SlideShare una empresa de Scribd logo
1 de 14
Descargar para leer sin conexión
1
Dragan Kolobaric fa5527
Nishant Pathak fy4913
Srinivasa Gowtham gd7875
Krushal Chaudhary gb7704
Wayne State University
Course: DETERMINISTIC OPTIMIZATION
(Course Code: IE 6560)
Date: December 1st, 2016
Course Project
Group 10
2
 Portfolio selection for North American Operations
of global Italy based corporation for specially
equipment and automotive interior components
tooling
 Executive Management tasked the operation
department to confirm Business Plan (BP)
projections based on historical human resources
and product development data
 Objective is to maximize sales and maintain
profit margin with resources and product
development capabilities constrains.
 Priority 1 is to develop North America capacity
with Italy support and outsourcing the last.
 Product sales and development data is obtained from
corporation database and an average is utilized with minimal
historical data on file.
Product Avg. Sale Price Profit [%]
1 Ultrasonic Welding 95,000.00$ 13
2 Ultrasonic Punching 156,000.00$ 12
3 Lamination Tools 251,000.00$ 24
4 Foaming Tools 168,000.00$ 26
5 Cutting tools 178,000.00$ 20
6 In-mold graining Tools 541,000.00$ 25
7 Forming Tools 321,400.00$ 42
8 Thermoforming Tools 465,000.00$ 38
9 Vacuum Forming Tools 195,000.00$ 11
10 Cast Skin Tools 362,800.00$ 18
Product Desing Fabrication Machining Assembly
Test runs/
Tunig
1 Ultrasonic Welding 120 130 132 180 55
2 Ultrasonic Punching 195 180 200 230 48
3 Lamination Tools 220 210 220 120 85
4 Foaming Tools 175 165 250 100 50
5 Cutting tools 160 85 274 80 40
6 In-mold graining Tools 247 140 240 145 80
7 Forming Tools 260 80 320 180 90
8 Thermoforming Tools 340 165 280 250 100
9 Vacuum Forming Tools 156 90 240 140 50
10 Cast Skin Tools 310 180 350 120 80
Total:
North America Current 8 10 10 12 10 50
North America 1st Year 12 10 20 18 15 75
North America 2nd year 15 10 30 25 20 100
Italy Resources Available - employees
5 12 10 12 10
Manhours
Emplyee head count projections
 Resources capabilities/ development selection for specific products
 Outsourcing restrictions are highlighted.
BinaryFormat:
Product
NorthAmerica Italy
Outsourc
e
NorthAmerica Italy
Outsourc
e
NorthAmerica Italy
Outsourc
e
NorthAmerica Italy
Outsourc
e
NorthAmerica Italy
Outsourc
e
1 UltrasonicWelding 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0
2 UltrasonicPunching 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0
3 LaminationTools 1 1 0 1 1 1 1 1 1 1 1 0 1 1 0
4 FoamingTools 1 1 0 1 1 1 1 1 1 1 1 0 1 1 0
5 Cuttingtools 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0
6 In-moldgrainingTools 1 1 0 1 1 1 1 1 0 1 1 0 1 1 0
7 FormingTools 1 1 0 1 1 1 1 1 1 1 1 1 1 1 0
8 ThermoformingTools 1 1 0 1 1 1 1 1 0 1 1 1 1 1 0
9 VacuumFormingTools 1 1 0 1 1 1 1 1 0 1 1 0 1 1 0
10 CastSkinTools 0 1 0 1 1 1 0 1 0 1 1 0 1 1 0
ResourceCapabilites/Selection
Design Fabrication Machining Assembly TestRuns/Tuning
5
 An Integer linear programming was used with objective to maximize sales and resources
constrains
Priority-1) Z1= S1T1+S2T2+S3T3+S4T4+S5T5+S6T6+S7T7+S8T8+S9T9+S10T10
