SlideShare una empresa de Scribd logo
1 de 61
Descargar para leer sin conexión
Inspection of MGNREGA, SBM Toilets, IAY
Awas, BNRGSK, BRGF works & Health Facility
using latest technology and user friendly m-
governance tools
Implemented By :
Mr. Harsh. J. Vyas, IAS
District Development Officer
Sabarkantha, Gujarat
Email address: ddo-sab@gujarat.gov.in
1
MOBILE INSPECTION SYSTEM FOR RURAL
DEVELOPMENT WORKS
2District Sabarkantha & Arvalli - Gujarat
Tribal Taluka
2
Geographical
Location
73.39 East (Longitude)
23.03 North (Latitude)
Temperature
40.5 C (Max.)
9.04 C (Min.)
Average Rain fall 750mm
Rivers Hathmati,Sabarmati,Khari,Meshwo,Vatrak,Mazum,Harnav
Area 739012 Hectare
Cultivable Area 456832 Hectare
Irrigated Area 230370 Hectare
Panchayat 746
Revenue Villages 1372
Tribal Taluka Khedbrahma, Vijaynagar, Meghraj, Bhiloda, Poshina
Literacy Rate 76.6%
Seismic Zone Zone III
Facts About Sabarkantha District Panchayat
3
Sabarkantha District Panchayat Profile
Description 2011
Actual Population 24,27,346
Population Growth 16.56%
Proportion to
Gujarat Population
4.02%
Density/km2 328
Average Literacy 76.6%
Sex Ratio 950
Sex Ratio(0-6) 899
4
5 Tribal Taluka
BRGF District
High Priority District-Health
Field Reality
5
Government of
India
State Government
District Level
Taluka
Village
Problem Area Mobile Inspection
System
Solution
The idea
• To use latest technology to eliminate delays and errors in
inspection and monitoring
• To use Tablet device to capture field work/ inspection
report
• To use pervasive cellular network to send reports directly
to district from the field.
• Minimum human intervention reduces the chances of
mistakes and provides valid and reliable data.
6
Administrative Authority
at Taluka & District Level
Work 1 – Awas
Work 2 – Toilet Work 3 – MGNREGA Work Any Other Work…
7
Concept
Process Flow
GSM/ GPRS
Server
Field inspection officer with Tab
having Pre installed software
Instant Report in
your inbox.
database
Access Reports
from anywhere
8
Key Benefits
• Planning – Implementation Feedback loop.
9
Planning
Implementation
Key Features of System
1. Inspection through tab (mobile device), highly adaptive for all.
2. Capture the work stage details, Images and Videos of work
with other relevant data
3. Geo-tagging of work at various stage with GPS Coordinates.
4. Inspection order can be generated through system which is
mailed automatically to Inspecting officer and Ordering
authority.
10
Key Features of System
5. Inspection report can be completed even without any
mobile network coverage
6. Inspection reports can be sent immediately through
GPRS connectivity
7. Reports are generated & emailed automatically to all
concern officer in pdf format.
8. Inspection report’s GPS Co-ordinate is linked with map
and it shows the location on the map.
11
12
Government to Citizen:
 Citizen gets benefit as per grant Sanctioned by Government
for development work.
 Quality and progress of development work has been
Improved.
 Due to pre, mid and post inspection of development works
have increased communication between citizen and
government. So trust in government work system has
increased among citizens
13
 There is an improvement in reliability and validity of data for various development
works. So now district authority is able to do evidence based decision making.
 With Mobile application inspection and monitoring of almost 2,97,643 development
works have been completed.
 Details Collected:
• with photograph of beneficiary,
• beneficiary’s photo identification proof and
• development work with
• GPS tagging with
 Optimal use of human resource.
 District authority is now able to do desktop review with backend web application
and gives feedback to all level government servants.
Government to Government
14
 Due to completion of work in time payment for development
work has become speedy and transparent.
 Corruption has decreased with use of Mobile Application.
Government staff from any department can do inspection of
any development work done in district.
 This type of third party evaluation has reduced a chance of
corruption and false report submission.
Government to Government (contd)
15
 There is an improvement in efficacy and efficiency of
employees. Employees are able to complete inspection of all
works in time with minimum resource utilization.
 Real time submission of report with GPS tagging has improved
authenticity of report submitted by employee.
 District authority and all level other officers can easily monitor
progress of all development works with necessary information.
There is a reduction in paper work.
Government to Employee
Outcome of Mobile Inspection in all type
of Works
1. Ground Truthing & Up to date information of all development
works executed/under- execution in all 13 blocks.
2. Online monitoring of progress of all development works
3. Avoid duplicity of work by mapping of GPS locations and analysis
4. Control the Quality of work by analysis of Videos and Photos.
16
