KEBUTUHAN MDU TW I 2020
NO MATERIAL SAT
KEBUTUHAN MDU
KET
JAN PEB MAR TOTAL
1
KWH
METER
1
kWh Meter Prabayar 1 Phase (MTR;kWH E-PR-
COM;1P;230V;5-60A;1;;2W)
Bh 2,500 3,000 3,000 8,500 Prioritas 1 (Mendesak)
2
kWh Meter Statik Energi Listrik Phase Tiga
Pengukuran Tidak Langsung Kelas 0,5 (MTR;KWH E;
3P;57.5-400V; 5A; 0.5; 4W)
Bh 3 3 4 10 Prioritas 1 (Mendesak)
3
kWh Meter Statik Energi Listrik Phase Tiga
Pengukuran Tidak Langsung Kelas 1 (MTR;KWH E;
3P;230/400V; 5-10A; 1; 4W)
Bh 5 10 15 30 Prioritas 1 (Mendesak)
4
kWh Meter Statik Energi Listrik Phase Tiga
Pengukuran Langsung Kelas 1 (MTR;KWH E; 3P;230/400V;
5-80A; 1; 4W)
Bh 60 90 100 250 Prioritas 1 (Mendesak)
TOTAL (buah) 2,568 3,103 3,119
2 MCB
1 1 Phase 2A Bh -
2 1 Phase 4A Bh 2,500 3,000 3,000 8,500 Prioritas 1 (Mendesak)
3 1 Phase 6A Bh 500 500 750 1,750 Prioritas 1 (Mendesak)
4 1 Phase 10A Bh 50 75 85 210 Prioritas 2 (Sedang)
5 1 Phase 16A Bh 50 75 85 210 Prioritas 2 (Sedang)
6 1 Phase 20A Bh 50 75 85 210 Prioritas 2 (Sedang)
7 1 Phase 25A Bh 25 25 25 75 Prioritas 1 (Mendesak)
8 1 Phase 35A Bh 5 5 5 15
9 1 Phase 50A Bh 5 5 5 15
10 3 Phase 10A Bh 20 20 30 70 Prioritas 1 (Mendesak)
11 3 Phase 16A Bh 25 25 35 85 Prioritas 1 (Mendesak)
12 3 Phase 20A Bh -
13 3 Phase 25A Bh 15 25 30 70 Prioritas 1 (Mendesak)
14 3 Phase 35A Bh 5 10 15 30 Prioritas 1 (Mendesak)
15 3 Phase 50A Bh 10 15 20 45 Prioritas 1 (Mendesak)
16 3 Phase 63A Bh 5 5 5 15 Prioritas 1 (Mendesak)
TOTAL (buah) Bh 3,255 3,850 4,210
www.pln.co.id |
6
KEBUTUHAN MDU TW I 2020
3
CABLE
POWER
SATUAN JAN PEB MAR JML KETERANGAN
1 NYY;1X70MM2;0.6/1KV;Opstig -
2 NYY;1X95MM2;0.6/1KV;Opstig -
3 NYY;1X150MM2;0.6/1KV;Opstig Mtr 1,000 1,000 1,000 3,000 Prioritas 2 (Sedang)
4 NYY;1X240MM2;0.6/1KV;Opstig -
5 NYY;4X70MM2;0.6/1KV;Opstig Mtr 500 1,000 1,000 2,500 Prioritas 2 (Sedang)
6 NFA2X;2X10MM2;0.6/1KV;OH Mtr 26,000 36,000 39,000 101,000 Prioritas 1 (Mendesak)
7 NFA2X;2X16MM2;0.6/1KV;OH -
8 NFA2X;4X16MM2;0.6/1KV;OH Mtr 3,000 3,000 4,000 10,000 Prioritas 1 (Mendesak)
9 NFA2X-T;3X70 + 70MM2;0.6/1KV Mtr 15,000 20,000 25,000 60,000 Prioritas 1 (Mendesak)
10 NFA2X-T;3X35 + 25MM2;0.6/1KV -
11 NFA2XSY-T;3X150+1X95;20kV;OH Mtr 3,000 3,000 Prioritas 1 (Mendesak)
12 NFA2XSY-T;3X240+1X95;20KV;OH -
13 NA2XSEYBY;3X150MM2;20KV;UG Mtr 500 1,000 1,500 Prioritas 1 (Mendesak)
14 NA2XSEYBY;3X240MM2;20KV;UG 250 250 500
15 NA2XSEYBY;3X300MM2;20KV;UG -
TOTAL (meter) Mtr 45,500 61,750 74,250
4
CONDU
CTOR
1 AAAC;70MM2; -
2 AAAC;150MM2; -
3 AAAC;240MM2; -
4 AAAC-S;70MM2; -
5 AAAC-S;150MM2; 20,000 25,000 45,000
6 AAAC-S;240MM2; -
TOTAL (meter) - 20,000 25,000 45,000
www.pln.co.id |
7
KEBUTUHAN MDU TW I 2020
5 TRAFO DISTRIBUSI SATUAN JAN PEB MAR JML KETERANGAN
1 1P 50kVA CSP OD Ii0 -
2 1P 50kVA NCSP OD li0 -
2 3P 25kVA YZn5 OD -
3 3P 50 kVA DYn5 OD -
4 3P 100 kVA YZn5 OD Unit
10 12 15
37
Prioritas 1 (Mendesak)
5 3P 160 kVA DYn5 OD Unit 5 6 9 20
Prioritas 1 (Mendesak)
6 3P 50 kVA YNyn0 OD -
7 3P 100 kVA YNyn0 OD -
8 3P 160 kVA YNyn0 OD -
9 3P 200 kVA YNyn0 OD -
10 3P 200 kVA DYn5 OD Unit 6 8
10
24
Prioritas 1 (Mendesak)
11 3P 250 kVA DYn5 OD Unit 6 5 5 16
Prioritas 1 (Mendesak)
12 3P 400 kVA DYn5 OD -
13 3P 400 kVA DYn5 ID -
14 3P 630 kVA DYn5 ID Unit -
15 3P 1000 kVA DYn5 ID -
TOTAL (unit) Unit
27 31 39
6 FUSE CUT OUT (FCO)
1 Fuse Cut Out, 24 kV Bh 150 195 210 555 Prioritas 1 (Mendesak)
TOTAL (buah) 150 195 210
www.pln.co.id |
8
KEBITUHAN MDU TW I 2020
7 ISOLATOR SATUAN JAN PEB MAR JML KETERANGAN
1 Pin Post;24kV;12.5kN;Porcelain 300 350 400 1,050 Prioritas 2 (Sedang)
2 Line Post;24kV;12.5kN;Polimer SIR Bh 300 350 400 1,050 Prioritas 2 (Sedang)
3 Line Post;24kV;12.5kN;Porcelain -
4 Dead End;24kV;70kN;Polimer SIR Set 100 125 150 375 Prioritas 1 (Mendesak)
5 Strain Rod;24kV;70kN;Porcelain -
6 String Kap & Pin;24kV;70kN;Porcelain (set) -
TOTAL (buah) 700 825 950
8 LIGHTNING ARRESTER
1 LA Polymer SIR, 21 kV, 10 kA -
2 LA Polymer SIR, 24 kV, 10 kA Bh 150 195 210 555 Prioritas 1 (Mendesak)
3 LA Polymer SIR, 27 kV, 10 kA -
TOTAL (buah) 150 195 210
9 CUBICLE
1
Fully Gas Insulated Switchgear
;LBS;24kV;630A;16kA
-
2
Fully Gas Insulated Switchgear
;TP;24kV;630A;16kA
-
3
Fully Gas Insulated Switchgear
;LBS Motorized;24kV;630A;16kA
-
4
Fully Gas Insulated Switchgear
;CBOG Motorized+Metering;24kV;630A;16kA
-
5 CUB;N ISO;CBOG+MTR;20kV;630A;16kA; Unit 3 2 5 Prioritas 1 (Mendesak)
6
Air Insulated Switchgear
;LBS Motorized;24kV;630A;16kA
-
7 CUB;N ISO;LBS INC;20kV;630A;16kA; Unit 3 2 5 Prioritas 1 (Mendesak)
8
Air Insulated Switchgear
;TP;24kV;630A;16kA
-
9 Metalclad;Outgoing;20kV;630A;25kA; -
10 Metalclad;Couple;20kV;2000A;25kA; -
TOTAL (cell) Unit - 6 4
www.pln.co.id |
9
KEBUTUHAN MDU TW I 2020
10 CURRENT TRANSFORMER (CT) SATUAN JAN PEB MAR JML KETERANGAN
1
CT TM Indoor
rasio 10/5-5 sd 1000/5-5
-
2 CT TM Indoor rasio 10/5 dan 100/5 (Ring) -
3 CT TM Outdoor -
TOTAL (buah) - - -
11 POTENTIAL TRANSFORMER (PT)
1 PT TM Indoor rasio 20.000/√3 : 100/√3 -
2 PT TM Outdoor rasio 20.000/√3 : 100/√3 - -
TOTAL (buah) - - -
12 TIANG BAJA
1 Tiang Baja 9 m / 100 daN - - -
2 Tiang Baja 9 m / 200 daN Bh 4 3 3 10
3 Tiang Baja 9 m / 350 daN - - -
4 Tiang Baja 11 m / 200 daN - - -
5 Tiang Baja 12 m / 200 daN - - -
6 Tiang Baja 12 m / 350 daN - - -
7 Tiang Baja 13 m / 200 daN - - -
8 Tiang Baja 13 m / 350 daN Bh 2 2 2 6
9 Tiang Baja 14 m / 350 daN - - -
TOTAL (batang) Bh 6 5 5
www.pln.co.id |
10
KEBUTUHAN MDU TW I 2020
13 TIANG BETON SATUAN JAN PEB MAR JML KETERANGAN
1 Tiang Beton 9 mtr 100 daN -
2 Tiang Beton 9 mtr 200 daN -
3 Tiang Beton 9 mtr 350 daN Bh 300 200 300 800
4 Tiang Beton 11 mtr 200 daN 10 5 10 25
5 Tiang Beton 12 mtr 200 daN -
6 Tiang Beton 12 mtr 350 daN -
7 Tiang Beton 13 mtr 350 daN Bh 100 75 100 275
8 Tiang Beton 13 mtr 500 daN Bh -
9 Tiang Beton 14 mtr 350 daN -
TOTAL (batang) Bh 410 280 410
14 PERANGKAT HUBUNG BAGI TEGANGAN RENDAH (PHB TR)
1 PL-250-2-LBS -
2 PL-250-2-MCCB -
3 PL-400-2-LBS Bh 10 15 20 45
Prioritas 1 (Mendesak)
4 PL-400-4-LBS -
5 PL-630-4-LBS
6 PD-1000-6-LBS -
7 PD-1000-8-LBS -
TOTAL (unit) Bh 10 15 20
15 LOAD BREAK SWITCH (LBS)
1 1. LBS Motorized + RTU -
2 2. LBS Motorized Non RTU -
TOTAL (unit) - - - -
www.pln.co.id |
Permintaan MDU s.d Juni 2020 u/ Kebutuhan PB
No Material Satuan Jumlah
1 Kabel A3CS 10.000 Meter
2 Pin Isolator 450 Bh
3 Hang Isolator 250 Bh
4 LA 180 Bh
5 Kabel NNY 150 3.000 Meter
6 Kabel NNY 4X70 2.000 Meter
7
Box Panel Umum/LV Panel 1 pintu 2 Jurusan
35 Bh
8 Box Panel Pengukuran Langsung 150 Bh
9
Box Panel Pengukuran tdk Langsung 53 VA
5 Bh
10
Box Panel Pengukuran tdk Langsung 66 VA
5 Bh
11
Box Panel Pengukuran tdk Langsung 82,5 VA
5 Bh
12
Box Panel Pengukuran tdk Langsung 10,5 VA
5 Bh
13
Box Panel Pengukuran tdk Langsung 131 VA
- Bh
14
Box Panel Pengukuran tdk Langsung 147 VA
- Bh
15
Box Panel Pengukuran tdk Langsung 164 VA
5 Bh
16
Box Panel Pengukuran tdk Langsung 197 VA
10 Bh
www.pln.co.id |
Monitoring Stok MDU Per Tgl. 01 April 2020
22
No material Area Tuban Lmg Bbt Pdg Brd Jrg Sbj Bjn Jumlah
