SlideShare una empresa de Scribd logo
1 de 40
Brownfields Redevelopment
Notable City Projects
Bridgeport, Connecticut
EBC CT BROWNFIELDS SEMINAR
September 17, 2010
Edward Lavernoich
City of Bridgeport, Connecticut
Office of Planning and Economic Development
Mayor Bill Finch
REDEVELOPING BROWNFIELDS
BRIDGEPORT, CT
EPA BROWNFIELDS PILOT
• Bridgeport was the 2nd EPA PILOT designated in the country
• City wide study conducted 1994 – 1996
• Study identified 250+ parcels with real or perceived contamination
problems that were discouraging investment
• Potential for re-development was evaluated
• 23 clusters/groups of property prioritized based on evaluations
• Progress made on approximately 30% of sites
• Some nationally recognized successes:
– Ballpark and Arena at Harboryard
– Derecktor Shipyards
– West End Industrial Park (former Bryant Electric)
– 1558 Barnum Avenue
Bridgeport has received more than $5 Million in EPA funding
BROWNFIELDS IN BRIDGEPORT
WHAT’S AT STAKE?
• Jobs; brownfields typically tie up land zoned for business uses,
limiting growth opportunities for existing companies and the influx of
new companies. CT currently “pushes” jobs to “greenfields”.
• Property Tax Revenue; brownfield properties that under-perform or
don’t contribute at all to the City’s economy represent $25 million to
$50 million of lost property tax revenue every year (estimates based
on zoning capacity).
• Quality of Life; brownfield properties discourage investment and
stability in surrounding neighborhoods.
• Public Health
• Smart Growth in CT; unachievable unless we find ways to more
fully utilize the infrastructure in inner cities rather than constantly
replicating it in suburbs and rural areas.
Went Field Aerial View Circa 2000
Went Field Conceptual Plan
WENT FIELD PLAYGROUND
Went Field Expansion
Background and Funding
• Before: passive park/ballfields down gradient from two abandoned factories.
• Neighborhood consideration: Bassick High School- only high school in CT with a
football team but no practice field. Neighborhood forum emphasized resident
involvement and vision.
• Findings: metals, deep toluene plume
• Properties acquired through condemnation from speculating owners
• Strategy: capping and institutional controls (Land Use Restriction)
• Funding: 8 different sources, nearly $4 Million
• Acquisition: City GO Bonding, CT DECD, City foreclosure
• Investigations: EPA Assessment Grant
• Park Design: CT DEP and US Dept. of Interior
• Park Improvements: CT DEP, US HUD CDBG, SBC/SNET and JP Morgan Chase
• Ongoing Groundwater Monitoring: CT DECD
Outcome: Public Health threat addressed- Park Expansion- Amenities added.
FUNDERS ATTRACT OTHER FUNDERS: LEVERAGE!
Bryant Electric
Rendering Circa 1940
West End; Bryant Electric Complex
and Environs, 1996
The New West End - State Street
West End Industrial Park
• Remediated multiple industrial properties and created revitalization
corridor now home to the Cesar Batalla School and 4 new private buildings
totaling 210,000 square feet; Dari Farms, AKDO InterTrade, Chaves Bakery,
A1 Trucking Supply (completed in 2000, 2005, 2006, and 2008)
• Next projects include a fuel cell generating station and mixed-use
redevelopment of the Hubbell Engineering site
Keys To West End/Bryant Electric Site
Brownfield Redevelopment
Publicly funded demolitions: CT DECD, US HUD (1996-1999)
Remediation activities funded by both private and public sources
(1996 to present)
Charitable donation of real estate: Viacom/CBS (1998)
Selective use of eminent domain
State subsidy for 1st new building: Chaves Bakery (1998-2000)
(no other private buildings in the neighborhood have required subsidy since)
2004-2007: Rising values for quality building stock (resulting in)
Increasingly strong demand for commercial/industrially zoned land
Abandoned Industrial Bldg @ 480 Bunnell Street
Prior to Seaview Avenue Industrial Park Project
Demolition of 480 Bunnell Street
Seaview Avenue Industrial Park Project
Seaview Avenue Industrial Park
All-Phase Construction Bunnell Street
Before view of 480 Bunnell Street
Demolition and Remediation
New steel going up on All Phase site.
Progress photo July, 2006.
Location:
Description:
All- Phase:
Bunnell Street, Bridgeport
Former site of an obsolete 80,000
sq ft multi-story factory
Site history included dry cleaning,
and various high impact
manufacturing operations over
100 years.
DECD/ DEP/ US EDA funding
obtained for site assembly,
remediation and public
