Driscoll Expansion:
What Is Going On?

Brookline Advisors
C O N F I D E N T I A L

Key Sections
•

What is the Current Plan?

•

How Did We Get Here?

•

How Will This Impact My Kids?
– School Growth Impact
– Playground/Green Space Impact
– Funding Impact

•

What Can We Afford?

•

What‟s Next?

•

How Can Parents Get Involved?

•

Meet the Author

2
C O N F I D E N T I A L

What is the Current Plan?
•

The current plan is to expand Driscoll to 4 sections per grade, adding 200
students1

– Represents a 56% increase from 2010 school size (479 to 747)
•

“Expand In Place” makes no provision for increasing the school footprint along
with student population
– No details have been offered on how more students will be accommodated on the
site
– No details have been provided on how shared spaces will be grossed up for added
population

•

„Expand in Place” is inconsistent with prior District and Driscoll additions
– The 1950‟s Driscoll expansion was built on additional land purchased by the town;
there is no such provision in current plan
– No exact analysis has been published, but using BSPACE‟s own data the plan will
result in far higher students/acre of play space than anywhere else in the district
(see page 8)
1. HMFH B-SPACE Final Report, August 2013
3
C O N F I D E N T I A L

How Did We Get Here?
•

“Expand in Place” is a major diversion from B-SPACE‟s (Brookline School
Population & Capacity Exploration) original plan

•

In April 2013, B-SPACE issued a report listing the three options “best matched
with the expressed objectives and constraints”1
– “3+HS Expand In Place” was not on the list
– A Driscoll expansion, let alone a very large one, was not on the list

•

B-SPACE‟s final recommendations dropped all three vetted options and
recommended the new “Expand in Place” plan
– Final recommendation is the most expensive plan at $250MM2
– Key committee members already have said this estimate is low for what they have
proposed – even with no provision for an anticipated Pierce rebuild/expansion
– B-SPACE did not recommend a full renovation for Driscoll
– SC Capital Sub Committee has recommended a “full renovation” but provided no
cost analysis or funding commitment in support of such a plan3

1. B-SPACE New School Options-FAQ-4.2.13, p.4
2. B-Space Final Report, 9/5/13, p41
3. Capital Sub-Committee of the Brookline School Committee, Proposal for School Expansion, 9/6/13 p.2
4
C O N F I D E N T I A L

How Will An Expansion Impact My Kids? – Disproportionate Growth
•

Driscoll‟s growth has been in line with the district but the planned expansion is
not

Population Growth
Driscoll

Town Avg Ex Driscoll

60%

56%

50%
40%
30%
20%
10%

18%
14%
8%

0%
'10-Current

Current - Proposed

Source: HMFH BSPACE Final Report, August 2013
5
C O N F I D E N T I A L

How Will An Expansion Impact My Kids? – Least Green Space In Town
•

Playground space per student is already below average and will get much worse
pro forma for growth

Kids/Playground Acre
Driscoll

Town Avg Ex Driscoll

250

228

200
150

129

119

107

100
50
2010

Proposed

Source: HMFH BSPACE Final Report, August 2013; square footage grown pro rata for existing sq ft/student at expanding schools
6
C O N F I D E N T I A L

How Will An Expansion Impact My Kids? – Low Investment
•

Current budget projections for Driscoll seem low compared to Devotion

Brookline Public School Site
K‐8 ‐ Current
Devotion School
Driscoll School

Current
2010 Student Student
Population Population
(MSBA)
(HMFH)
726
479

Proposed
Enrollement
Increase
(BSPACE)

821
547

Current
Bldg. sf

0
200

162,000
90,292

Capital
Spend
($MM)
(OAC
Study)

Added
Enrollment $ Per
2010Added
BSPACE
Enrollment
90
30

95
268

Implied Devo/Driscoll Spend per seat:

947,368
111,940
8.5x

Sources: HMFH BSPACE Final Report, August 2013; capital spend comes from Deputy Town Administrator presentation to
Override Study Committee, 10/18/13
7
C O N F I D E N T I A L

What Can We Afford?
•

Any capital plan will require funding from new debt, state aid, and quite likely one
or more tax rate increase overrides
– No specific funding plan has yet been developed
– No specific capital plan has yet been developed