Outcome of Mobile Inspection in all type
of works
5. Facility for various type of reports i.e. work wise, stage wise,
village wise etc.
6. Instant report and it’s comparison with previous report enables
us to know progress or delay in development works.
7. Auto Geo tagging of all development works ensures reliability in
execution and inspection of development work.
17
Outcome of survey and inspection of
spill over houses of IAY
1. Up to date information of progress of Houses.
2. Monitoring of payments distributed to beneficiary
A. Awas completed but installment pending
B. Advance installment given but awas is not yet started
C. Installment given but awas not completed upto
respective stage.
3. Toilet Availability Details 18
Outcome of survey and inspection of
spill over houses of IAY
4. Year wise sanctioned works reports.
5. Stage wise report of all works
6. Instant Reports and their Comparison
7. Geo tagging of all works using GPS Coordinates
8. Captures photo of works progress status, beneficiary and
beneficiary photo id.
19
Work flow
Ordering Authority
Inspecting Authority
Generates
and send
order of
inspection
inspects
and sends
report
By Email &
SMS
Uploaded to
cloud server
using Data
Connectivity
20
Program Implementation Workflow & MIS with
Analytics
21
New Work Order
22
Existing Work Orders
23
Work Order List
24
Print Work Order
25
New Work registration(DFS)
26
Online Inspection Order Generation
27
Inspection order email & SMS
automatically
28
Dashboard(DFS)
29
Everyday SMS Reporting
30
Taluka, Userwise SMS
31
Taluka wise SMS
32
VCE Report
33
General Statistics Report
34
Drilldown Statistics Report
35
Periodical Statistics Report
36
Register Report
37
Equipments provided -Tab, Internet,
Software, App etc.
38
Mobile Inspection App flow……
39
Mobile Inspection App
flow……(contd)
40
Mobile Inspection App flow……(contd)
41
Mobile Inspection App flow……(contd)
42
Mobile Inspection App
flow……(contd)
43
Report
View
44
Detailed
Individual
Report
45
PDF
Report
View
46
Dashboard
View
47
Dashboard View
Other Spin Off Benefits
1. Automated report generation & e-mailing of individual
inspection reports and statements to authorities.
2. Google Map view of all Inspected Work.
3. Various Statistical reports as per user requirement
4. Charting facility with KPI Dashboards
5. Data can be used for planning of works – GIS based planning,
Spatial analysis, Village Development planning
48
•Automated report
generation & e-
mailing of individual
inspection
•Can be viewed
online anytime,
anywhere
49
Map View
Report shows
Individual
works
location on
Google Map
with status
50
Government Process
Re-Engineering
• The picture of photo id of the beneficiary is taken and cross
verified with the id card number entered in the report.
• The reports are printed, reviewed authorised and kept in the
payment file of the work. 100% of all payments made only
after mobile inspection since 01 jan 2014.
• Works sanctioned by other authorities but implemented
through Taluka Panchayat are also covered now.
51
Total Development Spend
52
Approx. Per year, across 13 Blocks
Total Inspections as on 02/11/2017 ………… 297643
Taluka wise details
Taluka No. of
Inspection
Modasa 18062
Bhiloda 36236
Dhansura 13000
Malpur 19679
Bayad 21019
Meghraj 30870
Total 138866
Taluka No. of
Inspection
Himatnagar 32857
Khedbrahma 26623
Prantij 18030
Talod 18420
Vadali 12026
Idar 17914
Vijaynagar 7998
Total 158777
Total Inspections as on 02/11/2017 …………294128
Work wise details
Name of Work No. of Inspection
Toilet (SBM) 160474
Awas (IAY, SAY) 76047
C.C. Road 5962
MNREGA 11985
Other (BRGF) 17261
BNRGSK 248
Kacha Makan 22151
Total 294128
Total Inspections of spill over IAY
houses……16619
Taluka No. of
Inspection
Modasa 1107
Bhiloda 2128
Dhansura 255
Malpur 1286
Bayad 1339
Meghraj 2143
Total 8258
Taluka No. of
Inspection
Himatnagar 1421
Khedbrahma 2521
Prantij 506
Talod 1269
Vadali 915
Idar 889
Vijaynagar 840
Total 8361
Total Survey of Kacha Makan
as on 24/07/2017…….22151
Taluka No. of Survey
Bayad 1722
Dhansura 1552
Himatnagar 1725
Idar 1613
Khedbrahma 3420
Malpur 4540
Meghraj 365
Modasa 1481
Prantij 1192
Talod 2194
Total 22151
Open Access to data for
public at:
www.dfs.evikas.net/visit
Good Governance
57
Project Management Life-Cycle
Proposal Preliminary
Sanction
Technical
Sanction
Administrative
Sanction
Work
order
Work
Progress/
Inspection
Completion
Certificate
Interim
Payment
Final
Payment
Currently
Mobile
Inspection
Covers this
part
Pre
Mid
Post
58
 Skoch Platinum Award Winner-2014
In Top -20 E-Governance Projects of India
 Manthan Award Winner-2014
 CSI Nihilent Award Winner—2014
Award Winner
Future Plans
• Connecting Planning and Implementation seamlessly
• Publish Open Data in Data.Gov.in
• Linking benefits to Citizens across departments
• Integrating Works implementation, Public service delivery,
Planning and reporting.
60
THANK YOU
61
M. Harsh J. Vya, IAS
District Development Officer
Himatnagar - Sabarkantha, Gujarat
Email: ddo-sab@gujarat.gov.in

