SlideShare una empresa de Scribd logo
1 de 25
Descargar para leer sin conexión
Risk management in SEO projects
     Introduction and process model




         Download slides on SEO Südwest
Risk-boosting factors in all projects

•     Lack f i
      L k of time, d dli
                   deadlines
•     Bad acquisition and controlling of key performance indicators
•     Insufficient project management
•     Bad management of requirements and expectations
•     Huge and long-lasting projects




28.08.2012                     © SEO Südwest 2012                     2
Risk-boosting factors in SEO projects

•     Wrong expectations about SEO success
      W             i     b
•     No ex-ante planning of SEO success factors
•     SEO conducted without project management
•     SEO manager in role of project manager without having project
      management experience
               t       i




28.08.2012                     © SEO Südwest 2012                     3
Risk definition

Risk definition: uncertain event that effects one or more project
    objectives. Notice: effects can be positive or negative!
Example: The outage of an important software developer can cause a
     p           g           p                     p
   two-week delay of project completion
Risks consist of different components:
•     Risk event with probability of risk event
•     Risk impact with probability of risk impact
•     Expected gain or loss calculated from expected effect multiplied
      with probability of risk event and risk impact




28.08.2012                       © SEO Südwest 2012                      4
Risk components



             Risk event                Impact        Total gain / loss




Probability of            Probability of
 risk event                risk impact




28.08.2012                      © SEO Südwest 2012                       5
Typical
                         T i l SEO risk-events
                                    i k     t

•     Google updates search algorithm unexpectedly
      G   l    d          h l ih               dl
•     Important backlink is being devaluated
•     SEO black hat methods are discovered by Google
•     Wrong implementation of „rel canonical“ attribute




28.08.2012                      © SEO Südwest 2012        6
Typical impacts of SEO risks
                       T i li       t f        i k

•     Website
      W b i receives a penalty and i d
                i          l     d is downgraded
                                             d d
•     Multiple pages vanish from index
•     Domain is void due to black hat methods
•     Client won‘t pay because he is not satisfied with results




28.08.2012                      © SEO Südwest 2012                7
Risk t
                      Ri k categories
                                  i

•     Known risks that can b anticipated. E
      K       i k h        be    i i    d Example: competitors f ll
                                                 l        i     follow
      their own SEO strategy and bias succes of your SEO efforts
•     Unknown risks that cannot be anticipated Example: change of
                                    anticipated.
      Google search algorithm that leads to declined ranking
•     Scope risks (caused by frequent change requests or defects)
         p        (        y q            g    q                )
•     Schedule risks (delays, dependencies, wrong estimates or multiple
      critical paths)
•     Resource-based risks (outsourcing, distributed teams, integration
      of new team members)




28.08.2012                     © SEO Südwest 2012                         8
Multiple critical paths in projects
                                        Critical path 1

                          Task A               Task B              Task C



   Task D       Task E             Task F                Task G             Task H   Task I



                 Task J            Task K                 Task L            Task M


                                             Critical path 2

A critical path d t
    iti l th determines th d ti of th project. If th
                    i   the duration f the j t there i
                                                     is
more than one critical path in the project, the risk of a higher duration increases.


   28.08.2012                               © SEO Südwest 2012                            9
Risk management benefits

      •      Future problems are recognized and can b eliminated i d
             F         bl              i d d        be li i    d in due
             time
      •      Incentive to deal with project more intensely
      •      Incentive to deal with project stakeholders more intensely
      •      Promotion of censorious thi ki i project t
             P    ti    f       i    thinking in j t team
      •      More successful projects
      •      Risk management as a team building activity
      •      Continous improvement of project management




28.08.2012                         © SEO Südwest 2012                     10
Context of risk management


                 Web                    Stakeholder       Software
                 development            management        development




             Estimation and
                                                          Knowledge
             controlling of effort    Risk management
                                                          management




                                       Requirements        IT and technical
                      ……
                                       management          administration