•

“No one is in a position to promise Driscoll anything” - Chair of the Capital
Subcommittee of the Advisory Board
– There is no assurance of any kind of renovation
– There is no assurance that any specific student/facility ratios will be maintained

•

Any plan to do more than add classrooms at Driscoll will have to compete with
many other capital priorities
– Master plan for school growth yet to be defined
– Town has large unfunded Pension and OPEB liabilities
– Town has substantial non-school capital improvement needs

8
C O N F I D E N T I A L

Driscoll Growth is Full Steam Ahead – Feasibility, Funding are Not
•

Driscoll mega- growth is going forward without any practical assurances for the
community
– Nearly all practical questions have been answered with „we’re not at that stage yet‟

•

$30MM figure for sizeable expansion sounds low to architects and planners we
have consulted and is based on the Runkle budget which was a renovation, not a
200 seat expansion and renovation

•

Though very few specifics have been offered a Driscoll expansion is considered a
„done deal‟
– No feasibility study has yet been undertaken
– Very few numbers have been published by any committee or department
– …Yet project is a „done deal‟ in the eyes of key committees

No One Advocating For Driscoll Growth Has Guaranteed A Quality Outcome
Driscoll Should Know What It Is Getting/Not Getting Before A Project Is
Greenlighted, Not After
9
C O N F I D E N T I A L

What‟s Next?
•

The Superintendent of Schools will submit a Statement of Interest to the MSBA
seeking state aid for a Driscoll expansion in Q1 2014
– DSCAC has asked that the Driscoll Community be involved in this proposal and
offered to provide a professional capital needs analysis for free
– 11/5/13 response from School Committee essentially declined both proposals1

•

The Driscoll Community should receive assurances that any growth plan provide
adequately for:

– Green space consistent with existing resource/student ratios
– Common space expansion consistent with existing resource/student ratios
– Expansion spend consistent with Devotion spend

Establishing key ratios before an SOI is submitted and in all subsequent
expansion documents seems like a key minimum protection for Driscoll‟s
interests
1. Letter from Chairman Morse to DSCAC, 11/6/13
10
C O N F I D E N T I A L

What Can Interested Parents Do?
•
•

Fill out online survey so we can aggregate Parent sentiment and priorities
Attend key committee meetings
– Override Study Committee and its sub committees
– Capital Sub Committee of the Advisory Board
– School Committee
– School Committee Capital Sub Committee

•

– Sign up for meeting notices at BrookOnLine1
Ask Questions
– Contact committee members

•

– Contact Town Meeting Members; 4 Town Meeting districts send students to Driscoll
accounting for ~ 25% of all TMMs
Make contact with other engaged parents
– Driscollaction.com
– https://www.facebook.com/groups/BrooklineNewSchool/
– Driscollexpansion.org

1.http://www.brooklinema.gov/index.php?option=com_content&view=article&id=1200&Itemid=1497
11
C O N F I D E N T I A L

About the Author

•

•

•

•

Hello, my name is Sundar Srinivasan. I am a Driscoll Parent and the
husband of a BHS and Devotion alum. I volunteered to be the
‘Community Representative on the Driscoll Expansion Project’
because I wanted to find out more about the proposed plans and how
they will impact Driscoll, our town and our pocketbooks. I have no preconceived notions or agenda other than wanting to make sure any
proposed plan is reasonable and realistic.
You can reach me at sundar@driscollexpansion.org or look for me
most mornings at drop off on the west side of the school. Feel free to
stop me with any questions or ideas.
This document is meant to provide parents with information about
where things stand, key known‟s and unknown‟s, and ways to find out
more on your own.
Also attached is a survey about the project. By polling the community
we can quantify what people care about and what they do not.

12

Más contenido relacionado

Similar a What's going on with the driscoll expansion 11 18 13

The Local Control Funding Formula: Opportunities for Advancing STEM Learning
The Local Control Funding Formula: Opportunities for Advancing STEM LearningThe Local Control Funding Formula: Opportunities for Advancing STEM Learning
The Local Control Funding Formula: Opportunities for Advancing STEM LearningCalifornia STEM Learning Network
 
Success Collective Impact Improves Education Gaps_EC_Final (1).pptx
Success Collective Impact Improves Education Gaps_EC_Final (1).pptxSuccess Collective Impact Improves Education Gaps_EC_Final (1).pptx
Success Collective Impact Improves Education Gaps_EC_Final (1).pptxRILearn
 
