Project Schedule & Resource Allocation Plan 
Shuchi Dubey 
Walden University 
Dr. Deanna Romano 
EDUC-6145-2, Project Management in Education & Training 
07/29/2012
Project Schedule & Resource Allocation Plan 
Confidential Page 2 7/30/2012 
Project Name 
Online Performance Support System/ 4- Phases 
Department 
Training & Development 
Focus Area 
Creating an online performance support system for Widgemart Group managers and associates 
Project Manager/Lead Instructional Designer 
Davey Jones 
Prepared By 
Document Owner(s) 
Project/Organization Role 
Davey Jones 
Project Manager/ Lead Instructional Designer 
Project Schedule Version Control 
Version 
Date 
Author 
Change Description 
V.0 
07/29/2012 
Davey Jones 
Project Schedule & Resource Allocation Plan
Project Schedule & Resource Allocation Plan 
Confidential Page 3 7/30/2012 
TABLE OF CONTENTS 
1 PROJECT SCHEDULE PURPOSE......................................................................................... 4 
1.1 Resource allocation & Cost Estimation....................................................................... 4 
1.2 Project Assumptions ................................................................................................... 7 
2 GANTT CHART ....................................................................................................................... 8 
3 RESPONSIBILITIES/ACCOUNTABILITY MATRIX................................................................ 9 
4 SIGNATURES.......................................................................................................................... 9 
5 REFERENCES....................................................................................................................... 10
Project Schedule & Resource Allocation Plan 
Confidential Page 4 7/30/2012 
1 PROJECT SCHEDULE PURPOSE 
The following document’s purpose is to provide a detailed overview of the project schedule and cost estimation related to the tasks and resources/team members that will be working in the design and development of training deliverables for Widgemart EPSS training. This document contains schedule details related to start and end dates of the project and tracking information related to when each task/activity should begin and end. 
This document is provides you reference on the project schedule’s Gantt chart that illustrates the start and finish dates of the activities. Besides showing the activity start, duration, and completion part of the schedule, the Gantt chart also shows the connection between activities and the calendar, and provides a graphical representation of the activity duration. 
In addition, this document will serve as a contract between the Project Team of Widgemart and the Widgmart Project Sponsors, stating what will be delivered according to the budget, time constraints, risks, resources, and standards agreed upon for the project. 
1.1 Resource allocation & Cost Estimation 
This training will enable managers and associates to perform efficiently in their various job roles and responsibilities. The training is also divided into four phases and following table provides information related to the assigned tasks with no. of hours and the total cost that will take to complete the project and which resource is responsible for what task. 
Phase 1: Online QDs – Activity/ Task 
Resource: ID – Davey (hourly rate: $25) 
Hours worked 
Resource: SME – Josie (hourly rate: $30) 
Hours Worked 
Resource: 
Client/ 
Reviewer – Ellen (hourly rate: $40) 
Hours worked 
Resource: 
Translation & Change Management: Tim & Barry (hourly rate: $20 + $20) 
Hours worked 
No. of hours 
Total Cost 
Sub-task 1 - Project Charter & Scope 
4 
3 
1 
1 
8 
$270 
Sub-task 2 - Course Analysis 
4 
3 
1 
1 
8 
$270 
Sub-task 3 - Scripting for QDs 
40 
5 
- 
- 
45 
$1150 
Sub-task 4 - Script Approval 
3 
1 
3 
1 
8 
$265 
Sub- task 5 - Revise/Edit Script 
5 
2 
- 
1 
8 
$255 
Sub-task 6 - 
24 
- 
- 
- 
24 
$600
Project Schedule & Resource Allocation Plan 
Confidential Page 5 7/30/2012 
QD Development 
Sub-task 7 - Final review/QD Pilot 
- 
- 
16 
- 
16 
$640 
Sub-task 8 - Final review/updates 
8 
8 
$200 
Sub-task 9 - QA Review/ EPSS Upload 
8 (Widgemart EPSS Support) 
$0 
Phase 2: Training Repository- Activity/Task 
Sub-task 1 - Create Help Script 
16 
16 
$400 
Sub-task 2 - Edit review 
4 
3 
1 
1 
8 
$270 
Sub-task 3- Client review/updates 
24 
24 
$960 
Help Upload 
- 
- 
- 
- 
Upload to be done on Widgemart EPSS 
- 
Phase 3: Job Aid Function 
Sub-task 1 - Scripting Quick Reference Guides (QRG) 
32 
- 
- 
- 
32 
$256 
Sub-task 2 - Edit Review QRG 
15 
3 
3 
3 
24 
$705 
Sub-task 3 - Client review/updates 
24 
- Sub-sub- task 1 - Client 
- 
- 
16 
- 
16 
$640
Project Schedule & Resource Allocation Plan 
Confidential Page 6 7/30/2012 
Review 
- Sub-sub- task 2 - QA Review/ EPSS Upload 
- 
- 
- 
- 
8 (Widgemart EPSS Support) 
$0 
Phase 4: WBT Training 
Sub-task 1 - Scripting for Manager WBT 
40 
- 
- 
- 
40 
$1000 