improvements.
Growing local fabricator of
ironwork. 25,000 square feet
constructed. Additional 30,000
square feet planned.
Short term EPA Brownfield loan of
$350,000 used to bridge State
Urban Sites and US EDA funding
for land assembly and cleanup.
All Phase Project: Completion of Building 1
Seaview Avenue Industrial Park Project
2005 Aerial View - 1558 Barnum Avenue
Metal Scrap Yard
Metal Scrap Yard
1558 Barnum Avenue
Metal scrap yard mid 1930s to
2003; recycling electronic circuit
board etching solutions from 1980-90.
Former operators used
bankruptcy protection and single
purpose entities to fight foreclosure
for more than 10 years. City acquired
via tax foreclosure in 2004.
Original remediation estimates:
$300K to $800K; after post foreclosure
investigations: $1.3- $1.8 Million.
Final remediation cost $2.5 million.
PCB contamination!
Only 4.8 acres.
EPA RLF available.
Metal Scrap Yard @ 1558 Barnum Avenue
Site Assessment Activities, 2005
Remediation in Progress @ 1558 Barnum Avenue, Summer 2007
Remediation in Progress @ 1558 Barnum Avenue, Summer 2007
Remediation in Progress @ 1558 Barnum Avenue, Summer 2007
Industrial Condominium Project Concept for 1558 Barnum Avenue
Lot Size:
2.0 acres
Building 2
17,280 sq. ft.
Building 1
18,560 sq. ft.
Building 3
10,330 sq. ft.
Existing Building
28,830 sq. ft.
Lot Size:
2.8 acres
Rehabilitation of Existing Industrial Building - 1558 Barnum Avenue
Barnum Avenue Business Park
1558 Barnum Avenue
• 81,000 square foot new industrial park being developed by
Northeast Building Supply on a remediated metal scrap yard
• EPA/City of Bridgeport collaboration success story
Rehabilitation of Neighboring Property – 1558 Barnum Avenue
Keys to Success
Redevelopment of 1558 Barnum
A Motivated Seller (COB)
public health
addressing neighborhood frustration
neighborhood improvement
economic activity
not sales proceeds
City’s Track Record w/ EPA
nationally recognized successes in brownfield
reclamation
leveraging other sources of funding
Understanding EPA’s Priorities
cleaning up sites
preventing windfalls
recycling the BCRLF money for future deals
not commercial terms
The Right Borrower/Developer
vested interest in the neighborhood
prior experience with remediation
patient money
guts
Former American Fabrics Complex
Connecticut Avenue, Bridgeport
Approximately 360,000 square feet- obsolete buildings- inefficient layout
Acquired by CoB via tax foreclosure in 2006
Former American Fabrics Complex
Building Demolition and Paving
Former American Fabrics Complex
Building Restoration and Paving
Former American Fabrics Complex
Building Restoration and Paving
Bridgeport Commerce Park
(former American Fabrics)
• City utilized EPA Assessment $ to narrow unknowns
• Sale to private developer with significant brownfields experience
• Portion of sales proceeds escrowed to match developer’s demolition/
remediation expenditures (credit)
• $5 Million invested to create 230,000 square foot newly renovated
• commercial/industrial campus for businesses and artists, completed in 2010.
• Complex is currently 60% occupied, with 42 businesses and 85 employees.
The Commerce Park
includes the
AMERICAN FABRICS
ART & DESIGN CENTER,
home to 30 artists and
arts related businesses
2005 Aerial View of Former Bridgeport Brass Complex
Housatonic Avenue, Bridgeport
Former Bridgeport Brass Site – Southern Parcel (6 acres)
Former Bridgeport Brass – Northern Parcel
United Rentals Project
United Rentals
• Property had long history of tax delinquency. City abated portion of previous
taxes for new owner in consideration of owner’s expenditures related to
demolition and remediation (CGS 12-81).
• United Rentals moved to Bridgeport from Fairfield and in 2009 completed
construction on a 40,000 square foot facility at a remediated brownfield on
Housatonic Ave just north of downtown – its largest site in New England.
Personal property on the site exceeds $10 Million in value.
• Annual new property tax revenue in excess of $300,000.
Request for Proposals
80 Hastings Street
Redevelopment of 37,000 sf
Commercial-Industrial Property
Minimum Purchase Price: $10,000
Offered by
The City of Bridgeport, Connecticut
Bill Finch, Mayor
(City has utilized EPA assessment funding to
assess and develop RAP for the property)
CITY OF BRIDGEPORT, CONNECTICUT
Office of Planning &
Economic Development
Donald Eversley, Director
Edward Lavernoich, Deputy Director
Tel (203) 576-7221
www.bridgeportct.gov
click “economic development”