Holyoke Two Middle Schools Proposal
Holyoke Two Middle Schools ProposalHolyoke Two Middle Schools Proposal
Holyoke Two Middle Schools Proposalyestoinvest
 
Title I and Schoolwide Plans in Rising Star Presentation for IATD
Title I and Schoolwide Plans in Rising Star Presentation for IATDTitle I and Schoolwide Plans in Rising Star Presentation for IATD
Title I and Schoolwide Plans in Rising Star Presentation for IATDMarie A. Nolen, M.Ed
 
Hermosa Beach School District Long Range Facilities Master Plan
Hermosa Beach School District Long Range Facilities Master PlanHermosa Beach School District Long Range Facilities Master Plan
Hermosa Beach School District Long Range Facilities Master Planhermosahero
 
CELCIS Education Forum October 2018
CELCIS Education Forum October 2018CELCIS Education Forum October 2018
CELCIS Education Forum October 2018CELCIS
 
CSBA UTK Webinar Main PPT.pptx
CSBA UTK Webinar Main PPT.pptxCSBA UTK Webinar Main PPT.pptx
CSBA UTK Webinar Main PPT.pptxDebendraDevKhanal1
 
Bloxham N.P. - What you told us - June 2014
Bloxham N.P. - What you told us - June 2014Bloxham N.P. - What you told us - June 2014
Bloxham N.P. - What you told us - June 2014John Groves
 
USD 497 Budget Savings Recommendations
USD 497 Budget Savings RecommendationsUSD 497 Budget Savings Recommendations
USD 497 Budget Savings RecommendationsLHSBudget
 
Yab workshop 3 4 11(2).key
Yab workshop 3 4 11(2).keyYab workshop 3 4 11(2).key
Yab workshop 3 4 11(2).keyJennifer Howell
 
Educational Visioning: Defining Next Educational Practices + Facilities Supp...
Educational Visioning: Defining Next Educational Practices + Facilities Supp...Educational Visioning: Defining Next Educational Practices + Facilities Supp...
Educational Visioning: Defining Next Educational Practices + Facilities Supp...OHM Advisors
 
Pat Ashley NC Turnaround Efforts
Pat Ashley NC Turnaround EffortsPat Ashley NC Turnaround Efforts
Pat Ashley NC Turnaround EffortsEducationNC
 
President-Principal Model Presentation
President-Principal Model PresentationPresident-Principal Model Presentation
President-Principal Model PresentationXavier High School
 
Norwalk town hall faq answered3.12.14[1]
Norwalk town hall faq answered3.12.14[1]Norwalk town hall faq answered3.12.14[1]
Norwalk town hall faq answered3.12.14[1]Tim Scholefield
 
Norwalk town hall faq answered3.12.14[1]
Norwalk town hall faq answered3.12.14[1]Norwalk town hall faq answered3.12.14[1]
Norwalk town hall faq answered3.12.14[1]Tim Scholefield
 

Similar a What's going on with the driscoll expansion 11 18 13 (20)

CEO Update (July 11, 2014)
CEO Update (July 11, 2014)CEO Update (July 11, 2014)
CEO Update (July 11, 2014)
 
The Local Control Funding Formula: Opportunities for Advancing STEM Learning
The Local Control Funding Formula: Opportunities for Advancing STEM LearningThe Local Control Funding Formula: Opportunities for Advancing STEM Learning
The Local Control Funding Formula: Opportunities for Advancing STEM Learning
 
Success Collective Impact Improves Education Gaps_EC_Final (1).pptx
Success Collective Impact Improves Education Gaps_EC_Final (1).pptxSuccess Collective Impact Improves Education Gaps_EC_Final (1).pptx
Success Collective Impact Improves Education Gaps_EC_Final (1).pptx
 
Holyoke Two Middle Schools Proposal
Holyoke Two Middle Schools ProposalHolyoke Two Middle Schools Proposal
Holyoke Two Middle Schools Proposal
 
Fall Regional
Fall Regional Fall Regional
Fall Regional
 
Title I and Schoolwide Plans in Rising Star Presentation for IATD
Title I and Schoolwide Plans in Rising Star Presentation for IATDTitle I and Schoolwide Plans in Rising Star Presentation for IATD
Title I and Schoolwide Plans in Rising Star Presentation for IATD
 
