REF: SIS-UNIRAC-RACKING-BASICS-REV-2
Racking Basics

          This is an introduction to
        Unirac’s PV Racking Systems

Other presentations we offer include:
• Unirac Attachment Options
• Unirac SolarMount, RapidRac, CLICKSYS, ISYS, ULA
• Array Tilt & Ground Cover Ratio (mutual shading) Optimization
• Working Safely with PV Systems
• Off-Grid, Grid-Tie, & Grid-Interactive Systems IOM
• Other training programs



                                                                  2
                              PROPRIETARY & CONFIDENTIAL
                                 CONTROLLED DOCUMENT
                          REF: SIS-UNIRAC-RACKING-BASICS-REV-2
Outline

• Safety First
       y
• Racking Fundamentals
• Basic Terminology
• Pole Mount O Options
• Racking Options
• Racking Design Pre Requisites
                   Pre-Requisites




                                                 3
              PROPRIETARY & CONFIDENTIAL
                 CONTROLLED DOCUMENT
          REF: SIS-UNIRAC-RACKING-BASICS-REV-2
Safety First
• Safety is the responsibility of every employee

• Safety is a full-time job

• Never work alone on a PV system

• Professional tools are a must

• Professional equipment training is a must

• Know your system before working on it

• All circuits must be considered live at all times

• Weather / Mechanical / Electrical Hazards
  pose very serious risks

• Adhere to local & international safety codes

• Severe injury or even death may result from
  improper handling
                                                                                4
                                             PROPRIETARY & CONFIDENTIAL
                                                CONTROLLED DOCUMENT
                                         REF: SIS-UNIRAC-RACKING-BASICS-REV-2
Racking Fundamentals

Where will the PV system be installed?
                   y

  • Ground Mount

  • Roof Mount

  • Pole Mount


                                                        5
                     PROPRIETARY & CONFIDENTIAL
                        CONTROLLED DOCUMENT
                 REF: SIS-UNIRAC-RACKING-BASICS-REV-2
Racking Components
Module Hardware - how the module is attached
 to the racking

Racking Type - what the module is attached to

Attachment Options - how the racking is
 attached to the substructure

Tilt - are the modules tilted away from the
                                 y
  substructure toward the sun?

                                                          6
                       PROPRIETARY & CONFIDENTIAL
                          CONTROLLED DOCUMENT
                   REF: SIS-UNIRAC-RACKING-BASICS-REV-2
Module-to-Rail Connections

Top mounting clamps

                                                     Bottom clips




                                                                    7
                  PROPRIETARY & CONFIDENTIAL
                     CONTROLLED DOCUMENT
              REF: SIS-UNIRAC-RACKING-BASICS-REV-2
Rail Types

• SolarMount Standard                               • SunFrame
• SolarMount Light
• SolarMount Heavy Duty




• SunFrame




                                                                 8
                         PROPRIETARY & CONFIDENTIAL
                            CONTROLLED DOCUMENT
                     REF: SIS-UNIRAC-RACKING-BASICS-REV-2
Connection Between Rail & Roof


• L-foot
• Standoff
• FastFoot
• Threaded Feet
• Tile hooks


                                                     9
                  PROPRIETARY & CONFIDENTIAL
                     CONTROLLED DOCUMENT
              REF: SIS-UNIRAC-RACKING-BASICS-REV-2
Basic Terminology


• Solar Module Orientation
• Solar Array Orientation Basic Tools
• Solar Array Orientation
• Solar Array Size
• Rail Orientation
• Tilt Mount
• Flush Mount

                                              10
           PROPRIETARY & CONFIDENTIAL
              CONTROLLED DOCUMENT
       REF: SIS-UNIRAC-RACKING-BASICS-REV-2
Solar Module Orientation




Landscape                                   Portrait


                                                       11
                PROPRIETARY & CONFIDENTIAL
                   CONTROLLED DOCUMENT
            REF: SIS-UNIRAC-RACKING-BASICS-REV-2
Solar Array Orientation
         Basic Tools
         B i T l




Compass                                          Inclinometer


                                                                12
              PROPRIETARY & CONFIDENTIAL
                 CONTROLLED DOCUMENT
          REF: SIS-UNIRAC-RACKING-BASICS-REV-2
Solar Array Orientation




• Facing True South for Northern Hemisphere Locations
• Facing True North for Southern Hemisphere Locations

                                                        13
                     PROPRIETARY & CONFIDENTIAL
                        CONTROLLED DOCUMENT
                 REF: SIS-UNIRAC-RACKING-BASICS-REV-2
Solar Array Orientation
             WHY Facing True South for Northern Hemisphere Locations ?




 Sun Path
Polar Plot
   for
Dubai UAE




                                                                         14
                                    PROPRIETARY & CONFIDENTIAL
                                       CONTROLLED DOCUMENT
                                REF: SIS-UNIRAC-RACKING-BASICS-REV-2
Solar Array Orientation
             WHY Facing South for Northern Hemisphere Locations ?




 Sun Path
Rect. Plot
   for
Dubai UAE




                                                                     15
                                  PROPRIETARY & CONFIDENTIAL
                                     CONTROLLED DOCUMENT
                              REF: SIS-UNIRAC-RACKING-BASICS-REV-2
Solar Array Size
       Modules arranged in rows and columns
       No. of E-W Rows x No. of N-S Columns
Array orientation is independent of module orientation




                                                         16
                      PROPRIETARY & CONFIDENTIAL
                         CONTROLLED DOCUMENT
                  REF: SIS-UNIRAC-RACKING-BASICS-REV-2
Rail Orientation

  When looking at a south-facing solar array:

• Rails running East-West
  are l
      low profile
             fil




• Rails running North-South
  are high profile


                                                            17
                         PROPRIETARY & CONFIDENTIAL
                            CONTROLLED DOCUMENT
                     REF: SIS-UNIRAC-RACKING-BASICS-REV-2
Sawtooth (Shed) Tilt




                                            18
         PROPRIETARY & CONFIDENTIAL
            CONTROLLED DOCUMENT
     REF: SIS-UNIRAC-RACKING-BASICS-REV-2
Continuous (Single Plane) Tilt




                                                 19
              PROPRIETARY & CONFIDENTIAL
                 CONTROLLED DOCUMENT
          REF: SIS-UNIRAC-RACKING-BASICS-REV-2
Low-Profile, Portrait Tilt




                                               20
            PROPRIETARY & CONFIDENTIAL
               CONTROLLED DOCUMENT
        REF: SIS-UNIRAC-RACKING-BASICS-REV-2
High-Profile, Landscape Tilt




                                                21
             PROPRIETARY & CONFIDENTIAL
                CONTROLLED DOCUMENT
         REF: SIS-UNIRAC-RACKING-BASICS-REV-2
Flush-to-Roof



• No additional tilt away from substructure
                        y
• Mounted close to roof – modules are
  within ten inches of roof




                                                       22
                    PROPRIETARY & CONFIDENTIAL
                       CONTROLLED DOCUMENT
                REF: SIS-UNIRAC-RACKING-BASICS-REV-2
Flush-to-Roof
No additional tilt away from substructure




