N° DOCUMENTO
CO001‐00‐0905‐SI‐174‐00
15/12/2011
FECHA PK INICIAL PK FINAL
Metros 
Lineales
UNIDADES
Cantidad de trozas de 6 m. *25 cm de 
Diámetro utilizadas
volumen (m3) madera 
utilizada en cada relleno
Material Petreo m3
10/04/2013 210.250,000   210.050,000   200,00 133,5348791 133 31,46 53,61
23/03/2013 209.400,000   209.300,000   100,00 66,76743954 66 15,73 26,80
22/03/2013 209.300,000   209.200,000   100,00 66,76743954 66 15,73 26,80
16/03/13 207.950,000   207.990,000   40,00 26,70697582 26 6,29 10,72
06/05/13 201.500,000   201.630,000   130,00 86,7976714 86 20,45 34,85
07/05/13 201.300,000   201.500,000   200,00 133,5348791 133 31,46 53,61
13/05/13 199.900,000   200.000,000   100,00 66,76743954 66 15,73 26,80
13/04/13 196.900,000   196.850,000   50,00 33,38371977 33 7,87 13,40
17/04/13 196.850,000   196.000,000   850,00 567,5232361 567 133,72 227,84
18/04/13 196.000,000   195.875,000   125,00 83,45929943 83 19,66 33,51
19/04/13 195.875,000   195.750,000   125,00 83,45929943 83 19,66 33,51
20/04/13 195.750,000   195.650,000   100,00 66,76743954 66 15,73 26,80
22/04/13 195.650,000   195.600,000   50,00 33,38371977 33 7,87 13,40
23/04/13 195.600,000   195.450,000   150,00 100,1511593 100 23,60 40,21
24/04/13 195.450,000   195.250,000   200,00 133,5348791 133 31,46 53,61
25/04/13 195.250,000   195.200,000   50,00 33,38371977 33 7,87 13,40
26/04/13 195.200,000   195.000,000   200,00 133,5348791 133 31,46 53,61
27/04/13 195.000,000   194.950,000   50,00 33,38371977 33 7,87 13,40
03/04/13 194.700,000   194.500,000   200,00 133,5348791 133 31,46 53,61
04/04/13 194.500,000   194.300,000   200,00 133,5348791 133 31,46 53,61
05/04/13 194.300,000   194.100,000   200,00 133,5348791 133 31,46 53,61
07/04/13 194.100,000   194.000,000   100,00 66,76743954 66 15,73 26,80
08/04/13 194.000,000   193.770,000   230,00 153,5651109 153 36,18 61,65
02/04/13 193.750,000   193.600,000   150,00 100,1511593 100 23,60 40,21
29/03/13 192.250,000   192.150,000   100,00 66,76743954 66 15,73 26,80
28/03/13 192.150,000   192.050,000   100,00 66,76743954 66 15,73 26,80
4100,00 2737,465021 2458 645,00 1099,00
Nota: El valor de 2458 difiere del 2737,46 al redondear el dato pero los cálculos ser realizan con el valor de 2737,46
d: 0,25 TOTAL (ML)
h: 6 mtr
Volumen de cada troza: 25 cm 
diámetro X 6 m longitud
0,2356 m3
2737,47
Cantidad de Madera reutilizada m3 se 
compro para este trimestre 240 m3 y 
se reutilizo 405 m3
645 m3
Numero de secciones de 6 metros * 
25 cm de Diámetro
2737,47 Unidades
Cantidad de trozas en promedio por 
M/l
0,67
trozas de 6 m *25 cm de 
díametro
Longitud total de rellenos de paso 4100 m
Volumen de material comprado para 
uso en rellenos de paso (Vease 
consolidado Anexo 4 / Otros Anexos / 
AS5 / Formato consolidado de vías.
1099 m3
Cantidad de m3 de material petro por 
metro lineal
0,27 m
Volumen promedio de cada metro 
lineal x 6 m y 40 cm de prof
2,46 m3
CONSOLIDADO RELLENO DE PASO

Consolidado relleno de paso

  • 1.
