Introduction
Reducing project schedules and completing facility projects on
time has never been more important to our industry than it is
today. It is critical that drug manufacturers have the capability
of and capacity for producing therapies and treatments that
are needed by patients around the world. With the spotlight on
the new cell and gene therapies that are being launched, and
their effectiveness for curing life threatening diseases, the
importance of well-controlled project timelines using
pre-fabricated modular facility solutions continues to grow.
The Impact of Project Timelines
Historically, most drug manufacturers have followed a traditional
facility construction approach with extended project timelines,
high onsite complexity, and risks. Very few of the facilities built
using this approach were completed on time to their planned
schedule and it was not uncommon for a new facility project to
take up to 5 years from start to finish. Because of the duration of
project schedules and the unpredictability of traditional on-site
construction, drug manufacturers have had to make large
capital investments in new facilities long before they required
the capacity for their drug products. This has posed significant
financial risk to the companies under the following scenarios:
• A facility built for a drug product that failed in clinical trials
and/or did not get regulatory approval
• A facility delayed in start-up that could not commercially
manufacture a new drug product upon regulatory approval
• A facility which was oversized and underutilized for producing
a drug product that did not achieve the expected market
acceptance
• A facility which was undersized and not capable of meeting
the market demand for a drug product.
The Problem with Traditional Facility Schedules
There are many reasons for lengthy schedules and why they get
delayed during the design, construction, and commissioning
phases of a project. Because most facilities in our industry have
been stick-built, each one has been a unique or custom design
based on the manufacturers’ requirements, but also on the A&E
firm’s experience, design preferences, and desire to differentiate
their work. This non-standardized approach requires a
significant upfront engineering design effort with multiple stage
gates for design reviews and approvals before moving to the
next phase.
Traditional stick-built facilities require sequential construction
phases where the building shell is first erected, followed by
building core and utilities, and finally the critical cleanroom and
process infrastructure. This requires the continual planning,
coordination, and interaction of multiple sub-contractors and
services at the construction site. Due to the complexity there is
often a domino effect of construction delays if tasks are not
started or completed on time due to permitting issues, material
availability, labor shortages, or weather.
The Benefits of a Pre-Fabricated Modular Solution
PODs represent an innovative pre-fabricated modular
cleanroom solution that can be effective in avoiding the
extended project schedules, delays, and many other issues
experienced with traditional construction. The off-site
fabrication of the PODs allows for parallel construction activities
of both the cleanroom infrastructure and shell building/core
which provides a more compressed project timeline. And
because the PODs are fabricated in a well-controlled factory
environment by an experienced labor force, the risk of schedule
delays as well as the number of on-site contractors, staging
areas, safety issues, and overall project liability can be
significantly reduced.
The end result is a shorter and more predictable project timeline
that can help drug manufacturers produce the required
capacity when they need it. The prefabricated approach also
mitigates manufacturers’ financial risks by allowing them to
delay their capital investment until months before the capacity is
required or until the product is further along in the clinical trial
process and with a higher probability for regulatory approval.
The pre-fabricated modular approach can help companies
prevent the potential loss of millions of dollars in revenue as well
as prevent the wasting of millions of dollars in capital to build a
facility that cannot be used as planned.

Más contenido relacionado

La actualidad más candente

G con future flexible facility - mj 03-2015
G con future flexible facility  - mj 03-2015G con future flexible facility  - mj 03-2015
G con future flexible facility - mj 03-2015
MWJornitz
 
Helping a Small Biotech Reach a Critical Milestone
Helping a Small Biotech Reach a Critical MilestoneHelping a Small Biotech Reach a Critical Milestone
Helping a Small Biotech Reach a Critical Milestone
Covance
 
aaaQA_Dir. SteveCVQ216
aaaQA_Dir. SteveCVQ216aaaQA_Dir. SteveCVQ216
aaaQA_Dir. SteveCVQ216
....... STEP Co.CPC LLC
 
Case Studies in Pharmaceutical Project Management.
Case Studies in Pharmaceutical Project Management.Case Studies in Pharmaceutical Project Management.
Case Studies in Pharmaceutical Project Management.
Anthony Grenier
 
Resume Kevin_Koski_August_2016
Resume Kevin_Koski_August_2016Resume Kevin_Koski_August_2016
Resume Kevin_Koski_August_2016
Kevin Koski
 
How To Manage and Mitigate Risk in Medical Device New Product Development
How To Manage and Mitigate Risk in Medical Device New Product DevelopmentHow To Manage and Mitigate Risk in Medical Device New Product Development
How To Manage and Mitigate Risk in Medical Device New Product Development
Greenlight Guru
 
Design Controls: Building Objective Evidence and Process Architecture to Mee...
Design Controls: Building Objective Evidence and Process Architecture  to Mee...Design Controls: Building Objective Evidence and Process Architecture  to Mee...
Design Controls: Building Objective Evidence and Process Architecture to Mee...
April Bright
 
