Winter 2010

        Data Cabling Reference Sites




Able Data Installations Plc
Able House, 1 Figree Hill
Hemel Hempstead
Herts HP2 5XL
Tel: 01442 219580
www.abledata.co.uk
sales@abledata.co.uk
Able Data SCS Reference Sites



  Reed Smith
  Summary       Installation of Data & Voice Cabling over 13 Floors
  Contact       Nick Bennett
                Coleman Bennett International
                19th Floor
                30 St Mary Axe
                London
                EC3A 8AD
  Location      Broadgate Tower, London
  Contract      £400k
  Systems       Systimax GigaSPEED XL Cat 6
  Installed     Sept 2008 - Feb 2009
  Consultant    Coleman Bennett International
  Contractor    ISG
  Project     Reed Smith, one of the 15 largest law firms in the world with more than
  Description 1,500 lawyers, have consolidated its London operations by relocating
              from two legacy sites to a single new London Headquarters at Broadgate
              Tower, London.
              As part of the fit out Able Data were contracted to install 6,000 data
              outlets distributed over thirteen floors. The installation time spent on site
              was greatly reduced thanks to the use of pre-terminated cable looms,
              which were manufactured and tested off site.
              One of the key challenges to solve was the running of a fibre and copper
              cable backbone over thirty floors from the IT computer room at the foot
              of the building to the office floors.
  Pictures




Autumn 2009                                                                             Page 1
Able Data SCS Reference Sites



Ashmolean Museum
Summary Cabling of Major New Building Extension
Contact        Dr Jonathan Moffett
               Ashmolean Museum,
               Beaumont Street, Oxford
               OX1 2PH
Contract       £200K
Systems        Molex Cat6
Installed      Dec 2008 - Oct 2009
Builder        BAM
Project        The Ashmolean Museum, dating from the 17th century, is the oldest public
               museum in the UK. Award-winning architect Rick Mather created a new
               building that has doubled the Ashmolean’s gallery space and state-of-the-art
               facilities. In November 2009, the £61M redevelopment opened to the public.
               Able Data installed a structured cabling system, consisting of nearly a thousand
               outlets, spread over 6 floors of the new building extension.
               Each of the 13 remote patch cabinet locations had a fibre & copper backbone
               linking to the Basement computer room. As well as the provision of the
               computer cabinets at each location Able Data supplied & installed an APC UPS
               & 3Comm Switch. The biggest challenge was the complexity and range of
               cable routes. Whilst some outlets are located in low floor boxes, others for high
               gallery points (overhead projectors etc) are at more than eight metres high.
               Another challenge was fitting cabling around a complex building program;
               many outlets could not be terminated or tested until after the exhibition cabinets
               had been installed.
Pictures




 Autumn 2009                                                                                Page 2
Able Data SCS Reference Sites



  Misys
  Summary          Cabling & moves into new headquarters building
  Contact          Phil Davies, IT Manager.
                   Misys
                   One Kingdom Street, Paddington. W2 6BL
                   Tel: 020 8879 1188
  Location         Paddington, London
  Contract         £300K
  Systems          Brand-Rex Cat6 & OM3, Cooper B-Line Cabinets
  Start & Finish   Feb – Aug 2008
  Consultant       April Management
  Contractor       Mastercraft Design
  Project          Misys were consolidating four regional offices into one new
  Description      headquarters building.

                   The new offices required 3,000 Brand Rex LSOH Cat6 outlets
                   installed over three floors, each floor being cabled from two patch
                   rooms. Able Data connected the patch rooms through diversely routed
                   OM3 fibre and voice backbones. In the main computer room, Able
                   Data installed Cooper B-Line cabinets, fitted with the Unite Hawki-2
                   intelligent power monitor and control products.

                   Able Data also managed the movement of 500 users into the new
                   building. Scheduled over five weekends, this included providing an
                   asset register of all of their computer equipment and a full moves
                   service into the new offices, including connection and test of all of the
                   desktop equipment.
  Pictures




Autumn 2009                                                                             Page 3
Able Data SCS Reference Sites



  Ashburton Court
  Summary       Hampshire County Council Office HQ & Data Centre
  Contact       Bob Davis, Senior ICT Consultant
                Mace
                Atelier House, 64 Pratt Street
                London
                NW1 0LF
                Tel: 020 7554 8000

  Location      Winchester City Centre
  Contract      £850K
  Systems       Nexans Lanmark-6 10G F/UTP, Nexans LANsense System, Excel Cat6
  Installed     Sep 2007 – May 2009
  Consultant    Mace
  Contractor    BAM
  Project     In 2009 Hamshire County Council (HCC) completed a major office
  Description refurbishment of its HQ building at Ashburton Court. The conversion of
              this 1960’s council office building to a naturally ventilated, low energy
              facility included a heat recovery from the internal Data Centre as a source
              of heat to service the office areas.
              Able Data were contracted by BAM to install a data cabling system
              providing 4,000 Cat6 outlets to the new offices and meeting rooms. Able
              Data also won the contract to build the new Data Centre facility, completed
              over eight weeks in Spring 2009. With 70 Prism server cabinets, 5,000
              copper links and 2,000 fibre links, this new data centre has become HCC’s
              primary Data Centre. The facility incorporates leading edge Data Centre
              technologies to maximise space and power usage and to enable remote
              operation. Functionality installed by Able Data included a Nexans 10G
              Ca6a copper cabling system, a Nexans Intelligent Infrastructure
              Management (IIM) system, Nexans remotely control Intelligent PDU’s and
              a Data Centre wide Austin Hughes KVM system.
  Pictures




Autumn 2009                                                                          Page 4
Able Data SCS Reference Sites



  Veolia Three Valleys Water
  Summary          Cabling of building
  Contact          Bob Davis, Senior ICT Consultant
                   Mace
                   Atelier House, 64 Pratt Street
                   London
                   NW1 0LF
                   Tel: 020 7554 8000
  Location         Hatfield Business Park, Hatfield
  Contract         £200K
  Systems          Molex PowerCat 6 UTP Cat6
  Start & Finish   Nov 2008 – Jan 2009
  Consultant       Mace
  Contractor       Como
  Project          Veolia Water (formally Three Valleys Water) consolidated their
  Description      offices into the new HUB building in Hatfield, a building to house 750
                   office staff.
                   Able Data were contracted by Como to install a 3,000 outlet Cat6 data
                   cabling system. Run over four floors, outlets were terminated in a grid
                   of 8-way consolidation points installed under the false floor. Desk
                   outlets were connected to the consolidation points through solid patch
                   lead connections.
                   The project was completed over a period of two months.
  Pictures




Autumn 2009                                                                           Page 5
Able Data SCS Reference Sites