1 Trafo 100 KVA 0 0
2 Trafo 160 KVA 0 0
3 Trafo 200 KVA 0 0
4 Trafo 250 KVA 0 0
5 Kwh meter 1 phs LPB 0 1317 90 331 187 325 567 294 559 3670
6 Kwh meter 1 phs pasca 0 0 0 0 0 0 0 0 0
7 Kwh meter 3 phs LPB
8 MCB 1 phs 2 Amp 0 614 129 135 141 180 200 106 201 1706
9 MCB 1 phs 4 Amp 0 880 238 293 226 275 315 175 99 2501
10 MCB 1 phs 6 Amp 0 0 0 0 0 0 0 0 0 0
11 MCB 1 phs 10 Amp 0 0 0 0 0 533 0 0 0 533
12 MCB 1 phs 16 Amp 0 0 29 0 0 139 0 99 0 267
13 MCB 1 phs 20 Amp 0 50 541 374 0 248 0 62 0 1275
14 MCB 1 phs 25 Amp 0 0 0 0 0 0 0 0 0 0
15 MCB 1 phs 35 Amp 0 0 0 0 12 0 0 12
16 MCB 3 phs 10 Amp 0 0
17 MCB 3 phs 16 Amp 0 0
18 MCB 3 phs 20 Amp 0 0
19 MCB 3 phs 25 Amp 0 0
20 MCB 3 phs 35 Amp 0 0
21 MCB 3 phs 50 Amp 0 0
22 TC 2x10 mm 21000 8305 11672 17285 13110 13620 12010 14680 20467 132149
23 TC 3x70+1x70 mm 0 0
24 A3C-S 150 0 0
25 NYY 4x70 0 0
26 NYY 1x150 0 0
27 NFA2XSEY-T 3x150 0 0
28 NFA2XSEY-T 3x240 0 0
29 NFA2XSEY 3x150 0 0
30 NFA2XSEY 3x240 97 97
31 PHBTR 2 Jurusan 0 0
32 PHBTR 4 Jurusan 0 0
33 Air Insulated 2 2
34 Full Gas 0 0
www.pln.co.id |
12
Monitoring Rekap PK / Vendor s/d Tgl. 01 April 2020
No NO. VENDOR ULP JENIS PEKERJAAN KETERANGAN
1
PT. IKHLAS MULIA TEKNIK
NUSANTARA
BOJONEGORO
KOTA
SAR PK yang di bawa 60 ( Operasi 35 PK )
2 PT. KELUARGA ELEKTRO 2014 BABAT SAR PK yang di bawa 16 ( Operasi 6 PK )
3 PT. KELUARGA ELEKTRO 2014 BRONDONG SAR PK yang di bawa 18 ( Operasi 15 PK )
4 PT. KENCANA KENZIE YUDA NARRAYA JATIROGO SAR PK yang di bawa 27 ( Operasi 26 PK )
5 PT. JAYA TERANG MANDIRI LAMONGAN SAR PK yang di bawa 15 ( Operasi 8 PK )
6 PT. KENCANA KENZIE YUDA NARRAYA PADANGAN SAR PK yang di bawa 21( Operasi 19 PK )
7 PT. KENCANA KENZIE YUDA NARRAYA SUMBEREJO SAR PK yang di bawa 28( Operasi 21 PK )
8 PT. KUSUMA JAYA ANUGRAH TUBAN SAR PK yang di bawa 69 ( Operasi 16 PK )
9 PT. ILHAM UTAMA MANDIRI JATIROGO SAR
PK yang di bawa 8 ( Operasi 4 PK )
10
PT. KENCANA KENZIE YUDA NARRAYA TUBAN
SAR
PK yang di bawa 19 ( Operasi 0 PK )
www.pln.co.id |
24
MONITORING SPB MDU Blm DIKIRIM PABRIKAN s/d Tgl. 01 April 2020
NO Material Vendor
SPB MATERIAL DATANG
Sisa SPB(SPB- MAT
DATANG)
Satuan Jumlah
Harga
Satuan (Rp)
Biaya
Transportasi
Total Tanggal Nomor SPB Nama TGL Jumlah
a b d e f g h=ex(f+g) i j
21 Trafo Distribusi;3 Phase 160
KVA;OD;YZN5 PT. Bambang Djaja unit 3
Rp
33.000.000 Rp 845.434
Rp
101.536.302 23/1/2020
0356/DAN.02.03/040000/
2020 TRAFO 160 KVA 01-Feb-20 2 1
48
MCB 1 Phasa ( 2A,4A,6A,25A )
PT. SCHNEIDER
ELECTRIC Buah 1.100
Rp
30.600 Rp 70
Rp
33.737.000 02/11/2020
0733/DAN.02,03/040000/
2020 MCB 1 Phase, 4A
16-Mar-
20 700 400
49 String Kap & Pin; 24 kV; 70 kN;
Porcelain (set)
PT TWINK
INDONESIA Buah 105
Rp
384.000 Rp 17.600
Rp
42.168.000 02/11/2020
0735/DAN.02,03/040000/
2020 Isolator Porcelain 105
49
MCB 1 Phasa ( 2A,4A,6A,25A ) PT. ABB Buah 3.580
Rp
30.600 Rp 70
Rp
109.798.600 02/12/2020
0754/DAN.02,03/040000/
2020 MCB 1 Phase, 4A 3.580
49
PHBTR Pasangan Luar PL-400-4-LBS
PT, MULYA UTAMA
MANDIRI SENTOSA Buah 2
Rp
13.295.000 Rp 346.080
Rp
27.282.160 14/2/2020
0791/DAN.02,03/040000/
2020
Panel Umum 2
Pintu 2
62
Lemari APP Pengukuran Tidak
Langsung +MCCB 80 A
PT. MULYA UTAMA
MANDIRI SENTOSA
Buah 8
Rp
9.900.000
Rp 346.080
Rp
81.968.640
28/2/2020
1052/DAN.02.03/040000/
2020
Panel Umum 2
Pintu
8
58
NFA2X ; 2x10 mm2 ; 0,6/1 kV ;OH
PT. MAGNAKABEL
NUSANTARA Meter 39.000
Rp
4.000 Rp 110
Rp
160.290.000 03/02/2020
1067/DAN.02.03/040000/
2020 TC 2X10 39.000
63
String Kap & Pin; 24 kV; 70 kN;
Porcelain (set)
PT. KENTJANA SAKTI
INDONESIA Buah 66
Rp
384.000 Rp 17.600
Rp
26.505.600 03/12/2020
1270/DAN.02.03/040000/
2020
Isolator Porcelain
66
65
NFA2X ; 2 x 10 mm2 ; 0,6/1 Kv ; OH
PT. SUTRA KABEL
INTIMANDIRI Meter 18.000
Rp
4.000 Rp 110
Rp
73.980.000 03/12/2020
1273/DAN.02.03/040000/
2020 TC 2X10 18.000
66
Kwh Meter Prabayar Fasa Tunggal
PT. HEXING
TECHNOLOGY Buah 1.700
Rp
238.540 Rp 1.400
Rp
407.898.000 03/12/2020
1274/DAN.02.03/040000/
2020
kWh 1 fase
Prabayar
30-Mar-
20 700 1.000
70 MCB 1 Phasa (2A ; 4A)
PT. SCHNEIDER
ELECTRIC
Buah 1.500
Rp
30.600
Rp 70
Rp
46.005.000 03/12/2020
1279/DAN.02.03/040000/
2020
MCB 1 Phase 2A,
4A 1.500
71 NFA2X-T ; 3X70+1X70 ; 0,6/1 Kv ; OH
PT PRIMA INDAH
LESTARI
Meter 20.000
Rp
47.500
Rp 1.030
Rp
970.600.000 03/12/2020
1280/DAN.02.03/040000/
2020
TC 3X70 + 1X70
20.000
72 PHBTR Pasang Luar PL-400-4-LBS
PT, MULYA UTAMA
MANDIRI SENTOSA
Buah 2
Rp
13.295.000
Rp 346.080
Rp
27.282.160 14/3/2020
0791/DAN.02.03/040000/
2020
Panel Umum 2
Pintu 2
Trafo Distribusi 3 Phasa 200
KVA,OD,DyN5
PT. MASTERGREEN
ELECTRIC
Unit 1
Rp
36.650.000
Rp 2.048.685
Rp
38.698.685 23/3/2020
1476/DAN.02.03/040000/
2020
TRAFO 200 KVA
1
Trafo Distribusi 3 Phasa
100KVA,OD,Yzn5
PT. MEGA KARYA
PERKASA Unit 6 31.725.000 1.758.085 200.898.510 23/3/2020
1479/DAN.02.03/040000/
2020 TRAFO 100 KVA 6
Trafo Distribusi 3 Phasa 250
Kva;OD;Dyn5 PT. Bambang Djaja
Unit
2 43.000.000 1.081.541
Rp
88.163.082 13/3/2020
1311/DAN.02.03/040000/
2020 TRAFO 250 KVA 2
Trafo Distribusi 3 Phasa 160
KVA,OD,Yzn5
PT. MASTERGREEN
ELECTRIC Unit 3 33.000.000 1.758.085 104.274.255 23/3/2020
1479/DAN.02.03/040000/
2020 TRAFO 160 KVA 3
NFA2XY-T ; 3X150+1X95 ; 20 Kv ; OH
PT PRIMA INDAH
LESTARI
Meter
900 250.000 14.420
Rp
237.978.000 23/3/2020
1481/DAN.02.03/040000/
2020 TC 3X150 + 1X95 900
NA2XSEYBY;3x150 mm2;20 kV ; UG
PT. PRYSMIAN
CABLE Meter 300 341.000 14.420 106.626.000 23/3/2020
1480/DAN.02.03/040000/
2020
NA2XSEYBY;3x15
0 mm2;20 kV ;
UG 300
www.pln.co.id |
11
MONITORING TAGIHAN PEKERJAAN SAR s/d Tgl. 01 April 2020
No Pelaksana SPBJ Nilai (Rp.) ULP Keterangan
1 PT KJA SPBJ IV TAG 4 Rp117,519,205 BRD SUDAH SE TGL 22.11.2019
2 PT ILHAM SR SPBJ 2 TG 1 P3 Rp76,111,965 JRG SUDAH SE TGL 18.11.2019
3 PT KKYN SPBJ 7 TAG 4 MVTIC Rp269,251,343 BJN SUDAH SE TGL 11.12.2019
4 PT KJA SPBJ 7 TAG 8 MVTIC Rp276,684,078 BJN SUDAH SE TGL 11.12.2019
5 PT KJA SPBJ 7 TAG 9 Rp117,670,033 TBN SUDAH SE TGL 11.12.2019
6 PT KJA SPBJ 7 TAG 10 Rp166,657,060 TBN SUDAH SE TGL 11.12.2019
7 PT IMTN SPBJ 1 P1 TAG 1 BJN Rp196,083,605 BJN SUDAH SE TGL 06.12.2019
8 PT IMTN SPBJ 1 P1 TAG 2 BJN Rp118,651,212 BJN SUDAH SE TGL 11.12.2019
9 PT IUM SPBJ 1 P1 TAG 1 SBJ Rp140,337,190 SBJ SUDAH SE TGL 13.12.2019
10 PT JTM SPBJ 2 P1 TAG 1 LMG Rp47,511,422 LMG SUDAH SE TGL 12.12.2019
11 PT KKYN SPBJ 2 TG 1 P3 Rp72,364,185 PDG SUDAH SE TGL 09.12.2019
12 PT YUGA SPBJ 2 TG 1 P3 Rp151,130,591 BRD SUDAH SE TGL 10.12.2019
13 PT ILHAM SPBJ 2 TG 2 P3 Rp120,305,631 JRG SUDAH SE TGL 11.12.2019
14 PT KJE SPBJ 2 TG 2 P3 Rp115,458,686 TBN SUDAH SE TGL 11.12.2019
15 PT SINAR DWI SPBJ 2 TG 2 P3 Rp136,301,793 LMG SUDAH SE TGL 12.12.2019
16 PT KKYN SR SPBJ 2 TG 2 P3 Rp220,952,152 PDG SUDAH SE TGL 29.01.2020
17 PT JTM SR SPBJ 2 TG 2 P3 Rp111,138,089 SBJ SUDAH SE TGL 29.01.2020
18 PT ILHAM SR SPBJ 2 TG 3 P3 Rp119,911,666 JRG SUDAH SE TGL 31.01.2020
19 PT KJE SR SPBJ 2 TG 3 P3 Rp260,668,410 TBN SUDAH SE TGL 31.01.2020
20 PT JTM SR SPBJ 2 TG 3 P3 Rp148,341,181 SBJ SUDAH SE TGL 19.02.2020
