Practice Problems: Chapter 14, Material Requirements Planning
(MRP) and ERP
Problem 1:
The Hunicut and Hallock Corporation makes two versions of the same basic file cabinet,
the TOL (Top-of-the-line) five drawer file cabinet and the HQ (High-quality) five drawer
filing cabinet.
The TOL and HQ use the same cabinet frame and locking mechanism. The drawer
assemblies are different although both use the same drawer frame assembly. The drawer
assemblies for the TOL cabinet use a sliding assembly that requires four bearings per side
whereas the HQ sliding assembly requires only two bearings per side. (These bearings are
identical for both cabinet types.) 100 TOL and 300 HQ file cabinets need to be assembled
in week #10. No current stock exists.
Develop a material structure tree for the TOL and the HQ file cabinets.
Problem 2:
Develop a gross material requirements plan for the TOL and HQ cabinets in the previous
example.
Problem 3:
Develop a net material requirements plan for the TOL and HQ file cabinets in the
previous problems assuming a current on-hand finished goods inventory of 100 TOL
cabinets. The lead times are given below.
Painting and final assembly of both HQ and TOL requires 2 weeks.
Both cabinet frames and lock assembly require 1 week for manufacturing.
Both drawer assemblies require 2 weeks for assembly.
Both sliding assemblies require 2 weeks for manufacturing.
Bearings require 2 week to arrive from the supplier.

1
Problem 4:
If the TOL file cabinet has a gross material requirements plan as shown below, no
inventory, and 2 weeks lead time is required for assembly, what are the order release
dates and lot sizes when lot sizing is determined using lot-for-lot? Use a holding cost of
$2.00 and a setup cost of $20.00, and assume no initial inventory.

Gross Material Requirements Plan
Week

1

2

3

TOL

4

50

5

6

100

7

8

9

50

10
100

Problem 5:
If the TOL file cabinet has a gross material requirements plan as shown below, no
inventory, and 2 weeks of lead time is required for assembly, what are the order release
dates and lot sizes when lot sizing is determined by EOQ (Economic Order Quantity)?
Use a holding cost of $2.00 and a setup cost of $20.00, and assume no initial inventory.

Gross Material Requirements Plan
Week
TOL

1

2

3
50

4

5
100

2

6

7
50

8

9

10
100
Problem 6:
If the TOL file cabinet has a gross materials requirements plan as shown below, no
inventory, and 2 weeks of lead time is required for assembly, what are the order release
dates and lot size when lot sizing is determined using PPB (part period balancing)? Use a
holding cost of $2.00 and a setup cost of $20,000, and no initial inventory.

Gross Material Requirements Plan
Week
TOL

1

2

3
50

4

5
100

3

6

7
50

8

9

10
100
ANSWERS
Problem 1:

Problem 2:

Gross Requirements Plan
Week

1

2

3

4

5

6

7

8

9

10

TOL

100

HQ

300

4
Problem 3:

Week
1

4

5

6

7

8

Required date

9

Lead
Time
2 weeks

300

3

10
100

2

2 weeks

TOL
Order release date
Required date
HQ
Order release date
Cabinet
frame and
lock
HQ drawer
assembly
Drawer
frame
assembly
HQ sliding
assembly

300

Required date

300

1 week

1500

2 weeks

Order release date

300

Required date
Order release date

1500

Required date

1500

2 weeks

1500

2 weeks

Order release date

1500

Required date
Order release date

1500

Required date

6000

Bearings
Order release date

6000

Receipts:
300 cabinet frames and locks in week 8
1500 HQ drawer assemblies in week 8
1500 drawer frame assemblies in week 6
1500 HQ sliding assemblies in week 6
6000 bearings in week 4

5

2 weeks
Problem 4:

Gross Material Requirements Plan
Week

1

2

TOL
Release dates
and lot sizes

3

4

5

50

100

100

50

6

7

50

8

9

50

10
100

100

Holding cost = $0
Setup cost = 4 * $20 = $80
Total cost = $80
Problem 5:
Solution using POM for Windows:
Gross Material Requirements Plan
Week

