Two Types of Problem-Solving Models
There are two kinds of models for conducting enterprise-wide or company-specific
problem-solving methods.
In the first model, the company's management is charged with identifying the problems
of the company, and the management or its consultants apply the solutions to that
problem. The only remaining problem is: how to train the workers to do what they
don't know how to do?
The second model is more participatory than the former model. In this model, workers
are trained to find, identify, and quantify problems. The workforce helps devise cost-
effective solutions to the problems they uncover and, in the process, develop critical-
thinking and problem-soling skills.
The Participative Model & CEDAC
Are you looking for a participative problem-solving methodology to:
Identify root causes of production-related quality and related process problems?
Engage the workforce in helping to identify these problems and propose effective
counter-measures?
Capture the expertise of highly experienced personnel in a manner that produces
standardized methods and consistent practices that less-experienced personnel
can follow?
One mechanism that can help accomplish these needs is
CEDAC – Cause & Effect Diagram with the Addition of
Cards. The purpose of the CEDAC system is to reduce the
number of manufacturing defects through continuous
improvements by enabling people to make use of their
accumulated knowledge and experience. The system is a
tool to register and overcome defects, shortcomings,
problems, and suggestions found in production by
involving the employees in solving the problems.
CEDAC distinguishes itself in the broad array of problem-
solving methods in that it is a participatory problem-solving tool, rather than a delegated
problem-solving method. CEDAC may certainly be the most appropriate tool to bridge
some of the performance, communication, and quality gaps a company is experiencing.
CEDAC Board 1
1
(c) 1996, 2003 Performance Technology Group
Nashville TN www.performancetechnology.com
Welcome to CEDAC LearningWelcome to CEDAC Learning
Cause-and-Effect Diagram
with the Addition of Cards
© 1996, 2003
All rights reserved.
2
(c) 1996, 2003 Performance Technology Group
Purpose of CEDACPurpose of CEDAC
• Provide a tool for continuous systematic
improvement.
• To help identify causes of specific problems
and to identify, test, and institute process
improvements.
3
(c) 1996, 2003 Performance Technology Group
History of CEDACHistory of CEDAC
• Developed in the mid-1970’s by Dr. Ryuji
Fukuda for Sumitomo Electric.
• From 1976-1979, 350 CEDAC projects
were initiated by Sumitomo Electric;
results exceeded all expectations.
• Used today by numerous companies,
including Weyerhaeuser, Pratt &
Whitney, Allied Signal, Timken, Newell-
Rubbermaid, GM of Canada, & many
other companies worldwide.
4
(c) 1996, 2003 Performance Technology Group
AcknowledgmentsAcknowledgments
• Content of this course is based on the book:
CEDAC: A Tool for Continuous Systematic
Improvement, published by Productivity
Press, Portland, Oregon.
• CEDAC® is a registered trademark of
Productivity, Inc. We are using the term
CEDAC as an acronym for Dr. Fuduka's
"cause-and-effect diagram with the addition of
cards" methodology as described in the book.
5
(c) 1996, 2003 Performance Technology Group
Why Are We Doing This?Why Are We Doing This?
• To provide you with a tool for identifying and
solving problems.
• To teach you the skills required to implement
the CEDAC method.
• To initiate a team-based, systematic problem-
solving approach for the company.
6
(c) 1996, 2003 Performance Technology Group
What Will You Learn to Do?What Will You Learn to Do?
– Define the following terms used in
the CEDAC method:
• CAUSE vs. EFFECT
• PROBLEM-EFFECT STATEMENT
• TARGET-EFFECT STATEMENT
• FACT STATEMENT
• IMPROVEMENT STATEMENT
– Identify the components (sections) of
the CEDAC board.
– Write PROBLEM-EFFECT &
TARGET-EFFECT statements.
– Write FACT and IMPROVEMENT
statements.
7
(c) 1996, 2003 Performance Technology Group
An Overview of CEDACAn Overview of CEDAC
• CEDAC is short for “Cause-and-
Effect Diagram with the Addition of
Cards.”
• Helps you systematically collect,
analyze, and integrate information
on quality and productivity
problems.
• Brings problem-solving to the "front
lines," involving employees and
management.
8
(c) 1996, 2003 Performance Technology Group
Overview of CEDAC (contOverview of CEDAC (cont’’d)d)
• Can be applied to a variety of situations:
– Product quality; returns and allowances
– Customer complaints
– Design problems
– Rework
– Poor communications
– Setup problems
– Downtime problems
9
(c) 1996, 2003 Performance Technology Group
SAMPLE CEDAC BOARDSAMPLE CEDAC BOARD
CORRECT
PARTS OTHER
PLANNING QUALITY SHIPPING
FACTS IMPROVEMENTS
NEW STANDARDS
PROBLEM EFFECT:
97
96
95
94
93
92
91
90
In the past year, missed shipments have
increased to an average 10%.
Start
TARGET
Weeks
TARGET EFFECT:
Increase shipping promises kept from
90% to 97% over the next four months
using monthly production report.
CORE GROUP MEMBERS
Jim, Harry, Floyd, Charlie
PROJECT LEADER JM R
START DATE 5-22-02 TARGET DATE 9-22-02