                                                  23
               PROPRIETARY & CONFIDENTIAL
                  CONTROLLED DOCUMENT
           REF: SIS-UNIRAC-RACKING-BASICS-REV-2
Flush-to-Roof (SolarMount)




                                                 24
              PROPRIETARY & CONFIDENTIAL
                 CONTROLLED DOCUMENT
          REF: SIS-UNIRAC-RACKING-BASICS-REV-2
Flush-to-Roof (SunFrame)




                                               25
            PROPRIETARY & CONFIDENTIAL
               CONTROLLED DOCUMENT
        REF: SIS-UNIRAC-RACKING-BASICS-REV-2
Pole Mount Options


   1. Pole Top

   2. Pole Side
   2 P l Sid




                                            26
         PROPRIETARY & CONFIDENTIAL
            CONTROLLED DOCUMENT
     REF: SIS-UNIRAC-RACKING-BASICS-REV-2
Pole Mount – Pole Top




                                              27
           PROPRIETARY & CONFIDENTIAL
              CONTROLLED DOCUMENT
       REF: SIS-UNIRAC-RACKING-BASICS-REV-2
28
    PROPRIETARY & CONFIDENTIAL
       CONTROLLED DOCUMENT
REF: SIS-UNIRAC-RACKING-BASICS-REV-2
6” PoleTops




                                                     29
    PROPRIETARY & CONFIDENTIAL
       CONTROLLED DOCUMENT
REF: SIS-UNIRAC-RACKING-BASICS-REV-2
Pole Mount – Pole Side




Fixed tilt                             or adjustable

                                                       30
                 PROPRIETARY & CONFIDENTIAL
                    CONTROLLED DOCUMENT
             REF: SIS-UNIRAC-RACKING-BASICS-REV-2
31
    PROPRIETARY & CONFIDENTIAL
       CONTROLLED DOCUMENT
REF: SIS-UNIRAC-RACKING-BASICS-REV-2
Racking Options


 1. SolarMount
 2. SunFrame
 3.
 3 ULA
 4. RapidRac
 5. S-5!
    S 5!
 6. ClickSys




                                           32
        PROPRIETARY & CONFIDENTIAL
           CONTROLLED DOCUMENT
    REF: SIS-UNIRAC-RACKING-BASICS-REV-2
33
    PROPRIETARY & CONFIDENTIAL
       CONTROLLED DOCUMENT
REF: SIS-UNIRAC-RACKING-BASICS-REV-2
SolarMount Components




                                              34
           PROPRIETARY & CONFIDENTIAL
              CONTROLLED DOCUMENT
       REF: SIS-UNIRAC-RACKING-BASICS-REV-2
SolarMount Tilt


                                                           Tilt Leg
                                                           Adjustable
                                                              j
High-Profile
High Profile                                               or
                                                           Fixed




                                                         Low-Profile

                                                                        35
                      PROPRIETARY & CONFIDENTIAL
                         CONTROLLED DOCUMENT
                  REF: SIS-UNIRAC-RACKING-BASICS-REV-2
SolarMount can accommodate very
            long runs




                                                  36
               PROPRIETARY & CONFIDENTIAL
                  CONTROLLED DOCUMENT
           REF: SIS-UNIRAC-RACKING-BASICS-REV-2
Google Headquarters
  Mountain View, CA




                                                  37
               PROPRIETARY & CONFIDENTIAL
                  CONTROLLED DOCUMENT
           REF: SIS-UNIRAC-RACKING-BASICS-REV-2
Open Structure (SolarMount)




                                                38
             PROPRIETARY & CONFIDENTIAL
                CONTROLLED DOCUMENT
         REF: SIS-UNIRAC-RACKING-BASICS-REV-2
Awning for Residential Application




                                 39
40
    PROPRIETARY & CONFIDENTIAL
       CONTROLLED DOCUMENT
REF: SIS-UNIRAC-RACKING-BASICS-REV-2
41
    PROPRIETARY & CONFIDENTIAL
       CONTROLLED DOCUMENT
REF: SIS-UNIRAC-RACKING-BASICS-REV-2
• Quick and simple installation
• Fewer people on roof




                                                              42
                           PROPRIETARY & CONFIDENTIAL
                              CONTROLLED DOCUMENT
                       REF: SIS-UNIRAC-RACKING-BASICS-REV-2
Screw Slot




Larger Diameter
End Cap Screws




    Serrated Surface
       for L-Foot
      attachment


                                                                           43
                           PROPRIETARY & CONFIDENTIAL
                              CONTROLLED DOCUMENT
                       REF: SIS-UNIRAC-RACKING-BASICS-REV-2
Ground Mount




3 KILOWATTS TO 1+ MEGAWATT
                                                            44
          PROPRIETARY & CONFIDENTIAL
             CONTROLLED DOCUMENT
      REF: SIS-UNIRAC-RACKING-BASICS-REV-2
Ground Mount




                                                      45
    PROPRIETARY & CONFIDENTIAL
       CONTROLLED DOCUMENT
REF: SIS-UNIRAC-RACKING-BASICS-REV-2
Roof-Mounted U-LA
                           (reversing a slight north incline)




                                                           46
    PROPRIETARY & CONFIDENTIAL
       CONTROLLED DOCUMENT
REF: SIS-UNIRAC-RACKING-BASICS-REV-2
Ground Mount




                                                      47
    PROPRIETARY & CONFIDENTIAL
       CONTROLLED DOCUMENT
REF: SIS-UNIRAC-RACKING-BASICS-REV-2
PV s
PV’s Universal Flat Roof Solution
                                                 48
              PROPRIETARY & CONFIDENTIAL
                 CONTROLLED DOCUMENT
          REF: SIS-UNIRAC-RACKING-BASICS-REV-2
Ballast (RapidRac)




                                             49
          PROPRIETARY & CONFIDENTIAL
             CONTROLLED DOCUMENT
      REF: SIS-UNIRAC-RACKING-BASICS-REV-2
• Commercial flat roof
  racking system



•Delivers solution t customers’ #1 concerns
 D li       l ti to     t     ’
   lighter weight
   minimal penetration
   shorter installation times

                                                             50
                          PROPRIETARY & CONFIDENTIAL
                             CONTROLLED DOCUMENT
                      REF: SIS-UNIRAC-RACKING-BASICS-REV-2
•   Meets wind requirements up to 120 mph
•   Over 120 mph possible with some
    penetrations
•   Wind tunnel tested
•   May require zero penetrations


