Vendor Evaluation
EvaluationProcedure
The proposal evaluationprocessshallconsistof the followingsteps:
1. Proposalsreceivedbyprojectmanagerbysubmissiondeadlineof November1,2010
2. Receiptof proposal notification
3. Preliminaryevaluationsof proposals
4. Notificationsof proposal rejection
5. Contact suppliersbyNovember15th
, 2010 to schedule meetingwithprojectteam
6. Detailedevaluationprocess leadingtofinal decision
7. Notificationof proposal awardandnon-award
8. Schedulingof contractsigningwithwinningsupplier
9. Schedulingof projectinitiationmeeting
Preliminary Evaluation
Proposalswill undergoapreliminaryevaluationtodeterminesatisfactionwithbasicneedand
requirements. Proposalsshouldbe on-time,complete,andadequatelyprepared forconsideration.The
proposal needstomeetthese basicrequirementsinordertobe eligible forthe competitiveevaluation
process.The potential suppliermustbe able todo the following:
 Understandthe basicissuesandproblemspresentedinthe RFP
 Demonstrate sufficientqualificationsandexperience
 Price the proposal fairly
 Complywithadministrativerequirementsof the RFP
 Addressall basictechnical requirementsof the RFP
 Submitthe proposal ontime inthe requestedformat
 Submita professional andwell structuredproposal
 Include all requestedmaterials
EvaluationTeam
The evaluationteamwill consistof the projectmanagerforHaywardJapan Grill,management,andany
internal stakeholdersdeemedrelevantandcompetenttoscore a particularproposal component.
Factors in Evaluation DecisionProcess
The followingare the majorfactorsthat all proposalswill be evaluatedbyforscoring.Eachsub-areain
the major factorswill be evaluatedona0-5 scale:
0= doesnotmeet requirements
1=marginally meetsrequirements
2=mostly meetsrequirements
3= fully meetsrequirements
4=slightly exceedsrequirements
5=greatly exceed requirements
Technical
 Hardware: Doesthe POShardware satisfyall statedrequirementsinthe RFP?
 Software: Doesthe POShardware satisfyall statedrequirementsinthe RFP?
 Reduce waste: Doesthe proposedPOSsolution reduce paperandoffice supplywaste?
 Automation: Doesthe proposedPOSsolution automate checkhandlingandcalculations?
 Processingspeed:Doesthe proposedPOSsolution increase orderprocessingspeedfromtaking
the order,deliveringthe ordertothe kitchen/sushi bar,tohandlingguestcheckdeliveryand
payments?
 Error reduction:Doesthe proposedPOSsolution reduce ordererrorscreatedby
miscommunicationfromservertofoodprep?
 Reports: Doesthe proposedPOSsolution provide informationinausable digital formfor
analysis?
Management
 Installation:Doesthe proposal satisfythe statedneedforinstallationservice?
 Support: Doesthe proposal satisfythe statedneedfor supportand maintenance?
 Training: Doesthe proposal satisfythe needfortrainingdocumentationforall managersand
servers?
 Consistency:Isthe documentcompletelyconsistent?Are there anymistakesorconflicts within
the document?
 Project plan:Does the proposal include apreliminaryprojectplanincludingtaskbreakdown,
schedule,budget,staffing,andmilestones?
 Communication:Doesthe proposal include acommunicationsplanthatsatisfiesthe stated
communication requirementsinthe RFP?
 Change control: Doesthe proposal include aformal change control process?
Administrative/Supplier
 Experience:Isthe supplierexperienced—how longhave theybeenoperatinginthe line of
businessof theirproposal? How manyyearsof experience doesthe supplierhave?
 Reference satisfaction:Whatdid the supplier’s referencessayabouttheirwork? Are they
satisfiedwiththe supplier’squalityof work?
 Resources:Doesthe supplierhave sufficientinfrastructure,tools,andtechnology resourcesto
workon your project?
 Staffing:Are the individualswhowill workonthe contract capable of executingthe project
satisfactorily?
 Reputation:Are there complaintsregisteredagainstthisgroupwithlicensingagencies,better
businessbureaus,orthe like? Orisita leaderwiththese organizations?
 Financial strength: Doesthe supplierhave the financialstrengthtocarryout your contract?
 Schedule:Doesthe workschedule appearsoundandreasonable?
Pricing
 Payment process:Is there a clearlydefinedprocessforpayment?
 Total price: Is the total price for all aspectsof the proposal competitive?
 Value:Doesthis supplieroffergoodvalue forthe cost?Isthe proposal cost-effective?
EvaluationMatrix
Score each supplierforeachitalicizedsub-areaona scale of 0-5 inaccordance withthe above specified
rankingdefinitions.Multiplysupplierscoresbyweightvalue togetweightedsupplierscores.The total
for eachboldedmajorfactorwill be summed. Total the score foreach of these majorfactors to reach
the suppliertotal score andthen rank eachsupplierbasedonthe scores.
Criteria
Max
Score
Weight
Value
Original
Score
Weighted
Score
Original
Score2
Weighted
Score2
Technical 35
Hardware 5 100% 0 0
Software 5 100% 0 0
Reduce waste 5 110% 0 0
Automation 5 110% 0 0Processing
speed 5 110% 0 0
Error reduction 5 110% 0 0
Reports 5 110% 0 0
Management 35
Installation 5 100% 0 0
Support 5 100% 0 0
Training 5 100% 0 0
Consistency 5 90% 0 0
Project plan 5 100% 0 0
Communication 5 100% 0 0
Change control 5 100% 0 0
Administrative /
Supplier 35
Experience 5 70% 0 0
References 5 100% 0 0
Resources 5 100% 0 0
Staffing 5 100% 0 0
Reputation 5 100% 0 0
Financial
strength 5 100% 0 0
Schedule 5 80% 0 0
Pricing 15
Total price 5 100% 0 0
Value 5 100% 0 0
Payment
process 5 100% 0 0
Ranking na na
Total Score 120 0 0 0 0
Supplier 1 Supplier 2

