SlideShare una empresa de Scribd logo
1 de 19
Descargar para leer sin conexión
打包箱
FLAT-PACK
1
打包箱是一款基于钢框架和轻质墙板结构体系的模块
化建筑产品。该产品由顶框、底框、角柱和 14 块可互
换的墙板组成,可打包包装,便于陆地或海上运输。
Flat-Pack is a type of modular products designed by
using the steel frame and light-weight wall panels
system. One Flat-Pack consists of top frame, bottom
frame, 4 posts and 14 pieces exchangeable wall
panels. It can be flattened for easy transporting.
1 顶框 Top frame
2 底框 Bottom frame
3
角柱:4 根
Corner Posts: 4 posts
4
墙板:14 块可互换墙板
14 pieces exchangeable wall panels
5 窗户 Windows
6 门 Doors
7 电路系统 Electrical system
产品介绍 产品特点
运输优势
PRODUCT INTRODUCTION BENEFITS
TRANSPORTATION ADVANTAGES
安全耐用——使用寿命达 15 年以上,抗震烈度 8 度,
抗风 11 级。
SAFE AND DURABLE – over 15-year lifetime,
seismic resistance to 8 degree, wind resistance to
11 degree.
节省运费——扁平化压缩后,每 4 套等同于 1 个标准 20 尺集装箱尺寸,节省 3/4 运费;1 个 40 尺高柜可装运 6 套。
EASY TRANSPORTING – 4 units can be packed as a 20’ shipping container, which can save 3/4 freight cost; and 6 units can be
packed into a 40’ high-cube shipping container.
方式灵活——综合考虑目的地距离、现场安装便捷程度,可选择整箱运输 ( 卫浴箱推荐使用 ),扁平化压缩运输或集装箱货柜运输。
FLEXIBLE TRANSPORT METHOD - different transport methods are available to be chosen from according to the
distance to the desination and site installation conditions. Options are transported as a whole piece (recommended for bathroom
containers), 4 units packed horizontally as one piece and 6 units packed vertically into a 40' high-cube shipping container.
配套齐全——可搭配不同造型的屋顶、走廊、雨棚、
楼梯,另外有专门的卫浴箱、厨房箱可供选择,并
可根据需求对外观、内部进行装饰。
FULL-RANGE FACILITIES – different types of
roof, corridor, canopy and staircase are available;
plus specialized bathroom and kitchen containers
to choose; can be decorated both inside and
outside.
主体结构 Main Structure
组合灵活——可单箱使用,可组合成敞开
式大空间,并能叠加至 3 层。
FLEXIBLE COMBINATION – stand alone,
or combined horizontally to create big
open space, or stacked vertically up to 3
storeys.
安装快速——平均 4 个工人 3 个小时可完
成单箱安装,也可组装后整箱移动搬迁,
方便快捷。
FAST ASSEMBLING - averagely 4
workers can erect 1 container within
3 hours. The container also can be
assembled in factory and then tranferred
to the site.
2 3
技术参数
SPECIFICATION
名称 Item 内容 Details
外部尺寸(长 X 宽 X 高)
External Dimensions
(L x W x H)
推荐 Recommend
L6058 x W2438 x H2800mm / L6058 x W3022 x H2800mm
( 可按要求定制尺寸 )
(Custom sizes available)
底结构
Base
框架:钢构冷成型整体焊接
Frame: cold formed and completed welding
地板:防水胶合板 / 纤维水泥板 / 玻镁板 + PVC 地板革
Floor: waterproof plywood/ fiber cement board/ Bolivian magnesium board + PVC vinyl floor finishing
选配:底结构附加保温、叉车槽
Option:additional insulation and forklift
顶结构
Roof
框架:钢构冷成型整体焊接
Frame: cold formed and completed welding
屋顶:镀锌彩钢屋面板 + 岩棉保温 + 彩钢夹芯板吊顶板 / 饰面刨花板吊顶板
Roof: galvanized color-coated steel sheet + rock wool insulation + color-coated steel sandwich panel
ceiling + particleboard ceiling finish
选配:顶梁钢构附加保温 / 压型焊接屋面板
Options: roof beams filled with insulation/ profiled welding roof sheet
角柱
Corner Posts
折弯钢型材
Cold bending profiles
选配:角柱钢构附加保温
Option: corner post filled with insulation
墙板
Wall Panels
彩钢夹芯板 / 内饰刨花板
Color steel sandwich panels/ Chipboard for internal
芯材:EPS/ 玻璃棉 / 岩棉 / 聚氨酯
Insulation material: EPS/ glass wool/ rock wool/ PU
窗
Windows
推拉窗 / 内开内倒窗
Sliding window/ Tilt window
选配:纱窗、防盗杆、卷帘
Option: fly screen, theft-proof bar, rolling blind
门
Doors
钢质门 / 铝合金门
Steel door/ aluminum alloy door
电路系统
Electrical System
电路暗装,可满足国标、欧标、澳标等认证要求
Circuits concealed, match 3C/ CE/ AS
涂装
Paint
钢构镀锌处理 + 底漆 + 面漆
Galvanized treatment + base coat + finish coat
1. 安置底框及角柱
Installing the bottom frame and
the corner posts.
4. 安装电路材料
Mounting the electrical fittings.
2. 吊装顶框
Lifting the top frame.
5. 安装装饰件
Installing internal decorating
materials.
3. 安装侧板
Installing the wall panels.