Priority-2) Z2= S1T1+S2T2+S3T3+S4T4+S5T5+S6T6+S7T7+S8T8+S9T9+S10T10
Priority-3) Z3= S1T1+S2T2+S3T3+S4T4+S5T5+S6T6+S7T7+S8T8+S9T9+P10T10
Final Z= Z1+Z2+Z3
Where decision Variables being product/ tool:
T1, T2, T3, T4, T5, T6, T7, T8, T9, T10
And sales per unit is:
S1, S2, S3, S4, S5, S6, S7, S8, S9, S10
Subject to: T1, T2, T3, T4, T5, T6, T7, T8, T9, T10 = integer.
 Utilizing excel solver optimal solution has confirmed that both profit margin and
employee resources are in line with BP projections.
Current Year 1st Year 2nd Year
47 47 57
16 19 22
3 6 11
4 5 4
3 4 4
1 1 1
3 6 13
1 6 12
3 8 15
0 0 0
Total Sales: 11,475,200.00$ 17,306,400.00$ 26,216,200.00$
Total Employee needed: 30 40 55
Employee per BP: 50 75 100
Profit for a product Mix: 16% 18% 19%
Forming Tools
Thermoforming Tools
Vacuum Forming Tools
Cast Skin Tools
Product Mix
Ultrasonic Welding
Ultrasonic Punching
Lamination Tools
Foaming Tools
Cutting tools
In-mold graining Tools
7
 The operation department has applied employee skill level approach in defining
constrains for resources development
Department: Level: Pessimistic Optimistic Years of experience
Beginner 30% 65% 1-3
Intermediate 65% 95% 2-7
Advance 99% 100% > 4 years
Beginner 50% 75% 1-3
Intermediate 75% 100% 2-7
Advance 99% 100% > 4 years
Beginner 50% 75% 1-3
Intermediate 75% 100% 2-7
Advance 99% 100% > 4 years
Beginner 50% 75% 1-3
Intermediate 75% 100% 2-7
Advance 99% 100% > 4 years
Beginner 35% 60% 1-3
Intermediate 60% 90% 2-7
Advance 99% 100% > 4 years
Test Runs/ Tuning
Work without Assistance
Design
Fabrication
Machining
Assembly
 Pessimistic approach is applied to Priority 1 of developing North American
resources, hiring beginner level employees.
1st Year: Skill level Beginner for new employees
Maximize Z: S1T1+S2T2+S3T3+S4T4+S5T5+S6T6+S7T7+S8T8+S9T9+S10T10
S.T.:
Design Constraint (.30 efficiency): Hours used*Products <= 17664
Fabrication Department constraint (.50 efficiency): Hours used*Products <= 19200
Machining Department constraint (.50 efficiency): Hours used*Products <= 19200
Assembly Department constraint (.50 efficiency): Hours used*Products <= 23040
Test runs/Tuning Department constraint (.35 efficiency): Hours used*Products <=19200
Since, Cast Skin Tool cannot be produced in North America:
T10=0 (in priority-1)
 Pessimistic approach for 2nd year requires addition of beginner and on-going
development of intermediate skill level employees.
Second Year: Skill level Intermediate for 1st year employees and beginner for new employees
Maximize Z: S1T1+S2T2+S3T3+S4T4+S5T5+S6T6+S7T7+S8T8+S9T9+S10T10
S.T.:
Design Constraint (.65 and 0.3 efficiency): Hours used*Products <= 22080
Fabrication Department constraint (.75 and .5 efficiency): Hours used*Products <= 19200
Machining Department constraint (.75 and .5 efficiency): Hours used*Products <=43200
Assembly Department constraint (.75 and .5 efficiency): Hours used*Products <= 38400
Test runs/Tuning Department constraint (.6 and .35 efficiency): Hours used*Products <=28320
Since, Cast Skin Tool cannot be produced in North America:
T10=0 (in priority-1)