                                                        51
                     PROPRIETARY & CONFIDENTIAL
                        CONTROLLED DOCUMENT
                 REF: SIS-UNIRAC-RACKING-BASICS-REV-2
52
    PROPRIETARY & CONFIDENTIAL
       CONTROLLED DOCUMENT
REF: SIS-UNIRAC-RACKING-BASICS-REV-2
For tilt arrays
                 arrays,
attach SolarMount rail with S-5!
                                                 53
              PROPRIETARY & CONFIDENTIAL
                 CONTROLLED DOCUMENT
          REF: SIS-UNIRAC-RACKING-BASICS-REV-2
and now for something

completely different…



                                              54
           PROPRIETARY & CONFIDENTIAL
              CONTROLLED DOCUMENT
       REF: SIS-UNIRAC-RACKING-BASICS-REV-2
The lowest cost fastest flush roof
           cost, fastest,
        mounting system
                                                   55
                PROPRIETARY & CONFIDENTIAL
                   CONTROLLED DOCUMENT
            REF: SIS-UNIRAC-RACKING-BASICS-REV-2
CLICKSYS beam




                                          56
       PROPRIETARY & CONFIDENTIAL
          CONTROLLED DOCUMENT
   REF: SIS-UNIRAC-RACKING-BASICS-REV-2
The slider holds top mounting clamps
            on CLICKSYS




                                                    57
                 PROPRIETARY & CONFIDENTIAL
                    CONTROLLED DOCUMENT
             REF: SIS-UNIRAC-RACKING-BASICS-REV-2
CLICKSYS connectors

single flange
                                              double flange




                optional butyl pad


                                                              58
                      PROPRIETARY & CONFIDENTIAL
                         CONTROLLED DOCUMENT
                  REF: SIS-UNIRAC-RACKING-BASICS-REV-2
Click connections




                                           Click!




                                                    59
        PROPRIETARY & CONFIDENTIAL
           CONTROLLED DOCUMENT
    REF: SIS-UNIRAC-RACKING-BASICS-REV-2
CLICKSYS options

PV QuickMount flashing
   Q                 g

                                           Creotecc tile hook




                                         Unirac standoff


                                                                60
                         PROPRIETARY & CONFIDENTIAL
                            CONTROLLED DOCUMENT
                     REF: SIS-UNIRAC-RACKING-BASICS-REV-2
Racking Design Pre-Requisites
            (
            (Grid Tie Systems)
                       y     )




  1. Site Survey & Analysis
  2. Advanced Software & Hardware Tools
  3. Tilt Angle Analysis & Optimization
  4. Shading Analysis & Optimization




                                                   61
                PROPRIETARY & CONFIDENTIAL
                   CONTROLLED DOCUMENT
            REF: SIS-UNIRAC-RACKING-BASICS-REV-2
Site Survey & Analysis 1/2
                                 (
                                 (Grid Tie Systems)
                                            y     )
                              PV Grid Tie Systems Site Survey & Analysis Form
Site Name & Address                                                         Date      Job No.
Owner Name & Contact No.                                                    Eng. ID
Utility Name & A
Utilit N       Account N
                     t No.                                                  Tech.
                                                                            T h ID
                                  Pre-Visit Instructions & Notes
GPS & Google Maps
Sun Path Print
Note
N t 1
Note 2
                             Location & Distances of BOS Equipment
Electric Room                                     Distance to Array
Switchboard
S it hb d                                         Type/Model/Rating
                                                  T   /M d l/R ti
MDB                                               Type/Model/Rating
Meter                                             Type/Model/Rating
Substation / Transformer                          Type/Model/Rating
MDB S
    Spare C
          Connections
                ti                                Space for Inverters
                                                  S     f I      t
Space for Disconnects                             Space for Monit. Eqpt.
Site 24-Hour Access Y/N                           Data/Internet Point Y/N
Cables Routing Note 1                             Cables Routing Note 2
Take Ph t
T k Photos Y/N                                    Others
                                                  Oth
                                                                                                62
                                      PROPRIETARY & CONFIDENTIAL
                                         CONTROLLED DOCUMENT
                                  REF: SIS-UNIRAC-RACKING-BASICS-REV-2
Site Survey & Analysis 2/2
                                                          (
                                                          (Grid Tie Systems)
                                                                     y     )
                                                    PV Grid Tie Systems Site Survey & Analysis Form
Site Name & Address                                                                                Date      Job No.
Owner Name & Contact No.                                                                           Eng. ID
Utility Name & A
Utilit N       Account N
                     t No.                                                                         Tech.
                                                                                                   T h ID
                                                             Location of Solar Array
Roof / Ground                                                              Area
Height AGL                                                                 Orientation/Azimuth
Slope
Sl                           E-W
                             EW                     N-S
                                                    NS                     Fence / Parapet Y/N
                                                                           F       P     t
Surface Type                                                               Surface Finish
Wind Exposure Cat                                                          Seismic Cat.
Nearby Shading Y/N                 If Yes, Sketch on Sun Path Print        Nearby Shading Sketch
Solmetric Reading
S l t i R di Y/N                                                           New N b C
                                                                           N   Nearby Const. Y/N
                                                                                          t
Space for PV Combiners                                                     Space for DC Disconn.
Site 24-Hour Access Y/N                                                    Cables Routing Note 1
Take Photos Y/N                                                            Cables Routing Note 2
Others
Oth
Others
                                                          Obtain Site Drawings (As Built)
Electrical Drawings Y/N                                                    Others
Structural D
St t l Drawings Y/N
             i                                                             Others
                                                                           Oth
                                                                                                                       63
                                                              PROPRIETARY & CONFIDENTIAL
                                                                 CONTROLLED DOCUMENT
                                                          REF: SIS-UNIRAC-RACKING-BASICS-REV-2
Advanced Software & Hardware Tools

  1. Software: PVsyst
                  y


  2. Hardware: S
               Solmetric S
                         SunEye™




                                                         64
                      PROPRIETARY & CONFIDENTIAL
                         CONTROLLED DOCUMENT
                  REF: SIS-UNIRAC-RACKING-BASICS-REV-2
Tilt Angle Analysis & Optimization
            (Grid Tie Systems)




                                                   65
                PROPRIETARY & CONFIDENTIAL
                   CONTROLLED DOCUMENT
            REF: SIS-UNIRAC-RACKING-BASICS-REV-2
Shading Analysis & Optimization
            (Grid Tie Systems)

       Nearby Shading Effects




                                                   66
                PROPRIETARY & CONFIDENTIAL
                   CONTROLLED DOCUMENT
            REF: SIS-UNIRAC-RACKING-BASICS-REV-2
Shading Analysis & Optimization
            (Grid Tie Systems)

       Mutual Shading Effects




                                                   67
                PROPRIETARY & CONFIDENTIAL
                   CONTROLLED DOCUMENT
            REF: SIS-UNIRAC-RACKING-BASICS-REV-2
Shading Analysis & Optimization
              (Grid Tie Systems)

    Mutual-&-Nearby Shading Effects




                                                     68
                  PROPRIETARY & CONFIDENTIAL
                     CONTROLLED DOCUMENT
              REF: SIS-UNIRAC-RACKING-BASICS-REV-2
Summary
           (Grid Tie Systems)




                Geographic
                 Location


           Survey & Analysis

        Tilt A l O ti i ti
             Angle Optimization

    Layout & Shading Optimization


Unirac Solution Selection & Optimization


                                                  69
               PROPRIETARY & CONFIDENTIAL
                  CONTROLLED DOCUMENT
           REF: SIS-UNIRAC-RACKING-BASICS-REV-2
Thank you for attending

