteria.
Assumptions:
a.
b.
c.
d.

IRI after overlay will remain constant for the design period
Traffic volume and composition will remain constant for the design period
All costs in Figure 1 are in Malaysian Ringgit
IRI after overlay varies with thickness of overlay given by the following equation
Solution:
For the Rout 1
Route 1
Average Daily Traffic volume:
Medium car: 5000
Medium Bus: 50
Heavy Truck: 1000
Existing International Roughness Index (IRI) = 10 m/km
Required overlay = 100 mm
Design period =3 years
Length to be overlayed= 2 km
Overlay costs = RM300,00

RIa= 2.0 + 0.0071 Max ( 80 – H, 0 ) Max ( RIb – 2 , 0 )
= 2 + 0.0071 Max ( 80 – 100 , 0 ) max ( 10 – 2 , 0 ) = 2
RIb = 10

Unit Road User Costs (US$ per vehicle-km)

1.400

1.200

1.000

0.800
Medium Car
Medium Bus

0.600

Heavy Truck
Motorcycle

0.400

0.200

0.000

2.0

4.0

6.0

8.0

10.0

12.0

Roughness (IRI, m/km)

14.0

16.0

18.0
Vehicle Type

RM per vehicle-km
IRb = 10
0.24
0.83
0.93

Medium car
Medium Bus
Heavy Truck

RM per vehicle-km
IRa = 2
0.205
0.58
0.69

RM per vehicle-km
IRb - IRa
0.04
0.25
0.24

We have unit user cost and we should find the total cost for each type of vehicle by the bellow
equation:
Vehicle type's cost = Unit user cost × 365 × number of year × length of overlay × ADT
Vehicle
type's cost
Medium
car
Medium
Bus
Heavy
Truck

Unit user
cost
0.04

365

length of
overlay
2

ADT

RM

365

number of
year
3

5000

438'000.00

0.25

365

3

2

50

27'375.00

0.24

365

3

2

1000

525'600.00

∑ 1,2,3 = 990'975.00 RM
Benefit over cost = 990'975 – 300'000 = 690'975.00 RM
route 2
Route 2
Average Daily Traffic volume:
Medium car: 20000
Medium Bus: 1000
Heavy Truck: 2000
Existing International Roughness Index (IRI) = 4.50 m/km
Required overlay = 60 mm
Design period =3 years
Length to be overlayed= 4 km
Overlay costs = RM400,00

RIa= 2.0 + 0.0071 Max ( 80 – H, 0 ) Max ( RIb– 2 , 0 )
= 2 + 0.0071 Max ( 80 – 60 , 0 ) max ( 4.5 – 2 , 0 ) = 2.355
RIb = 4.5

Unit Road User Costs (US$ per vehicle-km)

1.400

1.200

1.000

0.800
Medium Car
Medium Bus

0.600

Heavy Truck
Motorcycle

0.400

0.200

0.000

2.0

4.0

6.0

8.0

10.0

12.0

Roughness (IRI, m/km)

14.0

16.0

18.0
Vehicle Type

RM per vehicle-km
IRb = 4.5
0.21
0.61
0.77

Medium car
Medium Bus
Heavy Truck

RM per vehicle-km
IRa = 2.355
0.205
0.59
0.72

RM per vehicle-km
IRb - IRa
0.005
0.02
0.05

We have unit user cost and we should find the total cost for each type of vehicle by the bellow
equation:
Vehicle type's cost = Unit user cost × 365 × number of year × length of overlay × ADT

Vehicle
type's cost
Medium
car
Medium
Bus
Heavy
Truck

Unit user
cost
0.005

365

length of
overlay
4

ADT

RM

365

number of
year
3

20000

438'000.00

0.02

365

3

4

1000

87'600.00

0.05

365

3

4

2000

438'000.00

∑ 1,2,3 = 963'600.00 RM

benefit over cost

= 1'095'000 – 400'000 = 563'600.00 RM
Rout 3
Route 3
Average Daily Traffic volume:
Medium car: 10000
Medium Bus: 400
Heavy Truck: 800
Existing International Roughness Index (IRI) = 7.00 m/km
Required overlay = 70 mm
Design period =3 years
Length to be overlayed= 3 km
Overlay costs = RM 360,00

RIa = 2.0 + 0.0071 Max ( 80 – H, 0 ) Max ( RIb – 2 , 0 )
= 2 + 0.0071 Max ( 80 – 70 , 0 ) max ( 7 – 2 , 0 ) = 2.355
RIb = 7

Unit Road User Costs (US$ per vehicle-km)