28.08.2012                           © SEO Südwest 2012                       11
Elements of risk management process



     Risk management
                                 Risk identification         Risk analysis
          planning




                                                           Risk monitoring and
     Risk prioritisation           Risk solution
                                                                controlling

28.08.2012                            © SEO Südwest 2012




                                                                                 12
Risk management process

                                          Identify risks




                                                                      ment planning
                                          Analyse risks




                    Check for new risks




                                                           Risk managem
                                          Prioritize i k
                                          P i iti risks




                                                                m
                                          Risk solution




                                             Risk
                                           monitoring




28.08.2012                 © SEO Südwest 2012                                         13
Risk
                           Ri k management planning
                                         t l    i

•      Describes th risk management process i th project
       D    ib the i k            t         in the  j t
•      What has to be communicated?
•      What kind of meetings are needed?
•      Which tools, documents etc. are used?
•      First estimate of overall project risk
•      Definition of risk categories
•      Definition of key figures (e.g. for risk probability and impact)
•      Schedule planning




    28.08.2012                         © SEO Südwest 2012                 14
Risk identification (1/2)

•   Start risk id ifi i as soon as possible
    S      i k identification          ibl
•   Iterative process. Repeat throughout the whole project
•   Should be part of every status meeting
•   Opens out into risk index
•   Risk identification tools and techniques:
      • Brainstorming, expert reviews
      • Checklists
      • Document analysis, analysis of assumptions
                     y         y            p
       Important: include all project areas, respect positive and negative
        risks!

28.08.2012                      © SEO Südwest 2012                       15
Risk identification (2/2)


•   First
    Fi counteraction can b planned while
                    i        be l       d hil
    conducting risk identification already
•   Most urgent risks are addressed first
•   Not later than kickoff the risk index must exist




28.08.2012                      © SEO Südwest 2012     16
Risk analysis

•   Qualitative
    Q lit ti vs. quantitative risk analysis
                     tit ti    i k    l i
•   Qualitative: classify risk by severity: „low“,
    „
    „middle“, „high“
             ,„ g
•   Quantitative: detailed calculation of probability
    and impact
•   Qualitative analysis is mainly used for risk
    prioritisation
•   Risk analysis and risk prioritisation can be done
    together
•   In order to avoid arbitrariness and subjective
    influence hen
    infl ence when defining risk probabilit it makes
                                   probability
    sense to use pre-defined rankings like: 0-10%,
    11-50 %, 51-80%, 81-100 %.


28.08.2012                       © SEO Südwest 2012     17
Risk analysis: tools and methods

•   Risk
    Ri k matrix (
           t i (qualitative risk analysis)
                   lit ti    i k    l i )
•   PERT (Program Evolution and Review Technique)
     comparing optimistic and pessimistic estimations
           p     g p             p
    (quantitative risk analysis)
•   Monte Carlo Analysis (automated and iterative
    calculation of different project results shows
    probability distribution)
•   Expert reviews
      p
•   Interviews
•          p
    Workshops
 The latter four used for quantitative and qualitative
  analysis as well


28.08.2012                      © SEO Südwest 2012        18
Risk matrix
             high



               Probability




              low                 Impact
                                  I    t                   high


                                 Risk severity

28.08.2012                            © SEO Südwest 2012          19
Risk prioritisation

•   After determining risk probability and i
    Af d        i i    i k    b bili     d impact the
                                                   h
    order of handling risks has to be defined
•   Concentrate on a set of most important risks  top
                                                   top-
    10 list
•   Marginal cost for solving an additional risk have to
         g                  g
    be equal or smaller than marginal loss caused by
    this additional risk




28.08.2012                      © SEO Südwest 2012         20
Risk solution

•   Define
    D fi counter measurements f every prioritized
                                  for         i ii d
    risk. Decide between actions concerning risk events
    and actions concerning risk impact.
•   Define responsibilities
•   Define those risks that no actions will be taken for
    (active / passive risk acceptance)
•   Update project plan
•   Create fallback-plan with actions to be taken if initial
    actions fail.