Sub-task 2 - Script Approval 
- 
8 
8 
- 
16 
$560 
Sub- task 3 - Revise/Edit Script 
5 
2 
- 
1 
8 
$450 
Sub-task 4 - Scripting for Associate WBT 
40 
- 
- 
- 
40 
$1000 
Sub-task 5 - Script Approval 
- 
8 
8 
- 
16 
$560 
Sub- task 6 - Revise/Edit Script 
5 
2 
- 
1 
8 
$450 
Sub-task 6 - WBT Development 
- 
-- 
- 
- 
56 (Contract given to a course development company) 
TBD 
Sub-task - Course Pilot 
- 
- 
- 
- 
8 
Sub-task - Final review/updates 
4 
8 (4 hr effort for Graphic change/updates – TBD) 
$550 
Sub-task - WBT Upload 
- 
- 
- 
- 
8 (Widgemart EPSS Support) 
$0
Project Schedule & Resource Allocation Plan 
Confidential Page 7 7/30/2012 
1.2 Project Assumptions 
Resource Assumptions: 
 Audience are expected to be fluent in English and will be available for the scheduled trainings 
 Audience are expected to be computer literate and have basic PC skills 
 Audience will require to Adobe Flash and Acrobat Reader for viewing videos and to access PDF files of the various User/Quick Reference Guides. 
 Audience should have access to EPSS for the training quick demos that will be incorporated within the EPSS system 
 A significant percentage of audience will be experienced with the technical environment, such how to access the EPSS and how browse through the basic navigation of the tool 
Delivery Assumptions: 
 Deliverables will be subject to no more than a specific number of review cycles 
 Rework related to client/SME feedback or change request: 
- Minimal Rework. Would have a minimal impact on the workload. Typically less than 3% of the total work. 
- Some Rework: There would be a requirement for additional work however it could still be accommodated within the existing timeframes. Typically no more than 10% of the total project would need to be reviewed and possibly reworked, or additional work undertaken. 
- Medium Rework: There would be either additional resources required, or the finish date would need to be adjusted. Up to 30% of the project would need to be reviewed and potentially reworked or additional work undertaken. 
- Significant Rework: A major impact on the project with more than 30% of the project work needing to be reviewed and changed, or additional work undertaken. 
 Training Equipment and software applications that are required to be used in the project are known and can be expected to be met. 
Budgetary Assumptions: 
 The statistics used in preparing the project cost estimates are accurate within a given percent. 
 No outside consultation related to the subject matter will be required, such as assistance of SME or outside consultation will be limited to a specified number of days at a specified rate per day. 
Environmental Assumptions 
 Issues related to the project will be resolved in a timely manner. 
 Systems components will be capable of being integrated with minimum rework.
Project Schedule & Resource Allocation Plan 
Confidential Page 8 7/30/2012 
2 Gantt Chart 
Below is displayed the illustrated project schedule Gantt Chart of this course project. 
Click on the icon to view the detailed chart of the Project Schedule: 
Online Performance Support System Proje
Project Schedule & Resource Allocation Plan 
Confidential Page 9 7/30/2012 
3 Responsibilities/Accountability Matrix 
Displayed below is the Responsibility/Accountability Matrix providing details related to who will do what on the project team. 
Responsibility/Accountability Matrix 
Task/Phase 
Person -> 
Davey 
Ellen 
Josie 
Tim 
Barry 
Needs Assessment & Project Analysis 
A 
P 
P 
P 
P 
Create Project Plan 
A 
S, I 
I 
I 
I 
Create Deliverable Specifications 
A, P 
S 
R 
I 
I 
Deliverables, Testing & Implementation 
A, P 
S, I 
P, R 
P, R 
P 
P = Participate A = Accountable R = Review I = Input Required S = Sign-off Required 
4 Signatures 
The following people agree that the above information is accurate: 
Project Team members 
Project/Organization Role 
Davey Jones 
Project Manager/ Lead Instructional Designer 
Ellen 
Project Administrator 
Josie 
Acquisition Manager 
Tim 
Translation Expert 
Barry 
Internal Marketing & Change Management 
Prepared by _________Davey Jones_________________________ 
Project Manager 
Approved by _________WidgetMart_Group_______________________ 
Project Sponsor
Project Schedule & Resource Allocation Plan 
Confidential Page 10 7/30/2012 
5 References 
Etmer, A. P., & Quinn, J. (2007). The ID Casebook: Case studies in instructional Design (3rd Ed.). Upper Saddle River: NJ, Pearson Education, Inc. 
Greer, M. (2010). The project Management Minimalist: Just Enough PM to Rock Your Projects. Retrieved from https://class.waldenu.edu/bbcswebdav/institution/USW1/201260_04/MS_INDT/EDUC_ 6145/Week%201/Course%20Project/Week%201%20Course%20Project/embedded/pm- minimalist-ver-3-laureate.pdf 
Portny, E. S., Mantel, J. S., Meredith, R. J., Shafer, M. S., Sutton, M. M., & Kramer, E. B. (2008). Project Management: Planning, scheduling, and controlling projects. River Street, Hoboken: NJ, John Wiley & Sons Inc.