Más contenido relacionado

La actualidad más candente

Cp 2 selection of contractor - pq and post q
Cp 2 selection of contractor - pq and post qCp 2 selection of contractor - pq and post q
Cp 2 selection of contractor - pq and post qumes manandhar
 
Senior Subcontracts officer-Mehadi
Senior Subcontracts officer-MehadiSenior Subcontracts officer-Mehadi
Senior Subcontracts officer-MehadiMd Mehadi Hasan
 
Tendering Bidding & Award of Contract Final Draft
Tendering Bidding & Award of Contract Final DraftTendering Bidding & Award of Contract Final Draft
Tendering Bidding & Award of Contract Final DraftMuneesh Methwani
 
Preparation of project report for bank finance
Preparation of project report for bank financePreparation of project report for bank finance
Preparation of project report for bank financeRevanth Rao
 
Preparation of Project Report
Preparation of Project ReportPreparation of Project Report
Preparation of Project Reportguest821cf8f
 
Session 5: Shipley Associates - 7 Pillars of Effective Proposals
Session 5: Shipley Associates - 7 Pillars of Effective ProposalsSession 5: Shipley Associates - 7 Pillars of Effective Proposals
Session 5: Shipley Associates - 7 Pillars of Effective ProposalsVisibleThread
 
A Comparison Between Time And Material And Fixed Bid Engagement
A Comparison Between Time And Material And Fixed Bid EngagementA Comparison Between Time And Material And Fixed Bid Engagement
A Comparison Between Time And Material And Fixed Bid EngagementiBoss Tech Solution
 
Types of tender and their processing.
Types of tender and their processing.Types of tender and their processing.
Types of tender and their processing.Abhishek kumar maurya
 
Winning tenders / securing tenderers in a competitive construction market - N...
Winning tenders / securing tenderers in a competitive construction market - N...Winning tenders / securing tenderers in a competitive construction market - N...
Winning tenders / securing tenderers in a competitive construction market - N...Browne Jacobson LLP
 