Más contenido relacionado

Similar a Mobile inspection System for Rural Development Works

GIS based integrated planning and monitoring system - Mr. Koustuv Basu
GIS based integrated planning and monitoring system - Mr. Koustuv BasuGIS based integrated planning and monitoring system - Mr. Koustuv Basu
GIS based integrated planning and monitoring system - Mr. Koustuv BasuNeGD Capacity Building
 
WSP presentation in Bangalore
WSP presentation in Bangalore WSP presentation in Bangalore
WSP presentation in Bangalore Kedar Dash
 
WATER SUPPLY DISTRIBUTION SYSTEM BY USING WATERGEMS SOFTWARE AT SAIGAON VILLAGE
WATER SUPPLY DISTRIBUTION SYSTEM BY USING WATERGEMS SOFTWARE AT SAIGAON VILLAGEWATER SUPPLY DISTRIBUTION SYSTEM BY USING WATERGEMS SOFTWARE AT SAIGAON VILLAGE
WATER SUPPLY DISTRIBUTION SYSTEM BY USING WATERGEMS SOFTWARE AT SAIGAON VILLAGEIRJET Journal
 
IDSP-IHIP national implemantion_Secy_VC_24th Feb2021_F (1).pptx
IDSP-IHIP national implemantion_Secy_VC_24th Feb2021_F (1).pptxIDSP-IHIP national implemantion_Secy_VC_24th Feb2021_F (1).pptx
IDSP-IHIP national implemantion_Secy_VC_24th Feb2021_F (1).pptxNIRAVTHAKKAR33
 
Intelligent power transmission asset management solutions
Intelligent power transmission asset management solutionsIntelligent power transmission asset management solutions
Intelligent power transmission asset management solutionsRavindranatha Reddy Bandi
 
