Angelo Baggini, angelo.baggini@unibg.it, Bergamo University - Engineering Department
Via Marconi 5, 24044 Dalmine (BG) – Italy
Failure analysis of a dry type cast resin MV/LV transformer
Failure analysis
of a dry type cast resin MV/LV
transformer
1. Introduction
2. Chronological events
3. Visual inspection
4. Causes of failures
5. Conclusions
Power Transformers Design Principles
INTRODUCTION
Installation Site and other
• Where: Office building of
a bank group - Milan city
center (Italy)
• When: following planned
maintenance works that
required the whole
installation to be turned
off
• Consequence: half the
building being without
power for 2 days
Electrical layout
Main characteristics of the transformer
Power Transformers Design Principles
CHRONOLOGICAL EVENTS
Chronological events
from 7.30 am to 9.30 am July 14th 2008
Main chronological events
#1
Q6 to Q21 were opened
to prepare for the
permanent disconnection
of some LV cables
Main chronological events
#2
The two main LV
switches (Q1 and Q3)
were opened
Main chronological events
#3
The back panels of the
main LV distribution
board are opened in
order to carry out the
disconnection
operations.
Main chronological events
#4
The lines are
disconnected and the
terminals of cables are
extracted
Main chronological events
#5
Once the disconnection
is completed the network
is restored
The main LV switch of
the transformer 2 (Q3) is
closed while Q6 to Q21
remain open.
Main chronological events
#6
The on site maintenance
personnel perceive a
buzzing (“frying”) noise
and two blows in fast
sequence.
Main chronological events
#7
The two MV switches of
the transformer (Q4 and
Q5) trip, while the main
MV switch (Q2) does not
trip
Main chronological events
#8 and #9
In order to understand
which transformer was
out of order, the
technicians on site try to
rearm the MV switch of
the transformer 2 (Q5).
Once (Q5) is closed the
main MV switch (Q2)
trips immediately, but not
the main MV switch of
the electrical company
(ENEL).
Main chronological events
#10 to #11
The MV switch is
restored (Q2).
The transformer 1 is put
into service, by closing
Q4, without any problem.
Main chronological events
#12 to #13
The enclosure of
transformer 2 is opened,
following prescribed
procedures.
Technicians on site
found considerable
damage to phase W of
transformer 2
Failure analysis
of a dry type cast resin MV/LV
transformer
VISUAL INSPECTION
Visual inspection
W and U windings:
black smoke traces.
Visual inspection
MV-LV channel:
electric arc traces
Visual inspection Lower part of LV-MV channel:
overheating traces
Visual inspection
Parts of winding
below the lower part
of winding W
Failure analysis
of a dry type cast resin MV/LV
transformer
CAUSES OF FAILURE
LV Windings
Sheet (or slab) type
• The windings were constituted by
thin Cu sheet with height almost
equal to the height of the column
• radially wounded coils were
separated by insulating sheets
MV Windings
Cast resin section type
Coils axially separated by insulating
spacers
Causes of failures
• consequence of a low number of coils inside the MV winding is an
high layer voltage
• partial discharges have damaged the insulation of the MV windings
and accelerated its breakdown
• The overvoltage, associated with the reconnection of the transformer at
the end of the maintenance operation, was sufficient to trigger a
breakdown through the weakened insulation
• the earlier failure of the same transformer supports the conclusion.
Causes of failures
• the discharge between the LV and MV windings was not the primary cause of
failure as the air insulation gap (channel MV/LV) was sufficiently large to
withstand the most severe overvoltage to which the transformer could
reasonably have been expected to be exposed;
• the structure of the network and the peak values of the impulse which the
transformer has been designed to withstand indicate that the transformer
would not have been affected by the over-voltage if the insulation system had
not been previously damaged;
• degradation of the insulating system by over-stressing, such as that assumed
here in order to explain the failure does not enable the prediction of the time of
the inevitable dielectric failure
• a degraded transformer could remain in service under these conditions for as
long as several years or for just a few months. What is certain is that failure
will occur.
Failure analysis
of a dry type cast resin MV/LV
transformer
CONCLUSIONS
Conclusions
• To agree with the transformer manufacturer that all MV windings and
the failed LV winding would be replaced. Taking into account the fact
that the fault is a result of a construction defect, even though it
became apparent some years into service life and considering the age
of the transformer, the costs should be shared accordingly between
supplier and customer.
• During dismantling of the transformer the conditions of the other
windings (not currently inspected) should be checked, with particular
attention to the central phase which may have been partially affected
by the fault on phase W.
• This solution would result in a practically new transformer at a modest
cost.
Additional conclusions
• To avoid the risk of a repetition of the same problem, it would be wise to
evaluate the possibility of replacing all the MV windings of the other
transformer (T1), since it is based on the same electromagnetic design. Of
course, even in this case the benefits are the same as indicated for the unit
currently out of service.
• The electrical layout should be modified to avoid the situation of having half the
building out of service in the event of a single fault. This could be achieved by
adopting a double radial scheme or by providing the ability to feed both LV
busbars from a single transformer (at reduced total load or increasing the
capacity of each transformer).
Failure analysis
of a dry type cast resin MV/LV
transformer
1. Introduction
2. Chronological events
3. Visual inspection
4. Causes of failures
5. Conclusions
Thank you
| Presentation title and date
For more information please contact
Angelo Baggini
Università di Bergamo
Dipartimento di Ingegneria
Viale Marconi 5,
24044 Dalmine (BG) Italy
email: angelo.baggini@unibg.it
ECD Engineering Consulting and Design
Via Maffi 21 27100 PAVIA Italy