SMi Group's 3rd annual Pre-Filled Syringes West Coast 2018
SMi Group's 3rd annual Pre-Filled Syringes West Coast 2018SMi Group's 3rd annual Pre-Filled Syringes West Coast 2018
SMi Group's 3rd annual Pre-Filled Syringes West Coast 2018
Dale Butler
 
Morciglio current resume 2016
Morciglio current resume 2016Morciglio current resume 2016
Morciglio current resume 2016
Chris Morciglio
 
Accelerating Post-approval Change Management with ICH Q12
Accelerating Post-approval Change Management with ICH Q12Accelerating Post-approval Change Management with ICH Q12
Accelerating Post-approval Change Management with ICH Q12
Veeva Systems
 
How to Prepare for an FDA Inspection and Respond to FDA 483's / Warning Letters
How to Prepare for an FDA Inspection and Respond to FDA 483's / Warning LettersHow to Prepare for an FDA Inspection and Respond to FDA 483's / Warning Letters
How to Prepare for an FDA Inspection and Respond to FDA 483's / Warning Letters
Greenlight Guru
 
Presentation trvx cdmo-v2
Presentation trvx   cdmo-v2Presentation trvx   cdmo-v2
Presentation trvx cdmo-v2
targovax2017
 
AWR resume
AWR resumeAWR resume
AWR resume
Anthony Ross
 
CV-Jose - 2015
CV-Jose - 2015CV-Jose - 2015
CV-Jose - 2015
Jose M Candelario
 
FDA Inspections are Different from ISO Audits, So Don't Treat Them the Same -...
FDA Inspections are Different from ISO Audits, So Don't Treat Them the Same -...FDA Inspections are Different from ISO Audits, So Don't Treat Them the Same -...
FDA Inspections are Different from ISO Audits, So Don't Treat Them the Same -...
April Bright
 
The FDA Early Feasibility Study Pilot and the Innovation Pathway
The FDA Early Feasibility Study Pilot and the Innovation PathwayThe FDA Early Feasibility Study Pilot and the Innovation Pathway
The FDA Early Feasibility Study Pilot and the Innovation Pathway
Trimed Media Group
 
Enabling higher process titers at a manufacturing facility
Enabling higher process titers at a manufacturing facilityEnabling higher process titers at a manufacturing facility
Enabling higher process titers at a manufacturing facility
GBX Summits
 
EC Ajawara_Resume_2015MS
EC Ajawara_Resume_2015MSEC Ajawara_Resume_2015MS
EC Ajawara_Resume_2015MS
Emmanuel Ajawara
 
Project Funding Guidelines
Project Funding GuidelinesProject Funding Guidelines
Project Funding Guidelines
Dilip Pandey
 
RESUME-JOSE FALCON
RESUME-JOSE FALCONRESUME-JOSE FALCON
RESUME-JOSE FALCON
Jose Falcon
 

La actualidad más candente (20)

G con future flexible facility - mj 03-2015
G con future flexible facility  - mj 03-2015G con future flexible facility  - mj 03-2015
G con future flexible facility - mj 03-2015
 
Helping a Small Biotech Reach a Critical Milestone
Helping a Small Biotech Reach a Critical MilestoneHelping a Small Biotech Reach a Critical Milestone
Helping a Small Biotech Reach a Critical Milestone
 
aaaQA_Dir. SteveCVQ216
aaaQA_Dir. SteveCVQ216aaaQA_Dir. SteveCVQ216
aaaQA_Dir. SteveCVQ216
 
Case Studies in Pharmaceutical Project Management.
Case Studies in Pharmaceutical Project Management.Case Studies in Pharmaceutical Project Management.
Case Studies in Pharmaceutical Project Management.
 
Resume Kevin_Koski_August_2016
Resume Kevin_Koski_August_2016Resume Kevin_Koski_August_2016
Resume Kevin_Koski_August_2016
 
How To Manage and Mitigate Risk in Medical Device New Product Development
How To Manage and Mitigate Risk in Medical Device New Product DevelopmentHow To Manage and Mitigate Risk in Medical Device New Product Development
How To Manage and Mitigate Risk in Medical Device New Product Development
 
Design Controls: Building Objective Evidence and Process Architecture to Mee...
Design Controls: Building Objective Evidence and Process Architecture  to Mee...Design Controls: Building Objective Evidence and Process Architecture  to Mee...
Design Controls: Building Objective Evidence and Process Architecture to Mee...
 
