Plant Operating Manual is a guide for all the engineers who is involved in successfully
operating the plant. It is a responsibility of a process engineer working in Process Design field
to bring out the better manual which helps the operating team in start up, shutdown,
troubleshooting and optimization of the plant. Here is guidance for preparing a better plant
operating manual.
The task of writing plant manual categorized into two. One is for new plants and the other is
for plants that already running. For old plants there are already established systems and
procedures and for the modifications or revamps additional information has to be added,
which is a simple task. But writing the operating manual for new chemical plant is a
challenging task though already similar plants are running around the world. Let us will see
how to write operation manual for new plants here.
Most Process Engineers, specially the senior process engineers are required to write a plant
operating manual for a new greenfield project during their career. Mind you, this is quite
different from updating an existing operating manual for a brownfield project where the
scope of the project is modification and debottlenecking. Updation of an existing operating
manual is a simpler exercise compared to writing a new operating manual where you follow
the format of the existing operating manual and only provide an addendum to the existing
operating manual related to the scope of the project.
The real challenge lies in writing a new operating manual and that is where the experience of
the process engineer comes into fore.
In this article we have put across general guidelines on preparing a plant operating manual
based on our experience of writing a few of them. These guidelines are generic in nature and
do not subscribe to any company philosophy for writing an operating manual. These are the
basic minimum requirements to start writing an operating manual.
Contact john@ifluids.com (or) info@ifluids.com
Contact john@ifluids.com (or) info@ifluids.com , www.ifluids.com
Note: A typical OPM would consists of the following:Note: A typical OPM would consists of the following:Note: A typical OPM would consists of the following:Note: A typical OPM would consists of the following:
Section-1: 1.Process description of the facility
2.Details of Major equipments of the facility & functioning
3.Major instrumentation & control system
Section-2: Start up ( after a major turn around/ Cold start up/Hot start up)
;includes various check list like PTW closure;Ready for start up;availability of
utilities/upstream and downstream process units etc
Section-3: Normal operations (describe operations during normal steady state
operations)
Section-4: Shut down (describe planned shut down procedures)
Section-5: Emergency shut down ( describe about various emergency like
power/utility/facility/leaks/fire etc)
Section-6: Alarms,Trips and precautions
Section-7: Interlock system (cause and effect )
Section-8: Abnormal process conditions & Trouble shooting
Section-9: Safety (includes Hazardous situation/ MSDS/process safety/ personnel
safety etc)
Section-10: Flow diagrams
Section-11: Appendix (details of equipments & tag no; safety devices;Blind list and
Isolation/deisolation procedures)
Contact john@ifluids.com (or) info@ifluids.com
Contact john@ifluids.com (or) info@ifluids.com , www.ifluids.com
Data Collection and BrainstormingData Collection and BrainstormingData Collection and BrainstormingData Collection and Brainstorming
This is the preliminary task of a process engineer who is involved in preparation of Chemical
Plant operation manual. PFD, P& ID, Control System, Process description from Technology
provider, Equipment supplier manuals, HAZOP study recommendations, Details of legal/
regulatory requirements, Design Material & Heat balance of Process streams are to be
collected before proceeding further. Then a brainstorming session is to be arranged with the
colleagues/ superiors to discuss the various activities associated with the task and set SSSSpecific
MMMMeasurable AAAAttainable RRRRelevant TTTTime bound goal to bring up the better manual.
Following input documents and site investigations are required during preparation of
Operating Manual:
a. Basis of Design – Process Description
b. Process & Utility Flow Diagrams (PFDs and UFDs)
c. Piping & Instrument Diagrams (P&ID’s)
d. Detailed process description from "Technology Licensor" for proprietary processes if
applicable
e. Operating and Maintenance manuals of vendor equipment and packages (e.g. Instrument
Air Package, Compressor Systems, Pumps, Water Treatment Plants, Fired Heaters etc.)
f. Function logic narrative provided by Instrumentation
g. Plant Change Request
h. Management of Change
i. Interview of Site Operation Personnel
j. Interview of Site Maintenance Personnel
Contents of Chemical Plant Operating ManualContents of Chemical Plant Operating ManualContents of Chemical Plant Operating ManualContents of Chemical Plant Operating Manual
The content of a chemical plant operation manual is simplified into the following
topics and the details may be added into appropriate section based on the specific
requirements of the plant.
Abbreviations
Design Basis
Overview of the Process
Process Description
Procedures
Safety, Health & Environment Section
Utility and Other Systems
Appendix
Contact john@ifluids.com (or) info@ifluids.com
Contact john@ifluids.com (or) info@ifluids.com , www.ifluids.com
Abbreviations and DefinitionsAbbreviations and DefinitionsAbbreviations and DefinitionsAbbreviations and Definitions
The abbreviations and definitions of terms used in the entire document are summarized
here.
Design BasisDesign BasisDesign BasisDesign Basis
Design basis of the plant including Plant Capacity, Technology used, Site Climatic Data, Raw
Materials, Utility & Product Specifications forms this section in the chemical plant operation
manual.
Overview of the ProcessOverview of the ProcessOverview of the ProcessOverview of the Process
Overview of the Manufacturing process with the major equipments or sections involved in
sequential manner to be described to get the overall understanding of the chemical plant.
Process Flow Diagram (PFD) helps in preparing this section.
Process DescriptionProcess DescriptionProcess DescriptionProcess Description
The detailed process description with Equipments and Control valves associated including tag
no’s used with the design parameters and compositions at various streams in a sequential
manner forms this section. Process control philosophy for various parameters in the plant like
pressure, flow, level & temperature and description of various controllers and control loops
available for the process control. Various Trips and Interlocks and reasons for having it along
with Emergency Shutdown (ESD) system available in that section is elaborated. Piping &
Instrumentation Diagram (P& ID) and Process description from Technology provider will be
useful in bringing effective process description of units in the chemical plant.
ProcedureProcedureProcedureProcedure:
Operating Manual is generally a Microsoft Word document. Standard operating Procedures
for individual equipment and sections in plant for Normal Operation, Start up and Shutdown
and then for total plant are to be established and produced in this section. Procedure for safe
isolation of equipment for maintenance jobs shall also be included. This section shall also
include Trouble shooting guide for various upsets. Routine schedule with incorporation of
lubrication schedule, trial run of equipment, availability check of systems etc. Equipment
supplier Manuals, HAZOP study recommendations will help the process engineer for
preparing this important section of Chemical Plant Operating manual.
Contact john@ifluids.com (or) info@ifluids.com
Contact john@ifluids.com (or) info@ifluids.com , www.ifluids.com
StructureStructureStructureStructure:
The Operating Manual is a structured document with a particular narrative style. The
following is the sequence of the document:
- Coversheet with project title and document name i.e. Operating Manual
- 1st sheet with project title, document name i.e. Operating Manual
- List of Contents which includes:
. Abbreviations and Definitions
. Introduction which provides an overview of the project
. Process & Utility System Description
. Process Control and Automation
. Equipment Description
. Start-Up Procedure
. Normal Operating Procedure
. Shutdown Procedure
. Health, Safety & Environment (HSE)
. Appendices
IntroductionIntroductionIntroductionIntroduction:
This section provides the brief overview of the project which includes the purpose of the
facility and what it contains.
Process & Utility System DescriptionProcess & Utility System DescriptionProcess & Utility System DescriptionProcess & Utility System Description:
This section describes in detail the overall facility. The narrative should be in such a manner
that the description is in the correct sequence of the process for easy understanding. Utility
systems which supplement the main process should be described as a separate sub-section.
Wherever possible, process description should be supplemented by simple sketches showing
the major equipment and process control for a particular unit operation. This enhances the
understanding of the process.
Process Control & AutProcess Control & AutProcess Control & AutProcess Control & Automationomationomationomation:
This section provides the description of the overall controls required for the safe, reliable and
uninterrupted operation of the plant / unit. This could include flow, pressure, temperature
and level control of the plant / unit for the smooth operation of the plant / unit. Controls
required for start-up, planned shutdown and to change plant / unit capacity should be
mentioned. High and Low alarms for process operating parameters are also described in this
section.
Contact john@ifluids.com (or) info@ifluids.com
Contact john@ifluids.com (or) info@ifluids.com , www.ifluids.com
Plant section-wise or unit-wise control systems should be addressed in a sequential manner
in order to explain the process control in continuity.