Más contenido relacionado

La actualidad más candente

La actualidad más candente (20)

project management
project managementproject management
project management
 
Project Management Office (PMO)
Project Management Office (PMO)Project Management Office (PMO)
Project Management Office (PMO)
 
Project Integration Management
Project Integration ManagementProject Integration Management
Project Integration Management
 
PMO Handbook - How to Plan, Build, and Run a PMO
PMO Handbook - How to Plan, Build, and Run a PMOPMO Handbook - How to Plan, Build, and Run a PMO
PMO Handbook - How to Plan, Build, and Run a PMO
 
Project Management Office Roles Functions And Benefits
Project Management Office Roles Functions And BenefitsProject Management Office Roles Functions And Benefits
Project Management Office Roles Functions And Benefits
 
PMP_Project Time Management
PMP_Project Time ManagementPMP_Project Time Management
PMP_Project Time Management
 
Project communication management
Project communication  managementProject communication  management
Project communication management
 
Chap 4.0 Project integration management Overview
Chap 4.0 Project integration management OverviewChap 4.0 Project integration management Overview
Chap 4.0 Project integration management Overview
 
Fundamentals of Project Management
Fundamentals of Project ManagementFundamentals of Project Management
Fundamentals of Project Management
 
PMO 101
PMO 101PMO 101
PMO 101
 
Project Time Management - PMBOK 5th Edition
Project  Time Management - PMBOK 5th EditionProject  Time Management - PMBOK 5th Edition
Project Time Management - PMBOK 5th Edition
 
A brief on project time management
A brief on project time managementA brief on project time management
A brief on project time management
 
Practical Guide to Useful Project Management Plan
Practical Guide to Useful Project Management PlanPractical Guide to Useful Project Management Plan
Practical Guide to Useful Project Management Plan
 
Pmbok Processes Flow, ALL!
Pmbok Processes Flow, ALL!Pmbok Processes Flow, ALL!
Pmbok Processes Flow, ALL!
 