SMi Group's 3rd annual Pre-Filled Syringes West Coast 2018
SMi Group's 3rd annual Pre-Filled Syringes West Coast 2018SMi Group's 3rd annual Pre-Filled Syringes West Coast 2018
SMi Group's 3rd annual Pre-Filled Syringes West Coast 2018
 
Morciglio current resume 2016
Morciglio current resume 2016Morciglio current resume 2016
Morciglio current resume 2016
 
Accelerating Post-approval Change Management with ICH Q12
Accelerating Post-approval Change Management with ICH Q12Accelerating Post-approval Change Management with ICH Q12
Accelerating Post-approval Change Management with ICH Q12
 
How to Prepare for an FDA Inspection and Respond to FDA 483's / Warning Letters
How to Prepare for an FDA Inspection and Respond to FDA 483's / Warning LettersHow to Prepare for an FDA Inspection and Respond to FDA 483's / Warning Letters
How to Prepare for an FDA Inspection and Respond to FDA 483's / Warning Letters
 
Presentation trvx cdmo-v2
Presentation trvx   cdmo-v2Presentation trvx   cdmo-v2
Presentation trvx cdmo-v2
 
AWR resume
AWR resumeAWR resume
AWR resume
 
CV-Jose - 2015
CV-Jose - 2015CV-Jose - 2015
CV-Jose - 2015
 
FDA Inspections are Different from ISO Audits, So Don't Treat Them the Same -...
FDA Inspections are Different from ISO Audits, So Don't Treat Them the Same -...FDA Inspections are Different from ISO Audits, So Don't Treat Them the Same -...
FDA Inspections are Different from ISO Audits, So Don't Treat Them the Same -...
 
The FDA Early Feasibility Study Pilot and the Innovation Pathway
The FDA Early Feasibility Study Pilot and the Innovation PathwayThe FDA Early Feasibility Study Pilot and the Innovation Pathway
The FDA Early Feasibility Study Pilot and the Innovation Pathway
 
Enabling higher process titers at a manufacturing facility
Enabling higher process titers at a manufacturing facilityEnabling higher process titers at a manufacturing facility
Enabling higher process titers at a manufacturing facility
 
EC Ajawara_Resume_2015MS
EC Ajawara_Resume_2015MSEC Ajawara_Resume_2015MS
EC Ajawara_Resume_2015MS
 
Project Funding Guidelines
Project Funding GuidelinesProject Funding Guidelines
Project Funding Guidelines
 
RESUME-JOSE FALCON
RESUME-JOSE FALCONRESUME-JOSE FALCON
RESUME-JOSE FALCON
 

Similar a The Importance of Reduced and Predictable Project Timelines, By: Dennis Powers - G-CON Manufacturing

Nancy K Johnson PMP_resume
Nancy K Johnson PMP_resumeNancy K Johnson PMP_resume
Nancy K Johnson PMP_resume
Nancy Johnson
 
Contract manufacturing, By Anubhav Singh, M.pharm
Contract manufacturing, By Anubhav Singh, M.pharmContract manufacturing, By Anubhav Singh, M.pharm
Contract manufacturing, By Anubhav Singh, M.pharm
Anubhav Singh
 
It's easy to turn money into technology...
It's easy to turn money into technology...It's easy to turn money into technology...
It's easy to turn money into technology...
Team Consulting Ltd
 
Product definition starting point for medical device manufacturing
Product definition starting point for medical device manufacturingProduct definition starting point for medical device manufacturing
Product definition starting point for medical device manufacturing
Katherine Dalton
 
The Medical Device Milestone Map
The Medical Device Milestone MapThe Medical Device Milestone Map
The Medical Device Milestone Map
Revital (Tali) Hirsch
 
industrial microbial culture (1).pdf
industrial microbial culture (1).pdfindustrial microbial culture (1).pdf
industrial microbial culture (1).pdf
RupajitBhattacharjee1
 
Planning & Scheduling of Commercial Building using Microsoft Project & Applic...
Planning & Scheduling of Commercial Building using Microsoft Project & Applic...Planning & Scheduling of Commercial Building using Microsoft Project & Applic...
Planning & Scheduling of Commercial Building using Microsoft Project & Applic...
IRJET Journal
 
Technology Absorption & Management, Concurrent Engineering, Project Management
Technology Absorption & Management, Concurrent Engineering, Project ManagementTechnology Absorption & Management, Concurrent Engineering, Project Management
Technology Absorption & Management, Concurrent Engineering, Project Management
MOHAMMED FAHEEM KHAN
 
Having a Prosperous New Year with Your CRO: The Gift of a Great Contract!
Having a Prosperous New Year with Your CRO: The Gift of a Great Contract!Having a Prosperous New Year with Your CRO: The Gift of a Great Contract!
Having a Prosperous New Year with Your CRO: The Gift of a Great Contract!
mwright1
 
Customerlogo hereProject Name Project CharterCompany
Customerlogo hereProject Name Project CharterCompanyCustomerlogo hereProject Name Project CharterCompany
Customerlogo hereProject Name Project CharterCompany
OllieShoresna
 
Future flexible facility needs - mj 06-2016
Future flexible facility needs - mj 06-2016Future flexible facility needs - mj 06-2016
Future flexible facility needs - mj 06-2016
MWJornitz
 
6 Tips to Accelerate MedTech Time To Clinical Data
6 Tips to Accelerate MedTech Time To Clinical Data6 Tips to Accelerate MedTech Time To Clinical Data
6 Tips to Accelerate MedTech Time To Clinical Data
Andy Rogers
 