www.pln.co.id |
MONITORING TAGIHAN PEKERJAAN SAR s/d Tgl. 01 April 2020
No Pelaksana SPBJ Nilai (Rp.) ULP Keterangan
21 PT JTM SPBJ 1 P1 TAG 2 LMG Rp254,081,830 LMG SUDAH SE TGL 31.01.2020
22 PT KE SPBJ 1 P1 TAG 1 BRD Rp64,752,835 BRD SUDAH SE TGL 29.01.2020
23 PT KJA SPBJ 1 P1 TAG 1 TBN Rp319,670,517 TBN SUDAH SE TGL 12.02.2020
24 PT IMTN SPBJ 2 P1 TAG 1 BJN Rp191,854,643 BJN SUDAH SE TGL 13.02.2020
25 PT IMTN SPBJ 2 P1 TAG2 BJN Rp491,501,705 BJN SUDAH SE TGL 13.02.2020
26 PT IMTN SPBJ 2 TG 1 P2 BJN Rp183,373,215 BJN SUDAH SE TGL 06.02.2020
27 PT IMTN SPBJ 2 TG 2 P2 BJN Rp162,046,224 BJN SUDAH SE TGL 06.02.2020
28 PT KKYN PDG SPBJ 2 TG 1 P2 Rp194,244,051 PDG SUDAH SE TGL 12.02.2020
29 PT KKYN JRG SPBJ 2 TG 1 P2 Rp163,139,947 JRG SUDAH SE TGL 12.02.2020
30 PT KE SPBJ 2 TG 1 P2 Rp60,606,093 BBT SUDAH SE TGL 14.02.2020
31 PT KJA TBN SPBJ 2 TG 1 P2 Rp70,154,279 TBN SUDAH SE TGL 18.02.2020
32 PT KE BBT SPBJ 2 TG 1 P2 Rp60,606,093 BBT SUDAH SE TGL 14.02.2020
33 PT MME SPBJ 2 TG 1 P2 Rp52,297,100 BJN SUDAH SE TGL 19.02.2020
34 PT IMTN SPBJ 2 P1 TAG 3 BJN Rp366,761,606 BJN SUDAH SE TGL 19.02.2020
35 PT IMTN SPBJ 2 P1 TAG 4 BJN Rp434,787,225 BJN SUDAH SE TGL 19.02.2020
36 PT KKYN SPBJ 2 P1 TAG 2 PDG Rp119,936,766 PDG SUDAH SE TGL 19.02.2020
37 PT JTM SPBJ 2 TG 3 P3 Rp148,341,181 SBJ SUDAH SE TGL 19.02.2020
38 PT MME SPBJ 2 TG 3 P3 Rp152,075,436 BJN SUDAH SE TGL 19.02.2020
39 PT KJA SPBJ 2 TG 3 P3 Rp157,979,623 BBT SUDAH SE TGL 19.02.2020
40 PT KKYN SPBJ 2 TG 3 P3 Rp128,398,449 PDG SUDAH SE TGL 19.02.2020
41 PT KE SPBJ2 P1 Rp9,589,509 BRD MASIH DI PENGAWAS
JUMLAH Rp6,769,247,824
www.pln.co.id |
18
Monitoring Pekerjaan Keandalan s/d Tgl. 01 April 2020
No Nama Pekerjaan
Lokasi
ULP Vendor No. PRK
Material Distribusi
Utama Jumlah
Satua
n
Progr
es Keterangan
MDU Yang Di
butuh kan SPB/Stok
1 Rekonfigurasi Penyulang Plumpang Lot 2 Tuban PT. KKYN 2019.DJBT.7.001 1. Pin Post 408 Buah 25% 1. Pin Post 854
Yudi 2. Hang Isolator 93 Set 2. Hang Isolator 219
3. LA 21 Buah 3. LA 78
12.000 4. Kabel A3CS 150 24.098 Meter 4. Kabel A3CS 150 41.772
5. Kabel A3C 70 215 Meter 5. Kabel A3C 70 373
6. Tibet 13 - 350 daN 25 Buah 6. Tibet 13 - 350 daN 64
2 Rekonfigurasi Penyulang Plumpang Lot 1 Tuban PT. KJA 2019.DJBT.7.001 1. Pin Post 366 Buah 0% 7. Tibet 11 - 200 daN 44
Rochim 2. Hang Isolator 87 Set 8. Tibet 9 - 200 daN 48
3. LA 18 Buah 9. Kabel MVTIC 150 17.379
4. Kabel A3CS 150 17.674 Meter 10. Kabel XLPE 150 210
5. Kabel A3C 70 158 Meter
3 Pembangunan Penyulang Baru Untuk Tuban PT. IKHLAS 2019.DJBT.7.001 1. Pin Post 34 Buah 0%
Pecah Beban Penyulang Plumpang Lot 1 Daffi 2. Hang Isolator 12 Set
3. LA 6 Buah
4. Kabel MVTIC 150 3.655 Meter
5. Kabel XLPE 150 100 Meter
6. Tibet 13 - 350 daN 8 Buah
7. Tibet 9 - 200 daN 24 Buah
4 Pembangunan Penyulang Baru Untuk Tuban PT. ILHAM 2019.DJBT.7.001 1. Pin Post 13 Buah 0%
Pecah Beban Penyulang Plumpang Lot 2 Bobby 2. Hang Isolator 12 Set
3. LA 9 Buah
4. Kabel MVTIC 150 3.594 Meter
5. Kabel XLPE 150
6. Tibet 13 - 350 daN 4 Buah
7. Tibet 9 - 200 daN 5 Buah
www.pln.co.id |
Monitoring Pekerjaan Keandalan s/d Tgl. 01 April 2020
No Nama Pekerjaan
Lokasi
ULP Vendor No. PRK
Material Distribusi
Utama Jumlah
Satua
n
Progr
es Keterangan
MDU Yang Di
butuh kan SPB/Stok
5
Pembangunan Penyulang Baru Untuk
Pecah Babat PT. JTM 2019.DJBT.7.001 1. Pin Post 3 Buah 100% Operasi penyulang
Beban Penyulang Kepohbaru Lot 1 Heri 2. Hang Isolator
3. LA 6 Buah
2.389 4. Kabel MVTIC 150 2.389 Meter
5. Kabel XLPE 150
6. Tibet 11 - 200 daN 24 Buah
7. Tibet 9 - 200 daN 6 Buah
6
Pembangunan Penyulang Baru Untuk
Pecah Babat PT. ILHAM 2019.DJBT.7.001 1. Pin Post 3 Buah 100% Operasi penyulang
Beban Penyulang Kepohbaru Lot 2 Bobby 2. Hang Isolator
3. LA 6 Buah
2.000 4. Kabel MVTIC 150 2.788 Meter
5. Kabel XLPE 150
6. Tibet 11 - 200 daN 39 Buah
7. Tibet 9 - 200 daN 13 Buah
7
Pembangunan Penyulang Baru Untuk
Pecah Lamongan PT. KJA 2019.DJBT.7.001 1. Pin Post 27 Buah 100% Operasi penyulang
Beban Penyulang Petro Rochim 2. Hang Isolator 15 Set
3. LA 18 Buah
4.000 4. Kabel MVTIC 150 4.953 Meter
5. Kabel XLPE 150 110 Meter
6. Tibet 13 - 350 daN 27 Buah
7. Tibet 11 - 200 daN 5 Buah
8. Tibet 9 - 200 daN 5 Buah
8
Pembangunan Penyulang Baru Untuk
Pecah Bogota
PT. KJA, Ikhlas,
KKYN Sudah Komplait 100% OPERASI
Beban Penyulang Kalitidu
www.pln.co.id |
Monitoring Pekerjaan Lisdes/RE s/d Tgl. 01 April 2020 UP3 BJN
20
TAHAP 2
NO.
LOKASI POTENSI
PELANGG
AN
DAYA
RUPIAH
TOTAL
(Termasuk
Ppn)
GTT SUTM SUTR TIANG
KET
DESA DUSUN KEC
10
0
16
0
20
0
25
0
RUPIAH
PANJAN
G (ms)
RUPIAH
PANJAN
G (ms)
RUPIAH
13
Mtr
11
Mtr
9
Mtr
1 Turi
Bacem Tambakrejo
147 900
299,333,026
1
28,604,110 7,070 193,767,126 3,220 76,961,790
42
6
61
Tiang TM 100% & TR 100%
Sokosewu Tambakrejo
86 900
2 Napis Kalidandang Tambakrejo
82 900 210,943,746
1
28,837,308 5,575 138,692,558 1,796 43,413,880 19
6
38
Tiang TM 100% & TR 100%
3 Nglampin Gowah Ngambon
58 900 159,570,730
1
28,837,308 881 87,950,468 1,356 42,782,954 19
2
34
Tiang TM 100% & TR 100%
4 Clebung Maor Bubulan
71 900 324,178,174
1
28,837,308 3,282 251,927,028 1,633 43,413,838 68
11
43
Tiang TM 100% & TR 100%
5 Panjang Malangbong
Kedungade
m 90 900 533,010,181
1
28,837,308 6,360 483,502,312 645 20,670,561
132 12
15
Tiang TM 100% & TR 100%
TOTAL
534
1,527,035,85
7
4 1 - -
143,953,341 23,168 1,155,839,492 8,650 227,243,023
280 37 191
508
TAHAP 3
NO.
LOKASI
POTENSI
PELANGG
AN
DAYA
RUPIAH
TOTAL
(Termasuk
Ppn)
GTT SUTM SUTR TIANG
KET
DESA DUSUN KEC
10
0
16
0
20
0
25
0
RUPIAH
PANJAN
G (ms)
RUPIAH
PANJAN
G (ms)
RUPIAH
13
Mtr
11
Mtr
9
Mtr
1 Kesongo Bunten
Kedungade
m 70 900 418,883,500
1
28,837,308 4,330 353,390,502 3,220 36,655,691 94
16
32
Tiang TM 100% & TR 100%
2
Margomuly
o
Tepus
Margomuly
o 35 900 93,523,584
1
28,837,308 2,207 64,686,277 2
-
48
Tiang TM 100% & TR 100%
3 Nganti Mbingung Tambakrejo
23 900 107,302,055
1
28,837,308 881 48,831,582 1,239 29,633,165 12
-
35
Tiang TM 100% & TR 100%
TOTAL
128 619,709,139
2 1 - -
86,511,923 5,211 402,222,084 6,666 130,975,132
108 16 115
www.pln.co.id |
1
MONITORING KINERJA ITO s/d Tgl. 01 April 2020
BULAN TARGET REALISASI
JAN 1.49 0.33
FEB 2.98 2.88
MAR 4.47 Proses Perhitungan
APR 5.96
MAY 7.45
JUN 8.94
JUL 10.43
AUG 11.92
SEP 13.41
OCT 14.90
NOV 16.39
DEC 17.88
www.pln.co.id |
2
GRAFIK KINERJA ITO TARGET VS REALISASI Tgl. 01 April 2020
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
TARGET 1.49 2.98 4.47 5.96 7.45 8.94 10.43 11.92 13.41 14.9 16.39 17.88
REALISASI 0.33 2.88
Realisasi dlm
proses
perhtungan
www.pln.co.id |
3
MONITORING KINERJA ITO DARI TH. 2016 s/d Tgl. 01 April 2020
BULAN
TAHUN 2016 TAHUN 2017 TAHUN 2018 TAHUN 2019
TAHUN 2020
TARGET REALISASI TARGET REALISASI TARGET REALISASI TARGET REALISASI TARGET REALISASI
JAN 0.4 0.23 0.14 0.19 1.55 0.48 1.23 0.26 1.49 0.33
FEB 0.36 0.88 0.56 0.31 3.01 0.36 2.39 0.97 2.98 2.88
MAR 0.55 1.06 0.77 2.39 4.38 0.46 3.49 1.97 4.47
APR 0.83 1.18 1.24 2.07 5.68 0.78 4.51 2.79 5.96
