The document provides a summary of an individual's professional experience in performance testing. It outlines over 5 years of experience in performance testing using tools like LoadRunner and HP Performance Center. Specific projects are described involving testing websites, applications, and systems for clients in various industries. Responsibilities included creating test plans and scripts, executing load, peak, and soak tests, analyzing results, and providing recommendations. Technical skills and qualifications are also listed, including programming languages, databases, and testing tools.
SyndBuddy AI 2k Review 2024: Revolutionizing Content Syndication with AI
Shriraam-performance test engineer 5.4 years
1. M.SHRIRAAM
Contact: +91-9994951823 -Mail: shriraam49@gmail.com
P R O F E S S I O N A L S U M M A R Y
Around 5.4 Years of experience in IT and Software development Industry.
Excellent knowledge of Performance Testing concepts and skills. Good Analytical skills to
comprehend Business requirements.
Experienced in managing, modeling, analyzing, and reporting the performance characteristics of a
system.
Performance test Protocols Used: Web HTTP/HTML, Web services ,Citrix,SAP,Win
sock,Java,Ajax,AMF,RDP.
Proficient with Performance Test tools such as Load Runner/Performance center
Proficient with HP Performance center Admin activities.
Learning experience on tools likesplunk.
Monitor system resources and other server statistics and identify any potential bottlenecks.
Deep knowledge of carrying out system performance investigations.
Knowledge on Testing tools likeLoad runner, Performance center,Team quest,IBM PMAT,HP
diagnostics,GC Log analyzer,BSM,Neo load 3.2 ,Quality Center, QTP, Rally.
Good knowledge of testing process, test tools, creation and understanding of testing artifacts like test
plan, test scripts and Preparation and execution of Test scripts.
Experience in Base24 ATM performance testing.
Training experience in J meter 2.11.
Experience scripting & executing automation test scripts using QTP.
Flexible in Understanding & Learning new technologies/architecture
E D U C A T I O N A L Q U A L I F I C A T I O N S
Have been awarded Bachelor of Electronics & Communication Engineering from SMK Fomra Institute
of Tech, Chennai in 2010 with 72 %, Anna University, Chennai, India.
Completed HSC from JaiGopal Garodia National School, East Tambaram, Chennai with 81%.
Completed SSLC from JaiGopal Garodia National School, East Tambaram, Chennai with 86%.
W O R K E X P E R I E N C E S
Cognizant Technology Solutions India Pvt Ltd, Chennai
Current Designation: Associate
Employment Type: Full-time / Regular.
Duration: October 2010 to December 2015
Wipro, Chennai
Current Designation: Senior Test Engineer
Employment Type: Full-time / Regular.
Duration: January 2015 to till date
2. T E C H N I C A L S K I L L S
Operating Systems Win 7,Vista,xp, Unix, Macintosh,Tandem servers
Languages C,C++,Java,VB scripting.
Databases Oracle, SQL Server 2008.
Web Related HTML, XML
Tools & Utilities Load Runner 12,11.5,9.2 Versions ,Performance center,
Team quest, IBM PMAT,Hp diagnostics,BSM,Neo Load
3.2,SOAP UI, J Meter 2.11 ,Requirements Center,Quality
Center,QTP,SQL Server 2008,Visual studio Ultimate edition
2010,Oracle,TOAD,
Domain Knowledge Health Care, Life Science, Information Media
Entertainment, Banking,Retail.
Scripting Languages Unix, Power Shell
C A R E E R C O N T O U R
Project # 8 Philip Morris International
Philip Morris International Inc.(PMI) is an American global cigarette and tobbaco company, with products
sold in over 200 countries with 15.6% of the international cigarette market outside the United States. The
most recognized and best selling product of the company is Marlboro.
Role and Responsibilities(Test Lead)
Reviewed requirements for project and designs for performance risks.
Implemented workload models sizing application.
Generated BSM performance reports and got reviewed by the management .
Protocols Used: Web HTTP/HTML, Citrix,Sap,Ajax,AMF.
Creating and reviewing load runner scripts.
Performed Load test, Peak load test, Soak test.
Analyzing test results and providing recommendations.
Coordinating and guiding team of 3 members.
Project #7 HSDL Remediation
Halifax Share Dealing is an on line broker allowing customers to buy and sell shares in UK and
international companies across a range of markets. Halifax offer a regular investment plan where
customers can buy shares, known as Share Builder.
Role and Responsibilities
Non Functional Requirement gathering and Analysis.
Conducting Test data and Environment workshops .
Test Plan preparation.
Coordination with different teams at different test phases.
WLM preparation.
Creating and reviewing load runner scripts.
Performed Load test, Peak load test, Soak test.
Project #6
FALCON
Environment : JAVA, Oracle
Tools Used : Unix, Performance Centre, Load runner 11.5, Team quest
3. Falcon Fraud Manager 6 is the most accurate and comprehensive solution for detecting payment card
fraud, reducing losses by up to 50%. No other system detects as much fraud with as little impact on
customers and low operational costs.
