KILIFI DISTRICT
            1




 FFA PROJECTS UPDATES


     JUNE 13TH 2011

DISTRCT FFA COORDINATOR
         ALRMP



                          11/12/2011
Current Phase I Projects( August 2010-Sept
    2011) Planned Projects and Outputs
                          Total number of project sites                                           32
Improve pasture and browse Hectares of land developed for              No of Sites                 4
        production           pasture production (e.g semi-                Ha
                                                      2
                            circular bunds, re-seeded range
                                        lands etc)
                                                                                                   20
  Reduce environmental      Number of tree seedlings planted No of sites                           32
      degradation                      in negarims           No                               293,438
Improve access to water for Number of NEW water pans/ponds No of sites                             33
    Human and livestock      Constructed (3,000-15,000 m3) M3                                 189,920
       consumption             Number of water pans/ponds No of sites                               5
                             Rehabilitated 3,000-15,000 m3) m3                                 43,000
                             Number of zai pits constructed) No of sites                           32
                                                             No Ha                                393
                               Number of trapezoidal bunds No of sites                             15
                                       constructed           No Ha                                149
 Increased Crop production
                             No of sunken beds constructed No of sites                              5
                                                             No Ha                                0.8
                              Number of multistorey gardens No of sites                            32
                                       constructed           No. of multistorey gardens         4,510

                                                                                          11/12/2011
3
     Achieved May 31, 2011: Sites outputs
                              Total number of project sites                                                   32
Improve pasture and browse      Hectares of land developed for No of Sites                                     4
        production               pasture production (e.g. semi- Ha
                                circular bunds, re-seeded range
                                            lands etc)
                                                                                                              41
  Reduce environmental        Number of trees seedlings planted No of sites                                   32
      degradation                                               No                                       6230
Improve access to water for    Number of NEW water pans/ponds No of sites                                     29
   Human and livestock          Constructed (3,000-15,000 m3) M3
      consumption                                                                                      132,423
                                 Number of water pans/ponds No of sites                                        4
                                Rehabilitated 3,000-15,000 m3) M3
                                                                                                        11,545
                                Number of zai pits constructed) No of sites                                   32
                                                                No Ha                                     589
                                 Number of trapezoidal bunds    No of sites                                    0
                                        constructed             No Ha                                          0
Increased Crop production
                                No of sunken beds constructed No of sites                                      3
                                                                No Ha                                         0.8
                                Number of multistorey gardens   No of sites                                   32
                                        constructed             No. of multistorey gardens                600
                                                                                                 11/12/2011
ACHIEVED OUTPUT PHOTOS
          4




                         11/12/2011
ACHIEVED OUTPUT PHOTOS
          5




                         11/12/2011
CONTINUED
    6




            11/12/2011
Current partnerships for the FFA Projects:

                             7
 Ministry of Livestock Production
 Ministry of Water and Irrigation
 Ministry of Agriculture
 ALRMP II
 Ministry of Public Works
 Ministry of Forests
 Ministry of Education
 Office of the President
 CBO’s
 Ministry of Public Health and sanitation

                                             11/12/2011
Partnership chart
        8

               Community
               • FFA
                 beneficiaries

               Government
               Line
               Ministries

               NGOS




                                 11/12/2011
Procurement of NFI for first installment funds:
                                    9

No ITEM                  STATUS                            REMARKS
1     Tools (Assorted)   Being delivered by the supplier   Rammers are too
                                                           expensive
2.    Survey equipment   Being delivered by the supplier   -

3.    Water tanks        PRF sent to National Office       Awaiting delivery
4.    Cattle troughs     BoQ developed on 10th June        Tenders to be
                                                           floated
5.    Tree seeds         Procured and distributed to       Payment done
                         farmers
6.    Poly tubes         LPO sent to supplier              Awaiting delivery
7.    SMM Pumps          PRF sent to sub branch office     Awaiting delivery