MEI 0.97 1.29 1.72 2.91 6.9 2.87 5.49 5.69 7.45
JUN 1.03 1.7 2.18 3.02 5.88 8.13 6.38 7.96 8.94
JUL 1.52 2.04 2.62 3.87 7.19 2.89 8.6 5.06 10.43
AGUS 1.63 3.05 3.2 4.16 8.5 3.32 10.64 10.91 11.92
SEP 1.91 3.12 3.76 5.76 9.8 4.63 12.56 13.14 13.41
OKT 2.01 3.84 4.44 7.48 10.89 6.96 14.31 14.84 14.9
NOP 2.39 5.47 5.61 10.35 11.99 8.96 15.9 18.09 16.39
DES 3.89 9.85 9.19 12.65 13.07 15.68 17.32 22 17.88
www.pln.co.id |
4
GRAFIK KINERJA ITO DARI TAHUN 2016 s/d Tgl. 01 April 2020
JAN FEB MAR APR MEI JUN JUL AGUS SEP OKT NOP DES
TAHUN 2016 TARGET 0.4 0.36 0.55 0.83 0.97 1.03 1.52 1.63 1.91 2.01 2.39 3.89
TAHUN 2016 REALISASI 0.23 0.88 1.06 1.18 1.29 1.7 2.04 3.05 3.12 3.84 5.47 9.85
TAHUN 2017 TARGET 0.14 0.56 0.77 1.24 1.72 2.18 2.62 3.2 3.76 4.44 5.61 9.19
TAHUN 2017 REALISASI 0.19 0.31 2.39 2.07 2.91 3.02 3.87 4.16 5.76 7.48 10.35 12.65
TAHUN 2018 TARGET 1.55 3.01 4.38 5.68 6.9 5.88 7.19 8.5 9.8 10.89 11.99 13.07
TAHUN 2018 REALISASI 0.48 0.36 0.46 0.78 2.87 8.13 2.89 3.32 4.63 6.96 8.96 15.68
TAHUN 2019 TARGET 1.23 2.39 3.49 4.51 5.49 6.38 8.6 10.64 12.56 14.31 15.9 17.32
TAHUN 2019 REALISASI 0.26 0.97 1.97 2.79 5.69 7.96 5.06 10.91 13.14 14.84 18.09 22
TAHUN 2020 TARGET 1.49 2.98 4.47 5.96 7.45 8.94 10.43 11.92 13.41 14.9 16.39 17.88
TAHUN 2020 REALISASI 0.33 2.88
www.pln.co.id |
Monitoring Perputaran MDU/ITO s/d 01 April 2020
Proses Hitung
www.pln.co.id |
18
Monitoring Potensi Pelanggan TM >200 Kva s/d Tgl. 01 April 2020
NO ULP NAMA MVA PB/PD ESTIMASI LAYANAN
PROGRESS
FISIK
KETERANGAN
1 TUBAN PANCA KALSIUM 1,175,000 PD PREMIUM 100%
OPERASI DGN UCKB dan Rencana
Operasi Tgl. 11 Maret 2020
2 BOGOTA
PERTAMINA SUKOWATI
PAD A
1,110,000 PB PREMIUM 100%
SEMENTARA OPERASI U/PECAH
BEBAN PENYULANG PEMUDA
3 BOGOTA
PERTAMINA SUKOWATI
PAD B
1,110,000 PB PREMIUM 100%
Cubikel Double incaming dan
Outgoing di ambil u/ Panca Kalsiun
4 PADANGAN REKAYASA INDUSTRI 2,530,000 PD REGULER 20%
MENUNGGU IJIN PERHUTANI DAN
IML PELANGGAN, SEMENTARA
OPERASI 240 KVA DGN UCKB
5 BOGOTA BAHTERA ABADI GAS 865,000 PB REGULER 100% Operasi 20 Maret 2020
POTENSI UBAH LAYANAN DARI REGULER KE PREMIUM
NO. NAMA MVA ESTIMASI KETERANGAN
1 PERTAMINA KAWENGAN 1,385,000
Sudah Operasi Penyulang Malo dan
Penyulang Singgahan ( Stanby )
2 KAYAN WOOD 1,730,000 Operasi Tgl. 21 Peb 2020
www.pln.co.id |
MONITORING PEKERJAAN TERMINASI & JOINTING KHS
UP3 BOJONEGOROs/d Tgl. 01 April 2020
No.
DATA PEKERJAAN DATA TERMINASI DAN KABEL EXISTING Beban
PELAKSANAAN TERMINASI &
WAKTU
Megger 10.000 M.Ohm & Nilai Tahanan ..
Ohm
Analisa Penyebab Gangguan
dari Teknisi
IDENTITAS PETUGAS YANG TERLIBAT
KETERANGAN
Phasa - Ground Phasa - Phasa PELAKSANA PLN
Koordinat
(Derajat
Desimal)
LOKASI
JENIS
PEKERJAAN
TERMINASI
DIPASANG
TAHUN
ULP GARDU INDUK / GIS Type Merk Jenis
Ukuran
(mm)
Pabrikan Jenis
Amper
(A)
TANGGAL MULAI SELESAI R - 0 S - 0 T - 0 R - S R - T S - T JOINTER HP PABRIKAN PENGAWAS
1
-07.01501,
111.47971
Jl. Kedung Jambe, Singgahan, Tuban
(PT. BAG )
Baru 2020
ULP Bojonegoro
Kota
BOJONEGORO TRAFO 1
BJG
Outdoor
Termination
Fastindo
Coldsrink
Shear Bolt
150 Lain lain Single Core 200 18-Mar-20 12:10 18:00 50G 51G 50G 100 G 100 G 100 G Pengoperasian jaringan Baru Agung 085203845111 Fastindo Kopriyanto BELUM BAYAR
2
-07.01501,
111.47971
Jl. Kedung Jambe, Singgahan, Tuban
(PT. BAG )
Baru 2020
ULP Bojonegoro
Kota
BOJONEGORO TRAFO 1
BJG
Outdoor
Termination
Fastindo
Coldsrink
Shear Bolt
150 Lain lain Single Core 200 18-Mar-20 12:10 18:00 50G 51G 50G 100 G 100 G 100 G Pengoperasian jaringan Baru Agung 085203845111 Fastindo Kopriyanto BELUM BAYAR
3
-07.02126,
111.48440
Jl. Kedung Jambe, Singgahan, Tuban
(PT. BAG )
Baru 2020
ULP
BOJONEGORO
KOTA
BOJONEGORO TRAFO 1
BJG
Indoor
Termination
Fastindo
Coldsrink
Shear Bolt
150 Lain lain Single Core 200 18-Mar-20 12:10 18:00 50G 51G 50G 100 G 100 G 100 G Pengoperasian jaringan Baru Agung 085203845111 Fastindo Kopriyanto BELUM BAYAR
4
-07.015491,
111.481792
Jl. Kedung Jambe, Singgahan, Tuban
(PT. BAG )
Baru 2020
ULP
BOJONEGORO
KOTA
BOJONEGORO TRAFO 1
BJG
Outdoor
Jointing
Fastindo Coldsrink 150 Lain lain Single Core 200 18-Mar-20 12:00 18:00 50G 51G 50G 100 G 100 G 100 G Pengoperasian jaringan Baru Ruslan 085203845111 Fastindo Kopriyanto BELUM BAYAR
5
-07.014416 ,
111.480661
Jl. Kedung Jambe, Singgahan, Tuban
(PT. BAG )
Baru 2020
ULP
BOJONEGORO
KOTA
BOJONEGORO TRAFO 1
BJG
Outdoor
Jointing
Fastindo Coldsrink 150 Lain lain Single Core 200 18-Mar-20 12:00 18:00 50G 51G 50G 100 G 100 G 100 G Pengoperasian jaringan Baru Ruslan 085203845111 Fastindo Kopriyanto BELUM BAYAR
6
-07.014185 ,
111.480502
Jl. Kedung Jambe, Singgahan, Tuban
(PT. BAG )
Baru 2020
ULP
BOJONEGORO
KOTA
BOJONEGORO TRAFO 1
BJG
Outdoor
Jointing
Fastindo Coldsrink 150 Lain lain Single Core 200 19-Mar-20 12:00 18:00 50G 51G 50G 100 G 100 G 100 G Pengoperasian jaringan Baru Masrukan 085203845111 Fastindo Kopriyanto BELUM BAYAR
7
-07.013769 ,
111.480137
Jl. Kedung Jambe, Singgahan, Tuban
(PT. BAG )
Baru 2020
ULP
BOJONEGORO
KOTA
BOJONEGORO TRAFO 1
BJG
Outdoor
Jointing
Fastindo Coldsrink 150 Lain lain Single Core 200 19-Mar-20 12:00 18:00 50G 51G 50G 100 G 100 G 100 G Pengoperasian jaringan Baru Masrukan 085203845111 Fastindo Kopriyanto BELUM BAYAR
8
-07.012990,
111.475779
Jl. Kedung Jambe, Singgahan, Tuban
(PT. BAG )
Baru 2020
ULP
BOJONEGORO
KOTA
BOJONEGORO TRAFO 1
BJG
Outdoor
Jointing
Fastindo Coldsrink 150 Lain lain Single Core 200 20-Mar-20 10:20 15:00 50G 51G 50G 100 G 100 G 100 G Pengoperasian jaringan Baru Ruslan 085203845111 Fastindo Kopriyanto BELUM BAYAR
9
-07.012990,
111.475779
Jl. Kedung Jambe, Singgahan, Tuban
(PT. BAG )
Baru 2020
ULP
BOJONEGORO
KOTA
BOJONEGORO TRAFO 1
BJG
Outdoor
Termination
Fastindo
Coldsrink
Shear Bolt
150 Lain lain Single Core 200 20-Mar-20 10:20 15:00 50G 51G 50G 100 G 100 G 100 G Pengoperasian jaringan Baru Ruslan 085203845111 Fastindo Kopriyanto BELUM BAYAR
10
-07.090217,
111.524575
Alun-alun Bojonegoro Baru 2020
ULP
BOJONEGORO
KOTA
BOJONEGORO TRAFO 1
BJG
Outdoor
Termination
Fastindo
Coldsrink
Shear Bolt
150 Lain lain Single Core 180 23-Mar-20 09:00 12:00 101G 105G 102G 200 G 200 G 200 G Pengoperasian jaringan Baru Masrukan 085203845111 Fastindo Kopriyanto BELUM BAYAR
11
-07.090217,
111.524575
Alun-alun Bojonegoro Baru 2020
ULP
BOJONEGORO
KOTA
BOJONEGORO TRAFO 1
BJG
Outdoor
Termination
Fastindo
Coldsrink
Shear Bolt
150 Lain lain Single Core 180 23-Mar-20 09:00 12:00 101G 105G 102G 200 G 200 G 200 G Pengoperasian jaringan Baru Masrukan 085203845111 Fastindo Kopriyanto BELUM BAYAR
www.pln.co.id |
Rekapitulasi Pemakaian Mat Exhandal
Per 01 April 2020
Janis Mat TC 4X16 TC 4X25 TC 3X50/3X70 PIN PORCE HANG PORCE AAAC 70 AAAC 150 AAAC S 150 MVTIC 3X150
Jumlah - 22.521 15.594 400 125 18.031 210 54.686 1.941
0%
20%
14%
0%
0%
16%
0%
48%
2%
Grafik PENGELUARAN MATERIAL EX BONGKARAN UP RATING DAN
ADB
TC 4X16 TC 4X25 TC 3X50/3X70 PIN PORCE HANG PORCE
AAAC 70 AAAC 150 AAAC S 150 MVTIC 3X150
TERIMA
KASIH
Efisien, andal dan berkualitas

