SlideShare una empresa de Scribd logo
1 de 24
Industrial training
Electrical Loco Shed, Ghaziabad
Name : Shreyashkar Singh
ABES engineering college
EEE 4th
year (1003221092)
shreysng@gmail.com
INTRODUCTION
ESTABLISHMENT
> Electric Loco Shed was set in 1976 by Railway
Electrification Organisation (8910 SQ. MTRS).
> It’s main purpose is of maintenance of
WAP1,WAP4,WAP5,WAP7 ,WAG5, WAM4
engines.
INITIAL COST
Rs. 1.5 (IN CRORES)
PRESENT LOCO HOLDING
185
TYPES OF LOCOS HOLDING-
[gauge] [power] [load] [series]
1. WAP1 (Traction Motors: 4, 575kW ,18 coaches)
2. WAP4 (Traction Motors- 6,630 kW, 750V, 26 coaches )
3. WAP5 (Traction Motors-3phase squirrel-cage induction
motors(1150kW, 2180V).
4. WAP7 (Traction Motors- 3phase squirrel-cage induction
motors(850 kW, 2180V).
5. WAG5 (Haulage Capacity-2375t
6. WAM4 (Traction Motors-6, 575kW, 750V,
Hauling capacity-2010t
INTRODUCTION
TRACTION
Driving forward of vehicle is called traction and the system,
which employ this type of mechanism is called as traction
system.
Classified broadly into two groups namely:
1. Non Electric Traction System.
2. Electric Traction System.
>Electric Traction means a Locomotion in which the
driving force is obtained from electric motors.
>For Traction purpose 3-phase induction motor and DC
series motor are used and both have high starting torque
provide high speed acceleration.
TYPES OF ELECTRIC TRACTION SYSTEM
DC traction units uses direct current drawn from
overhead line.
DC traction units uses 600v-750v DC voltage range .
The low-voltage,series wound,direct current motor is
well suited to railroad traction,being simple to construct
and easy to control.
DC TRACTION
DC Traction
AC Traction
AC Traction units draw alternating current from an
overhead line.
Typical voltages used are-
15kV /25kV AC,50Hz
Fewer substations are required and the lighter overhead
current supply wire can be used.
Reduced capital cost of electrification
AC TRACTION
3-PHASE AC TRACTION MOTOR
DC-TRACTION MOTOR
Components of an ac locomotive
CATENARY:- This is the Over head Wire of Special
Cross section of area.
PANTOGRAPH:- This is a device used for collecting
current from the catenary.
CIRCUIT BREAKER:- To disconnect the engine from the
line side in case of some fault.
RECTIFIERS:- Conversion of AC power into DC power.
SMOOTHING REACTORS:- Any ripple found on the
output side of the rectifier are eliminated bythis fitted after
the rectifier.
TRANSFORMER:- It is installed in locomotive for step
down the voltage according to the requirement of motor.
Pantograph
 A pantograph is a device that collects electric current from
overhead lines for electric trains or trams.
 It is spring loaded and pushes a contact shoe up against the
contact wire to draw the electricity needed to run the train.
 Pantographs are typically operated by compressed air from
the vehicle's braking system, either to raise the unit and hold
it against the conductor .
Pantograph
Brakes
Mainly two types of brakes are
used-
1. Air Brake System
2. Regenerative Brake System.
1. Air Brake System
 This braking systems use compressed air as the
force to push blocks on to wheels or pads on to discs.
 In this system three main positions are used in
controlling the loco.
I. Application Position
II. Release Position
III. Lap Position
I. Application Position
II.Release Position
III. Lap Position
2. Regenerative Brake system
 During braking, the traction motor connections are altered
to turn them into electrical generators.
 The motor fields are connected across the main traction
generator and the motor armatures are connected across
the load.
 The rolling locomotive or multiple unit wheels turn the
motor armatures, and the motors act as generators, either
sending the generated current back into the supply.
Traction Motor
 In electric locos mainly squirrel
cage, 3-phase Induction Motor
is used.
 Nose suspended, axle hung
type traction motor is used.
Nose-Suspended type traction
motor
 Motor is mounted in the bogie
frame supported partially by
the axle which it drove and
partially by the bogie frame.
 The motor case is provided
with a "nose" which rested on
a bracket fixed to the frame of
the bogie.
WHEEL:
 Wheels are manufactured of cast
steel.
 Railway wheels sit on the rails
without guidance.
 the flanges should not touch the
rails.
 The wheel tire is coned .
 Rail head slightly curved as
shown in the diagram.
High power-to weight ratio.
Fewer Locomotive
Fast Acceleration
Higher limit of speed
Higher hauling capability
No carbon emission
Less noise pollution
Maintenance cost is 50% of that for steam engine.
Steam engine requires two hours for heat up whereas
electric engine start within moment.
High torque motor are used in electric traction.
ADVANTAGE OF ELECRICAL LOCO
Significant capital cost of electrification.
Maintenance cost is high.
Overhead wires further limit the clearance in tunnel.
Railway traction need immune power, with no cuts.
DISADVANTAGES
Thank You!!