All process safety and shutdown interlocks, automation provided for emergency shutdown of
entire plant or unit of the plant should be described in this section. An example of an
emergency shutdown could be the description of the Fire and Gas Monitoring system which
initiates the plant or unit shutdown.
Tag numbers of instruments used for process control and automation should be mentioned
for sake of clarity.
Equipment DescriptionEquipment DescriptionEquipment DescriptionEquipment Description:
This section provides the functional description of the individual equipment or group of
equipment which form a unit operation in the overall context of the entire facility.
Description could include operating and design conditions for the individual equipment.
Providing tag nos. for the equipment is recommended.
Wherever possible, sketches are recommended for the sake of clarity.
StartStartStartStart----up Procedureup Procedureup Procedureup Procedure:
This section provides the description of the start-up procedure for the plant / unit under
consideration:
The first sub-section of this section should address the readiness of the plant to be started-
up. By readiness it is meant that the plant / unit is ready to accept the process or utility fluid,
raw materials or reactants. This requires that the commissioning check-lists prepared for the
plant / unit are ticked off and signed off by the start-up team. A list of the check-lists may be
provided in this section which have been signed-off to indicate readiness.
The second sub-section should address the start-up of the utility systems prior to the start-up
of the main process. Utility systems could include charging up headers for instrument air,
cooling water, inert gas for blanketing / purging etc.
The third sub-section should address the start-up of the main process. This section should
describe the valves (manual or automated) and instruments to be lined up for introducing the
process fluid (e.g. hydrocarbons, chemicals) into the equipment or equipments (e.g. piping,
vessels, tanks, reactors) of the plant / unit being started up.
Wherever applicable, reference of vendor documents for any equipment / package unit
should be provided in this section.
Contact john@ifluids.com (or) info@ifluids.com
Contact john@ifluids.com (or) info@ifluids.com , www.ifluids.com
Normal Operating ProcedureNormal Operating ProcedureNormal Operating ProcedureNormal Operating Procedure:
This section provides the description of the normal operation of the plant / unit and indicates
the parameters to be monitored for maintaining the product quality and operational
reliability of the plant / unit.
Operating parameters should be mentioned for a particular equipment or unit or the entire
plant in this section. Sketches describing the normal operation are recommended for the
sake of clarity. Field logging and maintaining history records of critical process parameters
from the DCS or SCADA need to be mentioned in this section. Requirements of manning a
particular plant section or unit should be mentioned in this section including field monitoring
intervals by operating personnel for a particular equipment or unit.
While describing any operation it is recommended that equipment, instrument and line tag
nos. be mentioned for the sake of clarity.
Shutdown ProcedureShutdown ProcedureShutdown ProcedureShutdown Procedure:
This section provides the description of the shutdown procedures to stop the operation of
the plant.
The first sub-section of this section deals with normal shutdown due to either scheduled
maintenance and / or inspection or modification / de-bottlenecking of the plant. In this sub-
section, description should be provided for planned reduction / removal of inventory of the
process fluids from the equipment or unit to be shutdown. This would include stoppage of
fresh feed, gradual reduction of plant / unit throughput to minimise off-specification product
and final draining and purging of the equipment / unit for the purpose of complete emptying
prior to handing over for maintenance / inspection or modifications / de-bottlenecking.
The second sub-section deals with emergency shutdown procedures due to any emergency
such as an external fire, water flooding, earth quake, loss of containment of process fluid (gas
or liquid leak) etc. In this section description should be provided for the methods for isolation
of equipment or unit due to either manual initiation or automatic initiation of an emergency.
Manual initiation is emergency initiated by the operator of the plant / unit whereas
automatic initiation is emergency initiated by automatic detection of an emergency such as
detection of fire or gas leak by an automated Fire & Gas detection system.
Usage of tag nos. for equipment, valves and instruments while providing the shutdown
procedure description is recommended.
Utility and Other SystemsUtility and Other SystemsUtility and Other SystemsUtility and Other Systems
Contact john@ifluids.com (or) info@ifluids.com
Contact john@ifluids.com (or) info@ifluids.com , www.ifluids.com
Description of various other associated facilities in Chemical Plant like Water Treatment
facility, Cooling Towers, Cooling Water system, Deaerators, Boiler & Steam System,
Compressed Air System, Inert Gas generation & distribution systems, Effluent treatment
facilities, Flare system, Electrical Power Distribution and ESD system is to be prepared and
written under this section.
Safety, Health & Environment Section:Safety, Health & Environment Section:Safety, Health & Environment Section:Safety, Health & Environment Section:
This section describes the HSE aspects of the facility that need to be considered. Safety
section provides overview of installed Safety Systems, Fire Fighting Facility and available
safety procedures in the chemical plant. It also provides details on Zone classification,
Emergency Actions, Hazards. Applicable Work permit systems related to plant like Hot Work,
Confined Space Entry and procedure for issuing and authorizing the permits are to be listed
for the entrants to understand the systems. Types of Personal Protective Equipment (PPE)
available, issue and usage details are to be provided in this section and proper sign boards
are also to be made available in plant premises.
Toxicological information of chemicals used in the manufacturing process is to be provided in
the plant operation manual. Chemical handling & storage and their first air measures also
need to be listed for better understanding of chemical hazards.
Environment section of the Plant operation manual must contain industry specific disposal
limits for various effluents generated in the plant and details on applicable laws & governing
bodies.
Health:
This sub-section relates to the health of the people and working in the plant or living in the
vicinity of the plant whose health should be a concern for the management of the plant. This
should also address the health and well being of animals and other living organisms present
in the vicinity of the plant, for e.g. marine life in any water body which would be effected by
the operations of the plant.
In this sub-section a brief description of toxicity of the chemicals used in the plant / unit,
acceptable noise levels for humans and other animals, magnitude of injuries due to fire and
explosion, first aid measures for treating injuries etc. should be provided.
Safety:
This sub-section relates to the safe start-up, operation and shutdown of the plant during its
entire lifetime. This section should address the normal hazards those are encountered in day-
to-day operations of the plant. This section should also address the safety measures available
to prevent any accident.
Some of the normal hazards could be loss of containment of any hazardous fluid due to
Contact john@ifluids.com (or) info@ifluids.com
Contact john@ifluids.com (or) info@ifluids.com , www.ifluids.com
overflow, leak or rupture, static electricity build-up, accidental fall from heights, burns due to
exposure to hot surfaces, exposure to toxic fluids while collecting samples and piling up of
flammable solid waste (wood, paper, cloth etc.).
Description of safety measures should include:
- Special operating procedures for activities like sample collection and regular maintenance of
rotating machinery
- Issuance of work permits for hot work and vessel entry
- Usage of personal protective equipment (hard hats, safety shoes, eye goggles, ear muffs,
breathing apparatus etc.)
- Provision of field sign boards indicating the type of hazard
- Regular house-keeping
- Emergency evacuation procedures
Environment:
This sub-section describes the limits for discharge of hazardous solid, liquid and gaseous
effluents to the environment based on local laws and regulations and procedures for
compliance to them.
Appendix in Chemical Plant Operation Manual
This section contains the supporting information for better understanding of the Chemical
plant operating manual. Normally it contains PFD, P& ID, Alarm & Trip set points, MSDS of
Chemicals Handled, Equipment Data sheets & Curves, Further Reading – Vendor Document
List etc.
Process engineer can add additional resources in this section based on specific need. One can
also create his own structure based on the needs and prepare a better chemical plant
operation manual.
The appendices should preferably include the list of Process & Utility Flow Diagrams (PFDs /
UFDs), Piping & Instrument Diagrams (P&IDs), Cause and Effect Diagrams (CEDs) and
reference vendor documents, table for Alarm / Trip setpoints and lubrication schedule.
The above mentioned guidelines should help a process engineer to get started on a plant
operating manual.
For more information regarding iFluids Engineering Services & Past Project Track Record
please visit here
Contact john@ifluids.com (or) info@ifluids.com
Contact john@ifluids.com (or) info@ifluids.com , www.ifluids.com
Disclaimer: All information and content contained in this website are provided solely for
general information and reference purposes. TM information, Images & any copyrighted
material inadvertently published or depicted belong to rightfull owner and iFluids doesnt claim
to be its own.