Más contenido relacionado

Destacado

How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024Albert Qian
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsKurio // The Social Media Age(ncy)
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Search Engine Journal
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summarySpeakerHub
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next Tessa Mero
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentLily Ray
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best PracticesVit Horky
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project managementMindGenius
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...RachelPearson36
 
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Applitools
 
12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at WorkGetSmarter
 
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...DevGAMM Conference
 
Barbie - Brand Strategy Presentation
Barbie - Brand Strategy PresentationBarbie - Brand Strategy Presentation
Barbie - Brand Strategy PresentationErica Santiago
 
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them well
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them wellGood Stuff Happens in 1:1 Meetings: Why you need them and how to do them well
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them wellSaba Software
 
Introduction to C Programming Language
Introduction to C Programming LanguageIntroduction to C Programming Language
Introduction to C Programming LanguageSimplilearn
 

Destacado (20)

How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
 
12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work
 
ChatGPT webinar slides
ChatGPT webinar slidesChatGPT webinar slides
ChatGPT webinar slides
 
More than Just Lines on a Map: Best Practices for U.S Bike Routes
More than Just Lines on a Map: Best Practices for U.S Bike RoutesMore than Just Lines on a Map: Best Practices for U.S Bike Routes
More than Just Lines on a Map: Best Practices for U.S Bike Routes
 
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
 
Barbie - Brand Strategy Presentation
Barbie - Brand Strategy PresentationBarbie - Brand Strategy Presentation
Barbie - Brand Strategy Presentation
 
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them well
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them wellGood Stuff Happens in 1:1 Meetings: Why you need them and how to do them well
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them well
 
Introduction to C Programming Language
Introduction to C Programming LanguageIntroduction to C Programming Language
Introduction to C Programming Language
 