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015ramiz reyad
 
Tendering Document for the Procurement of Works
Tendering Document for the Procurement of WorksTendering Document for the Procurement of Works
Tendering Document for the Procurement of WorksMohammad Alimuzzaman Bappy
 

La actualidad más candente (17)

Cp 2 selection of contractor - pq and post q
Cp 2 selection of contractor - pq and post qCp 2 selection of contractor - pq and post q
Cp 2 selection of contractor - pq and post q
 
Senior Subcontracts officer-Mehadi
Senior Subcontracts officer-MehadiSenior Subcontracts officer-Mehadi
Senior Subcontracts officer-Mehadi
 
Tendering Bidding & Award of Contract Final Draft
Tendering Bidding & Award of Contract Final DraftTendering Bidding & Award of Contract Final Draft
Tendering Bidding & Award of Contract Final Draft
 
Mohammed Ramzy - CV1
Mohammed Ramzy - CV1Mohammed Ramzy - CV1
Mohammed Ramzy - CV1
 
111
111111
111
 
Preparation of project report for bank finance
Preparation of project report for bank financePreparation of project report for bank finance
Preparation of project report for bank finance
 
Preparation of Project Report
Preparation of Project ReportPreparation of Project Report
Preparation of Project Report
 
Session 5: Shipley Associates - 7 Pillars of Effective Proposals
Session 5: Shipley Associates - 7 Pillars of Effective ProposalsSession 5: Shipley Associates - 7 Pillars of Effective Proposals
Session 5: Shipley Associates - 7 Pillars of Effective Proposals
 
TENDER DOCUMENT
TENDER DOCUMENTTENDER DOCUMENT
TENDER DOCUMENT
 
A Comparison Between Time And Material And Fixed Bid Engagement
A Comparison Between Time And Material And Fixed Bid EngagementA Comparison Between Time And Material And Fixed Bid Engagement
A Comparison Between Time And Material And Fixed Bid Engagement
 
Types of tender and their processing.
Types of tender and their processing.Types of tender and their processing.
Types of tender and their processing.
 
Winning tenders / securing tenderers in a competitive construction market - N...
Winning tenders / securing tenderers in a competitive construction market - N...Winning tenders / securing tenderers in a competitive construction market - N...
Winning tenders / securing tenderers in a competitive construction market - N...
 
Final standard tender doc
Final standard tender docFinal standard tender doc
Final standard tender doc
 
2015 - CV of Michael Julius Orjaleza
2015 - CV  of Michael Julius Orjaleza 2015 - CV  of Michael Julius Orjaleza
2015 - CV of Michael Julius Orjaleza
 
Procurement system
Procurement systemProcurement system
Procurement system
 
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
 
Tendering Document for the Procurement of Works
Tendering Document for the Procurement of WorksTendering Document for the Procurement of Works
Tendering Document for the Procurement of Works
 

Similar a Sunny Mui_X474.3_Evaluation

Proforma Contract Bid Requirements
Proforma Contract Bid RequirementsProforma Contract Bid Requirements
Proforma Contract Bid RequirementsGibson Ali Holemba
 
How to Perfectly Construct an RFP in 8 StepsThe RFP (request for.docx
How to Perfectly Construct an RFP in 8 StepsThe RFP (request for.docxHow to Perfectly Construct an RFP in 8 StepsThe RFP (request for.docx
How to Perfectly Construct an RFP in 8 StepsThe RFP (request for.docxpooleavelina
 
Advertising Agency RFP Template
Advertising Agency RFP Template Advertising Agency RFP Template
Advertising Agency RFP Template Demand Metric
 
Webinar consulting services rfp
Webinar consulting services rfpWebinar consulting services rfp
Webinar consulting services rfpDemand Metric
 
VoIP Project Request For Proposal Presentation
VoIP Project Request For Proposal PresentationVoIP Project Request For Proposal Presentation
VoIP Project Request For Proposal Presentationbrianbish10795
 
3 developing project proposals
3 developing project proposals3 developing project proposals
3 developing project proposalsDaw Juguilon
 