Más contenido relacionado

La actualidad más candente

The Use Of Greenfield And Brownfield Sites
The Use Of Greenfield And Brownfield SitesThe Use Of Greenfield And Brownfield Sites
The Use Of Greenfield And Brownfield Sites
ljordan
 
Land use change brownfield vs greenfield
Land use change brownfield vs greenfieldLand use change brownfield vs greenfield
Land use change brownfield vs greenfield
Mrs Coles
 
120618_MurrayCSO_NEWS
120618_MurrayCSO_NEWS120618_MurrayCSO_NEWS
120618_MurrayCSO_NEWS
Erica Jacobs
 
NJ Future Forum 2012 Creating a Redevelopment Agenda Fisher
NJ Future Forum 2012 Creating a Redevelopment Agenda FisherNJ Future Forum 2012 Creating a Redevelopment Agenda Fisher
NJ Future Forum 2012 Creating a Redevelopment Agenda Fisher
New Jersey Future
 
Ongoing & Suspended Projects as of September 2011
Ongoing & Suspended Projects as of September 2011Ongoing & Suspended Projects as of September 2011
Ongoing & Suspended Projects as of September 2011
cmogsc
 
Foxhall w street community meeting-flyer
Foxhall w street  community meeting-flyerFoxhall w street  community meeting-flyer
Foxhall w street community meeting-flyer
RamaChilamkurthy
 

La actualidad más candente (20)

City council presentation 05.14.12 revised
City council presentation 05.14.12 revisedCity council presentation 05.14.12 revised
City council presentation 05.14.12 revised
 
NJ Future Redevelopment Forum 2015 LRichards
NJ Future Redevelopment Forum 2015 LRichardsNJ Future Redevelopment Forum 2015 LRichards
NJ Future Redevelopment Forum 2015 LRichards
 
The Use Of Greenfield And Brownfield Sites
The Use Of Greenfield And Brownfield SitesThe Use Of Greenfield And Brownfield Sites
The Use Of Greenfield And Brownfield Sites
 
Land use change brownfield vs greenfield
Land use change brownfield vs greenfieldLand use change brownfield vs greenfield
Land use change brownfield vs greenfield
 
B5 A Miraculous Transformation
B5 A Miraculous TransformationB5 A Miraculous Transformation
B5 A Miraculous Transformation
 