28.08.2012                       © SEO Südwest 2012            21
Risk solution - strategies


Risk                        Chance                      Example

Avoid                       Exploit                     Remove or add certain
                                                        tasks from / to project plan

Mitigate                    Emphasize                   Influence risk probability
                                                        and / or risk impact

Transmit                    Share                       Involve additional players
                                                        to handle risk or chance

                                                        Active: build reserves for
           Acceptance (active oder passive)             the case of risk occurrence
                                                        Passive: action is defined
                                                        after risk occurrence first.




  28.08.2012                                  © SEO Südwest 2012                       22
Risk monitoring and controlling

•   Check
    Ch k status of risks continously. Ri k status should
                   f i k      i    l Risk          h ld
    be part of every status meeting.
•   Are there any risks that can be removed from risk
    index because they are no longer relevant or
    haven‘t occurred?
•   Are there new risks to be analyzed?
•   Has there been a change of risk priorities? Is the
    top-list of risks still up-to-date?
•   Have the chosen risk solutions been appropriate?




28.08.2012                     © SEO Südwest 2012          23
Resumé
   •Risk management important in projects – especially when doing SEO
   •Risk management needs to be planned
    Risk
   •Risk management is an iterative process


   Contact information:
   SEO Südwest
   Christian Kunz
   http://www.seo-suedwest.de
   info@seo-suedwest.de

                      Download slides on SEO Südwest

28.08.2012                      © SEO Südwest 2012                      24
List of references

•   Smith, Preston G. / Merritt, Guy M. : Proactive
    Smith Preston G / Merritt Guy M : Proactive Risk Management Productivity Press 2002
                                                     Management. Productivity Press 2002


•   Heldman, Kim: Project Manager‘s Spotlight on Risk Management. Sybex 2005


•   Kendrick, Tom: Identifying and Managing Project Risk: Essential Tools for Failure‐Proofing Your Project. 
    Amacom 2003


•   Wideman, Max R.: Project and Program Risk Management: A Guide to Managing Project Risks and
    Opportunities. Project Management Institute 1992


•   Vose, David: Risk Analysis, A Quantitative Guide, Second Edition. John Wiley
    Vose David: Risk Analysis A Quantitative Guide Second Edition John Wiley and Sons (UK) 2002
                                                                                      (UK) 2002


•   Schuyler, John: Risk and Decision Analysis in Projects, Second Edition. Project Management Institute 
    2001


•   Mulcahy, Rita: PMP Exam Prep: Rita‘s Course in a Book for Passing the PMP Exam, Fifth Edition. RMX 
    Publications 2005



28.08.2012                                    © SEO Südwest 2012                                                25

Más contenido relacionado

Similar a Risk management in SEO projects

Next Gen Innovation
Next Gen InnovationNext Gen Innovation
Next Gen InnovationKegan Quimby
 
IT Risk Management - the right posture
IT Risk Management - the right postureIT Risk Management - the right posture
IT Risk Management - the right postureParag Deodhar
 
Introduction to RM Workshop Presentation (Dequity Partners)
Introduction to RM Workshop Presentation (Dequity Partners)Introduction to RM Workshop Presentation (Dequity Partners)
Introduction to RM Workshop Presentation (Dequity Partners)simonffg
 
Red7 NPD and Project Management Life Cycle Models Overview
Red7 NPD and Project Management Life Cycle Models OverviewRed7 NPD and Project Management Life Cycle Models Overview
Red7 NPD and Project Management Life Cycle Models OverviewRobert Grupe, CSSLP CISSP PE PMP
 
Serhii Podlevskyi: PMO implementation - benefits and constraints (UA)
Serhii Podlevskyi: PMO implementation - benefits and constraints (UA)Serhii Podlevskyi: PMO implementation - benefits and constraints (UA)
Serhii Podlevskyi: PMO implementation - benefits and constraints (UA)Lviv Startup Club
 