  Johnson & Johnson
  Summary       Johnson & Johnson Pinewood Building, Wokingham
  Contact       Paul Leinster
                Johnson & Johnson
                The Braccons
                London Road
                Bracknell
                Berkshire
                RG12 2AT
  Location      Nine Mile Ride, Wokingham, Berkshire.
  Contract      £300K
  Systems       Siemon 10G 6A F/UTP System
  Installed     Aug 2008 – Jan 2009
  Consultant    J&J Information Technology Services
  Contractor    Como
  Project     Johnson & Johnson, the global American pharmaceutical giant, built a
  Description brand new three storey Building at Nine Mile Ride, Wokingham.
              Able Data quoted and won the contract with Como to install 3,000 Data
              outlets covering three floors, including the cabling of a state of art
              Auditorium.
              Able Data installed a high performance Siemon shielded Cat6a system,
              tested to provide the full 10G performance over the full 90m required by
              the installation. Most of the outlets were installed under the raised floor in
              a grid pattern of 3-way outlets boxes, providing full flexibility for moves
              and changes.
              Able Data installed a single mode fibre backbone and fitted out a small
              data centre with Minkel equipment cabinets.
  Pictures




Autumn 2009                                                                             Page 7
Able Data SCS Reference Sites



  Fidelity Oakhill Data Centre
  Summary       New Data Centre at the Fidelity HQ
  Contact       John Brogan, Project Manager
                Fidelity International
                Oakhill House, 130 Tonbridge Rd
                Hildenborough, Kent, TN11 9DZ
                Tel: 01732 361 144
  Location      Tonbridge, Kent
  Contract      £2.5M
  Systems       Systimax Cat 6, LazrSPEED 300 OM3, iPatch, CPI Patch Frames
  Installed     Jul – Oct 2009
  Project     Fidelity International is a world-wide leading investment provider. As
  Description part of their UK data centre consolidation strategy, Fidelity required a
              new Data Centre facility at its HQ facility at Tonbridge.
              Spread over two underground data halls and two office floors, the
              project required the installation of 30,000 Cat6 copper links and 11,000
              OM3 duplex fibre links to 300 Rittal cabinets and used more than
              700km of cable. All links connect to a patch field of 80 x CPI patch
              frames, each monitored with the iPatch Intelligent patch system.
              The Data Centre was cabled overhead on three levels of CPI ladder
              racking. One of the biggest challenges faced by Able Data was to
              deliver the required high quality of cabling. To work out the optimum
              cable routing schemes, Able Data built an offsite mock up of a row of
              patch frames and the associated cables. To speed up installation whilst
              minimising unsightly cable slack, Able Data single end pre-terminated
              all copper and fibre links. The entire installation was completed over a
              14 week period.
              As well as building and configuring a 40,000 port iPatch system to
              manage patching and monitor network devices, Able Data implemented
              additional bespoke functionality tailored to Fidelity’s requirements,
              including auto server provisioning.
  Pictures




Autumn 2009                                                                           Page 6
Able Data SCS Reference Sites



  North Kent Police
  Summary       North Kent Police HQ
  Contact       Justice Support Service (North Kent) Ltd
  Location      Gravesend
  Contract      £200K
  System        Siemon System 6 UTP
  Start &       Dec 2007 – April 2008
  Finish
  Contractor    Imtech Meica
  Project     North Kent Police new Head Quarters is a new build state of the art
  Description 11,500 Metre2 four-storey building, which houses police officers, civilian
              staff, evidential stores and includes a 40-cell custody suite.
              Able Data installed 2,000 outlet Siemon Cat 6 LSZH data outlets across
              the four floors and custody suite. The computer rooms, fitted with Dell
              equipment cabinets, were interconnected through a Siemon OM3 fibre
              and Cat6 copper backbone. Able Data also installed a TV distribution
              system.
              The biggest challenge of the installation was to install and protect the
              cabling amidst the confusion of a large building site.
  Pictures




Autumn 2009                                                                           Page 8
Able Data SCS Reference Sites



  Bucks New University (BNU)
  Summary      Installation of Data & Voice Cabling over 13 Floors
  Contact      Andy MacFarlane
               BAM Construction
               Centrium, Griffiths Way
               St Albans, Herts. AL1 2RD
  Location     High Wycombe
  Contract     £150K
  Systems      Excel Cat6
  Installed    Apr 2009 – Dec 2009
  Contractor   BAM
  Project     Buckinghamshire New University’s camp has undergone an extensive
  Description £60m programme of rebuilding in 2009. A new, high-tech learning
              resources centre, known as the Gateway, forms the focal point of the
              University’s technology-led learning experience.
              Able Data were contracted by BAM to install an 1,800 Excel Cat6
              UTP cabling system, spread over the six patch rooms on the six floors
              of the new Gateway building extension. Able Data also installed an
              Blown Fibre (OM3) & a voice link backbone cabling infrastructure
              between each patch room and the main computer room on the 4th floor.
  Picture




Autumn 2009                                                                          Page 9
Able Data SCS Reference Sites



  Reynolds Porter Chamberlain
  Summary       Cabling of RPC’s new London HQ
  Contacts      Neil Davidson, IT Manager         Carl Stowe-Smith, Project Manager
                Reynolds Porter Chamberlain       Overbury
                Tower Bridge House                77 Newman Street
                St Katharines Way                 London
                London, E1W 1AA                   W1T 3EW
                Tel: 020 3060 6000                Tel: 020 7307 9083
  Location      Tower Bridge House, London
  Contract      £400K
  Systems       Beldon CDT Cat6
  Period        February 2006 – June 2006
  Consultant    Coleman Bennett International
  Contractor    Overbury
  Project       RPC, a leading UK law firm, consolidated their London operations
  Description   into the prestigious Tower Bridge House.
                As part of the fit out of the new building, Able Data supplied and
                installed 6,000 Cat6 outlets over four floors. These were installed in a
                flood-filled under floor grid of 4-way outlet boxes, so that outlets can
                be pulled through the floor and mounted on desk positions as required.
                Able Data also installed an OM3 fibre backbone, using redundant
                routes and supporting backup focal points to the building of a fault
                tolerant network.
                Able Data also installed an iTRACS cable management system,
                providing facilities for RPC to manage their cabling infrastructure and
                to support moves and changes. This included the iDiscovery module,
                which allows RPC to dynamically discover and monitor ip network
                devices on the network & to map these onto the cabling infrastructure.
  Pictures




Autumn 2009                                                                          Page 10
Able Data SCS Reference Sites




  Northumberland Hotel
  Summary       Mayflex, Excel Cat 5e - Northumberland Hotel
  Contact       Northumberland Hotel
                The Club Quarters
                Trafalgar Square
                London
  Location      Northumberland Avenue
  Contract      Data, Telephone and RF Cabling
  Systems       Mayflex Excel Cat 5e
  Start &       November 2006
  Finish        May 2007
  Consultant
  Contractor    Meica
  Project
  Description   The Installation of Telephone, Data and RF cabling to over 1000
                Hotel rooms.
                The Club Quarters Trafalgar Square is located in a beautifully
                restored building dating back to the 1880's, situated just off
                London's historic Trafalgar Square which houses Nelson’s
                Column, the church of St. Martin’s in the Fields and the National
                Gallery.