                                                                     11/12/2011
Comments
                          10

 Support from community
 Support from line ministries and the DSG




                                             11/12/2011
Phase II Projects (expansion of old, New) Planned: sites,
        Beneficiaries, Projects, Outputs(pans, Ha)
                                                           11
                    Total number of project sites /Beneficiaries                                          43(65,100)
 Increase crop production     Hectares of cultivated land treated and No of Sites                                  5
                              conserved with physical soil and water
                              conservation measures/structures (e.g.  Km
                               terraces, stone and soil bunds e.t.c.)
                                                                                                               37.8
Improve pasture and browse     Hectares of land developed for pasture      No of Sites                           10
        production         production (e.g. semi-circular bunds, re-seeded
                                           range lands etc)                Ha
                                                                                                                  65
  Reduce environmental                Number of tree seedlings planted     No of sites                            43
       degradation                                                         No                                404,724
Improve access to water for          Number of NEW water pans/ponds        No of sites                            36
   Human and livestock                Constructed (3,000-15,000 m3)        M
                                                                               3
                                                                                                             484,880
      consumption
                                 Number of water pans/ponds Rehabilitated No of sites                              9
                                                                            3
                                             3,000-15,000 m3)             M                                   71,600
                                     Number of zai pits constructed)      No                                      32
                                                                          No                                     596
                                  Number of trapezoidal bunds constructed No of sites                             33
                                                                          No Ha                                  400
                                      No of sunken beds constructed       No of sites                             16
Others(including fishponds,                                               No Ha                                   13
 trapezoidal bunds, stone            Number of negarims constructed       No of sites                             43
        bunds, etc)                                                       No. of seedlings                   404.724
                                                                                             11/12/2011
High Impact Projects & Mechanization
             Estimated Budget for Phase II projects
                                                  12
                                                Number of
   Project       Beneficiaries     Size                     Estimate Budget   Project Period
                                                 projects


Greenhouse                                                                    July 2011– April
                    19146          STD             15        15,481,950.00
 Projects                                                                           2012



                                            3                                 July 2011– April
Water pan for
                    20000        15,000 M          4         16,000,000.00          2012
 irrigation



NFI Budget for                   Assorted                                     July 2011– April
  Up scaled         24,100        items            31        10,318,176.00          2012
 Beneficiaries


   TOTAL                                                     41,800,126.00


                                                                                     11/12/2011
New Projects Update:
                                  13

NO.   NEW PROJECTS                 STATUS           REMARKS


1.    8 Community farms            Reviewed by DPSC Approved


2.    2 water pan expansion and    Reviewed by DPSC Approved
      rehabilitation



3.    2 water pan excavation       Reviewed by DPSC Approved




                                                               11/12/2011
New Partnerships
                       14

 SMART Logistics
 Chome (aloe Vera)
 AMIRAN
 CBOs – Mwangaza Mudzo, Dzikunze farmers




                                            11/12/2011
Challenges
                           15

 Unstable food pipeline
 Political interference
 Shortage of Government Staff in the Ministry of
  Public Works
 Inadequate NFI




                                                    11/12/2011
Mitigating actions that you took.
                           16

 Information sharing with all stakeholders
  (community, DSG)
 Negotiations for consideration and prioritization of
  FFA activities through related line ministries.




                                                  11/12/2011
Challenges that are still a bother and unresolved
                        17

 Inadequate NFIs




                                            11/12/2011

Más contenido relacionado

Más de Stephen Musimba

Kilifi District Food For Asset photo album 2011
Kilifi District Food For Asset  photo album 2011Kilifi District Food For Asset  photo album 2011
Kilifi District Food For Asset photo album 2011
Stephen Musimba
 
Seasonal Cash For Asset Initiative presentation KILIFI DSG
Seasonal Cash For Asset Initiative presentation KILIFI DSGSeasonal Cash For Asset Initiative presentation KILIFI DSG
Seasonal Cash For Asset Initiative presentation KILIFI DSG
Stephen Musimba
 
