1. Dogus Insaat
has preferred
Teknik-El formwork
systems
for
Boyabat Dam
Construction
2. Teknik-El has provided heavy duty climbing
formwork systems and shoring systems for
Boyabat dam and Hydropower Plant
construction.
The production has been continued 3 months
and materials have been loaded into 42
trucks.
• Formwork and Shoring Systems for Intake
Structure
• Bridge leverage formwork systems for
Penstock section
• Specially designed steel bridge
For further information about Boyabat Dam project please click here.
12. For further information about Tek-Group please take a look on
our online catalogues and do not hesitate to contact us
• Tek Group Catalogues homepage
http://www.slideshare.net/teknikel
• Teknik-El Product Catalogue:
Formwork, Scaffolding, Shoring Systems & accessories:
http://www.slideshare.net/teknikel/teknikel-formwork-systems
• Tek-Galvaniz Product Catalogue:
Hot dip Galvanizing, Lighting poles, Floodlight poles, high masts, flag poles:
http://www.slideshare.net/teknikel/tek-galvaniz-product-catalogue
Kindest Regards,
Cemile Oruç
International Business Development Specialist
E-mail: export@tek-galvaniz.com.tr
Tel: +90 232 853 84 00
Fax: +90 232 853 84 02
www.teknik-el.com