Introduction
Factors affecting distribution system planning
Present distribution system planning techniques
Distribution system planning models
Computer central role in distribution planning
Impact of dispersed storage and generation
Renewable resources of generation
Dr.A.Arunagiri
Introduction
Dr.A.Arunagiri
The electrical power system is very complex system.
Distribution is about 50% of the capital cost of the power system.
The power system consists of three main parts Generation plants,
Transmission and Distribution.
The electrical distribution system is a part of the system between
the transmission and the consumer service point.
The electrical distribution system is divided into primary and secondary
distribution.
3. 06/04/35
3
Typical Electrical Power System
Dr.A.Arunagiri
The electrical distribution systems consists of:
Dr.A.Arunagiri
1.Sub transmission
2.Distribution substation
3.Primary feeders
4.Distribution transformers
5.Secondary circuits
6.Service drops
4. 06/04/35
4
Distribution System
Dr.A.Arunagiri
Sub-transmission
Dr.A.Arunagiri
The sub-transmission is an electrical network designed to supply the
electrical power from the bulk power source (Transmission line) to the
distribution sub-station at a voltage ranging from 33 to 220 kV. May be over
head or underground cables.
There are six types of sub-transmission are:
• Radial system.
• Primary Loop System.
• Primary Selective.
•Secondary selective
• Spot Network
• Grid Network
13. 06/04/35
13
(C ) Three phase Three Wire
Dr.A.Arunagiri
(d) Three Phase four Wire
Dr.A.Arunagiri
14. 06/04/35
14
Basic Distribution Systems
• Radial
• Primary Loop
• Primary Selective
• Secondary Selective
• Spot Network
• Grid Network
Dr.A.Arunagiri
Factors Affecting Distribution System
Planning
Load demand and load
characteristics
Voltage level at the
customer point
Type of secondary
circuits
Size and location of
distribution transformer
Types of primary
distribution system
Loads at primary
distribution level
Size and location of
distribution substation
Routing and capacity of
associated sub-
transmission lines
Dr.A.Arunagiri
15. 06/04/35
15
Factors Affecting Distribution System
Planning…….
Restrictions such as
Permissible voltage deviations
Voltage dip and flicker
Service continuity and reliability
Types of protection to be
employed
Choice of circuit breakers,
reclosers and sectionalizers
Requirement of capacitors
for power factor correction
and loss minimization
Requirement of voltage
regulators
Types of transformers and
availability of space for
transformers
Insulation levels
Dr.A.Arunagiri
Distribution system Planning Technique
Load flow programs
Radial or loop load flow
programs
Short-circuit programs
Voltage drop calculation
programs
Total system impedance
calculation programs
Load forecasting programs
Voltage regulation and
regulator setting programs
Capacitor planning
programs
Substation optimal sitting
and sizing programs
Reliability programs
Dr.A.Arunagiri
16. 06/04/35
16
However, in general, the overall concept of
automatically using output of each program as
input for the next program is not in use.
Engineering judgment and trial and error method
are used in system planning. In this chapter, we
shall discuss some of the distribution planning and
operation techniques.
Dr.A.Arunagiri
Future Distribution System Planning
Components
Vision:
A clear vision for the future
communicates a sense of the kind of
organization, power utility needs to
become, and outlines the kind of
results it must achieve. The vision
provides a continuing focus and
constantly reminds the employees
and consumers of what the company
trying to change.
Mission:
For particular task there can be a
mission statement such as Electricity
for all KSA by the end of next decade
Values:
The power utility leadership must
create values such as consumer
satisfaction, environmental
responsibility.
Dr.A.Arunagiri
17. 06/04/35
17
Distribution system planning models
Traditional-Least cost
model:
It is a process by which utilities
minimize the cost of supplying a
given amount of power. The
existing system inadequacies are
identified as:
• Poor voltage regulation
• Higher system loss
• Higher equipment
failure/breakdown
• Bad quality of power supply
• No scope for future growth.
Dr.A.Arunagiri
The initial system improvement can be very cost effective in
removing the above system inadequacies as compared to the other
alternatives of laying a new extended system.
Thus there are two options:
System improvement
Expansion of the existing network
Dr.A.Arunagiri
18. 06/04/35
18
(a) System Improvement
Augmentation and strengthening of the existing system
Improving the reliability and quality of supply
Reduction of commercial and technical loss and / or
Dr.A.Arunagiri
b)Expansion of the existing network
When augmentation and strengthening of existing system are
involved the benefits of saving in losses (kw and energy), net
revenue increase due to additional sale of power and energy
after adjusting the expenditure incurred on generation of the
additional energy must be maximized.
Dr.A.Arunagiri
19. 06/04/35
19
2. Demand Side Planning(DSP)
It is the process by which power utilities quantify and assess the
programmes to alter the load pattern and level of their consumer’s
demand for electricity.
This is planning at the consumer level and often has a long planning
period, much longer than distribution system planning. It can take years
of slow progress to obtain meaningful levels of participation.
Dr.A.Arunagiri
The low cost demand side option can be :
Implementing energy conservation programmes
Providing vigilance and detection of theft.