1.400

1.200

1.000

0.800
Medium Car
Medium Bus

0.600

Heavy Truck
Motorcycle

0.400

0.200

0.000

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

18.0

Roughness (IRI, m/km)

Vehicle Type
Medium car
Medium Bus
Heavy Truck

RM per vehicle-km
IRb = 7
0.22
0.69
0.82

RM per vehicle-km
IRa = 2.355
0.21
0.59
0.71

RM per vehicle-km
IRb - IRa
0.01
0.1
0.11
We have unit user cost and we should find the total cost for each type of vehicle by the bellow
equation:
Vehicle type's cost = Unit user cost × 365 × number of year × length of overlay × ADT
Vehicle
type's cost
Medium
car
Medium
Bus
Heavy
Truck

Unit user
cost
0.01

365

length of
overlay
3

ADT

RM

365

number of
year
3

10000

328'500.00

0.10

365

3

3

400

131'400.00

0.11

365

3

3

800

289'080.00

Ʃ = 748'980.00

benefit over cost = 748'980 – 360'000 = 388'980.00 RM

Rout

Costs

1

690'975.00 RM

2

563'600.00 RM

3

388'980.00 RM

So, I recommend the 1st rout to be overlaid based on benefit over cost riteria.

Más contenido relacionado

Similar a Test 1

Fixation of Toll charge for Six Lane Highway
 Fixation of Toll charge for Six Lane Highway Fixation of Toll charge for Six Lane Highway
Fixation of Toll charge for Six Lane Highway
ijsrd.com
 
London buses Mike Weston
London buses Mike WestonLondon buses Mike Weston
London buses Mike Weston
hybriduserforum
 

Similar a Test 1 (20)

5. renewing of indonesia highway capacity manual urban road segment with traf...
5. renewing of indonesia highway capacity manual urban road segment with traf...5. renewing of indonesia highway capacity manual urban road segment with traf...
5. renewing of indonesia highway capacity manual urban road segment with traf...
 
Energy, Mobility & Freight Transport
Energy, Mobility & Freight TransportEnergy, Mobility & Freight Transport
Energy, Mobility & Freight Transport
 
30120130406009
3012013040600930120130406009
30120130406009
 
IRJET- Study and Development of Electric Vehicle with 200 Kilometers Range an...
IRJET- Study and Development of Electric Vehicle with 200 Kilometers Range an...IRJET- Study and Development of Electric Vehicle with 200 Kilometers Range an...
IRJET- Study and Development of Electric Vehicle with 200 Kilometers Range an...
 
Fixation of Toll charge for Six Lane Highway
 Fixation of Toll charge for Six Lane Highway Fixation of Toll charge for Six Lane Highway
Fixation of Toll charge for Six Lane Highway
 
ITS
ITSITS
ITS
 
PROPOSED INTELLIGENT TRANSPORT SYSTEM DEPLOYMENTS IN KAJANG CITY
PROPOSED INTELLIGENT TRANSPORT SYSTEM DEPLOYMENTS IN KAJANG CITYPROPOSED INTELLIGENT TRANSPORT SYSTEM DEPLOYMENTS IN KAJANG CITY
PROPOSED INTELLIGENT TRANSPORT SYSTEM DEPLOYMENTS IN KAJANG CITY
 
Electromobilité en Inde, Rajnish Ahuja, Pahle India Foundation, New Delhi
Electromobilité en Inde, Rajnish Ahuja, Pahle India Foundation, New DelhiElectromobilité en Inde, Rajnish Ahuja, Pahle India Foundation, New Delhi
Electromobilité en Inde, Rajnish Ahuja, Pahle India Foundation, New Delhi
 
Sanedi energy and_mobility_the_bus_unido_sustainable_transport_and_mobility_f...
Sanedi energy and_mobility_the_bus_unido_sustainable_transport_and_mobility_f...Sanedi energy and_mobility_the_bus_unido_sustainable_transport_and_mobility_f...
Sanedi energy and_mobility_the_bus_unido_sustainable_transport_and_mobility_f...
 