`Role and Responsibilities
Non Functional Requirement gathering and Analysis
Conducting Test data and Environment workshops
Test Plan preparation
WLM preparation
Creating and reviewing load runner scripts
Performed Load test, Peak load test, Soak test.
Project #5
Multi Channel Architecture
Environment : JAVA, Oracle
Tools Used : Load runner 9.2,Performance centre, Team Quest,PMAT.
Foundation desktop is the customer support Java based application using Oracle backend
Foundation Desktop an intranet based client, which is used by the customer support executives to help on
the queries related to account and banking transactions for the customer.
Role and Responsibilities
Non Functional Requirement gathering and Analysis
Conducting Test data and Environment workshops
Test Plan preparation & WLM preparation.
Creating and reviewing load runner scripts
Performed Load test, Peak load test, Soak test.
Analyze the Load runner results, heap dump analysis and to suggest the performance related
recommendations
Project #4
COBRA
Client : Lloyds Banking Group
Environment : ASP.NET, IIS Server, SQL Server 2000, Windows
Tools Used : Load runner 9.2, Team Quest,IBM PMAT,Lisa
The COBRA system is a flexible End User Computing application based on Microsoft .NET Framework
3.5 using a SQL Server 2000 backend and IIS6 based front end.
COBRA provides an intranet based client, which hosts multiple reports tailored to business users’
needs, for example leads usage MI is widely used functionality provided by COBRA. There is a wide
user base, in branch, head office, telephony, and offshore.
The purpose of this project is to replace the existing hardware with a performant, resilient and secure
new hardware in the strategic Group IT Data Centre i.e. Peterborough.
There are 2 main work streams to this project:
• Migrate the existing COBRA application and framework to new Group IT supported
infrastructure in the data centre including any required remediation.
• Partition the applications to support Verde.
4. Roles & Responsibilities:
Involved in creating test Plan
Involved in creating scripts and validating scripts
Involved in running tests concurrently up to 100, 500 Users
Involved in monitoring database and web server
Involved in preparing Interim report and Test Summary Report
Project #3
TB-Phase-2 call handoff improvements
Client : Lloyds Banking Group
Tools Used : Load Runner 9.2 , Performance center,Team Quest,IBM PMAT,GC Log analyzer.
EDGE is application which helps the Customer Care agents to Communicate with the End users
(Customers).
TB Phase-2 is mainly for testing the performance stats of the database which temporarily stores the
Customer information. Communication to the database is made via API.
Followed Baseline-Benchmark testing approach to measure the performance of the API since the
API was developed to communicate the DB.
Analyzing Load runner reports, AWR reports and provide recommendations for tuning the code
and infrastructure.
Role and Responsibilities
Non Functional Requirement gathering and Analysis
Test Plan preparation
WLM preparation
Creating and reviewing load runner scripts
Performed Load test, Peak load test, Soak test.
Analyze the results and to suggest the performance related recommendations
Project #2
Title AZ AD CAN EDW MDM Integration
Client Astra Zeneca
Operating System Windows 7, UNIX
Tools Informatica 9.1, Oracle SQL Developer, SAP BO objects.
Team Size 5
Role Team Member
Project Description:
AZ is one of the leading companies in Pharmaceutical industry. They have a wide range of products selling
globally. They need to track their business and take important decision based on them. They are using
ETL framework to monitor their employees and sales across the globe. As they are a huge company they
also require perfection in their data. Hence we perform the DW testing for the client to ensure that the
report they are analyzing is flawless and accurate. Thus to help them strengthen their business and grow
in this competitive world.
Role and Responsibilities
Responsibilities: As a Test Engineer
Involved in Preparation of Test Scenario Document, Test cases.
5. Ran Jobs in UNIX and Informatica for Loading the Data from One Stage to Another stage.
Executed test cases and validates results (system, regression.)
Log defects and track to resolution.
Interface with test coordinator for resolution of technical issues.
Liaise with developers regarding issues
Involved in Report Testing.
Provide inputs and participate in reviews of testing artefacts.
Project #1
Organization: Lexis Nexis
Project #1(October 2010 till January 2012)
Client Legal
Operating System Windows 7
Tools Quality Centre, Blue print, visual studio ultimate edition 2010, QTP.
Team Size 7
Role Team Member
Project Objective
The main Objective is to perform manual testing for web-based application and provide defect-free
products for the client.
Project Description
This project holds many applications within it. All are related with Legal documents. I have knowledge on
various modules of Application like Global Search, COI Search, Outlook & Google Integration, Mac
synch(which is critical part of Application) etc. And I also handle the alerts and billing verification part
for this application. For any new enhancements, test scenarios and test cases are prepared and verified
after executing it later. Also I have executed Automation test scripts. Various testing like regression
testing, platform testing, Mobile Testing, adhoc testing, black box testing, Performance Testing,
Automation testing are performed to deliver high quality products. Tested Mobile application in mobile
simulator.
MAJOR AREAS OF ACCOUNTABILITY
Responsibilities: As a Test Engineer
Understand requirements and prepare test cases scenarios.
Preparation of test performance test scripts
Executes test cases and validates results (system, regression, integration, etc.)
Scripting and executing automation test cases.