  Pictures




Autumn 2009                                                                         Page 11
Able Data SCS Reference Sites




  Penguin
  Summary       Penguin – London – Ortronics Cat6 – Outlets 2000
  Contact       Dean Moore
                Coleman Bennett International
                19th Floor
                30 St Mary Axe
                EC3A 8AD
                Tel: 020 7638 2000
  Location      The Strand, London
  Contract      £400K
  Systems       Ortronics Cat6 & OM3
  Period        March 2007 - December 2007
  Consultant    CBI
  Contractor    Faithdean
  Project       This project was part of the Penguin Publishing refurbishment at
  Description   their headquarters in the Strand.
                The project was spread over three
                floors and involved the upgrade and
                installation of a new Ortronics UTP
                Clarity Category 6 structured cabling
                system. Where possible, existing
                equipment and cables was re-used.
                A feature of the installation was the
                use of the Ortronics Clarity Jak-Pak 6-way outlet boxes to offer a
                very neat desk end solution.
                The project also included installation of the highly popular Mighty
                Mo 6 open patch frames.
  Pictures




Autumn 2009                                                                           Page 12
Able Data SCS Reference Sites




  London Transport Museum
  Summary          Structure Cabling & AV Cabling
  Location         Covent Garden
  Contract         £100K
  Systems          Excel Cat 5e UTP
  Start & Finish   February 07 - November 07
  Contractor       Imtech Meica
  Project          The new museum in Covent Garden opened in November 2007 after a
  Description      two year £22M redesign project. The Museum tells the story of the
                   development of London, its transport system and the people who
                   travelled and worked on them over the last 200 years.
                   Able Data installed a structured flood wired system throughout the
                   Museum and Gift shop. This involved installing cables at large heights
                   in order to reach all parts of the museum. Different sections were also
                   interconnected with a fibre backbone.
                   Able Data also installed a network of specials AV links to support the
                   equipment to enable visitors to enjoy a full vision and Audio
                   commentary as they walk around the museum.
  Pictures




Autumn 2009                                                                          Page 13
Able Data SCS Reference Sites



  Fidelity Investments
  Summary       Cabling of Fidelity’s Date Centres
  Contact       Dexter Baird
                Oakhill House, 130 Tonbridge Road
                Hildenborough, Kent
                TN11 9DZ
                Tel: 01732 777627
  Location      Acton Colt Data Centre, London
                Global Switch 2 Data Centre, London
  Contract      £650K (Total)
  Systems       SYSTIMAX GigaSPEED XL Cat6
                SYSTIMAX LazrSPEED OM2, OM3
  Start &       Jan 2003 – May 2003
  Finish        Nov 2005 – Dec 2005
                Jul 2006
  Project       In three separate projects, Able Data have cabled Fidelity’s London
  Description   based Data centres.
                In the first project Able Data supplied and installed thirty data
                cabinets and the required cabling infrastructure. The initial installation
                of 4,000 copper links was completed within four weeks. All RJ45
                patch panels are of the Avaya Fleximax variety, where standard outlet
                modules are clipped into the panel.
                The second and third projects were similar, but on a larger scale. The
                third project at Global Switch involved 10,000 links, installed over a
                period of one month, made possible by the use of off site pre-
                termination,
                As part of the initial project, Able Installed also 1,000 10Gbit OM2
                fibre links, terminated onto SC connector outlets. The later projects
                used LC connectors.
  Pictures




Autumn 2009                                                                            Page 14
Able Data SCS Reference Sites



  AllianceBernstein
  Summary       New structured cabling system for AllianceBernstein
  Contacts      Martyn Chadaway
                CBI
                19th Floor
                30 St Mary Axe
                London
                EC3A 8AD
                Tel: 020 7638 2000
  Location      50 Berkeley Street, London
  Contract      £400K
  Systems       Tyco AMP Cat6
  Period        January 2006 – June 2006
  Consultant    Coleman Bennett International
  Contractor    Wates
  Project       AllianceBerstein is on of the largest publicly traded global asset
  Description   management firms in the world.
                When AllianceBernstein were refurbishing their offices in Berkeley
                Street, Able Data were contracted to build a new structured cabling
                system. Spread over four floors, Able Data installed 5,000 new outlets
                and over 4,000 computer room links. A tight programme required
                completion in less than size weeks, achieved by using pre-termination
                to pre-build cable assemblies off site and night working on site.
                Each floor was flood wired back to two patch rooms per floor. All of
                the patch rooms were connected to the main and backup computer
                rooms through diversely routed Cat6 copper and OM3 fibre.
                Able Data were subsequently awarded the contract to review the
                cabling at Devonshire House, another AllianceBernstein site in
                London.
  Picture




Autumn 2009                                                                         Page 15
Able Data SCS Reference Sites



  eBay Berlin
  Summary          Cabling of building in Berlin.
  Contact          Kevin Wenman
                   Protek Systems Ltd
                   Flexford Road,, North Baddesley, Southampton
                   SO52 9DF
                   Tel: 023 8026 7733
  Location         Europarc-Dreilinden, Berlin
  Contract         £350K
  Systems          SYSTIMAX GigaSPEED XL7 Cat6
  Start & Finish   Aug -Sep 2005
  Consultant       N/A
  Contractor       Direct
  Project          EBay required a new cabling system for its new J9 HQ building in
  Description      Berlin. This was to be based upon the eBay US model of cabling and
                   would form the 1st of a number of similar installations around Europe.
                   Able Data installed 2,000 SYSTIMAX outlets over five floors. As per
                   the eBay standard, these were implemented in groups of four on US
                   style faceplates. To fit in with the strong eBay logo branding, the
                   outlets were implemented using coloured jacks, yellow and green
                   (Cat6 for data) and blue and red (Cat5e for voice). These were cabled
                   back to the patch rooms through three cables, the voice outlets sharing
                   one cable.
                   As well as a number of local patch rooms, the project also involved
                   the installation of a data centre. All were built using CPI open frame
                   racks for patching and servers, including full overhead ladder racking.
                   The impressive effect was further enhanced in the data centre by the
                   installation of an overhead Panduit Fibrerunner system for the
                   containment of the fibre interconnections.
                   A crucial aspect of the project was the logistics of shipping specialist
                   materials from UK, US and other parts of Europe in short timescales.
  Pictures




Autumn 2009                                                                           Page 16
Able Data SCS Reference Sites




  APAX
  Summary       Molex Cat 6 – OM3
  Contact       Stephen Grabiner
                020 7872 6300

  Location      33 Jermyn Street
                London
                SW1Y 6DN

  Contract      130k
  Systems       Molex
  Start &       6 Month Project
  Finish
  Consultant    CBI
  Contractor    ISG
  Project
  Description   Able Data Installations installed a Molex Cat 6 & OM3 Fibre Optic
                cabling systems over 6 floors of the new London headquarters
                Building of Apax and Partners in Jermym Street.
                Apax Partners is a global private equity group that invests in five
                industry sectors. Founded more than 30 years ago, the firm uses its
                sector expertise, deep local presence and broad global platform to
                create value for its stakeholders. The history of Apax is Interwoven
                with the development of the private equity assest class on both sides
                of the Atlantic.

