SlideShare una empresa de Scribd logo
1 de 21
Jacques Cartier Bicycle Path Network
April 30, 2018
Advisory Committee
2
Agenda
+ Meeting called to order 5 minutes
+ Network operation 15 minutes
+ Work and projects 30 minutes
+ Winter path opening 15 minutes
+ Next steps 5 minutes
3
Advisory committee
+ Formalize and structure discussions
about the Jacques Cartier Bridge bicycle
path network with cyclist groups and
partners
+ Track current issues and projects on a
quarterly basis
+ Help promote active transportation with
paths that are safe, accessible and
user-friendly
Review of goals
Network operation
Improvements for next season
5
Network operation
Follow-up on suggestions for
improvement
+ Analysis of reflector installation to reduce
path glare
+ Work on an electrical box last fall
+ Continued reflection process on issues
related to vehicles coming from Île Sainte-
Hélène
Work and projects
Improvements to the pedestrian and bicycle path
network
7
Review of upcoming work
+ Pilot project for painting and steel work in
section 7, which will have an impact on traffic
between June and October
+ Concrete repair and waterproofing work resulting
in occasional closures of the path and sidewalk
+ Work planned for the Île Sainte-Hélène ramps
+ Steel work under the structure
8
Replacement of guard rails
+ Work status
- Replacement of 500 guard-rail sections along
the multipurpose path and sidewalk
- Night closures from 9:00 p.m. to 5:00 a.m. from
April 30 to May 4 and May 7 to 8 with opening
of the sidewalk
- Opening of the sidewalk on May 20
+ Planning and work methods
- Major safety issues – complete removal of
sections
- Four guards posted at each access point to
ensure work site security and keep people off
the sidewalk and path
+ Schedule overview
- Work scheduled to end May 20
9
Modification of chicanes
+ Why were the chicanes modified?
- Reduce speed on the multipurpose path
- Enhance everyone's safety
- Facilitate maintenance of the multipurpose path
+ 5 chicanes in total (2 Longueuil, 2 Île Sainte-
Hélène pedestrian crossing, and 1 Montreal)
+ Upcoming modifications
- Addition of signage by the end of May
+ Technical standards
- 3 meters between each barrier as per the supplier’s
recommendation
- Allow bikes with a trailer to pass
10
Current regulations:
Powered scooters
Licence class Registration Helmet Allowed on
public roads
Allowed on
sidewalk
Motorcycle
and electric
moped
6A or 6D Yes: Green licence
plate
Yes Allowed Not allowed
Power-
assisted
bicycle
6D: for ages 14 to 17
No licence: for adults
None Yes
(bicycle
helmet)
Allowed
(except for
controlled
access roads)
Not allowed
MMA:
Motorized
mobility aids
No licence required None No Allowed Allowed
11
Separation of the
bicycle path and sidewalk
+ Program to be implemented to raise
awareness to help pedestrians/cyclists get
along
- Activity planned in May during Bike Month
- Committee members were asked for their help
+ An action plan is being prepared
- Stairs, better signage, etc.
- Counting of pedestrians-cyclists
Winter maintenance
Update on pilot project
13
Winter maintenance project
Winter maintenance pilot testing
Number of interventions 29
Type of snow removal operations
Basic operation, improved operation
and adapted operation
Number of products tested 9
Type of products tested Conventional and biological (organic)
Total duration of snow removal
operations
65 hours (snow removal operations)
30 hours (follow-up)
Heating system Mat and membrane
Number of follow-up visits 4
End of operations March 31, 2018
14
Winter maintenance – Ongoing learning
Consolidation
Improvement
Analyse
Collecte de données
15
Site climate analysis
Winter maintenance – Falling ice
16
Site climate analysis
Winter maintenance – Falling ice
17
Thermal analysis of the slab
Winter maintenance –
Heating systems
Next steps
Contact and next meetings
19
Next steps
May 2018: making pedestrians and cyclists
aware of the need to get along
End of summer 2018: publication of results of
the multipurpose path winter maintenance pilot
project
20
Next steps
Contact us
+ Advisory Committee, Claudia Carbonneau
(ccarbonneau@jccbi.ca / 450-651-8771, extension 2533)
+ Complaints and suggestions:
communications@pjcci.ca
or via Twitter @pontJCBridge
Next meeting
+ June 20, 2018
Jacques Cartier Bicycle Path Network - Advisory Committee - April 30, 2018