1

TOL
Release dates
and lot sizes

2

3

4

5

50
72

100

96

48

Holding cost = $280
Setup cost = 4 * $20 = $80
Total cost = $360

6

6

7

8

50

9

10
100

96
Problem 6:
Solution using POM for Windows:
Gross Material Requirements Plan
Week

1

TOL
Release dates
and lot sizes

2

3

4

5

50
50

100

100

50

Holding cost = $0
Setup cost = 4 * $20 = $80
Total cost = $80

7

6

7

8

50

9

10
100

100

Más contenido relacionado

La actualidad más candente

Donner case Operations Management
Donner case Operations ManagementDonner case Operations Management
Donner case Operations ManagementHarish B
 
Solutions manual for operations management processes and supply chains 11th e...
Solutions manual for operations management processes and supply chains 11th e...Solutions manual for operations management processes and supply chains 11th e...
Solutions manual for operations management processes and supply chains 11th e...Brown485
 
Basic EOQ Model, Quantity Discount, Economic Lot Size
Basic EOQ Model, Quantity Discount, Economic Lot SizeBasic EOQ Model, Quantity Discount, Economic Lot Size
Basic EOQ Model, Quantity Discount, Economic Lot SizePhillip Leonard Petate
 
Supply Chain Performance: The Case of World Co. Ltd
Supply Chain Performance: The Case of World Co. LtdSupply Chain Performance: The Case of World Co. Ltd
Supply Chain Performance: The Case of World Co. Ltdaliyudhi_h
 
Toyota Motor Manufacturing Inc - Case Study
Toyota Motor Manufacturing Inc - Case StudyToyota Motor Manufacturing Inc - Case Study
Toyota Motor Manufacturing Inc - Case StudyIshan Parekh
 
Solutions manual for operations management sustainability and supply chain ma...
Solutions manual for operations management sustainability and supply chain ma...Solutions manual for operations management sustainability and supply chain ma...
Solutions manual for operations management sustainability and supply chain ma...zammok
 
Solution manual for operations management processes and supply chains 10th ed...
Solution manual for operations management processes and supply chains 10th ed...Solution manual for operations management processes and supply chains 10th ed...
Solution manual for operations management processes and supply chains 10th ed...Aamir Gill
 
Mrs. fields cookies odc section c_group 9
Mrs. fields cookies odc section c_group 9Mrs. fields cookies odc section c_group 9
Mrs. fields cookies odc section c_group 9Karan Jaidka
 
Southwestern University Stadium Construction
Southwestern University Stadium ConstructionSouthwestern University Stadium Construction
Southwestern University Stadium ConstructionLayton Harding
 
Ford Motor Company HBR Case Analysis
Ford Motor Company HBR Case AnalysisFord Motor Company HBR Case Analysis
Ford Motor Company HBR Case AnalysisTony Sebastian
 
241232978 solution-manual-om-ch-12
241232978 solution-manual-om-ch-12241232978 solution-manual-om-ch-12
241232978 solution-manual-om-ch-12Hashem Yahya Almahdi
 
PROCESS,REPITATIVE,PRODUCT,MASS STRATEGY
PROCESS,REPITATIVE,PRODUCT,MASS STRATEGYPROCESS,REPITATIVE,PRODUCT,MASS STRATEGY
PROCESS,REPITATIVE,PRODUCT,MASS STRATEGYNABEEL SHAHID
 
Ranked Positional Weight Method | Management
Ranked Positional Weight Method | ManagementRanked Positional Weight Method | Management
Ranked Positional Weight Method | ManagementTransweb Global Inc
 
Bayonne packaging final ppt
Bayonne packaging final pptBayonne packaging final ppt
Bayonne packaging final pptpooja Khetwal
 
JIT case study of Toyota
JIT case study of ToyotaJIT case study of Toyota
JIT case study of Toyotaaneela yousaf
 
Barilla Spa: A case on Supply Chain Integration
Barilla Spa: A case on Supply Chain IntegrationBarilla Spa: A case on Supply Chain Integration
Barilla Spa: A case on Supply Chain IntegrationHimadri Singha
 

La actualidad más candente (20)

Donner case Operations Management
Donner case Operations ManagementDonner case Operations Management
Donner case Operations Management
 
Solutions manual for operations management processes and supply chains 11th e...
Solutions manual for operations management processes and supply chains 11th e...Solutions manual for operations management processes and supply chains 11th e...
Solutions manual for operations management processes and supply chains 11th e...
 