Más contenido relacionado

La actualidad más candente

Railay internship report
Railay internship reportRailay internship report
Railay internship reportsubham gahir
 
electrical locomotive report for final students
electrical locomotive report for final studentselectrical locomotive report for final students
electrical locomotive report for final studentsPiyush Saini
 
Summer internship Railway Electrical.pdf
Summer internship Railway Electrical.pdfSummer internship Railway Electrical.pdf
Summer internship Railway Electrical.pdfAbhisheksamal22
 
Indian railway final report
Indian railway  final reportIndian railway  final report
Indian railway final reportashwani kumar
 
SUMMER TRAINNING REPORT ELECTRIC LOCOSHED KANPUR
SUMMER TRAINNING  REPORT ELECTRIC LOCOSHED  KANPURSUMMER TRAINNING  REPORT ELECTRIC LOCOSHED  KANPUR
SUMMER TRAINNING REPORT ELECTRIC LOCOSHED KANPURShivesh Ranjan
 
33016052 electric-traction-system
33016052 electric-traction-system33016052 electric-traction-system
33016052 electric-traction-systemMasterhead Jack
 
central railway internship report
central railway internship reportcentral railway internship report
central railway internship reportrahul waghmare
 
Electric Traction
Electric TractionElectric Traction
Electric TractionNawaz Nz
 
Diesel locomotive work
Diesel locomotive workDiesel locomotive work
Diesel locomotive workvipin rai
 
Electric Traction System
Electric  Traction  SystemElectric  Traction  System
Electric Traction Systemsahotaharman
 
PPT ON ELECTRIC LOCO SHED
PPT ON ELECTRIC LOCO SHEDPPT ON ELECTRIC LOCO SHED
PPT ON ELECTRIC LOCO SHEDTarang Mittal
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training reportALOK RAJ
 
Indian Railway Diesel shed Training report
Indian Railway Diesel shed Training reportIndian Railway Diesel shed Training report
Indian Railway Diesel shed Training reportaman1312
 
presentation on diesel locomotive works (dlw)
presentation on diesel locomotive works (dlw)presentation on diesel locomotive works (dlw)
presentation on diesel locomotive works (dlw)shubham vishwakarma
 
Training report on NWR,jaipur
Training report on NWR,jaipurTraining report on NWR,jaipur
Training report on NWR,jaipurLokesh Judani
 
diesel locomotive works training report by somesh dwivedi
diesel locomotive works training report by somesh dwivedidiesel locomotive works training report by somesh dwivedi
diesel locomotive works training report by somesh dwivedisomesh dwivedi
 
Chittaranjan locomotives works
Chittaranjan locomotives worksChittaranjan locomotives works
Chittaranjan locomotives worksKanhaiya Kumar
 
Electric traction system
Electric traction systemElectric traction system
Electric traction systemAmitKumar6931
 
railway workshop jodhpur
railway workshop jodhpur railway workshop jodhpur
railway workshop jodhpur kalumutha
 

La actualidad más candente (20)

Railay internship report
Railay internship reportRailay internship report
Railay internship report
 
electrical locomotive report for final students
electrical locomotive report for final studentselectrical locomotive report for final students
electrical locomotive report for final students
 
Summer internship Railway Electrical.pdf
Summer internship Railway Electrical.pdfSummer internship Railway Electrical.pdf
Summer internship Railway Electrical.pdf
 
Indian railway final report
Indian railway  final reportIndian railway  final report
Indian railway final report
 
SUMMER TRAINNING REPORT ELECTRIC LOCOSHED KANPUR
SUMMER TRAINNING  REPORT ELECTRIC LOCOSHED  KANPURSUMMER TRAINNING  REPORT ELECTRIC LOCOSHED  KANPUR
SUMMER TRAINNING REPORT ELECTRIC LOCOSHED KANPUR
 