Más contenido relacionado

Similar a Jacques Cartier Bicycle Path Network - Advisory Committee - April 30, 2018

Phil Jones 3 Feb15 newcastle cycling symposium
Phil Jones 3 Feb15 newcastle cycling symposiumPhil Jones 3 Feb15 newcastle cycling symposium
Phil Jones 3 Feb15 newcastle cycling symposiumnewcycling
 
Vintersykling i Oulu
Vintersykling i OuluVintersykling i Oulu
Vintersykling i Ouluinsam
 
Delivering Dublin's Future Cycle Network
Delivering Dublin's Future Cycle NetworkDelivering Dublin's Future Cycle Network
Delivering Dublin's Future Cycle NetworkKevin Baker
 
Operation Moving Traffic
Operation Moving TrafficOperation Moving Traffic
Operation Moving TrafficJumpingJaq
 
2014 03-13 Planning and Designing for Cyclists
2014 03-13 Planning and Designing for Cyclists2014 03-13 Planning and Designing for Cyclists
2014 03-13 Planning and Designing for CyclistsCycling Scotland
 
ECF presentation Budapest SUSCO 2015
ECF presentation Budapest SUSCO 2015ECF presentation Budapest SUSCO 2015
ECF presentation Budapest SUSCO 2015William Nederpelt
 
The Minneapolis Bicycle Story David Peterson
The Minneapolis Bicycle Story David PetersonThe Minneapolis Bicycle Story David Peterson
The Minneapolis Bicycle Story David PetersonTrailnet
 
Proposed Leslie Street Closure Town Hall Meeting - April 2019
Proposed Leslie Street Closure Town Hall Meeting - April 2019Proposed Leslie Street Closure Town Hall Meeting - April 2019
Proposed Leslie Street Closure Town Hall Meeting - April 2019Crosstown TO
 
2013 11-11 Planning and Designing for Cyclists
2013 11-11 Planning and Designing for Cyclists2013 11-11 Planning and Designing for Cyclists
2013 11-11 Planning and Designing for CyclistsCycling Scotland
 
PM - Proposta de Rede Cicloviária para Aveiro (Cycling Network Proposal)
PM - Proposta de Rede Cicloviária para Aveiro (Cycling Network Proposal) PM - Proposta de Rede Cicloviária para Aveiro (Cycling Network Proposal)
PM - Proposta de Rede Cicloviária para Aveiro (Cycling Network Proposal) José Otávio Braga
 
Birmingham Cycle Revolution, Paul Simkins- Cycle City Event
Birmingham Cycle Revolution, Paul Simkins- Cycle City EventBirmingham Cycle Revolution, Paul Simkins- Cycle City Event
Birmingham Cycle Revolution, Paul Simkins- Cycle City EventDesign South East
 
City of Port Phillip proposed Streescape for Acland st
City of Port Phillip proposed Streescape for Acland stCity of Port Phillip proposed Streescape for Acland st
City of Port Phillip proposed Streescape for Acland stCity of Port Phillip
 

Similar a Jacques Cartier Bicycle Path Network - Advisory Committee - April 30, 2018 (20)

Jacques Cartier Bicycle Path Network - Advisory Committee - October 4, 2017
Jacques Cartier Bicycle Path Network - Advisory Committee - October 4, 2017Jacques Cartier Bicycle Path Network - Advisory Committee - October 4, 2017
Jacques Cartier Bicycle Path Network - Advisory Committee - October 4, 2017
 
2 cip infuse-ottawa-bennett
2 cip infuse-ottawa-bennett2 cip infuse-ottawa-bennett
2 cip infuse-ottawa-bennett
 
Phil Jones 3 Feb15 newcastle cycling symposium
Phil Jones 3 Feb15 newcastle cycling symposiumPhil Jones 3 Feb15 newcastle cycling symposium
Phil Jones 3 Feb15 newcastle cycling symposium
 
Vintersykling i Oulu
Vintersykling i OuluVintersykling i Oulu
Vintersykling i Oulu
 
Delivering Dublin's Future Cycle Network
Delivering Dublin's Future Cycle NetworkDelivering Dublin's Future Cycle Network
Delivering Dublin's Future Cycle Network
 