Más contenido relacionado

La actualidad más candente

Basics of overcurrent protection
Basics of overcurrent protectionBasics of overcurrent protection
Basics of overcurrent protectionSalim Palayi
 
Power Transformer Protection
Power Transformer ProtectionPower Transformer Protection
Power Transformer ProtectionAng Sovann
 
Testing of Transformers.
Testing of Transformers.Testing of Transformers.
Testing of Transformers.Geetesh Verma
 
132 kv substation
132 kv substation132 kv substation
132 kv substationWipro
 
SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMS
SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMSSWITCHYARD EQUIPMENTS & PROTECTION SYSTEMS
SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMSPartha Parida
 
Power system protection topic 1
Power system protection topic 1Power system protection topic 1
Power system protection topic 1Siswoyo Edo
 
220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance220 KV Substation Operation & Maintenance
220 KV Substation Operation & MaintenanceHimansu Pradhan
 
RELAY CO-ORDINATION WITH FAULT CALCULATION
RELAY CO-ORDINATION WITH FAULT CALCULATIONRELAY CO-ORDINATION WITH FAULT CALCULATION
RELAY CO-ORDINATION WITH FAULT CALCULATIONMd Sarowar Alam
 
Fuse- Power system Protection
Fuse- Power system Protection  Fuse- Power system Protection
Fuse- Power system Protection Md. Nahid Sarker
 
Protection Of Generator
Protection Of GeneratorProtection Of Generator
Protection Of GeneratorRahuldey1991
 
Basics of ups seminar presentation
Basics of ups   seminar presentationBasics of ups   seminar presentation
Basics of ups seminar presentationMurali Krishnan
 
Installation, Testing and Troubleshooting of Transformers
Installation, Testing and Troubleshooting of TransformersInstallation, Testing and Troubleshooting of Transformers
Installation, Testing and Troubleshooting of TransformersLiving Online
 
Switch gear and protection
Switch gear and protectionSwitch gear and protection
Switch gear and protectionDinesh Sharma
 
Maintenance and Troubleshooting of Uninterruptible Power Supply (UPS) Systems...
Maintenance and Troubleshooting of Uninterruptible Power Supply (UPS) Systems...Maintenance and Troubleshooting of Uninterruptible Power Supply (UPS) Systems...
Maintenance and Troubleshooting of Uninterruptible Power Supply (UPS) Systems...Living Online
 
Ppt on protection of power transformers
Ppt on protection of power transformersPpt on protection of power transformers
Ppt on protection of power transformerssiddharam kantoli
 
Short circuit test in brief
Short circuit test in briefShort circuit test in brief
Short circuit test in briefMuthar Hussain
 

La actualidad más candente (20)

Basics of overcurrent protection
Basics of overcurrent protectionBasics of overcurrent protection
Basics of overcurrent protection
 
Power Transformer Protection
Power Transformer ProtectionPower Transformer Protection
Power Transformer Protection
 
Testing of Transformers.
Testing of Transformers.Testing of Transformers.
Testing of Transformers.
 