Children Protection Presentation at AIC KILIFI
Children Protection Presentation at AIC KILIFIChildren Protection Presentation at AIC KILIFI
Children Protection Presentation at AIC KILIFI
Stephen Musimba
 
Kilifi food for asset - Sample presentation
Kilifi food for asset - Sample presentationKilifi food for asset - Sample presentation
Kilifi food for asset - Sample presentation
Stephen Musimba
 
Kilifi District Work plan
Kilifi District Work planKilifi District Work plan
Kilifi District Work plan
Stephen Musimba
 
For Mama Alice Kasika being sacked from Lands was a blessing
For Mama Alice Kasika being sacked from Lands was a blessingFor Mama Alice Kasika being sacked from Lands was a blessing
For Mama Alice Kasika being sacked from Lands was a blessing
Stephen Musimba
 
Improving_food_security_of_the_poor
Improving_food_security_of_the_poorImproving_food_security_of_the_poor
Improving_food_security_of_the_poor
Stephen Musimba
 
FFA PROCESS MANUALRevised 21-05-2010
FFA PROCESS  MANUALRevised 21-05-2010FFA PROCESS  MANUALRevised 21-05-2010
FFA PROCESS MANUALRevised 21-05-2010
Stephen Musimba
 
The Constitution of Kenya, 2010__1n2
The Constitution of Kenya, 2010__1n2The Constitution of Kenya, 2010__1n2
The Constitution of Kenya, 2010__1n2
Stephen Musimba
 
Kilifi FFA team exchange visit
Kilifi FFA team exchange visitKilifi FFA team exchange visit
Kilifi FFA team exchange visit
Stephen Musimba
 
water for rural communities
water for rural communitieswater for rural communities
water for rural communities
Stephen Musimba
 
JIKO Presentation AIC Kilifi itinerary
JIKO Presentation AIC Kilifi itineraryJIKO Presentation AIC Kilifi itinerary
JIKO Presentation AIC Kilifi itinerary
Stephen Musimba
 
Operation and Maintenance of RWH Structures
Operation and Maintenance of RWH StructuresOperation and Maintenance of RWH Structures
Operation and Maintenance of RWH Structures
Stephen Musimba
 
Irrigation Design Manual
Irrigation Design ManualIrrigation Design Manual
Irrigation Design Manual
Stephen Musimba
 

Más de Stephen Musimba (20)

Kilifi District Food For Asset photo album 2011
Kilifi District Food For Asset  photo album 2011Kilifi District Food For Asset  photo album 2011
Kilifi District Food For Asset photo album 2011
 
Seasonal Cash For Asset Initiative presentation KILIFI DSG
Seasonal Cash For Asset Initiative presentation KILIFI DSGSeasonal Cash For Asset Initiative presentation KILIFI DSG
Seasonal Cash For Asset Initiative presentation KILIFI DSG
 
Children Protection Presentation at AIC KILIFI
Children Protection Presentation at AIC KILIFIChildren Protection Presentation at AIC KILIFI
Children Protection Presentation at AIC KILIFI
 
Kilifi food for asset - Sample presentation
Kilifi food for asset - Sample presentationKilifi food for asset - Sample presentation
Kilifi food for asset - Sample presentation
 
Kilifi District Work plan
Kilifi District Work planKilifi District Work plan
Kilifi District Work plan
 
viragoni FDP
viragoni FDPviragoni FDP
viragoni FDP
 
Ndugu mnani proposal
Ndugu mnani proposalNdugu mnani proposal
Ndugu mnani proposal
 
For Mama Alice Kasika being sacked from Lands was a blessing
For Mama Alice Kasika being sacked from Lands was a blessingFor Mama Alice Kasika being sacked from Lands was a blessing
For Mama Alice Kasika being sacked from Lands was a blessing
 
Improving_food_security_of_the_poor
Improving_food_security_of_the_poorImproving_food_security_of_the_poor
Improving_food_security_of_the_poor
 