      UniRac Racking Basics
                   For questions, please contact us at:
                            fm28201@eim.ae
                            +971-50-624-6126
For products brochures, sizing charts, & installation manuals, please visit:

                             UniRac.com


                                                                               70
                                 PROPRIETARY & CONFIDENTIAL
                                    CONTROLLED DOCUMENT
                             REF: SIS-UNIRAC-RACKING-BASICS-REV-2

Más contenido relacionado

La actualidad más candente

Reducing RAN infrastructure resources by leveraging 5G RAN Transport Technolo...
Reducing RAN infrastructure resources by leveraging 5G RAN Transport Technolo...Reducing RAN infrastructure resources by leveraging 5G RAN Transport Technolo...
Reducing RAN infrastructure resources by leveraging 5G RAN Transport Technolo...Michael Gronovius
 
Building the foundations of Ultra-RELIABLE and Low-LATENCY Wireless Communica...
Building the foundations of Ultra-RELIABLE and Low-LATENCY Wireless Communica...Building the foundations of Ultra-RELIABLE and Low-LATENCY Wireless Communica...
Building the foundations of Ultra-RELIABLE and Low-LATENCY Wireless Communica...3G4G
 
Getting to the Edge – Exploring 4G/5G Cloud-RAN Deployable Solutions
Getting to the Edge – Exploring 4G/5G Cloud-RAN Deployable SolutionsGetting to the Edge – Exploring 4G/5G Cloud-RAN Deployable Solutions
Getting to the Edge – Exploring 4G/5G Cloud-RAN Deployable SolutionsRadisys Corporation
 
Grid-connected PV system
Grid-connected PV systemGrid-connected PV system
Grid-connected PV systemRamesh Adhikari
 
Qualcomm Snapdragon Processor
Qualcomm Snapdragon ProcessorQualcomm Snapdragon Processor
Qualcomm Snapdragon ProcessorKrishna Gehlot
 
cellular concepts in wireless communication
cellular concepts in wireless communicationcellular concepts in wireless communication
cellular concepts in wireless communicationasadkhan1327
 
5G Interview Questions: 50 Questions on Spectrum
5G Interview Questions: 50 Questions on Spectrum5G Interview Questions: 50 Questions on Spectrum
5G Interview Questions: 50 Questions on Spectrum3G4G
 
Wireless sensor network and its application
Wireless sensor network and its applicationWireless sensor network and its application
Wireless sensor network and its applicationRoma Vyas
 
Network optimization presentation generic dec18
Network optimization presentation generic dec18Network optimization presentation generic dec18
Network optimization presentation generic dec18frankjoh
 
Cellular concept
Cellular conceptCellular concept
Cellular conceptvish0110
 
Attracting and Maintaining Institutional Investment: Solar PV
Attracting and Maintaining Institutional Investment: Solar PVAttracting and Maintaining Institutional Investment: Solar PV
Attracting and Maintaining Institutional Investment: Solar PVEversheds Sutherland
 
Optical code division multiple access
Optical code division multiple accessOptical code division multiple access
Optical code division multiple accessMurtadha ali shukur
 
Land use/land cover classification using machine learning models
Land use/land cover classification using machine learning  modelsLand use/land cover classification using machine learning  models
Land use/land cover classification using machine learning modelsIJECEIAES
 
Element Management Subsystem
Element Management SubsystemElement Management Subsystem
Element Management Subsystemdevalnaik
 
Dell Technologies Dell EMC ISG Storage, CI, HCI and Data Protection Portfolio...
Dell Technologies Dell EMC ISG Storage, CI, HCI and Data Protection Portfolio...Dell Technologies Dell EMC ISG Storage, CI, HCI and Data Protection Portfolio...
Dell Technologies Dell EMC ISG Storage, CI, HCI and Data Protection Portfolio...Dell Technologies
 

La actualidad más candente (20)

Reducing RAN infrastructure resources by leveraging 5G RAN Transport Technolo...
Reducing RAN infrastructure resources by leveraging 5G RAN Transport Technolo...Reducing RAN infrastructure resources by leveraging 5G RAN Transport Technolo...
Reducing RAN infrastructure resources by leveraging 5G RAN Transport Technolo...
 
M.Tech Final Seminar
M.Tech Final SeminarM.Tech Final Seminar
M.Tech Final Seminar
 
Building the foundations of Ultra-RELIABLE and Low-LATENCY Wireless Communica...
Building the foundations of Ultra-RELIABLE and Low-LATENCY Wireless Communica...Building the foundations of Ultra-RELIABLE and Low-LATENCY Wireless Communica...
Building the foundations of Ultra-RELIABLE and Low-LATENCY Wireless Communica...
 
Getting to the Edge – Exploring 4G/5G Cloud-RAN Deployable Solutions
Getting to the Edge – Exploring 4G/5G Cloud-RAN Deployable SolutionsGetting to the Edge – Exploring 4G/5G Cloud-RAN Deployable Solutions
Getting to the Edge – Exploring 4G/5G Cloud-RAN Deployable Solutions
 
Grid-connected PV system
Grid-connected PV systemGrid-connected PV system
Grid-connected PV system
 
GPRS EDGE 3G 4G
GPRS EDGE 3G 4GGPRS EDGE 3G 4G
GPRS EDGE 3G 4G
 
Qualcomm Snapdragon Processor
Qualcomm Snapdragon ProcessorQualcomm Snapdragon Processor
Qualcomm Snapdragon Processor
 
cellular concepts in wireless communication
cellular concepts in wireless communicationcellular concepts in wireless communication
cellular concepts in wireless communication
 
Market Outlook for Energy Storage in India
Market Outlook for Energy Storage in IndiaMarket Outlook for Energy Storage in India
Market Outlook for Energy Storage in India
 
5G Interview Questions: 50 Questions on Spectrum
5G Interview Questions: 50 Questions on Spectrum5G Interview Questions: 50 Questions on Spectrum
5G Interview Questions: 50 Questions on Spectrum
 
Wireless sensor network and its application
Wireless sensor network and its applicationWireless sensor network and its application
Wireless sensor network and its application
 
Network optimization presentation generic dec18
Network optimization presentation generic dec18Network optimization presentation generic dec18
Network optimization presentation generic dec18
 
Gsm optimization
Gsm optimizationGsm optimization
Gsm optimization
 
Cellular concept
Cellular conceptCellular concept
Cellular concept
 
Attracting and Maintaining Institutional Investment: Solar PV
Attracting and Maintaining Institutional Investment: Solar PVAttracting and Maintaining Institutional Investment: Solar PV
Attracting and Maintaining Institutional Investment: Solar PV
 
Optical code division multiple access
Optical code division multiple accessOptical code division multiple access
Optical code division multiple access
 
Land use/land cover classification using machine learning models
Land use/land cover classification using machine learning  modelsLand use/land cover classification using machine learning  models
Land use/land cover classification using machine learning models
 
baseband-6648.pdf
baseband-6648.pdfbaseband-6648.pdf
baseband-6648.pdf
 
Element Management Subsystem
Element Management SubsystemElement Management Subsystem
Element Management Subsystem
 
Dell Technologies Dell EMC ISG Storage, CI, HCI and Data Protection Portfolio...
Dell Technologies Dell EMC ISG Storage, CI, HCI and Data Protection Portfolio...Dell Technologies Dell EMC ISG Storage, CI, HCI and Data Protection Portfolio...
Dell Technologies Dell EMC ISG Storage, CI, HCI and Data Protection Portfolio...
 

