Issue Revise Construction Drawing
Step 1:
This process involve LS ( Cost Consultants) review & feedback
LS/ Relevant consultants to provide brief or estimation cost
analysis. RFV must get client Approval
Estimate 10 days for LS combine all information & cost analysis
Step 2:
Step 3:
Step 4:
Allow Turner (2-3 working day) stamp & send back.
(drawing number, revision numbers & clouds with AI references
Step 5:
Allow Consultants (1-2 working days)
upload & transmit to Architect
Step 6:
Allow Consultants print out full size drawing 5 working days
CRCC to correct from consultant office every Tuesday afternoon
If Tuesday is Public Holiday, will be collect by following day
Step Description Duration
Consultants issue RFV and copy to VA/TURNER/LS 1
LS brief or estimate cost analysis and VA consent 10
2 Consultants issues AI to Contractor 2
3 Consultants releases construction drawing for Turner stamping 1
4 Turner review, stamping & send back 3
5 Consultant upload into aconex and transmit 2
6 Issue hardcopy drawing to contractors & other consultants 5
Total 24
BENEFITS:
A Ensure Client understands the estimate cost of the variation based on the cost consultant/ specialist consultant estimate of cost analysis
B Reduce EOT claim by contractor compared to less detailed of cost analysis.
C Less affected on physical works of construction.
RISK
A EOT may be claimed by contractor due to late release revised construction drawing.
B Based on estimate cost provided by specialist consultant or cost consultant, there might have cost different compared with cost submitted by the contractor.
C Consultant may not follow specify a time frame in providing cost analysis, and this will delay the release of construction drawing to the contractor.
1
Consultants Transmit
Construction Drawing
to Main-Contractor
Consultants Provide
Full Size Hardcopy
Construction Drawing
to Main-contractor
Consultants
Issues AIs/EIs to Contractors
Only approval RFV can be issues AI to
Turner Stamping & send
back to individual
Consultants Officially
issue by Transmitting
Construction Drawing
to Main-Contractor
Consultants Provide
Full Size Hardcopy
Construction Drawing
to Main-contractor
Consultants
(NRY, Wilson. VADI, ALT, Light Cibles, Belt
Collin, IHD, GDSS, CKP, KTA, MEINHARDT,
VADI and other)
Issue RFV to Cost Consultants, Turner and
Venus Assets (Client)
Consultants
Release Revised Construction Drawing for
stamping by Turner
All the changes must Clouds and indicated
the change refer to AI numbers.

Más contenido relacionado

La actualidad más candente

Development Plan Review Process
Development Plan Review ProcessDevelopment Plan Review Process
Development Plan Review Processgscplanning
 
3.1 the usage of bar chart
3.1 the usage of bar chart3.1 the usage of bar chart
3.1 the usage of bar chartNatalie Ulza
 
Quantity-Surveyor (ICI+ITD)-pdf.pdf
Quantity-Surveyor (ICI+ITD)-pdf.pdfQuantity-Surveyor (ICI+ITD)-pdf.pdf
Quantity-Surveyor (ICI+ITD)-pdf.pdfChong Yi Hui
 
2# types of estimate
2# types of estimate2# types of estimate
2# types of estimateLIJI A
 
4.1 planning schedulling
4.1 planning schedulling4.1 planning schedulling
4.1 planning schedullingNatalie Ulza
 
Qs(ici&itd)
Qs(ici&itd)Qs(ici&itd)
Qs(ici&itd)Jy Chong
 
Project management - CPA
Project management - CPA Project management - CPA
Project management - CPA Martino Ayala
 
M3 Lecture 11 provisional sum prime cost sum
M3 Lecture 11 provisional sum  prime cost sumM3 Lecture 11 provisional sum  prime cost sum
M3 Lecture 11 provisional sum prime cost sumEst
 
Broadcast Flowchart Processes and Procedure May2015
Broadcast Flowchart Processes and Procedure May2015Broadcast Flowchart Processes and Procedure May2015
Broadcast Flowchart Processes and Procedure May2015AmyLyn Bliss, MS
 
Clafis maritiem linked in
Clafis maritiem linked inClafis maritiem linked in
Clafis maritiem linked inClafis
 
Professional Practice 2: Group Assignment
Professional Practice 2: Group AssignmentProfessional Practice 2: Group Assignment
Professional Practice 2: Group Assignment마 이환
 
Quantity Surveyor presentation
Quantity Surveyor presentationQuantity Surveyor presentation
Quantity Surveyor presentationcynfang Fong
 
QUANTITY SURVEYOR magazine
QUANTITY SURVEYOR magazineQUANTITY SURVEYOR magazine
QUANTITY SURVEYOR magazineChong Chin Pin
 

La actualidad más candente (18)