Project communication management
Project communication managementProject communication management
Project communication management
 
Project Management 101 Primer
Project Management 101   PrimerProject Management 101   Primer
Project Management 101 Primer
 
project planning-estimation
project planning-estimationproject planning-estimation
project planning-estimation
 
How to Setup a High-IMPACT PMO
How to Setup a High-IMPACT PMOHow to Setup a High-IMPACT PMO
How to Setup a High-IMPACT PMO
 
PMO Performance Measurement and Metrics - Kendrick
PMO Performance Measurement and Metrics - KendrickPMO Performance Measurement and Metrics - Kendrick
PMO Performance Measurement and Metrics - Kendrick
 
5 phases of project management
5 phases of project management5 phases of project management
5 phases of project management
 

Destacado

3year Project Management Assignment Final
3year Project Management Assignment Final3year Project Management Assignment Final
3year Project Management Assignment Final
Mageba25
 
Introduction to project management academic essay assignment - www.topgrade...
Introduction to project management   academic essay assignment - www.topgrade...Introduction to project management   academic essay assignment - www.topgrade...
Introduction to project management academic essay assignment - www.topgrade...
Top Grade Papers
 
Project Management Assignment - Bailey
Project Management Assignment - BaileyProject Management Assignment - Bailey
Project Management Assignment - Bailey
Allison Bailey
 
Total project management
Total project managementTotal project management
Total project management
Atul Kishore
 
Planning, scheduling and resource allocation
Planning, scheduling and resource allocationPlanning, scheduling and resource allocation
Planning, scheduling and resource allocation
Jatin Mandhyan
 
Ice Cream project presentation
Ice Cream project presentationIce Cream project presentation
Ice Cream project presentation
Rizwan Qamar
 
Sample project plan
Sample project planSample project plan
Sample project plan
mamoonnift
 

Destacado (18)

3year Project Management Assignment Final
3year Project Management Assignment Final3year Project Management Assignment Final
3year Project Management Assignment Final
 
Introduction to project management academic essay assignment - www.topgrade...
Introduction to project management   academic essay assignment - www.topgrade...Introduction to project management   academic essay assignment - www.topgrade...
Introduction to project management academic essay assignment - www.topgrade...
 
Project Management Assignment - Bailey
Project Management Assignment - BaileyProject Management Assignment - Bailey
Project Management Assignment - Bailey
 
Total Project Management
Total Project ManagementTotal Project Management
Total Project Management
 
Assignment brief project management
Assignment brief project managementAssignment brief project management
Assignment brief project management
 
FINAL PROJECT OMT255 (WINDOWS 8)
FINAL PROJECT OMT255 (WINDOWS 8)FINAL PROJECT OMT255 (WINDOWS 8)
FINAL PROJECT OMT255 (WINDOWS 8)
 
Project development and implementation for strategic managers
Project development and implementation for strategic managersProject development and implementation for strategic managers
Project development and implementation for strategic managers
 
The Autonomy of Automated Systems: Social Systems and the Multi-level Autonomy
The Autonomy of Automated Systems: Social Systems and the Multi-level AutonomyThe Autonomy of Automated Systems: Social Systems and the Multi-level Autonomy
The Autonomy of Automated Systems: Social Systems and the Multi-level Autonomy
 
Research methods for strategic managers
Research methods for strategic managersResearch methods for strategic managers
Research methods for strategic managers
 
A swimming pool project of junhao hotel(4 star)
A swimming pool project of junhao hotel(4 star)A swimming pool project of junhao hotel(4 star)
A swimming pool project of junhao hotel(4 star)
 
ice cream management
ice cream managementice cream management
ice cream management
 
Total project management
Total project managementTotal project management
Total project management
 
Resource allocation and smoothing
Resource allocation and smoothingResource allocation and smoothing
Resource allocation and smoothing
 
It project management assignment ppt
It project management assignment pptIt project management assignment ppt
It project management assignment ppt
 
Planning, scheduling and resource allocation
Planning, scheduling and resource allocationPlanning, scheduling and resource allocation
Planning, scheduling and resource allocation
 
Swimming Pool Construction - Completed Projects
Swimming Pool Construction - Completed Projects Swimming Pool Construction - Completed Projects
Swimming Pool Construction - Completed Projects
 
Ice Cream project presentation
Ice Cream project presentationIce Cream project presentation
Ice Cream project presentation
 
Sample project plan
Sample project planSample project plan
Sample project plan
 

Similar a Project Management Project Assignment - Project Schedule & Resource Allocation Plan