Using Dashboards to Monitor Project Performance - Is there a Practical Approach?
Using Dashboards to Monitor Project Performance - Is there a Practical Approach?Using Dashboards to Monitor Project Performance - Is there a Practical Approach?
Using Dashboards to Monitor Project Performance - Is there a Practical Approach?New Mexico Technology Council
 
Planificación del proyecto análisis de riesgo
Planificación del proyecto   análisis de riesgoPlanificación del proyecto   análisis de riesgo
Planificación del proyecto análisis de riesgoProColombia
 
Key Concepts for Project Mgmt
Key Concepts for Project MgmtKey Concepts for Project Mgmt
Key Concepts for Project MgmtJaiveer Singh
 
Project Selection in Large Engineering and Construction Programs
Project Selection in Large Engineering and Construction ProgramsProject Selection in Large Engineering and Construction Programs
Project Selection in Large Engineering and Construction ProgramsBob Prieto
 
The Role of Leading vs. Lagging Indicators in Sustainability Planning
 The Role of Leading vs. Lagging Indicators in Sustainability Planning The Role of Leading vs. Lagging Indicators in Sustainability Planning
The Role of Leading vs. Lagging Indicators in Sustainability PlanningSustainable Brands
 
Software risk analysis and management
Software risk analysis and managementSoftware risk analysis and management
Software risk analysis and managementONE BCG
 
Risk on complex_projects_project_auditors
Risk on complex_projects_project_auditorsRisk on complex_projects_project_auditors
Risk on complex_projects_project_auditorsJoy Gumz
 
Large Complex Projects (PMI-MY presentation Sept 2012)
Large Complex Projects (PMI-MY presentation Sept 2012)Large Complex Projects (PMI-MY presentation Sept 2012)
Large Complex Projects (PMI-MY presentation Sept 2012)Jeremie Averous
 
Nicolas Schobinger | Business Transformation Academy - Post Merger Integratio...
Nicolas Schobinger | Business Transformation Academy - Post Merger Integratio...Nicolas Schobinger | Business Transformation Academy - Post Merger Integratio...
Nicolas Schobinger | Business Transformation Academy - Post Merger Integratio...Nicolas Schobinger
 
Project Management Methodology
Project Management MethodologyProject Management Methodology
Project Management MethodologyC.Y Wong
 

Similar a Risk management in SEO projects (20)

Next Gen Innovation
Next Gen InnovationNext Gen Innovation
Next Gen Innovation
 
IT Risk Management - the right posture
IT Risk Management - the right postureIT Risk Management - the right posture
IT Risk Management - the right posture
 
Introduction to RM Workshop Presentation (Dequity Partners)
Introduction to RM Workshop Presentation (Dequity Partners)Introduction to RM Workshop Presentation (Dequity Partners)
Introduction to RM Workshop Presentation (Dequity Partners)
 
Red7 NPD and Project Management Life Cycle Models Overview
Red7 NPD and Project Management Life Cycle Models OverviewRed7 NPD and Project Management Life Cycle Models Overview
Red7 NPD and Project Management Life Cycle Models Overview
 
Serhii Podlevskyi: PMO implementation - benefits and constraints (UA)
Serhii Podlevskyi: PMO implementation - benefits and constraints (UA)Serhii Podlevskyi: PMO implementation - benefits and constraints (UA)
Serhii Podlevskyi: PMO implementation - benefits and constraints (UA)
 
Using Dashboards to Monitor Project Performance - Is there a Practical Approach?
Using Dashboards to Monitor Project Performance - Is there a Practical Approach?Using Dashboards to Monitor Project Performance - Is there a Practical Approach?
Using Dashboards to Monitor Project Performance - Is there a Practical Approach?
 