  Pictures




Autumn 2009                                                                           Page 17
Able Data SCS Reference Sites



  Commerzbank Infrastructure Support
  Summary       Infrastructure support for Commerzbank
  Contact       Russel Sargent, Data Centre
                Manager
                Commerzbank, 30 Gresham Street
                London. EC2P 2XY
                Tel: 020 7623 8000
  Locations     • 30 Gresham Street London
                • Watford Data Centre
                • Camberley Data Centre
  Contract      £500K per annum
  Systems       Siemon 10G System with MAPIT IIM & iTRACS
  Start         1988 - Ongoing
  Project     Able Data have been supporting Commerzbank’s (formally Dresdner
  Description Kleinwort) infrastructure for over twenty years. The focus of the service has
              always been on fast response and quality of service.
              With 50,000 managed ports in London and more than 60,000 managed ports
              at the two Data Centres at Camberley and Watford, the facility is probably
              amongst the largest IIM installations in Europe.
              Able Data provides a permanent site based team to manage the infrastructure
              and to plan & implement moves and changes for both the uses and the
              computer servers. Duties include:
                •  7:00 – 17:00 daily cover
                •  Isolating and fixing infrastructure problems as they are reported
                •  General administration of the iTRACS system & maintenance of the
                   MapIT Intelligent hardware
                • Management & use of iDiscover to monitor network equipment and track
                   assets
                • General maintenance of patch frames throughout the buildings
                • Patching new services
                • Planning & installation of infrastructure upgrades
                • Using iTRACS to plan moves and changes
                Able Data is a Siemon approved installer and an iTRACS iPSP.




Autumn 2009                                                                          Page 18
Able Data SCS Reference Sites



  Debenhams
  Summary       Data Cabling for new and refurbished Department Stores
  Contact       Peter Craven, Project Manager.
                Bedford Road, Park Street, Taunton,
                Somerset, TA1 4DB
                Tel: 01823 364 303
  Location      Various retail sites including Hemel Hempstead, Thanet, Woking,
                Portsmouth & Slough.
  Contract      £150K
  Systems       SYSTIMAX PowerSUM Cat5e & Excel Cabinets
  Start &       November 2004 (Thanet)
  Finish        March 2005 (Portsmouth, Woking, Sough)
                April 2005 (Hemel Hempstead)
  Consultant    N/A
  Contractor    Various
  Project       Debenhams has an ongoing program of opening new stores. In each
  Description   they install a structured cabling system to serve the shop floor tills and
                pay points as well as the general offices. It is Debenhams policy to use
                SYSTIMAX PowerSUM cabling throughout.
                By the nature of shop premises, most of the cabling work is in the
                ceiling void, requiring the extensive use of platforms.
                Each store floor will normally have its own cabling cabinet. These
                cabinets are joined to the master cabinet via either fibre or copper
                interlinks, depending on the distances involved.
                Part of this project involved the fast track conversion of three Alders
                stores to Debenhams in March 2005. This involved the use of three
                separate cabling teams working on the different sites.
  Pictures




Autumn 2009                                                                           Page 19

Más contenido relacionado

La actualidad más candente

10 gigabit ethernet technology presentation
10 gigabit ethernet technology presentation10 gigabit ethernet technology presentation
10 gigabit ethernet technology presentation
Ibrahim Kazanci
 
Telebit - Wikipedia, the free encyclopedia
Telebit - Wikipedia, the free encyclopediaTelebit - Wikipedia, the free encyclopedia
Telebit - Wikipedia, the free encyclopedia
Bryan Holley
 

La actualidad más candente (8)

BrianTechResume
BrianTechResumeBrianTechResume
BrianTechResume
 
Resume
ResumeResume
Resume
 
Abb v2
Abb v2Abb v2
Abb v2
 
10 gigabit ethernet technology presentation
10 gigabit ethernet technology presentation10 gigabit ethernet technology presentation
10 gigabit ethernet technology presentation
 
Gigabit Ethernet Cabling Solution
Gigabit Ethernet Cabling SolutionGigabit Ethernet Cabling Solution
Gigabit Ethernet Cabling Solution
 
6. functional bonding and shielding of profibus and profinet peter thomas
6. functional bonding and shielding of profibus and profinet   peter thomas6. functional bonding and shielding of profibus and profinet   peter thomas
6. functional bonding and shielding of profibus and profinet peter thomas
 
Telebit - Wikipedia, the free encyclopedia
Telebit - Wikipedia, the free encyclopediaTelebit - Wikipedia, the free encyclopedia
Telebit - Wikipedia, the free encyclopedia
 
11. Screen currents and why you should measure them - Peter Thomas
11. Screen currents and why you should measure them - Peter Thomas11. Screen currents and why you should measure them - Peter Thomas
11. Screen currents and why you should measure them - Peter Thomas
 

Destacado

дот
дотдот
дот
Google
 
Perumahan
PerumahanPerumahan
Perumahan
Google
 
éRase una vez
éRase una vezéRase una vez
éRase una vez
amapola08
 
Érase una vez...
Érase una vez...Érase una vez...
Érase una vez...
amapola08
 
Gunung penanggungan
Gunung penanggunganGunung penanggungan
Gunung penanggungan
Naya Ti
 

Destacado (20)

Institut Nou del Poblenou
Institut Nou del PoblenouInstitut Nou del Poblenou
Institut Nou del Poblenou
 
дот
дотдот
дот
 
Perumahan
PerumahanPerumahan
Perumahan
 
Kerx zerenex phase3
Kerx zerenex phase3Kerx zerenex phase3
Kerx zerenex phase3
 
Menno van Dijk, THNK: Creatief Leiderschap 28 april 2011
Menno van Dijk, THNK: Creatief Leiderschap 28 april 2011Menno van Dijk, THNK: Creatief Leiderschap 28 april 2011
Menno van Dijk, THNK: Creatief Leiderschap 28 april 2011
 
VTUS SEC Filing Form 8-K
VTUS SEC Filing Form 8-KVTUS SEC Filing Form 8-K
VTUS SEC Filing Form 8-K
 
AmericanaCityDevelopmentPresentation1
AmericanaCityDevelopmentPresentation1AmericanaCityDevelopmentPresentation1
AmericanaCityDevelopmentPresentation1
 
Goldman Report SSIE 1.30.12
Goldman Report SSIE 1.30.12Goldman Report SSIE 1.30.12
Goldman Report SSIE 1.30.12
 
éRase una vez
éRase una vezéRase una vez
éRase una vez
 
26
2626
26
 
31-01-2013 Thierry Thijssen, Coosto
31-01-2013 Thierry Thijssen, Coosto31-01-2013 Thierry Thijssen, Coosto
31-01-2013 Thierry Thijssen, Coosto
 
Érase una vez...
Érase una vez...Érase una vez...
Érase una vez...
 