IJSRED-V2I2P1
IJSRED-V2I2P1IJSRED-V2I2P1
IJSRED-V2I2P1
IJSRED
 
Does Innovation Pay DIA 2006
Does Innovation Pay DIA 2006Does Innovation Pay DIA 2006
Does Innovation Pay DIA 2006
Neil Patel
 
Qualty Competence in Outsourced Formulations Labs - Making the Grade
Qualty Competence in Outsourced Formulations Labs - Making the GradeQualty Competence in Outsourced Formulations Labs - Making the Grade
Qualty Competence in Outsourced Formulations Labs - Making the Grade
Quality & Regulatory Network LLC
 
project management
project managementproject management
project management
Sanchita Siromoni
 
UNIT 1
UNIT 1UNIT 1
Building the Right Product vs. The Product Right
Building the Right Product vs. The Product RightBuilding the Right Product vs. The Product Right
Building the Right Product vs. The Product Right
MojoTech
 
Reconsidering the Potential of Commissioning and Startup
Reconsidering the Potential of Commissioning and StartupReconsidering the Potential of Commissioning and Startup
Reconsidering the Potential of Commissioning and Startup
Olivia Wilson
 
Project management risks.pptx for college
Project management risks.pptx for collegeProject management risks.pptx for college
Project management risks.pptx for college
ssuser829171
 

Similar a The Importance of Reduced and Predictable Project Timelines, By: Dennis Powers - G-CON Manufacturing (20)

Nancy K Johnson PMP_resume
Nancy K Johnson PMP_resumeNancy K Johnson PMP_resume
Nancy K Johnson PMP_resume
 
Contract manufacturing, By Anubhav Singh, M.pharm
Contract manufacturing, By Anubhav Singh, M.pharmContract manufacturing, By Anubhav Singh, M.pharm
Contract manufacturing, By Anubhav Singh, M.pharm
 
It's easy to turn money into technology...
It's easy to turn money into technology...It's easy to turn money into technology...
It's easy to turn money into technology...
 
Product definition starting point for medical device manufacturing
Product definition starting point for medical device manufacturingProduct definition starting point for medical device manufacturing
Product definition starting point for medical device manufacturing
 
The Medical Device Milestone Map
The Medical Device Milestone MapThe Medical Device Milestone Map
The Medical Device Milestone Map
 
industrial microbial culture (1).pdf
industrial microbial culture (1).pdfindustrial microbial culture (1).pdf
industrial microbial culture (1).pdf
 
Planning & Scheduling of Commercial Building using Microsoft Project & Applic...
Planning & Scheduling of Commercial Building using Microsoft Project & Applic...Planning & Scheduling of Commercial Building using Microsoft Project & Applic...
Planning & Scheduling of Commercial Building using Microsoft Project & Applic...
 
Technology Absorption & Management, Concurrent Engineering, Project Management
Technology Absorption & Management, Concurrent Engineering, Project ManagementTechnology Absorption & Management, Concurrent Engineering, Project Management
Technology Absorption & Management, Concurrent Engineering, Project Management
 
Having a Prosperous New Year with Your CRO: The Gift of a Great Contract!
Having a Prosperous New Year with Your CRO: The Gift of a Great Contract!Having a Prosperous New Year with Your CRO: The Gift of a Great Contract!
Having a Prosperous New Year with Your CRO: The Gift of a Great Contract!
 
Customerlogo hereProject Name Project CharterCompany
Customerlogo hereProject Name Project CharterCompanyCustomerlogo hereProject Name Project CharterCompany
Customerlogo hereProject Name Project CharterCompany
 
Future flexible facility needs - mj 06-2016
Future flexible facility needs - mj 06-2016Future flexible facility needs - mj 06-2016
Future flexible facility needs - mj 06-2016
 
6 Tips to Accelerate MedTech Time To Clinical Data
6 Tips to Accelerate MedTech Time To Clinical Data6 Tips to Accelerate MedTech Time To Clinical Data
6 Tips to Accelerate MedTech Time To Clinical Data
 
IJSRED-V2I2P1
IJSRED-V2I2P1IJSRED-V2I2P1
IJSRED-V2I2P1
 
Does Innovation Pay DIA 2006
Does Innovation Pay DIA 2006Does Innovation Pay DIA 2006
Does Innovation Pay DIA 2006
 
Qualty Competence in Outsourced Formulations Labs - Making the Grade
Qualty Competence in Outsourced Formulations Labs - Making the GradeQualty Competence in Outsourced Formulations Labs - Making the Grade
Qualty Competence in Outsourced Formulations Labs - Making the Grade
 
project management
project managementproject management
project management
 
UNIT 1
UNIT 1UNIT 1
UNIT 1
 
Building the Right Product vs. The Product Right
Building the Right Product vs. The Product RightBuilding the Right Product vs. The Product Right
Building the Right Product vs. The Product Right
 
Reconsidering the Potential of Commissioning and Startup
Reconsidering the Potential of Commissioning and StartupReconsidering the Potential of Commissioning and Startup
Reconsidering the Potential of Commissioning and Startup
 
