SlideShare una empresa de Scribd logo
1 de 5
Summary of weighting system in BEAM rating system,
version 2
BEAM Rating System (v, 2.0)
7sustainability categories, 78 indicators, with (121 points +90 Bonus= 211)
points:
Integrated Design And Construction Management (IDCM) 25 Points +14
Bonus
Sustainable Sites (SS) 20 Points + 19
Bonus
Materials and Waste (MW) 14 Points + 21 Bonus
Energy Use (EU) 31 Points + 13 Bonus
Water Use (WU) 12 Points + 3 Bonus
Health and Wellbeing (HWB) 19 Points + 10 Bonus
Innovations and Additions (IA) 0 Points + 10 Bonus
BEAM Plus New Buildings version 2.0 (09.2019)
2
=121 points
+90 Bonus points
Range of Points (BEAM):
 Required= 0
 Credits, equal one point
 1 Bonus= 1 Point
Certification Levels
121 base points, four certification levels:
 Platinum: 75% (90.75 points)
 Gold : 65% (78.65 points)
 Silver : 55% (66.55 points)
 Bronze : 40% (48.40 points)
Aggregate and Calculating Final Score
Determination of Overall Grade :
The final certificate grading for projects certified under BEAM is
subject to the following conditions:
i. Satisfying all pre-requisites;
ii. Achieving overall score required; and
iii. Obtaining minimum percentage (%) for each category listed
below.
(90.75 points)
(78.65 points)
(66.55 points)
(48.40 points)
 If a project can comply with all the applicable pre-requisites but cannot reach
the threshold of Bronze rating, it will be graded as “Pre-requisites Achieved”. In
case the project fails to demonstrate compliance with any one of the applicable
pre-requisites, it will be graded as “Pre-requisite(s) Not Achieved”.
 For example: If a Building take points after assessment,
Cat 1. Integrated Design And Construction
Management (IDCM) 20 Points from 25
Cat 2. Sustainable Sites (SS) 16 Points from 20
Cat 3. Materials and Waste (MW) 12 Points from 14
Cat 4. Energy Use (EU) 25 Points from 31
Cat 5. Water Use (WU) 10 Points from 12
Cat 6. Health and Wellbeing (HWB) 15 Points from19
Cat 7. Innovations and Additions (IA) 0 Points from 0
TOTAL 98 points
Aggregate and Calculating Final Score
AWARDED
CERTIFICATE IS

Más contenido relacionado

Similar a weighting system BEAM(updated).pptx

Sustainable Affordable Housing
Sustainable Affordable HousingSustainable Affordable Housing
Sustainable Affordable Housing
Emma French
 
Deloitte tax presentation (Final)
Deloitte tax presentation (Final)Deloitte tax presentation (Final)
Deloitte tax presentation (Final)
Jiahui (Helen) Lu
 
Bean Co.pptx
Bean Co.pptxBean Co.pptx
Bean Co.pptx
onkarmohite9
 
ABN AMRO_SLP Consulting
ABN AMRO_SLP ConsultingABN AMRO_SLP Consulting
ABN AMRO_SLP Consulting
Sem de Moel
 

Similar a weighting system BEAM(updated).pptx (20)

CHAMP Year 1 Outcomes Leadership Committee December 5 2014
CHAMP Year 1 Outcomes  Leadership Committee December 5 2014CHAMP Year 1 Outcomes  Leadership Committee December 5 2014
CHAMP Year 1 Outcomes Leadership Committee December 5 2014
 
GE case study
GE case studyGE case study
GE case study
 
Total Quality Management - Clients are the people for whom the company doing ...
Total Quality Management - Clients are the people for whom the company doing ...Total Quality Management - Clients are the people for whom the company doing ...
Total Quality Management - Clients are the people for whom the company doing ...
 
Total Quality Management - ……………….” Is we, not me; mission, not my show; visi...
Total Quality Management - ……………….” Is we, not me; mission, not my show; visi...Total Quality Management - ……………….” Is we, not me; mission, not my show; visi...
Total Quality Management - ……………….” Is we, not me; mission, not my show; visi...
 
Total Quality Management - An effective tqm program is often referred to as ...
Total Quality Management - An effective tqm program is often referred to as  ...Total Quality Management - An effective tqm program is often referred to as  ...
Total Quality Management - An effective tqm program is often referred to as ...
 
Total Quality Management - Knowledge is what to do the desire is the motivat...
Total Quality Management - Knowledge is what to do  the desire is the motivat...Total Quality Management - Knowledge is what to do  the desire is the motivat...
Total Quality Management - Knowledge is what to do the desire is the motivat...
 
Total Quality Management - Quality is judged by a) manager b) director c) gov...
Total Quality Management - Quality is judged by a) manager b) director c) gov...Total Quality Management - Quality is judged by a) manager b) director c) gov...
Total Quality Management - Quality is judged by a) manager b) director c) gov...
 
