Course contents
• What is a HAZOP Study?
• Definition of basic terms
• Risk matrix/ALARP principle
• When to Perform a HAZOP Study
• Different stages of Hazop study and
relevant Data requirement
• HAZOP STUDY - TEAM COMPOSITION
• Generally accepted rules of HAZOP
• Overall HAZOP Methodology
• Layers of protection/Safeguard
• Hierarchy of controls (with simple example)
• HAZOP Study-Example
• Relation between HAZOP and LOPA
• Brief introduction to LOPA
HAZARD AND OPERABILITY STUDY
Brainstorming,
Multidisciplinary Team
Approach
Structured Using Guide
Words
Problem Identifying Cost Effective
Basic terms definitions
HAZARD
Any thing which has
potential to cause
harm to people, asset,
Environment or/and
reputation
Risk
Risk= Frequency *
consequence
Frequency= Probability
of Event occurring
consequence= extent of
effect on people, asset,
Environment, reputation
Consequence
5
Multiple fatalities / constant breach of regulatory limits / plant outage more than a month(>
Rs. 10 crore) / International impact
4
Single fatality / short term breaches of reglatory limits / 1 week to 1 month for the unit (< Rs.
10 crore) / Major Impact. On National TV/National Press
3
More than one MTC or LTI or Health Effect/Localized Effect Has significant Impact on
Environment but no
2
one LTI or MTC or Health Effect for One Person / Minor Effect. Has Impact on Environment but
no permanent effect / 12 hrs to 48 hrs
1
Minor injury (First Aid Case) or Health Effect/Slight Effect. 100% Cleanup possible/Less than
12 hour outage for single section (within 1
Likelihood/Frequency
A
more than 100 years (never
heard of the incident)
B
once in 100 years (heard of the
incident in the industry)
C
once in 20 years (incident has
occured in the company)
D
once in 4 years (happened
several times in the company)
E
Happens more than two times
per year.
RISK ASSESSMENT MATRIX (RAM)
CONSEQUENCE LIKELIHOOD
Rating
Severity
People
Equipment
damage
Production
loss
Environment
Reputation
A B C D E
More than100
years (Never
heard of the
incident)
Once in 100
years (Heard of
Incident in
Industry)
Once in 20
years (Incident
has occurred in
Our Company)
Once in 4 years
(Happened
several times in
the Company)
More than once
in a year
5
Catastrophic
Multiple worker
fatalities /
permanent total
disabilities or single
public fatality
Extensive
damage,
prolonged loss of
production or >
Rs. 10 Crore
More than a
month of outage
for one unit
Massive effect over
a large area or
constant breach of
regulatory limits
International impact.
Adverse attention in
International media
5A 5B 5C 5D 5E
4
Major
Single worker
fatality / Permanent
disability or serious
injury to public
Major damage,
disruption to
operations or <
Rs. 10 Crore
More than one
week to one
month outage
for one unit
Major Effect, Short
term breaches of
regulatory limits
Major Impact. On
National TV /
National Press
4A 4B 4C 4D 4E
3
Serious
More than one LTI Local damage,
unit shutdown or
< Rs. 1 Crore
48 hrs. to one
week outage for
one unit
Localized effect.
Has significant
impact on
Environment but no
permanent effect
Considerable
impact. Major
concern in National
Press / Local TV
3A 3B 3C 3D 3E
2
Minor
One Loss Time
Incident (LTI)
Minor damage or
< Rs. 50 Lakhs
24 hrs. to 48
hrs. outage for
one unit
Minor effect, has
impact on
Environment but no
permanent effect
Limited impact.
Public concern in
neighborhood.
Reported in local
newspaper
2A 2B 2C 2D 2E
1
Notable
Slight injuries (First
aid case) / Short
term effect
Slight damage or
< Rs. 10 Lakhs
Less than 24
hours
Slight effect; 100%
cleanup possible
Slight impact, Public
awareness exists, no
public concern 1A 1B 1C 1D 1E
Demonstrate
ALARP
Incorporate Risk
Reduction
Measures
Manage for
Continuous
Improvement
Intolerable
Zone
ALARP PRINCIPLE
“As Low As Reasonably Practicable”
▪ Involves weighing risk against the
trouble, time and money to control
▪ Describes level to which workplace risk
is to be controlled.
▪ Not prescriptive
▪ Challenging because it requires
employers to exercise judgment.
What is Acceptable Risk?
We accept/ tolerate risk when:
1. We don’t know that it exists
2. The Risk is insignificantly low
3. When it’s worth the Risk (?)
Tools for Process Hazard Identification
What if
Analysis?
HAZOP FMEA ETA
FTA
Safety
Audit
Compliance
Audit
HAZARD AND OPERABILITY STUDY
Brainstorming,
Multidisciplinary Team
Approach
Structured Using Guide
Words
Problem Identifying Cost Effective
HAZOP STUDY - TEAM COMPOSITION
A Team Leader, an expert in the HAZOP Technique
Technical Members, for example
New Design Existing Plant
Design or Project Engineer Plant Superintendent
Process Engineer Process Supervisor (Foreman)
Commissioning Manager Maintenance Engineer
Instrument Design Engineer Instrument Engineer
Chemist Technical Engineer
HAZOP PREPLANNING ISSUES
Preplanning issues addressed in a typical refinery unit HAZOP include the
following:
Verification of as-built
conditions shown on
the P&IDs
Line segment
boundaries set;
markup of P&IDs
• P&IDs (base study
document)
• Process flow
diagrams (PFDs)
• Process description • Operating
manuals/procedures
Recording technique
(computer program or
data sheet)
determination
Arrange for system or
process briefings for
team before work
begins.
Golden Rules of HAZOP
• HAZOP does not challenge the design for normal operating conditions. All equipments are assumed to be well