6. 完成
Finish.
单箱安装过程
ASSEMBLING PROCESS OF SINGLE UNIT
4 5
可选材料
MATERIAL OPTIONS
墙板
Wall Panel
地板
Floor
门窗
Door & Window
楼梯和走廊
Stairs & Corridor
PU 彩钢夹芯板
水泥纤维板 胶合板 玻镁板
推拉窗 直梯 折梯 走廊内开内倒窗 内开平开窗 单开门
岩棉彩钢夹芯板 玻璃棉彩钢夹芯板 EPS 彩钢夹芯板
PU color-coated sandwich panels
Fiber cement board Plywood Bolivian magnesium board
Sliding window Straight stair Folding stair CorridorInward tilt-turn window Inward hinged window Hinged door
Rock wool color-coated
sandwich panels
Glass wool color-coated
sandwich panels
EPS color-coated sandwich panels
6 7
打包箱产品可作为办公、住宿、餐厅、卫浴以及组合大空间使用,可满足建筑工地营房、野外作业营房、市政安置用房及
各类商业用房的需求。目前广泛应用于欧洲、日本、中东、东南亚、非洲等地区。
Flat-Pack can be used as the office, accommodation, canteen, bathroom and other big open spaces, to meet the needs
of construction site, fieldwork camp, social housing, disaster site and other commercial purposes. Flat-Pack is widely
used in Europe, Japan, Middle East, Southeast Asia, Africa and other areas.
办公室
Office
办公室
Office
住宿
Accommodation
娱乐室
Recreation Cantre
洗衣房
Laundry
集体宿舍
Dormitory
套间客厅
Suite Living Room
厨房
Kitchen
单人宿舍
Single Studio
单人宿舍
Single Studio 套间卧室
Suite Bedroom
浴室
Shower
卫生间
Toilet
典型功能应用典型功能布局
TYPICAL APPLICATIONSTYPICAL LAYOUTS
食堂
Canteen
8 9
经典案例
PREVIOUS PROJECTS
10 11
天津海关行政办公楼
雅致时尚酒店
Tianjin Customs Office Building
Yahgee Hotel Building
1 2 3
4
5
1 2
3 4 5
7 86
12 13
壳牌油田营地
2
1
Oil Field Camp for SHELL
中建科技综合营地
Camp of China Construction Science & Technology Group Co., Ltd.
2 3
5 6
4
1
14 15
中铁十四局越江工程项目
China Railway 14th Construction Bureau Co., Ltd. Yuejiang Construction Site
5 6
2 3 4
7 8
9 10
1
中国兰州建筑工地项目
Construction Site in Lanzhou, China
16 17
武汉中建三局武汉光谷中心城地下空间工程
Underground of Optics Valley Central City, by CSCEC 3rd Burea, Wuhan
2
1
65
3 4
18 19
军队营地
MIlitary Camp
1
2 3 4
5
深圳华润城建设工程
Shenzhen CR-City Construction Site
21
3
5
4
6
20 21
营地整体解决方案
TOTAL SOLUTION
22 23
工程周期 PROJECT LIFECYCLE
设计 20 天 Planning & Designing: 20 days
生产 30 天 Producing: 30 days
运输 30 天 Transporting: 30 days
安装 45 天 Assembling: 45 days
x 5 + x 50
现场工人 LABOUR ON SITE
项目介绍 PROJECT BRIEF
项目名称: 肯尼亚石油管道建设项目
客 户: 肯尼亚国家石油公司
项目地点: 肯尼亚蒙巴萨
项目描述: 雅致与肯尼亚国家石油公司合作,承接从内罗毕
到蒙巴萨的石油管道建设的整体营地解决方案。项目一期需
安置 400 个工人,从沟通到规划到设计,再到制造到运输到
现场安装,雅致为 400 个工人提供了办公、住宿、餐厅、卫
浴等用房,包括配套的家具电器,并为营地提供了外部管道
设施、电路设施等基础设施建设。
数 量: 247 个打包箱
使用人数: 400 人
完成时间: 2015 年
Project Name: Kenya Petroleum Pipeline Construction Site
Client: National Oil Corporation of Kenya
Project Location: Mombasa, Kenya
Description: Yahgee cooperated with the National Oil
Corporation of Kenya to provide the total solution of the
construction site for pipeline from Nairobi to Mombasa
to occupy 400 workers as Stage 1, including the office,
accommodation, canteen and etc. with furniture and
electronic fittings by using the Flat-Pack containers, and
also the infrastructure on site. Yahgee was in charge
of every process from communicating to planning, to
designing, then to producing, transporting and assembling
on site.
Volume: 247 Flat-Pack containers
No. of People Occupy: 400
Completion: 2015
集体宿舍 Labour Accommodation
洗衣房 Laundry
娱乐室 Recreation Centre
公共厕所 Public Toilet
两单间一卫浴 Dual Room with Shared Bath
三人宿舍带卫浴 Triple Room with Bath
一房一厅一卫 Independent Living
单间宿舍 Manager Accommadation
食堂 Canteen
医务室 Infirmary Room
办公室 Office
商店 Store
工作间 Workshop
设备用房 Equipment Room
平面布局图
Floor plan
肯尼亚营地项目
KENYA PROJECT
24 25
工程周期 PROJECT LIFECYCLE
设计 5 天 Planning & Designing: 5 days
生产 30 天 Producing: 30 days
运输 7 天 Transporting: 7 days
安装 30 天 Assembling: 30 days
( 不包括水电 Electrical & Plumbing Systems Excluded)
x 5 + x 3 + x 1
现场工人 LABOUR ON SITE
宿舍 Accommodation
公共厕所 Public Toilet
设备用房 Equipment Room
食堂 Canteen
项目介绍
PROJECT BRIEF
项目名称: 日本福岛重建项目
客 户: 日本川崎商事
项目地点: 日本福岛