Project management risks.pptx for college
Project management risks.pptx for collegeProject management risks.pptx for college
Project management risks.pptx for college
 

Más de Brittany Berryman

Standardized Cleanrooms Give Biopharma the Speed it Needs
Standardized Cleanrooms Give Biopharma the Speed it NeedsStandardized Cleanrooms Give Biopharma the Speed it Needs
Standardized Cleanrooms Give Biopharma the Speed it Needs
Brittany Berryman
 
White paper 2020: G-CON's Transmissible Disease Defense Units
White paper 2020: G-CON's Transmissible Disease Defense UnitsWhite paper 2020: G-CON's Transmissible Disease Defense Units
White paper 2020: G-CON's Transmissible Disease Defense Units
Brittany Berryman
 
Delivery of the First POD to Europe... Achieved with Flying Colors
Delivery of the First POD to Europe... Achieved with Flying ColorsDelivery of the First POD to Europe... Achieved with Flying Colors
Delivery of the First POD to Europe... Achieved with Flying Colors
Brittany Berryman
 
How to Get iCON Ready
How to Get iCON ReadyHow to Get iCON Ready
How to Get iCON Ready
Brittany Berryman
 
iCON: The Turnkey Facility of the Future Here Today
iCON: The Turnkey Facility of the Future Here TodayiCON: The Turnkey Facility of the Future Here Today
iCON: The Turnkey Facility of the Future Here Today
Brittany Berryman
 
Deployable Facilities Offer Pay As-You-Go Biomanufacturing Says Just
Deployable Facilities Offer Pay As-You-Go Biomanufacturing Says JustDeployable Facilities Offer Pay As-You-Go Biomanufacturing Says Just
Deployable Facilities Offer Pay As-You-Go Biomanufacturing Says Just
Brittany Berryman
 
Cleanroom PODs with LifeAire Systems
Cleanroom PODs with LifeAire SystemsCleanroom PODs with LifeAire Systems
Cleanroom PODs with LifeAire Systems
Brittany Berryman
 
Trends of Modular Mobile Cleanroom Facilities
Trends of Modular Mobile Cleanroom FacilitiesTrends of Modular Mobile Cleanroom Facilities
Trends of Modular Mobile Cleanroom Facilities
Brittany Berryman
 
Cost Comparison of Cleanroom Designs
Cost Comparison of Cleanroom DesignsCost Comparison of Cleanroom Designs
Cost Comparison of Cleanroom Designs
Brittany Berryman
 

Más de Brittany Berryman (9)

Standardized Cleanrooms Give Biopharma the Speed it Needs
Standardized Cleanrooms Give Biopharma the Speed it NeedsStandardized Cleanrooms Give Biopharma the Speed it Needs
Standardized Cleanrooms Give Biopharma the Speed it Needs
 
White paper 2020: G-CON's Transmissible Disease Defense Units
White paper 2020: G-CON's Transmissible Disease Defense UnitsWhite paper 2020: G-CON's Transmissible Disease Defense Units
White paper 2020: G-CON's Transmissible Disease Defense Units
 
Delivery of the First POD to Europe... Achieved with Flying Colors
Delivery of the First POD to Europe... Achieved with Flying ColorsDelivery of the First POD to Europe... Achieved with Flying Colors
Delivery of the First POD to Europe... Achieved with Flying Colors
 
How to Get iCON Ready
How to Get iCON ReadyHow to Get iCON Ready
How to Get iCON Ready
 
iCON: The Turnkey Facility of the Future Here Today
iCON: The Turnkey Facility of the Future Here TodayiCON: The Turnkey Facility of the Future Here Today
iCON: The Turnkey Facility of the Future Here Today
 
Deployable Facilities Offer Pay As-You-Go Biomanufacturing Says Just
Deployable Facilities Offer Pay As-You-Go Biomanufacturing Says JustDeployable Facilities Offer Pay As-You-Go Biomanufacturing Says Just
Deployable Facilities Offer Pay As-You-Go Biomanufacturing Says Just
 
Cleanroom PODs with LifeAire Systems
Cleanroom PODs with LifeAire SystemsCleanroom PODs with LifeAire Systems
Cleanroom PODs with LifeAire Systems
 
Trends of Modular Mobile Cleanroom Facilities
Trends of Modular Mobile Cleanroom FacilitiesTrends of Modular Mobile Cleanroom Facilities
Trends of Modular Mobile Cleanroom Facilities
 
Cost Comparison of Cleanroom Designs
Cost Comparison of Cleanroom DesignsCost Comparison of Cleanroom Designs
Cost Comparison of Cleanroom Designs
 

Último

Hemodialysis: Chapter 5, Dialyzers Overview - Dr.Gawad
Hemodialysis: Chapter 5, Dialyzers Overview - Dr.GawadHemodialysis: Chapter 5, Dialyzers Overview - Dr.Gawad
Hemodialysis: Chapter 5, Dialyzers Overview - Dr.Gawad
NephroTube - Dr.Gawad
 