designed, manufactured and properly inspected. Plant are well maintained in accordance with the standard.
• Deviations resulting from two or more independent events that occur concurrently were generally not considered
unless one of the events had a high probability rating and the consequences of the resulting event was high
• All of the valves and Blinds are assumed to be in correct position.
• shown in the P&IDs as open or closed are normally in the position shown
• Non process causes are not reviewed in HAZOP (e.g. storm, hurricane, Dropped Objects, external impacts /
Sabotage)
• Consequences are reviewed without any safeguards (No human response, No SIF, No mechanical barrier).
• Consequences are described at least up to the initial physical event (leakage, LOC, Off spec, etc.)
Golden Rules of HAZOP
• In each scenario where various degrees of severity are possible, such as the failure of a pump seal, the
maximum consequence of the event was used to determine both the likelihood and consequence.
• No escalation assessment is reviewed during the HAZOP (No F&G review, Layout, Safety distances etc.
• Manual Valve closure / Opening due to operator error should not be considered as credible
scenario.(The operator error frequency rates assume that the processes are operated by trained
operators and written instructions are followed where they are available.)
• Credit can be given to (Alarm & Operator response) only for Normal operating task.
• Credit cannot be given to (Alarm & Operator Response) for emergency response.
• Single check valve is adequate unless reverse flow may cause pressure to exceed test pressure.
• Mechanical Protection devices such as PSV / RD are expected to work.
• Operating instruction and operating manuals shall be considered as effective safeguard.
Defining the Nodes
• A NODE is the selection of one or more items of equipment as a focal point of study.
• A node could be as small as a line, a pump, a vessel or a heat exchanger or as large as an entire
process plant.
In the early method of assigning node, each of the lines entering and leaving the vessel was treated as a
separate node. The vessel itself was not treated as a separate node because it was considered to be
adequately addressed by applying deviations to the entry and exit lines.
The method of defining nodes at present day is to define compound nodes. For example, Feed piping
from a feed vessel, a centrifugal pump, a control valve set and a heat exchanger supplying a reactor
vessel would be considered as a single node.
Defining the Nodes
Greater the familiarity and confidence are with the HAZOP methodology; the node size can be
increased to include more equipment. Just as small node sizes are inefficient, very large node sizes may
also be inefficient. In general, the optimum node size can include multiple items of equipment,
provided, that they share a common function
HAZOP Methodology
Guide Word – Parameter Pairs
LOPA ONION-
SAFE GUARDS
PFDs for IPLs adapted from CCPS
Control
Measures
priority
What is the consequence ???
RISK ASSESSMENT MATRIX (RAM)
CONSEQUENCE LIKELIHOOD
Rating
Severity
People
Equipment
damage
Production
loss
Environment
Reputation
A B C D E
More than100
years (Never
heard of the
incident)
Once in 100
years (Heard of
Incident in
Industry)
Once in 20
years (Incident
has occurred in
Our Company)
Once in 4 years
(Happened
several times in
the Company)
More than once
in a year
5
Catastrophic
Multiple worker
fatalities /
permanent total
disabilities or single
public fatality
Extensive
damage,
prolonged loss of
production or >
Rs. 10 Crore
More than a
month of outage
for one unit
Massive effect over
a large area or
constant breach of
regulatory limits
International impact.
Adverse attention in
International media
5A 5B 5C 5D 5E
4
Major
Single worker
fatality / Permanent
disability or serious
injury to public
Major damage,
disruption to
operations or <
Rs. 10 Crore
More than one
week to one
month outage
for one unit
Major Effect, Short
term breaches of
regulatory limits
Major Impact. On
National TV /
National Press
4A 4B 4C 4D 4E
3
Serious
More than one LTI Local damage,
unit shutdown or
< Rs. 1 Crore
48 hrs. to one
week outage for
one unit
Localized effect.
Has significant
impact on
Environment but no
permanent effect
Considerable
impact. Major
concern in National
Press / Local TV
3A 3B 3C 3D 3E
2
Minor
One Loss Time
Incident (LTI)
Minor damage or
< Rs. 50 Lakhs
24 hrs. to 48
hrs. outage for
one unit
Minor effect, has
impact on
Environment but no
permanent effect
Limited impact.
Public concern in
neighborhood.
Reported in local
newspaper
2A 2B 2C 2D 2E
1
Notable
Slight injuries (First
aid case) / Short
term effect
Slight damage or
< Rs. 10 Lakhs
Less than 24
hours
Slight effect; 100%
cleanup possible
Slight impact, Public
awareness exists, no
public concern 1A 1B 1C 1D 1E
Demonstrate
ALARP
Incorporate Risk
Reduction
Measures
Manage for
Continuous
Improvement
Intolerable
Zone
Additional PT’s with
2oo3 Logic closing XV-
100 and PV-200
XV-100
Discrepancy alarm
Low and High alarm in
Each PT’s
Hazop Example
HAZOP Planning and Execution
TEAM
System
Assessment
Team Activity
PLAN
Select Team
Examine System
Keywords
CLOSE OUT
Record/File
Completed
Actions
TRACK
ACTIONS
HAZOP
Review
Meeting
REPORT
Action List
HAZOP
Report
58
Relation between HAZOP and LOPA
LOPA ONION-
SAFE GUARDS
Training Academy
training@ifluids.com
info@ifluids.com