项目描述: 和日本川崎商事合作,为日本灾
后重建项目提供临建用房。项目总共分四期,
第一期 300 人,包括现场工人住宿,厨房餐
厅、卫生间、淋浴间等配套设施。由于项目比
较紧急,经过雅致全体员工的努力,项目在短
短 40 天内保质保量地顺利完成交货,并受到
日方代表的高度认可,日方代表也特地为此项
目做了专题片。
数 量: 210 个打包箱
使用人数: 300 人
完成时间: 2014 年
Project Name: Japan Fukushima Disaster
Site
Client: Kawasaki Trading Co., Ltd.
Project Location: Fukushima, Japan
Description: Since after the earthquake
in Fukushima, Kawasaki has approached
Yahgee to quickly establish the temporary
housing for workers who were to help to
rebuild the destroyed site. This project is
divided into 4 stages and the first stage is to
occupy 300 workers by providing them the
accommodation, canteen, toilets, showers
and other facilities. Due to the emergent
situation, Yahgee branch has put a great
effort to deliver their high quality products
within 40 days, and this effort was highly
recognized by the Japanese clients. A
special documentary video was made by
the Japanese representatives to show their
appreciation.
Volume: 210 Flat-Pack containers
No. of People Occupy: 300
Completion: 2014
日本福岛重建项目
JAPAN FUKUSHIMA PROJECT
26 27
折叠箱,打包箱的一个分支。
Folding Box, a subdivision of Flat-Pack.
28 29
折叠箱作为打包箱系列产品之一,同样是一款基于钢结构框架和轻质墙板结构体系的模块化建筑产品。该箱房由中间的一
个整体卫浴箱和两块可折叠顶框、两块可折叠底框、四根角柱以及六块可拆卸、已预装了门窗的墙板组成。
产品规格尺寸为长 5950mm,宽 3300mm,高 2550mm。折叠后长度由 5950mm 变成 2090mm,其他尺寸不变,方便运输,每个
40 尺的集装箱高柜可装入三个折叠箱。
折叠箱不可横向组合或纵向堆叠,只能作为单箱使用。作为预制化建筑中最复杂的卫浴单元部分已在工厂安装完毕,因而
现场施工量少,特别适合工期比较紧迫的场地应用。
As one of the Flat-Pack series products, Folding Box is also designed by using the steel frame and lightweight wall
panels system. One Folding Box consists of a bathroom pod, 2 foldable top frames, 2 foldable bottom frames, 4 corner
columns and 6 pieces of wall panels with pre-installed doors and windows.
The unfolded container is 5950mm in length, 3300mm in width and 2550mm in height. After folding up, the length
reduces from 5950mm to 2090mm, the other two figures remain the same. Folding Box is easy for transport that each 40'
high-cube shipping container can have 3 of them stored.
Folding Box is a stand-alone product, which cannot be combined horizontally or stacked vertically. The bathroom pod, as
the most complicated part of the prefab building, is installed in the factory completely, thus to minimize the on-site work
and make it a preferable product for the use of any site with very limited delivery time.
产品介绍
PRODUCT INTRODUCTION
技术参数
SPECIFICATION
名称 Item 内容 Details
标准尺寸
Standard
Sizes
展开尺寸(长X宽X高)
Unfolded Dimensions
L5950 x W3300 x H2550mm
折叠尺寸(长X宽X高)
Folded Dimensions
L2090 x W3300 x H2550mm
建筑材料
Structural
Materials
屋面
Roof
复合彩钢大波瓦
Composite color-coated steel roof panels
墙体
Wall
复合彩钢夹芯板
Composite color-coated steel wall panels
地面
Floor
地面基材为纤维水泥板,面材为 PVC 地胶板,PVC 踢脚线
CCA board as base; PVC floor board as finish; PVC kicker board
门窗
Window & Door
室内门木门或复合彩钢夹芯板门;室外门为钢制门;
铝窗推拉窗或塑钢推拉窗
Timber door or composite color-coated sandwich panel door as internal doors;
steel panel door as external doors;
aluminium or plastic steel sliding windows
室内装饰
Interior Finishing
    室内墙角位、天花角位及折叠缝口采用 PVC 扣条修饰
PVC strips as corner capping, cornice
& folding gap capping
30 31
安装过程
ASSEMBLING PROCESS
1. 运达目的地
Delivered on site.
2. 展开地面
Unfold the bottom frame.
3. 展开屋面
Lift up the top frame.
4. 安装立柱
Install the corner columns.
5. 从内向外装正面墙板
Install the wall panels from
inside towards outside.
6. 角钢固定墙板
Fix wall panels by corner steel
pieces.
7. 同样的方法完成另一边墙板
Repeat the same steps for the
other side.
8. 安装屋面泛水板
Fix flashing on top of roof.
9. 安装装饰件
Install interior finishing pieces.
10. 完成
Finished.
32 33
雅致厂房
OUR FACTORY
我们为您量身定做符合您需求的产品
WE DESIGN TO SUIT,
MAKE TO MEASURE
TO MEET YOUR PARTICULAR REQUIREMENTS.
雅致官网
股票代码:002314
雅致微信
www.yahgee.com