132 kv substation
132 kv substation132 kv substation
132 kv substation
 
Switchyard
SwitchyardSwitchyard
Switchyard
 
SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMS
SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMSSWITCHYARD EQUIPMENTS & PROTECTION SYSTEMS
SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMS
 
Power system protection topic 1
Power system protection topic 1Power system protection topic 1
Power system protection topic 1
 
220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance
 
RELAY CO-ORDINATION WITH FAULT CALCULATION
RELAY CO-ORDINATION WITH FAULT CALCULATIONRELAY CO-ORDINATION WITH FAULT CALCULATION
RELAY CO-ORDINATION WITH FAULT CALCULATION
 
Fuse- Power system Protection
Fuse- Power system Protection  Fuse- Power system Protection
Fuse- Power system Protection
 
Protection Of Generator
Protection Of GeneratorProtection Of Generator
Protection Of Generator
 
Basics of ups seminar presentation
Basics of ups   seminar presentationBasics of ups   seminar presentation
Basics of ups seminar presentation
 
Protection and Switchgear
Protection and SwitchgearProtection and Switchgear
Protection and Switchgear
 
High Voltage
High VoltageHigh Voltage
High Voltage
 
Installation, Testing and Troubleshooting of Transformers
Installation, Testing and Troubleshooting of TransformersInstallation, Testing and Troubleshooting of Transformers
Installation, Testing and Troubleshooting of Transformers
 
Switch gear and protection
Switch gear and protectionSwitch gear and protection
Switch gear and protection
 
Maintenance and Troubleshooting of Uninterruptible Power Supply (UPS) Systems...
Maintenance and Troubleshooting of Uninterruptible Power Supply (UPS) Systems...Maintenance and Troubleshooting of Uninterruptible Power Supply (UPS) Systems...
Maintenance and Troubleshooting of Uninterruptible Power Supply (UPS) Systems...
 
Ppt on protection of power transformers
Ppt on protection of power transformersPpt on protection of power transformers
Ppt on protection of power transformers
 
Short circuit test in brief
Short circuit test in briefShort circuit test in brief
Short circuit test in brief
 
132 kv
132 kv132 kv
132 kv
 

Similar a Transformer failure case study

Example of Substation Maintenance & Assessment Audits for Training - Niels In...
Example of Substation Maintenance & Assessment Audits for Training - Niels In...Example of Substation Maintenance & Assessment Audits for Training - Niels In...
Example of Substation Maintenance & Assessment Audits for Training - Niels In...Niels Inderbiethen
 
Equipment Audits for LV, MV, HV for annual mandatory record keeping by Niels
Equipment Audits for LV, MV, HV for annual mandatory record keeping by NielsEquipment Audits for LV, MV, HV for annual mandatory record keeping by Niels
Equipment Audits for LV, MV, HV for annual mandatory record keeping by NielsNiels Inderbiethen
 
How to reduced transformer losses report
How to reduced transformer losses reportHow to reduced transformer losses report
How to reduced transformer losses reportkamal soni
 
Edwin Newsletter on transformer failures on 13 October 2015
Edwin Newsletter on transformer failures on 13 October 2015Edwin Newsletter on transformer failures on 13 October 2015
Edwin Newsletter on transformer failures on 13 October 2015Edwin Low
 
Partial discharge monitoring of High Voltage Assets - TATA Steel Scunthorpe
Partial discharge monitoring of High Voltage Assets - TATA Steel Scunthorpe Partial discharge monitoring of High Voltage Assets - TATA Steel Scunthorpe
Partial discharge monitoring of High Voltage Assets - TATA Steel Scunthorpe Mikolaj Kukawski
 