120618_MurrayCSO_NEWS
120618_MurrayCSO_NEWS120618_MurrayCSO_NEWS
120618_MurrayCSO_NEWS
 
Ecoforum 2011 Dave Johnson Brownfield Regeneration In Nsw
Ecoforum 2011 Dave Johnson Brownfield Regeneration In NswEcoforum 2011 Dave Johnson Brownfield Regeneration In Nsw
Ecoforum 2011 Dave Johnson Brownfield Regeneration In Nsw
 
CEA presentation slides-August2011
CEA presentation slides-August2011CEA presentation slides-August2011
CEA presentation slides-August2011
 
G1 Here Comes the Sun
G1 Here Comes the SunG1 Here Comes the Sun
G1 Here Comes the Sun
 
Department Of Planning & Community Development FY 2010
Department Of Planning & Community Development FY 2010Department Of Planning & Community Development FY 2010
Department Of Planning & Community Development FY 2010
 
Planning Staff Report Elizabeth Ann Seton 2010 Oct 14
Planning Staff Report Elizabeth Ann Seton 2010 Oct 14Planning Staff Report Elizabeth Ann Seton 2010 Oct 14
Planning Staff Report Elizabeth Ann Seton 2010 Oct 14
 
Brbc video bpt mktg cmpgn ec dev june 2010
Brbc video bpt mktg cmpgn ec dev june 2010Brbc video bpt mktg cmpgn ec dev june 2010
Brbc video bpt mktg cmpgn ec dev june 2010
 
W Palmer Portfolio
W Palmer  PortfolioW Palmer  Portfolio
W Palmer Portfolio
 
NJ Future Forum 2012 Creating a Redevelopment Agenda Fisher
NJ Future Forum 2012 Creating a Redevelopment Agenda FisherNJ Future Forum 2012 Creating a Redevelopment Agenda Fisher
NJ Future Forum 2012 Creating a Redevelopment Agenda Fisher
 
Economic development and revitalization in Leonia FAQ
Economic development and revitalization in Leonia FAQEconomic development and revitalization in Leonia FAQ
Economic development and revitalization in Leonia FAQ
 
Ongoing & Suspended Projects as of September 2011
Ongoing & Suspended Projects as of September 2011Ongoing & Suspended Projects as of September 2011
Ongoing & Suspended Projects as of September 2011
 
Monona CDA Presentation To Council 04 19 10
Monona CDA Presentation To Council 04 19 10Monona CDA Presentation To Council 04 19 10
Monona CDA Presentation To Council 04 19 10
 
Bangor Waterfront Park Plans by Shadley 12-2010
Bangor Waterfront Park Plans by Shadley 12-2010Bangor Waterfront Park Plans by Shadley 12-2010
Bangor Waterfront Park Plans by Shadley 12-2010
 
Item # 4 & 5 200 & 216 Grant & 315 Westover
Item # 4 & 5  200 & 216 Grant & 315 WestoverItem # 4 & 5  200 & 216 Grant & 315 Westover
Item # 4 & 5 200 & 216 Grant & 315 Westover
 
Foxhall w street community meeting-flyer
Foxhall w street  community meeting-flyerFoxhall w street  community meeting-flyer
Foxhall w street community meeting-flyer
 

Destacado (6)

Submersible Pressure Transducer Specifications
Submersible Pressure Transducer SpecificationsSubmersible Pressure Transducer Specifications
Submersible Pressure Transducer Specifications
 
Dns
DnsDns
Dns
 
Португалия. Лиссабон. Очень личные впечатления.
Португалия.  Лиссабон. Очень личные впечатления.Португалия.  Лиссабон. Очень личные впечатления.
Португалия. Лиссабон. Очень личные впечатления.
 
