Berikut adalah spesifikasi standard rumah yang pihak kami bina:
DESCRIPTION SPECIFICATION
PRELIMINARIES
plan akitek
plan struktur
jalan masuk crusher run
bekalan air boring tidak melebihi 30′ termasuk membekal 100w pamair hitachi
EARTHWORK/GROUND
LEVEL
level tanah asal, kerja tambun tanah adalah v.o kecuali stated dlm
contract
GENERAL SPESIFIKASI
ARAS LANTAI DR TANAH 450MM DR LEVEL TANAH
KETINGGIAN RUMAH
11 KAKI DARI ARAS LANTAI HINGGA PARASATASROOF
BEAM
KERJA KERJA STRUKTUR
main bar t9mm
link r5mm
concrete 1:2:4 cement,sand,aggregate ratio
DINDING
dinding bata 100mm (4″)machine pressed cement brick
plaster 1:3 cement and sand
KEKUDA KAYU treated timber
wall plate 2×3
cross beam 1 5/8 x5
rafter/strut 1 5/8 x 4
rain water down base,spacer 1×2
fascia board wrot 1×8
bolt nut 3/8″x 4.5″ ;3/8″x6.5″
ATAP
roof tiles premier red or equivalent
dpc
perabung premier red or equivalent,mortar fill tanpacat
SILING
ruang tamu & dining plaster siling
ruang dalam lain/porch siling 4×4 pasang rapat
luar( kaki lima) 2×4 flat sheet pasang rapat
lubang siling didalam tandas luar
TILING WORKS
wall tile
toilet 5′ high wall tile and 8″x8′ floor tile
kitchen v.o optional
floor tile
toilet 8″x8″ non slippery ceramic tile
kitchen 12×12 non slippery ceramic tile to floor only
dining 12×12 ceramic tile
living 12×12 ceramic tile
bed room 12×12 ceramic tile
porch v.o optional
JENDELA
asas aluminium frame puteh maximum 40% dr ukur lilit dinding luar
tinggi 5′ 6″.
cermin 5mm tinted glass black in color
** kos tambahan jika ada frame koko
tukar color cermin
tambahan kos untuk jendela labuh
PINTU
door frame kulim 15/8×5
leaf door mumbung malaysia
ironmongery
engsel(kps),topwin or equivalent cylindrical lock,penyelak pintu
depan shj
tophung fixed glass
PAINTING
internally
walls koreton mat
ceiling emulsion ceiling white
externally
walls 1 layer kcc wall sealer, 2 layer korevon two colors maximum
ceiling emulsion ceiling white
doors par or equivalent gloss paint
door frame par or equivalent gloss paint
door leaf par or equivalent gloss paint
APRON AND PREMETER
DRAIN
concrete bed 1:3:6 concrete bed with 1:3 cement screed finish with steel trowel
half round chanel drain 3′ long concrete half round drain
SANITARY FITTING
padestalw.c (tandas duduk) ceramic toilet bowl with colored pvcseat and cistern
squating w.c (tandas cangkung) colored ceramic bowl with pvc cistern
wash hand basin colored ceramic sink bowl
soap holder- vo v.o optional
floor trap 4″pvcwhite
mirror v.o optional
kepala paip chromium plated sink tap
shower rose chromium plated shower head
COLD WATER SYSTEM
pipe pvcpipe
pipefitting copper stopcock
kepala paip copper tap
water tank 150 gallon polytank inside roof structure
water tank tower v.o optional
WASTE AND SOIL PIPE
wastepipe 2″upvcpipe
soil pipe 2″upvcpipe
SUNDRIES
counter top (kabinet dapur)
12′ in length.14foot wall to wall length with rc counter top,tiled top
and side
with 1′x1′ ceramic tile with 3/4″ cove on edges,including detached
prestay
steel sink bowl with 1 chromium plated swan neck tap (wooden door
not
included). Include 2′ high wall tile to cabinet wall only
EXTERNAL WORKS
SEWERAGE
pipe 4″ upvcpipe
manhole
construct of cement bricks,plastered finish with steel trowel and
covered
with rc concrete slab
septictank 5 persons poly septictank
FENCING refer contract
chainlink steel wire coated with colored pvc
post 1.5″x1.5″ m. s steel angle 5′ high
strut 1.5″x1.5″ m. s steel angle 5′ high
concrete base not exceeding 125mm high conrete base.
gate m.s steel standard sliding gate
sundries eg. Special post, gate post,
450mmx600mm cement block plastered all around in mail box
included
and painting as main house external wall color code
M&E
ELECTRICAL WORK
electrical point
lampu 10 point
kipas 3 point
a/c v.o optional
soket 7 point
h/ter v.o optional