Más contenido relacionado

La actualidad más candente

HZOP-HAZID Presentation by Tony
HZOP-HAZID Presentation by TonyHZOP-HAZID Presentation by Tony
HZOP-HAZID Presentation by TonyAnthony Izegaegbe
 
27 hydrostatic pressure testing inside buildings risk assessment templates
27 hydrostatic pressure testing inside buildings risk assessment templates27 hydrostatic pressure testing inside buildings risk assessment templates
27 hydrostatic pressure testing inside buildings risk assessment templatesDwarika Bhushan Sharma
 
Commissioning of Industrial Projects - Cost Estimating Considerations
Commissioning of Industrial Projects - Cost Estimating ConsiderationsCommissioning of Industrial Projects - Cost Estimating Considerations
Commissioning of Industrial Projects - Cost Estimating ConsiderationsDoina Dobre, P.Eng, GSC
 
The mexico city explosion of 1984
The mexico city explosion of 1984The mexico city explosion of 1984
The mexico city explosion of 1984Mohit Nayal
 
Truck loading and unloading technical specification
Truck loading and unloading technical specificationTruck loading and unloading technical specification
Truck loading and unloading technical specificationCARLOS RUIZ CARDENAS
 
Process Safety Management System
Process Safety Management SystemProcess Safety Management System
Process Safety Management SystemACM Facility Safety
 
Introduction to PSM Online Interactive Training
Introduction to PSM Online Interactive TrainingIntroduction to PSM Online Interactive Training
Introduction to PSM Online Interactive TrainingJohn Kingsley
 
Piper Alpha Disaster Report
Piper Alpha Disaster ReportPiper Alpha Disaster Report
Piper Alpha Disaster ReportAhmad El Tawil
 
Ioc jaipur oil storage depot incident
Ioc jaipur oil storage depot incidentIoc jaipur oil storage depot incident
Ioc jaipur oil storage depot incidentHarshithGade
 
Piping Hydrostatic Test / Hydrotesting
Piping Hydrostatic Test / HydrotestingPiping Hydrostatic Test / Hydrotesting
Piping Hydrostatic Test / HydrotestingAbhijeet Nagle
 
Hazardous energy isolation
Hazardous energy isolationHazardous energy isolation
Hazardous energy isolationPaul Buyink
 
Seminar- Process Safety Management_.pptx
Seminar- Process Safety Management_.pptxSeminar- Process Safety Management_.pptx
Seminar- Process Safety Management_.pptxMoonJ3
 
Risk Assessment Example.pdf
Risk Assessment Example.pdfRisk Assessment Example.pdf
Risk Assessment Example.pdfBalamuruganD26
 

La actualidad más candente (20)

Process safety managment
Process safety managmentProcess safety managment
Process safety managment
 
HZOP-HAZID Presentation by Tony
HZOP-HAZID Presentation by TonyHZOP-HAZID Presentation by Tony
HZOP-HAZID Presentation by Tony
 
27 hydrostatic pressure testing inside buildings risk assessment templates
27 hydrostatic pressure testing inside buildings risk assessment templates27 hydrostatic pressure testing inside buildings risk assessment templates
27 hydrostatic pressure testing inside buildings risk assessment templates
 
Commissioning of Industrial Projects - Cost Estimating Considerations
Commissioning of Industrial Projects - Cost Estimating ConsiderationsCommissioning of Industrial Projects - Cost Estimating Considerations
Commissioning of Industrial Projects - Cost Estimating Considerations
 
The mexico city explosion of 1984
The mexico city explosion of 1984The mexico city explosion of 1984
The mexico city explosion of 1984
 
Hazop method
Hazop methodHazop method
Hazop method
 
Scaffold safe work method statement
Scaffold safe work method statementScaffold safe work method statement
Scaffold safe work method statement
 
Truck loading and unloading technical specification
Truck loading and unloading technical specificationTruck loading and unloading technical specification
Truck loading and unloading technical specification
 
Process Safety Management System
Process Safety Management SystemProcess Safety Management System
Process Safety Management System
 
Introduction to PSM Online Interactive Training
Introduction to PSM Online Interactive TrainingIntroduction to PSM Online Interactive Training
Introduction to PSM Online Interactive Training
 
SAFETY COMMITTEE.pdf
SAFETY COMMITTEE.pdfSAFETY COMMITTEE.pdf
SAFETY COMMITTEE.pdf
 
Piper Alpha Disaster Report
Piper Alpha Disaster ReportPiper Alpha Disaster Report
Piper Alpha Disaster Report
 
Presentation hazop introduction
Presentation hazop introductionPresentation hazop introduction
Presentation hazop introduction
 
Environment Training
Environment TrainingEnvironment Training
Environment Training
 
Ioc jaipur oil storage depot incident
Ioc jaipur oil storage depot incidentIoc jaipur oil storage depot incident
Ioc jaipur oil storage depot incident
 
Piping Hydrostatic Test / Hydrotesting
Piping Hydrostatic Test / HydrotestingPiping Hydrostatic Test / Hydrotesting
Piping Hydrostatic Test / Hydrotesting
 
Hazardous energy isolation
Hazardous energy isolationHazardous energy isolation
Hazardous energy isolation
 
What is a LOPA?
What is a LOPA?What is a LOPA?
What is a LOPA?
 