PLAN DE GESTION AMBIENTAL
PLAN DE GESTION AMBIENTALPLAN DE GESTION AMBIENTAL
PLAN DE GESTION AMBIENTAL
 
Microsoft power point_-_materi_sistem_penerapan_sni_ppt__compatib
Microsoft power point_-_materi_sistem_penerapan_sni_ppt__compatibMicrosoft power point_-_materi_sistem_penerapan_sni_ppt__compatib
Microsoft power point_-_materi_sistem_penerapan_sni_ppt__compatib
 
S&H Audit
S&H AuditS&H Audit
S&H Audit
 

Similar a 9 10ebcctbrownfieldsseminarfinal 100914104154 Phpapp01

Eric. E. Cavazza P.E., Director PA DEP Bureau of Abandoned Mine Reclamation -...
Eric. E. Cavazza P.E., Director PA DEP Bureau of Abandoned Mine Reclamation -...Eric. E. Cavazza P.E., Director PA DEP Bureau of Abandoned Mine Reclamation -...
Eric. E. Cavazza P.E., Director PA DEP Bureau of Abandoned Mine Reclamation -...
Michael Hewitt, GISP
 
Virginia Beach Investment Rev 1
Virginia Beach Investment Rev 1Virginia Beach Investment Rev 1
Virginia Beach Investment Rev 1
REALAGENT
 
Eastwood Village Public Private partnership
Eastwood Village Public Private partnershipEastwood Village Public Private partnership
Eastwood Village Public Private partnership
DennisChurch
 
Rodney Hibbard CV_Construction Manager
Rodney Hibbard CV_Construction ManagerRodney Hibbard CV_Construction Manager
Rodney Hibbard CV_Construction Manager
Rodney Hibbard
 
Stir 1215 bidwell case study
Stir 1215 bidwell case studyStir 1215 bidwell case study
Stir 1215 bidwell case study
Dicot
 

Similar a 9 10ebcctbrownfieldsseminarfinal 100914104154 Phpapp01 (20)

DOW Public Meeting Slides 2.5.20
DOW Public Meeting Slides 2.5.20DOW Public Meeting Slides 2.5.20
DOW Public Meeting Slides 2.5.20
 
Eric. E. Cavazza P.E., Director PA DEP Bureau of Abandoned Mine Reclamation -...
Eric. E. Cavazza P.E., Director PA DEP Bureau of Abandoned Mine Reclamation -...Eric. E. Cavazza P.E., Director PA DEP Bureau of Abandoned Mine Reclamation -...
Eric. E. Cavazza P.E., Director PA DEP Bureau of Abandoned Mine Reclamation -...
 
How to Clear the First Hurdle in Site Redevelopment
How to Clear the First Hurdle in Site RedevelopmentHow to Clear the First Hurdle in Site Redevelopment
How to Clear the First Hurdle in Site Redevelopment
 
Virginia Beach Investment Rev 1
Virginia Beach Investment Rev 1Virginia Beach Investment Rev 1
Virginia Beach Investment Rev 1
 
Two Fulton Market District Projects Approved!
Two Fulton Market District Projects Approved!Two Fulton Market District Projects Approved!
Two Fulton Market District Projects Approved!
 
D:\Patrick Depa Planner Portfolio
D:\Patrick Depa Planner Portfolio D:\Patrick Depa Planner Portfolio
D:\Patrick Depa Planner Portfolio
 
Brownfields Tour: A Visit to Hazelwood Green & RIDC Mill 19
Brownfields Tour: A Visit to Hazelwood Green & RIDC Mill 19Brownfields Tour: A Visit to Hazelwood Green & RIDC Mill 19
Brownfields Tour: A Visit to Hazelwood Green & RIDC Mill 19
 
Eastwood Village Public Private partnership
Eastwood Village Public Private partnershipEastwood Village Public Private partnership
Eastwood Village Public Private partnership
 
Rodney Hibbard CV_Construction Manager
Rodney Hibbard CV_Construction ManagerRodney Hibbard CV_Construction Manager
Rodney Hibbard CV_Construction Manager
 