KINERJA KONTRUKSI sd Tgl. 01 April 2020.pptx

  • 1. UP3 BOJONEGORO PT. PLN ( PERSERO ) UID JATIM KINERJA BAGIAN KONSTRUKSI s/d Tgl. 01 April 2020
  • 2. www.pln.co.id | 5 KEBUTUHAN MDU TW I 2020 NO MATERIAL SAT KEBUTUHAN MDU KET JAN PEB MAR TOTAL 1 KWH METER 1 kWh Meter Prabayar 1 Phase (MTR;kWH E-PR- COM;1P;230V;5-60A;1;;2W) Bh 2,500 3,000 3,000 8,500 Prioritas 1 (Mendesak) 2 kWh Meter Statik Energi Listrik Phase Tiga Pengukuran Tidak Langsung Kelas 0,5 (MTR;KWH E; 3P;57.5-400V; 5A; 0.5; 4W) Bh 3 3 4 10 Prioritas 1 (Mendesak) 3 kWh Meter Statik Energi Listrik Phase Tiga Pengukuran Tidak Langsung Kelas 1 (MTR;KWH E; 3P;230/400V; 5-10A; 1; 4W) Bh 5 10 15 30 Prioritas 1 (Mendesak) 4 kWh Meter Statik Energi Listrik Phase Tiga Pengukuran Langsung Kelas 1 (MTR;KWH E; 3P;230/400V; 5-80A; 1; 4W) Bh 60 90 100 250 Prioritas 1 (Mendesak) TOTAL (buah) 2,568 3,103 3,119 2 MCB 1 1 Phase 2A Bh - 2 1 Phase 4A Bh 2,500 3,000 3,000 8,500 Prioritas 1 (Mendesak) 3 1 Phase 6A Bh 500 500 750 1,750 Prioritas 1 (Mendesak) 4 1 Phase 10A Bh 50 75 85 210 Prioritas 2 (Sedang) 5 1 Phase 16A Bh 50 75 85 210 Prioritas 2 (Sedang) 6 1 Phase 20A Bh 50 75 85 210 Prioritas 2 (Sedang) 7 1 Phase 25A Bh 25 25 25 75 Prioritas 1 (Mendesak) 8 1 Phase 35A Bh 5 5 5 15 9 1 Phase 50A Bh 5 5 5 15 10 3 Phase 10A Bh 20 20 30 70 Prioritas 1 (Mendesak) 11 3 Phase 16A Bh 25 25 35 85 Prioritas 1 (Mendesak) 12 3 Phase 20A Bh - 13 3 Phase 25A Bh 15 25 30 70 Prioritas 1 (Mendesak) 14 3 Phase 35A Bh 5 10 15 30 Prioritas 1 (Mendesak) 15 3 Phase 50A Bh 10 15 20 45 Prioritas 1 (Mendesak) 16 3 Phase 63A Bh 5 5 5 15 Prioritas 1 (Mendesak) TOTAL (buah) Bh 3,255 3,850 4,210
  • 3. www.pln.co.id | 6 KEBUTUHAN MDU TW I 2020 3 CABLE POWER SATUAN JAN PEB MAR JML KETERANGAN 1 NYY;1X70MM2;0.6/1KV;Opstig - 2 NYY;1X95MM2;0.6/1KV;Opstig - 3 NYY;1X150MM2;0.6/1KV;Opstig Mtr 1,000 1,000 1,000 3,000 Prioritas 2 (Sedang) 4 NYY;1X240MM2;0.6/1KV;Opstig - 5 NYY;4X70MM2;0.6/1KV;Opstig Mtr 500 1,000 1,000 2,500 Prioritas 2 (Sedang) 6 NFA2X;2X10MM2;0.6/1KV;OH Mtr 26,000 36,000 39,000 101,000 Prioritas 1 (Mendesak) 7 NFA2X;2X16MM2;0.6/1KV;OH - 8 NFA2X;4X16MM2;0.6/1KV;OH Mtr 3,000 3,000 4,000 10,000 Prioritas 1 (Mendesak) 9 NFA2X-T;3X70 + 70MM2;0.6/1KV Mtr 15,000 20,000 25,000 60,000 Prioritas 1 (Mendesak) 10 NFA2X-T;3X35 + 25MM2;0.6/1KV - 11 NFA2XSY-T;3X150+1X95;20kV;OH Mtr 3,000 3,000 Prioritas 1 (Mendesak) 12 NFA2XSY-T;3X240+1X95;20KV;OH - 13 NA2XSEYBY;3X150MM2;20KV;UG Mtr 500 1,000 1,500 Prioritas 1 (Mendesak) 14 NA2XSEYBY;3X240MM2;20KV;UG 250 250 500 15 NA2XSEYBY;3X300MM2;20KV;UG - TOTAL (meter) Mtr 45,500 61,750 74,250 4 CONDU CTOR 1 AAAC;70MM2; - 2 AAAC;150MM2; - 3 AAAC;240MM2; - 4 AAAC-S;70MM2; - 5 AAAC-S;150MM2; 20,000 25,000 45,000 6 AAAC-S;240MM2; - TOTAL (meter) - 20,000 25,000 45,000
  • 4. www.pln.co.id | 7 KEBUTUHAN MDU TW I 2020 5 TRAFO DISTRIBUSI SATUAN JAN PEB MAR JML KETERANGAN 1 1P 50kVA CSP OD Ii0 - 2 1P 50kVA NCSP OD li0 - 2 3P 25kVA YZn5 OD - 3 3P 50 kVA DYn5 OD - 4 3P 100 kVA YZn5 OD Unit 10 12 15 37 Prioritas 1 (Mendesak) 5 3P 160 kVA DYn5 OD Unit 5 6 9 20 Prioritas 1 (Mendesak) 6 3P 50 kVA YNyn0 OD - 7 3P 100 kVA YNyn0 OD - 8 3P 160 kVA YNyn0 OD - 9 3P 200 kVA YNyn0 OD - 10 3P 200 kVA DYn5 OD Unit 6 8 10 24 Prioritas 1 (Mendesak) 11 3P 250 kVA DYn5 OD Unit 6 5 5 16 Prioritas 1 (Mendesak) 12 3P 400 kVA DYn5 OD - 13 3P 400 kVA DYn5 ID - 14 3P 630 kVA DYn5 ID Unit - 15 3P 1000 kVA DYn5 ID - TOTAL (unit) Unit 27 31 39 6 FUSE CUT OUT (FCO) 1 Fuse Cut Out, 24 kV Bh 150 195 210 555 Prioritas 1 (Mendesak) TOTAL (buah) 150 195 210
  • 5. www.pln.co.id | 8 KEBITUHAN MDU TW I 2020 7 ISOLATOR SATUAN JAN PEB MAR JML KETERANGAN 1 Pin Post;24kV;12.5kN;Porcelain 300 350 400 1,050 Prioritas 2 (Sedang) 2 Line Post;24kV;12.5kN;Polimer SIR Bh 300 350 400 1,050 Prioritas 2 (Sedang) 3 Line Post;24kV;12.5kN;Porcelain - 4 Dead End;24kV;70kN;Polimer SIR Set 100 125 150 375 Prioritas 1 (Mendesak) 5 Strain Rod;24kV;70kN;Porcelain - 6 String Kap & Pin;24kV;70kN;Porcelain (set) - TOTAL (buah) 700 825 950 8 LIGHTNING ARRESTER 1 LA Polymer SIR, 21 kV, 10 kA - 2 LA Polymer SIR, 24 kV, 10 kA Bh 150 195 210 555 Prioritas 1 (Mendesak) 3 LA Polymer SIR, 27 kV, 10 kA - TOTAL (buah) 150 195 210 9 CUBICLE 1 Fully Gas Insulated Switchgear ;LBS;24kV;630A;16kA - 2 Fully Gas Insulated Switchgear ;TP;24kV;630A;16kA - 3 Fully Gas Insulated Switchgear ;LBS Motorized;24kV;630A;16kA - 4 Fully Gas Insulated Switchgear ;CBOG Motorized+Metering;24kV;630A;16kA - 5 CUB;N ISO;CBOG+MTR;20kV;630A;16kA; Unit 3 2 5 Prioritas 1 (Mendesak) 6 Air Insulated Switchgear ;LBS Motorized;24kV;630A;16kA - 7 CUB;N ISO;LBS INC;20kV;630A;16kA; Unit 3 2 5 Prioritas 1 (Mendesak) 8 Air Insulated Switchgear ;TP;24kV;630A;16kA - 9 Metalclad;Outgoing;20kV;630A;25kA; - 10 Metalclad;Couple;20kV;2000A;25kA; - TOTAL (cell) Unit - 6 4
  • 6. www.pln.co.id | 9 KEBUTUHAN MDU TW I 2020 10 CURRENT TRANSFORMER (CT) SATUAN JAN PEB MAR JML KETERANGAN 1 CT TM Indoor rasio 10/5-5 sd 1000/5-5 - 2 CT TM Indoor rasio 10/5 dan 100/5 (Ring) - 3 CT TM Outdoor - TOTAL (buah) - - - 11 POTENTIAL TRANSFORMER (PT) 1 PT TM Indoor rasio 20.000/√3 : 100/√3 - 2 PT TM Outdoor rasio 20.000/√3 : 100/√3 - - TOTAL (buah) - - - 12 TIANG BAJA 1 Tiang Baja 9 m / 100 daN - - - 2 Tiang Baja 9 m / 200 daN Bh 4 3 3 10 3 Tiang Baja 9 m / 350 daN - - - 4 Tiang Baja 11 m / 200 daN - - - 5 Tiang Baja 12 m / 200 daN - - - 6 Tiang Baja 12 m / 350 daN - - - 7 Tiang Baja 13 m / 200 daN - - - 8 Tiang Baja 13 m / 350 daN Bh 2 2 2 6 9 Tiang Baja 14 m / 350 daN - - - TOTAL (batang) Bh 6 5 5
  • 7. www.pln.co.id | 10 KEBUTUHAN MDU TW I 2020 13 TIANG BETON SATUAN JAN PEB MAR JML KETERANGAN 1 Tiang Beton 9 mtr 100 daN - 2 Tiang Beton 9 mtr 200 daN - 3 Tiang Beton 9 mtr 350 daN Bh 300 200 300 800 4 Tiang Beton 11 mtr 200 daN 10 5 10 25 5 Tiang Beton 12 mtr 200 daN - 6 Tiang Beton 12 mtr 350 daN - 7 Tiang Beton 13 mtr 350 daN Bh 100 75 100 275 8 Tiang Beton 13 mtr 500 daN Bh - 9 Tiang Beton 14 mtr 350 daN - TOTAL (batang) Bh 410 280 410 14 PERANGKAT HUBUNG BAGI TEGANGAN RENDAH (PHB TR) 1 PL-250-2-LBS - 2 PL-250-2-MCCB - 3 PL-400-2-LBS Bh 10 15 20 45 Prioritas 1 (Mendesak) 4 PL-400-4-LBS - 5 PL-630-4-LBS 6 PD-1000-6-LBS - 7 PD-1000-8-LBS - TOTAL (unit) Bh 10 15 20 15 LOAD BREAK SWITCH (LBS) 1 1. LBS Motorized + RTU - 2 2. LBS Motorized Non RTU - TOTAL (unit) - - - -
  • 8. www.pln.co.id | Permintaan MDU s.d Juni 2020 u/ Kebutuhan PB No Material Satuan Jumlah 1 Kabel A3CS 10.000 Meter 2 Pin Isolator 450 Bh 3 Hang Isolator 250 Bh 4 LA 180 Bh 5 Kabel NNY 150 3.000 Meter 6 Kabel NNY 4X70 2.000 Meter 7 Box Panel Umum/LV Panel 1 pintu 2 Jurusan 35 Bh 8 Box Panel Pengukuran Langsung 150 Bh 9 Box Panel Pengukuran tdk Langsung 53 VA 5 Bh 10 Box Panel Pengukuran tdk Langsung 66 VA 5 Bh 11 Box Panel Pengukuran tdk Langsung 82,5 VA 5 Bh 12 Box Panel Pengukuran tdk Langsung 10,5 VA 5 Bh 13 Box Panel Pengukuran tdk Langsung 131 VA - Bh 14 Box Panel Pengukuran tdk Langsung 147 VA - Bh 15 Box Panel Pengukuran tdk Langsung 164 VA 5 Bh 16 Box Panel Pengukuran tdk Langsung 197 VA 10 Bh
  • 9. www.pln.co.id | Monitoring Stok MDU Per Tgl. 01 April 2020 22 No material Area Tuban Lmg Bbt Pdg Brd Jrg Sbj Bjn Jumlah 1 Trafo 100 KVA 0 0 2 Trafo 160 KVA 0 0 3 Trafo 200 KVA 0 0 4 Trafo 250 KVA 0 0 5 Kwh meter 1 phs LPB 0 1317 90 331 187 325 567 294 559 3670 6 Kwh meter 1 phs pasca 0 0 0 0 0 0 0 0 0 7 Kwh meter 3 phs LPB 8 MCB 1 phs 2 Amp 0 614 129 135 141 180 200 106 201 1706 9 MCB 1 phs 4 Amp 0 880 238 293 226 275 315 175 99 2501 10 MCB 1 phs 6 Amp 0 0 0 0 0 0 0 0 0 0 11 MCB 1 phs 10 Amp 0 0 0 0 0 533 0 0 0 533 12 MCB 1 phs 16 Amp 0 0 29 0 0 139 0 99 0 267 13 MCB 1 phs 20 Amp 0 50 541 374 0 248 0 62 0 1275 14 MCB 1 phs 25 Amp 0 0 0 0 0 0 0 0 0 0 15 MCB 1 phs 35 Amp 0 0 0 0 12 0 0 12 16 MCB 3 phs 10 Amp 0 0 17 MCB 3 phs 16 Amp 0 0 18 MCB 3 phs 20 Amp 0 0 19 MCB 3 phs 25 Amp 0 0 20 MCB 3 phs 35 Amp 0 0 21 MCB 3 phs 50 Amp 0 0 22 TC 2x10 mm 21000 8305 11672 17285 13110 13620 12010 14680 20467 132149 23 TC 3x70+1x70 mm 0 0 24 A3C-S 150 0 0 25 NYY 4x70 0 0 26 NYY 1x150 0 0 27 NFA2XSEY-T 3x150 0 0 28 NFA2XSEY-T 3x240 0 0 29 NFA2XSEY 3x150 0 0 30 NFA2XSEY 3x240 97 97 31 PHBTR 2 Jurusan 0 0 32 PHBTR 4 Jurusan 0 0 33 Air Insulated 2 2 34 Full Gas 0 0
  • 10. www.pln.co.id | 12 Monitoring Rekap PK / Vendor s/d Tgl. 01 April 2020 No NO. VENDOR ULP JENIS PEKERJAAN KETERANGAN 1 PT. IKHLAS MULIA TEKNIK NUSANTARA BOJONEGORO KOTA SAR PK yang di bawa 60 ( Operasi 35 PK ) 2 PT. KELUARGA ELEKTRO 2014 BABAT SAR PK yang di bawa 16 ( Operasi 6 PK ) 3 PT. KELUARGA ELEKTRO 2014 BRONDONG SAR PK yang di bawa 18 ( Operasi 15 PK ) 4 PT. KENCANA KENZIE YUDA NARRAYA JATIROGO SAR PK yang di bawa 27 ( Operasi 26 PK ) 5 PT. JAYA TERANG MANDIRI LAMONGAN SAR PK yang di bawa 15 ( Operasi 8 PK ) 6 PT. KENCANA KENZIE YUDA NARRAYA PADANGAN SAR PK yang di bawa 21( Operasi 19 PK ) 7 PT. KENCANA KENZIE YUDA NARRAYA SUMBEREJO SAR PK yang di bawa 28( Operasi 21 PK ) 8 PT. KUSUMA JAYA ANUGRAH TUBAN SAR PK yang di bawa 69 ( Operasi 16 PK ) 9 PT. ILHAM UTAMA MANDIRI JATIROGO SAR PK yang di bawa 8 ( Operasi 4 PK ) 10 PT. KENCANA KENZIE YUDA NARRAYA TUBAN SAR PK yang di bawa 19 ( Operasi 0 PK )