Hermosa Beach School District Long Range Facilities Master Plan
Hermosa Beach School District Long Range Facilities Master PlanHermosa Beach School District Long Range Facilities Master Plan
Hermosa Beach School District Long Range Facilities Master Plan
 
CELCIS Education Forum October 2018
CELCIS Education Forum October 2018CELCIS Education Forum October 2018
CELCIS Education Forum October 2018
 
Carlisle 11-19
Carlisle 11-19Carlisle 11-19
Carlisle 11-19
 
CSBA UTK Webinar Main PPT.pptx
CSBA UTK Webinar Main PPT.pptxCSBA UTK Webinar Main PPT.pptx
CSBA UTK Webinar Main PPT.pptx
 
Bloxham N.P. - What you told us - June 2014
Bloxham N.P. - What you told us - June 2014Bloxham N.P. - What you told us - June 2014
Bloxham N.P. - What you told us - June 2014
 
USD 497 Budget Savings Recommendations
USD 497 Budget Savings RecommendationsUSD 497 Budget Savings Recommendations
USD 497 Budget Savings Recommendations
 
Yab workshop 3 4 11(2).key
Yab workshop 3 4 11(2).keyYab workshop 3 4 11(2).key
Yab workshop 3 4 11(2).key
 
Yield Factor
Yield Factor Yield Factor
Yield Factor
 
Educational Visioning: Defining Next Educational Practices + Facilities Supp...
Educational Visioning: Defining Next Educational Practices + Facilities Supp...Educational Visioning: Defining Next Educational Practices + Facilities Supp...
Educational Visioning: Defining Next Educational Practices + Facilities Supp...
 
AACC Federal Legislative Update Webinar July 31, 2012
AACC Federal Legislative Update Webinar July 31, 2012AACC Federal Legislative Update Webinar July 31, 2012
AACC Federal Legislative Update Webinar July 31, 2012
 
Pat Ashley NC Turnaround Efforts
Pat Ashley NC Turnaround EffortsPat Ashley NC Turnaround Efforts
Pat Ashley NC Turnaround Efforts
 
President-Principal Model Presentation
President-Principal Model PresentationPresident-Principal Model Presentation
President-Principal Model Presentation
 
Norwalk town hall faq answered3.12.14[1]
Norwalk town hall faq answered3.12.14[1]Norwalk town hall faq answered3.12.14[1]
Norwalk town hall faq answered3.12.14[1]
 
Norwalk town hall faq answered3.12.14[1]
Norwalk town hall faq answered3.12.14[1]Norwalk town hall faq answered3.12.14[1]
Norwalk town hall faq answered3.12.14[1]
 

Último

ERP Contender Series: Acumatica vs. Sage Intacct
ERP Contender Series: Acumatica vs. Sage IntacctERP Contender Series: Acumatica vs. Sage Intacct
ERP Contender Series: Acumatica vs. Sage IntacctBrainSell Technologies
 
Hyatt driving innovation and exceptional customer experiences with FIDO passw...
Hyatt driving innovation and exceptional customer experiences with FIDO passw...Hyatt driving innovation and exceptional customer experiences with FIDO passw...
Hyatt driving innovation and exceptional customer experiences with FIDO passw...FIDO Alliance
 
State of the Smart Building Startup Landscape 2024!
State of the Smart Building Startup Landscape 2024!State of the Smart Building Startup Landscape 2024!
State of the Smart Building Startup Landscape 2024!Memoori
 
Extensible Python: Robustness through Addition - PyCon 2024
Extensible Python: Robustness through Addition - PyCon 2024Extensible Python: Robustness through Addition - PyCon 2024
Extensible Python: Robustness through Addition - PyCon 2024Patrick Viafore
 
Design Guidelines for Passkeys 2024.pptx
Design Guidelines for Passkeys 2024.pptxDesign Guidelines for Passkeys 2024.pptx
Design Guidelines for Passkeys 2024.pptxFIDO Alliance
 
Easier, Faster, and More Powerful – Notes Document Properties Reimagined
Easier, Faster, and More Powerful – Notes Document Properties ReimaginedEasier, Faster, and More Powerful – Notes Document Properties Reimagined
Easier, Faster, and More Powerful – Notes Document Properties Reimaginedpanagenda
 