Line balancing and heuristics
Line balancing and heuristicsLine balancing and heuristics
Line balancing and heuristics
 
Basic EOQ Model, Quantity Discount, Economic Lot Size
Basic EOQ Model, Quantity Discount, Economic Lot SizeBasic EOQ Model, Quantity Discount, Economic Lot Size
Basic EOQ Model, Quantity Discount, Economic Lot Size
 
Supply Chain Performance: The Case of World Co. Ltd
Supply Chain Performance: The Case of World Co. LtdSupply Chain Performance: The Case of World Co. Ltd
Supply Chain Performance: The Case of World Co. Ltd
 
Toyota Motor Manufacturing Inc - Case Study
Toyota Motor Manufacturing Inc - Case StudyToyota Motor Manufacturing Inc - Case Study
Toyota Motor Manufacturing Inc - Case Study
 
Solutions manual for operations management sustainability and supply chain ma...
Solutions manual for operations management sustainability and supply chain ma...Solutions manual for operations management sustainability and supply chain ma...
Solutions manual for operations management sustainability and supply chain ma...
 
Solution manual for operations management processes and supply chains 10th ed...
Solution manual for operations management processes and supply chains 10th ed...Solution manual for operations management processes and supply chains 10th ed...
Solution manual for operations management processes and supply chains 10th ed...
 
Mrs. fields cookies odc section c_group 9
Mrs. fields cookies odc section c_group 9Mrs. fields cookies odc section c_group 9
Mrs. fields cookies odc section c_group 9
 
Southwestern University Stadium Construction
Southwestern University Stadium ConstructionSouthwestern University Stadium Construction
Southwestern University Stadium Construction
 
Ford Motor Company HBR Case Analysis
Ford Motor Company HBR Case AnalysisFord Motor Company HBR Case Analysis
Ford Motor Company HBR Case Analysis
 
241232978 solution-manual-om-ch-12
241232978 solution-manual-om-ch-12241232978 solution-manual-om-ch-12
241232978 solution-manual-om-ch-12
 
PROCESS,REPITATIVE,PRODUCT,MASS STRATEGY
PROCESS,REPITATIVE,PRODUCT,MASS STRATEGYPROCESS,REPITATIVE,PRODUCT,MASS STRATEGY
PROCESS,REPITATIVE,PRODUCT,MASS STRATEGY
 
Bayonne Packaging Inc Case Study
Bayonne Packaging Inc Case StudyBayonne Packaging Inc Case Study
Bayonne Packaging Inc Case Study
 
Ranked Positional Weight Method | Management
Ranked Positional Weight Method | ManagementRanked Positional Weight Method | Management
Ranked Positional Weight Method | Management
 
Bayonne packaging final ppt
Bayonne packaging final pptBayonne packaging final ppt
Bayonne packaging final ppt
 
JIT case study of Toyota
JIT case study of ToyotaJIT case study of Toyota
JIT case study of Toyota
 
Barilla Spa: A case on Supply Chain Integration
Barilla Spa: A case on Supply Chain IntegrationBarilla Spa: A case on Supply Chain Integration
Barilla Spa: A case on Supply Chain Integration
 
Managing Cultural Differences
Managing Cultural DifferencesManaging Cultural Differences
Managing Cultural Differences
 
Brunswick motors, inc
Brunswick motors, incBrunswick motors, inc
Brunswick motors, inc
 

Más de Taliya Hemanth

Scientific knowledge in Vedas
Scientific knowledge in VedasScientific knowledge in Vedas
Scientific knowledge in VedasTaliya Hemanth
 
Dark matter ~ Introduction
Dark matter ~ Introduction Dark matter ~ Introduction
Dark matter ~ Introduction Taliya Hemanth
 
cutting forces(static) simulation on lathe
cutting forces(static) simulation on lathecutting forces(static) simulation on lathe
cutting forces(static) simulation on latheTaliya Hemanth
 
pnuematic valve symbols
pnuematic valve symbolspnuematic valve symbols
pnuematic valve symbolsTaliya Hemanth
 