Final Defence (3).pptx
Final Defence (3).pptxFinal Defence (3).pptx
Final Defence (3).pptx
 
London buses Mike Weston
London buses Mike WestonLondon buses Mike Weston
London buses Mike Weston
 
Diseño de pavimentos
Diseño de pavimentos Diseño de pavimentos
Diseño de pavimentos
 
Auto parking-system
Auto parking-systemAuto parking-system
Auto parking-system
 
IRJET- Design and Fabrication of Material Handling Trolley
IRJET- Design and Fabrication of Material Handling TrolleyIRJET- Design and Fabrication of Material Handling Trolley
IRJET- Design and Fabrication of Material Handling Trolley
 
Bus Karo: Electric Bus Trial in DTC
Bus Karo: Electric Bus Trial in DTCBus Karo: Electric Bus Trial in DTC
Bus Karo: Electric Bus Trial in DTC
 
Bus Karo: Electric Bus Trial in DTC (Session V)
Bus Karo: Electric Bus Trial in DTC (Session V)Bus Karo: Electric Bus Trial in DTC (Session V)
Bus Karo: Electric Bus Trial in DTC (Session V)
 
STUDY AND DESIGN OF SEMI-AUTOMATIC ROAD CLEANING MACHINE
STUDY AND DESIGN OF SEMI-AUTOMATIC ROAD CLEANING MACHINESTUDY AND DESIGN OF SEMI-AUTOMATIC ROAD CLEANING MACHINE
STUDY AND DESIGN OF SEMI-AUTOMATIC ROAD CLEANING MACHINE
 
Modelling Urban Transports in a City Energy System Model
Modelling Urban Transports in a City Energy System ModelModelling Urban Transports in a City Energy System Model
Modelling Urban Transports in a City Energy System Model
 
IRJET- Design of a Compact Go Kart Vehicle
IRJET- Design of a Compact Go Kart VehicleIRJET- Design of a Compact Go Kart Vehicle
IRJET- Design of a Compact Go Kart Vehicle
 
Presentation on Parking area in sector v, Kolkata
Presentation on Parking area in sector v, KolkataPresentation on Parking area in sector v, Kolkata
Presentation on Parking area in sector v, Kolkata
 

Último

Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
vineshkumarsajnani12
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
daisycvs
 

Último (20)

Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptx
 
New 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateNew 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck Template
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Cannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 UpdatedCannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 Updated
 
WheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond InsightsWheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond Insights
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdf
 
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTSDurg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur DubaiUAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
 
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
 
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
 
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTSJAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
 
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableBerhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service AvailableNashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
 