Más contenido relacionado

La actualidad más candente

Lean Strategy Implementation Methodology.
Lean Strategy Implementation Methodology.Lean Strategy Implementation Methodology.
Lean Strategy Implementation Methodology.
Yadhu Gopinath
 

La actualidad más candente (20)

Failure Mode & Effects Analysis (FMEA)
Failure Mode & Effects Analysis (FMEA)Failure Mode & Effects Analysis (FMEA)
Failure Mode & Effects Analysis (FMEA)
 
Operational-Excellence
Operational-ExcellenceOperational-Excellence
Operational-Excellence
 
How to Introduce Operational Excellence in your Organisation?
How to Introduce Operational Excellence in your Organisation?How to Introduce Operational Excellence in your Organisation?
How to Introduce Operational Excellence in your Organisation?
 
Lean Strategy Implementation Methodology.
Lean Strategy Implementation Methodology.Lean Strategy Implementation Methodology.
Lean Strategy Implementation Methodology.
 
POKA-YOKE - A Lean Strategy to Mistake Proofing
POKA-YOKE - A Lean Strategy to Mistake ProofingPOKA-YOKE - A Lean Strategy to Mistake Proofing
POKA-YOKE - A Lean Strategy to Mistake Proofing
 
Value stream mapping training
Value stream mapping trainingValue stream mapping training
Value stream mapping training
 
Poka yoke
Poka yokePoka yoke
Poka yoke
 
Projects Performance Analysis & Forecasting
Projects Performance Analysis & Forecasting Projects Performance Analysis & Forecasting
Projects Performance Analysis & Forecasting
 
Design & Process FMEA Manual
Design & Process FMEA ManualDesign & Process FMEA Manual
Design & Process FMEA Manual
 
Lean Office by Operational Excellence Consulting
Lean Office by Operational Excellence ConsultingLean Office by Operational Excellence Consulting
Lean Office by Operational Excellence Consulting
 
Mistake proofing smpl_1
Mistake proofing smpl_1Mistake proofing smpl_1
Mistake proofing smpl_1
 
CTQ Matrix
CTQ MatrixCTQ Matrix
CTQ Matrix
 
Business Process Improvement
Business Process ImprovementBusiness Process Improvement
Business Process Improvement
 
Lean thinking
Lean thinkingLean thinking
Lean thinking
 
Fmea handout
Fmea handoutFmea handout
Fmea handout
 
6 s visual management
6 s  visual management6 s  visual management
6 s visual management
 
Process improvement presentation
Process improvement presentationProcess improvement presentation
Process improvement presentation
 
The Funny Side of Project Management
The Funny Side of Project ManagementThe Funny Side of Project Management
The Funny Side of Project Management
 
The role of the project manager
The role of the project managerThe role of the project manager
The role of the project manager
 
Kaizen Poster
Kaizen PosterKaizen Poster
Kaizen Poster
 

Similar a Cedac ptg

1Grand Canyon UniversityInstructor Name MIS-652 Busines
1Grand Canyon UniversityInstructor Name MIS-652 Busines1Grand Canyon UniversityInstructor Name MIS-652 Busines
1Grand Canyon UniversityInstructor Name MIS-652 Busines
EttaBenton28
 
Ms – 05 management of machines and materials
Ms – 05 management of machines and materialsMs – 05 management of machines and materials
Ms – 05 management of machines and materials
smumbahelp
 
5 Steps of Problem Solving
5 Steps of Problem Solving5 Steps of Problem Solving
5 Steps of Problem Solving
Operational Excellence Consulting
 