G and m_programming_for_mills_manual
G and m_programming_for_mills_manualG and m_programming_for_mills_manual
G and m_programming_for_mills_manualTaliya Hemanth
 
Ukraines conflict and_resolution
Ukraines conflict and_resolutionUkraines conflict and_resolution
Ukraines conflict and_resolutionTaliya Hemanth
 
heizer jay operations management Supp10pp
heizer jay operations management Supp10ppheizer jay operations management Supp10pp
heizer jay operations management Supp10ppTaliya Hemanth
 
heizer jay operations managementSupp07pp
 heizer jay operations managementSupp07pp heizer jay operations managementSupp07pp
heizer jay operations managementSupp07ppTaliya Hemanth
 
heizer jay operations management Mod dpp
heizer jay operations management Mod dppheizer jay operations management Mod dpp
heizer jay operations management Mod dppTaliya Hemanth
 
heizer jay operations management Mod app
 heizer jay operations management Mod app heizer jay operations management Mod app
heizer jay operations management Mod appTaliya Hemanth
 
heizer jay operations management Ch17pp
 heizer jay operations management Ch17pp heizer jay operations management Ch17pp
heizer jay operations management Ch17ppTaliya Hemanth
 

Más de Taliya Hemanth (20)

Scientific knowledge in Vedas
Scientific knowledge in VedasScientific knowledge in Vedas
Scientific knowledge in Vedas
 
Dark matter ~ Introduction
Dark matter ~ Introduction Dark matter ~ Introduction
Dark matter ~ Introduction
 
cutting forces(static) simulation on lathe
cutting forces(static) simulation on lathecutting forces(static) simulation on lathe
cutting forces(static) simulation on lathe
 
Clean room technology
Clean room technologyClean room technology
Clean room technology
 
Ch11pp
Ch11ppCh11pp
Ch11pp
 
Ch17pp
Ch17ppCh17pp
Ch17pp
 
Dmt assignment
Dmt assignmentDmt assignment
Dmt assignment
 
pnuematic valve symbols
pnuematic valve symbolspnuematic valve symbols
pnuematic valve symbols
 
Cnc milling
Cnc millingCnc milling
Cnc milling
 
Sociology of work
Sociology of work   Sociology of work
Sociology of work
 
G and m_programming_for_mills_manual
G and m_programming_for_mills_manualG and m_programming_for_mills_manual
G and m_programming_for_mills_manual
 
Ukraines conflict and_resolution
Ukraines conflict and_resolutionUkraines conflict and_resolution
Ukraines conflict and_resolution
 
heizer jay operations management Supp10pp
heizer jay operations management Supp10ppheizer jay operations management Supp10pp
heizer jay operations management Supp10pp
 
heizer jay operations managementSupp07pp
 heizer jay operations managementSupp07pp heizer jay operations managementSupp07pp
heizer jay operations managementSupp07pp
 
Mod fpp
Mod fppMod fpp
Mod fpp
 
heizer jay operations management Mod dpp
heizer jay operations management Mod dppheizer jay operations management Mod dpp
heizer jay operations management Mod dpp
 
heizer jay operations management Mod app
 heizer jay operations management Mod app heizer jay operations management Mod app
heizer jay operations management Mod app
 
heizer jay operations management Ch17pp
 heizer jay operations management Ch17pp heizer jay operations management Ch17pp
heizer jay operations management Ch17pp
 
Ch16pp
Ch16ppCh16pp
Ch16pp
 
Ch15pp
Ch15ppCh15pp
Ch15pp
 

Último

M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdftbatkhuu1
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetDenis Gagné
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 

Último (20)