Project Plan For A Project Management Project
Project Plan For A Project Management ProjectProject Plan For A Project Management Project
Project Plan For A Project Management Project
Mary Stevenson
 
Project-Scope-Statement
Project-Scope-StatementProject-Scope-Statement
Project-Scope-Statement
Jeremy Heady
 
Assignment 1 ITECH 2250 IT Project Management Techniques.docx
Assignment 1 ITECH 2250 IT Project Management Techniques.docxAssignment 1 ITECH 2250 IT Project Management Techniques.docx
Assignment 1 ITECH 2250 IT Project Management Techniques.docx
sherni1
 
Pmp project management professional free sample
Pmp project management professional free samplePmp project management professional free sample
Pmp project management professional free sample
Nada Sallam
 
Hello Class- This is a very rough draft of the assignment. I have
Hello Class- This is a very rough draft of the assignment. I have Hello Class- This is a very rough draft of the assignment. I have
Hello Class- This is a very rough draft of the assignment. I have
SusanaFurman449
 
Project Charter - Outreach Events for the Company
Project Charter - Outreach Events for the CompanyProject Charter - Outreach Events for the Company
Project Charter - Outreach Events for the Company
Timothy Cochran
 
Regatta UniversityIT Project Charter ForStudent De.docx
Regatta UniversityIT Project Charter ForStudent De.docxRegatta UniversityIT Project Charter ForStudent De.docx
Regatta UniversityIT Project Charter ForStudent De.docx
audeleypearl
 
Regatta UniversityIT Project Charter ForStudent Degree ProgressVersion.docx
Regatta UniversityIT Project Charter ForStudent Degree ProgressVersion.docxRegatta UniversityIT Project Charter ForStudent Degree ProgressVersion.docx
Regatta UniversityIT Project Charter ForStudent Degree ProgressVersion.docx
larry345678
 
Find an example of a real project with a real project manager. The pr.pdf
Find an example of a real project with a real project manager. The pr.pdfFind an example of a real project with a real project manager. The pr.pdf
Find an example of a real project with a real project manager. The pr.pdf
infomalad
 
1 2. project management
1 2. project management1 2. project management
1 2. project management
akashsaini8
 
Project Scope StatementProject NameStudent NameDateI.docx
Project Scope StatementProject NameStudent NameDateI.docxProject Scope StatementProject NameStudent NameDateI.docx
Project Scope StatementProject NameStudent NameDateI.docx
wkyra78
 

Similar a Project Management Project Assignment - Project Schedule & Resource Allocation Plan (20)

Project Plan For A Project Management Project
Project Plan For A Project Management ProjectProject Plan For A Project Management Project
Project Plan For A Project Management Project
 
ERP/SAP Project Charter
ERP/SAP Project CharterERP/SAP Project Charter
ERP/SAP Project Charter
 
Project-Scope-Statement
Project-Scope-StatementProject-Scope-Statement
Project-Scope-Statement
 
The simplified project management process it-toolkits
The simplified project management process   it-toolkitsThe simplified project management process   it-toolkits
The simplified project management process it-toolkits
 
Assignment 1 ITECH 2250 IT Project Management Techniques.docx
Assignment 1 ITECH 2250 IT Project Management Techniques.docxAssignment 1 ITECH 2250 IT Project Management Techniques.docx
Assignment 1 ITECH 2250 IT Project Management Techniques.docx
 
Project Management Framework
Project Management FrameworkProject Management Framework
Project Management Framework
 
Pmp project management professional free sample
Pmp project management professional free samplePmp project management professional free sample
Pmp project management professional free sample
 
Hello Class- This is a very rough draft of the assignment. I have
Hello Class- This is a very rough draft of the assignment. I have Hello Class- This is a very rough draft of the assignment. I have
Hello Class- This is a very rough draft of the assignment. I have
 
Project Charter - Outreach Events for the Company
Project Charter - Outreach Events for the CompanyProject Charter - Outreach Events for the Company
Project Charter - Outreach Events for the Company
 
Regatta UniversityIT Project Charter ForStudent De.docx
Regatta UniversityIT Project Charter ForStudent De.docxRegatta UniversityIT Project Charter ForStudent De.docx
Regatta UniversityIT Project Charter ForStudent De.docx
 