 Optimistic approach is applied to Priority 1 of developing North American
resources, hiring beginner level employees.
1st Year: Skill level Beginner for new employees
Maximize Z: S1T1+S2T2+S3T3+S4T4+S5T5+S6T6+S7T7+S8T8+S9T9+S10T10
S.T.:
Design Constraint (.65 efficiency): Hours used*Products <= 20352
Fabrication Department constraint (0.75 efficiency): Hours used*Products <= 19200
Machining Department constraint (0.75 efficiency): Hours used*Products <= 19200
Assembly Department constraint (0.75 efficiency): Hours used*Products <= 23040
Test runs/Tuning Department constraint (.60 efficiency): Hours used*Products <=19200
Since, Cast Skin Tool cannot be produced in North America:
T10=0 (in priority-1)
Limitations of individual product:
T1<=47, T2<=19, T3<=6, T4<=5, T5<=4, T6<=1, T7<=6, T8<=6, T9<=8, T10<=7.
Sales value of all the product should not exceed the value of maximum possible sales:
C1T1+C2T2+C3T3+C4T4+C5T5+C6T6+C7T7+C8T8+C9T9+C10T10 <=
 Optimistic approach for 2nd year requires addition of beginner and on-going
development of intermediate skill level employees.
Second Year: Skill level Intermediate for 1st year employees and beginner for new employees
Maximize Z: S1T1+S2T2+S3T3+S4T4+S5T5+S6T6+S7T7+S8T8+S9T9+S10T10
S.T.:
Design Constraint: Hours used*Products <= 26400
Fabrication Department constraint: Hours used*Products <= 19200
Machining Department constraint: Hours used*Products <= 52800
Assembly Department constraint: Hours used*Products <= 44640
Test runs/Tuning Department constraint: Hours used*Products <=33600
Since, Cast Skin Tool cannot be produced in North America:
T10=0 (in priority-1)
Limitations of individual product:
T1=57, T2=22, T3=11, T4=4, T5=4, T6=1, T7=13, T8=12, T9=15, T10=10.
Sales value of all the product should not exceed the value of maximum possible sales:
C1T1+C2T2+C3T3+C4T4+C5T5+C6T6+C7T7+C8T8+C9T9+C10T10 <=
C1T1+C2T2+C3T3+C4T4+C5T5+C6T6+C7T7+C8T8+C9T9+C10T10
The assumption is that all employees in Italy are at 100 % skill level.
12
 The final results points that sales and profit margin with both pessimistic and optimistic approach in resource skill
level planning pose no risk to a BP projections
 On other hand it highlights further optimization of BP and opportunities to utilize resources for more global growth
as planned resources in Italy would not be needed to a full extent to support North American operation growth over
next two years.
◦ Opportunities for additional profit improvements with improvement in employee skill level and utilization of available man-hours.
Sales
Total
Profit
Cost of shipping
in %
Final
Profit
Sales
Total
Profit
Cost of shipping
in %
Final
Profit
Current Year 11,994,000$ 15% 1% 14% 11,994,000$ 14% 0.6% 13% 14%
First Year 19,980,000$ 17% 1% 16% 19,846,000$ 18% 0.6% 17% 17%
Second Year 27,876,200$ 19% 1% 18% 29,844,200$ 19% 0.6% 18% 18%
Final Result
AveragePessimistic Approach Optimistic Approach
North America Italy Sale
1st Year 75 7 19,980,000$
2nd Year 100 9 27,876,200$
North America Italy Sale
1st Year 75 5 19,846,000$
2nd Year 100 7 29,844,200$
Actual Employee Requirments- Pessimistic
Actual Employee Requirments- Optimistic
13
14