Accelerate CItizen Engagement @ the Speed of Now
Accelerate CItizen Engagement @ the Speed of NowAccelerate CItizen Engagement @ the Speed of Now
Accelerate CItizen Engagement @ the Speed of NowDux Raymond Sy
 
IRJET-Implementation of GIS for Land Record Management
IRJET-Implementation of GIS for Land Record ManagementIRJET-Implementation of GIS for Land Record Management
IRJET-Implementation of GIS for Land Record ManagementIRJET Journal
 
E world award e-municipality(final)
E world award e-municipality(final)E world award e-municipality(final)
E world award e-municipality(final)harishcuttack
 
Enhancing the Implementation of Swachh Bharat Mission (Gramin) in Andhra Prad...
Enhancing the Implementation of Swachh Bharat Mission (Gramin) in Andhra Prad...Enhancing the Implementation of Swachh Bharat Mission (Gramin) in Andhra Prad...
Enhancing the Implementation of Swachh Bharat Mission (Gramin) in Andhra Prad...India Water Portal
 
Government Process Re-engineering - Min. of Water Resources
Government Process Re-engineering - Min. of Water Resources Government Process Re-engineering - Min. of Water Resources
Government Process Re-engineering - Min. of Water Resources Praveer Singh
 
Indian cst bbmp case study 13 07-2014
Indian cst bbmp case study 13 07-2014Indian cst bbmp case study 13 07-2014
Indian cst bbmp case study 13 07-2014Raja Seevan
 
Rajkumar service delivery_imp
Rajkumar service delivery_impRajkumar service delivery_imp
Rajkumar service delivery_impSriSandhya
 
Mission Mode Project (MMP)
Mission Mode Project (MMP)Mission Mode Project (MMP)
Mission Mode Project (MMP)Meenu S
 
Express Technology Sabha Award 2015 E-Governance Champion presentation
Express Technology Sabha Award 2015 E-Governance Champion presentationExpress Technology Sabha Award 2015 E-Governance Champion presentation
Express Technology Sabha Award 2015 E-Governance Champion presentationNagarajan M
 
NREGS- Bihar (E-Shakti)
NREGS- Bihar (E-Shakti)NREGS- Bihar (E-Shakti)
NREGS- Bihar (E-Shakti)Nirmal Prakash
 
About Riddhi foundation
About Riddhi foundationAbout Riddhi foundation
About Riddhi foundationriddhitrends
 
Encroachment Detection Software
Encroachment Detection SoftwareEncroachment Detection Software
Encroachment Detection SoftwareFaiyaz Khan
 

Similar a Mobile inspection System for Rural Development Works (20)

GIS based integrated planning and monitoring system - Mr. Koustuv Basu
GIS based integrated planning and monitoring system - Mr. Koustuv BasuGIS based integrated planning and monitoring system - Mr. Koustuv Basu
GIS based integrated planning and monitoring system - Mr. Koustuv Basu
 
WSP presentation in Bangalore
WSP presentation in Bangalore WSP presentation in Bangalore
WSP presentation in Bangalore
 
WATER SUPPLY DISTRIBUTION SYSTEM BY USING WATERGEMS SOFTWARE AT SAIGAON VILLAGE
WATER SUPPLY DISTRIBUTION SYSTEM BY USING WATERGEMS SOFTWARE AT SAIGAON VILLAGEWATER SUPPLY DISTRIBUTION SYSTEM BY USING WATERGEMS SOFTWARE AT SAIGAON VILLAGE
WATER SUPPLY DISTRIBUTION SYSTEM BY USING WATERGEMS SOFTWARE AT SAIGAON VILLAGE
 
IDSP-IHIP national implemantion_Secy_VC_24th Feb2021_F (1).pptx
IDSP-IHIP national implemantion_Secy_VC_24th Feb2021_F (1).pptxIDSP-IHIP national implemantion_Secy_VC_24th Feb2021_F (1).pptx
IDSP-IHIP national implemantion_Secy_VC_24th Feb2021_F (1).pptx
 
Digital Survey Kerala SOP - Standards Operational procedures - Uploaded by Ja...
Digital Survey Kerala SOP - Standards Operational procedures - Uploaded by Ja...Digital Survey Kerala SOP - Standards Operational procedures - Uploaded by Ja...
Digital Survey Kerala SOP - Standards Operational procedures - Uploaded by Ja...
 