Social Media Consulting Services RFP
Social Media Consulting Services RFPSocial Media Consulting Services RFP
Social Media Consulting Services RFPDemand Metric
 
Everything You Need To Know About Writing The Winning Bid Proposal
 Everything You Need To Know About Writing The Winning Bid Proposal Everything You Need To Know About Writing The Winning Bid Proposal
Everything You Need To Know About Writing The Winning Bid ProposalTendersInfo .com
 
SMEF2010 Request For Proposal Management Ask The Right Questions And Choos...
SMEF2010 Request For Proposal Management    Ask The Right Questions And Choos...SMEF2010 Request For Proposal Management    Ask The Right Questions And Choos...
SMEF2010 Request For Proposal Management Ask The Right Questions And Choos...Harold van Heeringen
 
Resume - Hassan Abdallah
Resume - Hassan AbdallahResume - Hassan Abdallah
Resume - Hassan AbdallahHassan Abdallah
 
Resume - Hassan Abdallah
Resume - Hassan AbdallahResume - Hassan Abdallah
Resume - Hassan AbdallahHassan Abdallah
 
Resume - Hassan Abdallah
Resume - Hassan AbdallahResume - Hassan Abdallah
Resume - Hassan AbdallahHassan Abdallah
 
Cover Letter, Quotations, Tender & E-Tender
Cover Letter, Quotations, Tender & E-TenderCover Letter, Quotations, Tender & E-Tender
Cover Letter, Quotations, Tender & E-TenderRohit Mahindrakar
 
ISCF Modernising Energy Data Applications SBRI Competition Briefing
ISCF Modernising Energy Data Applications SBRI Competition BriefingISCF Modernising Energy Data Applications SBRI Competition Briefing
ISCF Modernising Energy Data Applications SBRI Competition BriefingKTN
 
Public Relations Agency RFP
Public Relations Agency RFPPublic Relations Agency RFP
Public Relations Agency RFPDemand Metric
 
Proposal and Bid Management Terms.pptx
Proposal and Bid Management  Terms.pptxProposal and Bid Management  Terms.pptx
Proposal and Bid Management Terms.pptxNavas Kilikkottu
 

Similar a Sunny Mui_X474.3_Evaluation (20)

RFP Evaluation Training
RFP Evaluation TrainingRFP Evaluation Training
RFP Evaluation Training
 
Proforma Contract Bid Requirements
Proforma Contract Bid RequirementsProforma Contract Bid Requirements
Proforma Contract Bid Requirements
 
How to Perfectly Construct an RFP in 8 StepsThe RFP (request for.docx
How to Perfectly Construct an RFP in 8 StepsThe RFP (request for.docxHow to Perfectly Construct an RFP in 8 StepsThe RFP (request for.docx
How to Perfectly Construct an RFP in 8 StepsThe RFP (request for.docx
 
Advertising Agency RFP Template
Advertising Agency RFP Template Advertising Agency RFP Template
Advertising Agency RFP Template
 
Webinar consulting services rfp
Webinar consulting services rfpWebinar consulting services rfp
Webinar consulting services rfp
 
VoIP Project Request For Proposal Presentation
VoIP Project Request For Proposal PresentationVoIP Project Request For Proposal Presentation
VoIP Project Request For Proposal Presentation
 
3 developing project proposals
3 developing project proposals3 developing project proposals
3 developing project proposals
 
Social Media Consulting Services RFP
Social Media Consulting Services RFPSocial Media Consulting Services RFP
Social Media Consulting Services RFP
 
Tender
TenderTender
Tender
 
Evaluation Training Guide
Evaluation Training GuideEvaluation Training Guide
Evaluation Training Guide
 
Everything You Need To Know About Writing The Winning Bid Proposal
 Everything You Need To Know About Writing The Winning Bid Proposal Everything You Need To Know About Writing The Winning Bid Proposal
Everything You Need To Know About Writing The Winning Bid Proposal
 
Final ang
Final angFinal ang
Final ang
 
SMEF2010 Request For Proposal Management Ask The Right Questions And Choos...
SMEF2010 Request For Proposal Management    Ask The Right Questions And Choos...SMEF2010 Request For Proposal Management    Ask The Right Questions And Choos...
SMEF2010 Request For Proposal Management Ask The Right Questions And Choos...
 