Más contenido relacionado

La actualidad más candente

Gas Plant Separator Design
Gas Plant Separator DesignGas Plant Separator Design
Gas Plant Separator Designiyaselex
 
PIPING & INSTRUMENTATION DIAGRAM.pdf
PIPING & INSTRUMENTATION DIAGRAM.pdfPIPING & INSTRUMENTATION DIAGRAM.pdf
PIPING & INSTRUMENTATION DIAGRAM.pdfMassinissaHamel
 
Definition and selection of design temperature and pressure prg.gg.gen.0001
Definition and selection of design temperature and pressure prg.gg.gen.0001Definition and selection of design temperature and pressure prg.gg.gen.0001
Definition and selection of design temperature and pressure prg.gg.gen.0001Efemena Doroh
 
AMANRAJ_INTERN2016_REPORT_FINAL
AMANRAJ_INTERN2016_REPORT_FINALAMANRAJ_INTERN2016_REPORT_FINAL
AMANRAJ_INTERN2016_REPORT_FINALamanrajgupta02
 
Piping and Insruementaion Diagrams
Piping and Insruementaion DiagramsPiping and Insruementaion Diagrams
Piping and Insruementaion DiagramsTejas Deshpande
 
Piping and Vessels Flushing and Cleaning Procedure
Piping and Vessels Flushing and Cleaning ProcedurePiping and Vessels Flushing and Cleaning Procedure
Piping and Vessels Flushing and Cleaning ProcedureGerard B. Hawkins
 
AIR COOLED HEAT EXCHANGER
AIR COOLED HEAT EXCHANGERAIR COOLED HEAT EXCHANGER
AIR COOLED HEAT EXCHANGERAhsan Shakil
 
Difference Between Upstream & Midstream & Downstream Activities in Oil and Ga...
Difference Between Upstream & Midstream & Downstream Activities in Oil and Ga...Difference Between Upstream & Midstream & Downstream Activities in Oil and Ga...
Difference Between Upstream & Midstream & Downstream Activities in Oil and Ga...Student
 
Troubleshooting in Distillation Columns
Troubleshooting in Distillation ColumnsTroubleshooting in Distillation Columns
Troubleshooting in Distillation ColumnsGerard B. Hawkins
 
6. phase separatation
6. phase separatation6. phase separatation
6. phase separatationElsayed Amer
 
Introduction to Storage Tanks
Introduction to Storage TanksIntroduction to Storage Tanks
Introduction to Storage TanksAnkur Sharma
 
Maintenance of distillation column asmita
Maintenance of distillation column asmitaMaintenance of distillation column asmita
Maintenance of distillation column asmitaAsmita Mishra
 
Piping and Instrumentation / Process Flow Diagram
Piping and Instrumentation /  Process Flow DiagramPiping and Instrumentation /  Process Flow Diagram
Piping and Instrumentation / Process Flow DiagramPatel Ghanshyam
 
CENTRIFUGAL PUMPS TRAINING.pdf
CENTRIFUGAL PUMPS TRAINING.pdfCENTRIFUGAL PUMPS TRAINING.pdf
CENTRIFUGAL PUMPS TRAINING.pdfyusuf699644
 
Separator sizing and droplet sizes low shear school - 2017
Separator sizing and droplet sizes   low shear school - 2017Separator sizing and droplet sizes   low shear school - 2017
Separator sizing and droplet sizes low shear school - 2017Low Shear School
 
oil and gas - P&ID symbols .pdf
oil and gas - P&ID symbols .pdfoil and gas - P&ID symbols .pdf
oil and gas - P&ID symbols .pdfnelsonhuatay
 
Troubleshooting of Distillation
Troubleshooting of DistillationTroubleshooting of Distillation
Troubleshooting of DistillationMarcep Inc.
 