Planificación del proyecto análisis de riesgo
Planificación del proyecto   análisis de riesgoPlanificación del proyecto   análisis de riesgo
Planificación del proyecto análisis de riesgo
 
Project Vital Signs
Project Vital SignsProject Vital Signs
Project Vital Signs
 
Key Concepts for Project Mgmt
Key Concepts for Project MgmtKey Concepts for Project Mgmt
Key Concepts for Project Mgmt
 
Project Selection in Large Engineering and Construction Programs
Project Selection in Large Engineering and Construction ProgramsProject Selection in Large Engineering and Construction Programs
Project Selection in Large Engineering and Construction Programs
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Management
 
The Role of Leading vs. Lagging Indicators in Sustainability Planning
 The Role of Leading vs. Lagging Indicators in Sustainability Planning The Role of Leading vs. Lagging Indicators in Sustainability Planning
The Role of Leading vs. Lagging Indicators in Sustainability Planning
 
Software risk analysis and management
Software risk analysis and managementSoftware risk analysis and management
Software risk analysis and management
 
EA Benefits
EA BenefitsEA Benefits
EA Benefits
 
Red7 Product Portfolio Management
Red7 Product Portfolio ManagementRed7 Product Portfolio Management
Red7 Product Portfolio Management
 
Risk on complex_projects_project_auditors
Risk on complex_projects_project_auditorsRisk on complex_projects_project_auditors
Risk on complex_projects_project_auditors
 
Large Complex Projects (PMI-MY presentation Sept 2012)
Large Complex Projects (PMI-MY presentation Sept 2012)Large Complex Projects (PMI-MY presentation Sept 2012)
Large Complex Projects (PMI-MY presentation Sept 2012)
 
Risk Management
Risk ManagementRisk Management
Risk Management
 
Nicolas Schobinger | Business Transformation Academy - Post Merger Integratio...
Nicolas Schobinger | Business Transformation Academy - Post Merger Integratio...Nicolas Schobinger | Business Transformation Academy - Post Merger Integratio...
Nicolas Schobinger | Business Transformation Academy - Post Merger Integratio...
 
Project Management Methodology
Project Management MethodologyProject Management Methodology
Project Management Methodology
 

Último

AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAndrey Devyatkin
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...apidays
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024The Digital Insurer
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FMESafe Software
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MIND CTI
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesrafiqahmad00786416
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...DianaGray10
 
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfOrbitshub
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...Zilliz
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyKhushali Kathiriya
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfsudhanshuwaghmare1
 
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamDEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamUiPathCommunity
 
AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024The Digital Insurer
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobeapidays
 
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...Angeliki Cooney
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FMESafe Software
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDropbox
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businesspanagenda
 

Último (20)

AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challenges
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamDEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
 
AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 

Risk management in SEO projects

  • 1. Risk management in SEO projects Introduction and process model Download slides on SEO Südwest
  • 2. Risk-boosting factors in all projects • Lack f i L k of time, d dli deadlines • Bad acquisition and controlling of key performance indicators • Insufficient project management • Bad management of requirements and expectations • Huge and long-lasting projects 28.08.2012 © SEO Südwest 2012 2
  • 3. Risk-boosting factors in SEO projects • Wrong expectations about SEO success W i b • No ex-ante planning of SEO success factors • SEO conducted without project management • SEO manager in role of project manager without having project management experience t i 28.08.2012 © SEO Südwest 2012 3
  • 4. Risk definition Risk definition: uncertain event that effects one or more project objectives. Notice: effects can be positive or negative! Example: The outage of an important software developer can cause a p g p p two-week delay of project completion Risks consist of different components: • Risk event with probability of risk event • Risk impact with probability of risk impact • Expected gain or loss calculated from expected effect multiplied with probability of risk event and risk impact 28.08.2012 © SEO Südwest 2012 4
  • 5. Risk components Risk event Impact Total gain / loss Probability of Probability of risk event risk impact 28.08.2012 © SEO Südwest 2012 5
  • 6. Typical T i l SEO risk-events i k t • Google updates search algorithm unexpectedly G l d h l ih dl • Important backlink is being devaluated • SEO black hat methods are discovered by Google • Wrong implementation of „rel canonical“ attribute 28.08.2012 © SEO Südwest 2012 6
  • 7. Typical impacts of SEO risks T i li t f i k • Website W b i receives a penalty and i d i l d is downgraded d d • Multiple pages vanish from index • Domain is void due to black hat methods • Client won‘t pay because he is not satisfied with results 28.08.2012 © SEO Südwest 2012 7
  • 8. Risk t Ri k categories i • Known risks that can b anticipated. E K i k h be i i d Example: competitors f ll l i follow their own SEO strategy and bias succes of your SEO efforts • Unknown risks that cannot be anticipated Example: change of anticipated. Google search algorithm that leads to declined ranking • Scope risks (caused by frequent change requests or defects) p ( y q g q ) • Schedule risks (delays, dependencies, wrong estimates or multiple critical paths) • Resource-based risks (outsourcing, distributed teams, integration of new team members) 28.08.2012 © SEO Südwest 2012 8
  • 9. Multiple critical paths in projects Critical path 1 Task A Task B Task C Task D Task E Task F Task G Task H Task I Task J Task K Task L Task M Critical path 2 A critical path d t iti l th determines th d ti of th project. If th i the duration f the j t there i is more than one critical path in the project, the risk of a higher duration increases. 28.08.2012 © SEO Südwest 2012 9
  • 10. Risk management benefits • Future problems are recognized and can b eliminated i d F bl i d d be li i d in due time • Incentive to deal with project more intensely • Incentive to deal with project stakeholders more intensely • Promotion of censorious thi ki i project t P ti f i thinking in j t team • More successful projects • Risk management as a team building activity • Continous improvement of project management 28.08.2012 © SEO Südwest 2012 10
  • 11. Context of risk management Web  Stakeholder Software development management development Estimation and Knowledge controlling of effort Risk management management Requirements IT and technical …… management administration 28.08.2012 © SEO Südwest 2012 11
  • 12. Elements of risk management process Risk management Risk identification Risk analysis planning Risk monitoring and Risk prioritisation Risk solution controlling 28.08.2012 © SEO Südwest 2012 12
  • 13. Risk management process Identify risks ment planning Analyse risks Check for new risks Risk managem Prioritize i k P i iti risks m Risk solution Risk monitoring 28.08.2012 © SEO Südwest 2012 13
  • 14. Risk Ri k management planning t l i • Describes th risk management process i th project D ib the i k t in the j t • What has to be communicated? • What kind of meetings are needed? • Which tools, documents etc. are used? • First estimate of overall project risk • Definition of risk categories • Definition of key figures (e.g. for risk probability and impact) • Schedule planning 28.08.2012 © SEO Südwest 2012 14