Resume - Hassan Abdallah
Resume - Hassan AbdallahResume - Hassan Abdallah
Resume - Hassan Abdallah
 
Resume - Hassan Abdallah
Resume - Hassan AbdallahResume - Hassan Abdallah
Resume - Hassan Abdallah
 
Resume - Hassan Abdallah
Resume - Hassan AbdallahResume - Hassan Abdallah
Resume - Hassan Abdallah
 
Cover Letter, Quotations, Tender & E-Tender
Cover Letter, Quotations, Tender & E-TenderCover Letter, Quotations, Tender & E-Tender
Cover Letter, Quotations, Tender & E-Tender
 
ISCF Modernising Energy Data Applications SBRI Competition Briefing
ISCF Modernising Energy Data Applications SBRI Competition BriefingISCF Modernising Energy Data Applications SBRI Competition Briefing
ISCF Modernising Energy Data Applications SBRI Competition Briefing
 
Public Relations Agency RFP
Public Relations Agency RFPPublic Relations Agency RFP
Public Relations Agency RFP
 
Proposal and Bid Management Terms.pptx
Proposal and Bid Management  Terms.pptxProposal and Bid Management  Terms.pptx
Proposal and Bid Management Terms.pptx
 

Más de sunnycmui

Sunny Mui_X474.3_Contract Closure
Sunny Mui_X474.3_Contract ClosureSunny Mui_X474.3_Contract Closure
Sunny Mui_X474.3_Contract Closuresunnycmui
 
Sunny Mui_X474.3_CSOW
Sunny Mui_X474.3_CSOWSunny Mui_X474.3_CSOW
Sunny Mui_X474.3_CSOWsunnycmui
 
Sunny Mui_X474.3_project proposal form
Sunny Mui_X474.3_project proposal formSunny Mui_X474.3_project proposal form
Sunny Mui_X474.3_project proposal formsunnycmui
 
Sunny Mui_X474.3_RFP
Sunny Mui_X474.3_RFPSunny Mui_X474.3_RFP
Sunny Mui_X474.3_RFPsunnycmui
 
Quality Management Plan Final Report
Quality Management Plan Final ReportQuality Management Plan Final Report
Quality Management Plan Final Reportsunnycmui
 
Logo Usage Guide
Logo Usage GuideLogo Usage Guide
Logo Usage Guidesunnycmui
 
college color
college colorcollege color
college colorsunnycmui
 
sales-brochure
sales-brochuresales-brochure
sales-brochuresunnycmui
 
about-brochure
about-brochureabout-brochure
about-brochuresunnycmui
 
Globial Presentation 2013 v3
Globial Presentation 2013 v3Globial Presentation 2013 v3
Globial Presentation 2013 v3sunnycmui
 
Yelp an Assessment of Customer Satisfaction
Yelp an Assessment of Customer SatisfactionYelp an Assessment of Customer Satisfaction
Yelp an Assessment of Customer Satisfactionsunnycmui
 
Everyday Ethnography
Everyday EthnographyEveryday Ethnography
Everyday Ethnographysunnycmui
 
Quality Management Plan: Hayward Japan Grill
Quality Management Plan: Hayward Japan GrillQuality Management Plan: Hayward Japan Grill
Quality Management Plan: Hayward Japan Grillsunnycmui
 
Target Glimmer Marketing Plan
Target Glimmer Marketing PlanTarget Glimmer Marketing Plan
Target Glimmer Marketing Plansunnycmui
 
Target Glimmer Presentation
Target Glimmer PresentationTarget Glimmer Presentation
Target Glimmer Presentationsunnycmui
 

Más de sunnycmui (16)