Destacado

Corporate Profile Presentation V2.0 (1)
Corporate Profile Presentation V2.0 (1)Corporate Profile Presentation V2.0 (1)
Corporate Profile Presentation V2.0 (1)Stuart Macnab
 
All You Need to Know About Type Script
All You Need to Know About Type ScriptAll You Need to Know About Type Script
All You Need to Know About Type ScriptFolio3 Software
 
General presentation Egemin 2015
General presentation Egemin 2015General presentation Egemin 2015
General presentation Egemin 2015Ronald Adriaenssens
 
Best Practices in SIS Documentation
Best Practices in SIS DocumentationBest Practices in SIS Documentation
Best Practices in SIS DocumentationEmerson Exchange
 
Project on construction of 3 block house report
Project on construction of 3 block house reportProject on construction of 3 block house report
Project on construction of 3 block house reportHagi Sahib
 
Material Handling Equipments
Material Handling EquipmentsMaterial Handling Equipments
Material Handling EquipmentsPuneeth Kamath
 
Construction of telecommunication towers
Construction of telecommunication towersConstruction of telecommunication towers
Construction of telecommunication towerssnookala
 
VanRiet Material Handling Systems Company Profile
VanRiet Material Handling Systems Company ProfileVanRiet Material Handling Systems Company Profile
VanRiet Material Handling Systems Company ProfileVanRietMHS
 

Destacado (11)

Corporate Profile Presentation V2.0 (1)
Corporate Profile Presentation V2.0 (1)Corporate Profile Presentation V2.0 (1)
Corporate Profile Presentation V2.0 (1)
 
All You Need to Know About Type Script
All You Need to Know About Type ScriptAll You Need to Know About Type Script
All You Need to Know About Type Script
 
Oose kk
Oose kkOose kk
Oose kk
 
General presentation Egemin 2015
General presentation Egemin 2015General presentation Egemin 2015
General presentation Egemin 2015
 
Best Practices in SIS Documentation
Best Practices in SIS DocumentationBest Practices in SIS Documentation
Best Practices in SIS Documentation
 
Project on construction of 3 block house report
Project on construction of 3 block house reportProject on construction of 3 block house report
Project on construction of 3 block house report
 
Cat SIS Fall 2011
Cat SIS Fall 2011Cat SIS Fall 2011
Cat SIS Fall 2011
 
Material Handling Equipments
Material Handling EquipmentsMaterial Handling Equipments
Material Handling Equipments
 
Phases of Construction - Solar Project
Phases of Construction - Solar ProjectPhases of Construction - Solar Project
Phases of Construction - Solar Project
 
Construction of telecommunication towers
Construction of telecommunication towersConstruction of telecommunication towers
Construction of telecommunication towers
 
VanRiet Material Handling Systems Company Profile
VanRiet Material Handling Systems Company ProfileVanRiet Material Handling Systems Company Profile
VanRiet Material Handling Systems Company Profile
 

Más de Fadi Maalouf, PMP

Green Hydrogen Financial Model Toolkit LCOH V6
Green Hydrogen Financial Model Toolkit LCOH V6Green Hydrogen Financial Model Toolkit LCOH V6
Green Hydrogen Financial Model Toolkit LCOH V6Fadi Maalouf, PMP
 
Green Ammonia Financial Model Toolkit LCOA
Green Ammonia Financial Model Toolkit LCOAGreen Ammonia Financial Model Toolkit LCOA
Green Ammonia Financial Model Toolkit LCOAFadi Maalouf, PMP
 
Green Hydrogen Financial Model Toolkit LCOH
Green Hydrogen Financial Model Toolkit LCOHGreen Hydrogen Financial Model Toolkit LCOH
Green Hydrogen Financial Model Toolkit LCOHFadi Maalouf, PMP
 
Green Hydrogen Financial Model Toolkit
Green Hydrogen Financial Model ToolkitGreen Hydrogen Financial Model Toolkit
Green Hydrogen Financial Model ToolkitFadi Maalouf, PMP
 
Project Finance Management Plan
Project Finance Management PlanProject Finance Management Plan
Project Finance Management PlanFadi Maalouf, PMP
 
New Era: Renewable Energy Beyond Distributed Generation and Utility Scale!
New Era: Renewable Energy Beyond Distributed Generation and Utility Scale!New Era: Renewable Energy Beyond Distributed Generation and Utility Scale!
New Era: Renewable Energy Beyond Distributed Generation and Utility Scale!Fadi Maalouf, PMP
 
Strategic Business Plan for IPP / EPC Renewable Energy Company
Strategic Business Plan for IPP / EPC Renewable Energy CompanyStrategic Business Plan for IPP / EPC Renewable Energy Company
Strategic Business Plan for IPP / EPC Renewable Energy CompanyFadi Maalouf, PMP
 
IPP Utility Scale Solar PV Project Development Roadmap
IPP Utility Scale Solar PV Project Development RoadmapIPP Utility Scale Solar PV Project Development Roadmap
IPP Utility Scale Solar PV Project Development RoadmapFadi Maalouf, PMP
 
PV Project Development Economic Feasibility Financial Model Baseline Case
PV Project Development Economic Feasibility Financial Model Baseline CasePV Project Development Economic Feasibility Financial Model Baseline Case
PV Project Development Economic Feasibility Financial Model Baseline CaseFadi Maalouf, PMP
 
PV Project Development Pre-Feasibility Financial Model
PV Project Development Pre-Feasibility Financial ModelPV Project Development Pre-Feasibility Financial Model
PV Project Development Pre-Feasibility Financial ModelFadi Maalouf, PMP
 

Más de Fadi Maalouf, PMP (13)

Green Hydrogen Financial Model Toolkit LCOH V6
Green Hydrogen Financial Model Toolkit LCOH V6Green Hydrogen Financial Model Toolkit LCOH V6
Green Hydrogen Financial Model Toolkit LCOH V6
 
Green Ammonia Financial Model Toolkit LCOA
Green Ammonia Financial Model Toolkit LCOAGreen Ammonia Financial Model Toolkit LCOA
Green Ammonia Financial Model Toolkit LCOA
 
Green Hydrogen Financial Model Toolkit LCOH
Green Hydrogen Financial Model Toolkit LCOHGreen Hydrogen Financial Model Toolkit LCOH
Green Hydrogen Financial Model Toolkit LCOH
 
Green Hydrogen Financial Model Toolkit
Green Hydrogen Financial Model ToolkitGreen Hydrogen Financial Model Toolkit
Green Hydrogen Financial Model Toolkit
 
SunBurn Test Presentation
SunBurn Test PresentationSunBurn Test Presentation
SunBurn Test Presentation
 
SunBurn Test
SunBurn TestSunBurn Test
SunBurn Test
 
Project Finance Management Plan
Project Finance Management PlanProject Finance Management Plan
Project Finance Management Plan
 
New Era: Renewable Energy Beyond Distributed Generation and Utility Scale!
New Era: Renewable Energy Beyond Distributed Generation and Utility Scale!New Era: Renewable Energy Beyond Distributed Generation and Utility Scale!
New Era: Renewable Energy Beyond Distributed Generation and Utility Scale!
 