  • 11. www.pln.co.id | 24 MONITORING SPB MDU Blm DIKIRIM PABRIKAN s/d Tgl. 01 April 2020 NO Material Vendor SPB MATERIAL DATANG Sisa SPB(SPB- MAT DATANG) Satuan Jumlah Harga Satuan (Rp) Biaya Transportasi Total Tanggal Nomor SPB Nama TGL Jumlah a b d e f g h=ex(f+g) i j 21 Trafo Distribusi;3 Phase 160 KVA;OD;YZN5 PT. Bambang Djaja unit 3 Rp 33.000.000 Rp 845.434 Rp 101.536.302 23/1/2020 0356/DAN.02.03/040000/ 2020 TRAFO 160 KVA 01-Feb-20 2 1 48 MCB 1 Phasa ( 2A,4A,6A,25A ) PT. SCHNEIDER ELECTRIC Buah 1.100 Rp 30.600 Rp 70 Rp 33.737.000 02/11/2020 0733/DAN.02,03/040000/ 2020 MCB 1 Phase, 4A 16-Mar- 20 700 400 49 String Kap & Pin; 24 kV; 70 kN; Porcelain (set) PT TWINK INDONESIA Buah 105 Rp 384.000 Rp 17.600 Rp 42.168.000 02/11/2020 0735/DAN.02,03/040000/ 2020 Isolator Porcelain 105 49 MCB 1 Phasa ( 2A,4A,6A,25A ) PT. ABB Buah 3.580 Rp 30.600 Rp 70 Rp 109.798.600 02/12/2020 0754/DAN.02,03/040000/ 2020 MCB 1 Phase, 4A 3.580 49 PHBTR Pasangan Luar PL-400-4-LBS PT, MULYA UTAMA MANDIRI SENTOSA Buah 2 Rp 13.295.000 Rp 346.080 Rp 27.282.160 14/2/2020 0791/DAN.02,03/040000/ 2020 Panel Umum 2 Pintu 2 62 Lemari APP Pengukuran Tidak Langsung +MCCB 80 A PT. MULYA UTAMA MANDIRI SENTOSA Buah 8 Rp 9.900.000 Rp 346.080 Rp 81.968.640 28/2/2020 1052/DAN.02.03/040000/ 2020 Panel Umum 2 Pintu 8 58 NFA2X ; 2x10 mm2 ; 0,6/1 kV ;OH PT. MAGNAKABEL NUSANTARA Meter 39.000 Rp 4.000 Rp 110 Rp 160.290.000 03/02/2020 1067/DAN.02.03/040000/ 2020 TC 2X10 39.000 63 String Kap & Pin; 24 kV; 70 kN; Porcelain (set) PT. KENTJANA SAKTI INDONESIA Buah 66 Rp 384.000 Rp 17.600 Rp 26.505.600 03/12/2020 1270/DAN.02.03/040000/ 2020 Isolator Porcelain 66 65 NFA2X ; 2 x 10 mm2 ; 0,6/1 Kv ; OH PT. SUTRA KABEL INTIMANDIRI Meter 18.000 Rp 4.000 Rp 110 Rp 73.980.000 03/12/2020 1273/DAN.02.03/040000/ 2020 TC 2X10 18.000 66 Kwh Meter Prabayar Fasa Tunggal PT. HEXING TECHNOLOGY Buah 1.700 Rp 238.540 Rp 1.400 Rp 407.898.000 03/12/2020 1274/DAN.02.03/040000/ 2020 kWh 1 fase Prabayar 30-Mar- 20 700 1.000 70 MCB 1 Phasa (2A ; 4A) PT. SCHNEIDER ELECTRIC Buah 1.500 Rp 30.600 Rp 70 Rp 46.005.000 03/12/2020 1279/DAN.02.03/040000/ 2020 MCB 1 Phase 2A, 4A 1.500 71 NFA2X-T ; 3X70+1X70 ; 0,6/1 Kv ; OH PT PRIMA INDAH LESTARI Meter 20.000 Rp 47.500 Rp 1.030 Rp 970.600.000 03/12/2020 1280/DAN.02.03/040000/ 2020 TC 3X70 + 1X70 20.000 72 PHBTR Pasang Luar PL-400-4-LBS PT, MULYA UTAMA MANDIRI SENTOSA Buah 2 Rp 13.295.000 Rp 346.080 Rp 27.282.160 14/3/2020 0791/DAN.02.03/040000/ 2020 Panel Umum 2 Pintu 2 Trafo Distribusi 3 Phasa 200 KVA,OD,DyN5 PT. MASTERGREEN ELECTRIC Unit 1 Rp 36.650.000 Rp 2.048.685 Rp 38.698.685 23/3/2020 1476/DAN.02.03/040000/ 2020 TRAFO 200 KVA 1 Trafo Distribusi 3 Phasa 100KVA,OD,Yzn5 PT. MEGA KARYA PERKASA Unit 6 31.725.000 1.758.085 200.898.510 23/3/2020 1479/DAN.02.03/040000/ 2020 TRAFO 100 KVA 6 Trafo Distribusi 3 Phasa 250 Kva;OD;Dyn5 PT. Bambang Djaja Unit 2 43.000.000 1.081.541 Rp 88.163.082 13/3/2020 1311/DAN.02.03/040000/ 2020 TRAFO 250 KVA 2 Trafo Distribusi 3 Phasa 160 KVA,OD,Yzn5 PT. MASTERGREEN ELECTRIC Unit 3 33.000.000 1.758.085 104.274.255 23/3/2020 1479/DAN.02.03/040000/ 2020 TRAFO 160 KVA 3 NFA2XY-T ; 3X150+1X95 ; 20 Kv ; OH PT PRIMA INDAH LESTARI Meter 900 250.000 14.420 Rp 237.978.000 23/3/2020 1481/DAN.02.03/040000/ 2020 TC 3X150 + 1X95 900 NA2XSEYBY;3x150 mm2;20 kV ; UG PT. PRYSMIAN CABLE Meter 300 341.000 14.420 106.626.000 23/3/2020 1480/DAN.02.03/040000/ 2020 NA2XSEYBY;3x15 0 mm2;20 kV ; UG 300
  • 12. www.pln.co.id | 11 MONITORING TAGIHAN PEKERJAAN SAR s/d Tgl. 01 April 2020 No Pelaksana SPBJ Nilai (Rp.) ULP Keterangan 1 PT KJA SPBJ IV TAG 4 Rp117,519,205 BRD SUDAH SE TGL 22.11.2019 2 PT ILHAM SR SPBJ 2 TG 1 P3 Rp76,111,965 JRG SUDAH SE TGL 18.11.2019 3 PT KKYN SPBJ 7 TAG 4 MVTIC Rp269,251,343 BJN SUDAH SE TGL 11.12.2019 4 PT KJA SPBJ 7 TAG 8 MVTIC Rp276,684,078 BJN SUDAH SE TGL 11.12.2019 5 PT KJA SPBJ 7 TAG 9 Rp117,670,033 TBN SUDAH SE TGL 11.12.2019 6 PT KJA SPBJ 7 TAG 10 Rp166,657,060 TBN SUDAH SE TGL 11.12.2019 7 PT IMTN SPBJ 1 P1 TAG 1 BJN Rp196,083,605 BJN SUDAH SE TGL 06.12.2019 8 PT IMTN SPBJ 1 P1 TAG 2 BJN Rp118,651,212 BJN SUDAH SE TGL 11.12.2019 9 PT IUM SPBJ 1 P1 TAG 1 SBJ Rp140,337,190 SBJ SUDAH SE TGL 13.12.2019 10 PT JTM SPBJ 2 P1 TAG 1 LMG Rp47,511,422 LMG SUDAH SE TGL 12.12.2019 11 PT KKYN SPBJ 2 TG 1 P3 Rp72,364,185 PDG SUDAH SE TGL 09.12.2019 12 PT YUGA SPBJ 2 TG 1 P3 Rp151,130,591 BRD SUDAH SE TGL 10.12.2019 13 PT ILHAM SPBJ 2 TG 2 P3 Rp120,305,631 JRG SUDAH SE TGL 11.12.2019 14 PT KJE SPBJ 2 TG 2 P3 Rp115,458,686 TBN SUDAH SE TGL 11.12.2019 15 PT SINAR DWI SPBJ 2 TG 2 P3 Rp136,301,793 LMG SUDAH SE TGL 12.12.2019 16 PT KKYN SR SPBJ 2 TG 2 P3 Rp220,952,152 PDG SUDAH SE TGL 29.01.2020 17 PT JTM SR SPBJ 2 TG 2 P3 Rp111,138,089 SBJ SUDAH SE TGL 29.01.2020 18 PT ILHAM SR SPBJ 2 TG 3 P3 Rp119,911,666 JRG SUDAH SE TGL 31.01.2020 19 PT KJE SR SPBJ 2 TG 3 P3 Rp260,668,410 TBN SUDAH SE TGL 31.01.2020 20 PT JTM SR SPBJ 2 TG 3 P3 Rp148,341,181 SBJ SUDAH SE TGL 19.02.2020
  • 13. www.pln.co.id | MONITORING TAGIHAN PEKERJAAN SAR s/d Tgl. 01 April 2020 No Pelaksana SPBJ Nilai (Rp.) ULP Keterangan 21 PT JTM SPBJ 1 P1 TAG 2 LMG Rp254,081,830 LMG SUDAH SE TGL 31.01.2020 22 PT KE SPBJ 1 P1 TAG 1 BRD Rp64,752,835 BRD SUDAH SE TGL 29.01.2020 23 PT KJA SPBJ 1 P1 TAG 1 TBN Rp319,670,517 TBN SUDAH SE TGL 12.02.2020 24 PT IMTN SPBJ 2 P1 TAG 1 BJN Rp191,854,643 BJN SUDAH SE TGL 13.02.2020 25 PT IMTN SPBJ 2 P1 TAG2 BJN Rp491,501,705 BJN SUDAH SE TGL 13.02.2020 26 PT IMTN SPBJ 2 TG 1 P2 BJN Rp183,373,215 BJN SUDAH SE TGL 06.02.2020 27 PT IMTN SPBJ 2 TG 2 P2 BJN Rp162,046,224 BJN SUDAH SE TGL 06.02.2020 28 PT KKYN PDG SPBJ 2 TG 1 P2 Rp194,244,051 PDG SUDAH SE TGL 12.02.2020 29 PT KKYN JRG SPBJ 2 TG 1 P2 Rp163,139,947 JRG SUDAH SE TGL 12.02.2020 30 PT KE SPBJ 2 TG 1 P2 Rp60,606,093 BBT SUDAH SE TGL 14.02.2020 31 PT KJA TBN SPBJ 2 TG 1 P2 Rp70,154,279 TBN SUDAH SE TGL 18.02.2020 32 PT KE BBT SPBJ 2 TG 1 P2 Rp60,606,093 BBT SUDAH SE TGL 14.02.2020 33 PT MME SPBJ 2 TG 1 P2 Rp52,297,100 BJN SUDAH SE TGL 19.02.2020 34 PT IMTN SPBJ 2 P1 TAG 3 BJN Rp366,761,606 BJN SUDAH SE TGL 19.02.2020 35 PT IMTN SPBJ 2 P1 TAG 4 BJN Rp434,787,225 BJN SUDAH SE TGL 19.02.2020 36 PT KKYN SPBJ 2 P1 TAG 2 PDG Rp119,936,766 PDG SUDAH SE TGL 19.02.2020 37 PT JTM SPBJ 2 TG 3 P3 Rp148,341,181 SBJ SUDAH SE TGL 19.02.2020 38 PT MME SPBJ 2 TG 3 P3 Rp152,075,436 BJN SUDAH SE TGL 19.02.2020 39 PT KJA SPBJ 2 TG 3 P3 Rp157,979,623 BBT SUDAH SE TGL 19.02.2020 40 PT KKYN SPBJ 2 TG 3 P3 Rp128,398,449 PDG SUDAH SE TGL 19.02.2020 41 PT KE SPBJ2 P1 Rp9,589,509 BRD MASIH DI PENGAWAS JUMLAH Rp6,769,247,824
  • 14. www.pln.co.id | 18 Monitoring Pekerjaan Keandalan s/d Tgl. 01 April 2020 No Nama Pekerjaan Lokasi ULP Vendor No. PRK Material Distribusi Utama Jumlah Satua n Progr es Keterangan MDU Yang Di butuh kan SPB/Stok 1 Rekonfigurasi Penyulang Plumpang Lot 2 Tuban PT. KKYN 2019.DJBT.7.001 1. Pin Post 408 Buah 25% 1. Pin Post 854 Yudi 2. Hang Isolator 93 Set 2. Hang Isolator 219 3. LA 21 Buah 3. LA 78 12.000 4. Kabel A3CS 150 24.098 Meter 4. Kabel A3CS 150 41.772 5. Kabel A3C 70 215 Meter 5. Kabel A3C 70 373 6. Tibet 13 - 350 daN 25 Buah 6. Tibet 13 - 350 daN 64 2 Rekonfigurasi Penyulang Plumpang Lot 1 Tuban PT. KJA 2019.DJBT.7.001 1. Pin Post 366 Buah 0% 7. Tibet 11 - 200 daN 44 Rochim 2. Hang Isolator 87 Set 8. Tibet 9 - 200 daN 48 3. LA 18 Buah 9. Kabel MVTIC 150 17.379 4. Kabel A3CS 150 17.674 Meter 10. Kabel XLPE 150 210 5. Kabel A3C 70 158 Meter 3 Pembangunan Penyulang Baru Untuk Tuban PT. IKHLAS 2019.DJBT.7.001 1. Pin Post 34 Buah 0% Pecah Beban Penyulang Plumpang Lot 1 Daffi 2. Hang Isolator 12 Set 3. LA 6 Buah 4. Kabel MVTIC 150 3.655 Meter 5. Kabel XLPE 150 100 Meter 6. Tibet 13 - 350 daN 8 Buah 7. Tibet 9 - 200 daN 24 Buah 4 Pembangunan Penyulang Baru Untuk Tuban PT. ILHAM 2019.DJBT.7.001 1. Pin Post 13 Buah 0% Pecah Beban Penyulang Plumpang Lot 2 Bobby 2. Hang Isolator 12 Set 3. LA 9 Buah 4. Kabel MVTIC 150 3.594 Meter 5. Kabel XLPE 150 6. Tibet 13 - 350 daN 4 Buah 7. Tibet 9 - 200 daN 5 Buah
  • 15. www.pln.co.id | Monitoring Pekerjaan Keandalan s/d Tgl. 01 April 2020 No Nama Pekerjaan Lokasi ULP Vendor No. PRK Material Distribusi Utama Jumlah Satua n Progr es Keterangan MDU Yang Di butuh kan SPB/Stok 5 Pembangunan Penyulang Baru Untuk Pecah Babat PT. JTM 2019.DJBT.7.001 1. Pin Post 3 Buah 100% Operasi penyulang Beban Penyulang Kepohbaru Lot 1 Heri 2. Hang Isolator 3. LA 6 Buah 2.389 4. Kabel MVTIC 150 2.389 Meter 5. Kabel XLPE 150 6. Tibet 11 - 200 daN 24 Buah 7. Tibet 9 - 200 daN 6 Buah 6 Pembangunan Penyulang Baru Untuk Pecah Babat PT. ILHAM 2019.DJBT.7.001 1. Pin Post 3 Buah 100% Operasi penyulang Beban Penyulang Kepohbaru Lot 2 Bobby 2. Hang Isolator 3. LA 6 Buah 2.000 4. Kabel MVTIC 150 2.788 Meter 5. Kabel XLPE 150 6. Tibet 11 - 200 daN 39 Buah 7. Tibet 9 - 200 daN 13 Buah 7 Pembangunan Penyulang Baru Untuk Pecah Lamongan PT. KJA 2019.DJBT.7.001 1. Pin Post 27 Buah 100% Operasi penyulang Beban Penyulang Petro Rochim 2. Hang Isolator 15 Set 3. LA 18 Buah 4.000 4. Kabel MVTIC 150 4.953 Meter 5. Kabel XLPE 150 110 Meter 6. Tibet 13 - 350 daN 27 Buah 7. Tibet 11 - 200 daN 5 Buah 8. Tibet 9 - 200 daN 5 Buah 8 Pembangunan Penyulang Baru Untuk Pecah Bogota PT. KJA, Ikhlas, KKYN Sudah Komplait 100% OPERASI Beban Penyulang Kalitidu