TEST BANK For, Information Technology Project Management 9th Edition Kathy Sc...
TEST BANK For, Information Technology Project Management 9th Edition Kathy Sc...TEST BANK For, Information Technology Project Management 9th Edition Kathy Sc...
TEST BANK For, Information Technology Project Management 9th Edition Kathy Sc...marcuskenyatta275
 
How we scaled to 80K users by doing nothing!.pdf
How we scaled to 80K users by doing nothing!.pdfHow we scaled to 80K users by doing nothing!.pdf
How we scaled to 80K users by doing nothing!.pdfSrushith Repakula
 
WebRTC and SIP not just audio and video @ OpenSIPS 2024
WebRTC and SIP not just audio and video @ OpenSIPS 2024WebRTC and SIP not just audio and video @ OpenSIPS 2024
WebRTC and SIP not just audio and video @ OpenSIPS 2024Lorenzo Miniero
 
(Explainable) Data-Centric AI: what are you explaininhg, and to whom?
(Explainable) Data-Centric AI: what are you explaininhg, and to whom?(Explainable) Data-Centric AI: what are you explaininhg, and to whom?
(Explainable) Data-Centric AI: what are you explaininhg, and to whom?Paolo Missier
 
Long journey of Ruby Standard library at RubyKaigi 2024
Long journey of Ruby Standard library at RubyKaigi 2024Long journey of Ruby Standard library at RubyKaigi 2024
Long journey of Ruby Standard library at RubyKaigi 2024Hiroshi SHIBATA
 
AI mind or machine power point presentation
AI mind or machine power point presentationAI mind or machine power point presentation
AI mind or machine power point presentationyogeshlabana357357
 
Secure Zero Touch enabled Edge compute with Dell NativeEdge via FDO _ Brad at...
Secure Zero Touch enabled Edge compute with Dell NativeEdge via FDO _ Brad at...Secure Zero Touch enabled Edge compute with Dell NativeEdge via FDO _ Brad at...
Secure Zero Touch enabled Edge compute with Dell NativeEdge via FDO _ Brad at...FIDO Alliance
 
ASRock Industrial FDO Solutions in Action for Industrial Edge AI _ Kenny at A...
ASRock Industrial FDO Solutions in Action for Industrial Edge AI _ Kenny at A...ASRock Industrial FDO Solutions in Action for Industrial Edge AI _ Kenny at A...
ASRock Industrial FDO Solutions in Action for Industrial Edge AI _ Kenny at A...FIDO Alliance
 
Linux Foundation Edge _ Overview of FDO Software Components _ Randy at Intel.pdf
Linux Foundation Edge _ Overview of FDO Software Components _ Randy at Intel.pdfLinux Foundation Edge _ Overview of FDO Software Components _ Randy at Intel.pdf
Linux Foundation Edge _ Overview of FDO Software Components _ Randy at Intel.pdfFIDO Alliance
 
Google I/O Extended 2024 Warsaw
Google I/O Extended 2024 WarsawGoogle I/O Extended 2024 Warsaw
Google I/O Extended 2024 WarsawGDSC PJATK
 
Where to Learn More About FDO _ Richard at FIDO Alliance.pdf
Where to Learn More About FDO _ Richard at FIDO Alliance.pdfWhere to Learn More About FDO _ Richard at FIDO Alliance.pdf
Where to Learn More About FDO _ Richard at FIDO Alliance.pdfFIDO Alliance
 
Choosing the Right FDO Deployment Model for Your Application _ Geoffrey at In...
Choosing the Right FDO Deployment Model for Your Application _ Geoffrey at In...Choosing the Right FDO Deployment Model for Your Application _ Geoffrey at In...
Choosing the Right FDO Deployment Model for Your Application _ Geoffrey at In...FIDO Alliance
 
TopCryptoSupers 12thReport OrionX May2024
TopCryptoSupers 12thReport OrionX May2024TopCryptoSupers 12thReport OrionX May2024
TopCryptoSupers 12thReport OrionX May2024Stephen Perrenod
 

Último (20)

ERP Contender Series: Acumatica vs. Sage Intacct
ERP Contender Series: Acumatica vs. Sage IntacctERP Contender Series: Acumatica vs. Sage Intacct
ERP Contender Series: Acumatica vs. Sage Intacct
 
Hyatt driving innovation and exceptional customer experiences with FIDO passw...
Hyatt driving innovation and exceptional customer experiences with FIDO passw...Hyatt driving innovation and exceptional customer experiences with FIDO passw...
Hyatt driving innovation and exceptional customer experiences with FIDO passw...
 