Más contenido relacionado

Similar a Course project ie6560 group 10_presentation

Ams total productive maintenance
Ams total productive maintenanceAms total productive maintenance
Ams total productive maintenance
vivekmsmech
 
Meloche Group
Meloche GroupMeloche Group
Meloche Group
hmeloche
 
VSM (Lean Manufacturing) Project PPT
VSM (Lean Manufacturing) Project PPTVSM (Lean Manufacturing) Project PPT
VSM (Lean Manufacturing) Project PPT
FASI93
 
LiteonMobile India Profile
LiteonMobile India Profile LiteonMobile India Profile
LiteonMobile India Profile
rmaniva
 

Similar a Course project ie6560 group 10_presentation (20)

Wear Plate Sourcing Project Case Study by Dragon Sourcing
Wear Plate Sourcing Project Case Study by Dragon SourcingWear Plate Sourcing Project Case Study by Dragon Sourcing
Wear Plate Sourcing Project Case Study by Dragon Sourcing
 
Industrial plants and safety project
Industrial plants and safety projectIndustrial plants and safety project
Industrial plants and safety project
 
Six sigma case study-a good approach with example
Six sigma case study-a good approach with exampleSix sigma case study-a good approach with example
Six sigma case study-a good approach with example
 
IRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
IRJET- Productivity Improvement in Manufacturing Industry using Lean ToolsIRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
IRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
 
M.tech (Production and Industrial Engineering) Thesis Presentation
M.tech (Production and Industrial Engineering) Thesis PresentationM.tech (Production and Industrial Engineering) Thesis Presentation
M.tech (Production and Industrial Engineering) Thesis Presentation
 
Lin Yu Enterprise Co., Ltd.
Lin Yu Enterprise Co., Ltd.Lin Yu Enterprise Co., Ltd.
Lin Yu Enterprise Co., Ltd.
 
Ams total productive maintenance
Ams total productive maintenanceAms total productive maintenance
Ams total productive maintenance
 
Triple Incorporated
Triple IncorporatedTriple Incorporated
Triple Incorporated
 
2015 deep research report on global high purity tin industry(table of contents)
2015 deep research report on global high purity tin industry(table of contents)2015 deep research report on global high purity tin industry(table of contents)
2015 deep research report on global high purity tin industry(table of contents)
 
Meloche Group
Meloche GroupMeloche Group
Meloche Group
 
Dicomol
DicomolDicomol
Dicomol
 
Asq int lss
Asq int lssAsq int lss
Asq int lss
 
Project profile on gent's shirts converted
Project profile on gent's shirts convertedProject profile on gent's shirts converted
Project profile on gent's shirts converted
 
VSM (Lean Manufacturing) Project PPT
VSM (Lean Manufacturing) Project PPTVSM (Lean Manufacturing) Project PPT
VSM (Lean Manufacturing) Project PPT
 
LiteonMobile India Profile
LiteonMobile India Profile LiteonMobile India Profile
LiteonMobile India Profile
 
IMPLEMENTATION OF LEAN TOOLS AND EGONOMIC ASPECTS IN THE DESIGN OF A CARAVAN
IMPLEMENTATION OF LEAN TOOLS AND EGONOMIC ASPECTS IN THE DESIGN OF A CARAVANIMPLEMENTATION OF LEAN TOOLS AND EGONOMIC ASPECTS IN THE DESIGN OF A CARAVAN
IMPLEMENTATION OF LEAN TOOLS AND EGONOMIC ASPECTS IN THE DESIGN OF A CARAVAN
 
2015 deep research report on global and china heat meter industry(table of co...
2015 deep research report on global and china heat meter industry(table of co...2015 deep research report on global and china heat meter industry(table of co...
2015 deep research report on global and china heat meter industry(table of co...
 
IBM Vision 2017 Conference Session #1148 - Leveraging Planning Analytics & CD...
IBM Vision 2017 Conference Session #1148 - Leveraging Planning Analytics & CD...IBM Vision 2017 Conference Session #1148 - Leveraging Planning Analytics & CD...
IBM Vision 2017 Conference Session #1148 - Leveraging Planning Analytics & CD...
 
