Capacity Planning for PI
Planning
The News Team (Josh Riddell + Alisa Smith)
Agenda
 What is Capacity Planning? page 2
 Benefits and Impact - Alisa page 3
 News App 5.6 - Measure + Analyze – Alisa (1-3) page 4
 Fist of Five Voting page 5
 News App 5.6 Formulate – Alisa (1 + 4) page 6
 Next Steps page 7
 Thank You page 8
2
Benefits and Impact – p. 3
High Quality Work - By understanding the capacity scrum, no matter at what level, one can focus on the highest work priority
and make staff adjustments that would ultimately align with the strategic goals.
Improved forecasting and predictability - Not only to improve performance in their next sprint but to increase
delivery predictability overall.
Committing and delivering - Using data from previous sprints improves commitment confidence, knowing what your team
can deliver in a given period.
Get more done with the same amount of resources - create more value with resources
Better planning - Better planning leads to better anticipation of challenges with regards to resource availability and time
constraints. It further helps optimize resource’ bandwidth, thereby improving commitment and reliability.
Know the demand of resources –this is the process of forecasting shortages or excesses of resources in the short or
long term. It is carried out by analyzing the gaps between the Capacity of resources against the demand for resources.
3
News App 5.6 – Measure + Analyze p. 4
The overarching goal of agile capacity planning is to optimize capacity. As
previously mentioned, this includes effective resource use. Fairly distributed work.
Real time data and better planning.
Here are 6 simple steps to get there:
• 1.Calculate Average Engineer Velocity Per Sprint - - Add up the total individual story
points completed from each sprint, then divide by the number of sprints.
• 2.Compute Team Capacity - Dividing the total Story Points completed by the team by the number of Sprints.
• 3.Determine List of Programs - Preferably 1 month to 15 days before the start of the quarter, provide the
list of programs and their scope to your Engineering Team so they can ask questions and get to know what they are developing.in
advance.
Next is Josh with steps 4 – 6.
4
News App 5.6 Formulate – p. 6
Agile capacity planning involves working out the capacity of your scrum team for a particular sprint - then determining how much of
the product backlog you can expect to complete. There are several tools to use in team capacity, resource allocation, and
determining available resources. These include JIRA, Total Story Points, Capacity Planning Template, Fist of Five Voting,
Engineering T-Shirt Sizing and Velocity Chart.
Here are the steps to loop through to Formulate your Team's Capacity:
1.Review Short List of Programs – Team Capacity Versus Total Story
Points Team velocity is based on actual story points completed in a closed sprint while team's
capacity is based on team's estimated or projected future availability for the next sprint. Review as a
team the selected programs which match your team's capacity.
Next Josh will review a technique for getting feedback or gauging consensus on the short list of programs.
1.Else Trim Program List: - Methods for reducing quarterly workload story
points includes:
I.Remove Some Programs Outright - Eliminating a program from the quarter
based on prioritization and T-shirt size. It will be on priority for the
next quarter.
II.Break a Program into Phases, Try Step I Again - Looking at how to reduce
the scope of a program into completing some for that quarter and
completing some for the next quarter (thus reducing the T-shirt size) LOOK
AT WORD: PHASES
5
Agenda
 What is Agile Capacity Planning? page 3
 Goals of Agile Capacity Planning page 4
 Challenges of Agile Capacity Planning page 5
 News Team Agile Capacity Planning Process page 6
 The Benefits of Agile Capacity Planning page 14
 Agile Capacity Planning Appendix page 15
6
What Is Agile Capacity Planning?
Agile capacity planning involves
working out the capacity of your scrum
team for a particular quarter - then
determining how much of the product
backlog you can expect to complete.
It is sometimes known as capacity-
based quarter planning or commitment-
based quarter planning.
7
Goals of Agile Capacity Planning
The outcome of Agile capacity planning isn’t simply
to know how much capacity you have. It’s about
knowing how much you can realistically commit to
delivering within the timeframe. And that’s not just
about people x time.
It’s about keeping resources optimally engaged to
deliver their best work - so they can create
functionality that delights your customers and users.
8
Challenges + Impact of Agile Capacity Planning
9
Finance
• Revenue Recognition for 1.0 – Issue first noticed on Feb 13th 2023
• Revenue Recognition – Bulk testing not started
•Resources, Collaboration & Priorities
EBS SME / Support – Hiring done( Onboarding April 24th )
•Sales Commitment & Comfort level for Bulk
News Team Agile Capacity Planning
10
Agile Capacity Planning is as simple as 1-2-3.
1. Determine your team average sprint
velocity (looking via JIRA Velocity Chart).
2. Determine your team quarterly capacity
(via Story Points) including removing 20%
to account for unknowns.
3. Determine your quarterly workload story
points (taking into consideration the
following T-Shirt Sizes to Story Points |
News Team uses the mid point of Story
Points listed):
News Team Agile Capacity Planning
11
News Team Agile Capacity Planning – Reduce
Workload
12
News Team Agile Capacity Planning – Fist of
Five Voting
13
News Team Agile Capacity Planning
Once your team reaches 80% Consensus Confidence Level, your
workload can be committed to and your capacity planning is done.
14
News Team Agile Capacity Planning - Example
• For example, for 5.6 PI Planning, News Team knew our quarterly
capacity and measured our T-Shirt Sizes into Story Points. We
determined our team quarterly capacity vs our quarterly workload
story points as measured here (the template will automatically
recommend if you should increase demand or increase capacity):
15
News Team Agile Capacity Planning - Example
• We had 5 Members and when doing the Fist of Five Voting News
Team needed a 4.0 or higher final vote from the following
options:
16
News Team Agile Capacity Planning - Example
17
The Benefits of Agile Capacity Planning
18
Agile Capacity Planning Appendix
 On Page 6, Velocity Chart Velocity Chart
 On Page 7, Engineering T-Shirt Sizing Engineering T-Shirt Sizing
 On Page 11, Capacity Planning Template
NT&ARM-Capacity-Planning-Template_Google-Sheet.xlsx
 On Page 12, "Fist of Five Voting"
Cast your vote using fist of five tool at Agilebin.com
Fist of Five Manual Process
19
Thank You
Feedback