WFP RWH Planning 3
WFP RWH Planning 3WFP RWH Planning 3
WFP RWH Planning 3
 
FFA PROCESS MANUALRevised 21-05-2010
FFA PROCESS  MANUALRevised 21-05-2010FFA PROCESS  MANUALRevised 21-05-2010
FFA PROCESS MANUALRevised 21-05-2010
 
The Constitution of Kenya, 2010__1n2
The Constitution of Kenya, 2010__1n2The Constitution of Kenya, 2010__1n2
The Constitution of Kenya, 2010__1n2
 
Probability Analysisx
Probability AnalysisxProbability Analysisx
Probability Analysisx
 
Water from small dams
Water from small damsWater from small dams
Water from small dams
 
Kilifi FFA team exchange visit
Kilifi FFA team exchange visitKilifi FFA team exchange visit
Kilifi FFA team exchange visit
 
water for rural communities
water for rural communitieswater for rural communities
water for rural communities
 
JIKO Presentation AIC Kilifi itinerary
JIKO Presentation AIC Kilifi itineraryJIKO Presentation AIC Kilifi itinerary
JIKO Presentation AIC Kilifi itinerary
 
WFP Hydrologic cycle
WFP Hydrologic cycleWFP Hydrologic cycle
WFP Hydrologic cycle
 
Operation and Maintenance of RWH Structures
Operation and Maintenance of RWH StructuresOperation and Maintenance of RWH Structures
Operation and Maintenance of RWH Structures
 
Irrigation Design Manual
Irrigation Design ManualIrrigation Design Manual
Irrigation Design Manual
 

Último

IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
Enterprise Knowledge
 

Último (20)

Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
Advantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessAdvantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your Business
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 