Intelligent power transmission asset management solutions
Intelligent power transmission asset management solutionsIntelligent power transmission asset management solutions
Intelligent power transmission asset management solutions
 
Accelerate CItizen Engagement @ the Speed of Now
Accelerate CItizen Engagement @ the Speed of NowAccelerate CItizen Engagement @ the Speed of Now
Accelerate CItizen Engagement @ the Speed of Now
 
IRJET-Implementation of GIS for Land Record Management
IRJET-Implementation of GIS for Land Record ManagementIRJET-Implementation of GIS for Land Record Management
IRJET-Implementation of GIS for Land Record Management
 
E world award e-municipality(final)
E world award e-municipality(final)E world award e-municipality(final)
E world award e-municipality(final)
 
Enhancing the Implementation of Swachh Bharat Mission (Gramin) in Andhra Prad...
Enhancing the Implementation of Swachh Bharat Mission (Gramin) in Andhra Prad...Enhancing the Implementation of Swachh Bharat Mission (Gramin) in Andhra Prad...
Enhancing the Implementation of Swachh Bharat Mission (Gramin) in Andhra Prad...
 
NREGS
NREGSNREGS
NREGS
 
Government Process Re-engineering - Min. of Water Resources
Government Process Re-engineering - Min. of Water Resources Government Process Re-engineering - Min. of Water Resources
Government Process Re-engineering - Min. of Water Resources
 
Indian cst bbmp case study 13 07-2014
Indian cst bbmp case study 13 07-2014Indian cst bbmp case study 13 07-2014
Indian cst bbmp case study 13 07-2014
 
Rajkumar service delivery_imp
Rajkumar service delivery_impRajkumar service delivery_imp
Rajkumar service delivery_imp
 
meebhoomi.ap.gov.in
meebhoomi.ap.gov.inmeebhoomi.ap.gov.in
meebhoomi.ap.gov.in
 
Mission Mode Project (MMP)
Mission Mode Project (MMP)Mission Mode Project (MMP)
Mission Mode Project (MMP)
 
Express Technology Sabha Award 2015 E-Governance Champion presentation
Express Technology Sabha Award 2015 E-Governance Champion presentationExpress Technology Sabha Award 2015 E-Governance Champion presentation
Express Technology Sabha Award 2015 E-Governance Champion presentation
 
NREGS- Bihar (E-Shakti)
NREGS- Bihar (E-Shakti)NREGS- Bihar (E-Shakti)
NREGS- Bihar (E-Shakti)
 
About Riddhi foundation
About Riddhi foundationAbout Riddhi foundation
About Riddhi foundation
 
Encroachment Detection Software
Encroachment Detection SoftwareEncroachment Detection Software
Encroachment Detection Software
 

Último

CALL ON ➥8923113531 🔝Call Girls Saharaganj Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Saharaganj Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Saharaganj Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Saharaganj Lucknow best sexual serviceanilsa9823
 
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best Night Fun service
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best Night Fun serviceCALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best Night Fun service
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best Night Fun serviceanilsa9823
 
9892124323 | Book Call Girls in Juhu and escort services 24x7
9892124323 | Book Call Girls in Juhu and escort services 24x79892124323 | Book Call Girls in Juhu and escort services 24x7
9892124323 | Book Call Girls in Juhu and escort services 24x7Pooja Nehwal
 
Powerful Love Spells in Arkansas, AR (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Arkansas, AR (310) 882-6330 Bring Back Lost LoverPowerful Love Spells in Arkansas, AR (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Arkansas, AR (310) 882-6330 Bring Back Lost LoverPsychicRuben LoveSpells
 
FULL ENJOY - 9999218229 Call Girls in {Mahipalpur}| Delhi NCR
FULL ENJOY - 9999218229 Call Girls in {Mahipalpur}| Delhi NCRFULL ENJOY - 9999218229 Call Girls in {Mahipalpur}| Delhi NCR
FULL ENJOY - 9999218229 Call Girls in {Mahipalpur}| Delhi NCRnishacall1
 