Osteoporosis - Definition , Evaluation and Management .pdf
Osteoporosis - Definition , Evaluation and Management .pdfOsteoporosis - Definition , Evaluation and Management .pdf
Osteoporosis - Definition , Evaluation and Management .pdf
Jim Jacob Roy
 
Ear and its clinical correlations By Dr. Rabia Inam Gandapore.pptx
Ear and its clinical correlations By Dr. Rabia Inam Gandapore.pptxEar and its clinical correlations By Dr. Rabia Inam Gandapore.pptx
Ear and its clinical correlations By Dr. Rabia Inam Gandapore.pptx
Dr. Rabia Inam Gandapore
 
CHEMOTHERAPY_RDP_CHAPTER 3_ANTIFUNGAL AGENT.pdf
CHEMOTHERAPY_RDP_CHAPTER 3_ANTIFUNGAL AGENT.pdfCHEMOTHERAPY_RDP_CHAPTER 3_ANTIFUNGAL AGENT.pdf
CHEMOTHERAPY_RDP_CHAPTER 3_ANTIFUNGAL AGENT.pdf
rishi2789
 
Medical Quiz ( Online Quiz for API Meet 2024 ).pdf
Medical Quiz ( Online Quiz for API Meet 2024 ).pdfMedical Quiz ( Online Quiz for API Meet 2024 ).pdf
Medical Quiz ( Online Quiz for API Meet 2024 ).pdf
Jim Jacob Roy
 
CHEMOTHERAPY_RDP_CHAPTER 4_ANTI VIRAL DRUGS.pdf
CHEMOTHERAPY_RDP_CHAPTER 4_ANTI VIRAL DRUGS.pdfCHEMOTHERAPY_RDP_CHAPTER 4_ANTI VIRAL DRUGS.pdf
CHEMOTHERAPY_RDP_CHAPTER 4_ANTI VIRAL DRUGS.pdf
rishi2789
 
share - Lions, tigers, AI and health misinformation, oh my!.pptx
share - Lions, tigers, AI and health misinformation, oh my!.pptxshare - Lions, tigers, AI and health misinformation, oh my!.pptx
share - Lions, tigers, AI and health misinformation, oh my!.pptx
Tina Purnat
 
NARCOTICS- POLICY AND PROCEDURES FOR ITS USE
NARCOTICS- POLICY AND PROCEDURES FOR ITS USENARCOTICS- POLICY AND PROCEDURES FOR ITS USE
NARCOTICS- POLICY AND PROCEDURES FOR ITS USE
Dr. Ahana Haroon
 
Integrating Ayurveda into Parkinson’s Management: A Holistic Approach
Integrating Ayurveda into Parkinson’s Management: A Holistic ApproachIntegrating Ayurveda into Parkinson’s Management: A Holistic Approach
Integrating Ayurveda into Parkinson’s Management: A Holistic Approach
Ayurveda ForAll
 
The Electrocardiogram - Physiologic Principles
The Electrocardiogram - Physiologic PrinciplesThe Electrocardiogram - Physiologic Principles
The Electrocardiogram - Physiologic Principles
MedicoseAcademics
 
Vestibulocochlear Nerve by Dr. Rabia Inam Gandapore.pptx
Vestibulocochlear Nerve by Dr. Rabia Inam Gandapore.pptxVestibulocochlear Nerve by Dr. Rabia Inam Gandapore.pptx
Vestibulocochlear Nerve by Dr. Rabia Inam Gandapore.pptx
Dr. Rabia Inam Gandapore
 
Cell Therapy Expansion and Challenges in Autoimmune Disease
Cell Therapy Expansion and Challenges in Autoimmune DiseaseCell Therapy Expansion and Challenges in Autoimmune Disease
Cell Therapy Expansion and Challenges in Autoimmune Disease
Health Advances
 
Histopathology of Rheumatoid Arthritis: Visual treat
Histopathology of Rheumatoid Arthritis: Visual treatHistopathology of Rheumatoid Arthritis: Visual treat
Histopathology of Rheumatoid Arthritis: Visual treat
DIVYANSHU740006
 
The Nervous and Chemical Regulation of Respiration
The Nervous and Chemical Regulation of RespirationThe Nervous and Chemical Regulation of Respiration
The Nervous and Chemical Regulation of Respiration
MedicoseAcademics
 
Cardiac Assessment for B.sc Nursing Student.pdf
Cardiac Assessment for B.sc Nursing Student.pdfCardiac Assessment for B.sc Nursing Student.pdf
Cardiac Assessment for B.sc Nursing Student.pdf
shivalingatalekar1
 
Efficacy of Avartana Sneha in Ayurveda
Efficacy of Avartana Sneha in AyurvedaEfficacy of Avartana Sneha in Ayurveda
Efficacy of Avartana Sneha in Ayurveda
Dr. Jyothirmai Paindla
 