Project Management Kickoff Meeting Template Powerpoint Presentation Slides
Project Management Kickoff Meeting Template Powerpoint Presentation SlidesProject Management Kickoff Meeting Template Powerpoint Presentation Slides
Project Management Kickoff Meeting Template Powerpoint Presentation Slides
 
Cmgt 410 cmgt410 cmgt 410 education for service uopstudy.com
Cmgt 410 cmgt410 cmgt 410 education for service   uopstudy.comCmgt 410 cmgt410 cmgt 410 education for service   uopstudy.com
Cmgt 410 cmgt410 cmgt 410 education for service uopstudy.com
 
The Effective Management of Time
The Effective Management of TimeThe Effective Management of Time
The Effective Management of Time
 
Regatta UniversityIT Project Charter ForStudent Degree ProgressVersion.docx
Regatta UniversityIT Project Charter ForStudent Degree ProgressVersion.docxRegatta UniversityIT Project Charter ForStudent Degree ProgressVersion.docx
Regatta UniversityIT Project Charter ForStudent Degree ProgressVersion.docx
 
Find an example of a real project with a real project manager. The pr.pdf
Find an example of a real project with a real project manager. The pr.pdfFind an example of a real project with a real project manager. The pr.pdf
Find an example of a real project with a real project manager. The pr.pdf
 
1 2. project management
1 2. project management1 2. project management
1 2. project management
 
Project Management Kickoff Meeting Template PowerPoint Presentation Slides
Project Management Kickoff Meeting Template PowerPoint Presentation SlidesProject Management Kickoff Meeting Template PowerPoint Presentation Slides
Project Management Kickoff Meeting Template PowerPoint Presentation Slides
 
D07 Project Charter
D07 Project CharterD07 Project Charter
D07 Project Charter
 
Project Scope StatementProject NameStudent NameDateI.docx
Project Scope StatementProject NameStudent NameDateI.docxProject Scope StatementProject NameStudent NameDateI.docx
Project Scope StatementProject NameStudent NameDateI.docx
 
Day 2 scope
Day 2 scopeDay 2 scope
Day 2 scope
 

Último

Vishram Singh - Textbook of Anatomy Upper Limb and Thorax.. Volume 1 (1).pdf
Vishram Singh - Textbook of Anatomy  Upper Limb and Thorax.. Volume 1 (1).pdfVishram Singh - Textbook of Anatomy  Upper Limb and Thorax.. Volume 1 (1).pdf
Vishram Singh - Textbook of Anatomy Upper Limb and Thorax.. Volume 1 (1).pdf
ssuserdda66b
 

Último (20)

Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the Classroom
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
Vishram Singh - Textbook of Anatomy Upper Limb and Thorax.. Volume 1 (1).pdf
Vishram Singh - Textbook of Anatomy  Upper Limb and Thorax.. Volume 1 (1).pdfVishram Singh - Textbook of Anatomy  Upper Limb and Thorax.. Volume 1 (1).pdf
Vishram Singh - Textbook of Anatomy Upper Limb and Thorax.. Volume 1 (1).pdf
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structure
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
Spatium Project Simulation student brief
Spatium Project Simulation student briefSpatium Project Simulation student brief
Spatium Project Simulation student brief
 

Project Management Project Assignment - Project Schedule & Resource Allocation Plan