Más contenido relacionado

La actualidad más candente

Transom Window - Beautiful Stained Glass Products
Transom Window - Beautiful Stained Glass ProductsTransom Window - Beautiful Stained Glass Products
Transom Window - Beautiful Stained Glass Products
Transom Window
 
How to build a lavamanos apls guatemala
How to build a lavamanos apls guatemalaHow to build a lavamanos apls guatemala
How to build a lavamanos apls guatemala
waloart
 
Mahogany Place III
Mahogany Place IIIMahogany Place III
Mahogany Place III
rchrealty
 

La actualidad más candente (12)

Transom Window - Beautiful Stained Glass Products
Transom Window - Beautiful Stained Glass ProductsTransom Window - Beautiful Stained Glass Products
Transom Window - Beautiful Stained Glass Products
 
How to build a lavamanos apls guatemala
How to build a lavamanos apls guatemalaHow to build a lavamanos apls guatemala
How to build a lavamanos apls guatemala
 
Rivergreen Residences
Rivergreen ResidencesRivergreen Residences
Rivergreen Residences
 
Cabin Moxie inside
Cabin Moxie insideCabin Moxie inside
Cabin Moxie inside
 
Edgewood835 punchlist
Edgewood835 punchlistEdgewood835 punchlist
Edgewood835 punchlist
 
BELLEFORT ESTATES
BELLEFORT ESTATESBELLEFORT ESTATES
BELLEFORT ESTATES
 
Shot list
Shot listShot list
Shot list
 
Drainage systems and Covid
Drainage systems and CovidDrainage systems and Covid
Drainage systems and Covid
 
Vala Catalouge
Vala CatalougeVala Catalouge
Vala Catalouge
 
Centura tile 2
Centura tile 2Centura tile 2
Centura tile 2
 
Mahogany Place III
Mahogany Place IIIMahogany Place III
Mahogany Place III
 
Mahogany Place 3
Mahogany Place 3Mahogany Place 3
Mahogany Place 3
 

Similar a 01 spec rumahi (6)

work samples
work sampleswork samples
work samples
 
House Plan For Robert Ledwaba
House Plan For Robert LedwabaHouse Plan For Robert Ledwaba
House Plan For Robert Ledwaba
 
3. sequances of drilling operations
3. sequances of drilling operations3. sequances of drilling operations
3. sequances of drilling operations
 
Tlalanyane Residence Proposal
Tlalanyane Residence ProposalTlalanyane Residence Proposal
Tlalanyane Residence Proposal
 
2014 Forest River Wildwood DLX - Lodge Destination Trailers
2014 Forest River Wildwood DLX - Lodge Destination Trailers2014 Forest River Wildwood DLX - Lodge Destination Trailers
2014 Forest River Wildwood DLX - Lodge Destination Trailers
 
Wall Elevation A4
Wall Elevation A4Wall Elevation A4
Wall Elevation A4
 

Último

Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
ZurliaSoop
 

Último (20)

Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptxOn_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the Classroom
 
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
Plant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptxPlant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptx
 
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxExploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxCOMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
 
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structure
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 