Thefuturewewantrio20outcomedocument 120619185658-phpapp02
Thefuturewewantrio20outcomedocument 120619185658-phpapp02Thefuturewewantrio20outcomedocument 120619185658-phpapp02
Thefuturewewantrio20outcomedocument 120619185658-phpapp02
 
Wantlet Sales Presentation
Wantlet Sales PresentationWantlet Sales Presentation
Wantlet Sales Presentation
 
Motos
MotosMotos
Motos
 
Gunung penanggungan
Gunung penanggunganGunung penanggungan
Gunung penanggungan
 
Modotti2
Modotti2Modotti2
Modotti2
 
PLEA conference 2008, Dublin
PLEA conference 2008, DublinPLEA conference 2008, Dublin
PLEA conference 2008, Dublin
 
SunSi Executive Summary December 2011
SunSi Executive Summary December 2011SunSi Executive Summary December 2011
SunSi Executive Summary December 2011
 
Arnold Smeulders, directeur COMMIT
Arnold Smeulders, directeur COMMITArnold Smeulders, directeur COMMIT
Arnold Smeulders, directeur COMMIT
 

Similar a Data Cabling Reference Sites Winter 2010 (2)

Cat 6a - Dublin City University
Cat 6a - Dublin City UniversityCat 6a - Dublin City University
Cat 6a - Dublin City University
Lee Stokes
 
PRECISION CABLES PROVIDES PERFECT PRODUCTS FOR UPS HQ
PRECISION CABLES PROVIDES PERFECT PRODUCTS FOR UPS HQPRECISION CABLES PROVIDES PERFECT PRODUCTS FOR UPS HQ
PRECISION CABLES PROVIDES PERFECT PRODUCTS FOR UPS HQ
Geoff Byrne
 
CIC Backhaul Development Short 3 9 2010
CIC Backhaul Development Short 3 9 2010CIC Backhaul Development Short 3 9 2010
CIC Backhaul Development Short 3 9 2010
CIC
 
DCU Cat6A 10gig Case Study.pdf
DCU Cat6A 10gig Case Study.pdfDCU Cat6A 10gig Case Study.pdf
DCU Cat6A 10gig Case Study.pdf
Geoff Byrne
 
Fiber_optic_LANs_help_protect_condo owners_property_values_CASE STUDY
Fiber_optic_LANs_help_protect_condo owners_property_values_CASE STUDYFiber_optic_LANs_help_protect_condo owners_property_values_CASE STUDY
Fiber_optic_LANs_help_protect_condo owners_property_values_CASE STUDY
Pat Mahony
 
PCN InterMax IX1610-P Product Brochure rev 1-0 (1)
PCN InterMax IX1610-P Product Brochure rev 1-0 (1)PCN InterMax IX1610-P Product Brochure rev 1-0 (1)
PCN InterMax IX1610-P Product Brochure rev 1-0 (1)
Robert Rivenbark
 

Similar a Data Cabling Reference Sites Winter 2010 (2) (20)

Cat 6a - Dublin City University
Cat 6a - Dublin City UniversityCat 6a - Dublin City University
Cat 6a - Dublin City University
 
PRECISION CABLES PROVIDES PERFECT PRODUCTS FOR UPS HQ
PRECISION CABLES PROVIDES PERFECT PRODUCTS FOR UPS HQPRECISION CABLES PROVIDES PERFECT PRODUCTS FOR UPS HQ
PRECISION CABLES PROVIDES PERFECT PRODUCTS FOR UPS HQ
 
Eur 605-en
Eur 605-enEur 605-en
Eur 605-en
 
CIC Backhaul Development Short 3 9 2010
CIC Backhaul Development Short 3 9 2010CIC Backhaul Development Short 3 9 2010
CIC Backhaul Development Short 3 9 2010
 
DCU Cat6A 10gig Case Study.pdf
DCU Cat6A 10gig Case Study.pdfDCU Cat6A 10gig Case Study.pdf
DCU Cat6A 10gig Case Study.pdf
 
CBEC New _Wide Area Network customs .ppt
CBEC New _Wide Area Network customs .pptCBEC New _Wide Area Network customs .ppt
CBEC New _Wide Area Network customs .ppt
 
Park Place Optical LAN Case Study
Park Place Optical LAN Case StudyPark Place Optical LAN Case Study
Park Place Optical LAN Case Study
 
Fiber_optic_LANs_help_protect_condo owners_property_values_CASE STUDY
Fiber_optic_LANs_help_protect_condo owners_property_values_CASE STUDYFiber_optic_LANs_help_protect_condo owners_property_values_CASE STUDY
Fiber_optic_LANs_help_protect_condo owners_property_values_CASE STUDY
 
Fiber applications
Fiber applicationsFiber applications
Fiber applications
 
PCN InterMax IX1610-P Product Brochure rev 1-0 (1)
PCN InterMax IX1610-P Product Brochure rev 1-0 (1)PCN InterMax IX1610-P Product Brochure rev 1-0 (1)
PCN InterMax IX1610-P Product Brochure rev 1-0 (1)
 
Total Turnkey DAS: A Path to Ensure Rapid Business Growth and Career Success
Total Turnkey DAS: A Path to Ensure Rapid Business Growth and Career SuccessTotal Turnkey DAS: A Path to Ensure Rapid Business Growth and Career Success
Total Turnkey DAS: A Path to Ensure Rapid Business Growth and Career Success
 
BICSI DAS Presentation
BICSI DAS PresentationBICSI DAS Presentation
BICSI DAS Presentation
 
accv1
accv1accv1
accv1
 
IXcellerate Tech Presentation about datacenter
IXcellerate Tech Presentation about datacenterIXcellerate Tech Presentation about datacenter
IXcellerate Tech Presentation about datacenter
 
Ch09
Ch09Ch09
Ch09
 
Chapter 9
Chapter 9Chapter 9
Chapter 9
 
Pacnet Jan 2011
Pacnet Jan 2011Pacnet Jan 2011
Pacnet Jan 2011
 
SIMATIC PCS 7 - the Smart Answer
SIMATIC PCS 7 - the Smart AnswerSIMATIC PCS 7 - the Smart Answer
SIMATIC PCS 7 - the Smart Answer
 
1308794-2_-_AMP_CO_Handbook_12-06[1].pdf
1308794-2_-_AMP_CO_Handbook_12-06[1].pdf1308794-2_-_AMP_CO_Handbook_12-06[1].pdf
1308794-2_-_AMP_CO_Handbook_12-06[1].pdf
 
John_Buckley_CV_Dec 2016
John_Buckley_CV_Dec 2016John_Buckley_CV_Dec 2016
John_Buckley_CV_Dec 2016
 

Data Cabling Reference Sites Winter 2010 (2)