Auto pistons
Auto pistonsAuto pistons
Auto pistons
 
Machine toolindustry en
Machine toolindustry enMachine toolindustry en
Machine toolindustry en
 

Último

DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
MayuraD1
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
Health
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
jaanualu31
 

Último (20)

DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Rums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfRums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdf
 
Learn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksLearn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic Marks
 
Bridge Jacking Design Sample Calculation.pptx
Bridge Jacking Design Sample Calculation.pptxBridge Jacking Design Sample Calculation.pptx
Bridge Jacking Design Sample Calculation.pptx
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
 
Air Compressor reciprocating single stage
Air Compressor reciprocating single stageAir Compressor reciprocating single stage
Air Compressor reciprocating single stage
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 

Course project ie6560 group 10_presentation

  • 1. 1 Dragan Kolobaric fa5527 Nishant Pathak fy4913 Srinivasa Gowtham gd7875 Krushal Chaudhary gb7704 Wayne State University Course: DETERMINISTIC OPTIMIZATION (Course Code: IE 6560) Date: December 1st, 2016 Course Project Group 10
  • 2. 2  Portfolio selection for North American Operations of global Italy based corporation for specially equipment and automotive interior components tooling  Executive Management tasked the operation department to confirm Business Plan (BP) projections based on historical human resources and product development data  Objective is to maximize sales and maintain profit margin with resources and product development capabilities constrains.  Priority 1 is to develop North America capacity with Italy support and outsourcing the last.
  • 3.  Product sales and development data is obtained from corporation database and an average is utilized with minimal historical data on file. Product Avg. Sale Price Profit [%] 1 Ultrasonic Welding 95,000.00$ 13 2 Ultrasonic Punching 156,000.00$ 12 3 Lamination Tools 251,000.00$ 24 4 Foaming Tools 168,000.00$ 26 5 Cutting tools 178,000.00$ 20 6 In-mold graining Tools 541,000.00$ 25 7 Forming Tools 321,400.00$ 42 8 Thermoforming Tools 465,000.00$ 38 9 Vacuum Forming Tools 195,000.00$ 11 10 Cast Skin Tools 362,800.00$ 18 Product Desing Fabrication Machining Assembly Test runs/ Tunig 1 Ultrasonic Welding 120 130 132 180 55 2 Ultrasonic Punching 195 180 200 230 48 3 Lamination Tools 220 210 220 120 85 4 Foaming Tools 175 165 250 100 50 5 Cutting tools 160 85 274 80 40 6 In-mold graining Tools 247 140 240 145 80 7 Forming Tools 260 80 320 180 90 8 Thermoforming Tools 340 165 280 250 100 9 Vacuum Forming Tools 156 90 240 140 50 10 Cast Skin Tools 310 180 350 120 80 Total: North America Current 8 10 10 12 10 50 North America 1st Year 12 10 20 18 15 75 North America 2nd year 15 10 30 25 20 100 Italy Resources Available - employees 5 12 10 12 10 Manhours Emplyee head count projections