  • 1. Confidential Project Schedule & Resource Allocation Plan Shuchi Dubey Walden University Dr. Deanna Romano EDUC-6145-2, Project Management in Education & Training 07/29/2012
  • 2. Project Schedule & Resource Allocation Plan Confidential Page 2 7/30/2012 Project Name Online Performance Support System/ 4- Phases Department Training & Development Focus Area Creating an online performance support system for Widgemart Group managers and associates Project Manager/Lead Instructional Designer Davey Jones Prepared By Document Owner(s) Project/Organization Role Davey Jones Project Manager/ Lead Instructional Designer Project Schedule Version Control Version Date Author Change Description V.0 07/29/2012 Davey Jones Project Schedule & Resource Allocation Plan
  • 3. Project Schedule & Resource Allocation Plan Confidential Page 3 7/30/2012 TABLE OF CONTENTS 1 PROJECT SCHEDULE PURPOSE......................................................................................... 4 1.1 Resource allocation & Cost Estimation....................................................................... 4 1.2 Project Assumptions ................................................................................................... 7 2 GANTT CHART ....................................................................................................................... 8 3 RESPONSIBILITIES/ACCOUNTABILITY MATRIX................................................................ 9 4 SIGNATURES.......................................................................................................................... 9 5 REFERENCES....................................................................................................................... 10
  • 4. Project Schedule & Resource Allocation Plan Confidential Page 4 7/30/2012 1 PROJECT SCHEDULE PURPOSE The following document’s purpose is to provide a detailed overview of the project schedule and cost estimation related to the tasks and resources/team members that will be working in the design and development of training deliverables for Widgemart EPSS training. This document contains schedule details related to start and end dates of the project and tracking information related to when each task/activity should begin and end. This document is provides you reference on the project schedule’s Gantt chart that illustrates the start and finish dates of the activities. Besides showing the activity start, duration, and completion part of the schedule, the Gantt chart also shows the connection between activities and the calendar, and provides a graphical representation of the activity duration. In addition, this document will serve as a contract between the Project Team of Widgemart and the Widgmart Project Sponsors, stating what will be delivered according to the budget, time constraints, risks, resources, and standards agreed upon for the project. 1.1 Resource allocation & Cost Estimation This training will enable managers and associates to perform efficiently in their various job roles and responsibilities. The training is also divided into four phases and following table provides information related to the assigned tasks with no. of hours and the total cost that will take to complete the project and which resource is responsible for what task. Phase 1: Online QDs – Activity/ Task Resource: ID – Davey (hourly rate: $25) Hours worked Resource: SME – Josie (hourly rate: $30) Hours Worked Resource: Client/ Reviewer – Ellen (hourly rate: $40) Hours worked Resource: Translation & Change Management: Tim & Barry (hourly rate: $20 + $20) Hours worked No. of hours Total Cost Sub-task 1 - Project Charter & Scope 4 3 1 1 8 $270 Sub-task 2 - Course Analysis 4 3 1 1 8 $270 Sub-task 3 - Scripting for QDs 40 5 - - 45 $1150 Sub-task 4 - Script Approval 3 1 3 1 8 $265 Sub- task 5 - Revise/Edit Script 5 2 - 1 8 $255 Sub-task 6 - 24 - - - 24 $600
  • 5. Project Schedule & Resource Allocation Plan Confidential Page 5 7/30/2012 QD Development Sub-task 7 - Final review/QD Pilot - - 16 - 16 $640 Sub-task 8 - Final review/updates 8 8 $200 Sub-task 9 - QA Review/ EPSS Upload 8 (Widgemart EPSS Support) $0 Phase 2: Training Repository- Activity/Task Sub-task 1 - Create Help Script 16 16 $400 Sub-task 2 - Edit review 4 3 1 1 8 $270 Sub-task 3- Client review/updates 24 24 $960 Help Upload - - - - Upload to be done on Widgemart EPSS - Phase 3: Job Aid Function Sub-task 1 - Scripting Quick Reference Guides (QRG) 32 - - - 32 $256 Sub-task 2 - Edit Review QRG 15 3 3 3 24 $705 Sub-task 3 - Client review/updates 24 - Sub-sub- task 1 - Client - - 16 - 16 $640