Más contenido relacionado

Similar a Walkthrough - Capacity Planning for PI Planning (1).pptx

GIP - Backwards planning & strategy planning tier 1
GIP - Backwards planning & strategy planning tier 1GIP - Backwards planning & strategy planning tier 1
GIP - Backwards planning & strategy planning tier 1
AIESEC
 
GIP - Backwards Planning & Strategy Planning Tier 1
GIP - Backwards Planning & Strategy Planning Tier 1GIP - Backwards Planning & Strategy Planning Tier 1
GIP - Backwards Planning & Strategy Planning Tier 1
AIESEC
 
Workforce Planning Overview Workshop Presentation
Workforce Planning Overview Workshop PresentationWorkforce Planning Overview Workshop Presentation
Workforce Planning Overview Workshop Presentation
Julie Lee
 
GIP - Backwards planning & strategy planning Tier 2
GIP - Backwards planning & strategy planning Tier 2GIP - Backwards planning & strategy planning Tier 2
GIP - Backwards planning & strategy planning Tier 2
AIESEC
 
GIP - Backwards planning & strategy planning Tier 3
GIP - Backwards planning & strategy planning Tier 3GIP - Backwards planning & strategy planning Tier 3
GIP - Backwards planning & strategy planning Tier 3
AIESEC
 
GIP - Backwards planning & strategy planning tier 2
GIP - Backwards planning & strategy planning tier 2GIP - Backwards planning & strategy planning tier 2
GIP - Backwards planning & strategy planning tier 2
AIESEC
 
GIP - Backwards planning & strategy planning tier 3
GIP - Backwards planning & strategy planning tier 3GIP - Backwards planning & strategy planning tier 3
GIP - Backwards planning & strategy planning tier 3
AIESEC
 
Man power planning
Man power planningMan power planning
Man power planning
SchemaHealth
 

Similar a Walkthrough - Capacity Planning for PI Planning (1).pptx (20)

Agile planning
Agile planningAgile planning
Agile planning
 
AIESEC | Italy 1415 | MC | Planning Guide
AIESEC | Italy 1415 | MC | Planning GuideAIESEC | Italy 1415 | MC | Planning Guide
AIESEC | Italy 1415 | MC | Planning Guide
 
GIP - Backwards planning & strategy planning tier 1
GIP - Backwards planning & strategy planning tier 1GIP - Backwards planning & strategy planning tier 1
GIP - Backwards planning & strategy planning tier 1
 
GIP - Backwards Planning & Strategy Planning Tier 1
GIP - Backwards Planning & Strategy Planning Tier 1GIP - Backwards Planning & Strategy Planning Tier 1
GIP - Backwards Planning & Strategy Planning Tier 1
 
Workforce Planning Overview Workshop Presentation
Workforce Planning Overview Workshop PresentationWorkforce Planning Overview Workshop Presentation
Workforce Planning Overview Workshop Presentation
 