Review of work in 2016
Review of work in 2016Review of work in 2016
Review of work in 2016
 
Operation Moving Traffic
Operation Moving TrafficOperation Moving Traffic
Operation Moving Traffic
 
2014 03-13 Planning and Designing for Cyclists
2014 03-13 Planning and Designing for Cyclists2014 03-13 Planning and Designing for Cyclists
2014 03-13 Planning and Designing for Cyclists
 
ECF presentation Budapest SUSCO 2015
ECF presentation Budapest SUSCO 2015ECF presentation Budapest SUSCO 2015
ECF presentation Budapest SUSCO 2015
 
The Minneapolis Bicycle Story David Peterson
The Minneapolis Bicycle Story David PetersonThe Minneapolis Bicycle Story David Peterson
The Minneapolis Bicycle Story David Peterson
 
Maximizing Biking and Walking Access to Transit
Maximizing Biking and Walking Access to TransitMaximizing Biking and Walking Access to Transit
Maximizing Biking and Walking Access to Transit
 
Proposed Leslie Street Closure Town Hall Meeting - April 2019
Proposed Leslie Street Closure Town Hall Meeting - April 2019Proposed Leslie Street Closure Town Hall Meeting - April 2019
Proposed Leslie Street Closure Town Hall Meeting - April 2019
 
2013 11-11 Planning and Designing for Cyclists
2013 11-11 Planning and Designing for Cyclists2013 11-11 Planning and Designing for Cyclists
2013 11-11 Planning and Designing for Cyclists
 
PM - Proposta de Rede Cicloviária para Aveiro (Cycling Network Proposal)
PM - Proposta de Rede Cicloviária para Aveiro (Cycling Network Proposal) PM - Proposta de Rede Cicloviária para Aveiro (Cycling Network Proposal)
PM - Proposta de Rede Cicloviária para Aveiro (Cycling Network Proposal)
 
Complete Streets in Large Urban Counties
Complete Streets in Large Urban CountiesComplete Streets in Large Urban Counties
Complete Streets in Large Urban Counties
 
Scarborough Subway Extension - Phase 2 Presentation
Scarborough Subway Extension - Phase 2 PresentationScarborough Subway Extension - Phase 2 Presentation
Scarborough Subway Extension - Phase 2 Presentation
 
Birmingham Cycle Revolution, Paul Simkins- Cycle City Event
Birmingham Cycle Revolution, Paul Simkins- Cycle City EventBirmingham Cycle Revolution, Paul Simkins- Cycle City Event
Birmingham Cycle Revolution, Paul Simkins- Cycle City Event
 
Eduardo Feio S4C Colloquium Aveiro 2016
Eduardo Feio S4C Colloquium Aveiro 2016Eduardo Feio S4C Colloquium Aveiro 2016
Eduardo Feio S4C Colloquium Aveiro 2016
 
City of Port Phillip proposed Streescape for Acland st
City of Port Phillip proposed Streescape for Acland stCity of Port Phillip proposed Streescape for Acland st
City of Port Phillip proposed Streescape for Acland st
 
Coordinated Transit Planning in Toronto
Coordinated Transit Planning in TorontoCoordinated Transit Planning in Toronto
Coordinated Transit Planning in Toronto
 

Más de Ponts Jacques Cartier + Champlain Bridges

Comité consultatif - Réseau cyclable du pont Jacques-Cartier - 30 avril 2018
Comité consultatif - Réseau cyclable du pont Jacques-Cartier - 30 avril 2018Comité consultatif - Réseau cyclable du pont Jacques-Cartier - 30 avril 2018
Comité consultatif - Réseau cyclable du pont Jacques-Cartier - 30 avril 2018Ponts Jacques Cartier + Champlain Bridges
 
Réseau cyclable du pont Jacques-Cartier - Comité consultatif - Rencontre du 2...
Réseau cyclable du pont Jacques-Cartier - Comité consultatif - Rencontre du 2...Réseau cyclable du pont Jacques-Cartier - Comité consultatif - Rencontre du 2...
Réseau cyclable du pont Jacques-Cartier - Comité consultatif - Rencontre du 2...Ponts Jacques Cartier + Champlain Bridges
 