La actualidad más candente (20)

Gas Plant Separator Design
Gas Plant Separator DesignGas Plant Separator Design
Gas Plant Separator Design
 
Hydrogen Compressors
Hydrogen CompressorsHydrogen Compressors
Hydrogen Compressors
 
PIPING & INSTRUMENTATION DIAGRAM.pdf
PIPING & INSTRUMENTATION DIAGRAM.pdfPIPING & INSTRUMENTATION DIAGRAM.pdf
PIPING & INSTRUMENTATION DIAGRAM.pdf
 
Ppt
PptPpt
Ppt
 
Definition and selection of design temperature and pressure prg.gg.gen.0001
Definition and selection of design temperature and pressure prg.gg.gen.0001Definition and selection of design temperature and pressure prg.gg.gen.0001
Definition and selection of design temperature and pressure prg.gg.gen.0001
 
AMANRAJ_INTERN2016_REPORT_FINAL
AMANRAJ_INTERN2016_REPORT_FINALAMANRAJ_INTERN2016_REPORT_FINAL
AMANRAJ_INTERN2016_REPORT_FINAL
 
Piping and Insruementaion Diagrams
Piping and Insruementaion DiagramsPiping and Insruementaion Diagrams
Piping and Insruementaion Diagrams
 
Piping and Vessels Flushing and Cleaning Procedure
Piping and Vessels Flushing and Cleaning ProcedurePiping and Vessels Flushing and Cleaning Procedure
Piping and Vessels Flushing and Cleaning Procedure
 
AIR COOLED HEAT EXCHANGER
AIR COOLED HEAT EXCHANGERAIR COOLED HEAT EXCHANGER
AIR COOLED HEAT EXCHANGER
 
Hvac preventive maintenance schedule
Hvac preventive maintenance scheduleHvac preventive maintenance schedule
Hvac preventive maintenance schedule
 
Difference Between Upstream & Midstream & Downstream Activities in Oil and Ga...
Difference Between Upstream & Midstream & Downstream Activities in Oil and Ga...Difference Between Upstream & Midstream & Downstream Activities in Oil and Ga...
Difference Between Upstream & Midstream & Downstream Activities in Oil and Ga...
 
Troubleshooting in Distillation Columns
Troubleshooting in Distillation ColumnsTroubleshooting in Distillation Columns
Troubleshooting in Distillation Columns
 
6. phase separatation
6. phase separatation6. phase separatation
6. phase separatation
 
Introduction to Storage Tanks
Introduction to Storage TanksIntroduction to Storage Tanks
Introduction to Storage Tanks
 
Maintenance of distillation column asmita
Maintenance of distillation column asmitaMaintenance of distillation column asmita
Maintenance of distillation column asmita
 
Piping and Instrumentation / Process Flow Diagram
Piping and Instrumentation /  Process Flow DiagramPiping and Instrumentation /  Process Flow Diagram
Piping and Instrumentation / Process Flow Diagram
 
CENTRIFUGAL PUMPS TRAINING.pdf
CENTRIFUGAL PUMPS TRAINING.pdfCENTRIFUGAL PUMPS TRAINING.pdf
CENTRIFUGAL PUMPS TRAINING.pdf
 
Separator sizing and droplet sizes low shear school - 2017
Separator sizing and droplet sizes   low shear school - 2017Separator sizing and droplet sizes   low shear school - 2017
Separator sizing and droplet sizes low shear school - 2017
 
oil and gas - P&ID symbols .pdf
oil and gas - P&ID symbols .pdfoil and gas - P&ID symbols .pdf
oil and gas - P&ID symbols .pdf
 
Troubleshooting of Distillation
Troubleshooting of DistillationTroubleshooting of Distillation
Troubleshooting of Distillation
 

Similar a How to Write a Chemical Plant Operating Manual

Chapter7_ControlLoop-1.pdf
Chapter7_ControlLoop-1.pdfChapter7_ControlLoop-1.pdf
Chapter7_ControlLoop-1.pdfJoshua25806
 
INDUSTRIAL CHEMICAL PROCESS DESIGN.pptx
INDUSTRIAL CHEMICAL PROCESS DESIGN.pptxINDUSTRIAL CHEMICAL PROCESS DESIGN.pptx
INDUSTRIAL CHEMICAL PROCESS DESIGN.pptxHumphrey23
 
commissioning.pdf
commissioning.pdfcommissioning.pdf
commissioning.pdfharis348605
 
Process Flow Diagram and P&I Diagram.pptx
Process Flow Diagram and P&I Diagram.pptxProcess Flow Diagram and P&I Diagram.pptx
Process Flow Diagram and P&I Diagram.pptxDrAyyarKandasamy
 
3 psm process_hazard_analysis2
3 psm process_hazard_analysis23 psm process_hazard_analysis2
3 psm process_hazard_analysis2Syyeda Misbah
 
IRJET- Standard Work Documents (SWD) Development and Implementation of New Pr...
IRJET- Standard Work Documents (SWD) Development and Implementation of New Pr...IRJET- Standard Work Documents (SWD) Development and Implementation of New Pr...
IRJET- Standard Work Documents (SWD) Development and Implementation of New Pr...IRJET Journal
 
Control Loop Foundation - Batch And Continous Processes
Control Loop Foundation - Batch And Continous ProcessesControl Loop Foundation - Batch And Continous Processes
Control Loop Foundation - Batch And Continous ProcessesEmerson Exchange
 
Process design for chemical engineers
Process design for chemical engineersProcess design for chemical engineers
Process design for chemical engineersAmanda Ribeiro
 
Instrumentation Design Engineer
Instrumentation Design Engineer Instrumentation Design Engineer
Instrumentation Design Engineer Parth Tailor
 
Case study of DCS upgrade how to reduce stress during execution
Case study of DCS upgrade how to reduce stress during executionCase study of DCS upgrade how to reduce stress during execution
Case study of DCS upgrade how to reduce stress during executioniFluidsEng
 
Case study of dcs upgrade how to reduce stress during execution
Case study of dcs upgrade how to reduce stress during executionCase study of dcs upgrade how to reduce stress during execution
Case study of dcs upgrade how to reduce stress during executionJohn Kingsley
 
Process planning approaches
Process planning approaches Process planning approaches
Process planning approaches chethan kumar
 
Medical Store Management System Software Engineering Project
Medical Store Management System Software Engineering ProjectMedical Store Management System Software Engineering Project
Medical Store Management System Software Engineering Projecthani2253
 

Similar a How to Write a Chemical Plant Operating Manual (20)

Chapter7_ControlLoop-1.pdf
Chapter7_ControlLoop-1.pdfChapter7_ControlLoop-1.pdf
Chapter7_ControlLoop-1.pdf
 
INDUSTRIAL CHEMICAL PROCESS DESIGN.pptx
INDUSTRIAL CHEMICAL PROCESS DESIGN.pptxINDUSTRIAL CHEMICAL PROCESS DESIGN.pptx
INDUSTRIAL CHEMICAL PROCESS DESIGN.pptx
 
commissioning.pdf
commissioning.pdfcommissioning.pdf
commissioning.pdf
 
Process Flow Diagram and P&I Diagram.pptx
Process Flow Diagram and P&I Diagram.pptxProcess Flow Diagram and P&I Diagram.pptx
Process Flow Diagram and P&I Diagram.pptx
 
luai_cv
luai_cvluai_cv
luai_cv
 
3 psm process_hazard_analysis2
3 psm process_hazard_analysis23 psm process_hazard_analysis2
3 psm process_hazard_analysis2
 
IRJET- Standard Work Documents (SWD) Development and Implementation of New Pr...
IRJET- Standard Work Documents (SWD) Development and Implementation of New Pr...IRJET- Standard Work Documents (SWD) Development and Implementation of New Pr...
IRJET- Standard Work Documents (SWD) Development and Implementation of New Pr...
 