Brownfields Redevelopment Case Studies
Brownfields Redevelopment Case Studies Brownfields Redevelopment Case Studies
Brownfields Redevelopment Case Studies
 
Stir 1215 bidwell case study
Stir 1215 bidwell case studyStir 1215 bidwell case study
Stir 1215 bidwell case study
 
7ShariHyman_NICHI_BusinessSummit
7ShariHyman_NICHI_BusinessSummit7ShariHyman_NICHI_BusinessSummit
7ShariHyman_NICHI_BusinessSummit
 
Ls360 Q1 2010 Status Report
Ls360 Q1 2010 Status ReportLs360 Q1 2010 Status Report
Ls360 Q1 2010 Status Report
 
Hunting Creek at Fairfield Stream Restoration
Hunting Creek at Fairfield Stream RestorationHunting Creek at Fairfield Stream Restoration
Hunting Creek at Fairfield Stream Restoration
 
Bull Neck Run at Spring Hill Recreation Center Stream Restoration
Bull Neck Run at Spring Hill Recreation Center Stream RestorationBull Neck Run at Spring Hill Recreation Center Stream Restoration
Bull Neck Run at Spring Hill Recreation Center Stream Restoration
 
Frederick Md Economic Presentation 9-3-15
Frederick Md Economic Presentation 9-3-15Frederick Md Economic Presentation 9-3-15
Frederick Md Economic Presentation 9-3-15
 
Frederick Economic Presentation 9-3-15
Frederick Economic Presentation 9-3-15Frederick Economic Presentation 9-3-15
Frederick Economic Presentation 9-3-15
 
Elizabeth Hughes, Earth Conservancy, “Lessons Learned from 25 Years of Recove...
Elizabeth Hughes, Earth Conservancy, “Lessons Learned from 25 Years of Recove...Elizabeth Hughes, Earth Conservancy, “Lessons Learned from 25 Years of Recove...
Elizabeth Hughes, Earth Conservancy, “Lessons Learned from 25 Years of Recove...
 
Let's Put Macon-Bibb to Work
Let's Put Macon-Bibb to WorkLet's Put Macon-Bibb to Work
Let's Put Macon-Bibb to Work
 
Updated Vision Power Point March 2015(b)
Updated Vision Power Point March 2015(b)Updated Vision Power Point March 2015(b)
Updated Vision Power Point March 2015(b)
 

Último

Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
panagenda
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
WSO2
 

Último (20)

MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 
AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu SubbuApidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot ModelNavi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
 