State of the Smart Building Startup Landscape 2024!
State of the Smart Building Startup Landscape 2024!State of the Smart Building Startup Landscape 2024!
State of the Smart Building Startup Landscape 2024!
 
Overview of Hyperledger Foundation
Overview of Hyperledger FoundationOverview of Hyperledger Foundation
Overview of Hyperledger Foundation
 
Extensible Python: Robustness through Addition - PyCon 2024
Extensible Python: Robustness through Addition - PyCon 2024Extensible Python: Robustness through Addition - PyCon 2024
Extensible Python: Robustness through Addition - PyCon 2024
 
Design Guidelines for Passkeys 2024.pptx
Design Guidelines for Passkeys 2024.pptxDesign Guidelines for Passkeys 2024.pptx
Design Guidelines for Passkeys 2024.pptx
 
Easier, Faster, and More Powerful – Notes Document Properties Reimagined
Easier, Faster, and More Powerful – Notes Document Properties ReimaginedEasier, Faster, and More Powerful – Notes Document Properties Reimagined
Easier, Faster, and More Powerful – Notes Document Properties Reimagined
 
TEST BANK For, Information Technology Project Management 9th Edition Kathy Sc...
TEST BANK For, Information Technology Project Management 9th Edition Kathy Sc...TEST BANK For, Information Technology Project Management 9th Edition Kathy Sc...
TEST BANK For, Information Technology Project Management 9th Edition Kathy Sc...
 
How we scaled to 80K users by doing nothing!.pdf
How we scaled to 80K users by doing nothing!.pdfHow we scaled to 80K users by doing nothing!.pdf
How we scaled to 80K users by doing nothing!.pdf
 
WebRTC and SIP not just audio and video @ OpenSIPS 2024
WebRTC and SIP not just audio and video @ OpenSIPS 2024WebRTC and SIP not just audio and video @ OpenSIPS 2024
WebRTC and SIP not just audio and video @ OpenSIPS 2024
 
(Explainable) Data-Centric AI: what are you explaininhg, and to whom?
(Explainable) Data-Centric AI: what are you explaininhg, and to whom?(Explainable) Data-Centric AI: what are you explaininhg, and to whom?
(Explainable) Data-Centric AI: what are you explaininhg, and to whom?
 
Long journey of Ruby Standard library at RubyKaigi 2024
Long journey of Ruby Standard library at RubyKaigi 2024Long journey of Ruby Standard library at RubyKaigi 2024
Long journey of Ruby Standard library at RubyKaigi 2024
 
AI mind or machine power point presentation
AI mind or machine power point presentationAI mind or machine power point presentation
AI mind or machine power point presentation
 
Secure Zero Touch enabled Edge compute with Dell NativeEdge via FDO _ Brad at...
Secure Zero Touch enabled Edge compute with Dell NativeEdge via FDO _ Brad at...Secure Zero Touch enabled Edge compute with Dell NativeEdge via FDO _ Brad at...
Secure Zero Touch enabled Edge compute with Dell NativeEdge via FDO _ Brad at...
 
ASRock Industrial FDO Solutions in Action for Industrial Edge AI _ Kenny at A...
ASRock Industrial FDO Solutions in Action for Industrial Edge AI _ Kenny at A...ASRock Industrial FDO Solutions in Action for Industrial Edge AI _ Kenny at A...
ASRock Industrial FDO Solutions in Action for Industrial Edge AI _ Kenny at A...
 