Dii Toolkit Initiative
Dii Toolkit InitiativeDii Toolkit Initiative
Dii Toolkit Initiative
 
Strategic Business Plan for IPP / EPC Renewable Energy Company
Strategic Business Plan for IPP / EPC Renewable Energy CompanyStrategic Business Plan for IPP / EPC Renewable Energy Company
Strategic Business Plan for IPP / EPC Renewable Energy Company
 
IPP Utility Scale Solar PV Project Development Roadmap
IPP Utility Scale Solar PV Project Development RoadmapIPP Utility Scale Solar PV Project Development Roadmap
IPP Utility Scale Solar PV Project Development Roadmap
 
PV Project Development Economic Feasibility Financial Model Baseline Case
PV Project Development Economic Feasibility Financial Model Baseline CasePV Project Development Economic Feasibility Financial Model Baseline Case
PV Project Development Economic Feasibility Financial Model Baseline Case
 
PV Project Development Pre-Feasibility Financial Model
PV Project Development Pre-Feasibility Financial ModelPV Project Development Pre-Feasibility Financial Model
PV Project Development Pre-Feasibility Financial Model
 

Unirac PV Racking Basics

  • 1. 1 PROPRIETARY & CONFIDENTIAL CONTROLLED DOCUMENT REF: SIS-UNIRAC-RACKING-BASICS-REV-2
  • 2. Racking Basics This is an introduction to Unirac’s PV Racking Systems Other presentations we offer include: • Unirac Attachment Options • Unirac SolarMount, RapidRac, CLICKSYS, ISYS, ULA • Array Tilt & Ground Cover Ratio (mutual shading) Optimization • Working Safely with PV Systems • Off-Grid, Grid-Tie, & Grid-Interactive Systems IOM • Other training programs 2 PROPRIETARY & CONFIDENTIAL CONTROLLED DOCUMENT REF: SIS-UNIRAC-RACKING-BASICS-REV-2
  • 3. Outline • Safety First y • Racking Fundamentals • Basic Terminology • Pole Mount O Options • Racking Options • Racking Design Pre Requisites Pre-Requisites 3 PROPRIETARY & CONFIDENTIAL CONTROLLED DOCUMENT REF: SIS-UNIRAC-RACKING-BASICS-REV-2
  • 4. Safety First • Safety is the responsibility of every employee • Safety is a full-time job • Never work alone on a PV system • Professional tools are a must • Professional equipment training is a must • Know your system before working on it • All circuits must be considered live at all times • Weather / Mechanical / Electrical Hazards pose very serious risks • Adhere to local & international safety codes • Severe injury or even death may result from improper handling 4 PROPRIETARY & CONFIDENTIAL CONTROLLED DOCUMENT REF: SIS-UNIRAC-RACKING-BASICS-REV-2
  • 5. Racking Fundamentals Where will the PV system be installed? y • Ground Mount • Roof Mount • Pole Mount 5 PROPRIETARY & CONFIDENTIAL CONTROLLED DOCUMENT REF: SIS-UNIRAC-RACKING-BASICS-REV-2
  • 6. Racking Components Module Hardware - how the module is attached to the racking Racking Type - what the module is attached to Attachment Options - how the racking is attached to the substructure Tilt - are the modules tilted away from the y substructure toward the sun? 6 PROPRIETARY & CONFIDENTIAL CONTROLLED DOCUMENT REF: SIS-UNIRAC-RACKING-BASICS-REV-2
  • 7. Module-to-Rail Connections Top mounting clamps Bottom clips 7 PROPRIETARY & CONFIDENTIAL CONTROLLED DOCUMENT REF: SIS-UNIRAC-RACKING-BASICS-REV-2
  • 8. Rail Types • SolarMount Standard • SunFrame • SolarMount Light • SolarMount Heavy Duty • SunFrame 8 PROPRIETARY & CONFIDENTIAL CONTROLLED DOCUMENT REF: SIS-UNIRAC-RACKING-BASICS-REV-2
  • 9. Connection Between Rail & Roof • L-foot • Standoff • FastFoot • Threaded Feet • Tile hooks 9 PROPRIETARY & CONFIDENTIAL CONTROLLED DOCUMENT REF: SIS-UNIRAC-RACKING-BASICS-REV-2
  • 10. Basic Terminology • Solar Module Orientation • Solar Array Orientation Basic Tools • Solar Array Orientation • Solar Array Size • Rail Orientation • Tilt Mount • Flush Mount 10 PROPRIETARY & CONFIDENTIAL CONTROLLED DOCUMENT REF: SIS-UNIRAC-RACKING-BASICS-REV-2
  • 11. Solar Module Orientation Landscape Portrait 11 PROPRIETARY & CONFIDENTIAL CONTROLLED DOCUMENT REF: SIS-UNIRAC-RACKING-BASICS-REV-2
  • 12. Solar Array Orientation Basic Tools B i T l Compass Inclinometer 12 PROPRIETARY & CONFIDENTIAL CONTROLLED DOCUMENT REF: SIS-UNIRAC-RACKING-BASICS-REV-2
  • 13. Solar Array Orientation • Facing True South for Northern Hemisphere Locations • Facing True North for Southern Hemisphere Locations 13 PROPRIETARY & CONFIDENTIAL CONTROLLED DOCUMENT REF: SIS-UNIRAC-RACKING-BASICS-REV-2
  • 14. Solar Array Orientation WHY Facing True South for Northern Hemisphere Locations ? Sun Path Polar Plot for Dubai UAE 14 PROPRIETARY & CONFIDENTIAL CONTROLLED DOCUMENT REF: SIS-UNIRAC-RACKING-BASICS-REV-2
  • 15. Solar Array Orientation WHY Facing South for Northern Hemisphere Locations ? Sun Path Rect. Plot for Dubai UAE 15 PROPRIETARY & CONFIDENTIAL CONTROLLED DOCUMENT REF: SIS-UNIRAC-RACKING-BASICS-REV-2