GIP - Backwards planning & strategy planning Tier 2
GIP - Backwards planning & strategy planning Tier 2GIP - Backwards planning & strategy planning Tier 2
GIP - Backwards planning & strategy planning Tier 2
 
GIP - Backwards planning & strategy planning Tier 3
GIP - Backwards planning & strategy planning Tier 3GIP - Backwards planning & strategy planning Tier 3
GIP - Backwards planning & strategy planning Tier 3
 
GIP - Backwards planning & strategy planning tier 2
GIP - Backwards planning & strategy planning tier 2GIP - Backwards planning & strategy planning tier 2
GIP - Backwards planning & strategy planning tier 2
 
GIP - Backwards planning & strategy planning tier 3
GIP - Backwards planning & strategy planning tier 3GIP - Backwards planning & strategy planning tier 3
GIP - Backwards planning & strategy planning tier 3
 
Kapanowski FINAL_CIPL
Kapanowski FINAL_CIPLKapanowski FINAL_CIPL
Kapanowski FINAL_CIPL
 
Creating a Talent Acquisition Roadmap
Creating a Talent Acquisition RoadmapCreating a Talent Acquisition Roadmap
Creating a Talent Acquisition Roadmap
 
Develop work priorities
Develop work prioritiesDevelop work priorities
Develop work priorities
 
People Metrics: How to Use Team Data to Produce Positive Change
People Metrics: How to Use Team Data to Produce Positive ChangePeople Metrics: How to Use Team Data to Produce Positive Change
People Metrics: How to Use Team Data to Produce Positive Change
 
Why Our Inbound Marketing Agency went "All In" with Agile
Why Our Inbound Marketing Agency went "All In" with AgileWhy Our Inbound Marketing Agency went "All In" with Agile
Why Our Inbound Marketing Agency went "All In" with Agile
 
What is master production schedule
What is master production scheduleWhat is master production schedule
What is master production schedule
 
How to Evaluate Your Affirmative Action Program's Audit Readiness
How to Evaluate Your Affirmative Action Program's Audit ReadinessHow to Evaluate Your Affirmative Action Program's Audit Readiness
How to Evaluate Your Affirmative Action Program's Audit Readiness
 
Software Project Management
Software Project ManagementSoftware Project Management
Software Project Management
 
Man power planning
Man power planningMan power planning
Man power planning
 
Brennan "Planning & Budgeting"
Brennan "Planning & Budgeting"Brennan "Planning & Budgeting"
Brennan "Planning & Budgeting"
 
Mortfolio v8
Mortfolio v8Mortfolio v8
Mortfolio v8
 

Último

Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 

Último (20)

Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 

Walkthrough - Capacity Planning for PI Planning (1).pptx

  • 1. Confidential and proprietary information. Do not distribute. ® 2021 Business Wire, Inc. Capacity Planning for PI Planning The News Team (Josh Riddell + Alisa Smith)
  • 2. Agenda  What is Capacity Planning? page 2  Benefits and Impact - Alisa page 3  News App 5.6 - Measure + Analyze – Alisa (1-3) page 4  Fist of Five Voting page 5  News App 5.6 Formulate – Alisa (1 + 4) page 6  Next Steps page 7  Thank You page 8 2
  • 3. Benefits and Impact – p. 3 High Quality Work - By understanding the capacity scrum, no matter at what level, one can focus on the highest work priority and make staff adjustments that would ultimately align with the strategic goals. Improved forecasting and predictability - Not only to improve performance in their next sprint but to increase delivery predictability overall. Committing and delivering - Using data from previous sprints improves commitment confidence, knowing what your team can deliver in a given period. Get more done with the same amount of resources - create more value with resources Better planning - Better planning leads to better anticipation of challenges with regards to resource availability and time constraints. It further helps optimize resource’ bandwidth, thereby improving commitment and reliability. Know the demand of resources –this is the process of forecasting shortages or excesses of resources in the short or long term. It is carried out by analyzing the gaps between the Capacity of resources against the demand for resources. 3
  • 4. News App 5.6 – Measure + Analyze p. 4 The overarching goal of agile capacity planning is to optimize capacity. As previously mentioned, this includes effective resource use. Fairly distributed work. Real time data and better planning. Here are 6 simple steps to get there: • 1.Calculate Average Engineer Velocity Per Sprint - - Add up the total individual story points completed from each sprint, then divide by the number of sprints. • 2.Compute Team Capacity - Dividing the total Story Points completed by the team by the number of Sprints. • 3.Determine List of Programs - Preferably 1 month to 15 days before the start of the quarter, provide the list of programs and their scope to your Engineering Team so they can ask questions and get to know what they are developing.in advance. Next is Josh with steps 4 – 6. 4
  • 5. News App 5.6 Formulate – p. 6 Agile capacity planning involves working out the capacity of your scrum team for a particular sprint - then determining how much of the product backlog you can expect to complete. There are several tools to use in team capacity, resource allocation, and determining available resources. These include JIRA, Total Story Points, Capacity Planning Template, Fist of Five Voting, Engineering T-Shirt Sizing and Velocity Chart. Here are the steps to loop through to Formulate your Team's Capacity: 1.Review Short List of Programs – Team Capacity Versus Total Story Points Team velocity is based on actual story points completed in a closed sprint while team's capacity is based on team's estimated or projected future availability for the next sprint. Review as a team the selected programs which match your team's capacity. Next Josh will review a technique for getting feedback or gauging consensus on the short list of programs. 1.Else Trim Program List: - Methods for reducing quarterly workload story points includes: I.Remove Some Programs Outright - Eliminating a program from the quarter based on prioritization and T-shirt size. It will be on priority for the next quarter. II.Break a Program into Phases, Try Step I Again - Looking at how to reduce the scope of a program into completing some for that quarter and completing some for the next quarter (thus reducing the T-shirt size) LOOK AT WORD: PHASES 5
  • 6. Agenda  What is Agile Capacity Planning? page 3  Goals of Agile Capacity Planning page 4  Challenges of Agile Capacity Planning page 5  News Team Agile Capacity Planning Process page 6  The Benefits of Agile Capacity Planning page 14  Agile Capacity Planning Appendix page 15 6
  • 7. What Is Agile Capacity Planning? Agile capacity planning involves working out the capacity of your scrum team for a particular quarter - then determining how much of the product backlog you can expect to complete. It is sometimes known as capacity- based quarter planning or commitment- based quarter planning. 7
  • 8. Goals of Agile Capacity Planning The outcome of Agile capacity planning isn’t simply to know how much capacity you have. It’s about knowing how much you can realistically commit to delivering within the timeframe. And that’s not just about people x time. It’s about keeping resources optimally engaged to deliver their best work - so they can create functionality that delights your customers and users. 8
  • 9. Challenges + Impact of Agile Capacity Planning 9 Finance • Revenue Recognition for 1.0 – Issue first noticed on Feb 13th 2023 • Revenue Recognition – Bulk testing not started •Resources, Collaboration & Priorities EBS SME / Support – Hiring done( Onboarding April 24th ) •Sales Commitment & Comfort level for Bulk
  • 10. News Team Agile Capacity Planning 10 Agile Capacity Planning is as simple as 1-2-3. 1. Determine your team average sprint velocity (looking via JIRA Velocity Chart). 2. Determine your team quarterly capacity (via Story Points) including removing 20% to account for unknowns. 3. Determine your quarterly workload story points (taking into consideration the following T-Shirt Sizes to Story Points | News Team uses the mid point of Story Points listed):
  • 11. News Team Agile Capacity Planning 11
  • 12. News Team Agile Capacity Planning – Reduce Workload 12
  • 13. News Team Agile Capacity Planning – Fist of Five Voting 13
  • 14. News Team Agile Capacity Planning Once your team reaches 80% Consensus Confidence Level, your workload can be committed to and your capacity planning is done. 14
  • 15. News Team Agile Capacity Planning - Example • For example, for 5.6 PI Planning, News Team knew our quarterly capacity and measured our T-Shirt Sizes into Story Points. We determined our team quarterly capacity vs our quarterly workload story points as measured here (the template will automatically recommend if you should increase demand or increase capacity): 15
  • 16. News Team Agile Capacity Planning - Example • We had 5 Members and when doing the Fist of Five Voting News Team needed a 4.0 or higher final vote from the following options: 16
  • 17. News Team Agile Capacity Planning - Example 17
  • 18. The Benefits of Agile Capacity Planning 18
  • 19. Agile Capacity Planning Appendix  On Page 6, Velocity Chart Velocity Chart  On Page 7, Engineering T-Shirt Sizing Engineering T-Shirt Sizing  On Page 11, Capacity Planning Template NT&ARM-Capacity-Planning-Template_Google-Sheet.xlsx  On Page 12, "Fist of Five Voting" Cast your vote using fist of five tool at Agilebin.com Fist of Five Manual Process 19