Hemodialysis: Chapter 4, Dialysate Circuit - Dr.Gawad
Hemodialysis: Chapter 4, Dialysate Circuit - Dr.GawadHemodialysis: Chapter 4, Dialysate Circuit - Dr.Gawad
Hemodialysis: Chapter 4, Dialysate Circuit - Dr.Gawad
NephroTube - Dr.Gawad
 
Netter's Atlas of Human Anatomy 7.ed.pdf
Netter's Atlas of Human Anatomy 7.ed.pdfNetter's Atlas of Human Anatomy 7.ed.pdf
Netter's Atlas of Human Anatomy 7.ed.pdf
BrissaOrtiz3
 
OCT Training Course for clinical practice Part 1
OCT Training Course for clinical practice Part 1OCT Training Course for clinical practice Part 1
OCT Training Course for clinical practice Part 1
KafrELShiekh University
 
pathology MCQS introduction to pathology general pathology
pathology MCQS introduction to pathology general pathologypathology MCQS introduction to pathology general pathology
pathology MCQS introduction to pathology general pathology
ZayedKhan38
 

Último (20)

Hemodialysis: Chapter 5, Dialyzers Overview - Dr.Gawad
Hemodialysis: Chapter 5, Dialyzers Overview - Dr.GawadHemodialysis: Chapter 5, Dialyzers Overview - Dr.Gawad
Hemodialysis: Chapter 5, Dialyzers Overview - Dr.Gawad
 
Osteoporosis - Definition , Evaluation and Management .pdf
Osteoporosis - Definition , Evaluation and Management .pdfOsteoporosis - Definition , Evaluation and Management .pdf
Osteoporosis - Definition , Evaluation and Management .pdf
 
Ear and its clinical correlations By Dr. Rabia Inam Gandapore.pptx
Ear and its clinical correlations By Dr. Rabia Inam Gandapore.pptxEar and its clinical correlations By Dr. Rabia Inam Gandapore.pptx
Ear and its clinical correlations By Dr. Rabia Inam Gandapore.pptx
 
CHEMOTHERAPY_RDP_CHAPTER 3_ANTIFUNGAL AGENT.pdf
CHEMOTHERAPY_RDP_CHAPTER 3_ANTIFUNGAL AGENT.pdfCHEMOTHERAPY_RDP_CHAPTER 3_ANTIFUNGAL AGENT.pdf
CHEMOTHERAPY_RDP_CHAPTER 3_ANTIFUNGAL AGENT.pdf
 
Medical Quiz ( Online Quiz for API Meet 2024 ).pdf
Medical Quiz ( Online Quiz for API Meet 2024 ).pdfMedical Quiz ( Online Quiz for API Meet 2024 ).pdf
Medical Quiz ( Online Quiz for API Meet 2024 ).pdf
 
CHEMOTHERAPY_RDP_CHAPTER 4_ANTI VIRAL DRUGS.pdf
CHEMOTHERAPY_RDP_CHAPTER 4_ANTI VIRAL DRUGS.pdfCHEMOTHERAPY_RDP_CHAPTER 4_ANTI VIRAL DRUGS.pdf
CHEMOTHERAPY_RDP_CHAPTER 4_ANTI VIRAL DRUGS.pdf
 
share - Lions, tigers, AI and health misinformation, oh my!.pptx
share - Lions, tigers, AI and health misinformation, oh my!.pptxshare - Lions, tigers, AI and health misinformation, oh my!.pptx
share - Lions, tigers, AI and health misinformation, oh my!.pptx
 
NARCOTICS- POLICY AND PROCEDURES FOR ITS USE
NARCOTICS- POLICY AND PROCEDURES FOR ITS USENARCOTICS- POLICY AND PROCEDURES FOR ITS USE
NARCOTICS- POLICY AND PROCEDURES FOR ITS USE
 
Integrating Ayurveda into Parkinson’s Management: A Holistic Approach
Integrating Ayurveda into Parkinson’s Management: A Holistic ApproachIntegrating Ayurveda into Parkinson’s Management: A Holistic Approach
Integrating Ayurveda into Parkinson’s Management: A Holistic Approach
 
The Electrocardiogram - Physiologic Principles
The Electrocardiogram - Physiologic PrinciplesThe Electrocardiogram - Physiologic Principles
The Electrocardiogram - Physiologic Principles
 
Vestibulocochlear Nerve by Dr. Rabia Inam Gandapore.pptx
Vestibulocochlear Nerve by Dr. Rabia Inam Gandapore.pptxVestibulocochlear Nerve by Dr. Rabia Inam Gandapore.pptx
Vestibulocochlear Nerve by Dr. Rabia Inam Gandapore.pptx
 
Cell Therapy Expansion and Challenges in Autoimmune Disease
Cell Therapy Expansion and Challenges in Autoimmune DiseaseCell Therapy Expansion and Challenges in Autoimmune Disease
Cell Therapy Expansion and Challenges in Autoimmune Disease
 
Histopathology of Rheumatoid Arthritis: Visual treat
Histopathology of Rheumatoid Arthritis: Visual treatHistopathology of Rheumatoid Arthritis: Visual treat
Histopathology of Rheumatoid Arthritis: Visual treat
 