Más contenido relacionado

La actualidad más candente

Innova eco building profile
Innova eco building profileInnova eco building profile
Innova eco building profileMario Caprini
 
PRECAST CONCRETE STAIRS
  PRECAST CONCRETE STAIRS  PRECAST CONCRETE STAIRS
PRECAST CONCRETE STAIRSAbhishek Mewada
 
Lewis Flooring Presentation
Lewis Flooring PresentationLewis Flooring Presentation
Lewis Flooring Presentationphilwdm
 
Oldcastle Precast Spokane - Urban Modular Construction - The Grand Hotel
Oldcastle Precast Spokane - Urban Modular Construction - The Grand HotelOldcastle Precast Spokane - Urban Modular Construction - The Grand Hotel
Oldcastle Precast Spokane - Urban Modular Construction - The Grand HotelBlake Johnson
 
Precast concrete - drywall
Precast  concrete - drywallPrecast  concrete - drywall
Precast concrete - drywallDenis Patel
 

La actualidad más candente (8)

Innova eco building profile
Innova eco building profileInnova eco building profile
Innova eco building profile
 
PRECAST CONCRETE STAIRS
  PRECAST CONCRETE STAIRS  PRECAST CONCRETE STAIRS
PRECAST CONCRETE STAIRS
 
Lewis Flooring Presentation
Lewis Flooring PresentationLewis Flooring Presentation
Lewis Flooring Presentation
 
Ahmed burqan
Ahmed burqanAhmed burqan
Ahmed burqan
 
Oldcastle Precast Spokane - Urban Modular Construction - The Grand Hotel
Oldcastle Precast Spokane - Urban Modular Construction - The Grand HotelOldcastle Precast Spokane - Urban Modular Construction - The Grand Hotel
Oldcastle Precast Spokane - Urban Modular Construction - The Grand Hotel
 
Precast concrete - drywall
Precast  concrete - drywallPrecast  concrete - drywall
Precast concrete - drywall
 
Introduction to Chemical Storage Non-Occupancy Buildings
Introduction to Chemical Storage Non-Occupancy BuildingsIntroduction to Chemical Storage Non-Occupancy Buildings
Introduction to Chemical Storage Non-Occupancy Buildings
 
KwikUP Brochure
KwikUP BrochureKwikUP Brochure
KwikUP Brochure
 

Similar a Yahgee flat-pack house

Container house catalogue
Container house catalogueContainer house catalogue
Container house catalogueRobin Luo
 
Transform Group Construction
Transform Group ConstructionTransform Group Construction
Transform Group ConstructionLionel Fitch MIH
 
Liftable Portable Cabin - EPACK Prefab
Liftable Portable Cabin - EPACK PrefabLiftable Portable Cabin - EPACK Prefab
Liftable Portable Cabin - EPACK PrefabEPACK Prefab
 
Aasra Martech Pvt. Ltd., New Delhi, Prefab Building Systems
Aasra Martech Pvt. Ltd., New Delhi, Prefab Building SystemsAasra Martech Pvt. Ltd., New Delhi, Prefab Building Systems
Aasra Martech Pvt. Ltd., New Delhi, Prefab Building SystemsIndiaMART InterMESH Limited
 
FTS INTERNATIONAL profile
FTS INTERNATIONAL profileFTS INTERNATIONAL profile
FTS INTERNATIONAL profileasad iqbal
 
Warehouse Tents
Warehouse TentsWarehouse Tents
Warehouse Tentssuperbtent
 
HUAHAI STRUCTURE
HUAHAI STRUCTUREHUAHAI STRUCTURE
HUAHAI STRUCTURESunny Wang
 
PRECAST CONSTRUCTION MAKE IN INDIA
PRECAST CONSTRUCTION MAKE IN INDIAPRECAST CONSTRUCTION MAKE IN INDIA
PRECAST CONSTRUCTION MAKE IN INDIADevender Kumar
 
ACMP Company profile
ACMP Company profileACMP Company profile
ACMP Company profileJohn Kotze
 
Panel Built Catalog
Panel Built CatalogPanel Built Catalog
Panel Built CatalogPanel Built
 
Diuk storage buildings
Diuk storage buildingsDiuk storage buildings
Diuk storage buildingsMeital Toker
 
Wabi Cabins & Villas
Wabi Cabins & VillasWabi Cabins & Villas
Wabi Cabins & VillasGretaMack
 
New Life Steel Structures, Mumbai, Sheds and Steel Structures
 New Life Steel Structures, Mumbai, Sheds and Steel Structures New Life Steel Structures, Mumbai, Sheds and Steel Structures
New Life Steel Structures, Mumbai, Sheds and Steel StructuresIndiaMART InterMESH Limited
 
Genwest Company profile
Genwest Company profileGenwest Company profile
Genwest Company profileGenwest Steel
 

Similar a Yahgee flat-pack house (20)

Container house catalogue
Container house catalogueContainer house catalogue
Container house catalogue
 
New Catlogue Cabins-1.pdf
New Catlogue Cabins-1.pdfNew Catlogue Cabins-1.pdf
New Catlogue Cabins-1.pdf
 
Transform Group Construction
Transform Group ConstructionTransform Group Construction
Transform Group Construction
 