  • 1. Winter 2010 Data Cabling Reference Sites Able Data Installations Plc Able House, 1 Figree Hill Hemel Hempstead Herts HP2 5XL Tel: 01442 219580 www.abledata.co.uk sales@abledata.co.uk
  • 2.
  • 3. Able Data SCS Reference Sites Reed Smith Summary Installation of Data & Voice Cabling over 13 Floors Contact Nick Bennett Coleman Bennett International 19th Floor 30 St Mary Axe London EC3A 8AD Location Broadgate Tower, London Contract £400k Systems Systimax GigaSPEED XL Cat 6 Installed Sept 2008 - Feb 2009 Consultant Coleman Bennett International Contractor ISG Project Reed Smith, one of the 15 largest law firms in the world with more than Description 1,500 lawyers, have consolidated its London operations by relocating from two legacy sites to a single new London Headquarters at Broadgate Tower, London. As part of the fit out Able Data were contracted to install 6,000 data outlets distributed over thirteen floors. The installation time spent on site was greatly reduced thanks to the use of pre-terminated cable looms, which were manufactured and tested off site. One of the key challenges to solve was the running of a fibre and copper cable backbone over thirty floors from the IT computer room at the foot of the building to the office floors. Pictures Autumn 2009 Page 1
  • 4. Able Data SCS Reference Sites Ashmolean Museum Summary Cabling of Major New Building Extension Contact Dr Jonathan Moffett Ashmolean Museum, Beaumont Street, Oxford OX1 2PH Contract £200K Systems Molex Cat6 Installed Dec 2008 - Oct 2009 Builder BAM Project The Ashmolean Museum, dating from the 17th century, is the oldest public museum in the UK. Award-winning architect Rick Mather created a new building that has doubled the Ashmolean’s gallery space and state-of-the-art facilities. In November 2009, the £61M redevelopment opened to the public. Able Data installed a structured cabling system, consisting of nearly a thousand outlets, spread over 6 floors of the new building extension. Each of the 13 remote patch cabinet locations had a fibre & copper backbone linking to the Basement computer room. As well as the provision of the computer cabinets at each location Able Data supplied & installed an APC UPS & 3Comm Switch. The biggest challenge was the complexity and range of cable routes. Whilst some outlets are located in low floor boxes, others for high gallery points (overhead projectors etc) are at more than eight metres high. Another challenge was fitting cabling around a complex building program; many outlets could not be terminated or tested until after the exhibition cabinets had been installed. Pictures Autumn 2009 Page 2
  • 5. Able Data SCS Reference Sites Misys Summary Cabling & moves into new headquarters building Contact Phil Davies, IT Manager. Misys One Kingdom Street, Paddington. W2 6BL Tel: 020 8879 1188 Location Paddington, London Contract £300K Systems Brand-Rex Cat6 & OM3, Cooper B-Line Cabinets Start & Finish Feb – Aug 2008 Consultant April Management Contractor Mastercraft Design Project Misys were consolidating four regional offices into one new Description headquarters building. The new offices required 3,000 Brand Rex LSOH Cat6 outlets installed over three floors, each floor being cabled from two patch rooms. Able Data connected the patch rooms through diversely routed OM3 fibre and voice backbones. In the main computer room, Able Data installed Cooper B-Line cabinets, fitted with the Unite Hawki-2 intelligent power monitor and control products. Able Data also managed the movement of 500 users into the new building. Scheduled over five weekends, this included providing an asset register of all of their computer equipment and a full moves service into the new offices, including connection and test of all of the desktop equipment. Pictures Autumn 2009 Page 3
  • 6. Able Data SCS Reference Sites Ashburton Court Summary Hampshire County Council Office HQ & Data Centre Contact Bob Davis, Senior ICT Consultant Mace Atelier House, 64 Pratt Street London NW1 0LF Tel: 020 7554 8000 Location Winchester City Centre Contract £850K Systems Nexans Lanmark-6 10G F/UTP, Nexans LANsense System, Excel Cat6 Installed Sep 2007 – May 2009 Consultant Mace Contractor BAM Project In 2009 Hamshire County Council (HCC) completed a major office Description refurbishment of its HQ building at Ashburton Court. The conversion of this 1960’s council office building to a naturally ventilated, low energy facility included a heat recovery from the internal Data Centre as a source of heat to service the office areas. Able Data were contracted by BAM to install a data cabling system providing 4,000 Cat6 outlets to the new offices and meeting rooms. Able Data also won the contract to build the new Data Centre facility, completed over eight weeks in Spring 2009. With 70 Prism server cabinets, 5,000 copper links and 2,000 fibre links, this new data centre has become HCC’s primary Data Centre. The facility incorporates leading edge Data Centre technologies to maximise space and power usage and to enable remote operation. Functionality installed by Able Data included a Nexans 10G Ca6a copper cabling system, a Nexans Intelligent Infrastructure Management (IIM) system, Nexans remotely control Intelligent PDU’s and a Data Centre wide Austin Hughes KVM system. Pictures Autumn 2009 Page 4
  • 7. Able Data SCS Reference Sites Veolia Three Valleys Water Summary Cabling of building Contact Bob Davis, Senior ICT Consultant Mace Atelier House, 64 Pratt Street London NW1 0LF Tel: 020 7554 8000 Location Hatfield Business Park, Hatfield Contract £200K Systems Molex PowerCat 6 UTP Cat6 Start & Finish Nov 2008 – Jan 2009 Consultant Mace Contractor Como Project Veolia Water (formally Three Valleys Water) consolidated their Description offices into the new HUB building in Hatfield, a building to house 750 office staff. Able Data were contracted by Como to install a 3,000 outlet Cat6 data cabling system. Run over four floors, outlets were terminated in a grid of 8-way consolidation points installed under the false floor. Desk outlets were connected to the consolidation points through solid patch lead connections. The project was completed over a period of two months. Pictures Autumn 2009 Page 5
  • 8. Able Data SCS Reference Sites Johnson & Johnson Summary Johnson & Johnson Pinewood Building, Wokingham Contact Paul Leinster Johnson & Johnson The Braccons London Road Bracknell Berkshire RG12 2AT Location Nine Mile Ride, Wokingham, Berkshire. Contract £300K Systems Siemon 10G 6A F/UTP System Installed Aug 2008 – Jan 2009 Consultant J&J Information Technology Services Contractor Como Project Johnson & Johnson, the global American pharmaceutical giant, built a Description brand new three storey Building at Nine Mile Ride, Wokingham. Able Data quoted and won the contract with Como to install 3,000 Data outlets covering three floors, including the cabling of a state of art Auditorium. Able Data installed a high performance Siemon shielded Cat6a system, tested to provide the full 10G performance over the full 90m required by the installation. Most of the outlets were installed under the raised floor in a grid pattern of 3-way outlets boxes, providing full flexibility for moves and changes. Able Data installed a single mode fibre backbone and fitted out a small data centre with Minkel equipment cabinets. Pictures Autumn 2009 Page 7