Seminar- Process Safety Management_.pptx
Seminar- Process Safety Management_.pptxSeminar- Process Safety Management_.pptx
Seminar- Process Safety Management_.pptx
 
Risk Assessment Example.pdf
Risk Assessment Example.pdfRisk Assessment Example.pdf
Risk Assessment Example.pdf
 

Similar a Hazop Training - Intermediate Level Course iFluids

Hazard and Operability Study (HAZOP) | Gaurav Singh Rajput
Hazard and Operability Study (HAZOP) | Gaurav Singh RajputHazard and Operability Study (HAZOP) | Gaurav Singh Rajput
Hazard and Operability Study (HAZOP) | Gaurav Singh RajputGaurav Singh Rajput
 
HAZOP (Hazard & Operability) Study.pdf
HAZOP (Hazard & Operability) Study.pdfHAZOP (Hazard & Operability) Study.pdf
HAZOP (Hazard & Operability) Study.pdfiFluidsEngineering1
 
HAZOP ppt for chambal urea -1.pptx
HAZOP ppt for chambal urea -1.pptxHAZOP ppt for chambal urea -1.pptx
HAZOP ppt for chambal urea -1.pptxvidhyasagarverma
 
Hazop Fundamentals Online Training iFluids
Hazop Fundamentals Online Training iFluidsHazop Fundamentals Online Training iFluids
Hazop Fundamentals Online Training iFluidsJohn Kingsley
 
Hazop group 7
Hazop   group 7Hazop   group 7
Hazop group 7Xin Yi
 
industrial safety and hazar
industrial safety and hazarindustrial safety and hazar
industrial safety and hazarmannukumar24
 
HAZOP Module.pptx
HAZOP Module.pptxHAZOP Module.pptx
HAZOP Module.pptxakaash13
 
HAZOP AND OPERABILITY STUDY
HAZOP AND OPERABILITY STUDY HAZOP AND OPERABILITY STUDY
HAZOP AND OPERABILITY STUDY damomech92
 
Common problems and recent trends with HAZOPs
Common problems and recent trends with HAZOPsCommon problems and recent trends with HAZOPs
Common problems and recent trends with HAZOPsAlan Munn
 
09.1 hazop studytrainingcourse
09.1 hazop studytrainingcourse09.1 hazop studytrainingcourse
09.1 hazop studytrainingcoursejoepaulnelson
 
INTRODUCTION & BASIS OF HAZOP
INTRODUCTION & BASIS OF HAZOPINTRODUCTION & BASIS OF HAZOP
INTRODUCTION & BASIS OF HAZOPNimra Nayyar
 
Functional safety certification guide
Functional safety certification guideFunctional safety certification guide
Functional safety certification guideMohammed Majid Khan
 
22801434-HAZOP-Training.pdf
22801434-HAZOP-Training.pdf22801434-HAZOP-Training.pdf
22801434-HAZOP-Training.pdfssuser6c7f421
 

Similar a Hazop Training - Intermediate Level Course iFluids (20)

2.pptx
2.pptx2.pptx
2.pptx
 
Hazard and Operability Study (HAZOP) | Gaurav Singh Rajput
Hazard and Operability Study (HAZOP) | Gaurav Singh RajputHazard and Operability Study (HAZOP) | Gaurav Singh Rajput
Hazard and Operability Study (HAZOP) | Gaurav Singh Rajput
 
HAZOP (Hazard & Operability) Study.pdf
HAZOP (Hazard & Operability) Study.pdfHAZOP (Hazard & Operability) Study.pdf
HAZOP (Hazard & Operability) Study.pdf
 
HAZOP ppt for chambal urea -1.pptx
HAZOP ppt for chambal urea -1.pptxHAZOP ppt for chambal urea -1.pptx
HAZOP ppt for chambal urea -1.pptx
 
Hazop Fundamentals Online Training iFluids
Hazop Fundamentals Online Training iFluidsHazop Fundamentals Online Training iFluids
Hazop Fundamentals Online Training iFluids
 
Hazop group 7
Hazop   group 7Hazop   group 7
Hazop group 7
 
industrial safety and hazar
industrial safety and hazarindustrial safety and hazar
industrial safety and hazar
 