Appraisal ppt ankur
Appraisal ppt ankurAppraisal ppt ankur
Appraisal ppt ankurAnkur Mishra
 
Why transformers fail_final
Why transformers fail_finalWhy transformers fail_final
Why transformers fail_finalSnehangshu Ghosh
 
Protection & switchgear
Protection & switchgear   Protection & switchgear
Protection & switchgear johny renoald
 
Electrical Installations, MCB, MCCB, ELCB
Electrical Installations, MCB, MCCB, ELCBElectrical Installations, MCB, MCCB, ELCB
Electrical Installations, MCB, MCCB, ELCBMANOJ964697
 
Reel and Umbilical Training for Subsea Hose Reels and Umbilicals
Reel and Umbilical Training for Subsea Hose Reels and UmbilicalsReel and Umbilical Training for Subsea Hose Reels and Umbilicals
Reel and Umbilical Training for Subsea Hose Reels and Umbilicalswevans1
 
Design_of_Power_Transformers.ppt
Design_of_Power_Transformers.pptDesign_of_Power_Transformers.ppt
Design_of_Power_Transformers.pptSelvaPriyaAEEE2020
 
Entership Presentation (1).pptx
Entership Presentation (1).pptxEntership Presentation (1).pptx
Entership Presentation (1).pptxmebremezgebe
 

Similar a Transformer failure case study (20)

Example of Substation Maintenance & Assessment Audits for Training - Niels In...
Example of Substation Maintenance & Assessment Audits for Training - Niels In...Example of Substation Maintenance & Assessment Audits for Training - Niels In...
Example of Substation Maintenance & Assessment Audits for Training - Niels In...
 
Equipment Audits for LV, MV, HV for annual mandatory record keeping by Niels
Equipment Audits for LV, MV, HV for annual mandatory record keeping by NielsEquipment Audits for LV, MV, HV for annual mandatory record keeping by Niels
Equipment Audits for LV, MV, HV for annual mandatory record keeping by Niels
 
How to reduced transformer losses report
How to reduced transformer losses reportHow to reduced transformer losses report
How to reduced transformer losses report
 
Thermoelectricity
ThermoelectricityThermoelectricity
Thermoelectricity
 
G04714245
G04714245G04714245
G04714245
 
Edwin Newsletter on transformer failures on 13 October 2015
Edwin Newsletter on transformer failures on 13 October 2015Edwin Newsletter on transformer failures on 13 October 2015
Edwin Newsletter on transformer failures on 13 October 2015
 
Heavy maintenance
Heavy maintenanceHeavy maintenance
Heavy maintenance
 
Partial discharge monitoring of High Voltage Assets - TATA Steel Scunthorpe
Partial discharge monitoring of High Voltage Assets - TATA Steel Scunthorpe Partial discharge monitoring of High Voltage Assets - TATA Steel Scunthorpe
Partial discharge monitoring of High Voltage Assets - TATA Steel Scunthorpe
 
Appraisal ppt ankur
Appraisal ppt ankurAppraisal ppt ankur
Appraisal ppt ankur
 
Why transformers fail_final
Why transformers fail_finalWhy transformers fail_final
Why transformers fail_final
 
Protection & switchgear
Protection & switchgear   Protection & switchgear
Protection & switchgear
 
Circuit breakers
Circuit breakersCircuit breakers
Circuit breakers
 
Executive summary
Executive summaryExecutive summary
Executive summary
 
TRANSFORMER DESIGN.pptx
TRANSFORMER DESIGN.pptxTRANSFORMER DESIGN.pptx
TRANSFORMER DESIGN.pptx
 
Electrical Installations, MCB, MCCB, ELCB
Electrical Installations, MCB, MCCB, ELCBElectrical Installations, MCB, MCCB, ELCB
Electrical Installations, MCB, MCCB, ELCB
 
Art%20 e sierra%20etp%20mantenimiento
Art%20 e sierra%20etp%20mantenimientoArt%20 e sierra%20etp%20mantenimiento
Art%20 e sierra%20etp%20mantenimiento
 