Liftable Portable Cabin - EPACK Prefab
Liftable Portable Cabin - EPACK PrefabLiftable Portable Cabin - EPACK Prefab
Liftable Portable Cabin - EPACK Prefab
 
Company Profile - NEW
Company Profile - NEWCompany Profile - NEW
Company Profile - NEW
 
Aasra Martech Pvt. Ltd., New Delhi, Prefab Building Systems
Aasra Martech Pvt. Ltd., New Delhi, Prefab Building SystemsAasra Martech Pvt. Ltd., New Delhi, Prefab Building Systems
Aasra Martech Pvt. Ltd., New Delhi, Prefab Building Systems
 
FTS INTERNATIONAL profile
FTS INTERNATIONAL profileFTS INTERNATIONAL profile
FTS INTERNATIONAL profile
 
Warehouse Tents
Warehouse TentsWarehouse Tents
Warehouse Tents
 
HUAHAI STRUCTURE
HUAHAI STRUCTUREHUAHAI STRUCTURE
HUAHAI STRUCTURE
 
PRECAST CONSTRUCTION MAKE IN INDIA
PRECAST CONSTRUCTION MAKE IN INDIAPRECAST CONSTRUCTION MAKE IN INDIA
PRECAST CONSTRUCTION MAKE IN INDIA
 
ACMP Company profile
ACMP Company profileACMP Company profile
ACMP Company profile
 
Panel Built Catalog
Panel Built CatalogPanel Built Catalog
Panel Built Catalog
 
Diuk storage buildings
Diuk storage buildingsDiuk storage buildings
Diuk storage buildings
 
Wabi Cabins & Villas
Wabi Cabins & VillasWabi Cabins & Villas
Wabi Cabins & Villas
 
profile ALSANABEL
profile ALSANABELprofile ALSANABEL
profile ALSANABEL
 
New Life Steel Structures, Mumbai, Sheds and Steel Structures
 New Life Steel Structures, Mumbai, Sheds and Steel Structures New Life Steel Structures, Mumbai, Sheds and Steel Structures
New Life Steel Structures, Mumbai, Sheds and Steel Structures
 
Cl newlifesteel
Cl newlifesteelCl newlifesteel
Cl newlifesteel
 
Outokumpu Business Development Brochure
Outokumpu Business Development BrochureOutokumpu Business Development Brochure
Outokumpu Business Development Brochure
 
Smartfix Presentation
Smartfix PresentationSmartfix Presentation
Smartfix Presentation
 
Genwest Company profile
Genwest Company profileGenwest Company profile
Genwest Company profile
 

Más de leo tan

Yahgee hotel for worker accommodation
Yahgee hotel for worker accommodationYahgee hotel for worker accommodation
Yahgee hotel for worker accommodationleo tan
 
Yahgee container house introduction
Yahgee container house introductionYahgee container house introduction
Yahgee container house introductionleo tan
 
New zealand apartment highly prefabricated
New zealand apartment highly prefabricatedNew zealand apartment highly prefabricated
New zealand apartment highly prefabricatedleo tan
 
Australia hotel in perth
Australia hotel in perthAustralia hotel in perth
Australia hotel in perthleo tan
 
Norway refugee camp
Norway refugee campNorway refugee camp
Norway refugee campleo tan
 
Csa certified container house
Csa certified container houseCsa certified container house
Csa certified container houseleo tan
 
Generator container
Generator containerGenerator container
Generator containerleo tan
 
Kenya Petroleum Pipeline Construction Site
Kenya Petroleum Pipeline Construction SiteKenya Petroleum Pipeline Construction Site
Kenya Petroleum Pipeline Construction Siteleo tan
 
Flat pack japan fukushima-disaster site
Flat pack   japan fukushima-disaster siteFlat pack   japan fukushima-disaster site
Flat pack japan fukushima-disaster siteleo tan
 
Storage container for japan market
Storage container for japan marketStorage container for japan market
Storage container for japan marketleo tan
 

Más de leo tan (10)

Yahgee hotel for worker accommodation
Yahgee hotel for worker accommodationYahgee hotel for worker accommodation
Yahgee hotel for worker accommodation
 
Yahgee container house introduction
Yahgee container house introductionYahgee container house introduction
Yahgee container house introduction
 
New zealand apartment highly prefabricated
New zealand apartment highly prefabricatedNew zealand apartment highly prefabricated
New zealand apartment highly prefabricated
 
Australia hotel in perth
Australia hotel in perthAustralia hotel in perth
Australia hotel in perth
 
Norway refugee camp
Norway refugee campNorway refugee camp
Norway refugee camp
 
Csa certified container house
Csa certified container houseCsa certified container house
Csa certified container house
 
Generator container
Generator containerGenerator container
Generator container
 
Kenya Petroleum Pipeline Construction Site
Kenya Petroleum Pipeline Construction SiteKenya Petroleum Pipeline Construction Site
Kenya Petroleum Pipeline Construction Site
 
Flat pack japan fukushima-disaster site
Flat pack   japan fukushima-disaster siteFlat pack   japan fukushima-disaster site
Flat pack japan fukushima-disaster site
 
Storage container for japan market
Storage container for japan marketStorage container for japan market
Storage container for japan market
 