Réseau cyclable du pont Jacques-Cartier - Comité consultatif - Rencontre du 4...
Réseau cyclable du pont Jacques-Cartier - Comité consultatif - Rencontre du 4...Réseau cyclable du pont Jacques-Cartier - Comité consultatif - Rencontre du 4...
Réseau cyclable du pont Jacques-Cartier - Comité consultatif - Rencontre du 4...Ponts Jacques Cartier + Champlain Bridges
 
Good Neighbourly Relations Committee - Jacques Cartier Bridge - February 6, 2018
Good Neighbourly Relations Committee - Jacques Cartier Bridge - February 6, 2018Good Neighbourly Relations Committee - Jacques Cartier Bridge - February 6, 2018
Good Neighbourly Relations Committee - Jacques Cartier Bridge - February 6, 2018Ponts Jacques Cartier + Champlain Bridges
 
Solution Bonaventure - Projet environnemental visant à protéger le fleuve Sai...
Solution Bonaventure - Projet environnemental visant à protéger le fleuve Sai...Solution Bonaventure - Projet environnemental visant à protéger le fleuve Sai...
Solution Bonaventure - Projet environnemental visant à protéger le fleuve Sai...Ponts Jacques Cartier + Champlain Bridges
 

Más de Ponts Jacques Cartier + Champlain Bridges (20)

2018-06-19 - Réseau cyclable du pont Jacques-Cartier - Comité consultatif
2018-06-19 - Réseau cyclable du pont Jacques-Cartier - Comité consultatif2018-06-19 - Réseau cyclable du pont Jacques-Cartier - Comité consultatif
2018-06-19 - Réseau cyclable du pont Jacques-Cartier - Comité consultatif
 
Jacques Cartier Bridge Good Neighbourly Relations Committee - May 8, 2018
Jacques Cartier Bridge Good Neighbourly Relations Committee - May 8, 2018Jacques Cartier Bridge Good Neighbourly Relations Committee - May 8, 2018
Jacques Cartier Bridge Good Neighbourly Relations Committee - May 8, 2018
 
Comité consultatif - Réseau cyclable du pont Jacques-Cartier - 30 avril 2018
Comité consultatif - Réseau cyclable du pont Jacques-Cartier - 30 avril 2018Comité consultatif - Réseau cyclable du pont Jacques-Cartier - 30 avril 2018
Comité consultatif - Réseau cyclable du pont Jacques-Cartier - 30 avril 2018
 
Comité de bon voisinage du pont Jacques-Cartier - 8 mai 2018
Comité de bon voisinage du pont Jacques-Cartier - 8 mai 2018Comité de bon voisinage du pont Jacques-Cartier - 8 mai 2018
Comité de bon voisinage du pont Jacques-Cartier - 8 mai 2018
 
Réseau cyclable du pont Jacques-Cartier - Comité consultatif - Rencontre du 2...
Réseau cyclable du pont Jacques-Cartier - Comité consultatif - Rencontre du 2...Réseau cyclable du pont Jacques-Cartier - Comité consultatif - Rencontre du 2...
Réseau cyclable du pont Jacques-Cartier - Comité consultatif - Rencontre du 2...
 
Réseau cyclable du pont Jacques-Cartier - Comité consultatif - Rencontre du 4...
Réseau cyclable du pont Jacques-Cartier - Comité consultatif - Rencontre du 4...Réseau cyclable du pont Jacques-Cartier - Comité consultatif - Rencontre du 4...
Réseau cyclable du pont Jacques-Cartier - Comité consultatif - Rencontre du 4...
 
Planification 2018
Planification 2018Planification 2018
Planification 2018
 
2018 Planning
2018 Planning2018 Planning
2018 Planning
 
Illumination of the Jacques Cartier Bridge
Illumination of the Jacques Cartier BridgeIllumination of the Jacques Cartier Bridge
Illumination of the Jacques Cartier Bridge
 
Comité de bon voisinage - pont Jacques-Cartier - 6 février 2018
Comité de bon voisinage - pont Jacques-Cartier - 6 février 2018Comité de bon voisinage - pont Jacques-Cartier - 6 février 2018
Comité de bon voisinage - pont Jacques-Cartier - 6 février 2018
 
Good Neighbourly Relations Committee - Jacques Cartier Bridge - February 6, 2018
Good Neighbourly Relations Committee - Jacques Cartier Bridge - February 6, 2018Good Neighbourly Relations Committee - Jacques Cartier Bridge - February 6, 2018
Good Neighbourly Relations Committee - Jacques Cartier Bridge - February 6, 2018
 
Solution Bonaventure - Projet environnemental visant à protéger le fleuve Sai...
Solution Bonaventure - Projet environnemental visant à protéger le fleuve Sai...Solution Bonaventure - Projet environnemental visant à protéger le fleuve Sai...
Solution Bonaventure - Projet environnemental visant à protéger le fleuve Sai...
 