Control Loop Foundation - Batch And Continous Processes
Control Loop Foundation - Batch And Continous ProcessesControl Loop Foundation - Batch And Continous Processes
Control Loop Foundation - Batch And Continous Processes
 
Process design for chemical engineers
Process design for chemical engineersProcess design for chemical engineers
Process design for chemical engineers
 
HAZOP.PPT
HAZOP.PPTHAZOP.PPT
HAZOP.PPT
 
Industrial Machines Maintenance
Industrial Machines MaintenanceIndustrial Machines Maintenance
Industrial Machines Maintenance
 
Guidelines to OEMs IETM Code and Pixels.pdf
Guidelines to OEMs IETM Code and Pixels.pdfGuidelines to OEMs IETM Code and Pixels.pdf
Guidelines to OEMs IETM Code and Pixels.pdf
 
Instrumentation Design Engineer
Instrumentation Design Engineer Instrumentation Design Engineer
Instrumentation Design Engineer
 
Case study of DCS upgrade how to reduce stress during execution
Case study of DCS upgrade how to reduce stress during executionCase study of DCS upgrade how to reduce stress during execution
Case study of DCS upgrade how to reduce stress during execution
 
Case study of dcs upgrade how to reduce stress during execution
Case study of dcs upgrade how to reduce stress during executionCase study of dcs upgrade how to reduce stress during execution
Case study of dcs upgrade how to reduce stress during execution
 
ROHIT JOSHI JI
ROHIT JOSHI JIROHIT JOSHI JI
ROHIT JOSHI JI
 
Process planning approaches
Process planning approaches Process planning approaches
Process planning approaches
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 
Medical Store Management System Software Engineering Project
Medical Store Management System Software Engineering ProjectMedical Store Management System Software Engineering Project
Medical Store Management System Software Engineering Project
 
Mahi2
Mahi2Mahi2
Mahi2
 

Más de John Kingsley

Get yourself trained or Certified for IEC 62443 and other trainings.pdf
Get yourself trained or Certified for IEC 62443 and other trainings.pdfGet yourself trained or Certified for IEC 62443 and other trainings.pdf
Get yourself trained or Certified for IEC 62443 and other trainings.pdfJohn Kingsley
 
MODIFICATION OF EXISTING FACILITIES FOR 20% ETHANOL BLENDING
MODIFICATION OF EXISTING FACILITIES FOR 20% ETHANOL BLENDINGMODIFICATION OF EXISTING FACILITIES FOR 20% ETHANOL BLENDING
MODIFICATION OF EXISTING FACILITIES FOR 20% ETHANOL BLENDINGJohn Kingsley
 
Reliability, availability, maintainability (RAM) study, on reciprocating comp...
Reliability, availability, maintainability (RAM) study, on reciprocating comp...Reliability, availability, maintainability (RAM) study, on reciprocating comp...
Reliability, availability, maintainability (RAM) study, on reciprocating comp...John Kingsley
 
Introduction to oil and gas exploration and processing
Introduction to oil and gas exploration and processingIntroduction to oil and gas exploration and processing
Introduction to oil and gas exploration and processingJohn Kingsley
 
iFluids Engineering Introduction
iFluids Engineering IntroductioniFluids Engineering Introduction
iFluids Engineering IntroductionJohn Kingsley
 
iFluids Engineering Brochure
iFluids Engineering BrochureiFluids Engineering Brochure
iFluids Engineering BrochureJohn Kingsley
 
iFluids Engienering Capability Presentation
iFluids Engienering Capability PresentationiFluids Engienering Capability Presentation
iFluids Engienering Capability PresentationJohn Kingsley
 
Hazop Training - Intermediate Level Course iFluids
Hazop Training  -  Intermediate Level Course iFluidsHazop Training  -  Intermediate Level Course iFluids
Hazop Training - Intermediate Level Course iFluidsJohn Kingsley
 
Introduction to PSM Online Interactive Training
Introduction to PSM Online Interactive TrainingIntroduction to PSM Online Interactive Training
Introduction to PSM Online Interactive TrainingJohn Kingsley
 
Sil assessment Risk Graph and LOPA Training iFluids
Sil assessment Risk Graph and LOPA Training iFluidsSil assessment Risk Graph and LOPA Training iFluids
Sil assessment Risk Graph and LOPA Training iFluidsJohn Kingsley
 
Hazop Fundamentals Online Training iFluids
Hazop Fundamentals Online Training iFluidsHazop Fundamentals Online Training iFluids
Hazop Fundamentals Online Training iFluidsJohn Kingsley
 
John kingsley OT ICS SCADA Cyber security consultant
John kingsley OT ICS SCADA Cyber security consultantJohn kingsley OT ICS SCADA Cyber security consultant
John kingsley OT ICS SCADA Cyber security consultantJohn Kingsley
 
iFluids Lean Six Sigma Case Study oil & gas
iFluids Lean Six Sigma Case Study oil & gasiFluids Lean Six Sigma Case Study oil & gas
iFluids Lean Six Sigma Case Study oil & gasJohn Kingsley
 
iFluids Behaviour based safety services and training
iFluids Behaviour based safety services and trainingiFluids Behaviour based safety services and training
iFluids Behaviour based safety services and trainingJohn Kingsley
 
iFluids Tank Inspection services
iFluids Tank Inspection servicesiFluids Tank Inspection services
iFluids Tank Inspection servicesJohn Kingsley
 
iFluids Cybersecurity Seminar CIC Qatar 2018 Agenda
iFluids Cybersecurity Seminar  CIC Qatar 2018 AgendaiFluids Cybersecurity Seminar  CIC Qatar 2018 Agenda
iFluids Cybersecurity Seminar CIC Qatar 2018 AgendaJohn Kingsley
 
Hydrocarbon leak detection in tank farms
Hydrocarbon leak detection in tank farmsHydrocarbon leak detection in tank farms
Hydrocarbon leak detection in tank farmsJohn Kingsley
 
Guide to specifying visual signals
Guide to specifying visual signalsGuide to specifying visual signals
Guide to specifying visual signalsJohn Kingsley
 
Introduction to bowtie : A barrier-based approach to risk
Introduction to bowtie : A barrier-based approach to riskIntroduction to bowtie : A barrier-based approach to risk
Introduction to bowtie : A barrier-based approach to riskJohn Kingsley
 