Reel and Umbilical Training for Subsea Hose Reels and Umbilicals
Reel and Umbilical Training for Subsea Hose Reels and UmbilicalsReel and Umbilical Training for Subsea Hose Reels and Umbilicals
Reel and Umbilical Training for Subsea Hose Reels and Umbilicals
 
Design_of_Power_Transformers.ppt
Design_of_Power_Transformers.pptDesign_of_Power_Transformers.ppt
Design_of_Power_Transformers.ppt
 
MV Switchgear from IEEE
MV Switchgear from IEEEMV Switchgear from IEEE
MV Switchgear from IEEE
 
Entership Presentation (1).pptx
Entership Presentation (1).pptxEntership Presentation (1).pptx
Entership Presentation (1).pptx
 

Más de Leonardo ENERGY

A new generation of instruments and tools to monitor buildings performance
A new generation of instruments and tools to monitor buildings performanceA new generation of instruments and tools to monitor buildings performance
A new generation of instruments and tools to monitor buildings performanceLeonardo ENERGY
 
Addressing the Energy Efficiency First Principle in a National Energy and Cli...
Addressing the Energy Efficiency First Principle in a National Energy and Cli...Addressing the Energy Efficiency First Principle in a National Energy and Cli...
Addressing the Energy Efficiency First Principle in a National Energy and Cli...Leonardo ENERGY
 
Auctions for energy efficiency and the experience of renewables
 Auctions for energy efficiency and the experience of renewables Auctions for energy efficiency and the experience of renewables
Auctions for energy efficiency and the experience of renewablesLeonardo ENERGY
 
Energy efficiency first – retrofitting the building stock final
Energy efficiency first – retrofitting the building stock finalEnergy efficiency first – retrofitting the building stock final
Energy efficiency first – retrofitting the building stock finalLeonardo ENERGY
 
How auction design affects the financing of renewable energy projects
How auction design affects the financing of renewable energy projects How auction design affects the financing of renewable energy projects
How auction design affects the financing of renewable energy projects Leonardo ENERGY
 
Energy Efficiency Funds in Europe (updated)
Energy Efficiency Funds in Europe (updated)Energy Efficiency Funds in Europe (updated)
Energy Efficiency Funds in Europe (updated)Leonardo ENERGY
 
Energy Efficiency Funds in Europe
Energy Efficiency Funds in EuropeEnergy Efficiency Funds in Europe
Energy Efficiency Funds in EuropeLeonardo ENERGY
 
Five actions fit for 55: streamlining energy savings calculations
Five actions fit for 55: streamlining energy savings calculationsFive actions fit for 55: streamlining energy savings calculations
Five actions fit for 55: streamlining energy savings calculationsLeonardo ENERGY
 
Recent energy efficiency trends in the EU
Recent energy efficiency trends in the EURecent energy efficiency trends in the EU
Recent energy efficiency trends in the EULeonardo ENERGY
 
Energy and mobility poverty: Will the Social Climate Fund be enough to delive...
Energy and mobility poverty: Will the Social Climate Fund be enough to delive...Energy and mobility poverty: Will the Social Climate Fund be enough to delive...
Energy and mobility poverty: Will the Social Climate Fund be enough to delive...Leonardo ENERGY
 
Does the EU Emission Trading Scheme ETS Promote Energy Efficiency?
Does the EU Emission Trading Scheme ETS Promote Energy Efficiency?Does the EU Emission Trading Scheme ETS Promote Energy Efficiency?
Does the EU Emission Trading Scheme ETS Promote Energy Efficiency?Leonardo ENERGY
 
Energy efficiency, structural change and energy savings in the manufacturing ...
Energy efficiency, structural change and energy savings in the manufacturing ...Energy efficiency, structural change and energy savings in the manufacturing ...
Energy efficiency, structural change and energy savings in the manufacturing ...Leonardo ENERGY
 
Energy Sufficiency Indicators and Policies (Lea Gynther, Motiva)
Energy Sufficiency Indicators and Policies (Lea Gynther, Motiva)Energy Sufficiency Indicators and Policies (Lea Gynther, Motiva)
Energy Sufficiency Indicators and Policies (Lea Gynther, Motiva)Leonardo ENERGY
 