BDSM⚡Call Girls in Sector 71 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 71 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 71 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 71 Noida Escorts >༒8448380779 Escort ServiceDelhi Call girls
 
Call US Pooja 9892124323 ✓Call Girls In Mira Road ( Mumbai ) secure service,
Call US Pooja 9892124323 ✓Call Girls In Mira Road ( Mumbai ) secure service,Call US Pooja 9892124323 ✓Call Girls In Mira Road ( Mumbai ) secure service,
Call US Pooja 9892124323 ✓Call Girls In Mira Road ( Mumbai ) secure service,Pooja Nehwal
 

Último (7)

CALL ON ➥8923113531 🔝Call Girls Saharaganj Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Saharaganj Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Saharaganj Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Saharaganj Lucknow best sexual service
 
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best Night Fun service
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best Night Fun serviceCALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best Night Fun service
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best Night Fun service
 
9892124323 | Book Call Girls in Juhu and escort services 24x7
9892124323 | Book Call Girls in Juhu and escort services 24x79892124323 | Book Call Girls in Juhu and escort services 24x7
9892124323 | Book Call Girls in Juhu and escort services 24x7
 
Powerful Love Spells in Arkansas, AR (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Arkansas, AR (310) 882-6330 Bring Back Lost LoverPowerful Love Spells in Arkansas, AR (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Arkansas, AR (310) 882-6330 Bring Back Lost Lover
 
FULL ENJOY - 9999218229 Call Girls in {Mahipalpur}| Delhi NCR
FULL ENJOY - 9999218229 Call Girls in {Mahipalpur}| Delhi NCRFULL ENJOY - 9999218229 Call Girls in {Mahipalpur}| Delhi NCR
FULL ENJOY - 9999218229 Call Girls in {Mahipalpur}| Delhi NCR
 
BDSM⚡Call Girls in Sector 71 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 71 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 71 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 71 Noida Escorts >༒8448380779 Escort Service
 
Call US Pooja 9892124323 ✓Call Girls In Mira Road ( Mumbai ) secure service,
Call US Pooja 9892124323 ✓Call Girls In Mira Road ( Mumbai ) secure service,Call US Pooja 9892124323 ✓Call Girls In Mira Road ( Mumbai ) secure service,
Call US Pooja 9892124323 ✓Call Girls In Mira Road ( Mumbai ) secure service,
 