Linux Foundation Edge _ Overview of FDO Software Components _ Randy at Intel.pdf
Linux Foundation Edge _ Overview of FDO Software Components _ Randy at Intel.pdfLinux Foundation Edge _ Overview of FDO Software Components _ Randy at Intel.pdf
Linux Foundation Edge _ Overview of FDO Software Components _ Randy at Intel.pdf
 
Google I/O Extended 2024 Warsaw
Google I/O Extended 2024 WarsawGoogle I/O Extended 2024 Warsaw
Google I/O Extended 2024 Warsaw
 
Where to Learn More About FDO _ Richard at FIDO Alliance.pdf
Where to Learn More About FDO _ Richard at FIDO Alliance.pdfWhere to Learn More About FDO _ Richard at FIDO Alliance.pdf
Where to Learn More About FDO _ Richard at FIDO Alliance.pdf
 
Choosing the Right FDO Deployment Model for Your Application _ Geoffrey at In...
Choosing the Right FDO Deployment Model for Your Application _ Geoffrey at In...Choosing the Right FDO Deployment Model for Your Application _ Geoffrey at In...
Choosing the Right FDO Deployment Model for Your Application _ Geoffrey at In...
 
TopCryptoSupers 12thReport OrionX May2024
TopCryptoSupers 12thReport OrionX May2024TopCryptoSupers 12thReport OrionX May2024
TopCryptoSupers 12thReport OrionX May2024
 