The Super-efficient Equipment and Appliance Deployment (SEAD) Initiative Prod...
The Super-efficient Equipment and Appliance Deployment (SEAD) Initiative Prod...The Super-efficient Equipment and Appliance Deployment (SEAD) Initiative Prod...
The Super-efficient Equipment and Appliance Deployment (SEAD) Initiative Prod...Leonardo ENERGY
 
Modelling and optimisation of electric motors with hairpin windings
Modelling and optimisation of electric motors with hairpin windingsModelling and optimisation of electric motors with hairpin windings
Modelling and optimisation of electric motors with hairpin windingsLeonardo ENERGY
 
Casting zero porosity rotors
Casting zero porosity rotorsCasting zero porosity rotors
Casting zero porosity rotorsLeonardo ENERGY
 
Direct coil cooling through hollow wire
Direct coil cooling through hollow wireDirect coil cooling through hollow wire
Direct coil cooling through hollow wireLeonardo ENERGY
 
Motor renovation - Potential savings and views from various EU Member States
Motor renovation - Potential savings and views from various EU Member StatesMotor renovation - Potential savings and views from various EU Member States
Motor renovation - Potential savings and views from various EU Member StatesLeonardo ENERGY
 
The need for an updated European Motor Study - key findings from the 2021 US...
The need for  an updated European Motor Study - key findings from the 2021 US...The need for  an updated European Motor Study - key findings from the 2021 US...
The need for an updated European Motor Study - key findings from the 2021 US...Leonardo ENERGY
 
Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...
Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...
Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...Leonardo ENERGY
 

Más de Leonardo ENERGY (20)

A new generation of instruments and tools to monitor buildings performance
A new generation of instruments and tools to monitor buildings performanceA new generation of instruments and tools to monitor buildings performance
A new generation of instruments and tools to monitor buildings performance
 
Addressing the Energy Efficiency First Principle in a National Energy and Cli...
Addressing the Energy Efficiency First Principle in a National Energy and Cli...Addressing the Energy Efficiency First Principle in a National Energy and Cli...
Addressing the Energy Efficiency First Principle in a National Energy and Cli...
 
Auctions for energy efficiency and the experience of renewables
 Auctions for energy efficiency and the experience of renewables Auctions for energy efficiency and the experience of renewables
Auctions for energy efficiency and the experience of renewables
 
Energy efficiency first – retrofitting the building stock final
Energy efficiency first – retrofitting the building stock finalEnergy efficiency first – retrofitting the building stock final
Energy efficiency first – retrofitting the building stock final
 
How auction design affects the financing of renewable energy projects
How auction design affects the financing of renewable energy projects How auction design affects the financing of renewable energy projects
How auction design affects the financing of renewable energy projects
 
Energy Efficiency Funds in Europe (updated)
Energy Efficiency Funds in Europe (updated)Energy Efficiency Funds in Europe (updated)
Energy Efficiency Funds in Europe (updated)
 
Energy Efficiency Funds in Europe
Energy Efficiency Funds in EuropeEnergy Efficiency Funds in Europe
Energy Efficiency Funds in Europe
 
Five actions fit for 55: streamlining energy savings calculations
Five actions fit for 55: streamlining energy savings calculationsFive actions fit for 55: streamlining energy savings calculations
Five actions fit for 55: streamlining energy savings calculations
 
Recent energy efficiency trends in the EU
Recent energy efficiency trends in the EURecent energy efficiency trends in the EU
Recent energy efficiency trends in the EU
 
Energy and mobility poverty: Will the Social Climate Fund be enough to delive...
Energy and mobility poverty: Will the Social Climate Fund be enough to delive...Energy and mobility poverty: Will the Social Climate Fund be enough to delive...
Energy and mobility poverty: Will the Social Climate Fund be enough to delive...
 