Development Plan Review Process
Development Plan Review ProcessDevelopment Plan Review Process
Development Plan Review Process
 
Atc tower
Atc towerAtc tower
Atc tower
 
3.1 the usage of bar chart
3.1 the usage of bar chart3.1 the usage of bar chart
3.1 the usage of bar chart
 
Quantity-Surveyor (ICI+ITD)-pdf.pdf
Quantity-Surveyor (ICI+ITD)-pdf.pdfQuantity-Surveyor (ICI+ITD)-pdf.pdf
Quantity-Surveyor (ICI+ITD)-pdf.pdf
 
Practice notes for_quantity_surveyors_fi
Practice notes for_quantity_surveyors_fiPractice notes for_quantity_surveyors_fi
Practice notes for_quantity_surveyors_fi
 
S curves
S curvesS curves
S curves
 
2# types of estimate
2# types of estimate2# types of estimate
2# types of estimate
 
4.1 planning schedulling
4.1 planning schedulling4.1 planning schedulling
4.1 planning schedulling
 
Qs(ici&itd)
Qs(ici&itd)Qs(ici&itd)
Qs(ici&itd)
 
Project management - CPA
Project management - CPA Project management - CPA
Project management - CPA
 
M3 Lecture 11 provisional sum prime cost sum
M3 Lecture 11 provisional sum  prime cost sumM3 Lecture 11 provisional sum  prime cost sum
M3 Lecture 11 provisional sum prime cost sum
 
Broadcast Flowchart Processes and Procedure May2015
Broadcast Flowchart Processes and Procedure May2015Broadcast Flowchart Processes and Procedure May2015
Broadcast Flowchart Processes and Procedure May2015
 
Clafis maritiem linked in
Clafis maritiem linked inClafis maritiem linked in
Clafis maritiem linked in
 
Clafis Maritiem
Clafis MaritiemClafis Maritiem
Clafis Maritiem
 
Lesson in fs cpm,cpa
Lesson in fs cpm,cpaLesson in fs cpm,cpa
Lesson in fs cpm,cpa
 
Professional Practice 2: Group Assignment
Professional Practice 2: Group AssignmentProfessional Practice 2: Group Assignment
Professional Practice 2: Group Assignment
 
Quantity Surveyor presentation
Quantity Surveyor presentationQuantity Surveyor presentation
Quantity Surveyor presentation
 
QUANTITY SURVEYOR magazine
QUANTITY SURVEYOR magazineQUANTITY SURVEYOR magazine
QUANTITY SURVEYOR magazine
 

Destacado

Shweta's construction drawing sample-2
Shweta's construction drawing sample-2Shweta's construction drawing sample-2
Shweta's construction drawing sample-2Shweta Joshi
 
Architectural Drawings are Entitled to Copyright Protection
Architectural Drawings are Entitled to Copyright ProtectionArchitectural Drawings are Entitled to Copyright Protection
Architectural Drawings are Entitled to Copyright ProtectionPatton Boggs LLP
 
Construction drawing
Construction drawingConstruction drawing
Construction drawingLin Yan
 
Architectural drawing
Architectural drawingArchitectural drawing
Architectural drawingLwj Welson
 
Integrated Project Slides
Integrated Project SlidesIntegrated Project Slides
Integrated Project SlidesJunXiang97
 
Architectural working drawings (1)
Architectural working drawings (1)Architectural working drawings (1)
Architectural working drawings (1)Ricardo Torres
 
Inrto to Architectural Drawing and Graphics I
Inrto to Architectural Drawing and Graphics IInrto to Architectural Drawing and Graphics I
Inrto to Architectural Drawing and Graphics Iindiracad
 
Architectural Drawings - The language of architectural design
Architectural Drawings - The language of architectural designArchitectural Drawings - The language of architectural design
Architectural Drawings - The language of architectural designGalala University
 
Architectural Working Drawings - الرسومات التنفيذية المعمارية
Architectural Working Drawings - الرسومات التنفيذية المعماريةArchitectural Working Drawings - الرسومات التنفيذية المعمارية
Architectural Working Drawings - الرسومات التنفيذية المعماريةGalala University
 
Architectural construction drawings on revit
Architectural construction drawings on revitArchitectural construction drawings on revit
Architectural construction drawings on revitBimSrv
 
Architectural drawings
Architectural drawingsArchitectural drawings
Architectural drawingsSomnath Bhui
 
Architecture drawing presentation
Architecture drawing presentationArchitecture drawing presentation
Architecture drawing presentationCarlson Ko
 
Architectural Drawings & Photos
Architectural Drawings & PhotosArchitectural Drawings & Photos
Architectural Drawings & PhotosJami Bantry
 

Destacado (15)

Shweta's construction drawing sample-2
Shweta's construction drawing sample-2Shweta's construction drawing sample-2
Shweta's construction drawing sample-2
 