Sunny Mui_X474.3_Contract Closure
Sunny Mui_X474.3_Contract ClosureSunny Mui_X474.3_Contract Closure
Sunny Mui_X474.3_Contract Closure
 
Sunny Mui_X474.3_CSOW
Sunny Mui_X474.3_CSOWSunny Mui_X474.3_CSOW
Sunny Mui_X474.3_CSOW
 
Sunny Mui_X474.3_project proposal form
Sunny Mui_X474.3_project proposal formSunny Mui_X474.3_project proposal form
Sunny Mui_X474.3_project proposal form
 
Sunny Mui_X474.3_RFP
Sunny Mui_X474.3_RFPSunny Mui_X474.3_RFP
Sunny Mui_X474.3_RFP
 
Quality Management Plan Final Report
Quality Management Plan Final ReportQuality Management Plan Final Report
Quality Management Plan Final Report
 
Logo Usage Guide
Logo Usage GuideLogo Usage Guide
Logo Usage Guide
 
college color
college colorcollege color
college color
 
sales 85x11
sales 85x11sales 85x11
sales 85x11
 
sales-brochure
sales-brochuresales-brochure
sales-brochure
 
about-brochure
about-brochureabout-brochure
about-brochure
 
Globial Presentation 2013 v3
Globial Presentation 2013 v3Globial Presentation 2013 v3
Globial Presentation 2013 v3
 
Yelp an Assessment of Customer Satisfaction
Yelp an Assessment of Customer SatisfactionYelp an Assessment of Customer Satisfaction
Yelp an Assessment of Customer Satisfaction
 
Everyday Ethnography
Everyday EthnographyEveryday Ethnography
Everyday Ethnography
 
Quality Management Plan: Hayward Japan Grill
Quality Management Plan: Hayward Japan GrillQuality Management Plan: Hayward Japan Grill
Quality Management Plan: Hayward Japan Grill
 
Target Glimmer Marketing Plan
Target Glimmer Marketing PlanTarget Glimmer Marketing Plan
Target Glimmer Marketing Plan
 
Target Glimmer Presentation
Target Glimmer PresentationTarget Glimmer Presentation
Target Glimmer Presentation
 