Réseau cyclable du pont Jacques-Cartier - Comité consultatif
Réseau cyclable du pont Jacques-Cartier - Comité consultatifRéseau cyclable du pont Jacques-Cartier - Comité consultatif
Réseau cyclable du pont Jacques-Cartier - Comité consultatif
 
Assemblée publique annuelle 2017 / Annual Public Meeting 2017
Assemblée publique annuelle 2017 / Annual Public Meeting 2017Assemblée publique annuelle 2017 / Annual Public Meeting 2017
Assemblée publique annuelle 2017 / Annual Public Meeting 2017
 
Planification 2017 : Présentation des chantiers majeurs
Planification 2017 : Présentation des chantiers majeursPlanification 2017 : Présentation des chantiers majeurs
Planification 2017 : Présentation des chantiers majeurs
 
Réseau cyclable et piétonnier 2016
Réseau cyclable et piétonnier  2016Réseau cyclable et piétonnier  2016
Réseau cyclable et piétonnier 2016
 
Bilan des travaux 2016 de PJCCI
Bilan des travaux 2016 de PJCCIBilan des travaux 2016 de PJCCI
Bilan des travaux 2016 de PJCCI
 
Annual Public Meeting 2016
Annual Public Meeting 2016Annual Public Meeting 2016
Annual Public Meeting 2016
 
Assemblée publique annuelle 2016
Assemblée publique annuelle 2016Assemblée publique annuelle 2016
Assemblée publique annuelle 2016
 
Solution Bonaventure
Solution BonaventureSolution Bonaventure
Solution Bonaventure
 

Último

Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spaintimesproduction05
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...tanu pandey
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Christo Ananth
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 

Último (20)

NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spain
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 

Jacques Cartier Bicycle Path Network - Advisory Committee - April 30, 2018

  • 1. Jacques Cartier Bicycle Path Network April 30, 2018 Advisory Committee
  • 2. 2 Agenda + Meeting called to order 5 minutes + Network operation 15 minutes + Work and projects 30 minutes + Winter path opening 15 minutes + Next steps 5 minutes
  • 3. 3 Advisory committee + Formalize and structure discussions about the Jacques Cartier Bridge bicycle path network with cyclist groups and partners + Track current issues and projects on a quarterly basis + Help promote active transportation with paths that are safe, accessible and user-friendly Review of goals
  • 5. 5 Network operation Follow-up on suggestions for improvement + Analysis of reflector installation to reduce path glare + Work on an electrical box last fall + Continued reflection process on issues related to vehicles coming from Île Sainte- Hélène
  • 6. Work and projects Improvements to the pedestrian and bicycle path network
  • 7. 7 Review of upcoming work + Pilot project for painting and steel work in section 7, which will have an impact on traffic between June and October + Concrete repair and waterproofing work resulting in occasional closures of the path and sidewalk + Work planned for the Île Sainte-Hélène ramps + Steel work under the structure
  • 8. 8 Replacement of guard rails + Work status - Replacement of 500 guard-rail sections along the multipurpose path and sidewalk - Night closures from 9:00 p.m. to 5:00 a.m. from April 30 to May 4 and May 7 to 8 with opening of the sidewalk - Opening of the sidewalk on May 20 + Planning and work methods - Major safety issues – complete removal of sections - Four guards posted at each access point to ensure work site security and keep people off the sidewalk and path + Schedule overview - Work scheduled to end May 20
  • 9. 9 Modification of chicanes + Why were the chicanes modified? - Reduce speed on the multipurpose path - Enhance everyone's safety - Facilitate maintenance of the multipurpose path + 5 chicanes in total (2 Longueuil, 2 Île Sainte- Hélène pedestrian crossing, and 1 Montreal) + Upcoming modifications - Addition of signage by the end of May + Technical standards - 3 meters between each barrier as per the supplier’s recommendation - Allow bikes with a trailer to pass
  • 10. 10 Current regulations: Powered scooters Licence class Registration Helmet Allowed on public roads Allowed on sidewalk Motorcycle and electric moped 6A or 6D Yes: Green licence plate Yes Allowed Not allowed Power- assisted bicycle 6D: for ages 14 to 17 No licence: for adults None Yes (bicycle helmet) Allowed (except for controlled access roads) Not allowed MMA: Motorized mobility aids No licence required None No Allowed Allowed
  • 11. 11 Separation of the bicycle path and sidewalk + Program to be implemented to raise awareness to help pedestrians/cyclists get along - Activity planned in May during Bike Month - Committee members were asked for their help + An action plan is being prepared - Stairs, better signage, etc. - Counting of pedestrians-cyclists
  • 13. 13 Winter maintenance project Winter maintenance pilot testing Number of interventions 29 Type of snow removal operations Basic operation, improved operation and adapted operation Number of products tested 9 Type of products tested Conventional and biological (organic) Total duration of snow removal operations 65 hours (snow removal operations) 30 hours (follow-up) Heating system Mat and membrane Number of follow-up visits 4 End of operations March 31, 2018
  • 14. 14 Winter maintenance – Ongoing learning Consolidation Improvement Analyse Collecte de données
  • 15. 15 Site climate analysis Winter maintenance – Falling ice
  • 16. 16 Site climate analysis Winter maintenance – Falling ice
  • 17. 17 Thermal analysis of the slab Winter maintenance – Heating systems
  • 18. Next steps Contact and next meetings
  • 19. 19 Next steps May 2018: making pedestrians and cyclists aware of the need to get along End of summer 2018: publication of results of the multipurpose path winter maintenance pilot project
  • 20. 20 Next steps Contact us + Advisory Committee, Claudia Carbonneau (ccarbonneau@jccbi.ca / 450-651-8771, extension 2533) + Complaints and suggestions: communications@pjcci.ca or via Twitter @pontJCBridge Next meeting + June 20, 2018