  • 16. www.pln.co.id | Monitoring Pekerjaan Lisdes/RE s/d Tgl. 01 April 2020 UP3 BJN 20 TAHAP 2 NO. LOKASI POTENSI PELANGG AN DAYA RUPIAH TOTAL (Termasuk Ppn) GTT SUTM SUTR TIANG KET DESA DUSUN KEC 10 0 16 0 20 0 25 0 RUPIAH PANJAN G (ms) RUPIAH PANJAN G (ms) RUPIAH 13 Mtr 11 Mtr 9 Mtr 1 Turi Bacem Tambakrejo 147 900 299,333,026 1 28,604,110 7,070 193,767,126 3,220 76,961,790 42 6 61 Tiang TM 100% & TR 100% Sokosewu Tambakrejo 86 900 2 Napis Kalidandang Tambakrejo 82 900 210,943,746 1 28,837,308 5,575 138,692,558 1,796 43,413,880 19 6 38 Tiang TM 100% & TR 100% 3 Nglampin Gowah Ngambon 58 900 159,570,730 1 28,837,308 881 87,950,468 1,356 42,782,954 19 2 34 Tiang TM 100% & TR 100% 4 Clebung Maor Bubulan 71 900 324,178,174 1 28,837,308 3,282 251,927,028 1,633 43,413,838 68 11 43 Tiang TM 100% & TR 100% 5 Panjang Malangbong Kedungade m 90 900 533,010,181 1 28,837,308 6,360 483,502,312 645 20,670,561 132 12 15 Tiang TM 100% & TR 100% TOTAL 534 1,527,035,85 7 4 1 - - 143,953,341 23,168 1,155,839,492 8,650 227,243,023 280 37 191 508 TAHAP 3 NO. LOKASI POTENSI PELANGG AN DAYA RUPIAH TOTAL (Termasuk Ppn) GTT SUTM SUTR TIANG KET DESA DUSUN KEC 10 0 16 0 20 0 25 0 RUPIAH PANJAN G (ms) RUPIAH PANJAN G (ms) RUPIAH 13 Mtr 11 Mtr 9 Mtr 1 Kesongo Bunten Kedungade m 70 900 418,883,500 1 28,837,308 4,330 353,390,502 3,220 36,655,691 94 16 32 Tiang TM 100% & TR 100% 2 Margomuly o Tepus Margomuly o 35 900 93,523,584 1 28,837,308 2,207 64,686,277 2 - 48 Tiang TM 100% & TR 100% 3 Nganti Mbingung Tambakrejo 23 900 107,302,055 1 28,837,308 881 48,831,582 1,239 29,633,165 12 - 35 Tiang TM 100% & TR 100% TOTAL 128 619,709,139 2 1 - - 86,511,923 5,211 402,222,084 6,666 130,975,132 108 16 115
  • 17. www.pln.co.id | 1 MONITORING KINERJA ITO s/d Tgl. 01 April 2020 BULAN TARGET REALISASI JAN 1.49 0.33 FEB 2.98 2.88 MAR 4.47 Proses Perhitungan APR 5.96 MAY 7.45 JUN 8.94 JUL 10.43 AUG 11.92 SEP 13.41 OCT 14.90 NOV 16.39 DEC 17.88
  • 18. www.pln.co.id | 2 GRAFIK KINERJA ITO TARGET VS REALISASI Tgl. 01 April 2020 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC TARGET 1.49 2.98 4.47 5.96 7.45 8.94 10.43 11.92 13.41 14.9 16.39 17.88 REALISASI 0.33 2.88 Realisasi dlm proses perhtungan
  • 19. www.pln.co.id | 3 MONITORING KINERJA ITO DARI TH. 2016 s/d Tgl. 01 April 2020 BULAN TAHUN 2016 TAHUN 2017 TAHUN 2018 TAHUN 2019 TAHUN 2020 TARGET REALISASI TARGET REALISASI TARGET REALISASI TARGET REALISASI TARGET REALISASI JAN 0.4 0.23 0.14 0.19 1.55 0.48 1.23 0.26 1.49 0.33 FEB 0.36 0.88 0.56 0.31 3.01 0.36 2.39 0.97 2.98 2.88 MAR 0.55 1.06 0.77 2.39 4.38 0.46 3.49 1.97 4.47 APR 0.83 1.18 1.24 2.07 5.68 0.78 4.51 2.79 5.96 MEI 0.97 1.29 1.72 2.91 6.9 2.87 5.49 5.69 7.45 JUN 1.03 1.7 2.18 3.02 5.88 8.13 6.38 7.96 8.94 JUL 1.52 2.04 2.62 3.87 7.19 2.89 8.6 5.06 10.43 AGUS 1.63 3.05 3.2 4.16 8.5 3.32 10.64 10.91 11.92 SEP 1.91 3.12 3.76 5.76 9.8 4.63 12.56 13.14 13.41 OKT 2.01 3.84 4.44 7.48 10.89 6.96 14.31 14.84 14.9 NOP 2.39 5.47 5.61 10.35 11.99 8.96 15.9 18.09 16.39 DES 3.89 9.85 9.19 12.65 13.07 15.68 17.32 22 17.88
  • 20. www.pln.co.id | 4 GRAFIK KINERJA ITO DARI TAHUN 2016 s/d Tgl. 01 April 2020 JAN FEB MAR APR MEI JUN JUL AGUS SEP OKT NOP DES TAHUN 2016 TARGET 0.4 0.36 0.55 0.83 0.97 1.03 1.52 1.63 1.91 2.01 2.39 3.89 TAHUN 2016 REALISASI 0.23 0.88 1.06 1.18 1.29 1.7 2.04 3.05 3.12 3.84 5.47 9.85 TAHUN 2017 TARGET 0.14 0.56 0.77 1.24 1.72 2.18 2.62 3.2 3.76 4.44 5.61 9.19 TAHUN 2017 REALISASI 0.19 0.31 2.39 2.07 2.91 3.02 3.87 4.16 5.76 7.48 10.35 12.65 TAHUN 2018 TARGET 1.55 3.01 4.38 5.68 6.9 5.88 7.19 8.5 9.8 10.89 11.99 13.07 TAHUN 2018 REALISASI 0.48 0.36 0.46 0.78 2.87 8.13 2.89 3.32 4.63 6.96 8.96 15.68 TAHUN 2019 TARGET 1.23 2.39 3.49 4.51 5.49 6.38 8.6 10.64 12.56 14.31 15.9 17.32 TAHUN 2019 REALISASI 0.26 0.97 1.97 2.79 5.69 7.96 5.06 10.91 13.14 14.84 18.09 22 TAHUN 2020 TARGET 1.49 2.98 4.47 5.96 7.45 8.94 10.43 11.92 13.41 14.9 16.39 17.88 TAHUN 2020 REALISASI 0.33 2.88
  • 21. www.pln.co.id | Monitoring Perputaran MDU/ITO s/d 01 April 2020 Proses Hitung
  • 22. www.pln.co.id | 18 Monitoring Potensi Pelanggan TM >200 Kva s/d Tgl. 01 April 2020 NO ULP NAMA MVA PB/PD ESTIMASI LAYANAN PROGRESS FISIK KETERANGAN 1 TUBAN PANCA KALSIUM 1,175,000 PD PREMIUM 100% OPERASI DGN UCKB dan Rencana Operasi Tgl. 11 Maret 2020 2 BOGOTA PERTAMINA SUKOWATI PAD A 1,110,000 PB PREMIUM 100% SEMENTARA OPERASI U/PECAH BEBAN PENYULANG PEMUDA 3 BOGOTA PERTAMINA SUKOWATI PAD B 1,110,000 PB PREMIUM 100% Cubikel Double incaming dan Outgoing di ambil u/ Panca Kalsiun 4 PADANGAN REKAYASA INDUSTRI 2,530,000 PD REGULER 20% MENUNGGU IJIN PERHUTANI DAN IML PELANGGAN, SEMENTARA OPERASI 240 KVA DGN UCKB 5 BOGOTA BAHTERA ABADI GAS 865,000 PB REGULER 100% Operasi 20 Maret 2020 POTENSI UBAH LAYANAN DARI REGULER KE PREMIUM NO. NAMA MVA ESTIMASI KETERANGAN 1 PERTAMINA KAWENGAN 1,385,000 Sudah Operasi Penyulang Malo dan Penyulang Singgahan ( Stanby ) 2 KAYAN WOOD 1,730,000 Operasi Tgl. 21 Peb 2020
  • 23. www.pln.co.id | MONITORING PEKERJAAN TERMINASI & JOINTING KHS UP3 BOJONEGOROs/d Tgl. 01 April 2020 No. DATA PEKERJAAN DATA TERMINASI DAN KABEL EXISTING Beban PELAKSANAAN TERMINASI & WAKTU Megger 10.000 M.Ohm & Nilai Tahanan .. Ohm Analisa Penyebab Gangguan dari Teknisi IDENTITAS PETUGAS YANG TERLIBAT KETERANGAN Phasa - Ground Phasa - Phasa PELAKSANA PLN Koordinat (Derajat Desimal) LOKASI JENIS PEKERJAAN TERMINASI DIPASANG TAHUN ULP GARDU INDUK / GIS Type Merk Jenis Ukuran (mm) Pabrikan Jenis Amper (A) TANGGAL MULAI SELESAI R - 0 S - 0 T - 0 R - S R - T S - T JOINTER HP PABRIKAN PENGAWAS 1 -07.01501, 111.47971 Jl. Kedung Jambe, Singgahan, Tuban (PT. BAG ) Baru 2020 ULP Bojonegoro Kota BOJONEGORO TRAFO 1 BJG Outdoor Termination Fastindo Coldsrink Shear Bolt 150 Lain lain Single Core 200 18-Mar-20 12:10 18:00 50G 51G 50G 100 G 100 G 100 G Pengoperasian jaringan Baru Agung 085203845111 Fastindo Kopriyanto BELUM BAYAR 2 -07.01501, 111.47971 Jl. Kedung Jambe, Singgahan, Tuban (PT. BAG ) Baru 2020 ULP Bojonegoro Kota BOJONEGORO TRAFO 1 BJG Outdoor Termination Fastindo Coldsrink Shear Bolt 150 Lain lain Single Core 200 18-Mar-20 12:10 18:00 50G 51G 50G 100 G 100 G 100 G Pengoperasian jaringan Baru Agung 085203845111 Fastindo Kopriyanto BELUM BAYAR 3 -07.02126, 111.48440 Jl. Kedung Jambe, Singgahan, Tuban (PT. BAG ) Baru 2020 ULP BOJONEGORO KOTA BOJONEGORO TRAFO 1 BJG Indoor Termination Fastindo Coldsrink Shear Bolt 150 Lain lain Single Core 200 18-Mar-20 12:10 18:00 50G 51G 50G 100 G 100 G 100 G Pengoperasian jaringan Baru Agung 085203845111 Fastindo Kopriyanto BELUM BAYAR 4 -07.015491, 111.481792 Jl. Kedung Jambe, Singgahan, Tuban (PT. BAG ) Baru 2020 ULP BOJONEGORO KOTA BOJONEGORO TRAFO 1 BJG Outdoor Jointing Fastindo Coldsrink 150 Lain lain Single Core 200 18-Mar-20 12:00 18:00 50G 51G 50G 100 G 100 G 100 G Pengoperasian jaringan Baru Ruslan 085203845111 Fastindo Kopriyanto BELUM BAYAR 5 -07.014416 , 111.480661 Jl. Kedung Jambe, Singgahan, Tuban (PT. BAG ) Baru 2020 ULP BOJONEGORO KOTA BOJONEGORO TRAFO 1 BJG Outdoor Jointing Fastindo Coldsrink 150 Lain lain Single Core 200 18-Mar-20 12:00 18:00 50G 51G 50G 100 G 100 G 100 G Pengoperasian jaringan Baru Ruslan 085203845111 Fastindo Kopriyanto BELUM BAYAR 6 -07.014185 , 111.480502 Jl. Kedung Jambe, Singgahan, Tuban (PT. BAG ) Baru 2020 ULP BOJONEGORO KOTA BOJONEGORO TRAFO 1 BJG Outdoor Jointing Fastindo Coldsrink 150 Lain lain Single Core 200 19-Mar-20 12:00 18:00 50G 51G 50G 100 G 100 G 100 G Pengoperasian jaringan Baru Masrukan 085203845111 Fastindo Kopriyanto BELUM BAYAR 7 -07.013769 , 111.480137 Jl. Kedung Jambe, Singgahan, Tuban (PT. BAG ) Baru 2020 ULP BOJONEGORO KOTA BOJONEGORO TRAFO 1 BJG Outdoor Jointing Fastindo Coldsrink 150 Lain lain Single Core 200 19-Mar-20 12:00 18:00 50G 51G 50G 100 G 100 G 100 G Pengoperasian jaringan Baru Masrukan 085203845111 Fastindo Kopriyanto BELUM BAYAR 8 -07.012990, 111.475779 Jl. Kedung Jambe, Singgahan, Tuban (PT. BAG ) Baru 2020 ULP BOJONEGORO KOTA BOJONEGORO TRAFO 1 BJG Outdoor Jointing Fastindo Coldsrink 150 Lain lain Single Core 200 20-Mar-20 10:20 15:00 50G 51G 50G 100 G 100 G 100 G Pengoperasian jaringan Baru Ruslan 085203845111 Fastindo Kopriyanto BELUM BAYAR 9 -07.012990, 111.475779 Jl. Kedung Jambe, Singgahan, Tuban (PT. BAG ) Baru 2020 ULP BOJONEGORO KOTA BOJONEGORO TRAFO 1 BJG Outdoor Termination Fastindo Coldsrink Shear Bolt 150 Lain lain Single Core 200 20-Mar-20 10:20 15:00 50G 51G 50G 100 G 100 G 100 G Pengoperasian jaringan Baru Ruslan 085203845111 Fastindo Kopriyanto BELUM BAYAR 10 -07.090217, 111.524575 Alun-alun Bojonegoro Baru 2020 ULP BOJONEGORO KOTA BOJONEGORO TRAFO 1 BJG Outdoor Termination Fastindo Coldsrink Shear Bolt 150 Lain lain Single Core 180 23-Mar-20 09:00 12:00 101G 105G 102G 200 G 200 G 200 G Pengoperasian jaringan Baru Masrukan 085203845111 Fastindo Kopriyanto BELUM BAYAR 11 -07.090217, 111.524575 Alun-alun Bojonegoro Baru 2020 ULP BOJONEGORO KOTA BOJONEGORO TRAFO 1 BJG Outdoor Termination Fastindo Coldsrink Shear Bolt 150 Lain lain Single Core 180 23-Mar-20 09:00 12:00 101G 105G 102G 200 G 200 G 200 G Pengoperasian jaringan Baru Masrukan 085203845111 Fastindo Kopriyanto BELUM BAYAR
  • 24. www.pln.co.id | Rekapitulasi Pemakaian Mat Exhandal Per 01 April 2020 Janis Mat TC 4X16 TC 4X25 TC 3X50/3X70 PIN PORCE HANG PORCE AAAC 70 AAAC 150 AAAC S 150 MVTIC 3X150 Jumlah - 22.521 15.594 400 125 18.031 210 54.686 1.941 0% 20% 14% 0% 0% 16% 0% 48% 2% Grafik PENGELUARAN MATERIAL EX BONGKARAN UP RATING DAN ADB TC 4X16 TC 4X25 TC 3X50/3X70 PIN PORCE HANG PORCE AAAC 70 AAAC 150 AAAC S 150 MVTIC 3X150