  • 16. Solar Array Size Modules arranged in rows and columns No. of E-W Rows x No. of N-S Columns Array orientation is independent of module orientation 16 PROPRIETARY & CONFIDENTIAL CONTROLLED DOCUMENT REF: SIS-UNIRAC-RACKING-BASICS-REV-2
  • 17. Rail Orientation When looking at a south-facing solar array: • Rails running East-West are l low profile fil • Rails running North-South are high profile 17 PROPRIETARY & CONFIDENTIAL CONTROLLED DOCUMENT REF: SIS-UNIRAC-RACKING-BASICS-REV-2
  • 18. Sawtooth (Shed) Tilt 18 PROPRIETARY & CONFIDENTIAL CONTROLLED DOCUMENT REF: SIS-UNIRAC-RACKING-BASICS-REV-2
  • 19. Continuous (Single Plane) Tilt 19 PROPRIETARY & CONFIDENTIAL CONTROLLED DOCUMENT REF: SIS-UNIRAC-RACKING-BASICS-REV-2
  • 20. Low-Profile, Portrait Tilt 20 PROPRIETARY & CONFIDENTIAL CONTROLLED DOCUMENT REF: SIS-UNIRAC-RACKING-BASICS-REV-2
  • 21. High-Profile, Landscape Tilt 21 PROPRIETARY & CONFIDENTIAL CONTROLLED DOCUMENT REF: SIS-UNIRAC-RACKING-BASICS-REV-2
  • 22. Flush-to-Roof • No additional tilt away from substructure y • Mounted close to roof – modules are within ten inches of roof 22 PROPRIETARY & CONFIDENTIAL CONTROLLED DOCUMENT REF: SIS-UNIRAC-RACKING-BASICS-REV-2
  • 23. Flush-to-Roof No additional tilt away from substructure 23 PROPRIETARY & CONFIDENTIAL CONTROLLED DOCUMENT REF: SIS-UNIRAC-RACKING-BASICS-REV-2
  • 24. Flush-to-Roof (SolarMount) 24 PROPRIETARY & CONFIDENTIAL CONTROLLED DOCUMENT REF: SIS-UNIRAC-RACKING-BASICS-REV-2
  • 25. Flush-to-Roof (SunFrame) 25 PROPRIETARY & CONFIDENTIAL CONTROLLED DOCUMENT REF: SIS-UNIRAC-RACKING-BASICS-REV-2
  • 26. Pole Mount Options 1. Pole Top 2. Pole Side 2 P l Sid 26 PROPRIETARY & CONFIDENTIAL CONTROLLED DOCUMENT REF: SIS-UNIRAC-RACKING-BASICS-REV-2
  • 27. Pole Mount – Pole Top 27 PROPRIETARY & CONFIDENTIAL CONTROLLED DOCUMENT REF: SIS-UNIRAC-RACKING-BASICS-REV-2
  • 28. 28 PROPRIETARY & CONFIDENTIAL CONTROLLED DOCUMENT REF: SIS-UNIRAC-RACKING-BASICS-REV-2
  • 29. 6” PoleTops 29 PROPRIETARY & CONFIDENTIAL CONTROLLED DOCUMENT REF: SIS-UNIRAC-RACKING-BASICS-REV-2
  • 30. Pole Mount – Pole Side Fixed tilt or adjustable 30 PROPRIETARY & CONFIDENTIAL CONTROLLED DOCUMENT REF: SIS-UNIRAC-RACKING-BASICS-REV-2
  • 31. 31 PROPRIETARY & CONFIDENTIAL CONTROLLED DOCUMENT REF: SIS-UNIRAC-RACKING-BASICS-REV-2
  • 32. Racking Options 1. SolarMount 2. SunFrame 3. 3 ULA 4. RapidRac 5. S-5! S 5! 6. ClickSys 32 PROPRIETARY & CONFIDENTIAL CONTROLLED DOCUMENT REF: SIS-UNIRAC-RACKING-BASICS-REV-2
  • 33. 33 PROPRIETARY & CONFIDENTIAL CONTROLLED DOCUMENT REF: SIS-UNIRAC-RACKING-BASICS-REV-2
  • 34. SolarMount Components 34 PROPRIETARY & CONFIDENTIAL CONTROLLED DOCUMENT REF: SIS-UNIRAC-RACKING-BASICS-REV-2
  • 35. SolarMount Tilt Tilt Leg Adjustable j High-Profile High Profile or Fixed Low-Profile 35 PROPRIETARY & CONFIDENTIAL CONTROLLED DOCUMENT REF: SIS-UNIRAC-RACKING-BASICS-REV-2
  • 36. SolarMount can accommodate very long runs 36 PROPRIETARY & CONFIDENTIAL CONTROLLED DOCUMENT REF: SIS-UNIRAC-RACKING-BASICS-REV-2
  • 37. Google Headquarters Mountain View, CA 37 PROPRIETARY & CONFIDENTIAL CONTROLLED DOCUMENT REF: SIS-UNIRAC-RACKING-BASICS-REV-2
  • 38. Open Structure (SolarMount) 38 PROPRIETARY & CONFIDENTIAL CONTROLLED DOCUMENT REF: SIS-UNIRAC-RACKING-BASICS-REV-2
  • 39. Awning for Residential Application 39
  • 40. 40 PROPRIETARY & CONFIDENTIAL CONTROLLED DOCUMENT REF: SIS-UNIRAC-RACKING-BASICS-REV-2
  • 41. 41 PROPRIETARY & CONFIDENTIAL CONTROLLED DOCUMENT REF: SIS-UNIRAC-RACKING-BASICS-REV-2
  • 42. • Quick and simple installation • Fewer people on roof 42 PROPRIETARY & CONFIDENTIAL CONTROLLED DOCUMENT REF: SIS-UNIRAC-RACKING-BASICS-REV-2
  • 43. Screw Slot Larger Diameter End Cap Screws Serrated Surface for L-Foot attachment 43 PROPRIETARY & CONFIDENTIAL CONTROLLED DOCUMENT REF: SIS-UNIRAC-RACKING-BASICS-REV-2
  • 44. Ground Mount 3 KILOWATTS TO 1+ MEGAWATT 44 PROPRIETARY & CONFIDENTIAL CONTROLLED DOCUMENT REF: SIS-UNIRAC-RACKING-BASICS-REV-2
  • 45. Ground Mount 45 PROPRIETARY & CONFIDENTIAL CONTROLLED DOCUMENT REF: SIS-UNIRAC-RACKING-BASICS-REV-2
  • 46. Roof-Mounted U-LA (reversing a slight north incline) 46 PROPRIETARY & CONFIDENTIAL CONTROLLED DOCUMENT REF: SIS-UNIRAC-RACKING-BASICS-REV-2
  • 47. Ground Mount 47 PROPRIETARY & CONFIDENTIAL CONTROLLED DOCUMENT REF: SIS-UNIRAC-RACKING-BASICS-REV-2
  • 48. PV s PV’s Universal Flat Roof Solution 48 PROPRIETARY & CONFIDENTIAL CONTROLLED DOCUMENT REF: SIS-UNIRAC-RACKING-BASICS-REV-2
  • 49. Ballast (RapidRac) 49 PROPRIETARY & CONFIDENTIAL CONTROLLED DOCUMENT REF: SIS-UNIRAC-RACKING-BASICS-REV-2
  • 50. • Commercial flat roof racking system •Delivers solution t customers’ #1 concerns D li l ti to t ’ lighter weight minimal penetration shorter installation times 50 PROPRIETARY & CONFIDENTIAL CONTROLLED DOCUMENT REF: SIS-UNIRAC-RACKING-BASICS-REV-2