M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdf
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 

heizer jay operations management Ch14pp

  • 1. Practice Problems: Chapter 14, Material Requirements Planning (MRP) and ERP Problem 1: The Hunicut and Hallock Corporation makes two versions of the same basic file cabinet, the TOL (Top-of-the-line) five drawer file cabinet and the HQ (High-quality) five drawer filing cabinet. The TOL and HQ use the same cabinet frame and locking mechanism. The drawer assemblies are different although both use the same drawer frame assembly. The drawer assemblies for the TOL cabinet use a sliding assembly that requires four bearings per side whereas the HQ sliding assembly requires only two bearings per side. (These bearings are identical for both cabinet types.) 100 TOL and 300 HQ file cabinets need to be assembled in week #10. No current stock exists. Develop a material structure tree for the TOL and the HQ file cabinets. Problem 2: Develop a gross material requirements plan for the TOL and HQ cabinets in the previous example. Problem 3: Develop a net material requirements plan for the TOL and HQ file cabinets in the previous problems assuming a current on-hand finished goods inventory of 100 TOL cabinets. The lead times are given below. Painting and final assembly of both HQ and TOL requires 2 weeks. Both cabinet frames and lock assembly require 1 week for manufacturing. Both drawer assemblies require 2 weeks for assembly. Both sliding assemblies require 2 weeks for manufacturing. Bearings require 2 week to arrive from the supplier. 1
  • 2. Problem 4: If the TOL file cabinet has a gross material requirements plan as shown below, no inventory, and 2 weeks lead time is required for assembly, what are the order release dates and lot sizes when lot sizing is determined using lot-for-lot? Use a holding cost of $2.00 and a setup cost of $20.00, and assume no initial inventory. Gross Material Requirements Plan Week 1 2 3 TOL 4 50 5 6 100 7 8 9 50 10 100 Problem 5: If the TOL file cabinet has a gross material requirements plan as shown below, no inventory, and 2 weeks of lead time is required for assembly, what are the order release dates and lot sizes when lot sizing is determined by EOQ (Economic Order Quantity)? Use a holding cost of $2.00 and a setup cost of $20.00, and assume no initial inventory. Gross Material Requirements Plan Week TOL 1 2 3 50 4 5 100 2 6 7 50 8 9 10 100
  • 3. Problem 6: If the TOL file cabinet has a gross materials requirements plan as shown below, no inventory, and 2 weeks of lead time is required for assembly, what are the order release dates and lot size when lot sizing is determined using PPB (part period balancing)? Use a holding cost of $2.00 and a setup cost of $20,000, and no initial inventory. Gross Material Requirements Plan Week TOL 1 2 3 50 4 5 100 3 6 7 50 8 9 10 100
  • 4. ANSWERS Problem 1: Problem 2: Gross Requirements Plan Week 1 2 3 4 5 6 7 8 9 10 TOL 100 HQ 300 4
  • 5. Problem 3: Week 1 4 5 6 7 8 Required date 9 Lead Time 2 weeks 300 3 10 100 2 2 weeks TOL Order release date Required date HQ Order release date Cabinet frame and lock HQ drawer assembly Drawer frame assembly HQ sliding assembly 300 Required date 300 1 week 1500 2 weeks Order release date 300 Required date Order release date 1500 Required date 1500 2 weeks 1500 2 weeks Order release date 1500 Required date Order release date 1500 Required date 6000 Bearings Order release date 6000 Receipts: 300 cabinet frames and locks in week 8 1500 HQ drawer assemblies in week 8 1500 drawer frame assemblies in week 6 1500 HQ sliding assemblies in week 6 6000 bearings in week 4 5 2 weeks
  • 6. Problem 4: Gross Material Requirements Plan Week 1 2 TOL Release dates and lot sizes 3 4 5 50 100 100 50 6 7 50 8 9 50 10 100 100 Holding cost = $0 Setup cost = 4 * $20 = $80 Total cost = $80 Problem 5: Solution using POM for Windows: Gross Material Requirements Plan Week 1 TOL Release dates and lot sizes 2 3 4 5 50 72 100 96 48 Holding cost = $280 Setup cost = 4 * $20 = $80 Total cost = $360 6 6 7 8 50 9 10 100 96
  • 7. Problem 6: Solution using POM for Windows: Gross Material Requirements Plan Week 1 TOL Release dates and lot sizes 2 3 4 5 50 50 100 100 50 Holding cost = $0 Setup cost = 4 * $20 = $80 Total cost = $80 7 6 7 8 50 9 10 100 100