Notas del editor

  1. PV Explication du déroulement et de l’ordre du jour
  2. PV Accueil : Retour sur les objectifs du Comité Tour de table (membres) Adoption de l’ordre du jour
  3. DJ Pour les réflecteurs, j’ai un exemple à vous montrer. Nous allons les installer dès que nos opérations de nettoyage printanier seront complétées. Pour votre information, une garde a été installée sur le boîtier de l’illumination Nous avons exploré certaines solutions tels que le marquage, l’illumination du panneau Stop ou de Danger et l’aménagement d’une nouvelle signalisation. Une solution en fonction du guide de signalisation reconnu par le CSR sera proposée. À valider avec nos experts en circulation  
  4. PV Travaux à venir et à coordonner en 2018…Peinture section 7, garde-corps sur tout le pont, fibre optique… Réalisation de travaux de réparation de béton et d’imperméabilisant et que ceux-ci vont entrainer des fermetures ponctuelles de la piste cyclable et du trottoir et vont avoir lieu au printemps et au début de l’été 2018
  5. PV Nature des travaux Remplacement et sécurisation des garde-corps affaiblis par la corrosion causée par sels de déglaçage et embrun salin 260 du côté de la piste cyclable et 266 côté trottoir Message des agents de sécurité « La zone est dangereuse, morceaux de clôture manquant, risque de chute au fleuve ou au sol Échéancier Dernière semaine des travaux de nuit sur la piste multifonctionnelle: du 30 avril au 4 mai et lundi 7 et mardi 8 mai (trottoir ouvert) Ouverture du trottoir dès le 20 mai
  6. PV Nous avons modifié les chicanes pour réduire la vitesse dans les voies cyclables afin de favoriser la sécurité de tous les utilisateurs et aussi pour faciliter l’entretien de la piste multifonctionnelle. De la signalisation sera ajoutée d’ici la fin du mois de mai (marquage au sol et panneaux) pour indiquer la priorité à respecter. Aucune norme existe, PJCCI a suivi les recommandations du fournisseur
  7. Présentation de cette diapositive par la SQ
  8. Explications de PV
  9. Explications de PV
  10. PV Des analyses complémentaires doivent être réalisées ce qui occasionne un délai dans le dépôt des résultats de l’étude d’avant-projet d’entretien hivernal
  11. 1 rencontre par trimestre