PDCA Problem Solving Process & Tools
PDCA Problem Solving Process & ToolsPDCA Problem Solving Process & Tools
PDCA Problem Solving Process & Tools
Operational Excellence Consulting
 
Leveraging the 7Stones Framework
Leveraging the 7Stones FrameworkLeveraging the 7Stones Framework
Leveraging the 7Stones Framework
Bryan LeBlanc
 
Qm0013 quality management tools
Qm0013  quality management toolsQm0013  quality management tools
Qm0013 quality management tools
smumbahelp
 

Similar a Cedac ptg (20)

6.1 presentation 606
6.1 presentation 6066.1 presentation 606
6.1 presentation 606
 
Quality Engineering material
Quality Engineering materialQuality Engineering material
Quality Engineering material
 
Qm0022 tqm tools and techniques
Qm0022 tqm tools and techniquesQm0022 tqm tools and techniques
Qm0022 tqm tools and techniques
 
Using the DMAIC Process for SEO Projects
Using the DMAIC Process for SEO ProjectsUsing the DMAIC Process for SEO Projects
Using the DMAIC Process for SEO Projects
 
SSCG 8D Problem Solving
SSCG 8D Problem SolvingSSCG 8D Problem Solving
SSCG 8D Problem Solving
 
Using the DMAIC Process for SEO Projects
Using the DMAIC Process for SEO ProjectsUsing the DMAIC Process for SEO Projects
Using the DMAIC Process for SEO Projects
 
Project delivery standardization framework innovate vancouver
Project delivery standardization framework  innovate vancouverProject delivery standardization framework  innovate vancouver
Project delivery standardization framework innovate vancouver
 
1Grand Canyon UniversityInstructor Name MIS-652 Busines
1Grand Canyon UniversityInstructor Name MIS-652 Busines1Grand Canyon UniversityInstructor Name MIS-652 Busines
1Grand Canyon UniversityInstructor Name MIS-652 Busines
 
Profolio
ProfolioProfolio
Profolio
 
Ms – 05 management of machines and materials
Ms – 05 management of machines and materialsMs – 05 management of machines and materials
Ms – 05 management of machines and materials
 
FinalPoster_V11
FinalPoster_V11FinalPoster_V11
FinalPoster_V11
 
5 Steps of Problem Solving
5 Steps of Problem Solving5 Steps of Problem Solving
5 Steps of Problem Solving
 
PDCA Problem Solving Process & Tools
PDCA Problem Solving Process & ToolsPDCA Problem Solving Process & Tools
PDCA Problem Solving Process & Tools
 
8D Problem Solving Approach
8D Problem Solving Approach8D Problem Solving Approach
8D Problem Solving Approach
 
How to solve problems (or at least try) with 8D
How to solve problems (or at least try) with 8DHow to solve problems (or at least try) with 8D
How to solve problems (or at least try) with 8D
 
Leveraging the 7Stones Framework
Leveraging the 7Stones FrameworkLeveraging the 7Stones Framework
Leveraging the 7Stones Framework
 
Root cause analysis training
Root cause analysis trainingRoot cause analysis training
Root cause analysis training
 
6 SIGMA AND KAIZEN
6 SIGMA AND KAIZEN6 SIGMA AND KAIZEN
6 SIGMA AND KAIZEN
 
Qm0013 quality management tools
Qm0013  quality management toolsQm0013  quality management tools
Qm0013 quality management tools
 
Qm0013 quality management tools
Qm0013  quality management toolsQm0013  quality management tools
Qm0013 quality management tools
 