Último

Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxMuhammadAsimMuhammad6
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network DevicesChandrakantDivate1
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdfKamal Acharya
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdfKamal Acharya
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxchumtiyababu
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Servicemeghakumariji156
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersMairaAshraf6
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwaitjaanualu31
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdfKamal Acharya
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEselvakumar948
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARKOUSTAV SARKAR
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiessarkmank1
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 

Último (20)

Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 

Yahgee flat-pack house

  • 2. 1 打包箱是一款基于钢框架和轻质墙板结构体系的模块 化建筑产品。该产品由顶框、底框、角柱和 14 块可互 换的墙板组成,可打包包装,便于陆地或海上运输。 Flat-Pack is a type of modular products designed by using the steel frame and light-weight wall panels system. One Flat-Pack consists of top frame, bottom frame, 4 posts and 14 pieces exchangeable wall panels. It can be flattened for easy transporting. 1 顶框 Top frame 2 底框 Bottom frame 3 角柱:4 根 Corner Posts: 4 posts 4 墙板:14 块可互换墙板 14 pieces exchangeable wall panels 5 窗户 Windows 6 门 Doors 7 电路系统 Electrical system 产品介绍 产品特点 运输优势 PRODUCT INTRODUCTION BENEFITS TRANSPORTATION ADVANTAGES 安全耐用——使用寿命达 15 年以上,抗震烈度 8 度, 抗风 11 级。 SAFE AND DURABLE – over 15-year lifetime, seismic resistance to 8 degree, wind resistance to 11 degree. 节省运费——扁平化压缩后,每 4 套等同于 1 个标准 20 尺集装箱尺寸,节省 3/4 运费;1 个 40 尺高柜可装运 6 套。 EASY TRANSPORTING – 4 units can be packed as a 20’ shipping container, which can save 3/4 freight cost; and 6 units can be packed into a 40’ high-cube shipping container. 方式灵活——综合考虑目的地距离、现场安装便捷程度,可选择整箱运输 ( 卫浴箱推荐使用 ),扁平化压缩运输或集装箱货柜运输。 FLEXIBLE TRANSPORT METHOD - different transport methods are available to be chosen from according to the distance to the desination and site installation conditions. Options are transported as a whole piece (recommended for bathroom containers), 4 units packed horizontally as one piece and 6 units packed vertically into a 40' high-cube shipping container. 配套齐全——可搭配不同造型的屋顶、走廊、雨棚、 楼梯,另外有专门的卫浴箱、厨房箱可供选择,并 可根据需求对外观、内部进行装饰。 FULL-RANGE FACILITIES – different types of roof, corridor, canopy and staircase are available; plus specialized bathroom and kitchen containers to choose; can be decorated both inside and outside. 主体结构 Main Structure 组合灵活——可单箱使用,可组合成敞开 式大空间,并能叠加至 3 层。 FLEXIBLE COMBINATION – stand alone, or combined horizontally to create big open space, or stacked vertically up to 3 storeys. 安装快速——平均 4 个工人 3 个小时可完 成单箱安装,也可组装后整箱移动搬迁, 方便快捷。 FAST ASSEMBLING - averagely 4 workers can erect 1 container within 3 hours. The container also can be assembled in factory and then tranferred to the site.
  • 3. 2 3 技术参数 SPECIFICATION 名称 Item 内容 Details 外部尺寸(长 X 宽 X 高) External Dimensions (L x W x H) 推荐 Recommend L6058 x W2438 x H2800mm / L6058 x W3022 x H2800mm ( 可按要求定制尺寸 ) (Custom sizes available) 底结构 Base 框架:钢构冷成型整体焊接 Frame: cold formed and completed welding 地板:防水胶合板 / 纤维水泥板 / 玻镁板 + PVC 地板革 Floor: waterproof plywood/ fiber cement board/ Bolivian magnesium board + PVC vinyl floor finishing 选配:底结构附加保温、叉车槽 Option:additional insulation and forklift 顶结构 Roof 框架:钢构冷成型整体焊接 Frame: cold formed and completed welding 屋顶:镀锌彩钢屋面板 + 岩棉保温 + 彩钢夹芯板吊顶板 / 饰面刨花板吊顶板 Roof: galvanized color-coated steel sheet + rock wool insulation + color-coated steel sandwich panel ceiling + particleboard ceiling finish 选配:顶梁钢构附加保温 / 压型焊接屋面板 Options: roof beams filled with insulation/ profiled welding roof sheet 角柱 Corner Posts 折弯钢型材 Cold bending profiles 选配:角柱钢构附加保温 Option: corner post filled with insulation 墙板 Wall Panels 彩钢夹芯板 / 内饰刨花板 Color steel sandwich panels/ Chipboard for internal 芯材:EPS/ 玻璃棉 / 岩棉 / 聚氨酯 Insulation material: EPS/ glass wool/ rock wool/ PU 窗 Windows 推拉窗 / 内开内倒窗 Sliding window/ Tilt window 选配:纱窗、防盗杆、卷帘 Option: fly screen, theft-proof bar, rolling blind 门 Doors 钢质门 / 铝合金门 Steel door/ aluminum alloy door 电路系统 Electrical System 电路暗装,可满足国标、欧标、澳标等认证要求 Circuits concealed, match 3C/ CE/ AS 涂装 Paint 钢构镀锌处理 + 底漆 + 面漆 Galvanized treatment + base coat + finish coat 1. 