33016052 electric-traction-system
33016052 electric-traction-system33016052 electric-traction-system
33016052 electric-traction-system
 
central railway internship report
central railway internship reportcentral railway internship report
central railway internship report
 
Electric Traction
Electric TractionElectric Traction
Electric Traction
 
Diesel locomotive work
Diesel locomotive workDiesel locomotive work
Diesel locomotive work
 
Electric Traction System
Electric  Traction  SystemElectric  Traction  System
Electric Traction System
 
PPT ON ELECTRIC LOCO SHED
PPT ON ELECTRIC LOCO SHEDPPT ON ELECTRIC LOCO SHED
PPT ON ELECTRIC LOCO SHED
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training report
 
Indian Railway Diesel shed Training report
Indian Railway Diesel shed Training reportIndian Railway Diesel shed Training report
Indian Railway Diesel shed Training report
 
presentation on diesel locomotive works (dlw)
presentation on diesel locomotive works (dlw)presentation on diesel locomotive works (dlw)
presentation on diesel locomotive works (dlw)
 
Training report on NWR,jaipur
Training report on NWR,jaipurTraining report on NWR,jaipur
Training report on NWR,jaipur
 
diesel locomotive works training report by somesh dwivedi
diesel locomotive works training report by somesh dwivedidiesel locomotive works training report by somesh dwivedi
diesel locomotive works training report by somesh dwivedi
 
Chittaranjan locomotives works
Chittaranjan locomotives worksChittaranjan locomotives works
Chittaranjan locomotives works
 
Electric traction system
Electric traction systemElectric traction system
Electric traction system
 
railway workshop jodhpur
railway workshop jodhpur railway workshop jodhpur
railway workshop jodhpur
 
Northen Western Railway
Northen Western RailwayNorthen Western Railway
Northen Western Railway
 

Similar a Railway Training ppt

Design and Analysis of Drive System with Slip Ring Induction Motor for Electr...
Design and Analysis of Drive System with Slip Ring Induction Motor for Electr...Design and Analysis of Drive System with Slip Ring Induction Motor for Electr...
Design and Analysis of Drive System with Slip Ring Induction Motor for Electr...IJPEDS-IAES
 
Electric Traction
Electric Traction Electric Traction
Electric Traction ZunAib Ali
 
Basics of Electrical Traction drives
Basics of Electrical Traction drivesBasics of Electrical Traction drives
Basics of Electrical Traction drivesVivek Thakkar
 
Electric traction system final upload
Electric traction system final uploadElectric traction system final upload
Electric traction system final uploadBishal Rimal
 
1550091 634842733511023750
1550091 6348427335110237501550091 634842733511023750
1550091 634842733511023750Mdtarique Anwar
 
Application of dc generator at railway coach
Application of dc generator at railway coachApplication of dc generator at railway coach
Application of dc generator at railway coachjjasdxjz
 
Electric traction
Electric tractionElectric traction
Electric tractionDipak Meher
 
sreenivas.pptx
sreenivas.pptxsreenivas.pptx
sreenivas.pptxsameed4
 
BHARAT HEAVY ELECTRICALS LIMITED.JHANSI LOCOMOTIVE PPT
BHARAT HEAVY ELECTRICALS LIMITED.JHANSI LOCOMOTIVE PPTBHARAT HEAVY ELECTRICALS LIMITED.JHANSI LOCOMOTIVE PPT
BHARAT HEAVY ELECTRICALS LIMITED.JHANSI LOCOMOTIVE PPTRavindra Rawat
 
TAS MRS LAS COLONY.pdf
TAS MRS LAS COLONY.pdfTAS MRS LAS COLONY.pdf
TAS MRS LAS COLONY.pdfpriyanshupal26
 
Electrial tractions
Electrial tractionsElectrial tractions
Electrial tractionsVairam _VM
 
Presentation on Remanufacturing of Engine Block of a locomotive at DMW, Patiala
Presentation on Remanufacturing of Engine Block of a locomotive at DMW, PatialaPresentation on Remanufacturing of Engine Block of a locomotive at DMW, Patiala
Presentation on Remanufacturing of Engine Block of a locomotive at DMW, PatialaArjun Gaur
 