HAZOP Module.pptx
HAZOP Module.pptxHAZOP Module.pptx
HAZOP Module.pptx
 
HAZOP AND OPERABILITY STUDY
HAZOP AND OPERABILITY STUDY HAZOP AND OPERABILITY STUDY
HAZOP AND OPERABILITY STUDY
 
Common problems and recent trends with HAZOPs
Common problems and recent trends with HAZOPsCommon problems and recent trends with HAZOPs
Common problems and recent trends with HAZOPs
 
hazopanalysis-.pdf
hazopanalysis-.pdfhazopanalysis-.pdf
hazopanalysis-.pdf
 
Hazop analysis
Hazop analysisHazop analysis
Hazop analysis
 
09.1 hazop studytrainingcourse
09.1 hazop studytrainingcourse09.1 hazop studytrainingcourse
09.1 hazop studytrainingcourse
 
Hazop analysis complete report
Hazop analysis complete reportHazop analysis complete report
Hazop analysis complete report
 
INTRODUCTION & BASIS OF HAZOP
INTRODUCTION & BASIS OF HAZOPINTRODUCTION & BASIS OF HAZOP
INTRODUCTION & BASIS OF HAZOP
 
What is HAZOP?
What is HAZOP?What is HAZOP?
What is HAZOP?
 
HAZOP and QRA.pptx
HAZOP and QRA.pptxHAZOP and QRA.pptx
HAZOP and QRA.pptx
 
Functional safety certification guide
Functional safety certification guideFunctional safety certification guide
Functional safety certification guide
 
22801434-HAZOP-Training.pdf
22801434-HAZOP-Training.pdf22801434-HAZOP-Training.pdf
22801434-HAZOP-Training.pdf
 
HAZOP.PPT
HAZOP.PPTHAZOP.PPT
HAZOP.PPT
 

Más de John Kingsley

Get yourself trained or Certified for IEC 62443 and other trainings.pdf
Get yourself trained or Certified for IEC 62443 and other trainings.pdfGet yourself trained or Certified for IEC 62443 and other trainings.pdf
Get yourself trained or Certified for IEC 62443 and other trainings.pdfJohn Kingsley
 
MODIFICATION OF EXISTING FACILITIES FOR 20% ETHANOL BLENDING
MODIFICATION OF EXISTING FACILITIES FOR 20% ETHANOL BLENDINGMODIFICATION OF EXISTING FACILITIES FOR 20% ETHANOL BLENDING
MODIFICATION OF EXISTING FACILITIES FOR 20% ETHANOL BLENDINGJohn Kingsley
 
Reliability, availability, maintainability (RAM) study, on reciprocating comp...
Reliability, availability, maintainability (RAM) study, on reciprocating comp...Reliability, availability, maintainability (RAM) study, on reciprocating comp...
Reliability, availability, maintainability (RAM) study, on reciprocating comp...John Kingsley
 
Introduction to oil and gas exploration and processing
Introduction to oil and gas exploration and processingIntroduction to oil and gas exploration and processing
Introduction to oil and gas exploration and processingJohn Kingsley
 
iFluids Engineering Introduction
iFluids Engineering IntroductioniFluids Engineering Introduction
iFluids Engineering IntroductionJohn Kingsley
 
iFluids Engineering Brochure
iFluids Engineering BrochureiFluids Engineering Brochure
iFluids Engineering BrochureJohn Kingsley
 
iFluids Engienering Capability Presentation
iFluids Engienering Capability PresentationiFluids Engienering Capability Presentation
iFluids Engienering Capability PresentationJohn Kingsley
 
Sil assessment Risk Graph and LOPA Training iFluids
Sil assessment Risk Graph and LOPA Training iFluidsSil assessment Risk Graph and LOPA Training iFluids
Sil assessment Risk Graph and LOPA Training iFluidsJohn Kingsley
 
John kingsley OT ICS SCADA Cyber security consultant
John kingsley OT ICS SCADA Cyber security consultantJohn kingsley OT ICS SCADA Cyber security consultant
John kingsley OT ICS SCADA Cyber security consultantJohn Kingsley
 
iFluids Lean Six Sigma Case Study oil & gas
iFluids Lean Six Sigma Case Study oil & gasiFluids Lean Six Sigma Case Study oil & gas
iFluids Lean Six Sigma Case Study oil & gasJohn Kingsley
 
iFluids Behaviour based safety services and training
iFluids Behaviour based safety services and trainingiFluids Behaviour based safety services and training
iFluids Behaviour based safety services and trainingJohn Kingsley
 
iFluids Tank Inspection services
iFluids Tank Inspection servicesiFluids Tank Inspection services
iFluids Tank Inspection servicesJohn Kingsley
 
iFluids Cybersecurity Seminar CIC Qatar 2018 Agenda
iFluids Cybersecurity Seminar  CIC Qatar 2018 AgendaiFluids Cybersecurity Seminar  CIC Qatar 2018 Agenda
iFluids Cybersecurity Seminar CIC Qatar 2018 AgendaJohn Kingsley
 
How to write a plant operating manual
How to write a plant operating manualHow to write a plant operating manual
How to write a plant operating manualJohn Kingsley
 
Case study of dcs upgrade how to reduce stress during execution
Case study of dcs upgrade how to reduce stress during executionCase study of dcs upgrade how to reduce stress during execution
Case study of dcs upgrade how to reduce stress during executionJohn Kingsley
 
Hydrocarbon leak detection in tank farms
Hydrocarbon leak detection in tank farmsHydrocarbon leak detection in tank farms
Hydrocarbon leak detection in tank farmsJohn Kingsley
 