Mobile inspection System for Rural Development Works

  • 1. Inspection of MGNREGA, SBM Toilets, IAY Awas, BNRGSK, BRGF works & Health Facility using latest technology and user friendly m- governance tools Implemented By : Mr. Harsh. J. Vyas, IAS District Development Officer Sabarkantha, Gujarat Email address: ddo-sab@gujarat.gov.in 1 MOBILE INSPECTION SYSTEM FOR RURAL DEVELOPMENT WORKS
  • 2. 2District Sabarkantha & Arvalli - Gujarat Tribal Taluka 2
  • 3. Geographical Location 73.39 East (Longitude) 23.03 North (Latitude) Temperature 40.5 C (Max.) 9.04 C (Min.) Average Rain fall 750mm Rivers Hathmati,Sabarmati,Khari,Meshwo,Vatrak,Mazum,Harnav Area 739012 Hectare Cultivable Area 456832 Hectare Irrigated Area 230370 Hectare Panchayat 746 Revenue Villages 1372 Tribal Taluka Khedbrahma, Vijaynagar, Meghraj, Bhiloda, Poshina Literacy Rate 76.6% Seismic Zone Zone III Facts About Sabarkantha District Panchayat 3
  • 4. Sabarkantha District Panchayat Profile Description 2011 Actual Population 24,27,346 Population Growth 16.56% Proportion to Gujarat Population 4.02% Density/km2 328 Average Literacy 76.6% Sex Ratio 950 Sex Ratio(0-6) 899 4 5 Tribal Taluka BRGF District High Priority District-Health
  • 5. Field Reality 5 Government of India State Government District Level Taluka Village Problem Area Mobile Inspection System Solution
  • 6. The idea • To use latest technology to eliminate delays and errors in inspection and monitoring • To use Tablet device to capture field work/ inspection report • To use pervasive cellular network to send reports directly to district from the field. • Minimum human intervention reduces the chances of mistakes and provides valid and reliable data. 6
  • 7. Administrative Authority at Taluka & District Level Work 1 – Awas Work 2 – Toilet Work 3 – MGNREGA Work Any Other Work… 7 Concept
  • 8. Process Flow GSM/ GPRS Server Field inspection officer with Tab having Pre installed software Instant Report in your inbox. database Access Reports from anywhere 8
  • 9. Key Benefits • Planning – Implementation Feedback loop. 9 Planning Implementation
  • 10. Key Features of System 1. Inspection through tab (mobile device), highly adaptive for all. 2. Capture the work stage details, Images and Videos of work with other relevant data 3. Geo-tagging of work at various stage with GPS Coordinates. 4. Inspection order can be generated through system which is mailed automatically to Inspecting officer and Ordering authority. 10
  • 11. Key Features of System 5. Inspection report can be completed even without any mobile network coverage 6. Inspection reports can be sent immediately through GPRS connectivity 7. Reports are generated & emailed automatically to all concern officer in pdf format. 8. Inspection report’s GPS Co-ordinate is linked with map and it shows the location on the map. 11
  • 12. 12 Government to Citizen:  Citizen gets benefit as per grant Sanctioned by Government for development work.  Quality and progress of development work has been Improved.  Due to pre, mid and post inspection of development works have increased communication between citizen and government. So trust in government work system has increased among citizens
  • 13. 13  There is an improvement in reliability and validity of data for various development works. So now district authority is able to do evidence based decision making.  With Mobile application inspection and monitoring of almost 2,97,643 development works have been completed.  Details Collected: • with photograph of beneficiary, • beneficiary’s photo identification proof and • development work with • GPS tagging with  Optimal use of human resource.  District authority is now able to do desktop review with backend web application and gives feedback to all level government servants. Government to Government
  • 14. 14  Due to completion of work in time payment for development work has become speedy and transparent.  Corruption has decreased with use of Mobile Application. Government staff from any department can do inspection of any development work done in district.  This type of third party evaluation has reduced a chance of corruption and false report submission. Government to Government (contd)
  • 15. 15  There is an improvement in efficacy and efficiency of employees. Employees are able to complete inspection of all works in time with minimum resource utilization.  Real time submission of report with GPS tagging has improved authenticity of report submitted by employee.  District authority and all level other officers can easily monitor progress of all development works with necessary information. There is a reduction in paper work. Government to Employee