  • 9. Able Data SCS Reference Sites Fidelity Oakhill Data Centre Summary New Data Centre at the Fidelity HQ Contact John Brogan, Project Manager Fidelity International Oakhill House, 130 Tonbridge Rd Hildenborough, Kent, TN11 9DZ Tel: 01732 361 144 Location Tonbridge, Kent Contract £2.5M Systems Systimax Cat 6, LazrSPEED 300 OM3, iPatch, CPI Patch Frames Installed Jul – Oct 2009 Project Fidelity International is a world-wide leading investment provider. As Description part of their UK data centre consolidation strategy, Fidelity required a new Data Centre facility at its HQ facility at Tonbridge. Spread over two underground data halls and two office floors, the project required the installation of 30,000 Cat6 copper links and 11,000 OM3 duplex fibre links to 300 Rittal cabinets and used more than 700km of cable. All links connect to a patch field of 80 x CPI patch frames, each monitored with the iPatch Intelligent patch system. The Data Centre was cabled overhead on three levels of CPI ladder racking. One of the biggest challenges faced by Able Data was to deliver the required high quality of cabling. To work out the optimum cable routing schemes, Able Data built an offsite mock up of a row of patch frames and the associated cables. To speed up installation whilst minimising unsightly cable slack, Able Data single end pre-terminated all copper and fibre links. The entire installation was completed over a 14 week period. As well as building and configuring a 40,000 port iPatch system to manage patching and monitor network devices, Able Data implemented additional bespoke functionality tailored to Fidelity’s requirements, including auto server provisioning. Pictures Autumn 2009 Page 6
  • 10. Able Data SCS Reference Sites North Kent Police Summary North Kent Police HQ Contact Justice Support Service (North Kent) Ltd Location Gravesend Contract £200K System Siemon System 6 UTP Start & Dec 2007 – April 2008 Finish Contractor Imtech Meica Project North Kent Police new Head Quarters is a new build state of the art Description 11,500 Metre2 four-storey building, which houses police officers, civilian staff, evidential stores and includes a 40-cell custody suite. Able Data installed 2,000 outlet Siemon Cat 6 LSZH data outlets across the four floors and custody suite. The computer rooms, fitted with Dell equipment cabinets, were interconnected through a Siemon OM3 fibre and Cat6 copper backbone. Able Data also installed a TV distribution system. The biggest challenge of the installation was to install and protect the cabling amidst the confusion of a large building site. Pictures Autumn 2009 Page 8
  • 11. Able Data SCS Reference Sites Bucks New University (BNU) Summary Installation of Data & Voice Cabling over 13 Floors Contact Andy MacFarlane BAM Construction Centrium, Griffiths Way St Albans, Herts. AL1 2RD Location High Wycombe Contract £150K Systems Excel Cat6 Installed Apr 2009 – Dec 2009 Contractor BAM Project Buckinghamshire New University’s camp has undergone an extensive Description £60m programme of rebuilding in 2009. A new, high-tech learning resources centre, known as the Gateway, forms the focal point of the University’s technology-led learning experience. Able Data were contracted by BAM to install an 1,800 Excel Cat6 UTP cabling system, spread over the six patch rooms on the six floors of the new Gateway building extension. Able Data also installed an Blown Fibre (OM3) & a voice link backbone cabling infrastructure between each patch room and the main computer room on the 4th floor. Picture Autumn 2009 Page 9
  • 12. Able Data SCS Reference Sites Reynolds Porter Chamberlain Summary Cabling of RPC’s new London HQ Contacts Neil Davidson, IT Manager Carl Stowe-Smith, Project Manager Reynolds Porter Chamberlain Overbury Tower Bridge House 77 Newman Street St Katharines Way London London, E1W 1AA W1T 3EW Tel: 020 3060 6000 Tel: 020 7307 9083 Location Tower Bridge House, London Contract £400K Systems Beldon CDT Cat6 Period February 2006 – June 2006 Consultant Coleman Bennett International Contractor Overbury Project RPC, a leading UK law firm, consolidated their London operations Description into the prestigious Tower Bridge House. As part of the fit out of the new building, Able Data supplied and installed 6,000 Cat6 outlets over four floors. These were installed in a flood-filled under floor grid of 4-way outlet boxes, so that outlets can be pulled through the floor and mounted on desk positions as required. Able Data also installed an OM3 fibre backbone, using redundant routes and supporting backup focal points to the building of a fault tolerant network. Able Data also installed an iTRACS cable management system, providing facilities for RPC to manage their cabling infrastructure and to support moves and changes. This included the iDiscovery module, which allows RPC to dynamically discover and monitor ip network devices on the network & to map these onto the cabling infrastructure. Pictures Autumn 2009 Page 10
  • 13. Able Data SCS Reference Sites Northumberland Hotel Summary Mayflex, Excel Cat 5e - Northumberland Hotel Contact Northumberland Hotel The Club Quarters Trafalgar Square London Location Northumberland Avenue Contract Data, Telephone and RF Cabling Systems Mayflex Excel Cat 5e Start & November 2006 Finish May 2007 Consultant Contractor Meica Project Description The Installation of Telephone, Data and RF cabling to over 1000 Hotel rooms. The Club Quarters Trafalgar Square is located in a beautifully restored building dating back to the 1880's, situated just off London's historic Trafalgar Square which houses Nelson’s Column, the church of St. Martin’s in the Fields and the National Gallery. Pictures Autumn 2009 Page 11
  • 14. Able Data SCS Reference Sites Penguin Summary Penguin – London – Ortronics Cat6 – Outlets 2000 Contact Dean Moore Coleman Bennett International 19th Floor 30 St Mary Axe EC3A 8AD Tel: 020 7638 2000 Location The Strand, London Contract £400K Systems Ortronics Cat6 & OM3 Period March 2007 - December 2007 Consultant CBI Contractor Faithdean Project This project was part of the Penguin Publishing refurbishment at Description their headquarters in the Strand. The project was spread over three floors and involved the upgrade and installation of a new Ortronics UTP Clarity Category 6 structured cabling system. Where possible, existing equipment and cables was re-used. A feature of the installation was the use of the Ortronics Clarity Jak-Pak 6-way outlet boxes to offer a very neat desk end solution. The project also included installation of the highly popular Mighty Mo 6 open patch frames. Pictures Autumn 2009 Page 12
  • 15. Able Data SCS Reference Sites London Transport Museum Summary Structure Cabling & AV Cabling Location Covent Garden Contract £100K Systems Excel Cat 5e UTP Start & Finish February 07 - November 07 Contractor Imtech Meica Project The new museum in Covent Garden opened in November 2007 after a Description two year £22M redesign project. The Museum tells the story of the development of London, its transport system and the people who travelled and worked on them over the last 200 years. Able Data installed a structured flood wired system throughout the Museum and Gift shop. This involved installing cables at large heights in order to reach all parts of the museum. Different sections were also interconnected with a fibre backbone. Able Data also installed a network of specials AV links to support the equipment to enable visitors to enjoy a full vision and Audio commentary as they walk around the museum. Pictures Autumn 2009 Page 13