01 spec rumahi

  • 1. Berikut adalah spesifikasi standard rumah yang pihak kami bina: DESCRIPTION SPECIFICATION PRELIMINARIES plan akitek plan struktur jalan masuk crusher run bekalan air boring tidak melebihi 30′ termasuk membekal 100w pamair hitachi EARTHWORK/GROUND LEVEL level tanah asal, kerja tambun tanah adalah v.o kecuali stated dlm contract GENERAL SPESIFIKASI ARAS LANTAI DR TANAH 450MM DR LEVEL TANAH KETINGGIAN RUMAH 11 KAKI DARI ARAS LANTAI HINGGA PARASATASROOF BEAM KERJA KERJA STRUKTUR main bar t9mm link r5mm concrete 1:2:4 cement,sand,aggregate ratio DINDING dinding bata 100mm (4″)machine pressed cement brick plaster 1:3 cement and sand KEKUDA KAYU treated timber wall plate 2×3 cross beam 1 5/8 x5 rafter/strut 1 5/8 x 4 rain water down base,spacer 1×2 fascia board wrot 1×8 bolt nut 3/8″x 4.5″ ;3/8″x6.5″ ATAP roof tiles premier red or equivalent
  • 2. dpc perabung premier red or equivalent,mortar fill tanpacat SILING ruang tamu & dining plaster siling ruang dalam lain/porch siling 4×4 pasang rapat luar( kaki lima) 2×4 flat sheet pasang rapat lubang siling didalam tandas luar TILING WORKS wall tile toilet 5′ high wall tile and 8″x8′ floor tile kitchen v.o optional floor tile toilet 8″x8″ non slippery ceramic tile kitchen 12×12 non slippery ceramic tile to floor only dining 12×12 ceramic tile living 12×12 ceramic tile bed room 12×12 ceramic tile porch v.o optional JENDELA asas aluminium frame puteh maximum 40% dr ukur lilit dinding luar tinggi 5′ 6″. cermin 5mm tinted glass black in color ** kos tambahan jika ada frame koko tukar color cermin tambahan kos untuk jendela labuh PINTU door frame kulim 15/8×5 leaf door mumbung malaysia ironmongery engsel(kps),topwin or equivalent cylindrical lock,penyelak pintu depan shj
  • 3. tophung fixed glass PAINTING internally walls koreton mat ceiling emulsion ceiling white externally walls 1 layer kcc wall sealer, 2 layer korevon two colors maximum ceiling emulsion ceiling white doors par or equivalent gloss paint door frame par or equivalent gloss paint door leaf par or equivalent gloss paint APRON AND PREMETER DRAIN concrete bed 1:3:6 concrete bed with 1:3 cement screed finish with steel trowel half round chanel drain 3′ long concrete half round drain SANITARY FITTING padestalw.c (tandas duduk) ceramic toilet bowl with colored pvcseat and cistern squating w.c (tandas cangkung) colored ceramic bowl with pvc cistern wash hand basin colored ceramic sink bowl soap holder- vo v.o optional floor trap 4″pvcwhite mirror v.o optional kepala paip chromium plated sink tap shower rose chromium plated shower head COLD WATER SYSTEM pipe pvcpipe pipefitting copper stopcock kepala paip copper tap water tank 150 gallon polytank inside roof structure
  • 4. water tank tower v.o optional WASTE AND SOIL PIPE wastepipe 2″upvcpipe soil pipe 2″upvcpipe SUNDRIES counter top (kabinet dapur) 12′ in length.14foot wall to wall length with rc counter top,tiled top and side with 1′x1′ ceramic tile with 3/4″ cove on edges,including detached prestay steel sink bowl with 1 chromium plated swan neck tap (wooden door not included). Include 2′ high wall tile to cabinet wall only EXTERNAL WORKS SEWERAGE pipe 4″ upvcpipe manhole construct of cement bricks,plastered finish with steel trowel and covered with rc concrete slab septictank 5 persons poly septictank FENCING refer contract chainlink steel wire coated with colored pvc post 1.5″x1.5″ m. s steel angle 5′ high strut 1.5″x1.5″ m. s steel angle 5′ high concrete base not exceeding 125mm high conrete base. gate m.s steel standard sliding gate sundries eg. Special post, gate post, 450mmx600mm cement block plastered all around in mail box included and painting as main house external wall color code M&E ELECTRICAL WORK
  • 5. electrical point lampu 10 point kipas 3 point a/c v.o optional soket 7 point h/ter v.o optional