9 10ebcctbrownfieldsseminarfinal 100914104154 Phpapp01

  • 1. Brownfields Redevelopment Notable City Projects Bridgeport, Connecticut EBC CT BROWNFIELDS SEMINAR September 17, 2010 Edward Lavernoich City of Bridgeport, Connecticut Office of Planning and Economic Development Mayor Bill Finch
  • 3. EPA BROWNFIELDS PILOT • Bridgeport was the 2nd EPA PILOT designated in the country • City wide study conducted 1994 – 1996 • Study identified 250+ parcels with real or perceived contamination problems that were discouraging investment • Potential for re-development was evaluated • 23 clusters/groups of property prioritized based on evaluations • Progress made on approximately 30% of sites • Some nationally recognized successes: – Ballpark and Arena at Harboryard – Derecktor Shipyards – West End Industrial Park (former Bryant Electric) – 1558 Barnum Avenue Bridgeport has received more than $5 Million in EPA funding
  • 4. BROWNFIELDS IN BRIDGEPORT WHAT’S AT STAKE? • Jobs; brownfields typically tie up land zoned for business uses, limiting growth opportunities for existing companies and the influx of new companies. CT currently “pushes” jobs to “greenfields”. • Property Tax Revenue; brownfield properties that under-perform or don’t contribute at all to the City’s economy represent $25 million to $50 million of lost property tax revenue every year (estimates based on zoning capacity). • Quality of Life; brownfield properties discourage investment and stability in surrounding neighborhoods. • Public Health • Smart Growth in CT; unachievable unless we find ways to more fully utilize the infrastructure in inner cities rather than constantly replicating it in suburbs and rural areas.
  • 5. Went Field Aerial View Circa 2000
  • 8. Went Field Expansion Background and Funding • Before: passive park/ballfields down gradient from two abandoned factories. • Neighborhood consideration: Bassick High School- only high school in CT with a football team but no practice field. Neighborhood forum emphasized resident involvement and vision. • Findings: metals, deep toluene plume • Properties acquired through condemnation from speculating owners • Strategy: capping and institutional controls (Land Use Restriction) • Funding: 8 different sources, nearly $4 Million • Acquisition: City GO Bonding, CT DECD, City foreclosure • Investigations: EPA Assessment Grant • Park Design: CT DEP and US Dept. of Interior • Park Improvements: CT DEP, US HUD CDBG, SBC/SNET and JP Morgan Chase • Ongoing Groundwater Monitoring: CT DECD Outcome: Public Health threat addressed- Park Expansion- Amenities added. FUNDERS ATTRACT OTHER FUNDERS: LEVERAGE!
  • 10. West End; Bryant Electric Complex and Environs, 1996
  • 11. The New West End - State Street
  • 12. West End Industrial Park • Remediated multiple industrial properties and created revitalization corridor now home to the Cesar Batalla School and 4 new private buildings totaling 210,000 square feet; Dari Farms, AKDO InterTrade, Chaves Bakery, A1 Trucking Supply (completed in 2000, 2005, 2006, and 2008) • Next projects include a fuel cell generating station and mixed-use redevelopment of the Hubbell Engineering site
  • 13. Keys To West End/Bryant Electric Site Brownfield Redevelopment Publicly funded demolitions: CT DECD, US HUD (1996-1999) Remediation activities funded by both private and public sources (1996 to present) Charitable donation of real estate: Viacom/CBS (1998) Selective use of eminent domain State subsidy for 1st new building: Chaves Bakery (1998-2000) (no other private buildings in the neighborhood have required subsidy since) 2004-2007: Rising values for quality building stock (resulting in) Increasingly strong demand for commercial/industrially zoned land
  • 14. Abandoned Industrial Bldg @ 480 Bunnell Street Prior to Seaview Avenue Industrial Park Project
  • 15. Demolition of 480 Bunnell Street Seaview Avenue Industrial Park Project
  • 16. Seaview Avenue Industrial Park All-Phase Construction Bunnell Street Before view of 480 Bunnell Street Demolition and Remediation New steel going up on All Phase site. Progress photo July, 2006. Location: Description: All- Phase: Bunnell Street, Bridgeport Former site of an obsolete 80,000 sq ft multi-story factory Site history included dry cleaning, and various high impact manufacturing operations over 100 years. DECD/ DEP/ US EDA funding obtained for site assembly, remediation and public improvements. Growing local fabricator of ironwork. 25,000 square feet constructed. Additional 30,000 square feet planned. Short term EPA Brownfield loan of $350,000 used to bridge State Urban Sites and US EDA funding for land assembly and cleanup.