  • 16. Able Data SCS Reference Sites Fidelity Investments Summary Cabling of Fidelity’s Date Centres Contact Dexter Baird Oakhill House, 130 Tonbridge Road Hildenborough, Kent TN11 9DZ Tel: 01732 777627 Location Acton Colt Data Centre, London Global Switch 2 Data Centre, London Contract £650K (Total) Systems SYSTIMAX GigaSPEED XL Cat6 SYSTIMAX LazrSPEED OM2, OM3 Start & Jan 2003 – May 2003 Finish Nov 2005 – Dec 2005 Jul 2006 Project In three separate projects, Able Data have cabled Fidelity’s London Description based Data centres. In the first project Able Data supplied and installed thirty data cabinets and the required cabling infrastructure. The initial installation of 4,000 copper links was completed within four weeks. All RJ45 patch panels are of the Avaya Fleximax variety, where standard outlet modules are clipped into the panel. The second and third projects were similar, but on a larger scale. The third project at Global Switch involved 10,000 links, installed over a period of one month, made possible by the use of off site pre- termination, As part of the initial project, Able Installed also 1,000 10Gbit OM2 fibre links, terminated onto SC connector outlets. The later projects used LC connectors. Pictures Autumn 2009 Page 14
  • 17. Able Data SCS Reference Sites AllianceBernstein Summary New structured cabling system for AllianceBernstein Contacts Martyn Chadaway CBI 19th Floor 30 St Mary Axe London EC3A 8AD Tel: 020 7638 2000 Location 50 Berkeley Street, London Contract £400K Systems Tyco AMP Cat6 Period January 2006 – June 2006 Consultant Coleman Bennett International Contractor Wates Project AllianceBerstein is on of the largest publicly traded global asset Description management firms in the world. When AllianceBernstein were refurbishing their offices in Berkeley Street, Able Data were contracted to build a new structured cabling system. Spread over four floors, Able Data installed 5,000 new outlets and over 4,000 computer room links. A tight programme required completion in less than size weeks, achieved by using pre-termination to pre-build cable assemblies off site and night working on site. Each floor was flood wired back to two patch rooms per floor. All of the patch rooms were connected to the main and backup computer rooms through diversely routed Cat6 copper and OM3 fibre. Able Data were subsequently awarded the contract to review the cabling at Devonshire House, another AllianceBernstein site in London. Picture Autumn 2009 Page 15
  • 18. Able Data SCS Reference Sites eBay Berlin Summary Cabling of building in Berlin. Contact Kevin Wenman Protek Systems Ltd Flexford Road,, North Baddesley, Southampton SO52 9DF Tel: 023 8026 7733 Location Europarc-Dreilinden, Berlin Contract £350K Systems SYSTIMAX GigaSPEED XL7 Cat6 Start & Finish Aug -Sep 2005 Consultant N/A Contractor Direct Project EBay required a new cabling system for its new J9 HQ building in Description Berlin. This was to be based upon the eBay US model of cabling and would form the 1st of a number of similar installations around Europe. Able Data installed 2,000 SYSTIMAX outlets over five floors. As per the eBay standard, these were implemented in groups of four on US style faceplates. To fit in with the strong eBay logo branding, the outlets were implemented using coloured jacks, yellow and green (Cat6 for data) and blue and red (Cat5e for voice). These were cabled back to the patch rooms through three cables, the voice outlets sharing one cable. As well as a number of local patch rooms, the project also involved the installation of a data centre. All were built using CPI open frame racks for patching and servers, including full overhead ladder racking. The impressive effect was further enhanced in the data centre by the installation of an overhead Panduit Fibrerunner system for the containment of the fibre interconnections. A crucial aspect of the project was the logistics of shipping specialist materials from UK, US and other parts of Europe in short timescales. Pictures Autumn 2009 Page 16
  • 19. Able Data SCS Reference Sites APAX Summary Molex Cat 6 – OM3 Contact Stephen Grabiner 020 7872 6300 Location 33 Jermyn Street London SW1Y 6DN Contract 130k Systems Molex Start & 6 Month Project Finish Consultant CBI Contractor ISG Project Description Able Data Installations installed a Molex Cat 6 & OM3 Fibre Optic cabling systems over 6 floors of the new London headquarters Building of Apax and Partners in Jermym Street. Apax Partners is a global private equity group that invests in five industry sectors. Founded more than 30 years ago, the firm uses its sector expertise, deep local presence and broad global platform to create value for its stakeholders. The history of Apax is Interwoven with the development of the private equity assest class on both sides of the Atlantic. Pictures Autumn 2009 Page 17
  • 20. Able Data SCS Reference Sites Commerzbank Infrastructure Support Summary Infrastructure support for Commerzbank Contact Russel Sargent, Data Centre Manager Commerzbank, 30 Gresham Street London. EC2P 2XY Tel: 020 7623 8000 Locations • 30 Gresham Street London • Watford Data Centre • Camberley Data Centre Contract £500K per annum Systems Siemon 10G System with MAPIT IIM & iTRACS Start 1988 - Ongoing Project Able Data have been supporting Commerzbank’s (formally Dresdner Description Kleinwort) infrastructure for over twenty years. The focus of the service has always been on fast response and quality of service. With 50,000 managed ports in London and more than 60,000 managed ports at the two Data Centres at Camberley and Watford, the facility is probably amongst the largest IIM installations in Europe. Able Data provides a permanent site based team to manage the infrastructure and to plan & implement moves and changes for both the uses and the computer servers. Duties include: • 7:00 – 17:00 daily cover • Isolating and fixing infrastructure problems as they are reported • General administration of the iTRACS system & maintenance of the MapIT Intelligent hardware • Management & use of iDiscover to monitor network equipment and track assets • General maintenance of patch frames throughout the buildings • Patching new services • Planning & installation of infrastructure upgrades • Using iTRACS to plan moves and changes Able Data is a Siemon approved installer and an iTRACS iPSP. Autumn 2009 Page 18
  • 21. Able Data SCS Reference Sites Debenhams Summary Data Cabling for new and refurbished Department Stores Contact Peter Craven, Project Manager. Bedford Road, Park Street, Taunton, Somerset, TA1 4DB Tel: 01823 364 303 Location Various retail sites including Hemel Hempstead, Thanet, Woking, Portsmouth & Slough. Contract £150K Systems SYSTIMAX PowerSUM Cat5e & Excel Cabinets Start & November 2004 (Thanet) Finish March 2005 (Portsmouth, Woking, Sough) April 2005 (Hemel Hempstead) Consultant N/A Contractor Various Project Debenhams has an ongoing program of opening new stores. In each Description they install a structured cabling system to serve the shop floor tills and pay points as well as the general offices. It is Debenhams policy to use SYSTIMAX PowerSUM cabling throughout. By the nature of shop premises, most of the cabling work is in the ceiling void, requiring the extensive use of platforms. Each store floor will normally have its own cabling cabinet. These cabinets are joined to the master cabinet via either fibre or copper interlinks, depending on the distances involved. Part of this project involved the fast track conversion of three Alders stores to Debenhams in March 2005. This involved the use of three separate cabling teams working on the different sites. Pictures Autumn 2009 Page 19