Architectural Drawings are Entitled to Copyright Protection
Architectural Drawings are Entitled to Copyright ProtectionArchitectural Drawings are Entitled to Copyright Protection
Architectural Drawings are Entitled to Copyright Protection
 
Construction drawing
Construction drawingConstruction drawing
Construction drawing
 
working drawings
working drawingsworking drawings
working drawings
 
Architectural drawing
Architectural drawingArchitectural drawing
Architectural drawing
 
Integrated Project Slides
Integrated Project SlidesIntegrated Project Slides
Integrated Project Slides
 
Architectural working drawings (1)
Architectural working drawings (1)Architectural working drawings (1)
Architectural working drawings (1)
 
Inrto to Architectural Drawing and Graphics I
Inrto to Architectural Drawing and Graphics IInrto to Architectural Drawing and Graphics I
Inrto to Architectural Drawing and Graphics I
 
Architectural Drawings - The language of architectural design
Architectural Drawings - The language of architectural designArchitectural Drawings - The language of architectural design
Architectural Drawings - The language of architectural design
 
types of drawing
types of drawingtypes of drawing
types of drawing
 
Architectural Working Drawings - الرسومات التنفيذية المعمارية
Architectural Working Drawings - الرسومات التنفيذية المعماريةArchitectural Working Drawings - الرسومات التنفيذية المعمارية
Architectural Working Drawings - الرسومات التنفيذية المعمارية
 
Architectural construction drawings on revit
Architectural construction drawings on revitArchitectural construction drawings on revit
Architectural construction drawings on revit
 
Architectural drawings
Architectural drawingsArchitectural drawings
Architectural drawings
 
Architecture drawing presentation
Architecture drawing presentationArchitecture drawing presentation
Architecture drawing presentation
 
Architectural Drawings & Photos
Architectural Drawings & PhotosArchitectural Drawings & Photos
Architectural Drawings & Photos
 

Similar a Revised Construction Drawing Flow Chart_2016_01_11

TD PM Process Map rev1 07.02.09
TD PM Process Map rev1 07.02.09TD PM Process Map rev1 07.02.09
TD PM Process Map rev1 07.02.093MikeRyan
 
Construction Administration Seminar
Construction Administration Seminar Construction Administration Seminar
Construction Administration Seminar jenkinswilliamc
 
Project 1 ICI & ITD Presentation
Project 1 ICI & ITD PresentationProject 1 ICI & ITD Presentation
Project 1 ICI & ITD PresentationAfiqah Zariful
 
Ici and itd project 1
Ici and itd project 1Ici and itd project 1
Ici and itd project 1KhangWei Chin
 
2010 uci douglas hospital team platinum award by bdc
2010 uci douglas hospital team platinum award by bdc2010 uci douglas hospital team platinum award by bdc
2010 uci douglas hospital team platinum award by bdcAvi Grigorescu
 
Contract payment and variation
Contract payment and variationContract payment and variation
Contract payment and variationVj NiroSh
 
professional services and value engeneering
professional services and value engeneeringprofessional services and value engeneering
professional services and value engeneeringAbdo Jamous El Jamous
 
PP1 Project 1 Project implementation
PP1 Project 1 Project implementationPP1 Project 1 Project implementation
PP1 Project 1 Project implementationTeo Kean Hui
 
Your Renovation Project 2014
Your Renovation Project 2014Your Renovation Project 2014
Your Renovation Project 2014gcexpediting
 
7 Design Phases in Architectural Design Process
7 Design Phases in Architectural Design Process7 Design Phases in Architectural Design Process
7 Design Phases in Architectural Design Processarananeust
 
Constructability-Review-Guideline.pdf
Constructability-Review-Guideline.pdfConstructability-Review-Guideline.pdf
Constructability-Review-Guideline.pdfssuserfa0e691
 
Project Phase, Project Teams & Construction Phase.pdf
Project Phase, Project Teams & Construction Phase.pdfProject Phase, Project Teams & Construction Phase.pdf
Project Phase, Project Teams & Construction Phase.pdfMOHDFIRRDHAUSBINMOHD
 
Pmp t09 project_execution_plan_rev_a
Pmp t09 project_execution_plan_rev_aPmp t09 project_execution_plan_rev_a
Pmp t09 project_execution_plan_rev_aForbes Chanakira
 

Similar a Revised Construction Drawing Flow Chart_2016_01_11 (20)

TD PM Process Map rev1 07.02.09
TD PM Process Map rev1 07.02.09TD PM Process Map rev1 07.02.09
TD PM Process Map rev1 07.02.09
 
Construction Administration Seminar
Construction Administration Seminar Construction Administration Seminar
Construction Administration Seminar
 