Cedac ptg

  • 1. Two Types of Problem-Solving Models There are two kinds of models for conducting enterprise-wide or company-specific problem-solving methods. In the first model, the company's management is charged with identifying the problems of the company, and the management or its consultants apply the solutions to that problem. The only remaining problem is: how to train the workers to do what they don't know how to do? The second model is more participatory than the former model. In this model, workers are trained to find, identify, and quantify problems. The workforce helps devise cost- effective solutions to the problems they uncover and, in the process, develop critical- thinking and problem-soling skills. The Participative Model & CEDAC Are you looking for a participative problem-solving methodology to: Identify root causes of production-related quality and related process problems? Engage the workforce in helping to identify these problems and propose effective counter-measures? Capture the expertise of highly experienced personnel in a manner that produces standardized methods and consistent practices that less-experienced personnel can follow? One mechanism that can help accomplish these needs is CEDAC – Cause & Effect Diagram with the Addition of Cards. The purpose of the CEDAC system is to reduce the number of manufacturing defects through continuous improvements by enabling people to make use of their accumulated knowledge and experience. The system is a tool to register and overcome defects, shortcomings, problems, and suggestions found in production by involving the employees in solving the problems. CEDAC distinguishes itself in the broad array of problem- solving methods in that it is a participatory problem-solving tool, rather than a delegated problem-solving method. CEDAC may certainly be the most appropriate tool to bridge some of the performance, communication, and quality gaps a company is experiencing. CEDAC Board 1
  • 2. 1 (c) 1996, 2003 Performance Technology Group Nashville TN www.performancetechnology.com Welcome to CEDAC LearningWelcome to CEDAC Learning Cause-and-Effect Diagram with the Addition of Cards © 1996, 2003 All rights reserved.
  • 3. 2 (c) 1996, 2003 Performance Technology Group Purpose of CEDACPurpose of CEDAC • Provide a tool for continuous systematic improvement. • To help identify causes of specific problems and to identify, test, and institute process improvements.
  • 4. 3 (c) 1996, 2003 Performance Technology Group History of CEDACHistory of CEDAC • Developed in the mid-1970’s by Dr. Ryuji Fukuda for Sumitomo Electric. • From 1976-1979, 350 CEDAC projects were initiated by Sumitomo Electric; results exceeded all expectations. • Used today by numerous companies, including Weyerhaeuser, Pratt & Whitney, Allied Signal, Timken, Newell- Rubbermaid, GM of Canada, & many other companies worldwide.
  • 5. 4 (c) 1996, 2003 Performance Technology Group AcknowledgmentsAcknowledgments • Content of this course is based on the book: CEDAC: A Tool for Continuous Systematic Improvement, published by Productivity Press, Portland, Oregon. • CEDAC® is a registered trademark of Productivity, Inc. We are using the term CEDAC as an acronym for Dr. Fuduka's "cause-and-effect diagram with the addition of cards" methodology as described in the book.
  • 6. 5 (c) 1996, 2003 Performance Technology Group Why Are We Doing This?Why Are We Doing This? • To provide you with a tool for identifying and solving problems. • To teach you the skills required to implement the CEDAC method. • To initiate a team-based, systematic problem- solving approach for the company.
  • 7. 6 (c) 1996, 2003 Performance Technology Group What Will You Learn to Do?What Will You Learn to Do? – Define the following terms used in the CEDAC method: • CAUSE vs. EFFECT • PROBLEM-EFFECT STATEMENT • TARGET-EFFECT STATEMENT • FACT STATEMENT • IMPROVEMENT STATEMENT – Identify the components (sections) of the CEDAC board. – Write PROBLEM-EFFECT & TARGET-EFFECT statements. – Write FACT and IMPROVEMENT statements.
  • 8. 7 (c) 1996, 2003 Performance Technology Group An Overview of CEDACAn Overview of CEDAC • CEDAC is short for “Cause-and- Effect Diagram with the Addition of Cards.” • Helps you systematically collect, analyze, and integrate information on quality and productivity problems. • Brings problem-solving to the "front lines," involving employees and management.
  • 9. 8 (c) 1996, 2003 Performance Technology Group Overview of CEDAC (contOverview of CEDAC (cont’’d)d) • Can be applied to a variety of situations: – Product quality; returns and allowances – Customer complaints – Design problems – Rework – Poor communications – Setup problems – Downtime problems
  • 10. 9 (c) 1996, 2003 Performance Technology Group SAMPLE CEDAC BOARDSAMPLE CEDAC BOARD CORRECT PARTS OTHER PLANNING QUALITY SHIPPING FACTS IMPROVEMENTS NEW STANDARDS PROBLEM EFFECT: 97 96 95 94 93 92 91 90 In the past year, missed shipments have increased to an average 10%. Start TARGET Weeks TARGET EFFECT: Increase shipping promises kept from 90% to 97% over the next four months using monthly production report. CORE GROUP MEMBERS Jim, Harry, Floyd, Charlie PROJECT LEADER JM R START DATE 5-22-02 TARGET DATE 9-22-02