Does the EU Emission Trading Scheme ETS Promote Energy Efficiency?
Does the EU Emission Trading Scheme ETS Promote Energy Efficiency?Does the EU Emission Trading Scheme ETS Promote Energy Efficiency?
Does the EU Emission Trading Scheme ETS Promote Energy Efficiency?
 
Energy efficiency, structural change and energy savings in the manufacturing ...
Energy efficiency, structural change and energy savings in the manufacturing ...Energy efficiency, structural change and energy savings in the manufacturing ...
Energy efficiency, structural change and energy savings in the manufacturing ...
 
Energy Sufficiency Indicators and Policies (Lea Gynther, Motiva)
Energy Sufficiency Indicators and Policies (Lea Gynther, Motiva)Energy Sufficiency Indicators and Policies (Lea Gynther, Motiva)
Energy Sufficiency Indicators and Policies (Lea Gynther, Motiva)
 
The Super-efficient Equipment and Appliance Deployment (SEAD) Initiative Prod...
The Super-efficient Equipment and Appliance Deployment (SEAD) Initiative Prod...The Super-efficient Equipment and Appliance Deployment (SEAD) Initiative Prod...
The Super-efficient Equipment and Appliance Deployment (SEAD) Initiative Prod...
 
Modelling and optimisation of electric motors with hairpin windings
Modelling and optimisation of electric motors with hairpin windingsModelling and optimisation of electric motors with hairpin windings
Modelling and optimisation of electric motors with hairpin windings
 
Casting zero porosity rotors
Casting zero porosity rotorsCasting zero porosity rotors
Casting zero porosity rotors
 
Direct coil cooling through hollow wire
Direct coil cooling through hollow wireDirect coil cooling through hollow wire
Direct coil cooling through hollow wire
 
Motor renovation - Potential savings and views from various EU Member States
Motor renovation - Potential savings and views from various EU Member StatesMotor renovation - Potential savings and views from various EU Member States
Motor renovation - Potential savings and views from various EU Member States
 
The need for an updated European Motor Study - key findings from the 2021 US...
The need for  an updated European Motor Study - key findings from the 2021 US...The need for  an updated European Motor Study - key findings from the 2021 US...
The need for an updated European Motor Study - key findings from the 2021 US...
 
Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...
Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...
Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...
 

Último

04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsTop 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsRoshan Dwivedi
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Servicegiselly40
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure servicePooja Nehwal
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slidevu2urc
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...apidays
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘RTylerCroy
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Allon Mureinik
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
Developing An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilDeveloping An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilV3cube
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesSinan KOZAK
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024The Digital Insurer
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfEnterprise Knowledge
 

Último (20)

04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsTop 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Developing An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilDeveloping An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of Brazil
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen Frames
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 