Dr.A.Arunagiri
20. 06/04/35
20
DSM programmes generally fall into three main
categories:
1 Conservation programmes
Reduce energy use with programmes to improve the efficiency of the
equipments (like lighting and motors), buildings and industrial
processes as per the energy conservation act.
2 load management programmes:
Redistribute energy demands to spread it more evenly throughout
the day. Some way of doing this are:
Load shifting programmes ( shifting some of the loads during
peak period to off peak period)
Time -of –use ( Charging more for electricity during peak
demand)
Interruptible rates( providing rate discounts in exchange for
the right to reduce consumers electricity allocation each year
during few hours when electricity demand is the highest
Types of DSM
Dr.A.Arunagiri
3. Strategic load growth programmes:
Increase energy use during some periods, (Encourage cost
effective electrical technologies that operate primarily
during periods of low electricity demand.)
The following approaches can be used.
General information programmes to inform consumers about generic
energy efficientoptions
Site – specific information programmes that provide information
about specific DSM measures appropriate for a particular industry ,
agricultureor home.
Financing programmes to assist consumers to pay for DSM measures
includingloans, rebates, and shared savings programmes
Dr.A.Arunagiri
21. 06/04/35
21
Direct installation programmes that provide complete
services to design, finance and install a package of efficiency
measures.
Alternative tariff programmes including time-of-use tariff,
interruptible tariff, and load shifting tariff. ( These programmes
usually do not save energy but they are effective ways to shift
loads to off peak periods.
Bidding programmes in which utility solicits bids from
consumers and energy service companies.
Load limiters are effective in demand side management , as
they limit the maximum power that the consumer draws from
the supply.
Dr.A.Arunagiri
The process of designing and implementing DSM programmes
generally consists of the following steps.
Identifying the sectors, end -uses and efficiency
measures to target
Developing programme design
Conducting cost-effective screening
Preparing an implementation plan
Implementing programmes and
Evaluating programmes.
Dr.A.Arunagiri
22. 06/04/35
22
Benefits of DSM
• Reduces consumers energy bills
• Reduces the need for the new
plant, transmission and distribution
construction
• Stimulates economic development
• Creates long time jobs that benefits
the economy
• Increases the competitiveness of the
local enterprises
• Can reduce maintenance and
equipment replacement cost
• Reduces local air pollution
• Reduces emission s that contribute
to national and international
environmental problems such as acid
rain and global warming
• Enhances national security by easing
dependence on foreign energy
sources
Dr.A.Arunagiri
Computer central role in distribution planning
Software needs:
generally is selected on the basis of the
least life cycle cost or least ownership
costs (hiring or purchase + training +
maintenance costs). The software must
be.
– Bestoverallperformance
– Bestsolution
– Bestopen architecture system
Analysis of the system
computer aided power flow studies in
improving the performance of the existing
sub-transmission and distribution systems
and proposed expansion of network up to
the meter point (Consumers). Studies
will provide
– Active and reactive power flows as
well as the locations of capacitors
– Voltage variation (at each node or
bus, percent variation)
– Peak power losses and energy losses
– Computation of commercial losses of
feeder
– Overloading of transformers
:
Dr.A.Arunagiri
23. 06/04/35
23
Computer central role in distribution planning
Data:
success of any information
technology system is highly
dependent on the accurate, up to
date field data for improvement in
the network and system.
Information must be clear and up-
dated on:
Nodes
Single line diagram
Distribution substation
Primary feeder
Distribution transformer
and secondary feeder
Consumer data
Load data
Dr.A.Arunagiri
Elements of the distribution system
Distribution Transformer
Primary distribution feeder
Secondary distribution
feeder
Protection devices and
instrumentation
Dr.A.Arunagiri
24. 06/04/35
24
Dispersed Generation
Dr.A.Arunagiri
Impact of dispersed storage and generation
• This is When the generating plant is connected to a distribution
network capable of supplying power to the consumer load directly .
• This enhances the reliability and the quality of power supply.
• The expectations of the reliability especially for data centers, call
centers, computer controlled critical process/businesses, continuous
process industries, petro chemical refineries are four nines
(99.99%).
Dr.A.Arunagiri
25. 06/04/35
25
Impact of dispersed generation….
For dispersed generations line losses will be nominal since there is
no transmission system is required.
Dispersed generation with local radial distribution network will
play an important role in the 21st century.
Dispersed generation is generally from local renewable sources.
This saves environment degradation compared to conventional
thermal generation.
Dr.A.Arunagiri
Renewable resources of generation
Fuel cells
Solar photovoltaic
Wind energy
Tidal wave energy from
ocean
Small hydro (up to 25 MW
capacity, pumped
storage)
Geo-thermal
Bio-mass
Municipal and industrial
west
Dr.A.Arunagiri
26. 06/04/35
26
Net Metering
The kilo watt hour meter(import – export meter) can be used to
accurately register the flow of electricity in either direction. This
means the ‘netting’ process associated with net metering happens
automatically
Dr.A.Arunagiri
Assignment 1
Q.1
Draw the one line diagram of the electrical power system
available in KSA.. Indicate the voltage levels for
Generation
Transmission
Sub transmission
Primary Feeder
Secondary Feeder
Q2
Mention and discuss the different types of the renewable resources of
generation available in the KSA.
Dr.A.Arunagiri