Sunny Mui_X474.3_Evaluation

  • 1. Vendor Evaluation EvaluationProcedure The proposal evaluationprocessshallconsistof the followingsteps: 1. Proposalsreceivedbyprojectmanagerbysubmissiondeadlineof November1,2010 2. Receiptof proposal notification 3. Preliminaryevaluationsof proposals 4. Notificationsof proposal rejection 5. Contact suppliersbyNovember15th , 2010 to schedule meetingwithprojectteam 6. Detailedevaluationprocess leadingtofinal decision 7. Notificationof proposal awardandnon-award 8. Schedulingof contractsigningwithwinningsupplier 9. Schedulingof projectinitiationmeeting Preliminary Evaluation Proposalswill undergoapreliminaryevaluationtodeterminesatisfactionwithbasicneedand requirements. Proposalsshouldbe on-time,complete,andadequatelyprepared forconsideration.The proposal needstomeetthese basicrequirementsinordertobe eligible forthe competitiveevaluation process.The potential suppliermustbe able todo the following:  Understandthe basicissuesandproblemspresentedinthe RFP  Demonstrate sufficientqualificationsandexperience  Price the proposal fairly  Complywithadministrativerequirementsof the RFP  Addressall basictechnical requirementsof the RFP  Submitthe proposal ontime inthe requestedformat  Submita professional andwell structuredproposal  Include all requestedmaterials EvaluationTeam The evaluationteamwill consistof the projectmanagerforHaywardJapan Grill,management,andany internal stakeholdersdeemedrelevantandcompetenttoscore a particularproposal component. Factors in Evaluation DecisionProcess The followingare the majorfactorsthat all proposalswill be evaluatedbyforscoring.Eachsub-areain the major factorswill be evaluatedona0-5 scale: 0= doesnotmeet requirements
  • 2. 1=marginally meetsrequirements 2=mostly meetsrequirements 3= fully meetsrequirements 4=slightly exceedsrequirements 5=greatly exceed requirements Technical  Hardware: Doesthe POShardware satisfyall statedrequirementsinthe RFP?  Software: Doesthe POShardware satisfyall statedrequirementsinthe RFP?  Reduce waste: Doesthe proposedPOSsolution reduce paperandoffice supplywaste?  Automation: Doesthe proposedPOSsolution automate checkhandlingandcalculations?  Processingspeed:Doesthe proposedPOSsolution increase orderprocessingspeedfromtaking the order,deliveringthe ordertothe kitchen/sushi bar,tohandlingguestcheckdeliveryand payments?  Error reduction:Doesthe proposedPOSsolution reduce ordererrorscreatedby miscommunicationfromservertofoodprep?  Reports: Doesthe proposedPOSsolution provide informationinausable digital formfor analysis? Management  Installation:Doesthe proposal satisfythe statedneedforinstallationservice?  Support: Doesthe proposal satisfythe statedneedfor supportand maintenance?  Training: Doesthe proposal satisfythe needfortrainingdocumentationforall managersand servers?  Consistency:Isthe documentcompletelyconsistent?Are there anymistakesorconflicts within the document?  Project plan:Does the proposal include apreliminaryprojectplanincludingtaskbreakdown, schedule,budget,staffing,andmilestones?  Communication:Doesthe proposal include acommunicationsplanthatsatisfiesthe stated communication requirementsinthe RFP?  Change control: Doesthe proposal include aformal change control process? Administrative/Supplier  Experience:Isthe supplierexperienced—how longhave theybeenoperatinginthe line of businessof theirproposal? How manyyearsof experience doesthe supplierhave?  Reference satisfaction:Whatdid the supplier’s referencessayabouttheirwork? Are they satisfiedwiththe supplier’squalityof work?  Resources:Doesthe supplierhave sufficientinfrastructure,tools,andtechnology resourcesto workon your project?
  • 3.  Staffing:Are the individualswhowill workonthe contract capable of executingthe project satisfactorily?  Reputation:Are there complaintsregisteredagainstthisgroupwithlicensingagencies,better businessbureaus,orthe like? Orisita leaderwiththese organizations?  Financial strength: Doesthe supplierhave the financialstrengthtocarryout your contract?  Schedule:Doesthe workschedule appearsoundandreasonable? Pricing  Payment process:Is there a clearlydefinedprocessforpayment?  Total price: Is the total price for all aspectsof the proposal competitive?  Value:Doesthis supplieroffergoodvalue forthe cost?Isthe proposal cost-effective?
  • 4. EvaluationMatrix Score each supplierforeachitalicizedsub-areaona scale of 0-5 inaccordance withthe above specified rankingdefinitions.Multiplysupplierscoresbyweightvalue togetweightedsupplierscores.The total for eachboldedmajorfactorwill be summed. Total the score foreach of these majorfactors to reach the suppliertotal score andthen rank eachsupplierbasedonthe scores. Criteria Max Score Weight Value Original Score Weighted Score Original Score2 Weighted Score2 Technical 35 Hardware 5 100% 0 0 Software 5 100% 0 0 Reduce waste 5 110% 0 0 Automation 5 110% 0 0Processing speed 5 110% 0 0 Error reduction 5 110% 0 0 Reports 5 110% 0 0 Management 35 Installation 5 100% 0 0 Support 5 100% 0 0 Training 5 100% 0 0 Consistency 5 90% 0 0 Project plan 5 100% 0 0 Communication 5 100% 0 0 Change control 5 100% 0 0 Administrative / Supplier 35 Experience 5 70% 0 0 References 5 100% 0 0 Resources 5 100% 0 0 Staffing 5 100% 0 0 Reputation 5 100% 0 0 Financial strength 5 100% 0 0 Schedule 5 80% 0 0 Pricing 15 Total price 5 100% 0 0 Value 5 100% 0 0 Payment process 5 100% 0 0 Ranking na na Total Score 120 0 0 0 0 Supplier 1 Supplier 2