2. We are expert in Passive Fire Protection
Chúng tôi là chuyên gia chống cháy thụ động
Kho bạc nhà nước
State Treasury
Bộ Thương mại
Ministry of Commerce
Tập đoàn Bảo Việt
Bao Viet Insurance Corp
Tòa nhà HUD
HUD Tower
Tổ hợp lọc hóa dầu Nghi Sơn
Nghi Son Refinery and Petrochem
3. HUD TOWER
• Project Brief
• Fire Test
• Wiremeshing Works
• Sprayed Fireproofing
4. HUD TOWER – Project Brief
• Twin tower, 28 + 34 floors
• Steel structure to connect 2 buildings
• 13,000sqm of fireproofing SFRM
• FRL: 2hrs
• Fire test of real beam 1:1 to actual size, IBST, 132
minutes
5. Fire Test Model with 1:1 scale
Lowering 6m beam to the oven by crane IBST Fire Testing Oven
Test beam
on top =>
Test beam lowering
on top of the oven
6. Fire Test (con’t)
Central Control Cabin
Fire burning inside Oven
Beam settled inside Oven before enclosing
7. Fire Test Excellent Performance
Temperature sensors & Fire monitoring Fire test curve – temperature and time
Measuring temp by 26
sensors installed on
the tested beam
Gas controled followed
ISO fire curve
10. NSRP
• Project Brief
• Overall Fireproofing Work
• Training / HSSE / QC
• Fireproofing Work at Job-site
11. NSRP – Nghi Son Refinery and
Petrochem Complex
• Hydrocarbon fireproofing, 35mm SFRM for 2hrs FRL
• FSV’s contract with JGCS: 43,000 sqm
• Four Putzmeister SP11 were mobilized.
13. FSV’s Safety Training at NSRP
FSV’s personel including Australian
experts at training facility S.T.A.R.T and Work Permit approval
14. Finished SFRM
QC done for every steel member Fireproofing done for vessel
Fireproofing done for AFC
Fireproofing done for steel structure
Sprayer with coverall PPE