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 

Test 1

  • 1. PAVEMENT MANAGEMENT SYSTEM TEST NO: 1 Date: 10 Nov 2012 Question: The Road User Costs for various types of vehicles are affected by the road roughness, as shown in Figure 1. Unit Road User Costs (US$ per vehicle-km) 1.400 1.200 1.000 0.800 Medium Car Medium Bus 0.600 Heavy Truck Motorcycle 0.400 0.200 0.000 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 Roughness (IRI, m/km) FIGURE 1: RUC VERSUS ROUGHNESS A district engineer carried out an investigation on three different routes and the results are shown in Table 1; TABLE 1: RESULTS OF SITE SURVEY Route 1 Average Daily Traffic volume: Medium car: 5000 Medium Bus: 50 Heavy Truck: 1000 Existing International Roughness Index (IRI) = 10 m/km Required overlay = 100 mm Design period =3 years Length to be overlayed= 2 km Overlay costs = RM300,000 Route 2 Average Daily Traffic volume: Medium car: 20000 Medium bus: 1000 Heavy Truck: 2000 Existing International Roughness Index(IRI) = 4.5 m/km Required overlay = 60 mm Design period= 3 years Length to be overlayed = 4 km Overlay costs= RM400,000 Route 3 Average Daily Traffic volume: Medium car: 10000 Medium bus: 400 Heavy Truck: 800 Existing International Roughness Index(IRI) = 7 m/km Required overlay = 70 mm Design period= 3 years Length to be overlayed = 3 km Overlay costs= RM 360,000 Suggest the most suitable route to be overlaid based on benefit over cost criteria.
  • 2. Assumptions: a. b. c. d. IRI after overlay will remain constant for the design period Traffic volume and composition will remain constant for the design period All costs in Figure 1 are in Malaysian Ringgit IRI after overlay varies with thickness of overlay given by the following equation
  • 3. Solution: For the Rout 1 Route 1 Average Daily Traffic volume: Medium car: 5000 Medium Bus: 50 Heavy Truck: 1000 Existing International Roughness Index (IRI) = 10 m/km Required overlay = 100 mm Design period =3 years Length to be overlayed= 2 km Overlay costs = RM300,00 RIa= 2.0 + 0.0071 Max ( 80 – H, 0 ) Max ( RIb – 2 , 0 ) = 2 + 0.0071 Max ( 80 – 100 , 0 ) max ( 10 – 2 , 0 ) = 2 RIb = 10 Unit Road User Costs (US$ per vehicle-km) 1.400 1.200 1.000 0.800 Medium Car Medium Bus 0.600 Heavy Truck Motorcycle 0.400 0.200 0.000 2.0 4.0 6.0 8.0 10.0 12.0 Roughness (IRI, m/km) 14.0 16.0 18.0
  • 4. Vehicle Type RM per vehicle-km IRb = 10 0.24 0.83 0.93 Medium car Medium Bus Heavy Truck RM per vehicle-km IRa = 2 0.205 0.58 0.69 RM per vehicle-km IRb - IRa 0.04 0.25 0.24 We have unit user cost and we should find the total cost for each type of vehicle by the bellow equation: Vehicle type's cost = Unit user cost × 365 × number of year × length of overlay × ADT Vehicle type's cost Medium car Medium Bus Heavy Truck Unit user cost 0.04 365 length of overlay 2 ADT RM 365 number of year 3 5000 438'000.00 0.25 365 3 2 50 27'375.00 0.24 365 3 2 1000 525'600.00 ∑ 1,2,3 = 990'975.00 RM Benefit over cost = 990'975 – 300'000 = 690'975.00 RM
  • 5. route 2 Route 2 Average Daily Traffic volume: Medium car: 20000 Medium Bus: 1000 Heavy Truck: 2000 Existing International Roughness Index (IRI) = 4.50 m/km Required overlay = 60 mm Design period =3 years Length to be overlayed= 4 km Overlay costs = RM400,00 RIa= 2.0 + 0.0071 Max ( 80 – H, 0 ) Max ( RIb– 2 , 0 ) = 2 + 0.0071 Max ( 80 – 60 , 0 ) max ( 4.5 – 2 , 0 ) = 2.355 RIb = 4.5 Unit Road User Costs (US$ per vehicle-km) 1.400 1.200 1.000 0.800 Medium Car Medium Bus 0.600 Heavy Truck Motorcycle 0.400 0.200 0.000 2.0 4.0 6.0 8.0 10.0 12.0 Roughness (IRI, m/km) 14.0 16.0 18.0
  • 6. Vehicle Type RM per vehicle-km IRb = 4.5 0.21 0.61 0.77 Medium car Medium Bus Heavy Truck RM per vehicle-km IRa = 2.355 0.205 0.59 0.72 RM per vehicle-km IRb - IRa 0.005 0.02 0.05 We have unit user cost and we should find the total cost for each type of vehicle by the bellow equation: Vehicle type's cost = Unit user cost × 365 × number of year × length of overlay × ADT Vehicle type's cost Medium car Medium Bus Heavy Truck Unit user cost 0.005 365 length of overlay 4 ADT RM 365 number of year 3 20000 438'000.00 0.02 365 3 4 1000 87'600.00 0.05 365 3 4 2000 438'000.00 ∑ 1,2,3 = 963'600.00 RM benefit over cost = 1'095'000 – 400'000 = 563'600.00 RM
  • 7. Rout 3 Route 3 Average Daily Traffic volume: Medium car: 10000 Medium Bus: 400 Heavy Truck: 800 Existing International Roughness Index (IRI) = 7.00 m/km Required overlay = 70 mm Design period =3 years Length to be overlayed= 3 km Overlay costs = RM 360,00 RIa = 2.0 + 0.0071 Max ( 80 – H, 0 ) Max ( RIb – 2 , 0 ) = 2 + 0.0071 Max ( 80 – 70 , 0 ) max ( 7 – 2 , 0 ) = 2.355 RIb = 7 Unit Road User Costs (US$ per vehicle-km) 1.400 1.200 1.000 0.800 Medium Car Medium Bus 0.600 Heavy Truck Motorcycle 0.400 0.200 0.000 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 Roughness (IRI, m/km) Vehicle Type Medium car Medium Bus Heavy Truck RM per vehicle-km IRb = 7 0.22 0.69 0.82 RM per vehicle-km IRa = 2.355 0.21 0.59 0.71 RM per vehicle-km IRb - IRa 0.01 0.1 0.11
  • 8. We have unit user cost and we should find the total cost for each type of vehicle by the bellow equation: Vehicle type's cost = Unit user cost × 365 × number of year × length of overlay × ADT Vehicle type's cost Medium car Medium Bus Heavy Truck Unit user cost 0.01 365 length of overlay 3 ADT RM 365 number of year 3 10000 328'500.00 0.10 365 3 3 400 131'400.00 0.11 365 3 3 800 289'080.00 Ʃ = 748'980.00 benefit over cost = 748'980 – 360'000 = 388'980.00 RM Rout Costs 1 690'975.00 RM 2 563'600.00 RM 3 388'980.00 RM So, I recommend the 1st rout to be overlaid based on benefit over cost riteria.