Kilifi District Food For Asset brief

  • 1. KILIFI DISTRICT 1 FFA PROJECTS UPDATES JUNE 13TH 2011 DISTRCT FFA COORDINATOR ALRMP 11/12/2011
  • 2. Current Phase I Projects( August 2010-Sept 2011) Planned Projects and Outputs Total number of project sites 32 Improve pasture and browse Hectares of land developed for No of Sites 4 production pasture production (e.g semi- Ha 2 circular bunds, re-seeded range lands etc) 20 Reduce environmental Number of tree seedlings planted No of sites 32 degradation in negarims No 293,438 Improve access to water for Number of NEW water pans/ponds No of sites 33 Human and livestock Constructed (3,000-15,000 m3) M3 189,920 consumption Number of water pans/ponds No of sites 5 Rehabilitated 3,000-15,000 m3) m3 43,000 Number of zai pits constructed) No of sites 32 No Ha 393 Number of trapezoidal bunds No of sites 15 constructed No Ha 149 Increased Crop production No of sunken beds constructed No of sites 5 No Ha 0.8 Number of multistorey gardens No of sites 32 constructed No. of multistorey gardens 4,510 11/12/2011
  • 3. 3 Achieved May 31, 2011: Sites outputs Total number of project sites 32 Improve pasture and browse Hectares of land developed for No of Sites 4 production pasture production (e.g. semi- Ha circular bunds, re-seeded range lands etc) 41 Reduce environmental Number of trees seedlings planted No of sites 32 degradation No 6230 Improve access to water for Number of NEW water pans/ponds No of sites 29 Human and livestock Constructed (3,000-15,000 m3) M3 consumption 132,423 Number of water pans/ponds No of sites 4 Rehabilitated 3,000-15,000 m3) M3 11,545 Number of zai pits constructed) No of sites 32 No Ha 589 Number of trapezoidal bunds No of sites 0 constructed No Ha 0 Increased Crop production No of sunken beds constructed No of sites 3 No Ha 0.8 Number of multistorey gardens No of sites 32 constructed No. of multistorey gardens 600 11/12/2011
  • 4. ACHIEVED OUTPUT PHOTOS 4 11/12/2011
  • 5. ACHIEVED OUTPUT PHOTOS 5 11/12/2011
  • 6. CONTINUED 6 11/12/2011
  • 7. Current partnerships for the FFA Projects: 7  Ministry of Livestock Production  Ministry of Water and Irrigation  Ministry of Agriculture  ALRMP II  Ministry of Public Works  Ministry of Forests  Ministry of Education  Office of the President  CBO’s  Ministry of Public Health and sanitation 11/12/2011
  • 8. Partnership chart 8 Community • FFA beneficiaries Government Line Ministries NGOS 11/12/2011
  • 9. Procurement of NFI for first installment funds: 9 No ITEM STATUS REMARKS 1 Tools (Assorted) Being delivered by the supplier Rammers are too expensive 2. Survey equipment Being delivered by the supplier - 3. Water tanks PRF sent to National Office Awaiting delivery 4. Cattle troughs BoQ developed on 10th June Tenders to be floated 5. Tree seeds Procured and distributed to Payment done farmers 6. Poly tubes LPO sent to supplier Awaiting delivery 7. SMM Pumps PRF sent to sub branch office Awaiting delivery 11/12/2011
  • 10. Comments 10  Support from community  Support from line ministries and the DSG 11/12/2011
  • 11. Phase II Projects (expansion of old, New) Planned: sites, Beneficiaries, Projects, Outputs(pans, Ha) 11 Total number of project sites /Beneficiaries 43(65,100) Increase crop production Hectares of cultivated land treated and No of Sites 5 conserved with physical soil and water conservation measures/structures (e.g. Km terraces, stone and soil bunds e.t.c.) 37.8 Improve pasture and browse Hectares of land developed for pasture No of Sites 10 production production (e.g. semi-circular bunds, re-seeded range lands etc) Ha 65 Reduce environmental Number of tree seedlings planted No of sites 43 degradation No 404,724 Improve access to water for Number of NEW water pans/ponds No of sites 36 Human and livestock Constructed (3,000-15,000 m3) M 3 484,880 consumption Number of water pans/ponds Rehabilitated No of sites 9 3 3,000-15,000 m3) M 71,600 Number of zai pits constructed) No 32 No 596 Number of trapezoidal bunds constructed No of sites 33 No Ha 400 No of sunken beds constructed No of sites 16 Others(including fishponds, No Ha 13 trapezoidal bunds, stone Number of negarims constructed No of sites 43 bunds, etc) No. of seedlings 404.724 11/12/2011
  • 12. High Impact Projects & Mechanization Estimated Budget for Phase II projects 12 Number of Project Beneficiaries Size Estimate Budget Project Period projects Greenhouse July 2011– April 19146 STD 15 15,481,950.00 Projects 2012 3 July 2011– April Water pan for 20000 15,000 M 4 16,000,000.00 2012 irrigation NFI Budget for Assorted July 2011– April Up scaled 24,100 items 31 10,318,176.00 2012 Beneficiaries TOTAL 41,800,126.00 11/12/2011
  • 13. New Projects Update: 13 NO. NEW PROJECTS STATUS REMARKS 1. 8 Community farms Reviewed by DPSC Approved 2. 2 water pan expansion and Reviewed by DPSC Approved rehabilitation 3. 2 water pan excavation Reviewed by DPSC Approved 11/12/2011
  • 14. New Partnerships 14  SMART Logistics  Chome (aloe Vera)  AMIRAN  CBOs – Mwangaza Mudzo, Dzikunze farmers 11/12/2011
  • 15. Challenges 15  Unstable food pipeline  Political interference  Shortage of Government Staff in the Ministry of Public Works  Inadequate NFI 11/12/2011
  • 16. Mitigating actions that you took. 16  Information sharing with all stakeholders (community, DSG)  Negotiations for consideration and prioritization of FFA activities through related line ministries. 11/12/2011
  • 17. Challenges that are still a bother and unresolved 17  Inadequate NFIs 11/12/2011