安置底框及角柱 Installing the bottom frame and the corner posts. 4. 安装电路材料 Mounting the electrical fittings. 2. 吊装顶框 Lifting the top frame. 5. 安装装饰件 Installing internal decorating materials. 3. 安装侧板 Installing the wall panels. 6. 完成 Finish. 单箱安装过程 ASSEMBLING PROCESS OF SINGLE UNIT
  • 4. 4 5 可选材料 MATERIAL OPTIONS 墙板 Wall Panel 地板 Floor 门窗 Door & Window 楼梯和走廊 Stairs & Corridor PU 彩钢夹芯板 水泥纤维板 胶合板 玻镁板 推拉窗 直梯 折梯 走廊内开内倒窗 内开平开窗 单开门 岩棉彩钢夹芯板 玻璃棉彩钢夹芯板 EPS 彩钢夹芯板 PU color-coated sandwich panels Fiber cement board Plywood Bolivian magnesium board Sliding window Straight stair Folding stair CorridorInward tilt-turn window Inward hinged window Hinged door Rock wool color-coated sandwich panels Glass wool color-coated sandwich panels EPS color-coated sandwich panels
  • 5. 6 7 打包箱产品可作为办公、住宿、餐厅、卫浴以及组合大空间使用,可满足建筑工地营房、野外作业营房、市政安置用房及 各类商业用房的需求。目前广泛应用于欧洲、日本、中东、东南亚、非洲等地区。 Flat-Pack can be used as the office, accommodation, canteen, bathroom and other big open spaces, to meet the needs of construction site, fieldwork camp, social housing, disaster site and other commercial purposes. Flat-Pack is widely used in Europe, Japan, Middle East, Southeast Asia, Africa and other areas. 办公室 Office 办公室 Office 住宿 Accommodation 娱乐室 Recreation Cantre 洗衣房 Laundry 集体宿舍 Dormitory 套间客厅 Suite Living Room 厨房 Kitchen 单人宿舍 Single Studio 单人宿舍 Single Studio 套间卧室 Suite Bedroom 浴室 Shower 卫生间 Toilet 典型功能应用典型功能布局 TYPICAL APPLICATIONSTYPICAL LAYOUTS 食堂 Canteen
  • 7. 10 11 天津海关行政办公楼 雅致时尚酒店 Tianjin Customs Office Building Yahgee Hotel Building 1 2 3 4 5 1 2 3 4 5 7 86
  • 8. 12 13 壳牌油田营地 2 1 Oil Field Camp for SHELL 中建科技综合营地 Camp of China Construction Science & Technology Group Co., Ltd. 2 3 5 6 4 1
  • 9. 14 15 中铁十四局越江工程项目 China Railway 14th Construction Bureau Co., Ltd. Yuejiang Construction Site 5 6 2 3 4 7 8 9 10 1 中国兰州建筑工地项目 Construction Site in Lanzhou, China
  • 10. 16 17 武汉中建三局武汉光谷中心城地下空间工程 Underground of Optics Valley Central City, by CSCEC 3rd Burea, Wuhan 2 1 65 3 4
  • 11. 18 19 军队营地 MIlitary Camp 1 2 3 4 5 深圳华润城建设工程 Shenzhen CR-City Construction Site 21 3 5 4 6
  • 13. 22 23 工程周期 PROJECT LIFECYCLE 设计 20 天 Planning & Designing: 20 days 生产 30 天 Producing: 30 days 运输 30 天 Transporting: 30 days 安装 45 天 Assembling: 45 days x 5 + x 50 现场工人 LABOUR ON SITE 项目介绍 PROJECT BRIEF 项目名称: 肯尼亚石油管道建设项目 客 户: 肯尼亚国家石油公司 项目地点: 肯尼亚蒙巴萨 项目描述: 雅致与肯尼亚国家石油公司合作,承接从内罗毕 到蒙巴萨的石油管道建设的整体营地解决方案。项目一期需 安置 400 个工人,从沟通到规划到设计,再到制造到运输到 现场安装,雅致为 400 个工人提供了办公、住宿、餐厅、卫 浴等用房,包括配套的家具电器,并为营地提供了外部管道 设施、电路设施等基础设施建设。 数 量: 247 个打包箱 使用人数: 400 人 完成时间: 2015 年 Project Name: Kenya Petroleum Pipeline Construction Site Client: National Oil Corporation of Kenya Project Location: Mombasa, Kenya Description: Yahgee cooperated with the National Oil Corporation of Kenya to provide the total solution of the construction site for pipeline from Nairobi to Mombasa to occupy 400 workers as Stage 1, including the office, accommodation, canteen and etc. with furniture and electronic fittings by using the Flat-Pack containers, and also the infrastructure on site. Yahgee was in charge of every process from communicating to planning, to designing, then to producing, transporting and assembling on site. Volume: 247 Flat-Pack containers No. of People Occupy: 400 Completion: 2015 集体宿舍 Labour Accommodation 洗衣房 Laundry 娱乐室 Recreation Centre 公共厕所 Public Toilet 两单间一卫浴 Dual Room with Shared Bath 三人宿舍带卫浴 Triple Room with Bath 一房一厅一卫 Independent Living 单间宿舍 Manager Accommadation 食堂 Canteen 医务室 Infirmary Room 办公室 Office 商店 Store 工作间 Workshop 设备用房 Equipment Room 平面布局图 Floor plan 肯尼亚营地项目 KENYA PROJECT