  • 4.  Resources capabilities/ development selection for specific products  Outsourcing restrictions are highlighted. BinaryFormat: Product NorthAmerica Italy Outsourc e NorthAmerica Italy Outsourc e NorthAmerica Italy Outsourc e NorthAmerica Italy Outsourc e NorthAmerica Italy Outsourc e 1 UltrasonicWelding 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 2 UltrasonicPunching 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 3 LaminationTools 1 1 0 1 1 1 1 1 1 1 1 0 1 1 0 4 FoamingTools 1 1 0 1 1 1 1 1 1 1 1 0 1 1 0 5 Cuttingtools 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 6 In-moldgrainingTools 1 1 0 1 1 1 1 1 0 1 1 0 1 1 0 7 FormingTools 1 1 0 1 1 1 1 1 1 1 1 1 1 1 0 8 ThermoformingTools 1 1 0 1 1 1 1 1 0 1 1 1 1 1 0 9 VacuumFormingTools 1 1 0 1 1 1 1 1 0 1 1 0 1 1 0 10 CastSkinTools 0 1 0 1 1 1 0 1 0 1 1 0 1 1 0 ResourceCapabilites/Selection Design Fabrication Machining Assembly TestRuns/Tuning
  • 5. 5  An Integer linear programming was used with objective to maximize sales and resources constrains Priority-1) Z1= S1T1+S2T2+S3T3+S4T4+S5T5+S6T6+S7T7+S8T8+S9T9+S10T10 Priority-2) Z2= S1T1+S2T2+S3T3+S4T4+S5T5+S6T6+S7T7+S8T8+S9T9+S10T10 Priority-3) Z3= S1T1+S2T2+S3T3+S4T4+S5T5+S6T6+S7T7+S8T8+S9T9+P10T10 Final Z= Z1+Z2+Z3 Where decision Variables being product/ tool: T1, T2, T3, T4, T5, T6, T7, T8, T9, T10 And sales per unit is: S1, S2, S3, S4, S5, S6, S7, S8, S9, S10 Subject to: T1, T2, T3, T4, T5, T6, T7, T8, T9, T10 = integer.
  • 6.  Utilizing excel solver optimal solution has confirmed that both profit margin and employee resources are in line with BP projections. Current Year 1st Year 2nd Year 47 47 57 16 19 22 3 6 11 4 5 4 3 4 4 1 1 1 3 6 13 1 6 12 3 8 15 0 0 0 Total Sales: 11,475,200.00$ 17,306,400.00$ 26,216,200.00$ Total Employee needed: 30 40 55 Employee per BP: 50 75 100 Profit for a product Mix: 16% 18% 19% Forming Tools Thermoforming Tools Vacuum Forming Tools Cast Skin Tools Product Mix Ultrasonic Welding Ultrasonic Punching Lamination Tools Foaming Tools Cutting tools In-mold graining Tools
  • 7. 7  The operation department has applied employee skill level approach in defining constrains for resources development Department: Level: Pessimistic Optimistic Years of experience Beginner 30% 65% 1-3 Intermediate 65% 95% 2-7 Advance 99% 100% > 4 years Beginner 50% 75% 1-3 Intermediate 75% 100% 2-7 Advance 99% 100% > 4 years Beginner 50% 75% 1-3 Intermediate 75% 100% 2-7 Advance 99% 100% > 4 years Beginner 50% 75% 1-3 Intermediate 75% 100% 2-7 Advance 99% 100% > 4 years Beginner 35% 60% 1-3 Intermediate 60% 90% 2-7 Advance 99% 100% > 4 years Test Runs/ Tuning Work without Assistance Design Fabrication Machining Assembly
  • 8.  Pessimistic approach is applied to Priority 1 of developing North American resources, hiring beginner level employees. 1st Year: Skill level Beginner for new employees Maximize Z: S1T1+S2T2+S3T3+S4T4+S5T5+S6T6+S7T7+S8T8+S9T9+S10T10 S.T.: Design Constraint (.30 efficiency): Hours used*Products <= 17664 Fabrication Department constraint (.50 efficiency): Hours used*Products <= 19200 Machining Department constraint (.50 efficiency): Hours used*Products <= 19200 Assembly Department constraint (.50 efficiency): Hours used*Products <= 23040 Test runs/Tuning Department constraint (.35 efficiency): Hours used*Products <=19200 Since, Cast Skin Tool cannot be produced in North America: T10=0 (in priority-1)
  • 9.  Pessimistic approach for 2nd year requires addition of beginner and on-going development of intermediate skill level employees. Second Year: Skill level Intermediate for 1st year employees and beginner for new employees Maximize Z: S1T1+S2T2+S3T3+S4T4+S5T5+S6T6+S7T7+S8T8+S9T9+S10T10 S.T.: Design Constraint (.65 and 0.3 efficiency): Hours used*Products <= 22080 Fabrication Department constraint (.75 and .5 efficiency): Hours used*Products <= 19200 Machining Department constraint (.75 and .5 efficiency): Hours used*Products <=43200 Assembly Department constraint (.75 and .5 efficiency): Hours used*Products <= 38400 Test runs/Tuning Department constraint (.6 and .35 efficiency): Hours used*Products <=28320 Since, Cast Skin Tool cannot be produced in North America: T10=0 (in priority-1)