  • 17. All Phase Project: Completion of Building 1 Seaview Avenue Industrial Park Project
  • 18. 2005 Aerial View - 1558 Barnum Avenue Metal Scrap Yard
  • 19. Metal Scrap Yard 1558 Barnum Avenue Metal scrap yard mid 1930s to 2003; recycling electronic circuit board etching solutions from 1980-90. Former operators used bankruptcy protection and single purpose entities to fight foreclosure for more than 10 years. City acquired via tax foreclosure in 2004. Original remediation estimates: $300K to $800K; after post foreclosure investigations: $1.3- $1.8 Million. Final remediation cost $2.5 million. PCB contamination! Only 4.8 acres. EPA RLF available.
  • 20. Metal Scrap Yard @ 1558 Barnum Avenue Site Assessment Activities, 2005
  • 21. Remediation in Progress @ 1558 Barnum Avenue, Summer 2007
  • 22. Remediation in Progress @ 1558 Barnum Avenue, Summer 2007
  • 23. Remediation in Progress @ 1558 Barnum Avenue, Summer 2007
  • 24. Industrial Condominium Project Concept for 1558 Barnum Avenue Lot Size: 2.0 acres Building 2 17,280 sq. ft. Building 1 18,560 sq. ft. Building 3 10,330 sq. ft. Existing Building 28,830 sq. ft. Lot Size: 2.8 acres
  • 25. Rehabilitation of Existing Industrial Building - 1558 Barnum Avenue
  • 26. Barnum Avenue Business Park 1558 Barnum Avenue • 81,000 square foot new industrial park being developed by Northeast Building Supply on a remediated metal scrap yard • EPA/City of Bridgeport collaboration success story
  • 27. Rehabilitation of Neighboring Property – 1558 Barnum Avenue
  • 28. Keys to Success Redevelopment of 1558 Barnum A Motivated Seller (COB) public health addressing neighborhood frustration neighborhood improvement economic activity not sales proceeds City’s Track Record w/ EPA nationally recognized successes in brownfield reclamation leveraging other sources of funding Understanding EPA’s Priorities cleaning up sites preventing windfalls recycling the BCRLF money for future deals not commercial terms The Right Borrower/Developer vested interest in the neighborhood prior experience with remediation patient money guts
  • 29. Former American Fabrics Complex Connecticut Avenue, Bridgeport Approximately 360,000 square feet- obsolete buildings- inefficient layout Acquired by CoB via tax foreclosure in 2006
  • 30. Former American Fabrics Complex Building Demolition and Paving
  • 31. Former American Fabrics Complex Building Restoration and Paving
  • 32. Former American Fabrics Complex Building Restoration and Paving
  • 33. Bridgeport Commerce Park (former American Fabrics) • City utilized EPA Assessment $ to narrow unknowns • Sale to private developer with significant brownfields experience • Portion of sales proceeds escrowed to match developer’s demolition/ remediation expenditures (credit) • $5 Million invested to create 230,000 square foot newly renovated • commercial/industrial campus for businesses and artists, completed in 2010. • Complex is currently 60% occupied, with 42 businesses and 85 employees.
  • 34. The Commerce Park includes the AMERICAN FABRICS ART & DESIGN CENTER, home to 30 artists and arts related businesses
  • 35. 2005 Aerial View of Former Bridgeport Brass Complex Housatonic Avenue, Bridgeport
  • 36. Former Bridgeport Brass Site – Southern Parcel (6 acres)
  • 37. Former Bridgeport Brass – Northern Parcel United Rentals Project
  • 38. United Rentals • Property had long history of tax delinquency. City abated portion of previous taxes for new owner in consideration of owner’s expenditures related to demolition and remediation (CGS 12-81). • United Rentals moved to Bridgeport from Fairfield and in 2009 completed construction on a 40,000 square foot facility at a remediated brownfield on Housatonic Ave just north of downtown – its largest site in New England. Personal property on the site exceeds $10 Million in value. • Annual new property tax revenue in excess of $300,000.
  • 39. Request for Proposals 80 Hastings Street Redevelopment of 37,000 sf Commercial-Industrial Property Minimum Purchase Price: $10,000 Offered by The City of Bridgeport, Connecticut Bill Finch, Mayor (City has utilized EPA assessment funding to assess and develop RAP for the property)
  • 40. CITY OF BRIDGEPORT, CONNECTICUT Office of Planning & Economic Development Donald Eversley, Director Edward Lavernoich, Deputy Director Tel (203) 576-7221 www.bridgeportct.gov click “economic development”