The Nervous and Chemical Regulation of Respiration
The Nervous and Chemical Regulation of RespirationThe Nervous and Chemical Regulation of Respiration
The Nervous and Chemical Regulation of Respiration
 
Cardiac Assessment for B.sc Nursing Student.pdf
Cardiac Assessment for B.sc Nursing Student.pdfCardiac Assessment for B.sc Nursing Student.pdf
Cardiac Assessment for B.sc Nursing Student.pdf
 
Efficacy of Avartana Sneha in Ayurveda
Efficacy of Avartana Sneha in AyurvedaEfficacy of Avartana Sneha in Ayurveda
Efficacy of Avartana Sneha in Ayurveda
 
Hemodialysis: Chapter 4, Dialysate Circuit - Dr.Gawad
Hemodialysis: Chapter 4, Dialysate Circuit - Dr.GawadHemodialysis: Chapter 4, Dialysate Circuit - Dr.Gawad
Hemodialysis: Chapter 4, Dialysate Circuit - Dr.Gawad
 
Netter's Atlas of Human Anatomy 7.ed.pdf
Netter's Atlas of Human Anatomy 7.ed.pdfNetter's Atlas of Human Anatomy 7.ed.pdf
Netter's Atlas of Human Anatomy 7.ed.pdf
 
OCT Training Course for clinical practice Part 1
OCT Training Course for clinical practice Part 1OCT Training Course for clinical practice Part 1
OCT Training Course for clinical practice Part 1
 
pathology MCQS introduction to pathology general pathology
pathology MCQS introduction to pathology general pathologypathology MCQS introduction to pathology general pathology
pathology MCQS introduction to pathology general pathology
 

The Importance of Reduced and Predictable Project Timelines, By: Dennis Powers - G-CON Manufacturing

  • 1. TECHNICALLY SPEAKING 4 | PODTalk Newsletter | Q4 2018 Dennis Powers Vice President of Business Development & Sales Engineering The Importance of Reduced and Predictable Project Timelines Introduction Reducing project schedules and completing facility projects on time has never been more important to our industry than it is today. It is critical that drug manufacturers have the capability of and capacity for producing therapies and treatments that are needed by patients around the world. With the spotlight on the new cell and gene therapies that are being launched, and their effectiveness for curing life threatening diseases, the importance of well-controlled project timelines using pre-fabricated modular facility solutions continues to grow. The Impact of Project Timelines Historically, most drug manufacturers have followed a traditional facility construction approach with extended project timelines, high onsite complexity, and risks. Very few of the facilities built using this approach were completed on time to their planned schedule and it was not uncommon for a new facility project to take up to 5 years from start to finish. Because of the duration of project schedules and the unpredictability of traditional on-site construction, drug manufacturers have had to make large capital investments in new facilities long before they required the capacity for their drug products. This has posed significant financial risk to the companies under the following scenarios: • A facility built for a drug product that failed in clinical trials and/or did not get regulatory approval • A facility delayed in start-up that could not commercially manufacture a new drug product upon regulatory approval • A facility which was oversized and underutilized for producing a drug product that did not achieve the expected market acceptance • A facility which was undersized and not capable of meeting the market demand for a drug product. The Problem with Traditional Facility Schedules There are many reasons for lengthy schedules and why they get delayed during the design, construction, and commissioning phases of a project. Because most facilities in our industry have been stick-built, each one has been a unique or custom design based on the manufacturers’ requirements, but also on the A&E firm’s experience, design preferences, and desire to differentiate their work. This non-standardized approach requires a significant upfront engineering design effort with multiple stage gates for design reviews and approvals before moving to the next phase. Traditional stick-built facilities require sequential construction phases where the building shell is first erected, followed by building core and utilities, and finally the critical cleanroom and process infrastructure. This requires the continual planning, coordination, and interaction of multiple sub-contractors and services at the construction site. Due to the complexity there is often a domino effect of construction delays if tasks are not started or completed on time due to permitting issues, material availability, labor shortages, or weather. The Benefits of a Pre-Fabricated Modular Solution PODs represent an innovative pre-fabricated modular cleanroom solution that can be effective in avoiding the extended project schedules, delays, and many other issues experienced with traditional construction. The off-site fabrication of the PODs allows for parallel construction activities of both the cleanroom infrastructure and shell building/core which provides a more compressed project timeline. And because the PODs are fabricated in a well-controlled factory environment by an experienced labor force, the risk of schedule delays as well as the number of on-site contractors, staging areas, safety issues, and overall project liability can be significantly reduced. The end result is a shorter and more predictable project timeline that can help drug manufacturers produce the required capacity when they need it. The prefabricated approach also mitigates manufacturers’ financial risks by allowing them to delay their capital investment until months before the capacity is required or until the product is further along in the clinical trial process and with a higher probability for regulatory approval. The pre-fabricated modular approach can help companies prevent the potential loss of millions of dollars in revenue as well as prevent the wasting of millions of dollars in capital to build a facility that cannot be used as planned.