Presentation on Remanufacturing of Engine Block of a locomotive at DMW, Patiala
Presentation on Remanufacturing of Engine Block of a locomotive at DMW, PatialaPresentation on Remanufacturing of Engine Block of a locomotive at DMW, Patiala
Presentation on Remanufacturing of Engine Block of a locomotive at DMW, PatialaArjun Gaur
 
Single phase compensated motor
Single phase compensated motorSingle phase compensated motor
Single phase compensated motorSayanSarkar55
 
Utilization of electrical energy Unit 4 ElectricTraction.pdf
Utilization of electrical energy Unit 4 ElectricTraction.pdfUtilization of electrical energy Unit 4 ElectricTraction.pdf
Utilization of electrical energy Unit 4 ElectricTraction.pdfhomanathmore
 

Similar a Railway Training ppt (20)

Engine control
Engine controlEngine control
Engine control
 
Design and Analysis of Drive System with Slip Ring Induction Motor for Electr...
Design and Analysis of Drive System with Slip Ring Induction Motor for Electr...Design and Analysis of Drive System with Slip Ring Induction Motor for Electr...
Design and Analysis of Drive System with Slip Ring Induction Motor for Electr...
 
Electric Traction
Electric Traction Electric Traction
Electric Traction
 
Basics of Electrical Traction drives
Basics of Electrical Traction drivesBasics of Electrical Traction drives
Basics of Electrical Traction drives
 
Northern western raiways ppt
Northern western raiways pptNorthern western raiways ppt
Northern western raiways ppt
 
Traction motor
Traction motorTraction motor
Traction motor
 
Regenerative braking
Regenerative brakingRegenerative braking
Regenerative braking
 
Electric traction system final upload
Electric traction system final uploadElectric traction system final upload
Electric traction system final upload
 
1550091 634842733511023750
1550091 6348427335110237501550091 634842733511023750
1550091 634842733511023750
 
Application of dc generator at railway coach
Application of dc generator at railway coachApplication of dc generator at railway coach
Application of dc generator at railway coach
 
D43042025
D43042025D43042025
D43042025
 
Electric traction
Electric tractionElectric traction
Electric traction
 
sreenivas.pptx
sreenivas.pptxsreenivas.pptx
sreenivas.pptx
 
BHARAT HEAVY ELECTRICALS LIMITED.JHANSI LOCOMOTIVE PPT
BHARAT HEAVY ELECTRICALS LIMITED.JHANSI LOCOMOTIVE PPTBHARAT HEAVY ELECTRICALS LIMITED.JHANSI LOCOMOTIVE PPT
BHARAT HEAVY ELECTRICALS LIMITED.JHANSI LOCOMOTIVE PPT
 
TAS MRS LAS COLONY.pdf
TAS MRS LAS COLONY.pdfTAS MRS LAS COLONY.pdf
TAS MRS LAS COLONY.pdf
 
Electrial tractions
Electrial tractionsElectrial tractions
Electrial tractions
 
Presentation on Remanufacturing of Engine Block of a locomotive at DMW, Patiala
Presentation on Remanufacturing of Engine Block of a locomotive at DMW, PatialaPresentation on Remanufacturing of Engine Block of a locomotive at DMW, Patiala
Presentation on Remanufacturing of Engine Block of a locomotive at DMW, Patiala
 
Presentation on Remanufacturing of Engine Block of a locomotive at DMW, Patiala
Presentation on Remanufacturing of Engine Block of a locomotive at DMW, PatialaPresentation on Remanufacturing of Engine Block of a locomotive at DMW, Patiala
Presentation on Remanufacturing of Engine Block of a locomotive at DMW, Patiala
 
Single phase compensated motor
Single phase compensated motorSingle phase compensated motor
Single phase compensated motor
 
Utilization of electrical energy Unit 4 ElectricTraction.pdf
Utilization of electrical energy Unit 4 ElectricTraction.pdfUtilization of electrical energy Unit 4 ElectricTraction.pdf
Utilization of electrical energy Unit 4 ElectricTraction.pdf
 

Último

College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGSIVASHANKAR N
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 

Último (20)