Transformer failure case study

  • 1. Angelo Baggini, angelo.baggini@unibg.it, Bergamo University - Engineering Department Via Marconi 5, 24044 Dalmine (BG) – Italy Failure analysis of a dry type cast resin MV/LV transformer
  • 2. Failure analysis of a dry type cast resin MV/LV transformer 1. Introduction 2. Chronological events 3. Visual inspection 4. Causes of failures 5. Conclusions
  • 3. Power Transformers Design Principles INTRODUCTION
  • 4. Installation Site and other • Where: Office building of a bank group - Milan city center (Italy) • When: following planned maintenance works that required the whole installation to be turned off • Consequence: half the building being without power for 2 days
  • 6. Main characteristics of the transformer
  • 7. Power Transformers Design Principles CHRONOLOGICAL EVENTS
  • 8. Chronological events from 7.30 am to 9.30 am July 14th 2008
  • 9. Main chronological events #1 Q6 to Q21 were opened to prepare for the permanent disconnection of some LV cables
  • 10. Main chronological events #2 The two main LV switches (Q1 and Q3) were opened
  • 11. Main chronological events #3 The back panels of the main LV distribution board are opened in order to carry out the disconnection operations.
  • 12. Main chronological events #4 The lines are disconnected and the terminals of cables are extracted
  • 13. Main chronological events #5 Once the disconnection is completed the network is restored The main LV switch of the transformer 2 (Q3) is closed while Q6 to Q21 remain open.
  • 14. Main chronological events #6 The on site maintenance personnel perceive a buzzing (“frying”) noise and two blows in fast sequence.
  • 15. Main chronological events #7 The two MV switches of the transformer (Q4 and Q5) trip, while the main MV switch (Q2) does not trip
  • 16. Main chronological events #8 and #9 In order to understand which transformer was out of order, the technicians on site try to rearm the MV switch of the transformer 2 (Q5). Once (Q5) is closed the main MV switch (Q2) trips immediately, but not the main MV switch of the electrical company (ENEL).
  • 17. Main chronological events #10 to #11 The MV switch is restored (Q2). The transformer 1 is put into service, by closing Q4, without any problem.
  • 18. Main chronological events #12 to #13 The enclosure of transformer 2 is opened, following prescribed procedures. Technicians on site found considerable damage to phase W of transformer 2
  • 19. Failure analysis of a dry type cast resin MV/LV transformer VISUAL INSPECTION
  • 20. Visual inspection W and U windings: black smoke traces.
  • 22. Visual inspection Lower part of LV-MV channel: overheating traces
  • 23. Visual inspection Parts of winding below the lower part of winding W
  • 24. Failure analysis of a dry type cast resin MV/LV transformer CAUSES OF FAILURE
  • 25. LV Windings Sheet (or slab) type • The windings were constituted by thin Cu sheet with height almost equal to the height of the column • radially wounded coils were separated by insulating sheets
  • 26. MV Windings Cast resin section type Coils axially separated by insulating spacers
  • 27. Causes of failures • consequence of a low number of coils inside the MV winding is an high layer voltage • partial discharges have damaged the insulation of the MV windings and accelerated its breakdown • The overvoltage, associated with the reconnection of the transformer at the end of the maintenance operation, was sufficient to trigger a breakdown through the weakened insulation • the earlier failure of the same transformer supports the conclusion.
  • 28. Causes of failures • the discharge between the LV and MV windings was not the primary cause of failure as the air insulation gap (channel MV/LV) was sufficiently large to withstand the most severe overvoltage to which the transformer could reasonably have been expected to be exposed; • the structure of the network and the peak values of the impulse which the transformer has been designed to withstand indicate that the transformer would not have been affected by the over-voltage if the insulation system had not been previously damaged; • degradation of the insulating system by over-stressing, such as that assumed here in order to explain the failure does not enable the prediction of the time of the inevitable dielectric failure • a degraded transformer could remain in service under these conditions for as long as several years or for just a few months. What is certain is that failure will occur.
  • 29. Failure analysis of a dry type cast resin MV/LV transformer CONCLUSIONS
  • 30. Conclusions • To agree with the transformer manufacturer that all MV windings and the failed LV winding would be replaced. Taking into account the fact that the fault is a result of a construction defect, even though it became apparent some years into service life and considering the age of the transformer, the costs should be shared accordingly between supplier and customer. • During dismantling of the transformer the conditions of the other windings (not currently inspected) should be checked, with particular attention to the central phase which may have been partially affected by the fault on phase W. • This solution would result in a practically new transformer at a modest cost.
  • 31. Additional conclusions • To avoid the risk of a repetition of the same problem, it would be wise to evaluate the possibility of replacing all the MV windings of the other transformer (T1), since it is based on the same electromagnetic design. Of course, even in this case the benefits are the same as indicated for the unit currently out of service. • The electrical layout should be modified to avoid the situation of having half the building out of service in the event of a single fault. This could be achieved by adopting a double radial scheme or by providing the ability to feed both LV busbars from a single transformer (at reduced total load or increasing the capacity of each transformer).
  • 32. Failure analysis of a dry type cast resin MV/LV transformer 1. Introduction 2. Chronological events 3. Visual inspection 4. Causes of failures 5. Conclusions
  • 33. Thank you | Presentation title and date For more information please contact Angelo Baggini Università di Bergamo Dipartimento di Ingegneria Viale Marconi 5, 24044 Dalmine (BG) Italy email: angelo.baggini@unibg.it ECD Engineering Consulting and Design Via Maffi 21 27100 PAVIA Italy