    N° DOCUMENTO CO001‐00‐0905‐SI‐174‐00 15/12/2011 FECHA PK INICIAL PK FINAL Metros  Lineales UNIDADES Cantidad de trozas de 6 m. *25 cm de  Diámetro utilizadas volumen (m3) madera  utilizada en cada relleno Material Petreo m3 10/04/2013210.250,000   210.050,000   200,00 133,5348791 133 31,46 53,61 23/03/2013 209.400,000   209.300,000   100,00 66,76743954 66 15,73 26,80 22/03/2013 209.300,000   209.200,000   100,00 66,76743954 66 15,73 26,80 16/03/13 207.950,000   207.990,000   40,00 26,70697582 26 6,29 10,72 06/05/13 201.500,000   201.630,000   130,00 86,7976714 86 20,45 34,85 07/05/13 201.300,000   201.500,000   200,00 133,5348791 133 31,46 53,61 13/05/13 199.900,000   200.000,000   100,00 66,76743954 66 15,73 26,80 13/04/13 196.900,000   196.850,000   50,00 33,38371977 33 7,87 13,40 17/04/13 196.850,000   196.000,000   850,00 567,5232361 567 133,72 227,84 18/04/13 196.000,000   195.875,000   125,00 83,45929943 83 19,66 33,51 19/04/13 195.875,000   195.750,000   125,00 83,45929943 83 19,66 33,51 20/04/13 195.750,000   195.650,000   100,00 66,76743954 66 15,73 26,80 22/04/13 195.650,000   195.600,000   50,00 33,38371977 33 7,87 13,40 23/04/13 195.600,000   195.450,000   150,00 100,1511593 100 23,60 40,21 24/04/13 195.450,000   195.250,000   200,00 133,5348791 133 31,46 53,61 25/04/13 195.250,000   195.200,000   50,00 33,38371977 33 7,87 13,40 26/04/13 195.200,000   195.000,000   200,00 133,5348791 133 31,46 53,61 27/04/13 195.000,000   194.950,000   50,00 33,38371977 33 7,87 13,40 03/04/13 194.700,000   194.500,000   200,00 133,5348791 133 31,46 53,61 04/04/13 194.500,000   194.300,000   200,00 133,5348791 133 31,46 53,61 05/04/13 194.300,000   194.100,000   200,00 133,5348791 133 31,46 53,61 07/04/13 194.100,000   194.000,000   100,00 66,76743954 66 15,73 26,80 08/04/13 194.000,000   193.770,000   230,00 153,5651109 153 36,18 61,65 02/04/13 193.750,000   193.600,000   150,00 100,1511593 100 23,60 40,21 29/03/13 192.250,000   192.150,000   100,00 66,76743954 66 15,73 26,80 28/03/13 192.150,000   192.050,000   100,00 66,76743954 66 15,73 26,80 4100,00 2737,465021 2458 645,00 1099,00 Nota: El valor de 2458 difiere del 2737,46 al redondear el dato pero los cálculos ser realizan con el valor de 2737,46 d: 0,25 TOTAL (ML) h: 6 mtr Volumen de cada troza: 25 cm  diámetro X 6 m longitud 0,2356 m3 2737,47 Cantidad de Madera reutilizada m3 se  compro para este trimestre 240 m3 y  se reutilizo 405 m3 645 m3 Numero de secciones de 6 metros *  25 cm de Diámetro 2737,47 Unidades Cantidad de trozas en promedio por  M/l 0,67 trozas de 6 m *25 cm de  díametro Longitud total de rellenos de paso 4100 m Volumen de material comprado para  uso en rellenos de paso (Vease  consolidado Anexo 4 / Otros Anexos /  AS5 / Formato consolidado de vías. 1099 m3 Cantidad de m3 de material petro por  metro lineal 0,27 m Volumen promedio de cada metro  lineal x 6 m y 40 cm de prof 2,46 m3 CONSOLIDADO RELLENO DE PASO