  • 16. Outcome of Mobile Inspection in all type of Works 1. Ground Truthing & Up to date information of all development works executed/under- execution in all 13 blocks. 2. Online monitoring of progress of all development works 3. Avoid duplicity of work by mapping of GPS locations and analysis 4. Control the Quality of work by analysis of Videos and Photos. 16
  • 17. Outcome of Mobile Inspection in all type of works 5. Facility for various type of reports i.e. work wise, stage wise, village wise etc. 6. Instant report and it’s comparison with previous report enables us to know progress or delay in development works. 7. Auto Geo tagging of all development works ensures reliability in execution and inspection of development work. 17
  • 18. Outcome of survey and inspection of spill over houses of IAY 1. Up to date information of progress of Houses. 2. Monitoring of payments distributed to beneficiary A. Awas completed but installment pending B. Advance installment given but awas is not yet started C. Installment given but awas not completed upto respective stage. 3. Toilet Availability Details 18
  • 19. Outcome of survey and inspection of spill over houses of IAY 4. Year wise sanctioned works reports. 5. Stage wise report of all works 6. Instant Reports and their Comparison 7. Geo tagging of all works using GPS Coordinates 8. Captures photo of works progress status, beneficiary and beneficiary photo id. 19
  • 20. Work flow Ordering Authority Inspecting Authority Generates and send order of inspection inspects and sends report By Email & SMS Uploaded to cloud server using Data Connectivity 20
  • 21. Program Implementation Workflow & MIS with Analytics 21
  • 27. Online Inspection Order Generation 27
  • 28. Inspection order email & SMS automatically 28
  • 38. Equipments provided -Tab, Internet, Software, App etc. 38
  • 39. Mobile Inspection App flow…… 39
  • 41. Mobile Inspection App flow……(contd) 41
  • 42. Mobile Inspection App flow……(contd) 42
  • 48. Other Spin Off Benefits 1. Automated report generation & e-mailing of individual inspection reports and statements to authorities. 2. Google Map view of all Inspected Work. 3. Various Statistical reports as per user requirement 4. Charting facility with KPI Dashboards 5. Data can be used for planning of works – GIS based planning, Spatial analysis, Village Development planning 48
  • 49. •Automated report generation & e- mailing of individual inspection •Can be viewed online anytime, anywhere 49
  • 50. Map View Report shows Individual works location on Google Map with status 50
  • 51. Government Process Re-Engineering • The picture of photo id of the beneficiary is taken and cross verified with the id card number entered in the report. • The reports are printed, reviewed authorised and kept in the payment file of the work. 100% of all payments made only after mobile inspection since 01 jan 2014. • Works sanctioned by other authorities but implemented through Taluka Panchayat are also covered now. 51
  • 52. Total Development Spend 52 Approx. Per year, across 13 Blocks
  • 53. Total Inspections as on 02/11/2017 ………… 297643 Taluka wise details Taluka No. of Inspection Modasa 18062 Bhiloda 36236 Dhansura 13000 Malpur 19679 Bayad 21019 Meghraj 30870 Total 138866 Taluka No. of Inspection Himatnagar 32857 Khedbrahma 26623 Prantij 18030 Talod 18420 Vadali 12026 Idar 17914 Vijaynagar 7998 Total 158777
  • 54. Total Inspections as on 02/11/2017 …………294128 Work wise details Name of Work No. of Inspection Toilet (SBM) 160474 Awas (IAY, SAY) 76047 C.C. Road 5962 MNREGA 11985 Other (BRGF) 17261 BNRGSK 248 Kacha Makan 22151 Total 294128
  • 55. Total Inspections of spill over IAY houses……16619 Taluka No. of Inspection Modasa 1107 Bhiloda 2128 Dhansura 255 Malpur 1286 Bayad 1339 Meghraj 2143 Total 8258 Taluka No. of Inspection Himatnagar 1421 Khedbrahma 2521 Prantij 506 Talod 1269 Vadali 915 Idar 889 Vijaynagar 840 Total 8361
  • 56. Total Survey of Kacha Makan as on 24/07/2017…….22151 Taluka No. of Survey Bayad 1722 Dhansura 1552 Himatnagar 1725 Idar 1613 Khedbrahma 3420 Malpur 4540 Meghraj 365 Modasa 1481 Prantij 1192 Talod 2194 Total 22151
  • 57. Open Access to data for public at: www.dfs.evikas.net/visit Good Governance 57
  • 58. Project Management Life-Cycle Proposal Preliminary Sanction Technical Sanction Administrative Sanction Work order Work Progress/ Inspection Completion Certificate Interim Payment Final Payment Currently Mobile Inspection Covers this part Pre Mid Post 58
  • 59.  Skoch Platinum Award Winner-2014 In Top -20 E-Governance Projects of India  Manthan Award Winner-2014  CSI Nihilent Award Winner—2014 Award Winner
  • 60. Future Plans • Connecting Planning and Implementation seamlessly • Publish Open Data in Data.Gov.in • Linking benefits to Citizens across departments • Integrating Works implementation, Public service delivery, Planning and reporting. 60
  • 61. THANK YOU 61 M. Harsh J. Vya, IAS District Development Officer Himatnagar - Sabarkantha, Gujarat Email: ddo-sab@gujarat.gov.in