  • 51. Meets wind requirements up to 120 mph • Over 120 mph possible with some penetrations • Wind tunnel tested • May require zero penetrations 51 PROPRIETARY & CONFIDENTIAL CONTROLLED DOCUMENT REF: SIS-UNIRAC-RACKING-BASICS-REV-2
  • 52. 52 PROPRIETARY & CONFIDENTIAL CONTROLLED DOCUMENT REF: SIS-UNIRAC-RACKING-BASICS-REV-2
  • 53. For tilt arrays arrays, attach SolarMount rail with S-5! 53 PROPRIETARY & CONFIDENTIAL CONTROLLED DOCUMENT REF: SIS-UNIRAC-RACKING-BASICS-REV-2
  • 54. and now for something completely different… 54 PROPRIETARY & CONFIDENTIAL CONTROLLED DOCUMENT REF: SIS-UNIRAC-RACKING-BASICS-REV-2
  • 55. The lowest cost fastest flush roof cost, fastest, mounting system 55 PROPRIETARY & CONFIDENTIAL CONTROLLED DOCUMENT REF: SIS-UNIRAC-RACKING-BASICS-REV-2
  • 56. CLICKSYS beam 56 PROPRIETARY & CONFIDENTIAL CONTROLLED DOCUMENT REF: SIS-UNIRAC-RACKING-BASICS-REV-2
  • 57. The slider holds top mounting clamps on CLICKSYS 57 PROPRIETARY & CONFIDENTIAL CONTROLLED DOCUMENT REF: SIS-UNIRAC-RACKING-BASICS-REV-2
  • 58. CLICKSYS connectors single flange double flange optional butyl pad 58 PROPRIETARY & CONFIDENTIAL CONTROLLED DOCUMENT REF: SIS-UNIRAC-RACKING-BASICS-REV-2
  • 59. Click connections Click! 59 PROPRIETARY & CONFIDENTIAL CONTROLLED DOCUMENT REF: SIS-UNIRAC-RACKING-BASICS-REV-2
  • 60. CLICKSYS options PV QuickMount flashing Q g Creotecc tile hook Unirac standoff 60 PROPRIETARY & CONFIDENTIAL CONTROLLED DOCUMENT REF: SIS-UNIRAC-RACKING-BASICS-REV-2
  • 61. Racking Design Pre-Requisites ( (Grid Tie Systems) y ) 1. Site Survey & Analysis 2. Advanced Software & Hardware Tools 3. Tilt Angle Analysis & Optimization 4. Shading Analysis & Optimization 61 PROPRIETARY & CONFIDENTIAL CONTROLLED DOCUMENT REF: SIS-UNIRAC-RACKING-BASICS-REV-2
  • 62. Site Survey & Analysis 1/2 ( (Grid Tie Systems) y ) PV Grid Tie Systems Site Survey & Analysis Form Site Name & Address Date Job No. Owner Name & Contact No. Eng. ID Utility Name & A Utilit N Account N t No. Tech. T h ID Pre-Visit Instructions & Notes GPS & Google Maps Sun Path Print Note N t 1 Note 2 Location & Distances of BOS Equipment Electric Room Distance to Array Switchboard S it hb d Type/Model/Rating T /M d l/R ti MDB Type/Model/Rating Meter Type/Model/Rating Substation / Transformer Type/Model/Rating MDB S Spare C Connections ti Space for Inverters S f I t Space for Disconnects Space for Monit. Eqpt. Site 24-Hour Access Y/N Data/Internet Point Y/N Cables Routing Note 1 Cables Routing Note 2 Take Ph t T k Photos Y/N Others Oth 62 PROPRIETARY & CONFIDENTIAL CONTROLLED DOCUMENT REF: SIS-UNIRAC-RACKING-BASICS-REV-2
  • 63. Site Survey & Analysis 2/2 ( (Grid Tie Systems) y ) PV Grid Tie Systems Site Survey & Analysis Form Site Name & Address Date Job No. Owner Name & Contact No. Eng. ID Utility Name & A Utilit N Account N t No. Tech. T h ID Location of Solar Array Roof / Ground Area Height AGL Orientation/Azimuth Slope Sl E-W EW N-S NS Fence / Parapet Y/N F P t Surface Type Surface Finish Wind Exposure Cat Seismic Cat. Nearby Shading Y/N If Yes, Sketch on Sun Path Print Nearby Shading Sketch Solmetric Reading S l t i R di Y/N New N b C N Nearby Const. Y/N t Space for PV Combiners Space for DC Disconn. Site 24-Hour Access Y/N Cables Routing Note 1 Take Photos Y/N Cables Routing Note 2 Others Oth Others Obtain Site Drawings (As Built) Electrical Drawings Y/N Others Structural D St t l Drawings Y/N i Others Oth 63 PROPRIETARY & CONFIDENTIAL CONTROLLED DOCUMENT REF: SIS-UNIRAC-RACKING-BASICS-REV-2
  • 64. Advanced Software & Hardware Tools 1. Software: PVsyst y 2. Hardware: S Solmetric S SunEye™ 64 PROPRIETARY & CONFIDENTIAL CONTROLLED DOCUMENT REF: SIS-UNIRAC-RACKING-BASICS-REV-2
  • 65. Tilt Angle Analysis & Optimization (Grid Tie Systems) 65 PROPRIETARY & CONFIDENTIAL CONTROLLED DOCUMENT REF: SIS-UNIRAC-RACKING-BASICS-REV-2
  • 66. Shading Analysis & Optimization (Grid Tie Systems) Nearby Shading Effects 66 PROPRIETARY & CONFIDENTIAL CONTROLLED DOCUMENT REF: SIS-UNIRAC-RACKING-BASICS-REV-2
  • 67. Shading Analysis & Optimization (Grid Tie Systems) Mutual Shading Effects 67 PROPRIETARY & CONFIDENTIAL CONTROLLED DOCUMENT REF: SIS-UNIRAC-RACKING-BASICS-REV-2
  • 68. Shading Analysis & Optimization (Grid Tie Systems) Mutual-&-Nearby Shading Effects 68 PROPRIETARY & CONFIDENTIAL CONTROLLED DOCUMENT REF: SIS-UNIRAC-RACKING-BASICS-REV-2
  • 69. Summary (Grid Tie Systems) Geographic Location Survey & Analysis Tilt A l O ti i ti Angle Optimization Layout & Shading Optimization Unirac Solution Selection & Optimization 69 PROPRIETARY & CONFIDENTIAL CONTROLLED DOCUMENT REF: SIS-UNIRAC-RACKING-BASICS-REV-2
  • 70. Thank you for attending UniRac Racking Basics For questions, please contact us at: fm28201@eim.ae +971-50-624-6126 For products brochures, sizing charts, & installation manuals, please visit: UniRac.com 70 PROPRIETARY & CONFIDENTIAL CONTROLLED DOCUMENT REF: SIS-UNIRAC-RACKING-BASICS-REV-2