  • 10.  Optimistic approach is applied to Priority 1 of developing North American resources, hiring beginner level employees. 1st Year: Skill level Beginner for new employees Maximize Z: S1T1+S2T2+S3T3+S4T4+S5T5+S6T6+S7T7+S8T8+S9T9+S10T10 S.T.: Design Constraint (.65 efficiency): Hours used*Products <= 20352 Fabrication Department constraint (0.75 efficiency): Hours used*Products <= 19200 Machining Department constraint (0.75 efficiency): Hours used*Products <= 19200 Assembly Department constraint (0.75 efficiency): Hours used*Products <= 23040 Test runs/Tuning Department constraint (.60 efficiency): Hours used*Products <=19200 Since, Cast Skin Tool cannot be produced in North America: T10=0 (in priority-1) Limitations of individual product: T1<=47, T2<=19, T3<=6, T4<=5, T5<=4, T6<=1, T7<=6, T8<=6, T9<=8, T10<=7. Sales value of all the product should not exceed the value of maximum possible sales: C1T1+C2T2+C3T3+C4T4+C5T5+C6T6+C7T7+C8T8+C9T9+C10T10 <=
  • 11.  Optimistic approach for 2nd year requires addition of beginner and on-going development of intermediate skill level employees. Second Year: Skill level Intermediate for 1st year employees and beginner for new employees Maximize Z: S1T1+S2T2+S3T3+S4T4+S5T5+S6T6+S7T7+S8T8+S9T9+S10T10 S.T.: Design Constraint: Hours used*Products <= 26400 Fabrication Department constraint: Hours used*Products <= 19200 Machining Department constraint: Hours used*Products <= 52800 Assembly Department constraint: Hours used*Products <= 44640 Test runs/Tuning Department constraint: Hours used*Products <=33600 Since, Cast Skin Tool cannot be produced in North America: T10=0 (in priority-1) Limitations of individual product: T1=57, T2=22, T3=11, T4=4, T5=4, T6=1, T7=13, T8=12, T9=15, T10=10. Sales value of all the product should not exceed the value of maximum possible sales: C1T1+C2T2+C3T3+C4T4+C5T5+C6T6+C7T7+C8T8+C9T9+C10T10 <= C1T1+C2T2+C3T3+C4T4+C5T5+C6T6+C7T7+C8T8+C9T9+C10T10 The assumption is that all employees in Italy are at 100 % skill level.
  • 12. 12  The final results points that sales and profit margin with both pessimistic and optimistic approach in resource skill level planning pose no risk to a BP projections  On other hand it highlights further optimization of BP and opportunities to utilize resources for more global growth as planned resources in Italy would not be needed to a full extent to support North American operation growth over next two years. ◦ Opportunities for additional profit improvements with improvement in employee skill level and utilization of available man-hours. Sales Total Profit Cost of shipping in % Final Profit Sales Total Profit Cost of shipping in % Final Profit Current Year 11,994,000$ 15% 1% 14% 11,994,000$ 14% 0.6% 13% 14% First Year 19,980,000$ 17% 1% 16% 19,846,000$ 18% 0.6% 17% 17% Second Year 27,876,200$ 19% 1% 18% 29,844,200$ 19% 0.6% 18% 18% Final Result AveragePessimistic Approach Optimistic Approach North America Italy Sale 1st Year 75 7 19,980,000$ 2nd Year 100 9 27,876,200$ North America Italy Sale 1st Year 75 5 19,846,000$ 2nd Year 100 7 29,844,200$ Actual Employee Requirments- Pessimistic Actual Employee Requirments- Optimistic
  • 13. 13
  • 14. 14