What's going on with the driscoll expansion 11 18 13

  • 1. C O N F I D E N T I A L Driscoll Expansion: What Is Going On? Brookline Advisors
  • 2. C O N F I D E N T I A L Key Sections • What is the Current Plan? • How Did We Get Here? • How Will This Impact My Kids? – School Growth Impact – Playground/Green Space Impact – Funding Impact • What Can We Afford? • What‟s Next? • How Can Parents Get Involved? • Meet the Author 2
  • 3. C O N F I D E N T I A L What is the Current Plan? • The current plan is to expand Driscoll to 4 sections per grade, adding 200 students1 – Represents a 56% increase from 2010 school size (479 to 747) • “Expand In Place” makes no provision for increasing the school footprint along with student population – No details have been offered on how more students will be accommodated on the site – No details have been provided on how shared spaces will be grossed up for added population • „Expand in Place” is inconsistent with prior District and Driscoll additions – The 1950‟s Driscoll expansion was built on additional land purchased by the town; there is no such provision in current plan – No exact analysis has been published, but using BSPACE‟s own data the plan will result in far higher students/acre of play space than anywhere else in the district (see page 8) 1. HMFH B-SPACE Final Report, August 2013 3
  • 4. C O N F I D E N T I A L How Did We Get Here? • “Expand in Place” is a major diversion from B-SPACE‟s (Brookline School Population & Capacity Exploration) original plan • In April 2013, B-SPACE issued a report listing the three options “best matched with the expressed objectives and constraints”1 – “3+HS Expand In Place” was not on the list – A Driscoll expansion, let alone a very large one, was not on the list • B-SPACE‟s final recommendations dropped all three vetted options and recommended the new “Expand in Place” plan – Final recommendation is the most expensive plan at $250MM2 – Key committee members already have said this estimate is low for what they have proposed – even with no provision for an anticipated Pierce rebuild/expansion – B-SPACE did not recommend a full renovation for Driscoll – SC Capital Sub Committee has recommended a “full renovation” but provided no cost analysis or funding commitment in support of such a plan3 1. B-SPACE New School Options-FAQ-4.2.13, p.4 2. B-Space Final Report, 9/5/13, p41 3. Capital Sub-Committee of the Brookline School Committee, Proposal for School Expansion, 9/6/13 p.2 4
  • 5. C O N F I D E N T I A L How Will An Expansion Impact My Kids? – Disproportionate Growth • Driscoll‟s growth has been in line with the district but the planned expansion is not Population Growth Driscoll Town Avg Ex Driscoll 60% 56% 50% 40% 30% 20% 10% 18% 14% 8% 0% '10-Current Current - Proposed Source: HMFH BSPACE Final Report, August 2013 5
  • 6. C O N F I D E N T I A L How Will An Expansion Impact My Kids? – Least Green Space In Town • Playground space per student is already below average and will get much worse pro forma for growth Kids/Playground Acre Driscoll Town Avg Ex Driscoll 250 228 200 150 129 119 107 100 50 2010 Proposed Source: HMFH BSPACE Final Report, August 2013; square footage grown pro rata for existing sq ft/student at expanding schools 6
  • 7. C O N F I D E N T I A L How Will An Expansion Impact My Kids? – Low Investment • Current budget projections for Driscoll seem low compared to Devotion Brookline Public School Site K‐8 ‐ Current Devotion School Driscoll School Current 2010 Student Student Population Population (MSBA) (HMFH) 726 479 Proposed Enrollement Increase (BSPACE) 821 547 Current Bldg. sf 0 200 162,000 90,292 Capital Spend ($MM) (OAC Study) Added Enrollment $ Per 2010Added BSPACE Enrollment 90 30 95 268 Implied Devo/Driscoll Spend per seat: 947,368 111,940 8.5x Sources: HMFH BSPACE Final Report, August 2013; capital spend comes from Deputy Town Administrator presentation to Override Study Committee, 10/18/13 7
  • 8. C O N F I D E N T I A L What Can We Afford? • Any capital plan will require funding from new debt, state aid, and quite likely one or more tax rate increase overrides – No specific funding plan has yet been developed – No specific capital plan has yet been developed • “No one is in a position to promise Driscoll anything” - Chair of the Capital Subcommittee of the Advisory Board – There is no assurance of any kind of renovation – There is no assurance that any specific student/facility ratios will be maintained • Any plan to do more than add classrooms at Driscoll will have to compete with many other capital priorities – Master plan for school growth yet to be defined – Town has large unfunded Pension and OPEB liabilities – Town has substantial non-school capital improvement needs 8
  • 9. C O N F I D E N T I A L Driscoll Growth is Full Steam Ahead – Feasibility, Funding are Not • Driscoll mega- growth is going forward without any practical assurances for the community – Nearly all practical questions have been answered with „we’re not at that stage yet‟ • $30MM figure for sizeable expansion sounds low to architects and planners we have consulted and is based on the Runkle budget which was a renovation, not a 200 seat expansion and renovation • Though very few specifics have been offered a Driscoll expansion is considered a „done deal‟ – No feasibility study has yet been undertaken – Very few numbers have been published by any committee or department – …Yet project is a „done deal‟ in the eyes of key committees No One Advocating For Driscoll Growth Has Guaranteed A Quality Outcome Driscoll Should Know What It Is Getting/Not Getting Before A Project Is Greenlighted, Not After 9
  • 10. C O N F I D E N T I A L What‟s Next? • The Superintendent of Schools will submit a Statement of Interest to the MSBA seeking state aid for a Driscoll expansion in Q1 2014 – DSCAC has asked that the Driscoll Community be involved in this proposal and offered to provide a professional capital needs analysis for free – 11/5/13 response from School Committee essentially declined both proposals1 • The Driscoll Community should receive assurances that any growth plan provide adequately for: – Green space consistent with existing resource/student ratios – Common space expansion consistent with existing resource/student ratios – Expansion spend consistent with Devotion spend Establishing key ratios before an SOI is submitted and in all subsequent expansion documents seems like a key minimum protection for Driscoll‟s interests 1. Letter from Chairman Morse to DSCAC, 11/6/13 10
  • 11. C O N F I D E N T I A L What Can Interested Parents Do? • • Fill out online survey so we can aggregate Parent sentiment and priorities Attend key committee meetings – Override Study Committee and its sub committees – Capital Sub Committee of the Advisory Board – School Committee – School Committee Capital Sub Committee • – Sign up for meeting notices at BrookOnLine1 Ask Questions – Contact committee members • – Contact Town Meeting Members; 4 Town Meeting districts send students to Driscoll accounting for ~ 25% of all TMMs Make contact with other engaged parents – Driscollaction.com – https://www.facebook.com/groups/BrooklineNewSchool/ – Driscollexpansion.org 1.http://www.brooklinema.gov/index.php?option=com_content&view=article&id=1200&Itemid=1497 11
  • 12. C O N F I D E N T I A L About the Author • • • • Hello, my name is Sundar Srinivasan. I am a Driscoll Parent and the husband of a BHS and Devotion alum. I volunteered to be the ‘Community Representative on the Driscoll Expansion Project’ because I wanted to find out more about the proposed plans and how they will impact Driscoll, our town and our pocketbooks. I have no preconceived notions or agenda other than wanting to make sure any proposed plan is reasonable and realistic. You can reach me at sundar@driscollexpansion.org or look for me most mornings at drop off on the west side of the school. Feel free to stop me with any questions or ideas. This document is meant to provide parents with information about where things stand, key known‟s and unknown‟s, and ways to find out more on your own. Also attached is a survey about the project. By polling the community we can quantify what people care about and what they do not. 12