Guide to specifying visual signals
Guide to specifying visual signalsGuide to specifying visual signals
Guide to specifying visual signalsJohn Kingsley
 
Introduction to bowtie : A barrier-based approach to risk
Introduction to bowtie : A barrier-based approach to riskIntroduction to bowtie : A barrier-based approach to risk
Introduction to bowtie : A barrier-based approach to riskJohn Kingsley
 
Flow assurance and surge analysis
Flow assurance and surge analysisFlow assurance and surge analysis
Flow assurance and surge analysisJohn Kingsley
 
What is pressure surge analysis
What is pressure surge analysisWhat is pressure surge analysis
What is pressure surge analysisJohn Kingsley
 

Más de John Kingsley (20)

Get yourself trained or Certified for IEC 62443 and other trainings.pdf
Get yourself trained or Certified for IEC 62443 and other trainings.pdfGet yourself trained or Certified for IEC 62443 and other trainings.pdf
Get yourself trained or Certified for IEC 62443 and other trainings.pdf
 
MODIFICATION OF EXISTING FACILITIES FOR 20% ETHANOL BLENDING
MODIFICATION OF EXISTING FACILITIES FOR 20% ETHANOL BLENDINGMODIFICATION OF EXISTING FACILITIES FOR 20% ETHANOL BLENDING
MODIFICATION OF EXISTING FACILITIES FOR 20% ETHANOL BLENDING
 
Reliability, availability, maintainability (RAM) study, on reciprocating comp...
Reliability, availability, maintainability (RAM) study, on reciprocating comp...Reliability, availability, maintainability (RAM) study, on reciprocating comp...
Reliability, availability, maintainability (RAM) study, on reciprocating comp...
 
Introduction to oil and gas exploration and processing
Introduction to oil and gas exploration and processingIntroduction to oil and gas exploration and processing
Introduction to oil and gas exploration and processing
 
iFluids Engineering Introduction
iFluids Engineering IntroductioniFluids Engineering Introduction
iFluids Engineering Introduction
 
iFluids Engineering Brochure
iFluids Engineering BrochureiFluids Engineering Brochure
iFluids Engineering Brochure
 
iFluids Engienering Capability Presentation
iFluids Engienering Capability PresentationiFluids Engienering Capability Presentation
iFluids Engienering Capability Presentation
 
Sil assessment Risk Graph and LOPA Training iFluids
Sil assessment Risk Graph and LOPA Training iFluidsSil assessment Risk Graph and LOPA Training iFluids
Sil assessment Risk Graph and LOPA Training iFluids
 
John kingsley OT ICS SCADA Cyber security consultant
John kingsley OT ICS SCADA Cyber security consultantJohn kingsley OT ICS SCADA Cyber security consultant
John kingsley OT ICS SCADA Cyber security consultant
 
iFluids Lean Six Sigma Case Study oil & gas
iFluids Lean Six Sigma Case Study oil & gasiFluids Lean Six Sigma Case Study oil & gas
iFluids Lean Six Sigma Case Study oil & gas
 
iFluids Behaviour based safety services and training
iFluids Behaviour based safety services and trainingiFluids Behaviour based safety services and training
iFluids Behaviour based safety services and training
 
iFluids Tank Inspection services
iFluids Tank Inspection servicesiFluids Tank Inspection services
iFluids Tank Inspection services
 
iFluids Cybersecurity Seminar CIC Qatar 2018 Agenda
iFluids Cybersecurity Seminar  CIC Qatar 2018 AgendaiFluids Cybersecurity Seminar  CIC Qatar 2018 Agenda
iFluids Cybersecurity Seminar CIC Qatar 2018 Agenda
 
How to write a plant operating manual
How to write a plant operating manualHow to write a plant operating manual
How to write a plant operating manual
 
Case study of dcs upgrade how to reduce stress during execution
Case study of dcs upgrade how to reduce stress during executionCase study of dcs upgrade how to reduce stress during execution
Case study of dcs upgrade how to reduce stress during execution
 
Hydrocarbon leak detection in tank farms
Hydrocarbon leak detection in tank farmsHydrocarbon leak detection in tank farms
Hydrocarbon leak detection in tank farms
 
Guide to specifying visual signals
Guide to specifying visual signalsGuide to specifying visual signals
Guide to specifying visual signals
 
Introduction to bowtie : A barrier-based approach to risk
Introduction to bowtie : A barrier-based approach to riskIntroduction to bowtie : A barrier-based approach to risk
Introduction to bowtie : A barrier-based approach to risk
 
Flow assurance and surge analysis
Flow assurance and surge analysisFlow assurance and surge analysis
Flow assurance and surge analysis
 
What is pressure surge analysis
What is pressure surge analysisWhat is pressure surge analysis
What is pressure surge analysis
 

Último

Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilVinayVitekari
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxmaisarahman1
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network DevicesChandrakantDivate1
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxSCMS School of Architecture
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiessarkmank1
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdfKamal Acharya
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesMayuraD1
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...drmkjayanthikannan
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptxrouholahahmadi9876
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Call Girls Mumbai
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 

Último (20)

Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech Civil
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 