Project 1 ICI & ITD Presentation
Project 1 ICI & ITD PresentationProject 1 ICI & ITD Presentation
Project 1 ICI & ITD Presentation
 
Ici and itd project 1
Ici and itd project 1Ici and itd project 1
Ici and itd project 1
 
2010 uci douglas hospital team platinum award by bdc
2010 uci douglas hospital team platinum award by bdc2010 uci douglas hospital team platinum award by bdc
2010 uci douglas hospital team platinum award by bdc
 
Contract payment and variation
Contract payment and variationContract payment and variation
Contract payment and variation
 
Kandil_Sameh_CPMPart 4 _b
Kandil_Sameh_CPMPart 4 _bKandil_Sameh_CPMPart 4 _b
Kandil_Sameh_CPMPart 4 _b
 
Ici & itd pj1
Ici & itd pj1Ici & itd pj1
Ici & itd pj1
 
professional services and value engeneering
professional services and value engeneeringprofessional services and value engeneering
professional services and value engeneering
 
PP1 Project 1 Project implementation
PP1 Project 1 Project implementationPP1 Project 1 Project implementation
PP1 Project 1 Project implementation
 
Your Renovation Project 2014
Your Renovation Project 2014Your Renovation Project 2014
Your Renovation Project 2014
 
7 Design Phases in Architectural Design Process
7 Design Phases in Architectural Design Process7 Design Phases in Architectural Design Process
7 Design Phases in Architectural Design Process
 
Constructability-Review-Guideline.pdf
Constructability-Review-Guideline.pdfConstructability-Review-Guideline.pdf
Constructability-Review-Guideline.pdf
 
Project Phase, Project Teams & Construction Phase.pdf
Project Phase, Project Teams & Construction Phase.pdfProject Phase, Project Teams & Construction Phase.pdf
Project Phase, Project Teams & Construction Phase.pdf
 
Qsx
QsxQsx
Qsx
 
Qs(ici&itd)
Qs(ici&itd)Qs(ici&itd)
Qs(ici&itd)
 
Ici pj1
Ici pj1Ici pj1
Ici pj1
 
JAN 2015 CV
JAN 2015 CVJAN 2015 CV
JAN 2015 CV
 
Pmp t09 project_execution_plan_rev_a
Pmp t09 project_execution_plan_rev_aPmp t09 project_execution_plan_rev_a
Pmp t09 project_execution_plan_rev_a
 
Quality application
Quality applicationQuality application
Quality application
 

Revised Construction Drawing Flow Chart_2016_01_11

  • 1. Issue Revise Construction Drawing Step 1: This process involve LS ( Cost Consultants) review & feedback LS/ Relevant consultants to provide brief or estimation cost analysis. RFV must get client Approval Estimate 10 days for LS combine all information & cost analysis Step 2: Step 3: Step 4: Allow Turner (2-3 working day) stamp & send back. (drawing number, revision numbers & clouds with AI references Step 5: Allow Consultants (1-2 working days) upload & transmit to Architect Step 6: Allow Consultants print out full size drawing 5 working days CRCC to correct from consultant office every Tuesday afternoon If Tuesday is Public Holiday, will be collect by following day Step Description Duration Consultants issue RFV and copy to VA/TURNER/LS 1 LS brief or estimate cost analysis and VA consent 10 2 Consultants issues AI to Contractor 2 3 Consultants releases construction drawing for Turner stamping 1 4 Turner review, stamping & send back 3 5 Consultant upload into aconex and transmit 2 6 Issue hardcopy drawing to contractors & other consultants 5 Total 24 BENEFITS: A Ensure Client understands the estimate cost of the variation based on the cost consultant/ specialist consultant estimate of cost analysis B Reduce EOT claim by contractor compared to less detailed of cost analysis. C Less affected on physical works of construction. RISK A EOT may be claimed by contractor due to late release revised construction drawing. B Based on estimate cost provided by specialist consultant or cost consultant, there might have cost different compared with cost submitted by the contractor. C Consultant may not follow specify a time frame in providing cost analysis, and this will delay the release of construction drawing to the contractor. 1 Consultants Transmit Construction Drawing to Main-Contractor Consultants Provide Full Size Hardcopy Construction Drawing to Main-contractor Consultants Issues AIs/EIs to Contractors Only approval RFV can be issues AI to Turner Stamping & send back to individual Consultants Officially issue by Transmitting Construction Drawing to Main-Contractor Consultants Provide Full Size Hardcopy Construction Drawing to Main-contractor Consultants (NRY, Wilson. VADI, ALT, Light Cibles, Belt Collin, IHD, GDSS, CKP, KTA, MEINHARDT, VADI and other) Issue RFV to Cost Consultants, Turner and Venus Assets (Client) Consultants Release Revised Construction Drawing for stamping by Turner All the changes must Clouds and indicated the change refer to AI numbers.