Total Quality Management - The most important consideration of an effective t...
Total Quality Management - The most important consideration of an effective t...Total Quality Management - The most important consideration of an effective t...
Total Quality Management - The most important consideration of an effective t...
 
Total Quality Management - What could be the dimension of quality a) conforma...
Total Quality Management - What could be the dimension of quality a) conforma...Total Quality Management - What could be the dimension of quality a) conforma...
Total Quality Management - What could be the dimension of quality a) conforma...
 
Total Quality Management - In total quality management, what does the ‘qualit...
Total Quality Management - In total quality management, what does the ‘qualit...Total Quality Management - In total quality management, what does the ‘qualit...
Total Quality Management - In total quality management, what does the ‘qualit...
 
Sustainable Affordable Housing
Sustainable Affordable HousingSustainable Affordable Housing
Sustainable Affordable Housing
 
Ge 6757 total quality management (tqm)
Ge 6757 total quality management (tqm) Ge 6757 total quality management (tqm)
Ge 6757 total quality management (tqm)
 
Process management - managing quality, time by applyingthe theory of constrai...
Process management - managing quality, time by applyingthe theory of constrai...Process management - managing quality, time by applyingthe theory of constrai...
Process management - managing quality, time by applyingthe theory of constrai...
 
Deloitte tax presentation (Final)
Deloitte tax presentation (Final)Deloitte tax presentation (Final)
Deloitte tax presentation (Final)
 
Bean Co.pptx
Bean Co.pptxBean Co.pptx
Bean Co.pptx
 
Arndt PPT Draft 8 (May 25)-Draft 25
Arndt PPT Draft 8 (May 25)-Draft 25Arndt PPT Draft 8 (May 25)-Draft 25
Arndt PPT Draft 8 (May 25)-Draft 25
 
Effective Contingency Management - Contractor Management Forum - PD July 2013
Effective Contingency Management - Contractor Management Forum - PD July 2013Effective Contingency Management - Contractor Management Forum - PD July 2013
Effective Contingency Management - Contractor Management Forum - PD July 2013
 
ABN AMRO_SLP Consulting
ABN AMRO_SLP ConsultingABN AMRO_SLP Consulting
ABN AMRO_SLP Consulting
 
SEAM Centre Seminar - June 2010
SEAM Centre Seminar - June 2010SEAM Centre Seminar - June 2010
SEAM Centre Seminar - June 2010
 
0610 process tech
0610 process tech0610 process tech
0610 process tech
 

Último

Último (20)

How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structure
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptxOn_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
 
Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptx
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptx
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptx
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 

weighting system BEAM(updated).pptx

  • 1. Summary of weighting system in BEAM rating system, version 2 BEAM Rating System (v, 2.0)
  • 2. 7sustainability categories, 78 indicators, with (121 points +90 Bonus= 211) points: Integrated Design And Construction Management (IDCM) 25 Points +14 Bonus Sustainable Sites (SS) 20 Points + 19 Bonus Materials and Waste (MW) 14 Points + 21 Bonus Energy Use (EU) 31 Points + 13 Bonus Water Use (WU) 12 Points + 3 Bonus Health and Wellbeing (HWB) 19 Points + 10 Bonus Innovations and Additions (IA) 0 Points + 10 Bonus BEAM Plus New Buildings version 2.0 (09.2019) 2 =121 points +90 Bonus points
  • 3. Range of Points (BEAM):  Required= 0  Credits, equal one point  1 Bonus= 1 Point Certification Levels 121 base points, four certification levels:  Platinum: 75% (90.75 points)  Gold : 65% (78.65 points)  Silver : 55% (66.55 points)  Bronze : 40% (48.40 points)
  • 4. Aggregate and Calculating Final Score Determination of Overall Grade : The final certificate grading for projects certified under BEAM is subject to the following conditions: i. Satisfying all pre-requisites; ii. Achieving overall score required; and iii. Obtaining minimum percentage (%) for each category listed below. (90.75 points) (78.65 points) (66.55 points) (48.40 points)
  • 5.  If a project can comply with all the applicable pre-requisites but cannot reach the threshold of Bronze rating, it will be graded as “Pre-requisites Achieved”. In case the project fails to demonstrate compliance with any one of the applicable pre-requisites, it will be graded as “Pre-requisite(s) Not Achieved”.  For example: If a Building take points after assessment, Cat 1. Integrated Design And Construction Management (IDCM) 20 Points from 25 Cat 2. Sustainable Sites (SS) 16 Points from 20 Cat 3. Materials and Waste (MW) 12 Points from 14 Cat 4. Energy Use (EU) 25 Points from 31 Cat 5. Water Use (WU) 10 Points from 12 Cat 6. Health and Wellbeing (HWB) 15 Points from19 Cat 7. Innovations and Additions (IA) 0 Points from 0 TOTAL 98 points Aggregate and Calculating Final Score AWARDED CERTIFICATE IS