College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 

Railway Training ppt

  • 1. Industrial training Electrical Loco Shed, Ghaziabad Name : Shreyashkar Singh ABES engineering college EEE 4th year (1003221092) shreysng@gmail.com
  • 2. INTRODUCTION ESTABLISHMENT > Electric Loco Shed was set in 1976 by Railway Electrification Organisation (8910 SQ. MTRS). > It’s main purpose is of maintenance of WAP1,WAP4,WAP5,WAP7 ,WAG5, WAM4 engines. INITIAL COST Rs. 1.5 (IN CRORES) PRESENT LOCO HOLDING 185
  • 3. TYPES OF LOCOS HOLDING- [gauge] [power] [load] [series] 1. WAP1 (Traction Motors: 4, 575kW ,18 coaches) 2. WAP4 (Traction Motors- 6,630 kW, 750V, 26 coaches ) 3. WAP5 (Traction Motors-3phase squirrel-cage induction motors(1150kW, 2180V). 4. WAP7 (Traction Motors- 3phase squirrel-cage induction motors(850 kW, 2180V). 5. WAG5 (Haulage Capacity-2375t 6. WAM4 (Traction Motors-6, 575kW, 750V, Hauling capacity-2010t
  • 4. INTRODUCTION TRACTION Driving forward of vehicle is called traction and the system, which employ this type of mechanism is called as traction system. Classified broadly into two groups namely: 1. Non Electric Traction System. 2. Electric Traction System. >Electric Traction means a Locomotion in which the driving force is obtained from electric motors. >For Traction purpose 3-phase induction motor and DC series motor are used and both have high starting torque provide high speed acceleration.
  • 5. TYPES OF ELECTRIC TRACTION SYSTEM DC traction units uses direct current drawn from overhead line. DC traction units uses 600v-750v DC voltage range . The low-voltage,series wound,direct current motor is well suited to railroad traction,being simple to construct and easy to control. DC TRACTION DC Traction AC Traction
  • 6. AC Traction units draw alternating current from an overhead line. Typical voltages used are- 15kV /25kV AC,50Hz Fewer substations are required and the lighter overhead current supply wire can be used. Reduced capital cost of electrification AC TRACTION
  • 9. Components of an ac locomotive CATENARY:- This is the Over head Wire of Special Cross section of area. PANTOGRAPH:- This is a device used for collecting current from the catenary. CIRCUIT BREAKER:- To disconnect the engine from the line side in case of some fault. RECTIFIERS:- Conversion of AC power into DC power. SMOOTHING REACTORS:- Any ripple found on the output side of the rectifier are eliminated bythis fitted after the rectifier. TRANSFORMER:- It is installed in locomotive for step down the voltage according to the requirement of motor.
  • 10. Pantograph  A pantograph is a device that collects electric current from overhead lines for electric trains or trams.  It is spring loaded and pushes a contact shoe up against the contact wire to draw the electricity needed to run the train.  Pantographs are typically operated by compressed air from the vehicle's braking system, either to raise the unit and hold it against the conductor .
  • 12. Brakes Mainly two types of brakes are used- 1. Air Brake System 2. Regenerative Brake System.
  • 13. 1. Air Brake System  This braking systems use compressed air as the force to push blocks on to wheels or pads on to discs.  In this system three main positions are used in controlling the loco. I. Application Position II. Release Position III. Lap Position
  • 17. 2. Regenerative Brake system  During braking, the traction motor connections are altered to turn them into electrical generators.  The motor fields are connected across the main traction generator and the motor armatures are connected across the load.  The rolling locomotive or multiple unit wheels turn the motor armatures, and the motors act as generators, either sending the generated current back into the supply.
  • 18.
  • 19. Traction Motor  In electric locos mainly squirrel cage, 3-phase Induction Motor is used.  Nose suspended, axle hung type traction motor is used.
  • 20. Nose-Suspended type traction motor  Motor is mounted in the bogie frame supported partially by the axle which it drove and partially by the bogie frame.  The motor case is provided with a "nose" which rested on a bracket fixed to the frame of the bogie.
  • 21. WHEEL:  Wheels are manufactured of cast steel.  Railway wheels sit on the rails without guidance.  the flanges should not touch the rails.  The wheel tire is coned .  Rail head slightly curved as shown in the diagram.
  • 22. High power-to weight ratio. Fewer Locomotive Fast Acceleration Higher limit of speed Higher hauling capability No carbon emission Less noise pollution Maintenance cost is 50% of that for steam engine. Steam engine requires two hours for heat up whereas electric engine start within moment. High torque motor are used in electric traction. ADVANTAGE OF ELECRICAL LOCO
  • 23. Significant capital cost of electrification. Maintenance cost is high. Overhead wires further limit the clearance in tunnel. Railway traction need immune power, with no cuts. DISADVANTAGES