Flow assurance and surge analysis
Flow assurance and surge analysisFlow assurance and surge analysis
Flow assurance and surge analysisJohn Kingsley
 

Más de John Kingsley (20)

Get yourself trained or Certified for IEC 62443 and other trainings.pdf
Get yourself trained or Certified for IEC 62443 and other trainings.pdfGet yourself trained or Certified for IEC 62443 and other trainings.pdf
Get yourself trained or Certified for IEC 62443 and other trainings.pdf
 
MODIFICATION OF EXISTING FACILITIES FOR 20% ETHANOL BLENDING
MODIFICATION OF EXISTING FACILITIES FOR 20% ETHANOL BLENDINGMODIFICATION OF EXISTING FACILITIES FOR 20% ETHANOL BLENDING
MODIFICATION OF EXISTING FACILITIES FOR 20% ETHANOL BLENDING
 
Reliability, availability, maintainability (RAM) study, on reciprocating comp...
Reliability, availability, maintainability (RAM) study, on reciprocating comp...Reliability, availability, maintainability (RAM) study, on reciprocating comp...
Reliability, availability, maintainability (RAM) study, on reciprocating comp...
 
Introduction to oil and gas exploration and processing
Introduction to oil and gas exploration and processingIntroduction to oil and gas exploration and processing
Introduction to oil and gas exploration and processing
 
iFluids Engineering Introduction
iFluids Engineering IntroductioniFluids Engineering Introduction
iFluids Engineering Introduction
 
iFluids Engineering Brochure
iFluids Engineering BrochureiFluids Engineering Brochure
iFluids Engineering Brochure
 
iFluids Engienering Capability Presentation
iFluids Engienering Capability PresentationiFluids Engienering Capability Presentation
iFluids Engienering Capability Presentation
 
Hazop Training - Intermediate Level Course iFluids
Hazop Training  -  Intermediate Level Course iFluidsHazop Training  -  Intermediate Level Course iFluids
Hazop Training - Intermediate Level Course iFluids
 
Introduction to PSM Online Interactive Training
Introduction to PSM Online Interactive TrainingIntroduction to PSM Online Interactive Training
Introduction to PSM Online Interactive Training
 
Sil assessment Risk Graph and LOPA Training iFluids
Sil assessment Risk Graph and LOPA Training iFluidsSil assessment Risk Graph and LOPA Training iFluids
Sil assessment Risk Graph and LOPA Training iFluids
 
Hazop Fundamentals Online Training iFluids
Hazop Fundamentals Online Training iFluidsHazop Fundamentals Online Training iFluids
Hazop Fundamentals Online Training iFluids
 
John kingsley OT ICS SCADA Cyber security consultant
John kingsley OT ICS SCADA Cyber security consultantJohn kingsley OT ICS SCADA Cyber security consultant
John kingsley OT ICS SCADA Cyber security consultant
 
iFluids Lean Six Sigma Case Study oil & gas
iFluids Lean Six Sigma Case Study oil & gasiFluids Lean Six Sigma Case Study oil & gas
iFluids Lean Six Sigma Case Study oil & gas
 
iFluids Behaviour based safety services and training
iFluids Behaviour based safety services and trainingiFluids Behaviour based safety services and training
iFluids Behaviour based safety services and training
 
iFluids Tank Inspection services
iFluids Tank Inspection servicesiFluids Tank Inspection services
iFluids Tank Inspection services
 
iFluids Cybersecurity Seminar CIC Qatar 2018 Agenda
iFluids Cybersecurity Seminar  CIC Qatar 2018 AgendaiFluids Cybersecurity Seminar  CIC Qatar 2018 Agenda
iFluids Cybersecurity Seminar CIC Qatar 2018 Agenda
 
Hydrocarbon leak detection in tank farms
Hydrocarbon leak detection in tank farmsHydrocarbon leak detection in tank farms
Hydrocarbon leak detection in tank farms
 
Guide to specifying visual signals
Guide to specifying visual signalsGuide to specifying visual signals
Guide to specifying visual signals
 
Introduction to bowtie : A barrier-based approach to risk
Introduction to bowtie : A barrier-based approach to riskIntroduction to bowtie : A barrier-based approach to risk
Introduction to bowtie : A barrier-based approach to risk
 
Flow assurance and surge analysis
Flow assurance and surge analysisFlow assurance and surge analysis
Flow assurance and surge analysis
 

Último

MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 

Último (20)

MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 

How to Write a Chemical Plant Operating Manual

  • 1. Contact john@ifluids.com (or) info@ifluids.com Contact john@ifluids.com (or) info@ifluids.com , www.ifluids.com How To Write A Plant Operating ManualHow To Write A Plant Operating ManualHow To Write A Plant Operating ManualHow To Write A Plant Operating Manual Plant Operating Manual is a guide for all the engineers who is involved in successfully operating the plant. It is a responsibility of a process engineer working in Process Design field to bring out the better manual which helps the operating team in start up, shutdown, troubleshooting and optimization of the plant. Here is guidance for preparing a better plant operating manual. The task of writing plant manual categorized into two. One is for new plants and the other is for plants that already running. For old plants there are already established systems and procedures and for the modifications or revamps additional information has to be added, which is a simple task. But writing the operating manual for new chemical plant is a challenging task though already similar plants are running around the world. Let us will see how to write operation manual for new plants here. Most Process Engineers, specially the senior process engineers are required to write a plant operating manual for a new greenfield project during their career. Mind you, this is quite different from updating an existing operating manual for a brownfield project where the scope of the project is modification and debottlenecking. Updation of an existing operating manual is a simpler exercise compared to writing a new operating manual where you follow the format of the existing operating manual and only provide an addendum to the existing operating manual related to the scope of the project. The real challenge lies in writing a new operating manual and that is where the experience of the process engineer comes into fore. In this article we have put across general guidelines on preparing a plant operating manual based on our experience of writing a few of them. These guidelines are generic in nature and do not subscribe to any company philosophy for writing an operating manual. These are the basic minimum requirements to start writing an operating manual.
  • 2. Contact john@ifluids.com (or) info@ifluids.com Contact john@ifluids.com (or) info@ifluids.com , www.ifluids.com Note: A typical OPM would consists of the following:Note: A typical OPM would consists of the following:Note: A typical OPM would consists of the following:Note: A typical OPM would consists of the following: Section-1: 1.Process description of the facility 2.Details of Major equipments of the facility & functioning 3.Major instrumentation & control system Section-2: Start up ( after a major turn around/ Cold start up/Hot start up) ;includes various check list like PTW closure;Ready for start up;availability of utilities/upstream and downstream process units etc Section-3: Normal operations (describe operations during normal steady state operations) Section-4: Shut down (describe planned shut down procedures) Section-5: Emergency shut down ( describe about various emergency like power/utility/facility/leaks/fire etc) Section-6: Alarms,Trips and precautions Section-7: Interlock system (cause and effect ) Section-8: Abnormal process conditions & Trouble shooting Section-9: Safety (includes Hazardous situation/ MSDS/process safety/ personnel safety etc) Section-10: Flow diagrams Section-11: Appendix (details of equipments & tag no; safety devices;Blind list and Isolation/deisolation procedures)
  • 3. Contact john@ifluids.com (or) info@ifluids.com Contact john@ifluids.com (or) info@ifluids.com , www.ifluids.com Data Collection and BrainstormingData Collection and BrainstormingData Collection and BrainstormingData Collection and Brainstorming This is the preliminary task of a process engineer who is involved in preparation of Chemical Plant operation manual. PFD, P& ID, Control System, Process description from Technology provider, Equipment supplier manuals, HAZOP study recommendations, Details of legal/ regulatory requirements, Design Material & Heat balance of Process streams are to be collected before proceeding further. Then a brainstorming session is to be arranged with the colleagues/ superiors to discuss the various activities associated with the task and set SSSSpecific MMMMeasurable AAAAttainable RRRRelevant TTTTime bound goal to bring up the better manual. Following input documents and site investigations are required during preparation of Operating Manual: a. Basis of Design – Process Description b. Process & Utility Flow Diagrams (PFDs and UFDs) c. Piping & Instrument Diagrams (P&ID’s) d. Detailed process description from "Technology Licensor" for proprietary processes if applicable e. Operating and Maintenance manuals of vendor equipment and packages (e.g. Instrument Air Package, Compressor Systems, Pumps, Water Treatment Plants, Fired Heaters etc.) f. Function logic narrative provided by Instrumentation g. Plant Change Request h. Management of Change i. Interview of Site Operation Personnel j. Interview of Site Maintenance Personnel Contents of Chemical Plant Operating ManualContents of Chemical Plant Operating ManualContents of Chemical Plant Operating ManualContents of Chemical Plant Operating Manual The content of a chemical plant operation manual is simplified into the following topics and the details may be added into appropriate section based on the specific requirements of the plant. Abbreviations Design Basis Overview of the Process Process Description Procedures Safety, Health & Environment Section Utility and Other Systems Appendix
  • 4. Contact john@ifluids.com (or) info@ifluids.com Contact john@ifluids.com (or) info@ifluids.com , www.ifluids.com Abbreviations and DefinitionsAbbreviations and DefinitionsAbbreviations and DefinitionsAbbreviations and Definitions The abbreviations and definitions of terms used in the entire document are summarized here. Design BasisDesign BasisDesign BasisDesign Basis Design basis of the plant including Plant Capacity, Technology used, Site Climatic Data, Raw Materials, Utility & Product Specifications forms this section in the chemical plant operation manual. Overview of the ProcessOverview of the ProcessOverview of the ProcessOverview of the Process Overview of the Manufacturing process with the major equipments or sections involved in sequential manner to be described to get the overall understanding of the chemical plant. Process Flow Diagram (PFD) helps in preparing this section. Process DescriptionProcess DescriptionProcess DescriptionProcess Description The detailed process description with Equipments and Control valves associated including tag no’s used with the design parameters and compositions at various streams in a sequential manner forms this section. Process control philosophy for various parameters in the plant like pressure, flow, level & temperature and description of various controllers and control loops available for the process control. Various Trips and Interlocks and reasons for having it along with Emergency Shutdown (ESD) system available in that section is elaborated. Piping & Instrumentation Diagram (P& ID) and Process description from Technology provider will be useful in bringing effective process description of units in the chemical plant. ProcedureProcedureProcedureProcedure: Operating Manual is generally a Microsoft Word document. Standard operating Procedures for individual equipment and sections in plant for Normal Operation, Start up and Shutdown and then for total plant are to be established and produced in this section. Procedure for safe isolation of equipment for maintenance jobs shall also be included. This section shall also include Trouble shooting guide for various upsets. Routine schedule with incorporation of lubrication schedule, trial run of equipment, availability check of systems etc. Equipment supplier Manuals, HAZOP study recommendations will help the process engineer for preparing this important section of Chemical Plant Operating manual.
  • 5. Contact john@ifluids.com (or) info@ifluids.com Contact john@ifluids.com (or) info@ifluids.com , www.ifluids.com StructureStructureStructureStructure: The Operating Manual is a structured document with a particular narrative style. The following is the sequence of the document: - Coversheet with project title and document name i.e. Operating Manual - 1st sheet with project title, document name i.e. Operating Manual - List of Contents which includes: . Abbreviations and Definitions . Introduction which provides an overview of the project . Process & Utility System Description . Process Control and Automation . Equipment Description . Start-Up Procedure . Normal Operating Procedure . Shutdown Procedure . Health, Safety & Environment (HSE) . Appendices IntroductionIntroductionIntroductionIntroduction: This section provides the brief overview of the project which includes the purpose of the facility and what it contains. Process & Utility System DescriptionProcess & Utility System DescriptionProcess & Utility System DescriptionProcess & Utility System Description: This section describes in detail the overall facility. The narrative should be in such a manner that the description is in the correct sequence of the process for easy understanding. Utility systems which supplement the main process should be described as a separate sub-section. Wherever possible, process description should be supplemented by simple sketches showing the major equipment and process control for a particular unit operation. This enhances the understanding of the process. Process Control & AutProcess Control & AutProcess Control & AutProcess Control & Automationomationomationomation: This section provides the description of the overall controls required for the safe, reliable and uninterrupted operation of the plant / unit. This could include flow, pressure, temperature and level control of the plant / unit for the smooth operation of the plant / unit. Controls required for start-up, planned shutdown and to change plant / unit capacity should be mentioned. High and Low alarms for process operating parameters are also described in this section.