Hazop Training - Intermediate Level Course iFluids

  • 2. Course contents • What is a HAZOP Study? • Definition of basic terms • Risk matrix/ALARP principle • When to Perform a HAZOP Study • Different stages of Hazop study and relevant Data requirement • HAZOP STUDY - TEAM COMPOSITION • Generally accepted rules of HAZOP • Overall HAZOP Methodology • Layers of protection/Safeguard • Hierarchy of controls (with simple example) • HAZOP Study-Example • Relation between HAZOP and LOPA • Brief introduction to LOPA
  • 3. HAZARD AND OPERABILITY STUDY Brainstorming, Multidisciplinary Team Approach Structured Using Guide Words Problem Identifying Cost Effective
  • 4. Basic terms definitions HAZARD Any thing which has potential to cause harm to people, asset, Environment or/and reputation
  • 5.
  • 6. Risk Risk= Frequency * consequence Frequency= Probability of Event occurring consequence= extent of effect on people, asset, Environment, reputation
  • 7. Consequence 5 Multiple fatalities / constant breach of regulatory limits / plant outage more than a month(> Rs. 10 crore) / International impact 4 Single fatality / short term breaches of reglatory limits / 1 week to 1 month for the unit (< Rs. 10 crore) / Major Impact. On National TV/National Press 3 More than one MTC or LTI or Health Effect/Localized Effect Has significant Impact on Environment but no 2 one LTI or MTC or Health Effect for One Person / Minor Effect. Has Impact on Environment but no permanent effect / 12 hrs to 48 hrs 1 Minor injury (First Aid Case) or Health Effect/Slight Effect. 100% Cleanup possible/Less than 12 hour outage for single section (within 1
  • 8. Likelihood/Frequency A more than 100 years (never heard of the incident) B once in 100 years (heard of the incident in the industry) C once in 20 years (incident has occured in the company) D once in 4 years (happened several times in the company) E Happens more than two times per year.
  • 9. RISK ASSESSMENT MATRIX (RAM) CONSEQUENCE LIKELIHOOD Rating Severity People Equipment damage Production loss Environment Reputation A B C D E More than100 years (Never heard of the incident) Once in 100 years (Heard of Incident in Industry) Once in 20 years (Incident has occurred in Our Company) Once in 4 years (Happened several times in the Company) More than once in a year 5 Catastrophic Multiple worker fatalities / permanent total disabilities or single public fatality Extensive damage, prolonged loss of production or > Rs. 10 Crore More than a month of outage for one unit Massive effect over a large area or constant breach of regulatory limits International impact. Adverse attention in International media 5A 5B 5C 5D 5E 4 Major Single worker fatality / Permanent disability or serious injury to public Major damage, disruption to operations or < Rs. 10 Crore More than one week to one month outage for one unit Major Effect, Short term breaches of regulatory limits Major Impact. On National TV / National Press 4A 4B 4C 4D 4E 3 Serious More than one LTI Local damage, unit shutdown or < Rs. 1 Crore 48 hrs. to one week outage for one unit Localized effect. Has significant impact on Environment but no permanent effect Considerable impact. Major concern in National Press / Local TV 3A 3B 3C 3D 3E 2 Minor One Loss Time Incident (LTI) Minor damage or < Rs. 50 Lakhs 24 hrs. to 48 hrs. outage for one unit Minor effect, has impact on Environment but no permanent effect Limited impact. Public concern in neighborhood. Reported in local newspaper 2A 2B 2C 2D 2E 1 Notable Slight injuries (First aid case) / Short term effect Slight damage or < Rs. 10 Lakhs Less than 24 hours Slight effect; 100% cleanup possible Slight impact, Public awareness exists, no public concern 1A 1B 1C 1D 1E Demonstrate ALARP Incorporate Risk Reduction Measures Manage for Continuous Improvement Intolerable Zone
  • 10. ALARP PRINCIPLE “As Low As Reasonably Practicable” ▪ Involves weighing risk against the trouble, time and money to control ▪ Describes level to which workplace risk is to be controlled. ▪ Not prescriptive ▪ Challenging because it requires employers to exercise judgment. What is Acceptable Risk? We accept/ tolerate risk when: 1. We don’t know that it exists 2. The Risk is insignificantly low 3. When it’s worth the Risk (?)
  • 11.
  • 12. Tools for Process Hazard Identification What if Analysis? HAZOP FMEA ETA FTA Safety Audit Compliance Audit
  • 13. HAZARD AND OPERABILITY STUDY Brainstorming, Multidisciplinary Team Approach Structured Using Guide Words Problem Identifying Cost Effective
  • 14. HAZOP STUDY - TEAM COMPOSITION A Team Leader, an expert in the HAZOP Technique Technical Members, for example New Design Existing Plant Design or Project Engineer Plant Superintendent Process Engineer Process Supervisor (Foreman) Commissioning Manager Maintenance Engineer Instrument Design Engineer Instrument Engineer Chemist Technical Engineer
  • 15. HAZOP PREPLANNING ISSUES Preplanning issues addressed in a typical refinery unit HAZOP include the following: Verification of as-built conditions shown on the P&IDs Line segment boundaries set; markup of P&IDs • P&IDs (base study document) • Process flow diagrams (PFDs) • Process description • Operating manuals/procedures Recording technique (computer program or data sheet) determination Arrange for system or process briefings for team before work begins.