  • 15. Risk identification (1/2) • Start risk id ifi i as soon as possible S i k identification ibl • Iterative process. Repeat throughout the whole project • Should be part of every status meeting • Opens out into risk index • Risk identification tools and techniques: • Brainstorming, expert reviews • Checklists • Document analysis, analysis of assumptions y y p  Important: include all project areas, respect positive and negative risks! 28.08.2012 © SEO Südwest 2012 15
  • 16. Risk identification (2/2) • First Fi counteraction can b planned while i be l d hil conducting risk identification already • Most urgent risks are addressed first • Not later than kickoff the risk index must exist 28.08.2012 © SEO Südwest 2012 16
  • 17. Risk analysis • Qualitative Q lit ti vs. quantitative risk analysis tit ti i k l i • Qualitative: classify risk by severity: „low“, „ „middle“, „high“ ,„ g • Quantitative: detailed calculation of probability and impact • Qualitative analysis is mainly used for risk prioritisation • Risk analysis and risk prioritisation can be done together • In order to avoid arbitrariness and subjective influence hen infl ence when defining risk probabilit it makes probability sense to use pre-defined rankings like: 0-10%, 11-50 %, 51-80%, 81-100 %. 28.08.2012 © SEO Südwest 2012 17
  • 18. Risk analysis: tools and methods • Risk Ri k matrix ( t i (qualitative risk analysis) lit ti i k l i ) • PERT (Program Evolution and Review Technique)  comparing optimistic and pessimistic estimations p g p p (quantitative risk analysis) • Monte Carlo Analysis (automated and iterative calculation of different project results shows probability distribution) • Expert reviews p • Interviews • p Workshops  The latter four used for quantitative and qualitative analysis as well 28.08.2012 © SEO Südwest 2012 18
  • 19. Risk matrix high Probability low Impact I t high Risk severity 28.08.2012 © SEO Südwest 2012 19
  • 20. Risk prioritisation • After determining risk probability and i Af d i i i k b bili d impact the h order of handling risks has to be defined • Concentrate on a set of most important risks  top top- 10 list • Marginal cost for solving an additional risk have to g g be equal or smaller than marginal loss caused by this additional risk 28.08.2012 © SEO Südwest 2012 20
  • 21. Risk solution • Define D fi counter measurements f every prioritized for i ii d risk. Decide between actions concerning risk events and actions concerning risk impact. • Define responsibilities • Define those risks that no actions will be taken for (active / passive risk acceptance) • Update project plan • Create fallback-plan with actions to be taken if initial actions fail. 28.08.2012 © SEO Südwest 2012 21
  • 22. Risk solution - strategies Risk Chance Example Avoid Exploit Remove or add certain tasks from / to project plan Mitigate Emphasize Influence risk probability and / or risk impact Transmit Share Involve additional players to handle risk or chance Active: build reserves for Acceptance (active oder passive) the case of risk occurrence Passive: action is defined after risk occurrence first. 28.08.2012 © SEO Südwest 2012 22
  • 23. Risk monitoring and controlling • Check Ch k status of risks continously. Ri k status should f i k i l Risk h ld be part of every status meeting. • Are there any risks that can be removed from risk index because they are no longer relevant or haven‘t occurred? • Are there new risks to be analyzed? • Has there been a change of risk priorities? Is the top-list of risks still up-to-date? • Have the chosen risk solutions been appropriate? 28.08.2012 © SEO Südwest 2012 23
  • 24. Resumé •Risk management important in projects – especially when doing SEO •Risk management needs to be planned Risk •Risk management is an iterative process Contact information: SEO Südwest Christian Kunz http://www.seo-suedwest.de info@seo-suedwest.de Download slides on SEO Südwest 28.08.2012 © SEO Südwest 2012 24
  • 25. List of references • Smith, Preston G. / Merritt, Guy M. : Proactive Smith Preston G / Merritt Guy M : Proactive Risk Management Productivity Press 2002 Management. Productivity Press 2002 • Heldman, Kim: Project Manager‘s Spotlight on Risk Management. Sybex 2005 • Kendrick, Tom: Identifying and Managing Project Risk: Essential Tools for Failure‐Proofing Your Project.  Amacom 2003 • Wideman, Max R.: Project and Program Risk Management: A Guide to Managing Project Risks and Opportunities. Project Management Institute 1992 • Vose, David: Risk Analysis, A Quantitative Guide, Second Edition. John Wiley Vose David: Risk Analysis A Quantitative Guide Second Edition John Wiley and Sons (UK) 2002 (UK) 2002 • Schuyler, John: Risk and Decision Analysis in Projects, Second Edition. Project Management Institute  2001 • Mulcahy, Rita: PMP Exam Prep: Rita‘s Course in a Book for Passing the PMP Exam, Fifth Edition. RMX  Publications 2005 28.08.2012 © SEO Südwest 2012 25