  • 14. 24 25 工程周期 PROJECT LIFECYCLE 设计 5 天 Planning & Designing: 5 days 生产 30 天 Producing: 30 days 运输 7 天 Transporting: 7 days 安装 30 天 Assembling: 30 days ( 不包括水电 Electrical & Plumbing Systems Excluded) x 5 + x 3 + x 1 现场工人 LABOUR ON SITE 宿舍 Accommodation 公共厕所 Public Toilet 设备用房 Equipment Room 食堂 Canteen 项目介绍 PROJECT BRIEF 项目名称: 日本福岛重建项目 客 户: 日本川崎商事 项目地点: 日本福岛 项目描述: 和日本川崎商事合作,为日本灾 后重建项目提供临建用房。项目总共分四期, 第一期 300 人,包括现场工人住宿,厨房餐 厅、卫生间、淋浴间等配套设施。由于项目比 较紧急,经过雅致全体员工的努力,项目在短 短 40 天内保质保量地顺利完成交货,并受到 日方代表的高度认可,日方代表也特地为此项 目做了专题片。 数 量: 210 个打包箱 使用人数: 300 人 完成时间: 2014 年 Project Name: Japan Fukushima Disaster Site Client: Kawasaki Trading Co., Ltd. Project Location: Fukushima, Japan Description: Since after the earthquake in Fukushima, Kawasaki has approached Yahgee to quickly establish the temporary housing for workers who were to help to rebuild the destroyed site. This project is divided into 4 stages and the first stage is to occupy 300 workers by providing them the accommodation, canteen, toilets, showers and other facilities. Due to the emergent situation, Yahgee branch has put a great effort to deliver their high quality products within 40 days, and this effort was highly recognized by the Japanese clients. A special documentary video was made by the Japanese representatives to show their appreciation. Volume: 210 Flat-Pack containers No. of People Occupy: 300 Completion: 2014 日本福岛重建项目 JAPAN FUKUSHIMA PROJECT
  • 16. 28 29 折叠箱作为打包箱系列产品之一,同样是一款基于钢结构框架和轻质墙板结构体系的模块化建筑产品。该箱房由中间的一 个整体卫浴箱和两块可折叠顶框、两块可折叠底框、四根角柱以及六块可拆卸、已预装了门窗的墙板组成。 产品规格尺寸为长 5950mm,宽 3300mm,高 2550mm。折叠后长度由 5950mm 变成 2090mm,其他尺寸不变,方便运输,每个 40 尺的集装箱高柜可装入三个折叠箱。 折叠箱不可横向组合或纵向堆叠,只能作为单箱使用。作为预制化建筑中最复杂的卫浴单元部分已在工厂安装完毕,因而 现场施工量少,特别适合工期比较紧迫的场地应用。 As one of the Flat-Pack series products, Folding Box is also designed by using the steel frame and lightweight wall panels system. One Folding Box consists of a bathroom pod, 2 foldable top frames, 2 foldable bottom frames, 4 corner columns and 6 pieces of wall panels with pre-installed doors and windows. The unfolded container is 5950mm in length, 3300mm in width and 2550mm in height. After folding up, the length reduces from 5950mm to 2090mm, the other two figures remain the same. Folding Box is easy for transport that each 40' high-cube shipping container can have 3 of them stored. Folding Box is a stand-alone product, which cannot be combined horizontally or stacked vertically. The bathroom pod, as the most complicated part of the prefab building, is installed in the factory completely, thus to minimize the on-site work and make it a preferable product for the use of any site with very limited delivery time. 产品介绍 PRODUCT INTRODUCTION 技术参数 SPECIFICATION 名称 Item 内容 Details 标准尺寸 Standard Sizes 展开尺寸(长X宽X高) Unfolded Dimensions L5950 x W3300 x H2550mm 折叠尺寸(长X宽X高) Folded Dimensions L2090 x W3300 x H2550mm 建筑材料 Structural Materials 屋面 Roof 复合彩钢大波瓦 Composite color-coated steel roof panels 墙体 Wall 复合彩钢夹芯板 Composite color-coated steel wall panels 地面 Floor 地面基材为纤维水泥板,面材为 PVC 地胶板,PVC 踢脚线 CCA board as base; PVC floor board as finish; PVC kicker board 门窗 Window & Door 室内门木门或复合彩钢夹芯板门;室外门为钢制门; 铝窗推拉窗或塑钢推拉窗 Timber door or composite color-coated sandwich panel door as internal doors; steel panel door as external doors; aluminium or plastic steel sliding windows 室内装饰 Interior Finishing     室内墙角位、天花角位及折叠缝口采用 PVC 扣条修饰 PVC strips as corner capping, cornice & folding gap capping
  • 17. 30 31 安装过程 ASSEMBLING PROCESS 1. 运达目的地 Delivered on site. 2. 展开地面 Unfold the bottom frame. 3. 展开屋面 Lift up the top frame. 4. 安装立柱 Install the corner columns. 5. 从内向外装正面墙板 Install the wall panels from inside towards outside. 6. 角钢固定墙板 Fix wall panels by corner steel pieces. 7. 同样的方法完成另一边墙板 Repeat the same steps for the other side. 8. 安装屋面泛水板 Fix flashing on top of roof. 9. 安装装饰件 Install interior finishing pieces. 10. 完成 Finished.
  • 18. 32 33 雅致厂房 OUR FACTORY 我们为您量身定做符合您需求的产品 WE DESIGN TO SUIT, MAKE TO MEASURE TO MEET YOUR PARTICULAR REQUIREMENTS.