  • 16. Golden Rules of HAZOP • HAZOP does not challenge the design for normal operating conditions. All equipments are assumed to be well designed, manufactured and properly inspected. Plant are well maintained in accordance with the standard. • Deviations resulting from two or more independent events that occur concurrently were generally not considered unless one of the events had a high probability rating and the consequences of the resulting event was high • All of the valves and Blinds are assumed to be in correct position. • shown in the P&IDs as open or closed are normally in the position shown • Non process causes are not reviewed in HAZOP (e.g. storm, hurricane, Dropped Objects, external impacts / Sabotage) • Consequences are reviewed without any safeguards (No human response, No SIF, No mechanical barrier). • Consequences are described at least up to the initial physical event (leakage, LOC, Off spec, etc.)
  • 17. Golden Rules of HAZOP • In each scenario where various degrees of severity are possible, such as the failure of a pump seal, the maximum consequence of the event was used to determine both the likelihood and consequence. • No escalation assessment is reviewed during the HAZOP (No F&G review, Layout, Safety distances etc. • Manual Valve closure / Opening due to operator error should not be considered as credible scenario.(The operator error frequency rates assume that the processes are operated by trained operators and written instructions are followed where they are available.) • Credit can be given to (Alarm & Operator response) only for Normal operating task. • Credit cannot be given to (Alarm & Operator Response) for emergency response. • Single check valve is adequate unless reverse flow may cause pressure to exceed test pressure. • Mechanical Protection devices such as PSV / RD are expected to work. • Operating instruction and operating manuals shall be considered as effective safeguard.
  • 18. Defining the Nodes • A NODE is the selection of one or more items of equipment as a focal point of study. • A node could be as small as a line, a pump, a vessel or a heat exchanger or as large as an entire process plant. In the early method of assigning node, each of the lines entering and leaving the vessel was treated as a separate node. The vessel itself was not treated as a separate node because it was considered to be adequately addressed by applying deviations to the entry and exit lines. The method of defining nodes at present day is to define compound nodes. For example, Feed piping from a feed vessel, a centrifugal pump, a control valve set and a heat exchanger supplying a reactor vessel would be considered as a single node.
  • 19. Defining the Nodes Greater the familiarity and confidence are with the HAZOP methodology; the node size can be increased to include more equipment. Just as small node sizes are inefficient, very large node sizes may also be inefficient. In general, the optimum node size can include multiple items of equipment, provided, that they share a common function
  • 21. Guide Word – Parameter Pairs
  • 23. PFDs for IPLs adapted from CCPS
  • 25.
  • 26.
  • 27. What is the consequence ???
  • 28.
  • 29.
  • 30.
  • 31. RISK ASSESSMENT MATRIX (RAM) CONSEQUENCE LIKELIHOOD Rating Severity People Equipment damage Production loss Environment Reputation A B C D E More than100 years (Never heard of the incident) Once in 100 years (Heard of Incident in Industry) Once in 20 years (Incident has occurred in Our Company) Once in 4 years (Happened several times in the Company) More than once in a year 5 Catastrophic Multiple worker fatalities / permanent total disabilities or single public fatality Extensive damage, prolonged loss of production or > Rs. 10 Crore More than a month of outage for one unit Massive effect over a large area or constant breach of regulatory limits International impact. Adverse attention in International media 5A 5B 5C 5D 5E 4 Major Single worker fatality / Permanent disability or serious injury to public Major damage, disruption to operations or < Rs. 10 Crore More than one week to one month outage for one unit Major Effect, Short term breaches of regulatory limits Major Impact. On National TV / National Press 4A 4B 4C 4D 4E 3 Serious More than one LTI Local damage, unit shutdown or < Rs. 1 Crore 48 hrs. to one week outage for one unit Localized effect. Has significant impact on Environment but no permanent effect Considerable impact. Major concern in National Press / Local TV 3A 3B 3C 3D 3E 2 Minor One Loss Time Incident (LTI) Minor damage or < Rs. 50 Lakhs 24 hrs. to 48 hrs. outage for one unit Minor effect, has impact on Environment but no permanent effect Limited impact. Public concern in neighborhood. Reported in local newspaper 2A 2B 2C 2D 2E 1 Notable Slight injuries (First aid case) / Short term effect Slight damage or < Rs. 10 Lakhs Less than 24 hours Slight effect; 100% cleanup possible Slight impact, Public awareness exists, no public concern 1A 1B 1C 1D 1E Demonstrate ALARP Incorporate Risk Reduction Measures Manage for Continuous Improvement Intolerable Zone
  • 32. Additional PT’s with 2oo3 Logic closing XV- 100 and PV-200 XV-100 Discrepancy alarm Low and High alarm in Each PT’s
  • 34.
  • 35.
  • 36.
  • 37.
  • 38.
  • 39.
  • 40.
  • 41.
  • 42.
  • 43.
  • 44.
  • 45.
  • 46.
  • 47.
  • 48.
  • 49.
  • 50.
  • 51.
  • 52.
  • 53.
  • 54.
  • 55.
  • 56.
  • 57.
  • 58. HAZOP Planning and Execution TEAM System Assessment Team Activity PLAN Select Team Examine System Keywords CLOSE OUT Record/File Completed Actions TRACK ACTIONS HAZOP Review Meeting REPORT Action List HAZOP Report 58
  • 60.
  • 61.