  • 6. Contact john@ifluids.com (or) info@ifluids.com Contact john@ifluids.com (or) info@ifluids.com , www.ifluids.com Plant section-wise or unit-wise control systems should be addressed in a sequential manner in order to explain the process control in continuity. All process safety and shutdown interlocks, automation provided for emergency shutdown of entire plant or unit of the plant should be described in this section. An example of an emergency shutdown could be the description of the Fire and Gas Monitoring system which initiates the plant or unit shutdown. Tag numbers of instruments used for process control and automation should be mentioned for sake of clarity. Equipment DescriptionEquipment DescriptionEquipment DescriptionEquipment Description: This section provides the functional description of the individual equipment or group of equipment which form a unit operation in the overall context of the entire facility. Description could include operating and design conditions for the individual equipment. Providing tag nos. for the equipment is recommended. Wherever possible, sketches are recommended for the sake of clarity. StartStartStartStart----up Procedureup Procedureup Procedureup Procedure: This section provides the description of the start-up procedure for the plant / unit under consideration: The first sub-section of this section should address the readiness of the plant to be started- up. By readiness it is meant that the plant / unit is ready to accept the process or utility fluid, raw materials or reactants. This requires that the commissioning check-lists prepared for the plant / unit are ticked off and signed off by the start-up team. A list of the check-lists may be provided in this section which have been signed-off to indicate readiness. The second sub-section should address the start-up of the utility systems prior to the start-up of the main process. Utility systems could include charging up headers for instrument air, cooling water, inert gas for blanketing / purging etc. The third sub-section should address the start-up of the main process. This section should describe the valves (manual or automated) and instruments to be lined up for introducing the process fluid (e.g. hydrocarbons, chemicals) into the equipment or equipments (e.g. piping, vessels, tanks, reactors) of the plant / unit being started up. Wherever applicable, reference of vendor documents for any equipment / package unit should be provided in this section.
  • 7. Contact john@ifluids.com (or) info@ifluids.com Contact john@ifluids.com (or) info@ifluids.com , www.ifluids.com Normal Operating ProcedureNormal Operating ProcedureNormal Operating ProcedureNormal Operating Procedure: This section provides the description of the normal operation of the plant / unit and indicates the parameters to be monitored for maintaining the product quality and operational reliability of the plant / unit. Operating parameters should be mentioned for a particular equipment or unit or the entire plant in this section. Sketches describing the normal operation are recommended for the sake of clarity. Field logging and maintaining history records of critical process parameters from the DCS or SCADA need to be mentioned in this section. Requirements of manning a particular plant section or unit should be mentioned in this section including field monitoring intervals by operating personnel for a particular equipment or unit. While describing any operation it is recommended that equipment, instrument and line tag nos. be mentioned for the sake of clarity. Shutdown ProcedureShutdown ProcedureShutdown ProcedureShutdown Procedure: This section provides the description of the shutdown procedures to stop the operation of the plant. The first sub-section of this section deals with normal shutdown due to either scheduled maintenance and / or inspection or modification / de-bottlenecking of the plant. In this sub- section, description should be provided for planned reduction / removal of inventory of the process fluids from the equipment or unit to be shutdown. This would include stoppage of fresh feed, gradual reduction of plant / unit throughput to minimise off-specification product and final draining and purging of the equipment / unit for the purpose of complete emptying prior to handing over for maintenance / inspection or modifications / de-bottlenecking. The second sub-section deals with emergency shutdown procedures due to any emergency such as an external fire, water flooding, earth quake, loss of containment of process fluid (gas or liquid leak) etc. In this section description should be provided for the methods for isolation of equipment or unit due to either manual initiation or automatic initiation of an emergency. Manual initiation is emergency initiated by the operator of the plant / unit whereas automatic initiation is emergency initiated by automatic detection of an emergency such as detection of fire or gas leak by an automated Fire & Gas detection system. Usage of tag nos. for equipment, valves and instruments while providing the shutdown procedure description is recommended. Utility and Other SystemsUtility and Other SystemsUtility and Other SystemsUtility and Other Systems
  • 8. Contact john@ifluids.com (or) info@ifluids.com Contact john@ifluids.com (or) info@ifluids.com , www.ifluids.com Description of various other associated facilities in Chemical Plant like Water Treatment facility, Cooling Towers, Cooling Water system, Deaerators, Boiler & Steam System, Compressed Air System, Inert Gas generation & distribution systems, Effluent treatment facilities, Flare system, Electrical Power Distribution and ESD system is to be prepared and written under this section. Safety, Health & Environment Section:Safety, Health & Environment Section:Safety, Health & Environment Section:Safety, Health & Environment Section: This section describes the HSE aspects of the facility that need to be considered. Safety section provides overview of installed Safety Systems, Fire Fighting Facility and available safety procedures in the chemical plant. It also provides details on Zone classification, Emergency Actions, Hazards. Applicable Work permit systems related to plant like Hot Work, Confined Space Entry and procedure for issuing and authorizing the permits are to be listed for the entrants to understand the systems. Types of Personal Protective Equipment (PPE) available, issue and usage details are to be provided in this section and proper sign boards are also to be made available in plant premises. Toxicological information of chemicals used in the manufacturing process is to be provided in the plant operation manual. Chemical handling & storage and their first air measures also need to be listed for better understanding of chemical hazards. Environment section of the Plant operation manual must contain industry specific disposal limits for various effluents generated in the plant and details on applicable laws & governing bodies. Health: This sub-section relates to the health of the people and working in the plant or living in the vicinity of the plant whose health should be a concern for the management of the plant. This should also address the health and well being of animals and other living organisms present in the vicinity of the plant, for e.g. marine life in any water body which would be effected by the operations of the plant. In this sub-section a brief description of toxicity of the chemicals used in the plant / unit, acceptable noise levels for humans and other animals, magnitude of injuries due to fire and explosion, first aid measures for treating injuries etc. should be provided. Safety: This sub-section relates to the safe start-up, operation and shutdown of the plant during its entire lifetime. This section should address the normal hazards those are encountered in day- to-day operations of the plant. This section should also address the safety measures available to prevent any accident. Some of the normal hazards could be loss of containment of any hazardous fluid due to
  • 9. Contact john@ifluids.com (or) info@ifluids.com Contact john@ifluids.com (or) info@ifluids.com , www.ifluids.com overflow, leak or rupture, static electricity build-up, accidental fall from heights, burns due to exposure to hot surfaces, exposure to toxic fluids while collecting samples and piling up of flammable solid waste (wood, paper, cloth etc.). Description of safety measures should include: - Special operating procedures for activities like sample collection and regular maintenance of rotating machinery - Issuance of work permits for hot work and vessel entry - Usage of personal protective equipment (hard hats, safety shoes, eye goggles, ear muffs, breathing apparatus etc.) - Provision of field sign boards indicating the type of hazard - Regular house-keeping - Emergency evacuation procedures Environment: This sub-section describes the limits for discharge of hazardous solid, liquid and gaseous effluents to the environment based on local laws and regulations and procedures for compliance to them. Appendix in Chemical Plant Operation Manual This section contains the supporting information for better understanding of the Chemical plant operating manual. Normally it contains PFD, P& ID, Alarm & Trip set points, MSDS of Chemicals Handled, Equipment Data sheets & Curves, Further Reading – Vendor Document List etc. Process engineer can add additional resources in this section based on specific need. One can also create his own structure based on the needs and prepare a better chemical plant operation manual. The appendices should preferably include the list of Process & Utility Flow Diagrams (PFDs / UFDs), Piping & Instrument Diagrams (P&IDs), Cause and Effect Diagrams (CEDs) and reference vendor documents, table for Alarm / Trip setpoints and lubrication schedule. The above mentioned guidelines should help a process engineer to get started on a plant operating manual. For more information regarding iFluids Engineering Services & Past Project Track Record please visit here
  • 10. Contact john@ifluids.com (or) info@ifluids.com Contact john@ifluids.com (or) info@ifluids.com , www.ifluids.com Disclaimer: All information and content contained in this website are provided solely for general information and reference purposes. TM information, Images & any copyrighted material inadvertently published or depicted belong to rightfull owner and iFluids doesnt claim to be its own.