  • 6. Project Schedule & Resource Allocation Plan Confidential Page 6 7/30/2012 Review - Sub-sub- task 2 - QA Review/ EPSS Upload - - - - 8 (Widgemart EPSS Support) $0 Phase 4: WBT Training Sub-task 1 - Scripting for Manager WBT 40 - - - 40 $1000 Sub-task 2 - Script Approval - 8 8 - 16 $560 Sub- task 3 - Revise/Edit Script 5 2 - 1 8 $450 Sub-task 4 - Scripting for Associate WBT 40 - - - 40 $1000 Sub-task 5 - Script Approval - 8 8 - 16 $560 Sub- task 6 - Revise/Edit Script 5 2 - 1 8 $450 Sub-task 6 - WBT Development - -- - - 56 (Contract given to a course development company) TBD Sub-task - Course Pilot - - - - 8 Sub-task - Final review/updates 4 8 (4 hr effort for Graphic change/updates – TBD) $550 Sub-task - WBT Upload - - - - 8 (Widgemart EPSS Support) $0
  • 7. Project Schedule & Resource Allocation Plan Confidential Page 7 7/30/2012 1.2 Project Assumptions Resource Assumptions:  Audience are expected to be fluent in English and will be available for the scheduled trainings  Audience are expected to be computer literate and have basic PC skills  Audience will require to Adobe Flash and Acrobat Reader for viewing videos and to access PDF files of the various User/Quick Reference Guides.  Audience should have access to EPSS for the training quick demos that will be incorporated within the EPSS system  A significant percentage of audience will be experienced with the technical environment, such how to access the EPSS and how browse through the basic navigation of the tool Delivery Assumptions:  Deliverables will be subject to no more than a specific number of review cycles  Rework related to client/SME feedback or change request: - Minimal Rework. Would have a minimal impact on the workload. Typically less than 3% of the total work. - Some Rework: There would be a requirement for additional work however it could still be accommodated within the existing timeframes. Typically no more than 10% of the total project would need to be reviewed and possibly reworked, or additional work undertaken. - Medium Rework: There would be either additional resources required, or the finish date would need to be adjusted. Up to 30% of the project would need to be reviewed and potentially reworked or additional work undertaken. - Significant Rework: A major impact on the project with more than 30% of the project work needing to be reviewed and changed, or additional work undertaken.  Training Equipment and software applications that are required to be used in the project are known and can be expected to be met. Budgetary Assumptions:  The statistics used in preparing the project cost estimates are accurate within a given percent.  No outside consultation related to the subject matter will be required, such as assistance of SME or outside consultation will be limited to a specified number of days at a specified rate per day. Environmental Assumptions  Issues related to the project will be resolved in a timely manner.  Systems components will be capable of being integrated with minimum rework.
  • 8. Project Schedule & Resource Allocation Plan Confidential Page 8 7/30/2012 2 Gantt Chart Below is displayed the illustrated project schedule Gantt Chart of this course project. Click on the icon to view the detailed chart of the Project Schedule: Online Performance Support System Proje
  • 9. Project Schedule & Resource Allocation Plan Confidential Page 9 7/30/2012 3 Responsibilities/Accountability Matrix Displayed below is the Responsibility/Accountability Matrix providing details related to who will do what on the project team. Responsibility/Accountability Matrix Task/Phase Person -> Davey Ellen Josie Tim Barry Needs Assessment & Project Analysis A P P P P Create Project Plan A S, I I I I Create Deliverable Specifications A, P S R I I Deliverables, Testing & Implementation A, P S, I P, R P, R P P = Participate A = Accountable R = Review I = Input Required S = Sign-off Required 4 Signatures The following people agree that the above information is accurate: Project Team members Project/Organization Role Davey Jones Project Manager/ Lead Instructional Designer Ellen Project Administrator Josie Acquisition Manager Tim Translation Expert Barry Internal Marketing & Change Management Prepared by _________Davey Jones_________________________ Project Manager Approved by _________WidgetMart_Group_______________________ Project Sponsor
  • 10. Project Schedule & Resource Allocation Plan Confidential Page 10 7/30/2012 5 References Etmer, A. P., & Quinn, J. (2007). The ID Casebook: Case studies in instructional Design (3rd Ed.). Upper Saddle River: NJ, Pearson Education, Inc. Greer, M. (2010). The project Management Minimalist: Just Enough PM to Rock Your Projects. Retrieved from https://class.waldenu.edu/bbcswebdav/institution/USW1/201260_04/MS_INDT/EDUC_ 6145/Week%201/Course%20Project/Week%201%20Course%20Project/embedded/pm- minimalist-ver-3-laureate.pdf Portny, E. S., Mantel, J. S., Meredith, R. J., Shafer, M. S., Sutton, M. M., & Kramer, E. B. (2008). Project Management: Planning, scheduling, and controlling projects. River Street, Hoboken: NJ, John Wiley & Sons Inc.